West Industrial Area Structure Plan Bylaw 856-P-07-22
June 26, 2023
BYLAW 875-P-06-23
TOWN OF COALDALE
PROVINCE OF ALBERTA
BEING A BYLAW OF THE TOWN OF COALDALE
TO AMEND BYLAW 844-P-03-22,
BEING THE WEST INDUSTRIAL AREA STRUCTURE PLAN
WHEREAS the municipal council is in receipt of an application to amend the West
Industrial Area Structure Plan (Bylaw 844-P-03-22) within the municipality.
AND WHEREAS the purpose of the proposed amendment is to incorporate a portion of
land, legally described as Lot 4, Block 1, Plan 181 1388, into the West Industrial Area
Structure Plan, as shown in Schedule A.
AND WHEREAS all changes to the ASP as generally described are identified specifically
in "Schedule A" attached hereto.
AND WHEREAS the municipality must prepare an amending bylaw and provide for its
consideration at a public hearing.
NOW THEREFORE, under the authority and subject to the provisions of the Municipal
Government Act, Revised Statutes of Alberta 2000, Chapter M-26, the Council of the
Town of Coaldale, in the Province of Alberta, duly assembled does hereby enact the
following:
1.
The West Industrial Area Structure Plan amendments referenced above and
identified specifically in "Schedule A" shall make up the amended West Coaldale
Area Structure Plan.
2.
Bylaw 512-P-04-03, being the West Coaldale Area Structure Plan, is hereby
amended.
3.
This bylaw comes into effect upon third and final reading hereof.
READ a FIRST time this 26h day of June, 2023 for West Industrial Area Structure Plan
Bylaw 875-P-06-23.
____________________________
____________________________
Mayor - Jack Van Rijn
CAO - Kalen Hastings
Motion: 226-2023
Page 2 of 2
Town of Coaldale
West Industrial Area Structure Plan Bylaw 856-P-07-22
June 26, 2023
READ a SECOND time this ___day of _______________, 2023 for West Industrial Area
Structure Plan Bylaw 875-P-06-23.
____________________________
____________________________
Mayor - Jack Van Rijn
CAO - Kalen Hastings
Motion #
READ a THIRD and FINAL time this ___ day of ________, 2023 for West Industrial
Area Structure Plan Bylaw 875-P-06-23.
____________________________
____________________________
Mayor - Jack Van Rijn
CAO - Kalen Hastings
Motion #
West Industrial Area Structure Plan
Bylaw No. 844-P-03-22
May 2022
Amended to Bylaw No.________
Current as of June 2023
PREPARED BY:
ISL Engineering and Land Services Ltd.
PREPARED FOR:
Town of Coaldale
PREPARED ON BEHALF OF:
845 Developments Ltd.
Town of Coaldale, Planning and Development
IN CONSULTATION WITH:
Talbera International Technologies Ltd.
BYLAW 875-P-06-23
SCHEDULE A
Town of Coaldale
West Industrial ASP
Table of Contents
Section 1: Planning Context
This section outlines the policy context of the plan as well as the interpretation, monitoring, review and amendment of
policies herein.
1-1
Introduction ....................................................................................................................................................... 1
1-2
Purpose ............................................................................................................................................................. 1
1-3
Policy Context ................................................................................................................................................... 1
1-4
Plan Interpretation ............................................................................................................................................ 3
1-5
Monitoring and Review ..................................................................................................................................... 3
1-6
Amending the Asp ............................................................................................................................................ 3
1-7
Supporting Studies ........................................................................................................................................... 3
1-8
Limitations ......................................................................................................................................................... 4
Section 2: Plan Area
This section highlights the existing conditions of the plan area and the opportunities and constraints as they relate to
future development.
2-1
Area Context ..................................................................................................................................................... 7
2-2
Topography ....................................................................................................................................................... 7
2-3
Current Land Use ............................................................................................................................................. 7
2-4
Land Ownership ................................................................................................................................................ 8
Section 3: Development Concept
This section provides the overall Development Concept for the plan area, showing the general location of land uses,
community amenities and the road network.
3-1
Vision .............................................................................................................................................................. 11
3-2
Guiding Princples ............................................................................................................................................ 11
3-3
Consultation .................................................................................................................................................... 12
3-4
Development Concept .................................................................................................................................... 14
3-5
Land Uses ....................................................................................................................................................... 14
Section 4: Development Framework
This section details the policies designed to actualize the development potential of the plan area.
4-1
General Development Policy .......................................................................................................................... 17
4-2
Industrial ......................................................................................................................................................... 18
4-3
Mixed Use Transition Area ............................................................................................................................. 18
4-4
Open Space .................................................................................................................................................... 19
4-5
Institutional ...................................................................................................................................................... 19
Section 5: Transportation Framework
This section addresses how pedestrians, cyclists and motorists are accommodated within and beyond the plan area.
5-1
Transportation Network .................................................................................................................................. 20
Town of Coaldale
West Industrial ASP
Section 6: Servicing Framework
This section addresses the efficient provision of water, sanitary and stormwater services within the plan area.
6-1
General Servicing Policy ................................................................................................................................. 22
6-2
Water .............................................................................................................................................................. 23
6-3
Sanitary ........................................................................................................................................................... 23
6-4
Stormwater...................................................................................................................................................... 23
6-5
Shallow Utilities ............................................................................................................................................... 23
Section 7: Implementation
This section outlines the proposed sequence of development and the process required to proceed with future planning
applications.
7-1
Sequence of Development ............................................................................................................................. 27
7-2
Circulation and Collaboration.......................................................................................................................... 27
Appendix A: Outline Plan Requirements
A-1
Local Outline Plan Policy Framework ............................................................................................................. 30
A-2
Outline Plan Requirements ............................................................................................................................. 30
A-3
Supporting Technical Studies ......................................................................................................................... 32
TABLES
Table 1: Engagement Summary .................................................................................................................................. 13
Table 2: ASP Land Use Statistics ................................................................................................................................ 15
FIGURES
Figure 1: Plan Location .................................................................................................................................................. 5
Figure 2: Context Plan ................................................................................................................................................... 6
Figure 3: Topography .................................................................................................................................................... 9
Figure 4: Plan Area Ownership.................................................................................................................................... 10
Figure 5: Development Concept .................................................................................................................................. 16
Figure 6: Transportation Network ................................................................................................................................ 21
Figure 7: Water Distribution Mains .............................................................................................................................. 24
Figure 8: Sanitary Servicing ......................................................................................................................................... 25
Figure 9: Stormwater Management ............................................................................................................................. 26
Figure 10: Sequence of Development ......................................................................................................................... 28
1
Town of Coaldale
West Industrial ASP
1
SECTION ONE
Planning Context
This section outlines the policy context of the plan as well as the interpretation, monitoring, review and
amendment of policies herein.
