Safety Codes Services Permit Bylaw No. 12-05 (Consolidated September 2021)
County of Vermilion River, Alberta
· No. 12-05
· summary & facts
This is the exact embedded text of the captured official document.
Snapshot 458c37d2e417 · verified 2026-09-27 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
COUNTY OF VERMILION RIVER
PROVINCE OF ALBERTA
BYLAW 12-05
A BYLAW
of the County of Vermilion River, in the Province of Alberta, being a Safety
Codes Services Permit Bylaw, regulating the form, content and costs of
permits for the use, occupancy, relocation, construction or demolition of
buildings and any work done to an electrical, plumbing and private septic
system, or gas installation on required projects.
WHEREAS
by the authority of the Safety Codes Act, RSA 2000, c. S-1, the County of
Vermilion River has been designated as an accredited municipality in the
Building, Electrical, Plumbing, and Gas disciplines under the Safety Codes
Act.
AND WHEREAS
pursuant to the Safety Codes Act, the County of Vermilion River may make
Bylaws respecting the carrying out of its powers and duties as an
accredited municipality and respecting fees charged for permits issued or
services provided pursuant to the Safety Codes Act, Regulations and
Guidelines.
AND WHEREAS
the Municipal Government ACT, RSA 2000, c. M-26 as amended or
repealed and replaced from time to time, authorizes the Council of the
County of Vermilion River to pass Bylaws with respect to the safety, health
and welfare of people, the protection of people and property and the
enforcement of Bylaws within the County of Vermilion River.
NOW THEREFORE the Municipal Council of the County of Vermilion River, in the province of
Alberta duly assembled and pursuant to the authority conferred upon it by
the Safety Codes Act, Municipal Government Act, Regulation and
Guidelines, hereby enacts as follows:
1. TITLE
This bylaw shall be cited as the "Safety Codes Services Permit Bylaw"
2. DEFINITIONS
In this bylaw the following shall mean;
a) "Act" means the Safety Codes Act, RSA 2000, c. S-1, and amendments thereto;
b) "Accredited Municipality" means a municipality that is designated as an
accredited municipality under the Act.
c) "Agency" means the company, companies, agency or agencies contracted to
conduct business with or within the County of Vermilion River.
d) "Applicant" means the Owner of a building or a property or a representative
authorized in writing by the Owner who applies for a Permit;
e) "Application" means the Application for a Permit by the Owner for those services
regulated by the Safety Codes Act and this Bylaw;
f)
"Building Code" means the current Alberta Building Code, declared in force under
the Safety Codes Act Building Code Regulation, A.R. 31/2015, and amendments
thereto;
g) "Building Permit" means a Permit issued pursuant to this Act and Bylaw in relation
to activities for use, occupancy, relocation, construction or demolition of
buildings;
h) Chief Administrative Officer (CAO) means the Chief Administrative Officer of the
County as appointed by Council pursuant to Section 205 of the Municipal
Government Act, RSA 2000, c. M-26 and amendments thereto or his designate;
i) "County" means the County of Vermilion River;
j) "Estimated Construction Cost" is the total estimated cost of constructing and
finishing a building, excluding furniture and office equipment;
k) "Owner" includes a lessee, a person in charge, a person who has care and control
and a person who holds out that the person has the powers and authority of
Ownership or who for the time being exercises the power and authority of
Ownership;
l) "Occupancy Permit" means a Permit issued with respect to the occupancy or use
of a building and includes a PSR authorizing occupancy;
m) "Permit" means a Permit issued pursuant to this Bylaw;
n) "Partial Permit" means a Permit to proceed with construction of a part of a
building or structure;
o) "Permit Placard" is an identification card issued to notify the Owner and/or a
public that a Permit has been issued for the building;
p) "Plan of Survey" means a plan which establishes surveyed boundaries defining
the extent of a person's Ownership, or other rights in land, consisting of a
demarcation on the ground of the boundaries of the rights and a legally
authorized document depicting the location of the boundaries;
q) "PSR" means a Permit Services Report provided by the County or Agency;
r) "Safety Codes Council" shall mean Alberta Safety Codes Council;
s) "Safety Codes Officer" means a person appointed as such pursuant to the Safety
Codes Act, Chapter S-1 R.S.A. 2000 and amendments thereto;
t) "Services" means the functions, duties, tasks and responsibilities as described in
the Act, Regulation, guidelines and QMP;
u) "Site" means the physical location of the work that is the subject of the Permit;
v) "Quality Management Plan" or "QMP" means the current Quality Management
Plan adopted by the County of Vermilion River Council and approved by the Safety
Codes Council and amendments thereto;
w) "QMP Manager" means the person who has been designated by the CAO to
administer the Quality Management System;
x) All definitions contained in the Safety Codes Act and the Regulations made
pursuant to the Act shall apply in this Bylaw.
