2020 03 Development And Safety Codes Fee Bylaw

Millet, Alberta

This is the exact embedded text of the captured official document. Snapshot 24e19bb1ca70 · verified 2026-06-08 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

BYLAW NO. 2020/03 A BYLAW OF THE TOWN OF MILLET IN THE PROVINCE OF ALBERTA TO ESTABLISH FEES RELATED TO DEVELOPMENT AND SAFETY CODES SERVICES WHEREAS Section 7 of the Municipal Government Act, Chapter M--26, RSA gives authority to municipal Council's to pass bylaws respecting several matters including services provided by or on behalf ofthe municipality; AND WHEREAS, Section 8 ofthe Municipal Government Act, Chapter M--26, RSA provides the authority for Council to pass bylaws providing a system of licenses, permits or approvals and the associated fees. NOW, THEREFORE, the Council ofthe Town ofMillet, duly assembled, enacts as follows: 1. This Bylaw may be cited as the Development and Safety Codes Fee Bylaw. 2. That the fees related to development as outlined in Schedule A shall be implemented. 3. That the fees related to safety code permits as outlined in Schedule B shall be implemented. 4. This Bylaw 2020/03 shall come into full force upon signing. Read a first time this 12th day of February, A.D., 2020. Read a second time this 12"" day ofFebruary, A.D., 2020. Read a third time and finally passed this 26"" day of February, A.D., 2020. TOWN OF MILLET MavoRr/ -- * KAKG "CH}EF ADMINISTRAAIIVE OFFICER SCHEDULE A FEES RELATED TO DEVELOPMENT RESIDENTIAL FEE Accessory Building $75.00 Decks $75.00 Garage, Detached $75.00 Garage, Attached $75.00 Carports $75.00 Additions, covered--decks/veranda's, enclosures, renovations $100.00 Secondary/garage/garden suites $75.00 Basement developments $75.00 Demolition $100.00 Retaining walls $75.00 Swimming pools $75.00 Minor Home--based Business $75.00 Major Home--based Business $75.00 Assisted Living Facility $200 plus $50 per unit\bedroom Bed & Breakfast Facility $75.00 Boarding & Lodging House Facility $75.00 Day Home Operations $75.00 Global Vacation Rental Market Facility $75.00 Residential Care Facility $200 plus $50 per unit\ibedroom Residential Sales Centre $100.00 New Single Residential Dwelling $200.00 Multi--Family Dwelling $200 plus $50 per unit Modular and RTM Homes {permanent foundation} $200.00 Manufactured and Modular Homes (RMP District} $200.00 COMMERCIAL/INDUSTRILAL/INSTITUTIONAL Non--residential development (new, additions, alterations and accessory buildings over 300 sq.") $250.00 plus $0.50\m2 Demolitions $200.00 Change in business use (non--residential) $100.00 Signs On--site sign for licensed business Included in annual business Hicense fee Non--Profit Organizations No charge Portables $75.00 Billboards $500.00 DEVELOPMENT DEPOSIT FEES New residential {larger than 65m2 (7O0O0sqft)) $1,000.00 Multi--family over four (4) units, public, commercial, industrial $3,000.00 OTHER DEVELOPMENT FEES Notification Fee $75.00 Land Use Bylaw amendment $800.00 Municipal Development Plan amendments $800.00 Area Structure Plan application $2,000.00 Area Structure Plan amendments $500.00 Advertising Fee $500.00 Additional costs incurred by Town for outside agencies to review plans. Cost of Service Development Agreements: Single Phase $750.00 Multi Phase Development Agreement $1,500.00 Manufactured Home Park / Campground $1,500.00 Subdivision and Development Appeal fee $300.00 Encroachment agreement (includes registration fee) $250.00 Variance application (plus notification fee) $75.00 Compliance Certificates applications (Policy #10) Residential {within 3 working days) $75.00 Residential Rush (within one working day) $150.00 Non--Residential {within 3 working days) $100.00 Non--Residential Rush (within one working day) $200.00 