1-1 INTRODUCTION
The West Industrial Area Structure Plan (ASP) has been developed to provide a framework for future
development on lands generally located between 14 Avenue and Range Road 201A on the north and
between Highway 845 and Range Road 201A on the east as shown on Figure 1: Location Plan. The lands
were annexed to the Town in 2018. The annexation was to provide for a 25-year growth horizon to
accommodate future development within the Town.
1-2 PURPOSE
The West Industrial ASP is a statutory plan that provides a comprehensive development concept for the
lands within the plan area. As outlined in Section 633 (1) of the Municipal Government Act (MGA), ASPs
are developed "for the purpose of providing a framework for subsequent subdivision and development of
an area of land..."
The MGA empowers municipalities to shape their communities. It regulates how municipalities are funded
and how they should plan for growth. Per the MGA requirements, this ASP addresses the following:
-
Sequencing of development proposed for the area,
-
Proposed land uses,
-
Proposed density of population, and
-
General location of major transportation routes and public utilities
1-3 POLICY CONTEXT
Policies within this ASP are consistent with the following regulation, statutory plans and local bylaws:
Provincial Regulation
All development within this ASP is consistent with Provincial regulation, in particular the MGA and those
of Alberta Environment and Protected Areas (AEPA).
2
Town of Coaldale
West Industrial ASP
South Saskatchewan Regional Plan (SSRP)
This ASP aligns with the SSRP, which establishes broad policies to guide responsible land management in
southern Alberta by promoting efficient land use, quality of life and response to community needs.
Town Plan
The lands within this ASP are designated as an "Area of Growth" in the Town Plan and the proposed
development aligns with key goals and objectives of the Town Plan by providing efficient and effective
development in an area proposed for industrial uses. Land uses proposed herein are consistent with the
Town Plan and are a logical extension to existing development. The block-based design and opportunities
for the future development of trail connections support opportunities for walkable access to employment.
The subject lands are identified within the context of the Town Plan on Figure 2: Context Plan.
Transportation Master Plan (TMP)
While vehicles remain the primary mode of transportation within the local network, the development
concept provides opportunities for future active mode connections throughout the Town, consistent with
TMP policies. Road standards are consistent with classifications identified in the TMP.
Infrastructure Master Plan (IMP)
The IMP is a strategic document focused on the current status of the Town's potable water, stormwater,
sanitary sewer, and streets and roads. The document provides direction with respect to anticipated
upgrades to sustain and increase levels of service and ensure long term maintenance.
Malloy Drain Master Drainage Plan
The Malloy Drainage Basin encompasses the Town of Coaldale and surrounding areas in Lethbridge
County where capacity restraints can result in significant flooding issues. The Malloy Drain Master
Drainage Plan was completed in 2010 and provides direction for stormwater requirements in this area.
Gateways and Corridors Strategic Plan
This ASP includes a portion of the Highway 845 Corridor. Development within this area will be consistent
with the design and implementation guidelines outlined in this document to ensure that the corridor is
well planned and maintained to provide a clean and attractive welcome to the Town of Coaldale.
Parks and Trails Master Plan
The Parks and Trails Master Plan provides a comprehensive plan to provide pedestrian and non-vehicular
connections throughout the Town, including a future trail adjacent to and through this plan area, linking
to the Birds of Prey. Policies have been included in this ASP to allow for future development of trails
connecting to the overall trail network.
Recreation Master Plan
The Recreation Master Plan identifies areas of park reserve suitable for future development. While specific
park areas have not been identified on the subject lands, the land use concept provides opportunities to
include connections to important destinations such as the Gem of the West and the Birds of Prey.
Land Use Bylaw
The Development Concept prepared for this ASP has been developed to reflect the regulatory parameters
of the Coaldale Land Use Bylaw (LUB). Land use categories shown on the Development Concept do not
signify land use districts specified in the LUB. Future development proposals within the areas currently
designated Urban Reserve District (UR) will require Land Use Amendment prior to development.
3
Town of Coaldale
West Industrial ASP
1-4 PLAN INTERPRETATION
Map Interpretation
Unless otherwise specified within this ASP, the boundaries or locations of any symbols or areas shown on
a map or illustration are approximate only, not absolute, and shall be interpreted as such. They are not
intended to define exact locations except where they coincide with clearly recognizable physical features
or fixed boundaries such as property lines or utility/road rights-of-way. Details shown on the maps will be
subject to further study at the development approval stage. No measurements or area calculations shall
be taken from the plan maps.
Policy Interpretation
Where "shall", "will" or "require" are used in a policy, the policy is considered mandatory in order to
achieve a desired result. Where "should" or "encourage(d)" is used in a policy it is anticipated that the
policies will be applied in all situations unless it can be clearly demonstrated to the satisfaction of the
Development Authority, that the policy is not reasonable, practical and feasible in a given situation. Where
a policy requires compliance with the development concept, that requirement may be deferred to the
Subdivision Approval or Development Permit Approval stage at the discretion of the Development Authority.
Appendix Interpretation
Appendices included herein do not form part of the statutory portion of this ASP. The purpose of an
appendix is to provide information to further clarify the intent of plan policies.
1-5 MONITORING AND REVIEW
This ASP is a long-term policy document that promotes a vision for development and provides guiding
principles and policies that work towards achieving that vision over-time. The policies within this ASP will
be monitored and should be reviewed and updated every 10 years until such time as build-out of the plan
area is achieved. This ASP may also be amended in response to changes in the overall policy direction
within the Town or specific planning applications.
1-6 AMENDING THE ASP
If major changes with regards to land use, road networks or any other significant aspect of the plan are
contemplated, an amendment to the ASP, that includes a public hearing, shall be held in accordance with
the MGA. Minor changes will not require an amendment if, in the opinion of the Development Authority
and/or Council, the intent of the ASP is still achieved. Where an amendment to this ASP is requested by an
applicant, the applicant shall be required to submit the justification and information necessary to support
the amendment.
1-7 SUPPORTING STUDIES
Biophysical Impact Assessment (BIA)
The majority of the project area has been previously impacted by historic anthropogenic activities, which
substantially reduces the potential for adverse project related impacts to sensitive biota and other potential
environmental sensitivities generally associated with undeveloped sites. However, several potential
environmental sensitivities within the project study area were identified and should be considered during
project planning and development. This should include specific planning and mitigation to address potential
project related impacts to rescued and resident wildlife associated with the Alberta Birds of Prey Foundation
site. Assuming adherence to recommended mitigation strategies, it is anticipated that the majority of
anticipated project related impacts can be appropriately mitigated.
