Subdivision and Development Servicing Bylaw No. 1570, 2007

Armstrong, British Columbia · adopted 2007-11-13

This is the exact embedded text of the captured official document. Snapshot 2c60d10fcb24 · verified 2026-08-23 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

CITY OF ARMSTRONG SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570 2007 SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 1 City of Armstrong City of Armstrong SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 AMENDMENTS BYLAW NO. ADOPTION AMENDMENT SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 2 City of Armstrong Table of Contents City of Armstrong SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 Table of Contents BYLAW: SECTION 1 - Title P - 4 SECTION 2 - Interpretation P - 5 SECTION 3 - Subdivision and Development Requirements and Regulations P - 9 SECTION 4 - Provision of Services in Subdivisions and Developments P - 10 SECTION 5 - Servicing Requirements for Subdivisions under Land Title Act P - 17 SECTION 6 - Servicing Requirements for Developments not Requiring Subdivision P - 19 SECTION 7 - Servicing Requirements for Highways Abutting a Site being Subdivided or Developed P - 21 SECTION 8 - Administration and Enforcement P - 25 SECTION 9 - Enactment P - 29 SCHEDULES: TITLE SCHEDULE A Level of Service P - 30 SCHEDULE B Regulations, Standards and Specifications For The Design and Construction of Highways P - 36 SCHEDULE C Regulations, Standards and Specifications For The Design and Construction of Water Systems P - 49 SCHEDULE D Regulations, Standards and Specifications For The Design and Construction of Sanitary Sewers P - 60 SCHEDULE E Regulations, Standards and Specifications For The Design and Construction of Drainage Systems P - 69 SCHEDULE F Regulations, Standards and Specifications For The Design and Construction of Concrete Curbs, Gutters, Sidewalk, Stairs P - 78 SCHEDULE G Regulations, Standards and Specifications For The Design and Construction of Street Lighting P - 82 SCHEDULE H Regulations, Standards and Specifications For The Design and Construction of Hydro, Telephone, Gas, CATV P - 86 SCHEDULE I Regulations, Standards and Specifications For The Design and Construction of Landscaping P - 89 SCHEDULE J Specification Drawings P - 92 SCHEDULE K Regulations, Standards and Specifications For Surveys and Design Drawings P - 97 SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 3 City of Armstrong Table of Contents SCHEDULES: TITLE SCHEDULE L Materials, Construction, Testing Specifications P - 106 SCHEDULE M Application for Preliminary Layout Review P - 153 SCHEDULE M-1 Standard Subdivision / Development Agreement Document P - 156 SCHEDULE N Statutory Right-of-Way Document P - 174 SCHEDULE O Confirmation of Commitment by Owner Regarding Design and Field Review of Construction By A Professional Engineer P - 183 SCHEDULE P Certificate of Inspection P - 187 SCHEDULE Q Certificate of Substantial Completion P - 189 SCHEDULE R Certificate of Completion P - 191 SCHEDULE S Certificate of Final Acceptance P - 193 SCHEDULE T Agreement to Pay Non-Refundable Deposit P - 195 SCHEDULE U Cost Sharing Agreement P - 197 SCHEDULE V Insurance Certificate P - 199 SCHEDULE W Letter of Credit P - 202 SCHEDULE X Flushing / Testing / Disinfection Report P - 204 SCHEDULE Y Fire Hydrant Flow Test Procedure and Report P - 207 SCHEDULE Z Signed Release P - 210 FORMS Form M/07 Application for Preliminary Layout Review P - 153 Form M-1/07 Standard Subdivision / Development Agreement Document P - 156 Form N/07 Statutory Right-of-Way Document P - 174 Form O/07 Confirmation of Commitment by Owner Regarding Design and Field Review of Construction By A Professional Engineer P - 183 Form P/07 Certificate of Inspection P - 187 Form Q/07 Certificate of Substantial Completion P - 189 Form R/07 Certificate of Completion P - 191 Form S/07 Certificate of Final Acceptance P - 193 Form T/07 Agreement to Pay Non-Refundable Deposit P - 195 Form U/07 Cost Sharing Agreement P - 197 Form V/07 Insurance Certificate P - 199 Form W/07 Letter of Credit P - 202 Form X/07 Flushing / Testing / Disinfection Report P - 204 Form Y/07 Fire Hydrant Flow Test Procedure and Report P - 207 Form Z/07 Signed Release P - 210 SPECIFICATION DRAWINGS Schedule J Table of Contents P - 92 SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 4 City of Armstrong SECTION 1 - Title City of Armstrong SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 A Bylaw to Regulate the Subdivision and Development of Land. WHEREAS a Municipality may by Bylaw regulate the Subdivision and Development of land (currently pursuant to Part 26, Division 9 and 11 of the Local Government Act); AND WHEREAS it is deemed desirable to regulate the subdivision and development of land in order to promote the orderly and economic development of the City; AND WHEREAS the City of Armstrong wishes to amend the provisions of the present Subdivision and Development Servicing Bylaw No. 1169, 1994; NOW THEREFORE, the Council of the City of Armstrong, in open meeting assembled, ENACTS AS FOLLOWS: SECTION 1 - TITLE This Bylaw may be cited as the "City of Armstrong Subdivision and Development Servicing Bylaw No. 1570, 2007". SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 5 City of Armstrong SECTION 2 - Interpretation SECTION 2 - INTERPRETATION In this Bylaw, unless the context requires otherwise: "Act" means Local Government Act, Land Title Act, Health Act, and any other Act named in this Bylaw and found in the revised Statutes of British Columbia, 1996, as amended from time to time both before and after the date of this Bylaw. "Applicant" means a person, duly authorized by the Owner of the property proposed to be subdivided or developed, to act as agent for the Owner. "Approval, Final" means the Approving Officer's affixation of his/her signature to the subdivision plan pursuant to Section 88 of the Land Title Act. "Approval, Preliminary Layout" means written notification of a review of information presented to the Approving Officer previous to submission of a subdivision plan for final approval. "Approving Officer" means the person duly authorized by Council to act as Approving Officer under Section 77 of the Land Title Act and includes a Deputy Approving Officer. "As-Built/Record Drawing" means revised design drawings, prepared by or under the supervision of a Professional Engineer, which accurately detail the location of the final constructed works. "Boulevard" means that area between the parcel line of the adjoining property and the traveled portion of a street or highway but does not include curbs, gutters, sidewalks, or driveways. "Building Inspector" means the Building Inspector duly authorized by Council to act on behalf of the City of Armstrong. "Building Regulations" means the Building Regulations adopted by Council for application in the City of Armstrong. "City Engineer" means the Engineer, or Designate, of the City of Armstrong appointed as such by the City Council of Armstrong. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 6 City of Armstrong SECTION 2 - Interpretation "Contractor" means a company, firm, or employee, bound by a legal contract with the Owner(s) to complete the Works and Services required for the Subdivision or Development. "Council" means the City Council of the City of Armstrong. "Cul-de-sac" means a street or highway with only one point of intersection with another street or highway and which terminates in a vehicle-turning area and is designated to be permanently closed to thru traffic except for a lane or walkway, by the pattern of the subdivision. "Development" means an activity that requires a Building Permit or an activity that alters the existing surficial characteristics of the land. "Frontage" means the length of a lot boundary which immediately adjoins a street or highway other than a lane or a walkway. "Highway" means a street, road, lane, walkway, bridge, viaduct, and any other way open to public use. Except for highways created under Section 4 of the Highways Act, the width of a highway is measured from lot line to lot line. A highway does not include private easements on private property. "Highway, Arterial" means a street used primarily by fast or heavy traffic of which a significant portion has both its origin and destination outside of the subdivision area. "Highway, Collector" means a street which carries traffic from local streets to arterial streets and includes the principal entrance streets for circulation of traffic within such a subdivision. "Highway, Local" means a street used primarily for travel and access to and from the parcels of land contiguous thereto. "Irrigation District" means and Irrigation District incorporated under the Local Government Act or in the Water Act. "Lane" means a public thoroughfare which affords only secondary means of access to a lot at the side or rear and is not to be considered a partial street. "Lot" means an area of land, or lands, designated as a separate, distinct parcel on a legally recorded subdivision plan or description filed in the Land Title Office, and having a principal frontage upon a public street or road. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 7 City of Armstrong SECTION 2 - Interpretation "Lot Line" means a legally defined boundary of any lot. "Lot Depth" means the shortest horizontal distance between the front and rear lot lines. "Lot Width" means the horizontal distance between the side lot lines measured at right angles to the lot depth. "Medical Health Officer" means the Medical Health Officer appointed under the Health Act. "Municipality" means the City of Armstrong or the area within the city boundaries thereof as the context may require. "Owner(s)" means the person or persons registered in the Land Title Office as the Owner(s) of the parcel of land for which application is being made for subdivision or development. "Owner's Engineer" means the Professional Engineer engaged by the Owner to design and prepare drawings for construction of works in a subdivision or development and to issue a Certificate of Inspection. "Potable Water" means water which is approved for drinking purposes by the Medical Health Officer. "Professional Engineer" means a person who is registered or duly licensed as such under the provisions of the Engineers and Geoscientists Act of British Columbia. "Proven Supply" means that a supply of potable water is available and proven with respect to volume, delivery and continuity of supply from an on-site groundwater system, a source requiring a water license from the Ministry of Environment, or a community water system. "Roadway" means the portion of the highway that is improved, designed or ordinarily used for vehicular traffic. "Service Level" means the standard of municipal services required for the development of subdivisions and other developments not requiring subdivision under the provisions of this Bylaw. "Street" means a highway except a lane, trail, or walkway. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 8 City of Armstrong SECTION 2 - Interpretation "Subdivision" means any change in the existing size, shape, number or arrangement of registered lots, whether or not involving the creation of a greater number of lots than existing and whether carried out by plan or metes and bounds description. Consolidation of existing lots and subdivisions and developments carried out under the provisions of the Strata Property Act shall be included within this definition. "Top of Slope, Embankment or Escarpment" means the natural defined top edge of a slope, embankment or escarpment, or, where a gradual steepening exists, the point at which the slope exceeds 30% grade. "Walkway" means a highway intended to carry pedestrian and non-motorized traffic. "Watercourse" means any natural or man-made drainage course or source of water, whether usually containing water or not, and includes any lake, river, creek, spring, ravine, swamp, gulch, or source of ground water, whether enclosed in a conduit or not, or as required by a designated official of the Ministry of Environment of the Province of British Columbia. "Works and Services" means any public or private service, facility, or utility which is required by this Bylaw and without restricting the generality of the foregoing includes: the supply and distribution of water, including fire hydrants, the collection and disposal of sewage, the collection and disposal of storm/drainage water, street lighting, dedicated and constructed highways including asphalt concrete pavement surface, curb & gutter, landscaping, sidewalks, stairs, fences, boulevards, pavement markings, signage, street trees, planters, boulevard irrigation, park benches, mail boxes, the supply and installation of electrical power, telephone, natural gas, and cable television. "Zone" means an area created by the Zoning Bylaw of the City of Armstrong as amended or as replaced from time to time both before and after the effective date of this Bylaw. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 9 City of Armstrong SECTION 3 - Subdivision and Development Requirements and Regulations SECTION 3 - SUBDIVISION AND DEVELOPMENT REQUIREMENTS AND REGULATIONS Compliance with Bylaw 3.01 No person shall subdivide or undertake subdivision or development of land in the City of Armstrong except in compliance with the provisions of this Bylaw. General Requirements for Design of Subdivisions 3.02 No subdivision of land shall be approved which: a) is not suited to the configuration of land being subdivided, b) is not suited to the use to which it is intended, or c) will make impracticable the future subdivision of the land within the proposed subdivision or of any adjacent land. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 10 City of Armstrong SECTION 4 - Provision of Services in Subdivisions and Developments SECTION 4 - PROVISION OF SERVICES IN SUBDIVISIONS AND DEVELOPMENTS Level of Service 4.01 Unless otherwise approved by a Development Variance Permit issued by the Council pursuant to Section 922 of the Local Government Act, all subdivisions, strata developments, and developments shall be provided with services as prescribed in Schedule A of this Bylaw and the level of services required may be different for different zones as established by the Zoning Bylaw in accordance with the provisions of Schedule A of this Bylaw. Subdivisions Where Servicing Requirements May Be Waived 4.02 a) Notwithstanding Subsection 4.01 of this Section, the servicing requirements prescribed in Schedule A of this Bylaw may be waived, by the Approving Officer where the lot created is to be used solely for the unattended equipment necessary for the operation of: i) a community water system, ii) a community sewer system, iii) a community gas distribution system, iv) a community radio or television receiving antennae, v) a radio or television broadcasting antenna, vi) a telecommunications relay station, vii) an automatic telephone exchange, viii) an air or marine navigational aid, ix) electrical substations or generating stations, or, x) any other similar public service or quasi public service facility or utility. b) Notwithstanding Subsection 4.01 of this section, the servicing requirements prescribed in Schedule A pertaining to provision of community sanitary sewer systems, community water supply systems, or storm sewer systems, may be waived provided that all of the following conditions are met: i) the maximum width of the lot after subdivision shall be 60 metres and the minimum lot area after subdivision shall be 5,000 square metres, SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 11 City of Armstrong SECTION 4 - Provision of Services in Subdivisions and Developments ii) the subdivision will not create new highways other than widening of existing highways, iii) the parcel to be subdivided does not adjoin a highway or easement that contains one or more of the following services: - sanitary sewer, - water, - storm sewer. Expense of Services To Be Borne By Owner 4.03 Unless otherwise provided in this Bylaw, all works and services required in this Bylaw shall be constructed and installed at the expense of the Owner. Bonding and Development Agreement Required 4.04 All works and services to be constructed and installed to serve any proposed subdivision of any lands shall be constructed and installed as prescribed in Schedules A to H hereto at the expense of the Owner prior to the approval of such subdivision by the Approving Officer. A plan of subdivision may be finally approved prior to the completion of the construction and installation of the required works and services where the Owner deposits a bond with the City of Armstrong in the amount of One Hundred and Twenty-Five Percent (125%) of the cost of installing and paying for all the works and services required as estimated by the Approving Officer before the subdivision plan is finally approved by the Approving Officer, and enters into a form of agreement with the City as contained in Schedule M hereto for subdivisions pursuant to the Land Title Act of the Province of British Columbia, to do all things required to carry out and construct the necessary works and services. Excess or Extended Capacity 4.05 Pursuant to Section 939 of the Local Government Act the City may require that the Owner provide excess or extended services to provide access to or service land other than the land being subdivided or developed. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 12 City of Armstrong SECTION 4 - Provision of Services in Subdivisions and Developments Right-of-Way Agreement 4.06 Where the provisions of this Bylaw require an Owner to grant a utility or drainage right-of-way to the City of Armstrong the Owner shall be required to enter into an agreement as prescribed in Schedule N of this Bylaw and shall pay all associated costs. Design and Field Review of Construction by a Professional Engineer 4.07 All engineering drawings required in this Bylaw for works and services shall be prepared by a Professional Engineer registered to practice in the Province of British Columbia. The Owner shall engage a Professional Engineer to carry out all necessary field reviews and inspections during the construction of works and services required as a condition of subdivision approval. The Professional Engineer shall submit a report in the format set out in Schedule P of this Bylaw certifying that the works and services have been carried out in compliance with this Bylaw and the plans, drawings, and supporting documents submitted in support of the subdivision application which were accepted by the City of Armstrong. All applications for subdivision shall include a letter of commitment from the Owner in the format set out in Schedule O of this Bylaw that a Professional Engineer has been engaged to carry out all necessary design works and undertake all field services for the subdivision. a) Upon completion of the works and services the Owner shall provide to the City Engineer 2 sets of as-built ANSI D prints signed and sealed by the Owner's Professional Engineer, 1 - CD ROM and 1 - Adobe Acrobat PDF CD format scaled to print on 280 mm x 430 mm (11" x 17") ANSI D, of all work constructed or installed pursuant to the application. b) If there are any deficient or missing as-built drawings upon completion of the work any refund due the Owner will be debited in the amount of $1,500.00 per drawing and CD. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 13 City of Armstrong SECTION 4 - Provision of Services in Subdivisions and Developments Exception For Service Connection 4.08 Notwithstanding Section 4.07 above, in a subdivision where only service connections to existing works and services are required, the City may not require that the applicant engage a Professional Engineer to design the service connections. Geotechnical/ Slope Stability 4.09 A geotechnical report(s) on slope stability is required prior to land use redesignation, subdivision, development and/or building approval. A report is required wherever the slope on the subject lands or portions thereof exceed fifteen percent (15%) or where past subsidence, slippage or seepage is evidenced in the vicinity of the site. The requirement for a geotechnical report for slope stability may be waived by written authorization from the City Engineer. The City Engineer may also require a Geotechnical report for sites with soil conditions, swelling clays, groundwater, or other such conditions, which, in the opinion of the City Engineer, require special attention. a) Slope stability reports shall contain a minimum of the following information: i) Existing property lines shown on plan(s). ii) Top of slope, embankment escarpment, and toe of slope. iii) Contour mapping as required by the Geotechnical Engineer. iv) Stability Limit (S.L.) line(s) shown on the plan(s). The S.L. line is defined as the line that corresponds to a slope stability Safety Factor (S.F.) of 1.5 and delineates the Developable Area where S.F. is greater than 1.5 from the Undevelopable Area where S.F. is less than 1.5. To define the S.L. line, the slope is to be analyzed in the existing natural condition using the highest expected groundwater condition, both natural and man-made. v) The effect of and extent of slope failure on the subject land and adjacent properties and the methods of protection of the lands. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 14 City of Armstrong SECTION 4 - Provision of Services in Subdivisions and Developments vi) A setback line, drawn in relation to the S.L. line and within the developable area, which shall define the point nearest the S.L. line that structures (including streets, underground utilities, building foundations, swimming pools, etc.) can be constructed without jeopardizing the slope stability at the S.L. line. The building setback line shall be no closer to the top of slope than: a) that line determined by a Geotechnical Engineer using a method described in this section, or b) the "rear yard setback" distance as may be specified by City of Armstrong Bylaw. vii) Identification of proposed fill areas and development of a filling plan addressing ultimate topography, fill materials, methodology, inspection, testing, revegetation, slope stability and setbacks as defined by this section. viii) Assessment and recommendations regarding the effects of rainfall, runoff and irrigation. b) Existing lands within areas where the S.F. is less than 1.5 may be considered for development by the City Engineer if the existing slope is modified using recognized remedial procedures which will yield a S.F. greater than 1.5. c) A Geotechnical Report shall be provided which comments on, but is not necessarily limited to; the suitability of the subgrade to support road construction without settlement, provides recommendations for road structure design commenting on shrinkage/expansion of the subgrade found in the City of Armstrong, the suitability of the subgrade to support water and gravity sanitary and storm infrastructure without settlement, the suitability of excavated trench material for utilization as trench backfill, and the suitability of the subgrade to support residential or commercial development. d) Geotechnical and Slope stability reports shall be prepared by a Professional Geotechnical Engineer. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 15 City of Armstrong SECTION 4 - Provision of Services in Subdivisions and Developments e) It is the responsibility of the Owner to ensure that geotechnical and slope stability reports are initiated and that development conforms to the recommendations in the report. f) The Geotechnical and Slope Stability report shall include provisions which permit the City of Armstrong to use and rely on the Report's findings and recommendations and be signed over seal by a Geotechnical Engineer duly licensed as such under the provisions of the Engineers and Geoscientists Act of British Columbia. Traffic Impact Analysis 4.10 The Approving Officer may require the Owner to provide a traffic impact analysis. Off-Site Utilities Impact Analysis 4.11 The Approving Officer may require the Owner to provide an off-site utilities impact analysis. Site Preparation 4.12 In no case shall land be excavated, filled, paved or graveled or the surface features of land otherwise be altered for the purpose of development without the prior written approval of the Approving Officer or the City Engineer. Off-Site Services 4.13 The Owner may be required to contribute towards the costs of upgrading or upsizing off-site roads and utilities required to service the subdivision and/or development in accordance with Bylaw 1570. Works Within Existing Right-of-Ways 4.14 Where a subdivision or development must construct works within a City road, or right-of-way, the following is required: a) Provide engineering drawings for the works in accordance with the provisions of this Bylaw. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 16 City of Armstrong SECTION 4 - Provision of Services in Subdivisions and Developments b) Provide security in a form acceptable to the City Treasurer in the amount of One Hundred and Twenty-five (125%) of the cost of construction of the works within the City road or right-of-way, plus development, processing, administration, engineering and inspection fees as set out in Schedule 8.01 of this Bylaw. c) Obtain a Permit from the City Engineer for construction within a right-of-way. Exception for Property Boundary Adjustments 4.15 Notwithstanding Section 4.01 of this Bylaw, subdivisions involving only property boundary adjustments where the number of lots is not increased shall not be subject to the requirements of this Bylaw except in the following cases: a) Where road dedication is required all dedication for future road widening shall be obtained at the time of the property boundary adjustment application. b) Any unprotected or existing servicing that encroaches on an adjustment parcels shall be protected by means of easement or statutory right-of-way or relocated as required by the City Engineer. Any relocation of services shall be governed by the regulations of this Bylaw. c) The Applicant shall provide a plan prepared in accordance with this Bylaw showing the location of all existing structures, road and utilities in order to demonstrate compliance with the above requirements. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 17 City of Armstrong SECTION 5 - Servicing Requirements for Subdivisions under Land Title Act SECTION 5 - SERVICING REQUIREMENTS FOR SUBDIVISIONS UNDER LAND TITLE ACT Highways 5.01 All highways created by plan of subdivision including widening of highways shall: a) comply with the dimensions, location, alignment, drainage, and gradient requirements set out in Schedules A, B and E of this Bylaw and; b) be cleared, graded, surfaced and landscaped in accordance with standards set out in Schedules A and B of this Bylaw. Sidewalks, Curbs and Gutters 5.02 (a) In subdivisions where highways are created, sidewalks, curbs and gutters shall be provided as required in Schedule A and constructed in accordance with the standards set out in Schedule F of this Bylaw. (b) Where in the opinion of the City the construction of curb, gutter and sidewalks would be impractical at the time of subdivision a cash deposit shall instead be deposited with the City in accordance with the conditions and requirements of paragraph 7.01 (b) (iii) and Schedule T of this Bylaw, to be used by the City for the future construction of curb, gutter and sidewalk improvements on the highway adjacent to the lands being subdivided. Street Lighting 5.03 In subdivisions where highways are created, street lighting shall be provided as required in Schedule A and constructed in accordance with the standards set out in Schedule G of this Bylaw. Electrical and Communications Wiring and Gas Distribution System 5.04 In subdivisions where parcels are created each parcel shall be provided with power supply and communications consistent with the standards set out in Schedule A and Schedule H of this Bylaw. Where cablevision and gas service are to be provided such services shall be provided consistent with the standards set out in Schedules A and H of this Bylaw. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 18 City of Armstrong SECTION 5 - Servicing Requirements for Subdivisions under Land Title Act Water Distribution System 5.05 In subdivisions where parcels are created each parcel shall be supplied with a complete water distribution system connected to a community water system as required in Schedule A, and all system components shall be installed in accordance with the standards set out in Schedule C of this Bylaw. Sanitary Sewer 5.06 In subdivisions where parcels are created each parcel shall be: a) provided with a complete sewage collection system connected to the community sanitary sewer system, or b) provided with an on-site sewage disposal system as required in Schedule A of this Bylaw, and all system components shall be installed in accordance with the standards set out in Schedule D of this Bylaw. Drainage System 5.07 In subdivisions where parcels are created each parcel shall be provided with a complete and fully operative drainage system as required in Schedule A of this Bylaw, and constructed in accordance with the standards set out in Schedule E of this Bylaw. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 19 City of Armstrong SECTION 6 - Servicing Requirements for Developments not Requiring Subdivision SECTION 6 - SERVICING REQUIREMENTS FOR DEVELOPMENTS NOT REQUIRING SUBDIVISION Developments Not Requiring Subdivision 6.01 As a condition of the issuance of a Building Permit on a site being developed the City of Armstrong may require that the Owner provide works and services which are directly attributable to the development consistent with the provisions of this section. Prior to issuing a Building Permit on a site being developed the City of Armstrong may require the Owner to prepare a site servicing plan and details prepared by a Professional Engineer which shall identify how the Owner intends to construct the services on the site. All site servicing plans are to be approved by the City Engineer. Domestic Water 6.02 Where the provisions of Schedule A require a parcel containing a development to be served by a community water system the water distribution system on the parcel shall be constructed and connected to the community water system consistent with a site servicing plan approved by the City Engineer and the provisions of Schedule C of this Bylaw. Sanitary Sewer 6.03 Where the provisions of Schedule A require a parcel containing a development to be served by a community sewer system the sewage collection system on the parcel shall be constructed and connected to the community sewer system consistent with a site servicing plan approved by the City Engineer and the provisions of Schedule D of this Bylaw. Site Drainage 6.04 The development shall be provided with site drainage collection and disposal facilities in accordance with a site servicing plan approved by the City Engineer and the provisions of Schedule E of this Bylaw. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 20 City of Armstrong SECTION 6 - Servicing Requirements for Developments not Requiring Subdivision Site Parking and Loading Facilities 6.05 For developments where on-site parking and/or on-site loading facilities are required the development shall be provided with vehicle access from a highway or highways in accordance with the Access Permit and a site servicing plan approved by the City Engineer. For developments located on sites fronting on a controlled access highway designated pursuant to the Highway Act, the proposed method of providing access to the site shall also be subject to the approval of the Province of British Columbia Ministry of Transportation. Electrical, Telephone and Cablevision Wiring 6.06 Where the provisions of Schedule A require underground wiring all hydro, telephone, cablevision, and street light wiring shall be installed underground consistent with the provisions of Schedules G and H of this Bylaw. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 21 City of Armstrong SECTION 7 - Servicing Requirements for Highways Abutting a Site being Subdivided or Developed SECTION 7 - SERVICING REQUIREMENTS FOR HIGHWAYS ABUTTING A SITE BEING SUBDIVIDED OR DEVELOPED 7.01 As a condition of the approval of a subdivision or development or the issuance of a Building Permit the City of Armstrong shall require that the Owner provide works and services directly attributable to the development on that portion of all highways immediately abutting the parcel being subdivided or developed up to the centre line of the highways for Items (a) and (b) below only. Works and services which are required include: a) i) Where there is no existing work, highway improvements including clearing, grading, drainage and surfacing in accordance with the standards set out in Schedules A and B of this Bylaw. ii) Where existing works are deemed adequate for the development proposed no highway improvements shall be required. b) i) Sidewalk, curb and gutter improvements in accordance with the standards set out in Schedules A and F of this Bylaw subject to the following: 1. The construction of a sidewalk may also include without limiting the generalities of the foregoing, the construction of additional off-site works such as curbs, gutters, catch basins, storm sewer main extensions, handrails and retaining walls such that the sidewalk can be properly installed and maintained. Such additional off-site works shall be constructed in accordance with the standards contained within this Bylaw. The City Engineer is to confirm the extent and details of the additional off-site construction works associated with a required sidewalk. 2. Sidewalks are not required to be constructed within the City road right-of-way adjacent to a property for which a Building Permit or Subdivision Application has been submitted under the following conditions: SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 22 City of Armstrong SECTION 7 - Servicing Requirements for Highways Abutting a Site being Subdivided or Developed 2.1) A sidewalk has not been designated by the authority having jurisdiction for the side of the road right-of-way adjacent to the subject property under application. 2.2) A sidewalk is not required as per Table A.2 of this Bylaw. 2.3) Where the Subdivision Plan only involves a consolidation of lots or road dedication or road closure or phased building strata or lease plan. 2.4) Where the Building Permit application only involves signs or internal renovations or exterior renovations without additions or accessory buildings or small public utility structures such as pump houses and park washrooms or portable classrooms and washroom structures or temporary buildings or minor additions valued at less than $25,000., and 2.5) Where the road right-of-way adjacent to the subject property under application is insufficient in width to accommodate the designed sidewalk and where the right-of-way acquisition is not part of the application approval provisions. ii) Where the existing works are deemed adequate for the development proposed, no improvements will be required. iii) Where in the opinion of the City the construction of curb, gutter and sidewalk improvements would be impractical at the time of subdivision or development a cash deposit shall instead be deposited with the City to be used by the City for the future construction of curb, gutter and sidewalk improvements on the highway adjacent to the lands being subdivided or developed. The provision of a cash deposit shall be subject to the following: SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 23 City of Armstrong SECTION 7 - Servicing Requirements for Highways Abutting a Site being Subdivided or Developed 1. The amount of the cash deposit shall be equal to the total estimated costs of constructing the required curb, gutter and sidewalk improvements, as determined by the City, based on the City's unit prices for such construction and the requirements of Tables A2 and F.1 of Schedules A and F of this Bylaw. 2. Without limiting the generality of (a), the construction of the curb, gutter and sidewalk improvements shall include all additional and ancillary works including, but not limited to such items as base and sub-base aggregate, catch basins, storm sewer main extensions, steps, handrails and retaining walls required for the proper installation of the curb, gutter and sidewalk improvements. 3. The City shall hold the cash deposit in trust and only use the deposit for the future construction of curb, gutter and sidewalk improvements and ancillary components on the highway adjacent to the lands being subdivided or developed. 4. The timing of the future construction of the curb, gutter and sidewalk improvements shall be at the sole discretion of the City. 5. The provisions of the cash deposit shall constitute full and complete compliance with the requirements of subsections 7.01 (b) (i) and 5.02 (b) of this Bylaw and where the actual costs of construction of the curb, gutter and sidewalk improvements vary from the amount of the cash deposit, no refund shall be payable by the City nor shall the applicant be responsible for the shortfall. c) Water system improvements including construction of water distribution components in accordance with the standards set out in Schedule C of this Bylaw as required to service the development. d) Sewer system improvements including the construction of sewage collection system components in accordance with the standards set out in Schedule D of this Bylaw where Schedule A of this Bylaw requires the development of a sewer system as required to service the development. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 24 City of Armstrong SECTION 7 - Servicing Requirements for Highways Abutting a Site being Subdivided or Developed e) Drainage system improvements including the provision of drainage facilities as required in Schedule A of this Bylaw, and construction of specific drainage system improvements in accordance with the standards set out in Schedule E of this Bylaw as required to service the development. f) Where the provisions of Schedule A require underground wiring all hydro, telephone, electrical and cablevision ducting and junction facilities shall be installed in accordance with the provisions of Schedule H of this Bylaw as required to service the development. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 25 City of Armstrong SECTION 8 - Administration and Enforcement SECTION 8 - ADMINISTRATION AND ENFORCEMENT Application Fee (Bylaw No. 1567, 2007) 8.01 a) All subdivision, strata, and development applications, submitted to the City, shall be accompanied by any and all fees that relate to each application, prior to the City commencing any processing, inspection, advertising or administration processes: i) Subdivision - Regular, Bare Land Strata or Building Strata Conversion Application Fee - for the first lot proposed to be created $ 500.00 Fee for each additional parcel or strata lot created $ 155.00 Administration fees on subdivisions and strata developments creating more than three lots, 3% of the first $500,000., 2% of the second $500,000. and, 1% of the balance over $1,000,000., of the estimated costs of constructing utilities and roads, as approved by the City Engineer. Latecomer Agreement $1,000.00 ii) Development Development Permit $500.00 Development Variance Permit $600.00 Amendment to a Development Permit $500.00 Amendment to a Development Variance Permit $600.00 Joint Development and Development Variance Permit or Amendment $700.00 Administration fees on developments 3% of the first $500,000. 