Document hard copies (LUB, MDP, ASP, IDP etc.) $0.50 per page SCHEDULE B FEES RELATED TO SAFETY CODES PERMITS BUILDING PERMIT FEE SCHEDULE RESIDENTIAL / DWELLING UNITS / FARM New Construction -- Building Permit Levy (main level) -- Upper / Lower Floors No charge for undeveloped basements on new construction Building Permit also required for Basement Development Demolitions Residential $0.50 per sq. ft $0.39 per sq. ft $0.39 sq. ft {min. $95.00) $104.00 (Flat Rate) ACCESSORY Garages (attached or detached) (flat rate) {(under 624 sq. ft) Shops, garages, storage buildings (624 sq. ft& over) Additions / renovations / basement development / deck roofs and enclosure Decks 2 (.6m) & over in height And/or garden storage sheds over 107 sq. ft Fireplaces (if not included in new construction) Residential Geothermal Heating (Engineer Design Required) $125.00 (Flat Rate) $0.39 per sq. ft $0.39 sq. ft (min. fee $110.00) $125.00 (Flat Rate) $104.00 (Flat Rate) $275.00 (Flat Rate) RTIM / MODULAR HOMES / MANUFACTURED HOMES RTM/Modular home or relocate existing residence (Set--up on permanent foundation/basement/piles} Building Permit also required for Basement Development Manufactured home set--up {Set--up on blocking/foundation/piles) Manufactured home roof retrofit $0.39 per sq. ft {min. fee $350.00) $0.39 per sq. ft {min. fee $110.00) $150.00 (Flat Rate) $150.00 (Flat Rate) COMMERCIAL / INDUSTRIAL / INSTITUTIONAL / APARTMENTS / RESIDENTIAL UNITS (5 OR MORE) First $1,000,000.00 construction value $6.00 per/ $1,000 construction value Over $1,000,000.00 construction value $6,000.00 plus ($4.50 per/ $1,000 construction value over $1,000,000.00) Minimum Commercial Permit Fee $300.00 (Flat Rate) Demolitions Commercial (flat rate) $125.00 {Flat Rate) Commercial Geothermal Heating (Engineer Design Required) $275.00 (Flat Rate) MISCELLANEOUS Fee for Service (As Built / Existing Buildings) $95.00 an hour {(min 2--hour charge) Change of Occupancy / Tenant Improvement permit See Bldg Commercial Min Fee Re--open Old Files $95.00 Retaining Wall attached to building $95.00 (Flat Rate) Detached retaining wall, no building permit required Freestanding signs / Billboard signs $200.00 (Flat Rate) {foundation for billboard must be designed by a professional engineer) Building: Add applicable 'Safety Codes Council levies to each permit; $ 4.50 each permit or 4% of permit levy, whichever is greater. A minimum cancellation fee of $35.00 will be retained when a permit is cancelled, or 25% of the fee if a drawing review has been completed or an inspection has been carried out. When work has commenced without first obtaining the required permit(s); the permit fees will be doubled up to a maximum of $100.00 surcharge per permit. Re--inspections performed in addition to those required by the Town QMP will be charged to the permit applicant at the rate of $95.00 per inspection plus GST. GAS PERMIT FEE SCHEDULE Number of Outlets Permit Fee BTU Input Permit Fee BTU Input Permit Fee >rea $90.00 10,000 $90.00 210,000 $120.00 $95.00 20,000 $90.00 230,000 $120.00 $105.00 30,000 $90.00 250,000 $130.00 $120.00 40,000 £90.00 300,000 $135.00 $135.00 50,000 $95.00 350,000 $140.00 $150.00 60,000 $95.00 400,000 $145.00 $165.00 70,000 $95.00G 450,000 $155.00 $180.00 80,000 $95.00 500,000 $160.00 $190.00 90,000 $95.00 550,000 $165.00 $200.00 108,000 $100.00 600,000 $170.00 $210.00 118,000 $100.00 650,000 $175.00 $220.00 120,000 $100.00 700,000 $180.00 $230.00 130,000 $100.00 750,000 $185.00 $235.00 140,000 $100.00 800,000 $190.00 $245.00 150,000 $105.00 $50,000 $195.00 $250.00 160,000 $105.00 900,000 $205.00 $255.00 170,000 $105.00 950,000 $215.00 $260.00 180,000 $105.00 1,000,000 $250.00 [ cof g| of uj pf w[ ob Mn o ~1f Ofp uf l t Mfo--[ o 