This is the exact embedded text of the captured official document.
Snapshot f19da96c2c9c · verified 2026-06-08 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
The Inspections Group Inc.
The Inspections Group Inc. was
incorporated in 2001. We provide
compliance monitoring services
under the Alberta Safety Codes Act
for five disciplines: building,
electrical, plumbing (including
private sewage disposal systems)
gas and fire. The Inspections Group
Inc. also provides permit issuance
and inspection services for
residential, commercial and
industrial sites throughout the
province of Alberta
Edmonton Office
12010 111 Ave
Edmonton, AB T5G 0E6
(780) 454 5048
Edson Office
4905 4 Ave, Lower Level
Box 7815
Edson, AB T7E 1V9
(780) 723 4923
Cold Lake Office
110, 4910 50 Ave
Cold Lake, AB T9M 0G1
(780) 594 4301
www.inspectionsgroup.com
[email protected]
The Inspections Group Inc.
PLUMBING PERMIT
INSPECTION SERVICE
INFORMATION SHEET
A permit in the plumbing discipline is required to install,
alter or add to a plumbing system.
Plumbing Permit Inspection Service Information
Type of Install / Permit
Inspections Required Under
QMP
Stage of Inspection
Contractor permit for non
residential / multi-family
residential installation with
10 fixtures or less
1
Rough-in below grade
OR
Rough-in above grade
OR
Final (Within 180 days of
issuance)
Contractor permit for non
residential / multi-family
residential installation with
more than 10 fixtures
2
Rough-in below grade
OR
Rough-in above grade
AND
Final (Within 180 days of
issuance)
Contractor or homeowner
permit for residential install
with 5 fixtures or less
1
Final (Within 90 days of
issuance)
Contractor permit for
residential install with over 5
fixtures
1
Rough-in below grade
OR
Rough-in above grade (within
180 days of issuance)
Homeowner permit for
residential install with over 5
fixtures
2
Rough-in below grade
AND
Final (Within 365 days of
issuance)
Cost of additional Inspection $150
Please be aware that when you
purchase a permit you are only
getting an inspection done to the
minimum required levels in the
Quality Management Plan.
To be an informed buyer, it is critical
that you know what inspection(s) you
get and if you would like to have
more inspections on your project, this
can be easily arranged at the time of
your permit application.
The Inspections Group Inc.
The Inspections Group Inc. was
incorporated in 2001. We provide
compliance monitoring services
under the Alberta Safety Codes Act
for five disciplines: building,
electrical, plumbing (including
private sewage disposal systems)
gas and fire. The Inspections Group
Inc. also provides permit issuance
and inspection services for
residential, commercial and
industrial sites throughout the
province of Alberta
Edmonton Office
12010 111 Ave
Edmonton, AB T5G 0E6
(780) 454 5048
Edson Office
4905 4 Ave, Lower Level
Box 7815
Edson, AB T7E 1V9
(780) 723 4923
Cold Lake Office
110, 4910 50 Ave
Cold Lake, AB T9M 0G1
(780) 594 4301
www.inspectionsgroup.com
[email protected]
The Inspections Group Inc.
BUILDING PERMIT
INSPECTION SERVICE
INFORMATION SHEET
A permit in the building discipline is required for the
construction of a building, including the renovation of a
building, addition to a building, or a change is the
occupancy classification of a building.
Building Permit Inspection Service Information
Type of Install / Permit
Inspections Required Under
QMP
Stage of Inspection
Contractor or homeowner
permit for residential or non
residential construction with
value of work less than
$20,000
1
Final (Prior to occupancy)
Contractor or homeowner
permit for residential or non
residential construction with
value of work more than
$20,000
2
Foundation (prior to backfill)
OR
Framing (prior to insulation)
AND
Final including HVAC (within
365 days of issuance if a
homeowner permit
Contractor or homeowner
permit for mobile home,
detached garage, deck or
basement development
1
Final (Prior to occupancy)
Cost of additional Inspection $150
Please be aware that when you
purchase a permit you are only
getting an inspection done to the
minimum required levels in the
Quality Management Plan.
To be an informed buyer, it is
critical that you know what
inspection(s) you get and if you
would like to have more inspections
on your project, this can be easily
arranged at the time of your permit
application.