4
Town of Coaldale
West Industrial ASP
In the case of the Alberta Birds of Prey Foundation site, it is anticipated that potential project related impacts
will be substantially moderated by conditions relative to the site and nature of disturbance (e.g., no direct
sight lines, limited duration of disturbance, distance from receptor to disturbance, existing development
buffer between sites etc.). The potential for project related impacts will be further minimized through a
combination of engineering and operational mitigation strategies, including the use of erosion and sediment
control devices, dust control strategies and the development of project specific spill response and materials
management strategies. If feasible, the timing of construction to avoid sensitive seasonal timeframes
associated with the site should also be considered as an added measure to reduce potential indirect impacts.
Phase 1 Environmental Site Assessment (ESA)
The potential environmental risk on the Subject Property was generally rated as moderate, based on
the information reviewed and the historical use of the Property. The businesses surrounding the site
are light Industrial or agricultural land uses which generally carry moderate to low risk depending on
the nature of the business. Within the context of the Phase 1 Environmental Site Assessment, further
investigation of the site is not recommended based on the review of historical records, interviews, and
observation of site conditions at the time of site visit.
Historical Resources Act (HRA) Clearance
HRA approval has been granted for the activities described for the proposed development. Any
discovery of an historic resource during the development of the NW ASP shall notify the Heritage
Division of Alberta Culture. If previously unrecorded historic resources are discovered, proponents may
be ordered to undertake further salvage, preservative or protective measures or take any other actions
that the Minister of Alberta Culture considers necessary.
Wetland Identification and Delineation Assessment (WIDA)
Based on the results of the wetland inventory and assessment, no waterbodies or wetlands were
identified within the proposed Project development boundary. As such, development at the site is
not subject to approval requirements of the Alberta Water Act relative to specific conditions
pertaining to disturbance of wetlands.
1-8 LIMITATIONS
Policies within this ASP are not to be interpreted as an approval for a use on a specific site. Detailed site
conditions or constraints - including environmental considerations - must be assessed on a case-by-case basis
as part of an application for a Land Use Amendment, Subdivision, or a Development Permit.
RR 201
20 AVENUE
HIGHWAY 3
HIGHWAY AVE
16 AVENUE
22 AVENUE
24 AVENUE
13 STREET
HIGHWAY 845
17 STREET
11 STREET
22 STREET
24 STREET
30 STREET
19A AVE
14 AVENUE
12 AVENUE
HWY 845
13 AVE
14 AVENUE
N
WEST INDUSTRIAL
FIGURE 1
June, 2023
PLAN LOCATION
Town Boundary
ASP Area
Subject
Lands
AREA STRUCTURE PLAN
RR 201
20 AVENUE
HIGHWAY 3
HIGHWAY AVE
16 AVENUE
22 AVENUE
24 AVENUE
13 STREET
HIGHWAY 845
17 STREET
11 STREET
22 STREET
19A AVE
14 AVENUE
12 AVENUE
HWY 845
13 AVE
14 AVENUE
Existing Land Use
RESIDENTIAL R-1A
RESIDENTIAL SMALL LOT R-1B
RESIDENTIAL STARTER LOT R-1C
RESIDENTIAL MULTI-UNIT R-2
RESIDENTIAL MULTI-UNIT LIMITED R-2L
MANUFACTURED HOME PARK R-3
COUNTRY RESIDENTIAL ONE CR-1
COUNTRY RESIDENTIAL ONE "A" CR-1A
COUNTRY RESIDENTIAL TWO CR-2
COMMERCIAL C-1
HIGHWAY COMMERCIAL C-2
INSTITUTIONAL / RECREATIONAL I/R
INDUSTRY I
LIGHT INDUSTRY I-2
URBAN RESERVE
N
FIGURE 2
CONTEXT PLAN
AREA STRUCTURE PLAN
WEST INDUSTRIAL
June, 2023
Town Boundary
ASP Area
7
Town of Coaldale
West Industrial ASP
2
SECTION TWO
Plan Area
This section highlights the existing conditions of the plan area and the opportunities and constraints as they
relate to future development.
2-1 AREA CONTEXT
The West Industrial ASP encompasses approximately 59.92 ha (148.06 ac), which are predominantly
agricultural. These lands are identified for future industrial growth within the Town Plan. Partially
developed industrial/commercial uses are located to the east and west of the plan area. The Gem of the
West Museum and the Birds of Prey are located to the south west and a mix of commercial and
residential, and undeveloped lands are located to the south.
A search of the Government of Alberta Spatial Information System, Spin 2, indicates the property contains
easements for buried phone cable, a transmission line, and a gas pipeline. Existing shallow and overhead
utility easements and alignments will be reviewed at the Outline Plan stage.
2-2 TOPOGRAPHY
The parcel is relatively flat, and generally drains towards the southeast part of the site, as shown on Figure
3: Topography. The land has been used for agricultural purposes and there are no significant slopes within
the parcel.
East of the plan area there is a significant ditch that runs north-south along the east side of 13 Street and
an existing stormwater management facility to the southeast.
2-3 CURRENT LAND USE
As shown on Figure 2: Context Plan, the lands within the plan area at the time of adoption are designated
Urban Reserve (UR) district, Highway Commercial (C-2) district and Industrial (I) district.
A single parcel in the southwest of the plan area is zoned light industry (I-2) district.
The land is designated UR district are intended to be subdivided and developed for urban uses in the
future, but are presently essentially agricultural or non-urbanized. Before development proceeds on the
UR parcels, approvals of Outline Plans and Land Use Redesignation applications will be required.
8
Town of Coaldale
West Industrial ASP
2-4 LAND OWNERSHIP
Plan area lands are predominately owned by 845 Developments Ltd. Additional lands within the quarter-
section have been included as part of this ASP to ensure an orderly and efficient framework for future
development. Land ownership is shown on Figure 4: Ownership.
12 AVE
14 AVENUE
SPURLINE AVE
HWY 845
13 AVE
14 AVE
NW 1
4 SEC 14-9-20-W4
SW 1
4 SEC 14-9-20-W4
NE 1
4 SEC
14-9-20-W4
SE 1
4 SEC
14-9-20-W4
SE 1
4 SEC
15-9-20-W4
NE 1
4 SEC
15-9-20-W4
Town Boundary
ASP Boundary
N
FIGURE 3
TOPOGRAPHY
WEST INDUSTRIAL
June, 2023
AREA STRUCTURE PLAN
EXISTING
SWM
12 AVE
14 AVENUE
SPURLINE AVE
HWY 845
13 AVE
14 AVE
NW 1
4 SEC 14-9-20-W4
SW 1
4 SEC 14-9-20-W4
NE 1
4 SEC
14-9-20-W4
SE 1
4 SEC
14-9-20-W4
SE 1
4 SEC
15-9-20-W4
NE 1
4 SEC
15-9-20-W4
LOT 7, BLK 1
PL 211 1676
LOT 6
BLK 1
PL 211 1676
LOT 4
BLK 1
PL 181 1388
Tim and Dianne Shaum
Dennis and Julie Overweg
Ryan Tanner et al.