1,000,001 to 2,000,000 --a \p $265.00 190,000 $105.00 $270.00 ba < $270.00 200,000 $115.00 Over 2,000,000 Add $5.00 per 100,000 BTU Propane and Small Installations Propane Tank Sets (New or Replacements) $100.00 Temporary Propane/Natural Gas Heating (Includes Tank Set) $100,00 Gas/Propane Cylinder Refill Centers $280.00 Replacement Commercial or Industrial Appliances (per unit) 1 -- 400,0060 BTU Input $150.00 per Unit 400,001 -- 3,000,000 BTU Input $230.00 per Unit Over 3,000,000 BTU Input $330.00 per Unit Gas: Add applicable 'Safety Codes Council' levies to each permit; $ 4.50 each permit or 4% of permit levy, whichever is greater! A minimum cancellation fee of $35.00 will be retained when a permit is cancelled, or 25% of the fee if a drawing review has been completed or an inspection has been carried out. When work has commenced without first obtaining the required permit(s); the permit fees will be doubled up to a maximum s of $100.00 surcharge per permit. Re--inspections performed in addition to those required by the Town QMP will be charged to the permit applicant at the rate of $95.00 per inspection plus GST. PLUMBING PERMIT FEE SCHEDULE (RESIDENTIAL) $£90.00 21 $190.00 $95.00 22 $195.00 $100.00 23 $200.00 $105.00 24 $205.00 $110.00 25 $210.00 $115.00 26 $215.00 $120.00 27 $220.00 $125.00 28 $225.00 $130.00 29 $230.00 $135.00 30 $235.00 $140.00 31 $240.00 $145.00 32 $245.00 $150.00 33 $250.00 $155.00 34 $255.00 $160.00 35 $260.00 $165.00 36 $265.00 $170.00 37 $270.00 $175.00 38 $275.00 $180.00 39 $280.00 $185.00 40 $285.00 Add $4.00 fixture over 40 PRIVATE SEWAGE PERMITS Private Sewage System -- $380.00 Holding Tanks -- $155.00 1 2 3 4 5 6 7 8 9 10 11 h3 pma fea fear [ e e pe-- fp-- G D |co |--1 |O |ta B $ |b) Plumbing: Add applicable 'Safety Codes Council levies to each permit; $ 4.50 each permit or 4% of permit levy, whichever is greater! A mirimum cancellation fee of $35.00 will be retained when a permit is cancelled, or 25% of the fee if a drawing review has been completed or an inspection has been carried out. When work has commenced without first obtaining the required permit(s); the permit fees will be doubled up to a maximum of $100.00 surcharge per permit. Re--inspections performed in addition to those required by the Town QMP will be charged to the permit applicant at the rate of $95.00 per inspection plus GST PLUMBING PERMIT FEE SCHEDULE (COMMERCIAL) I $90.00 $260.00 69 $430.00 2 $95.00 36 $265.00 70 $435.00 3 $100.00 37 $270.00 71 $440.00 4 $105.00 38 $275.00 72 $445.00 5 $110.00 39 $280.00 73 $450,00 6 $115.00 40 $285.00 74 $455.00 7 $120.00 41 $290.00 75 $460.00 8 $125.00 42 $295.00 76 $465.00 9 $130.00 43 $300.00 77 $470.00 10 $135.00 44 $305.00 78 $475.00 11 $140.00 45 $310.00 79 $480.00 12 $145.00 46 $315.00 80 $485.00 13 $150.00 47 $320.00 81 $490.00 14 $155.00 48 $325.00 82 $495.00 15 $160.00 49 $330.00 83 $500.00 16 $165.00 50 $335.00 84 $505.00 17 $170.00 51 $340.00 85 $510.00 18 $175.00 52 $345.00 86 $515.00 19 $180.00 53 $350.00 87 $520.00 20 $185.00 54 $355.00 88 $525.00 21 $190.00 55 $360.00 89 $530.00 22 $195.00 56 $365.00 90 $535.00 23 $200.00 57 $370.00 91 $540.00 24 $205.00 58 $375.00 92 $545.00 25 $210.00 59 $380.00 93 $550.00 26 $215.00 60 $385.00 94 $555.00 27 $220.00 61 $390.00 95 $560.00 28 $225.00 62 $395.00 96 $565.00 29 $230.00 63 $400.00 97 $570.00 30 $235.00 64 $405.00 98 $575.00 31 $240.00 65 $410.00 99 $580.00 32 $245.00 66 $415.00 100 $585.00 33 $250.00 67 $420.00 Add $4.00 each fixture over 34 $255.00 68 $425.00 100 Under 1,000 $95.00 20,000.01--30,000 $335.00 ELECTRICAL PERMIET FEE SCHEDULE (For "Other Than" New Single Family Residential) 220,000.01 --230,000 1,000.01 -- 1,500 $100.00 30,000.01 --40,000 $370.00 230,000.91 -- 240,000 $1,000.00 