The Inspections Group Inc.
The Inspections Group Inc. was
incorporated in 2001. We provide
compliance monitoring services
under the Alberta Safety Codes Act
for five disciplines: Building,
Electrical, Plumbing (including
private sewage disposal systems)
gas and fire. The Inspections Group
Inc. also provides permit issuance
and inspection services for
residential, commercial and
industrial sites in four disciplines
throughout the province of Alberta
Edmonton Office
12010 111 Ave
Edmonton, AB T5G 0E6
(780) 454 5048
Edson Office
4905 4 Ave, Lower Level
Box 7815
Edson, AB T7E 1V9
(780) 723 4923
Cold Lake Office
110, 4910 50 Ave
Cold Lake, AB T9M 0G1
(780) 594 4301
www.inspectionsgroup.com
[email protected]
The Inspections Group Inc.
ELECTRICAL PERMIT
INSPECTION SERVICE
INFORMATION SHEET
A permit in the electrical discipline is required to install,
alter or add to an electrical system.
Electrical Permit Inspection Service Information
Type of Install / Permit
Inspections Required
Under QMP
Stage of Inspection
Contractor permit for non
residential / multi family
residential installation with
value of work $4,000 or less
1
Final inspection (within 90
days of issuance)
Contractor permit for non
residential / multi-family
residential installation with
value of work over $4,000
2
Rough-in (prior to cover-up)
AND
Final inspection (within 365
days of issuance)
Contractor permit for single
family residential or farm
building installation
1
Rough-in (prior to cover-up)
OR
Final inspection (within 180
days of issuance
Homeowner permit for
residential installation with
value of work $500 or less
1
Homeowner Permit for
residential installation with
value of work over $500
2
Rough-in (prior to cover-up)
OR
Final inspection (within 180
days of issuance
Skid units, relocatable
industrial accommodations,
manufactured housing, oilfield
pump jacks, temporary
services
1
Final Inspection (within 90
days)
Annual
2
Cost of additional Inspection $150
Please be aware that when you
purchase a permit you are only
getting an inspection done to the
minimum required levels in the
Quality Management Plan.
To be an informed buyer, it is critical
that you know what inspection(s) you
get and if you would like to have
more inspections on your project, this
can be easily arranged at the time of
your permit application.
The Inspections Group Inc.
The Inspections Group Inc. was
incorporated in 2001. We provide
compliance monitoring services
under the Alberta Safety Codes Act
for five disciplines: building,
electrical, plumbing (including
private sewage disposal systems)
gas and fire. The Inspections Group
Inc. also provides permit issuance
and inspection services for
residential, commercial and
industrial sites throughout the
province of Alberta
Edmonton Office
12010 111 Ave
Edmonton, AB T5G 0E6
(780) 454 5048
Edson Office
4905 4 Ave, Lower Level
Box 7815
Edson, AB T7E 1V9
(780) 723 4923
Cold Lake Office
110, 4910 50 Ave
Cold Lake, AB T9M 0G1
(780) 594 4301
www.inspectionsgroup.com
[email protected]
The Inspections Group Inc.
GAS PERMIT INSPECTION
SERVICE INFORMATION
SHEET
A permit in the gas discipline is required to install, alter or
add to a gas system.
Gas Permit Inspection Service Information Sheet
Type of Install / Permit
Inspections Required Under
QMP
Inspection Stage
Contractor permit for non
residential / multi-family
residential installation with
up to 400,000 BTU
1
Rough-in
OR
Final (Within 180 days of
issuance)
Contractor permit for non
residential / multi-family
residential installation with
400,001 BTU and more
2
Rough-in
AND
Final (Within 365 days of
issuance)
Contractor or homeowner
permit for residential
installation
1
Final (Within 180 days of
issuance for Contractor)
Final (Within 365 days of
issuance for Homeowner)
Temporary heat installation /
propane tank sets
1
Final (Within 90 days of
issuance)
Cost of additional Inspection $150
Please be aware that when you
purchase a permit you are only
getting an inspection done to the
minimum required levels in the
Quality Management Plan.
To be an informed buyer, it is critical
that you know what inspection(s) you
get and if you would like to have
more inspections on your project, this
can be easily arranged at the time of
your permit application.