3. SCOPE
Pursuant to the Act and the Quality Management Plan the provisions of this Bylaw shall
apply to the administration and enforcement of the Act within the County of Vermilion
River for the disciplines of Building, Electrical, Gas and Plumbing.
4. QMP'S POWERS AND DUTIES
4.1 The QMP Manager is hereby authorized to:
a) Enforce all provisions of this Bylaw, the Quality Management Plan and the Act in
accordance with the Safety Codes Officer's specific designation(s) of discipline.
5. POWERS AND DUTIES OF A SAFETY CODES OFFICER AND/OR AGENCY
5.1 A Safety Codes Officer, or his designate, or an Agency contracted by the County, is hereby
authorized to:
a) receive applications and issues permits of the type for which that person has
received the applicable designation by the Safety Codes Council, in accordance
with the Quality Management Plan and the Safety Codes Act and Regulations.
b) keep an accurate account of all permits issued and all fees collected and received
under this Bylaw, as amended from time to time.
c) Any Agency shall perform the services as required by their contract with the
County and in accordance with the Act, the QMP and this Bylaw.
6. PREVENTION
6.1 Unless there is a valid and subsisting Permit, no person shall commence or cause
commencement of:
a) the occupancy, relocation, construction or demolition of any building or part
thereof unless there is a valid and subsisting Permit thereof;
b) the excavation of any land for the purpose of erecting or relocating any building;
c) the installation of any heating, venting or air conditioning equipment specifically
governed by the Act;
d) the installation of any masonry or factory built fireplace or other fuel fired
appliance governed by the Alberta Building Code;
e) any electrical, gas, plumbing or privates sewage disposal system installations as
governed by the Safety Codes Act, Regulations or Standard of Practice.
6.2 A Permit is not required for construction, where in the opinion of the Safety Codes
Officer, the construction will not affect the health and safety of the occupants and/or the
public, and no changes which may be regulated under the Safety Codes Act or applicable
code are made and may include the following:
a) Construction, demolition, alteration of any building other than a residence on a
parcel of land greater than 80 acres where in the opinion of the Safety Codes
Officer, the building constitutes a definite part of an agricultural operation.
b) Construction, alterations or minor repairs of buildings less than 13.5 sq. m (145 sq.
ft) where matters affecting health or safety are not involved.
7. PERMITS ADMINISTRATION
7.1 Where a Development Permit is required, a Building Permit shall not be issued prior to
issuance of a valid Development Permit.
7.2 To obtain a Permit, an Applicant shall file an application on the form prescribed by the
County and contains the suitable information essential to the QMP and Safety Codes
Council.
7.3 Every application shall:
a) identify and describe details of the work covered by the Permit for which the
application is made;
b) describe the land upon which the proposed work is to be done, by a legal
description and when available by a civic address, that will readily and definitely
locate the proposed building;
c) be accompanied by plans and specifications;
d) provide the estimated value of the proposed work;
e) provide the name, address and phone number of the applicant and if applicable
the contractor ;
f) be signed by the registered Owner or his authorized agent who may be required
to submit evidence to indicate such authority;
g) be accompanied by the Permit fee calculated in accordance with Schedule "B" of
the current Fee Bylaw;
h) follow the municipalities QMP for necessary information for each discipline
7.4 An Application for a Permit shall not be considered complete until all information and
documentation is supplied to the Safety Codes Officer. If all information and
documentation has not been supplied to the safety codes officer within thirty (30) days of
the application, the application will be returned to the Applicant and shall not be
accepted or processed until such time as the complete information can be supplied.
8. PERMIT ISSUANCE
8.1 If a Safety Codes Officer is satisfied that the work described in an application for a Permit,
and the plans submitted therewith are in accordance with the provisions of the Act and
Regulations, the QMP and this Bylaw, and that the fees specified in Schedule "B" of the
current Fee Bylaw have been paid, the permit shall be issued to the applicant.