1,500.01 --2,000 $110.00 40,000.01 -- 50,000 $405.00 240,000.01 -- 250,000 $1,100.00 2,000.01 --2,500 $120.00 50,000.01 -- 60,000 $440.00 250,000.01 -- 30G,000 $1,200.00 2,500.01 --3,000 $130.00 60,000.01 -- 70,000 $473.00 300,000.01 --350,000 $1,300.00 3,000.01 --3.500 $140.00 79,000.01 ---- $0.000 $510.00 350.000.01 -- 400,000 $1,400.00 3,500.01 --4,000 $ 150.00 $0,000.01 --90,000 $545.00 400,000.01 --450,000 $1,500.00 1,000.01 -- 4,500 $160.00 $0,000.01 -- 100,000 $580.00 430,000.01 -- 500,000 $1,500.00 4,500.01 -- 5.000 $170.00 100.000.01 -- 110,000 $600.00 500,000.01 ---- 550,000 $1,700.00 5,000.01 -- 5.500 $130.00 110,000.01 -- 120,000 $630.00 550,000.01 ---- 600,000 $1.$00.00 5,500.01 --6,000 $190.00 120,000.01 -- 130,000 $660.00 €00,000.01 -- 650,000 $1,900.00 6,000.01 -- 6500 $200.00 139,000.01 -- 140,000 $690.00 £50,000.01 -- 700,000 $2,000.00 6,500.01 -- 7.000 $210.00 140,000.01 -- 150.000 $720.00 700,000.01 -- 750,0900 $2,100.00 7.000.01 -- 7,500 $220.00 150,000.01 -- 160,000 $750.00 750,000.01 -- £00,000 $2.250.00 7.500.01 ---- 8,000 $230.00 160.000.01 -- 170,000 $780.00 $00,000.01 -- $30,000 $2,350.00 $.000.01 -- £,500 $240.00 170,000.01 -- 180,000 $810.00 $50,000.01 -- 900,000 $2.450.00 £.500.01 _ 9.000 $250.00 180,000.01 -- 190,000 $840.00 900,000.01 -- 950,000 $2,550.00 $.000.G1 -- 9,500 $260.00 190,000.01 -- 200000 $870.00 950,000.01 -- 1,909,000 $2,650.00 9.500.01 -- 10,000 $270.00 200,000.01 --210,000 $900.00 For each additional $50,000 over $2,630.00 + $50.00 10,000.01 --20,000 $300.00 210,000.01 -- 220,000 $930.00 $1,000,000 per unit For installation costs exceeding $1,000,000.00, please contact The Inspections Group Inc. to verify permit fee. Installation Cost -- Total value of electrical materials, fixtures and supplies plus labor (in the case of a homeowner-- double the value of materjals, fixtures & supplies to get the installation cost) TEMPORARY AND SERVICE CONNECTIONS, CONDUCTORS AND FEEDERS -- A flat fee of $95.00 (plus Safety Codes Fee $4.50) will be charged for temporary services and above ground or underground service connections, conductors and feeders. ELECTRICAL PERMIT FEE SCHEDULE {For "NEW*"Single Family Residential Up to 1200 square feet $150.00 1201 to 1500 square feet $175.00 1501 to 2000 square feet $200.00 2001 to 2500 square feet $225.00 Over 2500 square feet $250.00 Attached Garage Include square footage of garage with house Manufactured, Modular and RTM Homes (on foundation or basement} $100.00 Basement development wiring -- new home -- if done at time of initfal construction {otherwise as per above) $95.00 Mobile home connection $95.00 Detached Residential Garage $.20 a sq. ft. (minimur fee $95.00) ANNUAL ELECTRICAL PERMIT FEE SCHEDULE $2.000 or less thcreafter $95.00 ner hour or portion thereof $450.00 plus $3.25 for each $100 cost over $2,000 or $ 2,000 to $ 3,000 fraction of each $100.00. $600.00 plus $1.60 for each $100 cost over $5,000 or $ 5.000 to $ 30,000 fraction of each $100.00. $1,200 plus $1.10 each $100 cost over $50,000 or fraction $50,000 to $1.000,000 of each $100.00. $1,000,000.01 and over Contact the Inspections Group Electrical: Add applicable 'Safety Codes Council' levies to each permit; $ 4.50 each permit or 4% of permit levy, whichever is greater! A minimum cancellation fee of$35.00 will be retained when a permit is cancelled. or 25% ofthefee ifa drawing review has been completed or an inspection has been carried out. When work has commenced without first obtaining the required permit(s); the permit fees will be doubled up to a maximum of $100.00 surcharge per permit. Re--inspections performed in addition to those required by the FTown QMP will be charged to the permit applicant at the rate of $95.00 per inspection plus GST