Jordan B.
Berhard
Fehr
Town Boundary
ASP Boundary
N
FIGURE 4
OWNERSHIP
WEST INDUSTRIAL
June, 2023
AREA STRUCTURE PLAN
11
Town of Coaldale
West Industrial ASP
3
SECTION THREE
Development Concept
This section provides the overall Development Concept for the plan area, showing the general location of
land uses, community amenities and the road network.
3-1 VISION
The West Industrial area is a centre for primarily industrial uses, including some mixed-use commercial
uses adjacent to Highway 845. Development is integrated with environmentally and historically sensitive
areas and the area provides a sustainable business-ready environment, attracting investment and
providing employment opportunities.
3-2 GUIDING PRINCPLES
The following principles provide guidance on the nature of development within the plan area:
Sustainability
Infrastructure and servicing should be developed in an efficient
manner following sustainable best practices. Energy efficiency,
innovative development strategies and alternative servicing
options for new construction should be considered.
Environmental Stewardship
Natural areas should be protected from negative development
impacts. Innovative approaches such as green infrastructure, water
conservation and low impact development should be encouraged
for future development.
12
Town of Coaldale
West Industrial ASP
Long Term Stability
Commercial and industrial development should be
encouraged to provide opportunities for local
employment, support a healthy local economy and foster
a vibrant and diverse local economy where people want
to live, work and play.
Managed Growth
Planning should be put in place to establish appropriate policy
and processes to facilitate development and provide a
business-ready environment. Development should proceed in
an efficient and logical order.
3-3 CONSULTATION
The West Industrial ASP, (Bylaw 844-P-03-22) was prepared in consultation with plan area landowners,
stakeholders, the general public and Administration. Due to the unprecedented COVID-19 pandemic
ongoing during the Plan's development, engagement opportunities were conducted virtually to protect
the safety and well-being of landowners, stakeholders and staff. The purpose of the engagement process
was to share the draft plan, respond to questions and gather feedback. Ideas and comments for this ASP
were gathered through direct communication with stakeholders and an online survey.
This feedback was used to establish a vision and guiding principles to inform the Development Concept
and policies within this ASP. Consultation milestones included:
-
Virtual Open House and Online Survey (December 2021 - January 2022). The Plan was shared online
with Council and key stakeholders to obtain feedback regarding challenges, opportunities, and an
overall vision for the Plan area.
-
Stakeholder Input (January 2022). Plan area landowners were contacted directly to gather feedback
on development priorities, a vision for the Plan, and any other opportunities and challenges
associated with the Plan area.
-
Virtual Engagement Session (January 2022). A live session was conducted on January 18, 2022 to
answer questions arising from the virtual open house and gather additional feedback from the
general public.
-
Let's Connect Coaldale (April 2022). Notice of the public hearing and opportunities to share feedback
and pose questions were posted online and social media.
-
Public Hearing (April 2022). A public hearing was held on April 25th to provide a final opportunity for
public comment on this ASP as part of the plan adoption process.
13
Town of Coaldale
West Industrial ASP
There was general support for the Plan including the proposed uses, the general layout and the
opportunities for additional employment. The following table summarizes the comments received and
how the input was incorporated into the design and policies of the ASP.
Table 1: Engagement Summary
What We Heard
How We Responded
Concerns were raised about the impact of the
proposed industrial development on adjacent
properties, airborne pollution and odor, noise,
traffic congestion and access.
The proposed uses are for light industrial
development which would not be a source of
pollution and nuisance factors. These types of
uses are prohibited within the Town and
regulated by other existing policy documents.
It was suggested that a green strip with
landscaping and trees be considered along the
west side of the plan area along Highway 845
as a gateway to the community.
A 10m green MR strip was incorporated along
the east side of Highway 845 and policies have
been included to ensure appropriate
landscaping.
There were questions about the type of mixed-
use commercial that are being proposed.
The mixed-use commercial component is
consistent with the land use direction provided
in the Town Plan and will be appropriate to the
Highway 845 corridor. A Land Use Amendment
will be required for subject parcels prior to
development.
There were concerns about access to the plan
area, possible traffic congestion and
emergency access issues as well as the
classification of road for 12 Avenue. It was
suggested that additional access to the area
from 10 Avenue, 11 Avenue or Range Road
201A be considered.
The transportation network was developed in
compliance with the Town Plan and the
Transportation Master Plan. ASP policies
require that a Traffic Impact Assessment be
provided as part of an Outline Plan application
to ensure adequate capacity and access to
support the proposed development.
It was suggested that team consider ways to
minimize potential nuisance between Station
Grounds and south edge of industrial
development.
Policies have been included to provide for
enhanced landscaping along the south
boundary of the ASP area where industrial
parcels back onto 14 Avenue.
There was a question about whether the plan
area paths would connect to the Birds of Prey.
Policies have been included in the ASP to allow
for future development of non-vehicular
routes to connect the area with other Town
destinations including the Birds of Prey, per
Parks and Trails Master Plan.
There were some concerns raised about the
location and configuration of the cul-de-sacs,
roadways and the stormwater pond inside of
the plan area and how they may negatively
impact the parcels of land and circulation
through the area.
There were minor revisions to the original road
network to reconfigure cul-de-sacs so they
function as dead-end streets that could be
converted to access points to peripheral
roadways if it were to become feasible to do
so. The road network and the location of the
stormpond are based on the Transportation
Master Plan, the Infrastructure Master Plan
and Malloy Master Drainage Plan.
14
Town of Coaldale
West Industrial ASP
Subsequent to the approval of the West Coaldale ASP in 2022, changes in ownership and evolving market
trends have created an opportunity to add vacant lands along the south boundary to ensure an orderly
and efficient framework for future development and update the Development Concept.
3-4 DEVELOPMENT CONCEPT
The Development Concept, shown in Figure 5: Development Concept, has been created by using input
gathered from the consultation process to prepare a design that respects the physical constraints within
the plan area. The block-based design provides an efficient road network with primary access from
Highway 845.
The grid layout shown in the development concept can be modified to accommodate smaller or larger
scale development and environmental constraints, and supports a variety of lotting scenarios and
flexibility to adapt to specific development requirements. The local road network may be revised without
an amendment to this ASP so long as adjacent landowners are not negatively impacted by the proposed
changes and revised alignments are consistent with Town standards.
A right-of -way to accommodate a rail spur line connecting to the south, has been incorporated into the
large block design and provides an opportunity for rail access.
3-5 LAND USES
Three primary land use areas have been identified within the Plan including:
-
Industrial. The Industrial area is intended to provide for industrial uses that have minimal to no impacts
on adjacent landowners in terms of operational nuisance. A wide range of lot sizes and configurations
can be accommodated within the area. Further subdivision or consolidation of parcels to accommodate
smaller or larger lotting may be permitted by extending or reducing the road network as long as key
connections are maintained.
-
Mixed Use Transition (Commercial/Industrial). Lands adjacent to Highway 845 are proposed to
accommodate mixed use (commercial and industrial) consistent with current development and the
proposed land uses in the Town Plan.
-
Open Space. An open space has been proposed within the natural drainage corridor along the
southeast portion of the plan area. This corridor preserves the natural area, accommodates future
stormwater facilities, and enhances overall walkability by providing valuable connections between the
key land use areas and existing development to the east and south. There is also provision for a 10-
metre green buffer along the west boundary. This provides for additional pedestrian connectivity and
landscaping to enhance functionality and visual aesthetics along Highway 845.
The uses above are a general indication for future land use and do not constitute land use approvals per
the Town's LUB. Prior to development, a Land Use Amendment will be required to comply with the LUB in
effect at that time. The following Land Use Statistics are based on the Development Concept and include
road areas:
15
Town of Coaldale
West Industrial ASP
Table 2: ASP Land Use Statistics
Proposed Land Use
Area in Area in
Hectares*
Acres*
ASP Area
59.92
148.06
Gross Developable Area (GDA)
59.92
148.06
Industrial
43.86
108.38
Mixed-Use Transition
7.34
18.14
Storm Pond (PUL)
2.12
5.24
Open Space ( MR)
2.55
6.30
Roads
4.05
10.00
* Areas are approximate only and any discrepancies are a result of rounding.
12 AVE
14 AVENUE
SPURLINE AVE
HWY 845
13 AVE
14 AVE
NW 1
4 SEC 14-9-20-W4
SW 1
4 SEC 14-9-20-W4
NE 1
4 SEC
14-9-20-W4
SE 1
4 SEC
14-9-20-W4
SE 1
4 SEC
15-9-20-W4
NE 1
4 SEC
15-9-20-W4
PUL
Potential PUL
Exact Location to
be determined at
time of detailed
design
N
FIGURE 5
DEVELOPMENT CONCEPT
WEST INDUSTRIAL
June, 2023
AREA STRUCTURE PLAN
Town Boundary
ASP Boundary
Industrial
Mixed Use Transition (Commercial/Industrial)
Open Space
Storm Water Management
PUL
MR
MR
MR
MR
Potential Rail Service
17
Town of Coaldale
West Industrial ASP
4
SECTION FOUR
Development Framework
This section details the policies designed to actualize the development potential of the plan area.
4-1 GENERAL DEVELOPMENT POLICY
The Development Concept has been designed to respond to stakeholder feedback, align with current
statutory policy and reflect market conditions. The following policies apply to all development within this ASP.
Policy 4.1.1
Municipal Reserve (MR) dedication shall be up to ten (10) percent of the developable
land. At the discretion of the Development Authority, MR should be dedicated as either
land or cash-in-lieu at the time of subdivision.
Policy 4.1.2
Institutional uses may be integrated, where appropriate, throughout the plan area.
Policy 4.1.3
Building setbacks shall comply with the requirements of the LUB and building orientation
and design shall be required as conditions of subdivision or development permit approval
in order to mitigate any unsightly operational areas.
Policy 4.1.4
High-Quality landscaping shall comply with the requirements of the LUB and landscaping
parameters and screening shall be required as conditions of subdivision or development
permit approval in order to mitigate any unsightly operational areas.
Policy 4.1.5
Innovative water-savings measures, such as, xeriscape landscaping and stormwater re-use
shall be encouraged.
Policy 4.1.6
Developers are encouraged to consider energy efficiency and alternative servicing
options for new construction.
Policy 4.1.7
Design for future sidewalks and pedestrian access shall be provided in accordance with
Town standards.
18
Town of Coaldale
West Industrial ASP
4-2 INDUSTRIAL
The purpose of the Industrial Area is to provide for light to medium industrial uses that have minimal to no
impacts on adjacent landowners in terms of operational nuisance. Uses may include building and structures
for the purpose of manufacturing, processing, fabricating, assembly, warehousing, storage and distribution
of goods or materials that do not create conditions that have a significant adverse impact or are dangerous
beyond the boundaries of the site by way of noise, odors, airborne emissions, lighting or vibration and are
not dependent on significant outdoor storage. The following policies align with the Town Plan Goal:
Encourage industrial businesses to develop that have a high-quality design and make efficient use of
infrastructure, to contribute to the sustainability and the positive appearance of the Town.
Policy 4.2.1
The Industrial Area shall be provided in the areas shown on Figure 5: Development
Concept.
Policy 4.2.2
Development sites shall provide pedestrian linkages that connect building and site
entrances with internal and public pedestrian networks.
Policy 4.2.3
Development sites shall provide conveniently located amenity spaces for employees, to
be identified in a site plan at the development permit stage.
Policy 4.2.4
Development in light industrial areas shall not have an adverse impact on adjacent areas
by way of noise, dust, odours, outdoor lighting or other emissions.
Policy 4.2.5
A range of land uses, from traditional industrial to low impact business park uses, shall be
supported where compatible with adjacent uses.
Policy 4.2.6
Where development occurs adjacent to non-industrial uses, sufficient screening or
buffering shall be required to minimize potential impacts on non-industrial properties.
Policy 4.2.7
Non-industrial uses shall be ancillary to industrial uses.
Policy 4.2.8
Low Impact Development (LID) shall be encouraged as part of the stormwater
management strategy for development parcels.
4-3 MIXED USE TRANSITION AREA
The purpose of the Mixed Use Transition Area is to accommodate compatible commercial development that
creates a transition to uses west of Highway 845. The following policies align with the Town Plan Goal:
Encourage commercial and light industrial businesses with high-quality design and building materials, that
contribute to the positive appearance of the Town, and that are accessible to different modes of travel.
Policy 4.3.1
The Mixed Use Transition Area shall be provided in the areas shown on Figure 5:
Development Concept.
Policy 4.3.2
Access to development sites shall be provided to the satisfaction of Alberta
Transportation and the Development Authority.
Policy 4.3.3
Development along the Highway 845 corridor should incorporate uses and designs that
create a sense of place and serve as a gateway to the community.
Policy 4.3.4
Development along the Highway 845 corridor should comply with the universal guidelines
and site-specific strategies in the Gateways and Corridors Strategic Plan.
19
Town of Coaldale
West Industrial ASP
4-4 OPEN SPACE
Natural areas within the Plan will be used to create an open space network that accommodates passive
recreational amenities and stormwater management solutions within the existing drainage corridor and
provides safe and enjoyable spaces which respect the natural environment. A 10 metre green buffer will be
dedicated as Municipal Reserve along Highway 845. The following policies align with the Town Plan Goal:
Provide recreational areas and open spaces that are safe and enjoyable to use while supporting
environmental objectives.
Policy 4.4.1
Parks and open spaces shall be provided generally in the areas shown on Figure 5:
Development Concept.
Policy 4.4.2
Connections shall be provided to ensure the plan area is connected to any adjacent
established areas and/or existing trail systems if applicable.
Policy 4.4.3
Areas identified as Environmental Reserve shall be dedicated at the time of subdivision in
accordance with Provincial regulations.
Policy 4.4.4
Innovative servicing strategies to incorporate stormwater management facilities within
the open space corridor shall be encouraged.
Policy 4.4 5
Impacts to existing drainage channels shall be minimized.
Policy 4.4.6
Landscaping shall be provided in the Highway 845 buffer in conformance with the LUB
and Policy ARG-03301121 to the satisfaction of the Development Authority.
Policy 4.4.7
Open spaces shall be developed in accordance with the Gateways and Corridors Strategic
Plan and the Parks and Trails Master Plan.
Policy 4.4.8
Notwithstanding the landscaping requirements in the LUB, additional landscaping may be
required on the south boundary of the plan area where industrial parcels are adjacent to
the residential development south of the 14 Avenue right-of -way to the satisfaction of the
Development Authority.
Policy 4.4.9
The design for a walking path along the Highway 845 MR buffer, and along one side of
12th Avenue shall be provided prior to development of affected parcels, so that it can be
easily incorporated into the Town's broader active mode transportation network when
the Town is prepared to move forward.
4-5 INSTITUTIONAL
Institutional uses may be located in any area of the plan to adequately accommodate local and regional
needs, as long as the uses do not preclude the development of industrial uses on adjacent parcels. Uses
may include, but are not limited to, buildings and structures for the purpose of accommodating public or
quasi-public services, utilities or facilities such as essential public services, municipal utilities, public
facilities and educational institutions.
Policy 4.5.1
Institutional uses may be integrated, where appropriate, in any of the policy areas.
Policy 4.5.2
Municipal amenities shall be identified at the Outline Plan stage.
Policy 4.5.3
Developers of institutional uses are encouraged to consider energy efficiency and
alternative servicing options for new construction.
Policy 4.5.4
New institutional uses shall be responsible for providing appropriate mitigation measures
onsite, where development is proposed adjacent to industrial areas.
20
Town of Coaldale
West Industrial ASP
5
SECTION FIVE
Transportation Framework
This section addresses how pedestrians, cyclists and motorists are accommodated within and beyond the
plan area.
5.1 TRANSPORTATION NETWORK
The Transportation Network shown in Figure 6: Transportation Network, will accommodate anticipated
traffic volumes in an efficient, safe and effective manner. The roads within the plan area will be maintained
at a standard sufficient to accommodate existing and proposed development. The local road network shall be
re-evaluated and revised as necessary via a Traffic Impact Assessment (TIA) required to support an Outline Plan.
Should smaller or larger lot sizes be required, additional local roads may be designed to further subdivide or
consolidate the area without requiring an amendment to the ASP. A right-of -way has been provided to allow
rail servicing to the area as an extension of rail lines to the south. The location of the right-of-way will be
defined as part of a future Outline Plan or Subdivision application.
Policy 5.1.1
The roadway network shall be consistent with Town's established planning documents
and engineering standards.
Policy 5.1.2
Intersection treatments at locations where plan area roads meet the existing
highway/road network may be cost shared by all benefiting developers through the
Standard Development Agreement process.
Policy 5.1.3
A Traffic Impact Assessment shall be required as a supporting study to an Outline Plan.
Policy 5.1.4
The optional road network may be revised within an Outline Plan without requiring an
amendment to the ASP so long as adjacent landowners are not negatively affected by the
proposed changes and revised alignments are consistent with Town standards.
Policy 5.1.5
Roadway design shall accommodate expected heavy vehicle traffic in the Industrial Area.
Figure 5.1.6
All onsite infrastructure shall be at the cost of the developer.
Figure 5.1.7
Offsite and oversize onsite infrastructure costs associated with the development shall be
established through offsite levies, development charges or endeavor to assist.
12 AVE
14 AVENUE
SPURLINE AVE
HWY 845
13 AVE
4 AVE
NW 1
4 SEC 14-9-20-W4
SW 1
4 SEC 14-9-20-W4
NE 1
4 SEC
14-9-20-W4
SE 1
4 SEC
14-9-20-W4
SE 1
4 SEC
15-9-20-W4
NE 1
4 SEC
15-9-20-W4
FIGURE 6
TRANSPORTATION NETWORK
WEST INDUSTRIAL
June, 2023
AREA STRUCTURE PLAN
Town Boundary
ASP Boundary
Collector Road
Local Road
Potential Rail Service
N
22
Town of Coaldale
West Industrial ASP
6
SECTION Six
Servicing Framework
This section addresses the efficient provision of water, sanitary and stormwater services within the plan
area.
6.1 GENERAL SERVICING POLICY
The following policies apply to the development of all servicing infrastructure within the Plan area. Existing
servicing infrastructure will be retained until such time as redevelopment occurs. Development/ re-
development or upgrading of servicing infrastructure will align with current Town standards and tie into
existing regional services where applicable. Figure 7: Water Distribution System, Figure 8: Sanitary System
and Figure 9: Stormwater Management, represent a high-level view of how servicing is likely to occur. The
specific alignment and design of servicing infrastructure shall comply with the Town's standards in place at
the time of development.
Policy 6.1.1
A Site Servicing Study the covers water, sanitary, stormwater, and shallow utilities is
required as a supporting study to an Outline Plan. The study shall examine site servicing
requirements and the ability of off-site infrastructure to support full development of the
site. Any necessary off-site infrastructure upgrades shall be identified, with costs and a
phasing plan included.
Policy 6.1.2
Utility rights-of-way and easements shall be provided to accommodate municipal utilities
at the discretion of the Development Authority and shallow utilities as determined
necessary by utility providers.
Policy 6.1.3
Utility alignments may be refined at the Outline Plan stage without an amendment to this
ASP.
Policy 6.1.4
Utility rights-of-way and easements and public utility lots shall be dedicated to the Town
as required, to accommodate the development or the extension of municipal utilities
necessary for development.
Policy 6.1.5
A developer may be required to provide, or enter into an agreement to provide when
required, the utility rights-of-way or easements necessary to accommodate the extension
of municipal utilities through or adjacent to a site in order to allow for the servicing of a
site.
23
Town of Coaldale
West Industrial ASP
Policy 6.1.6
New development or redevelopment shall be required to tie in to existing regional
services and preserve or improve existing drainage patterns.
Policy 6.1.7
All onsite infrastructure shall be at the cost of the developer.
Policy 6.1.8
Offsite and oversize onsite infrastructure costs associated with the development shall be
established through offsite levies, development charges or endeavor to assist.
6.2 WATER
The water distribution system for domestic uses and fire protection in the Plan area is supplied by main
trunks extending from existing water systems.
Policy 6.2.1
The design of the water distribution system shall ensure that all land has sufficient
looping and connections to provide for adequate fire flows as development progresses.
6.3 SANITARY
The wastewater collection system in the Plan area is supplied by gravity sewers, forcemains and lift
stations connecting to existing wastewater systems.
Policy 6.3.1
Any downstream infrastructure improvements to facilitate the development shall be
identified prior to the approval of an application for subdivision.
6.4 STORMWATER
Appropriate facilities for stormwater management facilities are proposed throughout the Plan area to
control stormwater and alleviate the impact of post-development flows on overland conveyances.
Policy 6.4.1
A post-event release rate of 0.4 l/s/ha shall be required to be achieved and detailed as
a part of the Stormwater Management Plan.
Policy 6.4.2
Existing wetlands may be incorporated into the stormwater management system.
Policy 6.4.3
The use of engineered stormwater wetlands is encouraged within the open space
corridors to ensure long-term sustainability, water quality improvements and pleasing
aesthetics, in a manner that continues to provide viable habitat.
6.5 SHALLOW UTILITIES
Shallow Utilities include telephone, natural gas, electrical, internet, and cable services. The developer will be
responsible for the provision of these services and extension from adjacent developed/developing areas.
Policy 6.5.1
The location of all shallow utilities and the provision of rights-of-way and easements
and related line assignments shall be addressed to the mutual satisfaction of the Town,
the landowner and the utility companies.
Policy 6.5.2
Detailed design of shallow utilities shall be determined at the time of subdivision.
Policy 6.5.3
Shallow utility and overhead utility easement conflicts shall be resolved at time of
subdivision.
12 AVE
14 AVENUE
SPURLINE AVE
HWY 845
13 AVE
14 AVE
NW 1
4 SEC 14-9-20-W4
SW 1
4 SEC 14-9-20-W4
NE 1
4 SEC
14-9-20-W4
SE 1
4 SEC
14-9-20-W4
SE 1
4 SEC
15-9-20-W4
NE 1
4 SEC
15-9-20-W4
TIE TO PROPOSED
300 PVC WATER LOOP
UPGRADE
250 PVC WAT
TIE TO EX
200 PVC
WAT
TIE TO EX
150 AC WAT
TIE TO EX
250 PVC WAT
OFFSITE IMPROVEMENTS
PUL
PROPOSED
WATER UTILITY R/W
Potential PUL
Exact Location to
be determined at
time of detailed
design
FIGURE 7
WATER DISTRIBUTION SYSTEM
WEST INDUSTRIAL
June, 2023
AREA STRUCTURE PLAN
Town Boundary
ASP Boundary
Proposed Water line
Existing Water line
Potential Rail Service
N
12 AVE
14 AVENUE
SPURLINE AVE
HWY 845
13 AVE
14 AVE
NW 1
4 SEC 14-9-20-W4
SW 1
4 SEC 14-9-20-W4
NE 1
4 SEC
14-9-20-W4
SE 1
4 SEC
14-9-20-W4
SE 1
4 SEC
15-9-20-W4
NE 1
4 SEC
15-9-20-W4
TIE TO EX
SAN VAULT
SANITARY TRUNK UPGRADES
TIE TO EX
SAN VAULT
OFFSITE IMPROVEMENTS
PUL
TIE TO
UPGRADED
SAN ITARY
TRUNK
POSSIBLE SANITARY
TIE TO EX
(LIMITED CAPACITY)
Potential PUL
Exact Location to
be determined at
time of detailed
design
FIGURE 8
SANITARY SERVICING
WEST INDUSTRIAL
June, 2023
AREA STRUCTURE PLAN
Town Boundary
ASP Boundary
Proposed Sanitary Sewer
Proposed Sanitary Trunk Upgrade
Existing Sanitary Sewer
Existing Sanitary Sewer Forcemain
Potential Rail Service
N
12 AVE
14 AVENUE
SPURLINE AVE
HWY 845
13 AVE
14 AVE
NW 1
4 SEC 14-9-20-W4
SW
1
4 SEC 14-9-20-W4
NE 1
4 SEC
14-9-20-W4
SE 1
4 SEC
14-9-20-W4
SE 1
4 SEC
15-9-20-W4
NE 1
4 SEC
15-9-20-W4
750 CONC
900 CONC
1050 CONC
OFFSITE IMPROVEMENTS
PUL
Potential PUL
Exact Location to
be determined at
time of detailed
design
FIGURE 9
STORMWATER MANAGEMENT
WEST INDUSTRIAL
June, 2023
AREA STRUCTURE PLAN
Town Boundary
ASP Boundary
Proposed Storm Sewer
Open Space
SWM Pond
Existing Storm Sewer
N
PUL
MR
MR
EXISTING
SWM
PROPOSED
SWM
(Storm Water
Manage System)
Existing Storm Ditch
Potential Rail Service
27
Town of Coaldale
West Industrial ASP
7
SECTION SEVEN
Implementation
This section outlines the proposed sequence of development and the process required to proceed with future
planning applications.
7.1 SEQUENCE OF DEVELOPMENT
The general sequence of future development within this ASP has been determined in consideration of
capacity and constraints within the transportation and servicing framework.
Policy 7.1.1
It is anticipated that development will generally proceed as shown on Figure 10:
Sequence of Development.
Policy 7.1.2
The sequence of development of the plan area:
-
shall be informed by patterns of growth management that consider infrastructure
capacity, servicing availability, environmental stewardship, and the topography of
land; and
-
shall occur through a staged approach to ensure a logical expansion of development.
Policy 7.1.3
Variances to the proposed sequence of development may be permitted so long as an
acceptable strategy to provide the required infrastructure is justified to the satisfaction
of the Development Authority.
7.2 CIRCULATION AND COLLABORATION
Responsible development within the plan area entails decision making which is sensitive to existing adjacent
uses. Development applications will require engagement with adjacent landowners within the Town.
Policy 7.2.1
An Outline Plan shall be required prior to subdivision. Requirements for an Outline Plan
are provided in Appendix A.
Policy 7.2.2
Adjacent landowners, provincial agencies and other stakeholders shall be circulated on
Outline Plan applications per Town protocol.
Policy 7.2.3
Upgrading of roadways between municipalities in the plan area shall be coordinated
where appropriate.
12 AVE
14 AVENUE
SPURLINE AVE
HWY 845
13 AVE
14 AVE
NW 1
4 SEC 14-9-20-W4
SW 1
4 SEC 14-9-20-W4
NE 1
4 SEC
14-9-20-W4
SE 1
4 SEC
14-9-20-W4
PHASE 3A
SE 1
4 SEC
15-9-20-W4
NE 1
4 SEC
15-9-20-W4
PHASE 1B
PHASE 3B
PHASE 2B
PHASE 1A
PUL
PHASE 2A
Potential PUL
Exact Location to
be determined at
time of detailed
design
N
FIGURE 10
SEQUENCE OF DEVELOPMENT
WEST INDUSTRIAL
June, 2023
AREA STRUCTURE PLAN
Town Boundary
ASP Boundary
Development Phase Boundaries
Potential Rail Service
29
Town of Coaldale
West Industrial ASP
Appendix A
Outline Plan Requirements
30
Town of Coaldale
West Industrial ASP
A-1 LOCAL OUTLINE PLAN POLICY FRAMEWORK
Outline Plans are not legislated under the MGA, but provide important decision-making tools approved by
resolution of Council. An Outline Plan describes the servicing method and proposed land uses for an area in more
detail than an ASP.
As noted in the Town Plan: an "Outline Plan [is] a non-statutory confirming the suitability and servicing method of
the lands for their proposed use. An Outline Plan may be for a smaller area within the boundaries of an Area
Structure Plan and involves detailed studies including, but not limited to, geotechnical investigation,
environmental impact assessment, transportation impact assessment, and stormwater management analysis".
Table A-1 Town Plan Requirements for an Outline Plan
Purpose
Application
Outline Plan (OP)
-
a non-statutory plan that describes the servicing
method and proposed land uses for an area in more
detail than an ASP
-
includes studies that ensure land is suitable for the
intended use in terms of soils, servicing, drainage,
and transportation
-
example studies include environmental impact
assessment, transportation impact assessment, and
stormwater management analysis
-
used for smaller areas of development
(neighbourhoods or stages) to provide technical
engineering details
-
must comply with the Town Plan and the relevant ASP
-
typically outlines opportunities and constraints of the
land, the development concept, open space needs,
servicing and transportation networks and the strategy
for phasing development
-
although it is not a statutory plan, it does go through
public consultation and decision by Council
A-2 OUTLINE PLAN REQUIREMENTS
The following information must be included with your completed application. If this information is not provided
at the time the application is submitted, your application will be deemed incomplete and it will not be processed
until the information is provided.
Outline Plan Application Checklist
Current copy of the Certificate(s) of Title of affected parcels (within 30 days).
Current copies of any restrictive covenants, utility rights-of-way, easements or caveats registered on the
Certificate(s) of Title (within 30 days).
Coloured photographs (minimum of 4) showing affected lands and adjacent area.
Development Concept (map) at a scale of 1:2000, with all dimensions and areas in metric showing:
o
north arrow
o
legal description of the plan area
o
plan area boundary
o
proposed Land Use Districts (with reference to the LUB)
o
proposed road system identifying arterial, collector and local roads
o
proposed street names
o
proposed reserve parcels (such as MR and environmental reserve (ER) etc.)
o
floodway or floodplain lines (if applicable)
o
infrastructure required to service and access the plan area, and
o
details of any public facilities or school sites identified in the plan area (if applicable)
31
Town of Coaldale
West Industrial ASP
An Outline Plan which includes:
o
A description of the study area in its present state with reference to special or unique physical or
environmental constraints or features and how they are to be addressed within the development
concept
o
A statement of the Vision for the development and an explanation of the development concept
including rationale for proposed land use districts, open spaces and any neighbourhood design
guidelines
o
Detailed development statistics, provided in table form, including gross areas, anticipated yields based
on proposed land use districts, reserve dedication, and population projections for residential areas
o
Preliminary site concepts for any open spaces, community amenities, commercial development and
multi-family sites (as appropriate)
o
A more detailed description of the proposed transportation network, any findings from a TIA and the
impact on existing routes
-
A proposed transportation network (map) providing alignments of any arterial, collector and local
roads
-
Cross-sections of any arterial, collector or proposed custom roads
o
A description of the site utility master servicing (including Water Distribution, Wastewater Collection,
Stormwater Management and Third-Party Utilities)
-
Layouts (maps) of proposed and existing site utility master servicing (including Water Distribution,
Wastewater Collection, Stormwater Management and Third-Party Utilities)
o
A description of the proposed sequence of development
-
A phasing plan (map) that identifies anticipated development of servicing infrastructure
Relaxations to the Outline Plan requirements may be considered at the discretion of the Development Authority
for single parcel developments or those less than 2 hectares which conform to the Plan and are contiguous to
existing development.
32
Town of Coaldale
West Industrial ASP
A-3 SUPPORTING TECHNICAL STUDIES
The following studies are/may be required by the Development Authority to be prepared in support of an Outline
Plan.
Table A-2 Supporting Studies
Supporting Studies
Outline Plan
Historical Resource Impact Assessment (HRIA)
AS REQUIRED
Environmental Site Assessment (ESA) - Phase 2
AS REQUIRED
Biophysical Impact Assessment (BIA)
DISCRETIONARY
Wetland Inventory and Assessment - Wetland Assessment and Impact Report
(WAIR)
AS REQUIRED
Geotechnical Report (including Slope Stability Analysis if the slope is greater than
15%)
REQUIRED
(including grading plan)
Site Utility Master Servicing Plans -
Water Distribution Master Servicing Plan
Wastewater Master Servicing Plan
Stormwater Management Master Servicing Plan
Third-Party Utility Master Servicing Plan
REQUIRED
Traffic Impact Assessment (TIA)
REQUIRED
Groundwater impact analysis and soils study
DISCRETIONARY
Market Study Analysis for commercial sites
DISCRETIONARY
Sound Attenuation Study