8.2 A Safety Codes Officer may issue a Permit for part of the work prior to the plans and
specifications for the complete work having been submitted or examined providing that
adequate information and detailed statements have been submitted complying with all
the pertinent requirements of the Act, the QMP and this Bylaw. The holder of such a
Permit shall proceed at their own risk without the assurance that the Permit for the
remainder of the work will be granted.
8.3
a) In the case of a Building Permit a placard will be issued by the Safety Codes
Officer. The Permit Placard shall be posted at all times in a conspicuous location
on the Site.
b) When a Permit is issued, one set of examined plans, drawings and specifications
shall be kept on file at the County Administration Office or Agency's Office and
shall be made available to the QMP manager, Safety Codes Officer, landowner or
their authorized representative on demand.
8.4 Permit Term and Extensions:
a) Unless a term in a Permit describes expiry, a permit expires if the undertaking to
which it applies:
i. is not commenced within 90 days from the date of issue of the permit,
ii. is suspended or abandoned for a period of 120 days, or
iii. is in respect of a seasonal use residence and the undertaking is suspended
or abandoned for a period of 240 days after the undertaking is started.
8.5 The Safety Codes Officer may, in writing, suspend or revoke a Permit if the Permit is:
a) found to be in error;
b) issued on the basis of incorrect information; or
c) in violation of any provision of the Act or regulations made pursuant to the Act.
8.6 A Permit which has expired may be reinstated by the Safety Codes Officer, or his
designate, at the written request of an Applicant within thirty (30) days of expiry
provided:
a) no changes are made in the documents submitted with the original application.
9. PLANS AND SPECIFICATIONS
9.1 Every Applicant shall submit two (2) sets of plans, drawings, specifications and other
information as required by the Safety Codes Officer with each application.
9.2 All Plans submitted must be legible, drawn to scale and be detailed enough to show
compliance with applicable legislation or code.
9.3 On completion of Permitted activities, the Safety Codes Officer may require an updated
set of plans including all changes reviewed by the Safety Codes Officer and/or a Plan of
Survey showing its location.
10. FEES
10.1 Fees to be charged by the County or its contracted Agency for services rendered and the
application for or issuance of any Permits shall be as set out in Schedule "B" of the
current Fee Bylaw.
10.2 Payment of the required fees is necessary for any application to be complete, and no
Permit shall be issued until all required fees have been paid in full.
11. REVISIONS AND RE-EXAMINATIONS
11.1 A Safety Codes Officer may accept a revision to the construction for which a permit has
been issued and determine the appropriate fee to be charged for the service as set out in
this bylaw.
11.2 If the document submitted with an application for a Permit contains substantial errors
or omissions the documents may be returned to the Applicant by the Safety Codes
Officer, as an incomplete application.
12. INSPECTIONS AND RECORD KEEPING
12.1 All inspections and record keeping shall be as outlined in the County of Vermilion River's
Quality Management Plan and shall be available to the public in accordance with the
Freedom of Information and Privacy Act.
13. OCCUPANCY PERMIT
13.1 No activity that is regulated by this Bylaw and the Safety Codes Act shall be used or
occupied unless a final inspection has occurred in all disciplines, and a PSR issued by a
Safety Codes Officer qualified in each applicable discipline, confirming that it is deemed
ready to occupy.
13.2 Occupancy shall be granted if in the opinion of the Safety Codes Officer, the building
does not contravene the provisions of the Act or any regulations made pursuant to the
Act.
13.3 The issuance of a Permit Services Report (PSR) shall not be construed to be permission
for, or approval of, a contravention of any provision of any other Act, Regulation or
Bylaw.
14. REFUNDS
14.1 An Applicant for a Permit may at any time cancel, withdraw or surrender the Permit by
making an application in writing to the County or Agency.
14.2 Applicants that cancel, withdraw or surrender their Permit may qualify for a refund as
outlined in this bylaw at the discretion of the QMP Manager or his designate or Agency.
14.3 The QMP Manager or his designate may authorize a refund of a Permit fee, less
administration charges, as set out in Schedule "B" of the current Fee Bylaw.
14.4 No refund shall be made if: