{
 "answer": "In the City of Airdrie, Alberta, building permit rules are set by Safety Codes Permit Bylaw B-45/2023 and 1 other bylaw, verified 2026-09-27. Permit fees: $10 per $1,000 (2025) / $10.17 per $1,000 (2026) of construction cost; minimum $135. Fines: Second offence $477/$485; Third offence $691/$703; starting construction without permit 100% of permit fee.",
 "municipality_id": "gx-000163",
 "municipality": "Airdrie",
 "status_type": "City",
 "jurisdiction": "Alberta",
 "country": "CA",
 "topic": "building_permits",
 "label": "Building permits",
 "status": "found",
 "last_verified": "2026-09-27",
 "official_website": "http://www.airdrie.ca",
 "documents": [
  {
   "primary": true,
   "is_official": true,
   "title": "Safety Codes Permit Bylaw B-45/2023",
   "category": "building_permits",
   "document_type": "bylaw",
   "status": "adopted",
   "adopted_date": "2023-12-18",
   "document_url": "https://www.airdrie.ca/getLink.cfm?ID=11534",
   "summary": "Requires a valid permit before starting any building, HVAC, electrical, gas or plumbing undertaking under the Safety Codes Act; sets application, issuance, transfer, extension, re-instatement and offence rules. Permit fees are set in the separate User Fees and Charges Bylaw. Repealed and replaced B-30/2008; in force Jan 1, 2024.",
   "discovered_by": "ab-building",
   "discovered_at": "2026-09-24",
   "capture_sha256": "c0988ae52104f01afc02a960eeb7d4d0dadaf2731b80d72afba42966c84591ba",
   "captured_at": "2026-09-25T01:52:39+00:00",
   "capture_http_status": 200,
   "document_number": "B-45/2023",
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/c0988ae52104f01afc02a960eeb7d4d0dadaf2731b80d72afba42966c84591ba.pdf",
   "link_dead": false,
   "transcript_url": "/ca/ab/airdrie/building-permits/bylaw-b-45-2023/",
   "transcript_quality": "exact"
  },
  {
   "primary": true,
   "is_official": true,
   "title": "User Fees and Charges Bylaw B-41/2023 (Consolidation to July 4, 2025)",
   "category": "building_permits",
   "document_type": "bylaw",
   "status": "adopted",
   "adopted_date": "2023-11-20",
   "document_url": "https://www.airdrie.ca/getLink.cfm?ID=11555",
   "summary": "Sets the actual building/safety-codes permit fee amounts referenced by the Safety Codes Permit Bylaw B-45/2023: residential permit fees by house size, commercial permit fees per $1,000 construction cost, extension, re-inspection, and occupancy-related fees.",
   "discovered_by": "ab-building",
   "discovered_at": "2026-09-24",
   "capture_sha256": "bc786a1d2379d6910a9d5b07fb86a132dd8772291445b5807b115b6eca6908a3",
   "captured_at": "2026-09-25T01:52:39+00:00",
   "capture_http_status": 200,
   "document_number": "B-41/2023",
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/bc786a1d2379d6910a9d5b07fb86a132dd8772291445b5807b115b6eca6908a3.pdf",
   "link_dead": false,
   "facts": {
    "fee_basis": "$10 per $1,000 (2025) / $10.17 per $1,000 (2026) of construction cost; minimum $135",
    "fine_range": "Second offence $477/$485; Third offence $691/$703; starting construction without permit 100% of permit fee"
   },
   "fact_citations": {
    "fee_basis": "Schedule \"A\", lines 7.1.1.11, 7.2.1.1",
    "fine_range": "Schedule \"A\", lines 7.2.6.2, 7.2.6.4, 7.2.6.5"
   },
   "transcript_url": "/ca/ab/airdrie/building-permits/bylaw-b-41-2023/",
   "transcript_quality": "exact"
  }
 ],
 "source": "https://govanswers.org/ca/ab/airdrie/building-permits/"
}