2% of the second $500,000. and, 1% of the balance over $1,000,000., of the estimated costs of constructing utilities and roads, as approved by the City Engineer. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 26 City of Armstrong SECTION 8 - Administration and Enforcement b) An Application, for development approval, shall include the following fees; i) At the time of application, any fee payable under the Building and Plumbing Permit application. ii) Prior to the issuance of a permit where a permit is required or prior to construction where no permit is required, the Owner shall submit a fee for City administration costs in the amount set out Clause 8.01 of this Bylaw. c) Application fees itemized in Section 8.01 a), i) and ii) shall be in accordance with the City of Armstrong Bylaw No. 1567, 2007 and any subsequent amendments thereto. Preliminary Layout Review 8.02 a) An Owner may, before causing a plan of subdivision to be prepared and submitted for approval pursuant to the provisions of the Land Title Act, make a submission for Preliminary Layout Review. This submission shall be accompanied by a preliminary plan of the proposal and shall include information as required by the Approving Officer to appraise the proposed subdivision. b) Preliminary Layout Review of any subdivision shall not be construed as final approval for land registration or any other purpose, nor is a submission for Preliminary Layout Review considered an application under Section 993 of the Local Government Act. This approval shall not be considered as acceptance by the City or its Approving Officer of anything except the general layout of the proposed subdivision, and a list of minimum conditions which would have to be taken into consideration in an application for final approval. Preliminary Layout Review is revocable by the Approving Officer at any time before final approval is granted. c) The approval period for Preliminary Layout Review (PLR) shall be a maximum of one (1) year with a maximum one (1) year re-approval period permitted wherein the PLR re-approval conditions may vary from the initial PLR approval conditions. d) Preliminary Layout Review Application shall be submitted on a Schedule M form "Application for Preliminary Layout Review". SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 27 City of Armstrong SECTION 8 - Administration and Enforcement Authorization To Enter On Lands Being Subdivided and/or Developed 8.03 Officers of the City of Armstrong, or their designates are authorized to enter at all reasonable times upon the lands for which the application to subdivide and/or develop has been made in order to ascertain whether the provisions of this Bylaw are being met. Violation 8.04 Every person who: a) Violates any of the provisions of this Bylaw; b) Causes or permits any act or thing to be done in contravention or violation of any of the provisions of this Bylaw; c) Neglects or omits to do anything required under this Bylaw; d) Carries out, causes or permits to be carried out any development in a manner prohibited by or contrary to any of the provisions of this Bylaw; e) Fails to comply with an order, direction or notice given under this Bylaw; f) Prevents or obstructs or attempts to prevent or obstruct the authorized entry of an officer on property under Clause 8.03; shall be deemed to be guilty upon summary conviction of an offence under this Bylaw. Offence 8.05 Each day's continuance of an offence under Section 3 constitutes a new and distinct offence. Penalty 8.06 Any person who violates any of the provisions of this Bylaw shall, on summary conviction, be liable to a penalty not exceeding $2,000. plus the cost of prosecution for each offence. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 28 City of Armstrong SECTION 8 - Administration and Enforcement Completion 8.07 Should any person fail to construct or install any works or services required under this Bylaw, the City, its agents or servants may construct or install the works and services at the expense of the person in default, and at the expense thereof, with interest at the rate of six percent (6%) per annum with costs, which may be recovered in like manner from the bond or as municipal taxes. Severability 8.08 If any section, subsection, sentence, clause or phrase of this Bylaw is for any reason deemed to be invalid by the decision of any court of competent jurisdiction the invalid portion shall be severed and the decision that it is invalid shall not affect the validity of the remainder of this Bylaw. Schedules Form Part of Bylaw 8.09 Schedules "A" through "Z" are attached to and form part of this Bylaw. Authorization 8.10 a) The City of Armstrong Administrator and Clerk are authorized to sign on behalf of the City the Agreement set out in Schedule M-1 without further resolution of Council if such Agreement conforms with the provisions of this Bylaw. b) The City Engineer and Clerk are authorized to sign on behalf of the City the Agreements set out in Schedules M-1, T, and U without further resolution of Council if such Agreements confirm with the provisions of this Bylaw. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 29 City of Armstrong SECTION 9 - Enactment SECTION 9 - ENACTMENT Repeal of Previous Bylaw 9.01 City of Armstrong Subdivision and Development Servicing Bylaw No. 1169, 1994 and all amendments thereto, are hereby repealed. 9.02 Bylaw Adoption This Bylaw shall take effect upon adoption by the Council of the City of Armstrong. READ A FIRST TIME THIS 22ND day of October, 2007. READ A SECOND TIME 22ND day of October, 2007. READ A THIRD TIME 22ND day of October, 2007. RECONSIDERED AND FINALLY ADOPTED THIS 13TH day of November, 2007. Signature on File Mayor Signature on File Clerk Certified to be a true and correct copy of Bylaw No. 1570 cited as Subdivision and Development Servicing Bylaw No. 1570, 2007 Dated this 13th day of November , 2007. Signature on File Clerk SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 30 City of Armstrong SCHEDULE A - Level of Service SCHEDULE A LEVEL OF SERVICE This is Schedule A of the City of Armstrong Subdivision and Development Servicing Bylaw No. 1570, 2007 ___________________________________ (Clerk) SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 31 City of Armstrong SCHEDULE A - Level of Service SCHEDULE A - LEVEL OF SERVICE Establishment of Service Levels The type of services to be constructed by an owner prior to obtaining approval for a plan of subdivision or development shall be based on the zone in which the land is located as set out on the Official Zoning Map of the Zoning Bylaw of the City of Armstrong as amended. In Table A.1, the minimum level of service to be provided with respect to sanitary sewer, water, drainage, street lighting and wiring is set out in Columns 2, 3, 4, 5 and 6, and the zones which are subject to each service level are described in Column 1. In Table A.2, the required minimum standards for various classifications of highways are provided in Columns 2, 3, 4 and 5, and the zones which are subject to each standard are described in Column 1. Boulevard and development landscaping shall be specified at the time of subdivision and/or development application, Schedule M -1 (Standard Subdivision Development Agreement Document, Appendices 'B' and 'C'). For the purposes of Table A.1: "Community Sanitary Sewer System (CSSS)" means construction of a sewage collection system and connection to a community sanitary sewer. "Community Water System (CWS)" means construction of a domestic water distribution system and connection to the City's domestic water distribution system. "On-Site Sewage Disposal (On-Site SD)" means on-site effluent disposal. "On-Site Water Supply (On-Site WS)" means a proven water supply located on each parcel. "Ditch System (Ditch)" means a drainage collection and disposal system by open ditches and culverts. "Overhead Wiring (Overhead)" means overhead electrical, communications and CATV wiring. "Storm Sewer System (SSS)" means construction of a storm water drainage and collection system and connection to the City's storm sewer system or major drainage system. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 32 City of Armstrong SCHEDULE A - Level of Service "Street Lighting - Thru Subdivision (Thru Subdivisions)" means the provision of street lighting throughout the subdivision or development to the standards specified in this Bylaw. "Street Lighting - Intersections Only (Intersections)" means the provisions of street lighting at intersections only. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 33 City of Armstrong SCHEDULE A - Level of Service TABLE A.1 REQUIRED MINIMUM LEVEL OF SERVICE FOR SANITARY SEWER, WATER SUPPLY, DRAINAGE, STREET LIGHTING, AND WIRING COLUMN 1 COLUMN 2 COLUMN 3 COLUMN 4 COLUMN 5 COLUMN 6 ZONE SANITARY SEWER WATER SUPPLY DRAINAGE STREET LIGHTING WIRING Residential & Public Assembly R-1, R-1A, R-1B, R-2, R-3, R-4, R-5, R-6, RBB P-1, P-2, P-3 CSSS CWS SSS Thru Sub- Division Thru Sub- Division Under- ground Under- Ground Commercial C-1, C-2, C-3, C-4, C-5 CSSS CWS SSS Thru Sub- Division Under- Ground Industrial I-1 CSSS CWS SSS Thru Sub- Division Overhead Agricultural - Small Holdings A1 CR On-Site SD1 On-Site SD1 On-Site CWS CWS Ditch Ditch Intersections Intersections Overhead Overhead CSSS - Community Sanitary Sewer System CWS - Community Water system SSS - Storm Sewer System CWS - Community Water System SD - Sewage Disposal CR - Country Residential 1 Minimum lot size for on-site sewage disposal shall be 1.0 hectare. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 34 City of Armstrong SCHEDULE A - Level of Service TABLE A.2 - Part I REQUIRED MINIMUM HIGHWAY STANDARDS Column 1 Column 2 Column 3 ZONE LOCAL HIGHWAYS2 MINOR COLLECTOR HIGWAYS2 R/W Width1 Pavement Width Curb & Gutter Sidewalk R/W Width Pavement Width Curb & Gutter Sidewalk Side Width Side Width Residential R-1, R-1A, R-1B, R-2, R-3, R-4, R-5, R-6, RBB Bare Land Strata Strata 18.0 14.0 n/a 8.5 8.5 8.5 Yes Yes Yes one none none 1.85 - - 18.0 14.0 n/a 8.5 8.5 8.5 Yes Yes Yes one none none 1.85 - - Commercial C-1, C-2, C- 3, C-4, C-5 20.0 12.0 Yes both 1.85 20.0 12.0 Yes both 1.85 Industrial I-1 20.0 12.0 Yes none - 20.0 12.0 Yes none - Public P-1, P-2, P-3 20.0 12.0 Yes one 1.85 20.0 12.0 Yes one 1.85 Other A1, CR 18.0 8.5 No none - 18.0 8.5 No none - 1 All dimensions shown in metres. 2 Landscape requirements shall be specified in Schedule M -1 (Standard Subdivision Development Agreement Document, Appendices 'B' and 'C'). Notes: In addition to the foregoing, the following standards shall apply to lanes and walkways: i) Lanes shall have a Right-of-Way width of not less than 6.0 m and a pavement width of 5.5 m except all commercial and Industrial zones in which case the main Right-of-way width shall be 7.6 m and the pavement width 7.6 m. ii) Walkways shall have a Right-of-way width of not less than 3.0 m and a pavement width of 3.0 m. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 35 City of Armstrong SCHEDULE A - Level of Service TABLE A.2 - Part II REQUIRED MINIMUM HIGHWAY STANDARDS COLUMN 1 COLUMN 4 COLUMN 5 ZONE MAJOR COLLECTOR HIGHWAYS3 ARTERIAL HIGHWAYS3 R/W Width1 Pavement Width Curb & Gutter Sidewalk R/W Width Pavement Width2 Curb & Gutter Sidewalk Side Width Side Width Residential R-1, R-1A, R-1B, R-2, R-3, R-4, R-5, R-6, RBB Bare Land Strata Strata 18.0 14.0 n/a 8.5 8.5 8.5 Yes Yes Yes one none none 1.85 - - 18.0 14.0 n/a 8.5 8.5 8.5 Yes Yes Yes one none none 1.85 - - Commercial C-1, C-2, C-3, C-4, C-5 20.0 12.0 Yes both 1.85 20.0 12.0 Yes both 1.85 Industrial I-1 20.0 14.0 Yes none - 25.0 14.4 Yes one 1.85 Public P-1, P-2, P-3 20.0 14.0 Yes one 1.85 25.0 14.4 Yes one 1.85 Other A1, CR 20.0 14.0 No none - 25.0 14.4 Yes one 1.85 1 All dimensions shown in metres. 2 Plus width of median. 3 Landscape requirements shall be specified in Schedule M -1 (Standard Subdivision Development Agreement Document, Appendices 'B' and 'C'). SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 36 City of Armstrong SCHEDULE B - Regulations, Standards and Specifications For The Design and Construction of Highways SCHEDULE B REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE DESIGN AND CONSTRUCTION OF HIGHWAYS This is Schedule B of the City of Armstrong Subdivision and Development Servicing Bylaw No. 1570, 2007 ___________________________________ (Clerk) SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 37 City of Armstrong SCHEDULE B - Regulations, Standards and Specifications For The Design and Construction of Highways SCHEDULE B REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE DESIGN AND CONSTRUCTION OF HIGHWAYS 1.0 GENERAL DESIGN 1.01 Where the provisions of Schedule A of this Bylaw require the construction of roads, the Owner shall construct such roads consistent with the regulations, standards and specifications set out in this Schedule. Approval of Engineering Drawings Required Prior to Construction 1.02 Engineering drawings, prepared in accordance with Schedule K of this Bylaw, showing detailed design of roads shall be submitted to the City Engineer for approval prior to commencement of construction. These drawings shall show existing ground line and proposed alignment and grade on the highways, horizontal and vertical curve information and all other details as may be required. Grades shall be given at all changes in vertical and horizontal alignments for centreline and gutter lines. Elevations shall be shown on the drawings at all changes in vertical alignment. Four (4) sets of size ANSI 'D' design drawings, date stamped, signed and sealed by a Professional Engineer, shall be submitted for review. Where required, additional sets of four (4) ANSI 'D' size revised design drawings shall be date stamped, signed and sealed by a Professional Engineer for approval. Classification of Highways 1.03 Prior to design of the road system the City Engineer shall classify each road proposed with the subdivision and stipulate the required standards in accordance with the provisions of this Bylaw. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 38 City of Armstrong SCHEDULE B - Regulations, Standards and Specifications For The Design and Construction of Highways Geotechnical Evaluation 1.04 The Owner shall be responsible for engaging the services of a qualified Geotechnical Engineer duly licensed as such under the provisions of the Engineers and Geoscientists Act of British Columbia to investigate surface and sub-surface conditions within the proposed subdivision. The Geotechnical Engineer shall prepare a report outlining the findings and shall provide clear, definitive recommendations of the geometry and placement of fill sections, compaction requirements over and above those stipulated in this Bylaw, cut and slope geometry, pavement structures for roads, shrinkage/expansion of subgrade unique to the City of Armstrong, and any other geotechnical issues affecting road construction within the proposed subdivision. The Geotechnical Report shall include provisions which permit the City of Armstrong to use and rely on the Report's findings and recommendations and be signed and sealed by the Geotechnical Engineer. 2.0 GENERAL DESIGN CRITERIA General Design Requirements 2.01 In the preparation of engineering plans for highways the Owner shall take into account the following general design considerations: 2.1.1 Continuation of Existing Streets The design and arrangement of highways within a subdivision shall provide for the continuation or projection of existing streets in the surrounding area. In no case shall the arrangement of highways within a proposed subdivision make impractical the subdivision of adjoining parcels. 2.1.2 Topography to be taken into Account The design and arrangement of highways shall be suited to the topography of the land proposed to be subdivided. Consistency with Official Community Plan 2.02 The location, classification and standard of all highways proposed within a subdivision shall take into account the proposed use of the land and shall conform to the provisions of the City of Armstrong Official Community Plan. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 39 City of Armstrong SCHEDULE B - Regulations, Standards and Specifications For The Design and Construction of Highways Local Highways 2.03 Local highways within a proposed subdivision shall be arranged so that their use by through traffic will be discouraged. Cul-de-Sacs 2.04 Cul-de-sac streets shall not exceed 150 metres in length and shall be provided with an area designed to permit safe and adequate space for the turning of emergency and motor vehicles. Lanes 2.05 Lanes meeting the standards set out in this Bylaw shall be provided where the City Engineer deems them to be necessary. Walkways 2.06 Walkways shall be provided where the City Engineer deems them to be necessary to provide access through a subdivision to schools, parks, playgrounds, commercial areas or other community facilities, or for the safe and efficient circulation of pedestrian traffic. Walkways shall be provided with chain link fencing on each side of the walkway. The height shall be 1.8 m for the entire length commencing at the setback from frontage property line. Transit Bays 2.07 Transit Bays shall be provided where the City Engineer deems them necessary. Intersections 2.08 Intersections shall be designed as follows: 2.8.1 Intersections shall meet substantially at right angles (between 70 degrees and 110 degrees). 2.8.2 Jogs in highway alignment at intersections shall be avoided except where the distance between centre lines is sufficient to ensure traffic safety. The minimum spacing between tee intersections along a street shall be 60 m. 2.8.3 Intersections having more than four intersecting legs shall not be permitted. 2.8.4 Intersections shall provide adequate crossing sight distances and stopping sight distances, whichever is greater. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 40 City of Armstrong SCHEDULE B - Regulations, Standards and Specifications For The Design and Construction of Highways Reverse Curves 2.09 If reverse curves are required in a highway alignment the City Engineer may require that they be separated by means of tangents of sufficient length to prevent superelevation rotation. Mail Boxes 2.10 Where required by Canada Post the Owner shall indicate on the engineering drawings approved locations for local mail boxes. The Owner is referred to Canada Post for location guidelines and approval. Street Names and Traffic Signs 2.11 Street names shall be assigned by the City of Armstrong. Street name signs and traffic signs and road lineage required as a result of constructing or improving streets shall be provided by the City of Armstrong at the expense of the Owner. Appurtenances 2.12 The Owner's Engineer shall detail on the engineering drawings the location of all proposed traffic islands, retaining walls, guardrails, and permanent barricades. These structures shall be designed in accordance with good engineering practice. The design shall show the location of all traffic signs, street signs, and other traffic control devices required to be placed in the road allowance. Drawings must show all utility poles, ducts, junction boxes and pipelines. The Owner's Engineer shall indicate those utilities which require relocation prior to road construction and shall confirm with the utility the feasibility of their relocation prior to design completion. For underground systems design drawings shall show the location of underground wiring and appurtenances including connections to properties. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 41 City of Armstrong SCHEDULE B - Regulations, Standards and Specifications For The Design and Construction of Highways 3.0 HIGHWAY DESIGN CRITERIA 3.01 Vertical Alignment The vertical alignment of the highway shall be set so the grades of the driveways to adjacent properties will not exceed 15% for a minimum distance of 5 metres into the property as measured from the property line. Where it is impractical to meet this criteria the City Engineer may approve the use of private access roads. The minimum longitudinal gradient at the gutter line shall be 0.50% for all classifications of streets. The minimum longitudinal gradient around cul-de-sacs and curb returns shall be 0.80%. 3.02 Design Speeds The design speeds to be used for design of Highways shall be as per Table B.1. TABLE B.1 DESIGN SPEED Arterial (A) 70 km/h Collector (C) 60 km/h Local (L) 50 km/h Road Crossfall 3.03 Minimum road crossfall shall be 3%, maximum crossfall shall be 4%. Road Grades 3.04 Minimum and maximum road centre line grades shall conform to Table B.2 based on the classification of the road: SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 42 City of Armstrong SCHEDULE B - Regulations, Standards and Specifications For The Design and Construction of Highways TABLE B.2 HIGHWAY GRADES Road Classification Minimum Grade Maximum Grade Arterial 0.5% 8% Major Collector 0.5% 9% Minor Collector 0.5% 9% Local, Building Permit and Recommended for Bare Land Strata, Strata 0.5% 10% Cul-de-Sac (entry downhill) 0.5% 8% Cul-de-Sac (entry uphill) 0.5% 10% Cul-de-Sac (bulbs) 0.5% 6% Lane 0.5% 9% Walkway 0.5% 15% Maximum grades are to be reduced by 1% for each (or part of each) 30 metres that the centre line radius is less than 150 metres. Vertical Curves 3.05 Vertical curves shall be designed to provide safe stopping sight distances. Minimum stopping sight distance is the least distance required to bring the vehicle to a stop under prevailing vehicle and climatic conditions. Vertical curves shall be provided at the following grade changes: Greater than 0.5% for Arterials Greater than 1.0% for Collectors Greater than 2.0% for Locals and Lanes Vertical curve length is calculated by the equation L = KA where: L is the length of the vertical curve (Minimum L = 15 m) K is a constant related to lines and geometry of a parabolic curve A is the algebraic difference in grades in percent Minimum K values (in metres) for vertical curve design shall be as described in Table B.3. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 43 City of Armstrong SCHEDULE B - Regulations, Standards and Specifications For The Design and Construction of Highways TABLE B.3 MINIMUM K VALUES (IN METRES) FOR VERTICAL CURVE DESIGN Road Classification Crest Curve Minimum Sag Curve Lighting No Lighting Arterial 22 15 25 Collector 15 10 20 Local, Recommended for Bare Land Strata, Strata 7 6 11 Centre Line Radii 3.06 The minimum required centre line radius for various superelevation rates for each classification of highway shall be as described in Table B.3: TABLE B.4 MINIMUM CENTRELINE RADIUS Road Classification Horizontal Curve Radii (m) Superelevation (m/m) None 0.02 0.04 0.06 Arterial n/a 230 200 190 Collector 160 140 130 n/a * Local, Recommended for Bare Land Strata, Strata 95 n/a n/a n/a Development Permit 12 n/a n/a n/a * Radius may be reduced at the discretion of the City Engineer. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 44 City of Armstrong SCHEDULE B - Regulations, Standards and Specifications For The Design and Construction of Highways Curb Return Radii 3.07 Curb return radii shall conform to the following and be based on the lesser classified Highway. Arterial 11.0 m Collector 11.0 m Local, Recommended for Bare Land Strata, Strata 7.5 m Cul-de-Sac 11.5 m, connecting radii to tangent = 16.0 m Industrial 11.0 m Building Permit - 6.0 m roadway 9.0 m - 7.3 m roadway 7.5 m Intersection Design 3.08 Unless indicated elsewhere herein, all intersection design standards shall conform to those outlined in the latest edition of 'B.C. Supplement to TAC Geometric Design Guide' as published by the Ministry of Transportation of British Columbia. Intersection Grades 3.09 Approach grades for minor streets at intersections to major streets shall not exceed 75% of the maximum grade allowed for that street classification. The minor street shall be designed to intersect the major street with a vertical curve of minimum length required for that street classification. The vertical curve shall terminate at the curb line using the following K values. TABLE B.5 INTERSECTION CURVES Intersecting Street Minimum K Value Crest Curve Sag Curve Arterial 17 15 Collector 7 6 Local, Recommend for Bare Land Strata, Strata 4 4 SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 45 City of Armstrong SCHEDULE B - Regulations, Standards and Specifications For The Design and Construction of Highways Crossfalling a road at an intersection will be permitted where required because of topographical features in keeping with good engineering practices. The transition length from a normal cross-sectioned road to a section of road where there is superelevation shall be calculated based on 10 m for every 1% of change in grade. If these conditions are to be used the Owner must submit a preliminary design showing a centre line profile with existing ground line and proposed grade for all streets and intersections affected for adverse topography. If prior approval has not been given by the City Engineer then any design submitted will not be approved. Pavement Structure 3.10 The pavement structure shall be designed in accordance with Manual Series MS- 1 of the Asphalt Institute (current edition). The pavement structure shall be designed for a twenty-five (25) year design life. Staged construction may be considered in the structural design by the City Engineer when a road is to be constructed and to be widened at a later date. Roads shall be classified as follows for purposes of structural design of the total pavement structure; design traffic values and minimum depths of hot mix asphalt are defined as well: TABLE B.6 PAVEMENT STRUCTURE Road Classification Design Traffic(1) (EAL's) Min. Compacted Depth of Hot Mix Asphalt (mm) Arterial Collector Industrial Residential > 2.8 x 105 2.8 x 105 5.6 x 105 2.8 x 104 See Note (2) 100 100 76 Lanes Walkways n/a n/a 50 50 Notes: (1) See Chapter IV of MS-1 of the Asphalt Institute. (2) To be specifically designed, based on projected EAL's, in accordance with MS-1 of the Asphalt Institute. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 46 City of Armstrong SCHEDULE B - Regulations, Standards and Specifications For The Design and Construction of Highways Soils used to construct the roadway subgrade shall be evaluated in accordance with MS-1 (Chapter V) to determine the load bearing capacity of the subgrade. For this purpose, the California Bearing Ratio (CBR) test value shall be obtained using soil molded to the minimum specified compaction level. The design CBR values shall be determined in the soaked condition in accordance with ASTM Des D1883. This value shall be used for structural design purposes. The minimum compacted depth of crushed granular base course, in the total pavement structure, shall be 75 mm. If the soaked CBR value of the subgrade soil is less than 3, subgrade enhancement shall be provided to create a soaked CBR of 3, and the pavement structure shall be designed using a soaked CBR of 3. Subgrade enhancement shall be provided by placement of an initial layer of granular sub-base of a thickness which has been calculated to provide the necessary structural improvement to the subgrade. A minimum pavement structure for roads shall be provided, not withstanding the structural character of the subgrade. Minimum pavement structures are specified in Table B.7, and will be considered structurally adequate when the subgrade soil exhibits a minimum soaked CBR of 6. TABLE B.7 MINIMUM PAVEMENT STRUCTURES (FOR SUBGRADE CBR P 6) Road Construction Sub-Base Aggregate (mm) Crushed Base Aggregate (mm) Hot Mix Asphalt (mm) Surface Lower Course Course Arterial Structural Design shall be project specific. Collector 450 75 50 50 Industrial 450 75 50 50 Residential 400 75 38 38 Lanes 400 50 50 Walkways 300 50 50 The design of structural overlays of existing pavements shall be based on the analysis of the results of Benkelman Beam tests and test hole information acquired from the existing road which is to be upgraded. The Transportation Association of Canada procedure for designing structural design of overlays of existing pavements, as published in the 'Pavement Management Guide', shall be used. The maximum permissible Benkelman Beam deflections to be used for overlay design are shown in Table B.8. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 47 City of Armstrong SCHEDULE B - Regulations, Standards and Specifications For The Design and Construction of Highways TABLE B.8 BENKELMAN BEAM DEFLECTIONS Road Classification Maximum Permissible Deflection After Overlay Arterial 1.00 mm Collector 1.25 mm Industrial See Note (1) Residential 1.50 mm Notes:(1) As specified by the City Engineer. The structural design of pavements for roads shall be performed by a qualified pavements engineer. Structural designs of pavements shall be submitted to the City Engineer in an acceptable report format. Highway Cross-Sections 3.11 The standard street cross-section for various classifications of roadways shall be as per Table B.9 and on the Specification Drawings. TABLE B.9 HIGHWAY CROSS-SECTIONS Road Classification Typical Cross-Section (Drawing Number) Urban: Arterial Major Collector Minor Collector Industrial Local Project Specific Project Specific Project Specific Project Specific RD-1, RD-2, RD-3, RD-4 Rural: Local Rural Lanes Walkways RD-1, RD-2, RD-3, RD-4 RD-5 CGS-6 SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 48 City of Armstrong SCHEDULE B - Regulations, Standards and Specifications For The Design and Construction of Highways Boulevards 3.12 The City Engineer reserves the right to request that boulevards be landscaped complete with automatic irrigation systems. Where boulevard landscaping and irrigation is required the Owner shall prepare a landscaping and irrigation design drawing in accordance with Schedule I of this Bylaw. Site Grading Plan 3.13 A Site Grading Plan, for on-site grading, shall illustrate the final lot grading and lot access locations and access grades. Site grading plans shall include, but not be limited to, existing and proposed elevations, building elevations, locations and extent of retaining walls, contours, swales, control/containment of surface water, cut/fill areas, areas of fill that exceed 0.75 metres in depth, safe building setbacks where required, and any other information deemed necessary. 4.0 CONSTRUCTION Materials 4.01 Highways construction materials shall be in accordance with SCHEDULE L - Division 2 - Sitework Section 2B - Roads and Earthworks. Construction 4.02 Highways construction shall be in accordance with SCHEDULE L - Division 2 - Sitework Section 2B - Roads and Earthworks. Testing 4.03 Highways construction and materials testing shall be in accordance with SCHEDULE L - Division 2 - Sitework Section 2B - Roads and Earthworks. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 49 City of Armstrong SCHEDULE C - Regulations, Standards and Specifications For The Design and Construction of Water Systems SCHEDULE C REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE DESIGN AND CONSTRUCTION OF WATER SYSTEMS This is Schedule C of the City of Armstrong Subdivision and Development Servicing Bylaw No. 1570, 2007 ___________________________________ (Clerk) SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 50 City of Armstrong SCHEDULE C - Regulations, Standards and Specifications For The Design and Construction of Water Systems SCHEDULE C REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE DESIGN AND CONSTRUCTION OF WATER SYSTEMS 1.0 GENERAL DESIGN Water Distribution System to be Constructed by Owner 1.01 Where the provisions of Schedule A of this Bylaw require the construction of a water distribution system, the Owner shall construct a water distribution system and storage facilities, including water mains, valves, hydrants, service connections, pump stations, and disinfection systems consistent with the regulations, standards and specifications set out in this Schedule. All standards not specifically described in the schedule shall be in accordance with appropriate American Water Works Association (AWWA) standards or as directed by the City Engineer. Approval of Engineering Drawings Required Prior to Construction 1.02 Engineering drawings showing detailed design of the required works shall be submitted to the City Engineer for approval. Engineering drawings shall also be submitted for approval to the regional Public Health Engineer of the Ministry of Health of the Province of British Columbia. The Ministry of Health's Final Certificate shall be submitted to the City Engineer prior to the construction of any water system. No construction shall commence until the engineering drawings have been approved by the City Engineer and the Ministry of Health. These drawings shall show alignment, size, grade and depths of pipes, pipe bedding requirements, existing ground line and proposed final ground line over the pipe, location, elevation and detail of all fittings, valves and hydrants, location of all service connections, location, access to, size and details of any pump stations and reservoirs, all easements and all such other details as may be required. Where a water system is not yet available, rights-of-way may be required to be provided by the Owner to allow for the eventual installation of the facility. Such rights-of-way shall be registered to the City of Armstrong at the Owner's expense. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 51 City of Armstrong SCHEDULE C - Regulations, Standards and Specifications For The Design and Construction of Water Systems Compliance with the Standards of Other Authorities 1.03 Where a subdivision is to be supplied by water from any other Authority the Owner shall comply with all of the specifications of the Authority in addition to providing a system equivalent to the City of Armstrong system and provided that offsets and general layout for hydrants and valves shall comply with the minimum requirements of this schedule. 2.0 DESIGN CRITERIA Capacity of System and Sizing of Water Mains 2.01 Water distribution systems shall be designed to deliver water in adequate quantities at adequate pressures for both domestic use under peak consumption conditions and fire flows. Mains shall be sized to carry the peak hourly flow rate or the maximum daily flow rate plus the fire flow rate, whichever is the greater. Mains shall be sized using the Hazen-Williams formula with C = 130 for PVC mains and C = 120 for all other pipe material for new mains and maximum flow velocity for peak hourly demand rate of 2.0 m per second. The flow velocity for fire flow plus the maximum day demand shall not exceed 4.0 m per second. Domestic Demand Criteria 2.02 For residential areas the daily domestic demand criteria for purposes of designing water distribution systems shall be: Average Day Demand (ADD) 850 litres/day/capita Maximum Day Demand (MDD) 2100 litres/day/capita Peak Hour / Maximum Day Consumption Ratio: 1.5 For other than residential areas the demand criteria shall be selected to suit the particular circumstances subject to the approval of the City Engineer. Design Pressures 2.03 Water main pipe shall be designed to accommodate 1.5 times the maximum projected working pressure for the applicable pressure zone. Pressure zones shall generally be set at minimum pressure of 250 kPa under peak hour conditions and a maximum pressure of 790 kPa under static conditions. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 52 City of Armstrong SCHEDULE C - Regulations, Standards and Specifications For The Design and Construction of Water Systems Thrust Blocks and Joint Thrust Restrainers 2.04 Thrust Blocks and Joint Thrust Restrainers shall be designed for a minimum 1725 kPa water pressure. Fire Flow Requirements 2.05 Water distribution systems shall also be designed to ensure that fire flows as required by the Insurer's Advisory Organization (IAO) are available for required durations. The following fire flows shall be met for the noted zones under maximum day flow conditions. TABLE C.1 FIRE FLOW REQUIREMENTS Single Family 60 litres/sec. Low/Medium Density Residential, Light Industrial, Service Commercial 90 litres/sec. High Density Residential, Urban Commercial, Institutional 150 litres/sec. Industrial 200 litres/sec. Interim fire flows shall be designed for pressures in the range of 210 kPa to 1030 kPa, with 210 kPa measured under peak hourly conditions and 1030 kPa measured under static conditions. The minimum pressures shall be measured or calculated at the main floor elevation of the highest proposed house and an allowance made for pressure loss in the service line to the house wall. Minimum residual pressure at any hydrant shall not be less than 140 kPa under maximum day domestic consumption plus fire conditions. Reservoir level shall be assumed at mid point for calculation of minimum pressures and full for calculation of maximum static pressures. Design pressures different, but not less than the above, may be required if sprinkler systems are required. Such pressures must be designed and confirmed by the Owner's engineer. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 53 City of Armstrong SCHEDULE C - Regulations, Standards and Specifications For The Design and Construction of Water Systems Minimum Pipe Size 2.06 Water main pipe size for all water mains shall be 150 mm diameter in low density residential areas and 200 mm in medium and high density residential, commercial, and institutional areas. Minimum water main pipe size for industrial areas shall be 250 mm. Where no further extensions are possible, water mains of 100 mm in diameter may be installed, downstream of the last fire hydrant, for low density residential areas on cul-de-sac roads. The City Engineer may require a hydraulic analysis design calculating flows and pressures and may require oversizing of distribution or transmission water mains. Location and Grade of Water Mains 2.07 Water mains shall be located in the road right-of-way as shown on the Specification Drawings unless otherwise approved by the City Engineer. There shall be a minimum lineal horizontal clearance of 1 metre between a water main and other existing or proposed underground services, except sanitary and storm sewer mains. A minimum of 3 metres horizontal distance between a water main and a sanitary main or storm main shall be maintained. In special cases such as installations in rock or hardpan, the horizontal clearance may be reduced, with the approval of the City Engineer and Ministry of Health, provided the invert of the water main is a minimum of 450 mm above the crown of the sanitary main and subject to any Provincial regulations. On side-hill streets, the main shall, where possible, be located on the cut side of the centre line of the street. Water mains shall be normally designed to follow a straight alignment between intersections. Curved alignments may be accepted provided that the pipe alignment is at a parallel offset with an established boundary and the radius of curvature is not less than 60 m or the minimum radius of curvature recommended by the pipe manufacturer, whichever is the greater. Water mains shall be designed with a rising grade wherever possible to minimize high points in the water main. Where a high point is unavoidable, either a service, fire hydrant, or air release valve shall be installed at that point. Where the slope of the water main exceeds 15% the design must provide restrained pipe anchorage. Where the water main network is deficient the City Engineer may request, installation of additional interconnecting water mains of a minimum 200 mm SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 54 City of Armstrong SCHEDULE C - Regulations, Standards and Specifications For The Design and Construction of Water Systems diameter to loop to the existing water mains. These interconnecting water mains may necessitate the provision of rights-of-way in favor of the City of Armstrong. The maximum length of any permanent non-interconnected water main is 150 m. All mains exceeding 150 m shall be looped except with the approval of the City Engineer. Interconnecting mains and rights-of-way when required shall be at the Owner's cost. No gas main, electric or telephone duct or other utility line shall be installed in the same trench with water mains. Where it is necessary for the water main to cross other underground services, the crossing shall be made at an angle greater than 70 degrees and the vertical clearance between services at the crossing point shall be not less than 300 mm except for sanitary sewers where the clearance shall be 450 mm between the exterior walls of the pipes. The engineered drawings shall indicate whether the water main passes over or under other underground services which it is crossing. Spacing of Fire Hydrants 2.08 Fire hydrants shall be located, in general, at highway intersections and at maximum spacing of 150 metres in residential areas and 90 metres in high density, commercial, and industrial areas. Additional hydrants may be required by the City Engineer at schools, multiple family developments, commercial buildings, institutional and public buildings, or other major developments consistent with the current fire flow requirements of Canadian Underwriter's Association, the Insurer's Advisory Organization (IAO), and the British Columbia Building Code. Whenever possible hydrants shall be located near the lowest point on the water main. Additional fire hydrants required to support new development which are not required to meet the minimum spacing must be installed on private property and are considered private hydrants. Where hydrants are located other than at intersections they should be located on the projection of the property line dividing two lots. In selecting the location of a fire hydrant the probable route of firefighting equipment shall be considered. A fire hydrant shall not be located within 3 metres of a utility pole, light standard, or hydro transformer, within 1.5 m horizontally of underground service pipes or open ditches, or within 1 m of the back of curb nor can they protrude into the walkway. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 55 City of Armstrong SCHEDULE C - Regulations, Standards and Specifications For The Design and Construction of Water Systems Line Valves 2.09 Main line valves shall be the same diameter as the main line pipe and shall be located at least in the following locations: three (3) valves located at a cross (+) fitting, two (2) valves required at a tee (T) fitting, one (1) isolation valve required every 200 metres in residential areas, one (1) isolation so that no more than one (1) fire hydrant is out of service at any one time, and, one (1) isolation valve at each end of a statutory right-of-way. In commercial and industrial areas, in addition to the above, line valves shall be spaced every 120 metres. Blow Offs 2.10 Permanent blow offs shall be installed at all permanent dead-ends in accordance with the specification drawings. Air Release and Vacuum Valves 2.11 Air Release and Vacuum Valves shall be installed, in accordance with the specification drawings, at the high points in all water main installations. Fittings and Appurtenances 2.12 Fittings and appurtenances with other than standard hub ends shall be so indicated on the design drawings. The location of fittings shall be dimensioned on the design drawings. Services 2.13 The diameter of water services shall be determined by the City Engineer provided that in no case shall the diameter be less than 19 mm. If on-site sprinkling is to be installed the Design Engineer must determine the diameter of service required and indicate the diameter on the design drawings. No service connection sizes greater than 50 mm and less than 100 mm will be permitted. Water services shall be installed in accordance with the specification drawings. Depth of Cover 2.14 The depth of the water main shall be sufficient to provide all services with a minimum cover of 1.8 m to the top of the service anywhere within the Right-of- way. In no instance shall the minimum cover over the crown of the water main be less than 1.8 m. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 56 City of Armstrong SCHEDULE C - Regulations, Standards and Specifications For The Design and Construction of Water Systems Tie-ins to Existing Water Mains 2.15 Connection of a new water pipe to an existing water main shall be completed by City Forces unless the existing main has an acceptable provision for a direct extension. The Owner shall pay for the supply and installation of all materials required to complete the connection. The connection details shall be indicated on the design drawings. Only City of Armstrong personnel may operate valves and curb stops on the existing water mains. Reservoirs 2.16 Reservoirs where required shall be designed to suit the particular circumstances. In general, reservoir capacity shall be not less than: Total Storage Requirement = A + B + E, where A = Fire Storage B = Equalization Storage (25% of maximum day demand) E = Emergency Storage (25% of A + B) Reservoir design shall incorporate but not be limited to the following features: - the Owner shall submit a pre-design report detailing reservoir siting, geotechnical investigation, sizing, design, construction, access, testing and disinfection, and all relevant information, to the City Engineer, prior to proceeding with the detailed design. - shall be to current Provincial Ministry of Health standards and a Ministry of Health Permit to Construct works obtained. - shall be constructed of reinforced concrete. - shall be a 2-cell design of equal volume - shall be below ground and covered, unless specifically approved otherwise by the City Engineer. - shall have SCADA interfaced to the City of Armstrong SCADA system. - shall include equipment and operations manuals. - shall include construction of access roads and security gates and fencing. - shall include overflow piping and discharge accommodation. - shall be designed to meet the approval of the City Engineer. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 57 City of Armstrong SCHEDULE C - Regulations, Standards and Specifications For The Design and Construction of Water Systems Reservoir Disinfection and Testing: - disinfection shall be in accordance with the latest version of AWWA Standard C652. - testing procedures shall be in accordance with the directions provided by the City Engineer. Pump Stations 2.17 Pump stations, where required, shall be designed for the particular circumstances utilizing current technology and equipment and to the approval of the City Engineer. In general, pump stations shall be designed to meet maximum daily demands with the largest pump out of service with balanced storage on line. A pre-design report providing pump station siting, site plan, geotechnical investigation, piping schematics, and design calculations shall be submitted by the Owner for review by the City Engineer prior to detailed design. Upon approval of the pre-design report by the City Engineer, the Owner can proceed with detailed design addressing the following general requirements. A building permit is required prior to construction: Pump Station design shall incorporate but not be limited to the following features: - the Owner shall submit a pre-design report detailing pump station siting, geotechnical investigation, building size, design, construction, access, pump and piping schematics, electrical/electronic line diagrams, chlorination, testing and disinfection, and all relevant information, to the City Engineer, prior to proceeding with the detailed design. - shall be to current Provincial Ministry of Health standards and a Ministry of Health Permit to Construct works obtained. - pump station design shall comply with WorkSafe BC regulations. - shall be constructed of reinforced concrete, all exposed walls to be constructed of aesthetically concrete block. - shall include supply of underground BC Hydro 3 phase service. - shall be equipped with an overhead crane or approved mechanical device for pump removal. - SCADA shall monitor building temperature, chlorine residual, turbidity, pump run times, flow meters, pump bearing temperatures, reservoir levels, line pressures, pump station entry and pump house intrusion. - SCADA to control solenoid valves. - pump and motor manufacturer to be acceptable to the City of Armstrong. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 58 City of Armstrong SCHEDULE C - Regulations, Standards and Specifications For The Design and Construction of Water Systems - shall include MCC and PLC control panels, surge suppressors. - shall have radio telemetry modem and antenna equipment. - shall have SCADA interfaced to the City of Armstrong SCADA system. - shall have on-site computer connected to PLC and interfaced with the City of Armstrong SCADA system, complete with desk and chair. - electronic card-swipe keyless entry compatible with City of Armstrong remote alarm monitoring. - pump station shall have a telephone (u/g from service pole) land line. - shall include equipment and operations manuals and equipment warranties. - shall include construction of access roads, security gates, fencing, and security lighting. - shall include asphalt parking lot and site landscaping. - shall be designed to meet the approval of the City Engineer. Pressure Reducing Stations 2.18 Where a Pressure Reducing Station (PRV) is required to provide water at an adequate reduced pressure to an area it must be designed to meet maximum daily demand as well as fire flow requirements for the service area and shall incorporate the following features: - to be designed using current technology and equipment. - to be designed and constructed to the approval of the City Engineer. - be located in a City of Armstrong Right-of-way but not under any permanent road structures. - shall be to current Provincial Ministry of Health standards and a Ministry of Health Permit to Construct works shall be obtained. - pump station design shall comply with WorkSafe BC regulations. - shall be constructed of reinforced concrete. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 59 City of Armstrong SCHEDULE C - Regulations, Standards and Specifications For The Design and Construction of Water Systems 3.0 CONSTRUCTION Materials 3.01 Waterworks construction materials shall be in accordance with SCHEDULE L Division 2 - Sitework Section 2C - Water Distribution Works. Construction 3.02 Waterworks construction shall be in accordance with SCHEDULE L - Division 2 - Sitework Section 2C - Water Distribution Works. Testing 3.03 Waterworks testing and disinfection shall be in accordance with SCHEDULE L - Division 2 - Sitework Section 2C - Water Distribution Works. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 60 City of Armstrong SCHEDULE D - Regulations, Standards and Specifications For The Design and Construction of Sanitary Sewers SCHEDULE D REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE DESIGN AND CONSTRUCTION OF SANITARY SEWERS This is Schedule D of the City of Armstrong Subdivision and Development Servicing Bylaw No. 1570, 2007 ___________________________________ (Clerk) SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 61 City of Armstrong SCHEDULE D - Regulations, Standards and Specifications For The Design and Construction of Sanitary Sewers SCHEDULE D REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE DESIGN AND CONSTRUCTION OF SANITARY SEWERS 1.0 GENERAL DESIGN General 1.01 Where sanitary sewage collection and disposal is required, sanitary sewer facilities including gravity sewer mains, pump stations and force mains if required, manholes, service connections and related appurtenances shall be provided by the Owner. A sewer service lateral shall be installed where required to provide a connection to each lot to be created by the subdivision and to any other existing or possible future lot which can be serviced from mains installed by or for the subdivision. The routing of sewers shall be in accordance with the directions of the City Engineer. Where sanitary sewer facilities are not required, rights-of-way may be required to be provided by the Owner to allow for the eventual installation of this facility. Such rights-of-way shall be registered in favour of the City of Armstrong at the Owner's expense. Septic tanks and disposal of effluent to ground shall not be permitted. Standards and Specifications of this Schedule to Apply to Sewer Works 1.02 Standards and specifications contained in this Schedule shall apply to all sanitary sewer installations constructed for or in the City of Armstrong. All standards not specifically covered in these standards shall be as directed by the City Engineer. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 62 City of Armstrong SCHEDULE D - Regulations, Standards and Specifications For The Design and Construction of Sanitary Sewers Approval of Engineering Drawings Required Prior to Construction 1.03 Engineering drawings showing detailed design of the necessary works shall be submitted to the City Engineer for approval. No construction of sanitary sewers shall commence until the drawings have been approved by the City Engineer. These drawings shall show alignment and size of pipes, proposed grades, distances between manholes, manhole invert elevations, existing ground line and proposed final ground line over pipe, location of all service locations to the property line, all easements, lift stations, force mains, pipe bedding requirements and all other details which may be required by the City Engineer. 2.0 GENERAL CRITERIA Pipe Capacity 2.01 Sanitary sewer facilities constructed in a subdivision shall be designed to provide sufficient capacity to carry the required quantity of sewage from the full contributing area as defined by the City Engineer. Sewage design flows shall be based on the equivalent population of the contributing area as determined by the City Engineer but no less than 66 persons per hectare with an average per capita flow of 360 litres per day. A peaking factor calculated using the Harmon Peak Factor curve shall be applied to the average flow as follows: Peak Factor = 1 + 14 4 + †P Where P = equivalent contributing population in thousands. An infiltration rate of 5,000 litres per hectare per day shall be used. In areas where the water table is high 8,000 litres per hectare per day shall be used. The peaking factor shall be applied to the sanitary contribution only and not to the infiltration allowance. Pipe sizes shall be selected so that sewers flow 2/3 to 3/4 full at peak hour design flow. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 63 City of Armstrong SCHEDULE D - Regulations, Standards and Specifications For The Design and Construction of Sanitary Sewers Sizing of Sewer Mains 2.02 The minimum pipe size for sanitary sewer mains shall be 200 mm. No reduction of pipe size shall be made downstream irrespective of pipe grade. 2.03 Sanitary Main Location and Alignment Sanitary sewer service pipe grades shall be in accordance with Table B.1. Sanitary sewer mains shall be located, wherever possible, where indicated on the Specification Drawings. Sanitary sewer mains shall generally be designed to follow a straight alignment between manholes. Curved alignments within rights-of-way shall be subject to the approval of the City Engineer and provided the pipe is set at a grade greater than the specified minimum and pipe alignment is at a parallel offset with an established boundary. In these cases, the radius of curvature shall be not less than 50 metres, or twice the minimum radius recommended by the pipe manufacturer, whichever is greater, the grade shall be not less than 1%, and the design velocity must exceed 0.91 m/s. Minimum Velocity and Design Grade 2.04 Minimum velocity for pipe flowing full or half full shall be 0.76 metres per second. There is no maximum velocity for gravity sewer mains, however, where the velocity exceeds 3.65 m/s consideration shall be given to possible scour and hydraulic shock concerns. Upstream sections of sewers require steeper grades to ensure self-cleansing velocity under partial flow conditions. The following design alternatives are acceptable: 2.4.1 The terminal section servicing 6 or less sanitary connections shall have a grade of 1% greater than the minimum grade specified. 2.4.2 The sewer line servicing the 7th to 12th sanitary connection shall have a grade of 0.5% greater than the minimum grade specified. 2.4.4 A sewer line servicing the 13th sanitary connection (or more) shall be at the minimum grade specified, or greater. 2.4.5 The minimum specified pipe grades for sanitary mains are specified in Table D.1. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 64 City of Armstrong SCHEDULE D - Regulations, Standards and Specifications For The Design and Construction of Sanitary Sewers TABLE D.1 MINIMUM PIPE GRADES FOR SANITARY SEWER Pipe Size (mm) Grade (%) 100 2.00 150 1.00 200 0.45 250 0.33 300 0.25 375 0.20 Hydraulic Losses Across Manholes 2.05 The minimum drop in invert elevations across manhole benching shall be: Straight Run minimum grade Deflections up to 45° 50 mm drop Deflections 45° to 90° 65 mm drop Minimum Depth of Cover 2.06 The minimum depth of cover for sanitary mains shall be 1.5 metres. Sanitary mains shall be at a depth sufficient to provide sanitary sewer service to residential basement elevations. City of Armstrong approval is required prior to installing sanitary sewer mains where 1.5 metre cover is not feasible or available. Sanitary Manhole Spacing 2.07 Sanitary manholes shall be installed at a maximum spacing of 100 metres except where the pipe grade exceeds 10% where the maximum spacing shall be 60 metres, at the following locations: - at all changes in pipe grade and/or alignment (for non curvilinear sewers). - at all changes in pipe size. - at all pipe junctions and intersections. - at the beginning and end of pipe curvature for curvilinear sewers. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 65 City of Armstrong SCHEDULE D - Regulations, Standards and Specifications For The Design and Construction of Sanitary Sewers Where, in the opinion of the City Engineer, the grades of sewer pipes are sufficient to provide proper cleaning, the maximum spacing of manholes where the pipe grade is less than 10% may be increased to 120 metres. Drop Manholes 2.08 Drop manholes shall only be used when the incoming sewers cannot be steepened or where site conditions do not permit otherwise. Inside ramps may be utilized when incoming sewers cannot be steepened and the elevation of the inlet invert is less than 600 mm above the invert elevation of the centre of the manhole where approved by the City Engineer. An outside drop manhole shall be installed where the elevation of the inlet invert is 600 mm, or greater, above the invert elevation of the centre of the manhole channel. Clean-outs 2.09 Clean-outs shall not be substituted for manholes except where the sanitary main will be extended for future subdivision/development and the maximum spacing for manholes has not been exceeded. Service Connections 2.10 Sanitary sewer services to single family dwellings and to each unit of duplexes shall be 100 mm diameter. Each service shall be installed with an inspection chamber in the highway right-of-way at property line. Sanitary sewer services to multifamily sites, mobile home parks, institutional, commercial and industrial sites, shall be sized in accordance with the British Columbia Building Code - Part 7 Plumbing Services. Each service from 100 mm to 150 mm in diameter shall be installed with an inspection chamber in the highway right-of-way at property line and each service greater than 150 mm shall be installed with a sanitary manhole at the sanitary main. A single sanitary sewer service shall be installed to each legal lot. Strata developments and other major developments will be permitted one sanitary service connection unless approved otherwise by the City Engineer. A service connection entering a manhole shall have its invert elevation at the crown of the highest main entering the manhole. The service connection shall discharge in the same direction as the benched flow in the manhole. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 66 City of Armstrong SCHEDULE D - Regulations, Standards and Specifications For The Design and Construction of Sanitary Sewers Sanitary Lift Stations 2.11 The objective of the City of Armstrong is to minimize the number of City operated and maintained sewage lift stations. All options to avoid the implementation of lift stations must be thoroughly considered. The Owner shall obtain approval from the City Engineer for the siting of a lift station prior to proceeding with detailed design. Prior to proceeding with a detailed design of a lift station the Owner shall submit a pre-design report that addresses the design considerations of this criteria to the City Engineer. Approval of the pre-design concepts must be obtained prior to commencing the detailed design. The location and construction pre-design report for a lift station shall include an assessment of the following considerations: - design shall accommodate flows from the overall catchment area. - type of station and impact on neighbours, in particular odour impact. - construction dewatering requirements where applicable. - lift station security and vandal proofing. - uplift restraints based on maximum water levels. - location of power supply. - proximity to water mains and receiving sewer main. - vehicular access. - geotechnical investigation. - WorkSafe BC compliance. - Capital costs, operation and maintenance costs. Sewage Lift Station design requirements shall include, but not be limited to, the following: - to be designed using current technology and equipment. - to be designed and constructed to the approval of the City Engineer. - be located in a City of Armstrong Right-of-way but not under any permanent road structures. - lift station design shall comply with WorkSafe BC regulations. - shall have SCADA interfaced to the City of Armstrong SCADA system. - provide minimum 2 hour storage between the high level alarm and the start of overflow. - provide minimum of 3 minutes to elapse between successive pump starts at peak flow conditions to prevent pump burnout. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 67 City of Armstrong SCHEDULE D - Regulations, Standards and Specifications For The Design and Construction of Sanitary Sewers - pumps shall operate alternatively. - pumps shall pump maximum flow with one pump in failure mode. - pump and electric motor manufacturer to be acceptable to City of Armstrong. - provide emergency overflow to a confined storage area which prevents flooding of buildings connected to the sewer system. - control panel to be mounted in isolated kiosk. - shall have radio telemetry modem and antenna equipment. - provide 347/600 volt connection for standby power, 110/220 volt receptacle for small power tools, 19 mm pressure reduced water supply for wash down and, illumination. - ball valves and check valves to located horizontally in separate chamber outside of lift station. - paved vehicular access. - provide equipment and operations manuals and equipment warranties. - particular additional criteria for lift stations may be required by the City Engineer. Force Mains 2.12 The minimum force main diameter shall be 100 mm. Force mains shall be designed and installed in the same manner as a water main. A locating tracer wire shall be installed with the force main. The maximum force main velocity shall be 3.65 m/s and the cleansing velocity shall be 0.9 m/s. Air Release and Vacuum Valves, suitable for sewage flow, shall be installed at the high points in all force main installations. Force mains shall enter receiving manholes at crown to crown elevation and direct the flow into the receiving channel without excessive spray and in the direction of the receiving sewer flow. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 68 City of Armstrong SCHEDULE D - Regulations, Standards and Specifications For The Design and Construction of Sanitary Sewers 3.0 CONSTRUCTION Materials 3.01 Sanitary Sewer construction materials shall be in accordance with SCHEDULE L Division 2 - Sitework Section 2D - Sanitary Sewer Works. Construction 3.02 Sanitary Sewer construction shall be in accordance with SCHEDULE L - Division 2 - Sitework Section 2D - Sanitary Sewer Works. Testing 3.03 Sanitary Sewer testing shall be in accordance with SCHEDULE - Division 2 - Sitework Section 2D - Sanitary Sewer Works. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 69 City of Armstrong SCHEDULE E - Regulations, Standards and Specifications For The Design and Construction of Drainage Systems SCHEDULE E REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE DESIGN AND CONSTRUCTION OF DRAINAGE SYSTEM This is Schedule E of the City of Armstrong Subdivision and Development Servicing Bylaw No. 1570, 2007 ___________________________________ (Clerk) SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 70 City of Armstrong SCHEDULE E - Regulations, Standards and Specifications For The Design and Construction of Drainage Systems SCHEDULE E REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE DESIGN AND CONSTRUCTION OF DRAINAGE SYSTEMS 1.0 GENERAL DESIGN General 1.01 All subdivisions and developments within the City of Armstrong are subject to compliance with the Provincial Riparian Areas Regulation. The Owner is encouraged to obtain Ministry of Environment confirmation that the proposed subdivision, strata or development will not adversely impact the environment at the earliest stages of the approval process. Discharges to natural drainage courses shall not adversely affect downstream properties. The drainage system in the City of Armstrong shall consist of two components, the minor and major systems. The minor system shall consist of underground conduits and open channels and watercourses to convey a 25 year return flow for residential, industrial, commercial, institutional, and high density residential areas. The major system shall consist of surface flood paths, roadways, and watercourses to convey a 100 year return flow. In special circumstances where surface flood paths cannot be established, pipes and appurtenances of the minor system may be enlarged to accommodate the major system flow. The presence of an existing City drainage facility does not imply that the facility has adequate capacity to receive the design flow nor does it indicate that the drainage pattern of this facility is necessarily acceptable to the City. All subdivisions and developments shall be adequately drained throughout the year. Where the whole or part of any proposed subdivision or development has a high water table or is subject to intermittent or periodic flooding, approval of the subdivision or development shall be withheld until the City Engineer is satisfied that appropriate steps have been taken to drain the land or otherwise remedy such wet or flooding conditions. Where a subdivision is traversed by a watercourse, drainage way or stream, a right-of-way shall be provided along such watercourse or its planned realignment of a width deemed necessary by the City Engineer for construction, maintenance, conservation and/or beautification purposes. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 71 City of Armstrong SCHEDULE E - Regulations, Standards and Specifications For The Design and Construction of Drainage Systems A natural drainage course shall not be altered or diverted unless such alteration or diversion has been approved by the City Engineer. Where it is necessary to convey a drainage system through privately owned land the Owner shall obtain and grant a right-of-way in favour of the City of Armstrong. Engineering drawings of the detailed storm water design shall be submitted to the City Engineer for review. Construction shall not commence until such time as an acceptable design has been approved by the City Engineer. The storm water engineering drawings shall indicate both minor and major storm flow routing, and grades, alignments, inverts, discharge points and all other relevant information, for storm pipes and appurtenances. The Owner shall submit a contour map at a 1:2500 scale with contour intervals of not more than 0.5 metres, for the total drainage area. The total drainage area boundary is to be indicated on the drawing. The contour map shall indicate the final elevation for all proposed lot corners and the proposed site grading cuts and fills. 2.0 DESIGN CRITERIA Design Flows 2.01 For drainage basins less than 10 ha in size the Design Flows shall be based on the Rational Method; Q = CIA 360 where, Q = Peak Rate of Ruin-off in m3/s C = Run-off Coefficient I = Average Rainfall Intensity for a storm whose duration is equal to the time of concentration for the basin in mm/hr. A = Area of watershed in hectares Tc = Time of Concentration For drainage basins greater than 10 ha in size the design flows shall be based on computer storm water modeling or other methods acceptable to the City Engineer. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 72 City of Armstrong SCHEDULE E - Regulations, Standards and Specifications For The Design and Construction of Drainage Systems Design Time of Concentration (Tc) shall be based on calculation and in no case will the Design Time of Concentration be less than 15 minutes for residential areas and 10 minutes for industrial and commercial areas. Storm sewers shall be designed for a 25 year peak storm return frequency for the appropriate Design Time of Concentration. Refer to Specification Drawing ST-7 Rainfall Intensity-Duration Data. Run-off Coefficient (C) shall be in accordance with Table E.1. TABLE E.1 RUN-OFF COEFFICIENT DESCRIPTION OF AREA RUNOFF COEFFICIENT Downtown commercial areas 0.80 Highway commercial and light Industrial areas 0.60 Apartment and other high density Multiple family areas 0.60 Single family residential, duplex and low density multiple family area 0.40 Open areas, parks and playgrounds 0.25 Runoff coefficients other than those specified in this section shall be used only with the written consent of the City Engineer. Design Grade 2.02 Gravity storm sewers shall be designed for full flow, calculated using the Manning Formula: Q = AR0.667 x S0.5 n where, Q = Design flow in m3 per second A = Cross sectional area of pipe in m2 R = Hydraulic radius in metres S = Slope of hydraulic grade line in m/m n = Roughness Coefficient The Roughness Coefficient (n) for the storm pipe shall be the coefficient certified by the Manufacturer of the pipe. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 73 City of Armstrong SCHEDULE E - Regulations, Standards and Specifications For The Design and Construction of Drainage Systems Minimum Pipe Grade 2.03 The minimum Storm pipe grades are: TABLE E.2 MINIMUM PIPE GRADES FOR STORM SEWER Pipe Diameter (mm) Grade (%) 200 2.00 (catch basin leads) 250 0.40 300 0.32 375 0.23 400 0.20 450 0.18 525 0.15 600 0.12 675 0.10 750 0.09 900 0.07 Minimum Pipe Diameter 2.04 The minimum pipe diameter for storm mains shall be 250 mm and the minimum diameter for catch basin leads shall be 200 mm. The minimum pipe diameter for residential and nonresidential storm services shall be 150 mm. Velocities and Joint Restraints 2.05 There is no maximum velocity for gravity storm mains, however, where the velocity exceeds 3.65 m/s consideration shall be given to possible scour and hydraulic shock problems. Gravity mains installed at grades exceeding 20% shall be reviewed for joint restraint requirements. Storm Manhole Spacing 2.06 Storm manholes shall be installed at a maximum spacing of 100 metres except where the pipe grade exceeds 10% where the maximum spacing shall be 60 metres, at the following locations: - at all changes in pipe grade and/or alignment (for non curvilinear sewers). - at all changes in pipe size. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 74 City of Armstrong SCHEDULE E - Regulations, Standards and Specifications For The Design and Construction of Drainage Systems - at all pipe junctions and intersections. - at the beginning and end of pipe curvature for curvilinear sewers. Where, in the opinion of the City Engineer, the grades of sewer pipes are sufficient to provide proper cleaning, the maximum spacing of manholes where the pipe grade is less than 10% may be increased to 120 metres. Clean-outs 2.07 Clean-outs shall not be substituted for manholes except where the storm main will be extended for future subdivision/development and the maximum spacing for manholes has not been exceeded. Catch Basin Spacing 2.08 Catch basins shall be located at maximum spacing of 75 m in the drainage path and at all intersections. Tributary areas shall not exceed 500 m2 on road grades up to 5% and 400 m2 on steeper grades, per catch basin. Catch basins shall be located at all low points or be spaced at intervals such that not more than 10% of the gutter flow reaching each inlet will pass on to the next inlet downstream, provided this carry-over is not objectionable to pedestrian or vehicular traffic and the inlet is not in a sump. Catch basins shall be located at intervals such that surface drainage does not exceed gutter or flow channel capacities, to eliminate overflow to driveways, boulevard, setbacks, sidewalks, or private property. Catch basins shall be located at all intersections, preferably at the EC or BC of curb returns. Catch basins shall not be installed in wheelchair ramps, crosswalks, or driveways. Side-inlet and/or twin-inlet catch basins shall be provided as sags in road grades and in downhill cul-de-sacs. Catch Basin Leads 2.09 Catch basin leads shall discharge into a manhole and not directly into the storm pipe wherever possible. Catch basin leads shall have a minimum cover of 0.9 metres. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 75 City of Armstrong SCHEDULE E - Regulations, Standards and Specifications For The Design and Construction of Drainage Systems Inlet and Outlet Structures 2.10 Inlet and Outlet Structures shall be designed and submitted for each application for review by the City Engineer. Inlet and Outlet Structures shall include trash racks, safety grillage, energy dissipation, oil separators, safety railings, rip-rap, monitoring devices, as required. 2.11 Storm Main Location and Alignment Storm sewer service pipe grades shall be 2% for 100 mm diameter and 1% for 150 mm diameter. Storm sewer mains shall be located, wherever possible, in accordance with Specifications Drawings. Storm sewer mains shall generally be designed to follow a straight alignment between manholes. Curved alignments within rights-of-way shall be subject to the approval of the City Engineer and provided the pipe is set at a grade greater than the specified minimum and pipe alignment is at a parallel offset with an established boundary. In these cases, the radius of curvature shall be not less than 50 metres, or twice the minimum radius recommended by the pipe manufacturer, whichever is greater, the grade shall be not less than 1%, and the design velocity must exceed 0.91 m/s. Service Connections 2.12 Storm sewer services to single family dwellings and to each unit of duplexes shall be 150 mm diameter. A storm inspection chamber is not required. Storm sewer services to multifamily sites, mobile home parks, institutional, commercial and industrial sites, shall be sized in accordance with the British Columbia Building Code - Part 7 Plumbing Services. The minimum service size shall be 150 mm in diameter, a storm inspection chamber is not required, however, each service greater than 150 mm shall be installed with a storm manhole at the storm main. A single storm sewer service shall be installed to each legal lot. Strata developments and other major developments will be permitted one storm service connection unless approved otherwise by the City Engineer. A service connection entering a manhole shall have its invert elevation at the crown of the highest main entering the manhole. The service connection shall discharge in the same direction as the benched flow in the manhole. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 76 City of Armstrong SCHEDULE E - Regulations, Standards and Specifications For The Design and Construction of Drainage Systems Major Flow Routing 2.13 Major flow routing for 100 year peak storm frequency shall be identified on the design drawings. The proportion of flow to be carried along the major flow routing shall be the total major flow less the flow carried in the minor storm system. All overland flows, in excess of 0.05 m3/sec shall have specifically designed flow routes that are protected and preserved by restrictive covenants or rights-of-way. The major flow routing shall normally be provided along roads and in natural watercourses. In some cases the major flow may also be carried alongside the road in grassed swales, and across country in statutory rights-of-way. In areas where surface major flow routes cannot be provided a pipe system will be designed to accommodate the required major flow, and sufficient inlet capacity will be provided to accommodate introduction of the major flow route into a piped system. Major flow routing over 0.05 m3/sec shall be shown and sufficient design shall be carried out to provide assurance to the City Engineer that no serious property damage or endangering of public safety will occur under major flow conditions. The discharge point from the development for the major flow route, shall be coordinated with the downstream routing to outfalls as determined by the City of Armstrong. Where major flow outfalls to a receiving watercourse, the velocity shall not exceed 1.5 m3/sec. An energy dissipater shall be provided to minimize erosion. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 77 City of Armstrong SCHEDULE E - Regulations, Standards and Specifications For The Design and Construction of Drainage Systems 3.0 CONSTRUCTION Materials 3.01 Storm Sewer construction materials shall be in accordance with SCHEDULE L - Division 2 - Sitework Section 2E - Storm Sewer Works. Construction 3.02 Storm Sewer construction shall be in accordance with SCHEDULE L - Division 2 - Sitework Section 2E - Storm Sewer Works. Testing 3.03 Storm Sewer testing shall be in accordance with SCHEDULE L - Division 2 - Sitework Section 2E - Storm Sewer Works. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 78 City of Armstrong SCHEDULE F - Regulations, Standards and Specifications For The Design and Construction of Concrete Curbs, Gutters, Sidewalk, Stairs SCHEDULE F REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE DESIGN AND CONSTRUCTION OF CONCRETE CURBS, GUTTERS, SIDEWALK, STAIRS This is Schedule F of the City of Armstrong Subdivision and Development Servicing Bylaw No. 1570, 2007 ___________________________________ (Clerk) SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 79 City of Armstrong SCHEDULE F - Regulations, Standards and Specifications For The Design and Construction of Concrete Curbs, Gutters, Sidewalk, Stairs SCHEDULE F REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE DESIGN AND CONSTRUCTION OF CONCRETE CURBS, GUTTERS, SIDEWALK, STAIRS 1.0 GENERAL DESIGN General Where the provisions of Schedule A of this Bylaw require the provision of curb and gutters, sidewalk, boulevard, or concrete stairs, the Owner shall construct such services in a manner consistent with the regulations, standards, and specifications set out in this Schedule and elsewhere in this Bylaw. Engineering drawings showing the detailed design of these works shall be submitted to the City Engineer for review. No construction of the works shall commence until the design drawings have been approved by the City Engineer. Curb, Gutter and Sidewalk Requirements 1.01 Curb, gutter and sidewalk shall be provided in accordance with Table F.1. TABLE F.1 CURB, GUTTER SIDEWALK REQUIREMENTS HIGHWAY CLASSIFICATION CURB TYPE REQUIRED MINIMUM SIDEWALK WIDTHS Residential Zones Arterial Major Collector Minor Collector Local Non-mountable (CGS-1) Non-mountable (CGS-1) Mountable (CGS-2) Mountable (CGS-2) 1.85 m 1.85 m 1.85 m 1.85 m Commercial Zone Arterial Major Collector Minor Collector Non-mountable (CGS-1) Non-mountable (CGS-1) Non-mountable (CGS-1) 1.85 m 1.85 m 1.85 m Industrial Arterial Major Collector Minor Collector Local Non-mountable (CGS-1) Non-mountable (CGS-1) Non-mountable (CGS-1) Non-mountable (CGS-1) 1.85 m 1.85 m 1.85 m 1.85 m SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 80 City of Armstrong SCHEDULE F - Regulations, Standards and Specifications For The Design and Construction of Concrete Curbs, Gutters, Sidewalk, Stairs Location of Sidewalk 1.02 Where sidewalk is required on one side of a highway, the sidewalk shall be located on the same side as the street lights where the street lights are davit lights on hydro poles. Where new street lights are to be installed, the City Engineer shall determine the side of the highway to locate both the sidewalk and the street lights. 2.0 DESIGN CRITERIA Design Gradient 2.01 The design gradient for curb and gutters shall be as specified for highways in Schedule B of this Bylaw, except that the minimum gradient around curb returns and around cul-de-sacs shall be 0.8%. Curb Return 2.02 The minimum curb return radius shall be as set out in Schedule B of this Bylaw. Elevations shall be shown on the design drawings for the beginning and end of the curb return, and at any grade changes in between. Design drawings shall provide all geometric details both vertically and horizontally for curb returns. Grading of Boulevards 2.03 Upon completion of road, curb and gutter and sidewalk construction, boulevards shall be shaped, graded and landscaped as shown on the Design Drawings. Unless otherwise approved, boulevards shall be graded to drain to the curb and gutter. Sidewalk Cross-Sections 2.04 Sidewalk Cross -sections shall have the concrete thickness and steel reinforcing as detailed on Specification Drawings CGS-4, CGS-5 and CGS-6. Driveway Access 2.05 Driveway access grades across highway boulevards shall be not less than 4% and not more than 6%. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 81 City of Armstrong SCHEDULE F - Regulations, Standards and Specifications For The Design and Construction of Concrete Curbs, Gutters, Sidewalk, Stairs Curb and Gutter Cross-Sections 2.06 Curb and gutter cross-sections, for non-mountable and mountable concrete curb and gutter, shall be as detailed on Specification Drawings CGS-1 and CGS-2. Commercial and Industrial Reinforced Concrete Accesses 2.07 Commercial and Industrial reinforced concrete accesses shall be as detailed in Specification Drawing CGS-4. Wheelchair Ramps 2.08 Wheelchair ramps shall be provided at all intersections on highways provided with sidewalks and at all designated cross-walks. Wheelchair ramps shall be constructed in accordance with Specification Drawing CGS-5. 3.0 CONSTRUCTION Materials 3.01 Concrete curbs, gutters, sidewalks, stairs construction materials shall be in accordance with SCHEDULE L - Division 2 - Sitework Section 2F - Concrete Curbs, Gutters, Sidewalk, Stairs. Construction 3.02 Concrete curbs, gutters, sidewalks, stairs construction shall be in accordance with SCHEDULE L - Division 2 - Sitework Section 2F - Concrete Curbs, Gutters, Sidewalk, Stairs. Testing 3.03 Concrete curbs, gutters, sidewalks, stairs testing shall be in accordance with SCHEDULE L - Division 2 - Sitework Section 2F - Concrete Curbs, Gutters, Sidewalk, Stairs. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 82 City of Armstrong SCHEDULE G - Regulations, Standards and Specifications For The Design and Construction of Street Lighting SCHEDULE G REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE DESIGN AND CONSTRUCTION OF STREET LIGHTING This is Schedule G of the City of Armstrong Subdivision and Development Servicing Bylaw No. 1570, 2007 ___________________________________ (Clerk) SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 83 City of Armstrong SCHEDULE G - Regulations, Standards and Specifications For The Design and Construction of Street Lighting SCHEDULE G REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE DESIGN AND CONSTRUCTION OF STREET LIGHTING 1.0 GENERAL DESIGN General Where the provisions of Schedule A of this Bylaw require the provision of street lighting, the Owner shall construct street lighting including all conduit, conductor, bases, poles, luminaries, lamps, fixtures, photo cells, control equipment, permits and fees, and all related appurtenances consistent with the regulations, standards, and specifications set out in this Schedule and the requirements of the Province of British Columbia Electrical Inspector. Detailed design drawings shall be submitted to the City Engineer for review. Construction shall not commence until the design drawings have been approved by the City Engineer. Electrical record drawings and wiring diagrams shall be submitted for review by the City Engineer prior to acceptance of the street lighting design by the City Engineer. Electrical Permit and Fees 1.01 The Owner shall be responsible for obtaining all required electrical permits, paying for all fees for such permits, and for arranging for all electrical inspections for the electrical works. 2.0 DESIGN CRITERIA Levels of Illumination 2.01 The average levels of illumination in lux, measured 1.45 m above the roadway shall be in accordance with Table G.1. The maximum uniformity ratio for urban roads shall be 6:1 and for collector and arterial roads shall be 3:1. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 84 City of Armstrong SCHEDULE G - Regulations, Standards and Specifications For The Design and Construction of Street Lighting TABLE G.I LEVELS OF ILLUMINATION Road Classification Residential Area (Lux) Commercial/Industrial Area (Lux) Arterial 10 22 Collector 10 13 Local/Industrial 4.5 10 Pole Locations 2.02 Davit poles and fixtures shall be located on all collector and arterial classified highways and post top poles and fixtures shall be located on all local classified highways, in accordance with Specification Drawings SL-1, SL-2, SL-3, SL-4, and SL-5. Pole locations, in general, shall be aligned with property lines and shall not conflict with driveways, fire hydrants, and underground services. Street light poles shall be off-set as indicated on Specification Drawings RD-1, RD-2, RD-3 and RD-4. Connection to Utility 2.03 Provide for a maximum of 8 post top street lights per electrical service connection. Each connection to BC Hydro shall be made with an underground service to the power base pole. 3.0 CONSTRUCTION Materials 3.01 Street Lighting construction materials shall be in accordance with SCHEDULE L - Division 2 - Sitework Section 2G - Street Lighting. Construction 3.02 Street Lighting construction shall be in accordance with SCHEDULE L - Division 2 - Sitework Section 2G - Street Lighting. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 85 City of Armstrong SCHEDULE G - Regulations, Standards and Specifications For The Design and Construction of Street Lighting Testing 3.03 Street Lighting testing shall be in accordance with SCHEDULE L - Division 2 - Sitework Section 2G - Street Lighting. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 86 City of Armstrong SCHEDULE H - Regulations, Standards and Specifications For The Design and Construction of Hydro, Telephone, Gas, CATV SCHEDULE H REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE DESIGN AND CONSTRUCTION OF HYDRO, TELEPHONE, GAS. CATV This is Schedule H of the City of Armstrong Subdivision and Development Servicing Bylaw No. 1570, 2007 ___________________________________ (Clerk) SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 87 City of Armstrong SCHEDULE H - Regulations, Standards and Specifications For The Design and Construction of Hydro, Telephone, Gas, CATV SCHEDULE H REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE DESIGN AND CONSTRUCTION OF HYDRO, TELEPHONE, GAS, CATV 1.0 GENERAL DESIGN General Where the provisions of Schedule A of this Bylaw require the provision of hydro, telephone, gas, and catv, the Owner shall coordinate the design of the City infrastructure with the Utility Company design, supply and construct all materials in accordance with the respective Utility company plans and specifications. All Utility Company infrastructure designs shall be submitted for review by the City Engineer. Utility Company works shall not proceed until their design(s) have been approved by the City Engineer. Fees 1.01 The Owner shall secure all permits and pay for all fees and material costs required for the installation of the hydro, telephone, gas and catv utilities. 2.0 DESIGN CRITERIA Horizontal Location 2.01 The preferred horizontal location for underground hydro, telephone and catv ducting, and gas main piping, is shown on Specification Drawings RD-1, RD-2, RD-3 and RD-4. Hydro, telephone, catv, and gas design drawings shall recognize municipal utilities and the final design shall have the approval of the City Engineer. Vertical Location 2.02 All hydro, telephone, catv, and gas main piping shall have the minimum cover as specified by the respective Utility Company. Detailed Design 2.03 Detailed design drawings shall be in accordance with the latest issue of the following specifications: SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 88 City of Armstrong SCHEDULE H - Regulations, Standards and Specifications For The Design and Construction of Hydro, Telephone, Gas, CATV 2.3.1 BC Hydro Specification No. 1323. 2.3.2 Telus Specification No. 6020. 2.3.3 Terasen Gas Specification No. CSA-Z184-M92. 2.3.4 CATV materials shall conform to Telus Specification No. 6020 except that CATV duct shall be 50 mm PVC 700 series orange teleduct. Boulevard Restoration 2.04 The Owner is responsible to ensure that roads and boulevards, which have been disturbed by the Utility Companies works, are restored to the City of Armstrong road and boulevard specifications immediately upon completion of the Utility works. 3.0 CONSTRUCTION Materials 3.01 Hydro, Telephone, Gas, CATV construction materials shall be in accordance with SCHEDULE L - Division 2 - Sitework Section 2H - Hydro, Telephone, Gas, CATV. Construction 3.02 Hydro, Telephone, Gas, CATV construction shall be in accordance with SCHEDULE L - Division 2 - Sitework Section 2H - Hydro, Telephone, Gas, CATV. Testing 3.03 Hydro, Telephone, Gas, CATV testing shall be in accordance with SCHEDULE L - Division 2 - Sitework Section 2H - Hydro, Telephone, Gas, CATV. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 89 City of Armstrong SCHEDULE I - Regulations, Standards and Specifications For The Design and Construction of Landscaping SCHEDULE I REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE DESIGN AND CONSTRUCTION OF LANDSCAPING This is Schedule I of the City of Armstrong Subdivision and Development Servicing Bylaw No. 1570, 2007 ___________________________________ (Clerk) SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 90 City of Armstrong SCHEDULE I - Regulations, Standards and Specifications For The Design and Construction of Landscaping SCHEDULE I REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE DESIGN AND CONSTRUCTION OF LANDSCAPING 1.0 GENERAL DESIGN General Where the provisions of Schedule A of this Bylaw require the provision for boulevard and/or right-of-way landscaping and irrigation the Owner shall submit landscaping and irrigation drawings to the City Engineer for review. The landscaping and irrigation works shall not proceed until design drawings have been approved by the City Engineer. 2.0 DESIGN CRITERIA General 2.01 Landscaping material shall be compatible with the climatic conditions enjoyed by the City of Armstrong. Where, in opinion of the City Engineer, the landscape design requires the expertise of a Landscape Architect the Owner shall engage a Landscape Architect to prepare the landscape and irrigation design and specifications for review by the City Engineer. Grading of Boulevards 2.02 Upon completion of road, curb and gutter and sidewalk construction, boulevards shall be shaped, graded and landscaped a shown on the Design Drawings. Unless otherwise approved, boulevards shall be graded to drain to the curb and gutter. 3.0 CONSTRUCTION Materials 3.01 Landscaping construction materials shall be in accordance with SCHEDULE L - Division 2 - Sitework Section 2I - Landscaping. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 91 City of Armstrong SCHEDULE I - Regulations, Standards and Specifications For The Design and Construction of Landscaping Construction 3.02 Landscaping construction shall be in accordance with SCHEDULE L - Division 2 - Sitework Section 2I - Landscaping. Testing 3.03 Landscaping testing shall be in accordance with SCHEDULE L - Division 2 - Sitework Section 2I - Landscaping. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 92 City of Armstrong SCHEDULE J - Specification Drawings SCHEDULE J SPECIFICATION DRAWINGS This is Schedule J of the City of Armstrong Subdivision and Development Servicing Bylaw No. 1570, 2007 ___________________________________ (Clerk) SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 93 City of Armstrong SCHEDULE J - Specification Drawings SCHEDULE J SPECIFICATION DRAWINGS 1.0 GENERAL Application of Specification Drawings 1.01 Specification Drawings are applicable where the provisions of Schedule A of this Bylaw require the preparation of design drawings for: roads, water, sanitary sewer, drainage, curbs, gutters, sidewalk, underground hydro, telephone, catv, gas, street lighting, landscaping, and other permanent structures. The application of Specification Drawings is project specific. Where required, the City Engineer will clarify which Specification Drawings are applicable to the Subdivision or Development for which application has been made. Where no standard in these Specification Drawings is applicable for the works and services required, instructions and requirements may be obtained from the City Engineer. 2.0 SPECIFICATION DRAWINGS Highways - (Schedule B) 2.01 Specification Drawings RD-1 18 m R/W Urban Local Road Cross-Section RD-2 20 m R/W Urban Local Road Cross-Section RD-3 18 m R/W Urban Road & Cul-de-Sac RD-4 20 m R/W Urban Road & Cul-de-Sac RD-5 6 m and 7.6 m R/W Lane Cross-Section SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 94 City of Armstrong SCHEDULE J - Specification Drawings Water Systems - (Schedule C) 2.02 Specification Drawings W-1 Thrust Block Details W-2 Typical 19 mm Water Service Connection W-3 Standard Fire Hydrant Detail W-4 Standard Fire Hydrant Detail c/w Mueller MVB Valve Box W-5 Typical Blow Off Assembly W-6 Standard Valve Box Assembly W-7 Mueller MVB Valve Box W-8 Air Release Valve W-9 H-20 Manhole Frame & Cover W-10 Residential Water Meter W-11 Commercial Water Meter W-12 Pit Setter Water Meter Sanitary Sewers - (Schedule D) 2.03 Specification Drawings SAN-1 Typical 1050 mm Sanitary Manhole SAN-2 H-20 Manhole Frame & Cover SAN-3 Typical 1050 mm Sanitary Drop Manhole SAN-4 Typical 100 mm Sanitary Service Connection SAN-5 Inspection Chamber for Sanitary Connection Drainage Systems - (Schedule E) 2.04 Specification Drawings ST-1 Precast Reinforced Conc. Catch Basin ST-2 Typical 1050 Storm Manhole ST-3 H-20 Manhole Frame & Cover ST-4 Typical 150 mm Storm Service Connection ST-5 150 mm Inserta Tee Storm Service Connection ST-6 Manhole Requirements for Storm Sewer Services ST-7 Rainfall Intensity-Duration Data ST-8 Typical Concrete Inlet Structure ST-9 Typical Concrete Outlet Structure ST-10 Twin Inlet Catch Basin Frame ST-11 Typical Drainage Drywell SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 95 City of Armstrong SCHEDULE J - Specification Drawings Servicing - (Schedules C, D, E) 2.05 Specification Drawings SER-1 Typical Lot Servicing Curbs, Gutter, Sidewalk, Stairs - (Schedule F) 2.06 Specification Drawings SP-1 Typical Sign Post Base CGS-1 Standard High-Back Curb & Gutter CGS-2 Mountable Curb & Gutter CGS-3 Standard Sidewalk CGS-4 Sidewalk Crossing at Driveway Entrance CGS-5 Wheelchair Sidewalk Ramp CGS-6 Standard Walkway CGS-7 Standard Pathway RS-1 Reinforced Concrete Stairs RS-2 Sidewalk Railing RS-3 Sidewalk Fence Street Lighting - (Schedule G) 2.07 Specification Drawings SL-1 9.00 m Davit Street Lights SL-2 9.00 m Davit Concrete Pedestal SL-3 Post Top Street Light SL-3-I Post Top Street Light with Irrigation & Electrical Outlet SL-4 Post Top Street Light/Power Base SL-4-I Post Top Street Light/Power Base with Irrigation & Electrical Outlet SL-5 5.00 m Post Top Concrete Pedestal SL-6 Bracket for Hanging Baskets Hydro, Telephone, Gas, CATV - (Schedule H) 2.08 Specification Drawings (To Hydro, Telephone, Gas, and CATV Specifications) SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 96 City of Armstrong SCHEDULE J - Specification Drawings Landscaping - (Schedule I) 2.09 Specification Drawings TRE-1 Typical Double Tree Stakes For Trees Over 2 m High TRE-2 Typical Tree (with grate, guard, and receptacle) Engineering Drawings - (Schedule K) 2.10 Specification Drawings DD-PL ANSI 'D' Size Plan Sheet DD-PP ANSI 'D' Size Plan/Profile Sheet DD-LG ANSI 'D' Size Legend SC-1 Utility Service Card Miscellaneous 2.11 Specification Drawings S-1 Typical Road Construction Ahead Sign UT-1 Typical Trench in Roadway UT-2 Typical Trench in Boulevard UT-3 Utility Main Relocation Details SG-1 Lockable Swing Gate SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 97 City of Armstrong SCHEDULE K - Regulations, Standards and Specifications For Surveys and Design Drawings SCHEDULE K REGULATIONS, STANDARDS AND SPECIFICATIONS FOR SURVEYS AND DESIGN DRAWINGS This is Schedule K of the City of Armstrong Subdivision and Development Servicing Bylaw No. 1570, 2007 ___________________________________ (Clerk) SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 98 City of Armstrong SCHEDULE K - Regulations, Standards and Specifications For Surveys and Design Drawings SCHEDULE K REGULATIONS, STANDARDS AND SPECIFICATIONS FOR SURVEYS AND DESIGN DRAWINGS 1.0 GENERAL DESIGN General Where the provisions of Schedule A of this Bylaw require the preparation of design drawings for: roads, water, sanitary sewer, drainage, curbs, gutters, sidewalk, underground hydro, telephone, catv, gas, street lighting, landscaping, and other permanent structures, the following regulations, standards, and specifications for surveys and design drawings shall apply. Where no standard is defined in this schedule for the preparation of a design drawing to define a particular service, structure, or other item, instructions and requirements may be obtained from the City Engineer. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 99 City of Armstrong SCHEDULE K - Regulations, Standards and Specifications For Surveys and Design Drawings 2.0 DESIGN CRITERIA General 2.01 The Owner shall not proceed with any construction until such time as engineering drawings have been accepted by the City of Armstrong. Acceptance of engineering drawings is indicated by date and signature of the City Engineer, or authorized delegate, on the accepted design drawings indicating that the design drawings have been 'Approved in Principle'. Design and Construction Administration 2.02 Where works and services are required under Schedule A of this Bylaw the Owner shall appoint a qualified Engineer to undertake the project engineering survey, design, field reviews, and record drawings in accordance with the provisions of this Bylaw. The Owner shall provide a confirmation of Professional Assurance Certificate, in accordance with Schedule O of this Bylaw, which has been dated, witnessed, and signed by both the Owner and the Engineer. Proof of Engineers Professional Liability Insurance (Errors and Omissions) shall be provided for all projects where the value of the works and services exceeds One Hundred Thousand Dollars ($100,000.00). The City of Armstrong review and approval in principle of the engineering design drawings does not confirm the accuracy or adequacy of the design nor does the City of Armstrong accept responsibility for any damages or costs incurred due to errors or omissions, or deficiencies in the design or location of any existing or new works and services. Legal Surveys 2.03 The Owner shall utilize a registered British Columbia Land Surveyor (B.C.L.S.) for project legal survey and preparation of plans for registered at the British Columbia Land Title Office. For new development the survey plan shall be prepared in a manner to dedicate as 'road' - corner cuts 3.0 metres by 3.0 metres on local streets and 5.0 metres by 5.0 metres on collector and arterial streets at all street intersections. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 100 City of Armstrong SCHEDULE K - Regulations, Standards and Specifications For Surveys and Design Drawings Design Surveys 2.04 Design surveys shall be conducted in a manner which will not create a nuisance to traffic or the Public. The permission of registered property owners is required before entering private property. All elevations shall be referenced to Geodetic Survey of Canada (GSC) datum. 2.05 Design Drawings Design drawings shall provide the following information plus any additional information deemed necessary to fully describe the design and scope of the proposed works. Where applicable, existing works shall be indicated on the design drawings. North Arrow RV Parking (where applicable) Legend Storm Manholes & Inverts Referenced Geodetic Benchmark Catch Basins, Leads & Inverts Legal Property Lines Storm Main Plans & Profiles Lot Dimensions and Bearings Storm Services Found Iron Pins Sanitary Manholes and Inverts Buried/Destroyed Iron Pins Sanitary Mains Plans & Profiles Coordinates for Reference Iron Pins Sanitary Services Road Plans and Profiles including Curb, Water Main Plans & Profiles Gutter & Sidewalk Plans and Profiles Water Main Valves & Fittings Hydro, Telephone & Street Light Poles Water Services & Curb Stops U/G Power, Telephone, CATV Fire Hydrants Prominent Features within the R/W Air Release Valves Road Cross-Sections Blow-offs Pavement Structure Gas Mains Aggregate Depths Transit Bus Bays Pavement Elevations Information Signs Curve & Spiral Data Regulatory Signs Lot Corner Elevations Lot Grades Control/Containment of Surface Water Major Flow Routing Lot & Plan Numbers Stationing and Off-sets Drainage Courses Retention Ponds Site Grading Details Canada Post Mail Boxes Any additional information as determined by the City Engineer SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 101 City of Armstrong SCHEDULE K - Regulations, Standards and Specifications For Surveys and Design Drawings 2.5.1 The existing information shall be illustrated with a 0.18 mm line size and proposed construction shall be illustrated with a 0.70 mm line size. 2.5.2 The scale of all design drawings shall be 1:500 Horizontal and 1:50 Vertical. Any deviation shall first be approved by the City Engineer. 2.5.3 The Project Cover Sheet / Key Plan shall indicate the Designers Name, Address, Telephone and Fax Number, the Project Number, the Site Location, the Legal Description of Properties involved, and an Index of the Design Drawings. 2.5.4 Design Drawings shall be organized and individual plan/profile drawings shall be submitted as follows; - Street design including curb and gutter, sidewalks and other related surface works on plan/profile drawings. - Water works, storm and sanitary mains and service connections and related appurtenances on plan/profile drawings. - Road cross-sections and specific construction details on plan/profile drawings. - Street and signal lighting on plan drawings. - General arrangement plan indicating all private utility servicing. 2.5.5 All backup design calculations shall be retained by the Owners Engineer and submitted when requested by the City Engineer. Design Drawing Submission 2.06 All design drawings shall be submitted in the City of Armstrong standard format as shown in specification drawings. The City of Armstrong has available a standard CD-ROM with all the standard symbols, line types, layering conventions, etc., for preparation of the design drawings. The Owner's Engineer shall submit four (4) complete sets on size ANSI 'D' and one (1) set reduced to 280 mm x 430 mm (11" x 17") of design drawing prints, date stamped, sealed and signed by the Engineer, for review by the City Engineer. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 102 City of Armstrong SCHEDULE K - Regulations, Standards and Specifications For Surveys and Design Drawings Additional sets of revised drawings are to be submitted by the Owner on request of the City Engineer until such time as the revised design drawings are approved by the City Engineer. The Owner shall arrange for the design and submission of four (4) complete sets of hydro, telephone, gas, and catv design drawings. The Owner shall arrange for the submission of signed and sealed engineering drawings to the Provincial Ministry of Health for a Certificate to Construct Water Works. Pre-Construction Requirements 2.07 No construction shall occur until such time as engineering drawings have been accepted by the City Engineer. Such acceptance is indicated only by the signature of the City Engineer, or authorized delegate, on the submitted design drawings. These design drawings shall be referred to as the City of Armstrong 'Approved in Principle' Design Drawings. The Owner shall provide the following documentation after acceptance of the Engineering Submission and before commencing any works within the City of Armstrong rights-of-way as follows: 2.7.1 A Signed and Sealed Servicing Agreement substantially in accordance with Schedule M. 2.7.2 Proof of Insurance in accordance with the terms and conditions provided in the Servicing Agreement, naming the City of Armstrong as a 'Named Additional Insured'. The Applicant's insurance provider must submit a completed Schedule V. 2.7.3 Submission of Performance Security in the amount equal to One Hundred and Twenty-Five (125%) Percent of the estimated off-site servicing costs. Performance Security shall be cash or clean irrevocable letter of credit. A letter of credit shall be in a form acceptable to the City of Armstrong. 2.7.4 Provision of a Field Review of Construction By A Professional Engineer Schedule O signed by the Owner's Engineer. 2.7.5 Submission of a copy of the WorkSafe BC 'Notice of Project'. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 103 City of Armstrong SCHEDULE K - Regulations, Standards and Specifications For Surveys and Design Drawings 2.7.6 Submission of a testing schedule for quality control of the construction materials and construction works, including the name of the Testing Firm and the Testing Firm contact person. 2.7.7 Submission of approvals, where applicable, from Provincial Ministry of Highways, Federal Fisheries and Oceans Canada, Provincial Ministry of Environment, and any other Provincial or Federal approvals required for approval of the proposed works. Post Construction and City of Armstrong Acceptance 2.08 On completion of works and services the Owner's Engineer shall submit a bound construction completion report to the City Engineer that contains the following documentation: 2.8.1 A Certificate of Inspection signed and sealed by the Owner's Engineer. 2.8.2 Complete Materials and Workmanship Testing Reports including, aggregate sieves, proctor test, in-situ density tests, asphalt marshal/compaction densities, concrete tests, sanitary sewer pressure/leakage tests, water main pressure leakage tests, water bacteriological tests and certification in accordance with Schedule X. All materials testing reports shall be signed and sealed by the Engineer for the Owner's testing agency and confirm that all works tested meet or exceed the requirements of this Bylaw. 2.8.3 Fire Hydrant Flow Test and Test Report for all newly installed fire hydrants in accordance with Schedule Y. The hydrant(s) shall be colour coded and an identification number stamped on the hydrant spindle in accordance with Specification Drawing W-3. The City of Armstrong shall provide the paint colour and the identification number. 2.8.4 Letters of acceptance from BC Hydro, Telus, Terasen Gas, and CATV, confirming acceptance of the installation of their private utilities. 2.8.5 Certificate from the Provincial Electrical Inspector accepting the street light electrical infrastructure. 2.8.6 Signed releases from the registered property owners of properties affected by, or adjacent to, the construction works in accordance with Schedule Z. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 104 City of Armstrong SCHEDULE K - Regulations, Standards and Specifications For Surveys and Design Drawings 2.8.7 Utility videos, complete with inspection report for all new sanitary and storm sewer installations. 2.8.8 Confirmation that Canada Post has been notified of the completed subdivision or development. 2.8.9 Certification form the Owner's Engineer that rough lot grading has been completed to with +/- 75 mm of the design lot grades. On completion of the Works and Services the Owner shall notify the City Engineer. The City Engineer will, upon receipt of the notice and bound completion report prepared by the Owners Engineer, inspect the Works and Services and, if necessary, issue a list of deficiencies that shall be corrected. If the City Engineer determines the Works and Services are substantially complete and can be put into service, a Certificate of Substantial Completion shall be dated and issued where all of the monies held by he City shall be released, less Ten Percent (10%) of the total cost of the Works and Services to be used as a Maintenance Security plus a Deficiency Amount of two (2) times the value of any deficiencies to be rectified. Upon completion of the deficiencies acceptable to the City Engineer, a Certificate of Completion shall be dated and issued and the Deficiency Amount, only, released. Record Drawings 2.09 The Owner shall submit Record Drawings, which accurately portray the as- constructed information for the works constructed by the Owner, to the City Engineer within four weeks of the completion of the installation of said works. As-built measurements and dimensions shall be recorded during the construction of the works, and prior to works being buried, and shall be accurate in 3 dimensions. The Record Drawings shall be signed and sealed by the Owner's Engineer. Where works include the installation of water, sanitary sewer, and storm sewer services the Owner shall provide accurate (surveyed) Utility Service cards in accordance with Specification Drawing SC-1. The Record Drawing submission shall include CD ROM(s) containing the Record Drawings in AutoCAD format and Adobe Acrobat PDF format scaled to print on 11" x 17" and ANSI D. The digital files shall be in structured formats and software versions that are the current release or the previous release. The City SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 105 City of Armstrong SCHEDULE K - Regulations, Standards and Specifications For Surveys and Design Drawings of Armstrong will provide a standard file naming structure for the digital drawing submission. Record Drawings shall include the installed location for hydro, telephone, gas and CATV ducting, mains and appurtenances. Final Acceptance 2.10 The City Engineer will release the Maintenance Security, less the cost of any repairs chargeable to the Owner, upon expiry of the Maintenance Period when so requested by the Owner. Upon release of the Maintenance Security the City Engineer will issue a Certificate of Final Acceptance. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 106 City of Armstrong SCHEDULE L - Materials, Construction, Testing Specifications SCHEDULE L MATERIALS, CONSTRUCTION, TESTING SPECIFICATIONS This is Schedule L of the City of Armstrong Subdivision and Development Servicing Bylaw No. 1570, 2007 ___________________________________ (Clerk) SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 107 City of Armstrong SCHEDULE L - Materials, Construction, Testing Specifications SCHEDULE L MATERIALS, CONSTRUCTION, TESTING SPECIFICATIONS 1.0 GENERAL DESIGN General Where the provisions of Schedule A of this Bylaw require the construction of roads, water, sanitary sewer, drainage, curbs, gutters, sidewalk, underground hydro, telephone, catv, gas, street lighting, landscaping, and other permanent structures, the following regulations, standards, and specifications for materials, construction, and testing shall apply: Section 2B Roads and Earthworks referenced to Schedule B Section 2C Water Distribution Works referenced to Schedule C Section 2D Sanitary Sewer Works referenced to Schedule D Section 2E Drainage/Storm Sewer Works referenced to Schedule E Section 2F Concrete Curbs, Gutters, Sidewalk, Stairs referenced to Schedule F Section 2G Street Lighting referenced to Schedule G Section 2H Hydro, Telephone, Gas, CATV referenced to Schedule H Section 2I Landscaping referenced to Schedule I Where no regulation, standards or specifications for materials, construction, and testing, is defined in this schedule for the construction of a particular service, structure, or other item, instructions and specifications may be obtained from the City Engineer. Material Alternatives 1.01 Material specifications, other than those specified in this Bylaw may be acceptable subject to the prior approval of the City Engineer. Where the Owner requests a material specification alternative the Owner shall supply all information, specifications, and certification for the material alternate as may be requested by the City Engineer to assist the City Engineer's evaluation. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 108 City of Armstrong SCHEDULE L - Materials, Construction, Testing Specifications SCHEDULE L MATERIALS, CONSTRUCTION, TESTING SPECIFICATIONS Division 2 - Siteworks Section 2B - Roads and Earthworks Division 2 - Siteworks Section 2C - Water Distribution Works Division 2 - Siteworks Section 2D - Sanitary Sewer Works Division 2 - Siteworks Section 2E - Storm Sewer Works Division 2 - Siteworks Section 2F - Curbs, Gutters, Sidewalk, Stairs Division 2 - Siteworks Section 2G - Street Lighting Division 2 - Siteworks Section 2H - Hydro, Telephone, Gas, CATV Division 2 - Siteworks Section 2I - Landscaping DIVISION 2 - SITEWORK Page 109 City of Armstrong SECTION 2B - ROADS AND EARTHWORKS SCHEDULE L - Materials, Construction, Testing Specifications 1.0 GENERAL 1.1 This section refers to the supply of all labour, supervision, equipment, and materials, as specified, necessary to complete the work in accordance with the City of Armstrong approved Drawings, Special Provisions and these Specifications. 2.0 DESCRIPTION OF WORK 2.1 The work shall include, but not necessarily be limited to the following principal items: 2.1.1 Supply and install all materials as per the drawings and specifications. 2.1.2 Take delivery, including unloading at the site, and store under suitable conditions to prevent damage, deterioration, or, contamination until incorporated into the works. 2.1.3 Schedule works such that disruption of normal traffic, and inconvenience to residents, in the working area is kept to a minimum, and such that emergency vehicles have suitable access thru the working area at all times. Provide dust control during the course of the Contract. 2.1.4 Maintain the work area in an orderly manner free of accumulated waste, and surplus materials and debris. Clean-up shall be a continuing daily process over the duration of the Contract. 2.1.5 Clearing, grubbing, and removal of all debris. 2.1.6 Stripping of topsoil and preservation of designated trees, shrubs, hedges, and landscaping features. 2.1.7 Excavation and subgrade embankment construction for road works, drainage works, site grading, excavation and embankment construction, removal of designated concrete and asphalt, for work designated in the Contract Documents, or as may be directed by the Owner's Representative. 2.1.8 Sub-base Course and Base Course construction for road works, sidewalks, and any other areas designated in the Contract Documents. 2.1.9 Asphalt Concrete Paving. 3.0 EXAMINATION OF THE SITE OF THE PROPOSED WORKS 3.1 The `Tenderer' will carefully examine the site of the proposed works and notify the Owners' Representative, in writing, of any changes which have been made to the site by `Others', during the period of `Tender Closing' to `Contract Award', which would affect the proper completion of the Contract. 3.2 Commencement of the work on this Contract shall constitute acceptance of the site and any changes which have been made to the work site by `Others'. 4.0 MATERIALS 4.1 Clearing and grubbing shall consist of the removal and disposal of trees, stumps, shrubs, deadfalls, roots, grass, fences, scrap metal, and miscellaneous structures within the project area, to the Contractors' disposal site, unless specifically noted to the contrary. Trees, shrubs, hedges and landscaping features designated for preservation, either on the Contract Drawings or by the Owner's Representative, shall not be damaged. DIVISION 2 - SITEWORK Page 110 City of Armstrong SECTION 2B - ROADS AND EARTHWORKS SCHEDULE L - Materials, Construction, Testing Specifications 4.2 Stripping shall include the excavation and complete removal and disposal and/or stockpiling of all organic material to the mineral soil wherever excavation or embankment construction is to be performed. The Contractor shall not excavate deeper than is required to remove such objectionable matter. Should he do so, the Contractor shall replace all over-stripped material at no cost to the Owner. 4.3 Excavated Materials shall be either Common Materials, Topsoil, Unsuitable Materials, or Rock. 4.3.1 Common Materials shall be that which is neither Topsoil, Unsuitable Materials, or Rock. 4.3.2 Topsoil excavation is defined as approved surface materials suitable for landscaping or restoration of garden areas. 4.3.3 Rock excavation is the removal of solid ledge rock which requires drilling and blasting for its removal. Removal of soft or disintegrated rock which can be removed with a hand pick or power-operated excavator, or previously blasted or broken stone in rock fills or elsewhere, shall not be classified as rock excavation. Excavation of permanently frozen materials, or of seasonally frozen materials, shall be considered as native material excavation and shall not be considered as rock excavation. 4.3.4 The Contractor shall immediately notify the Owners' Representative when solid ledge rock formations are encountered, and the Contractor shall clean off the upper and lower surfaces of the solid ledge rock, at his own cost, when instructed, so that measurements can be taken for volume calculations. 4.3.5 Unsuitable Materials shall be any organic, or inorganic, materials which are soft, unstable, or otherwise, which in the opinion of the Owners' Representative, are unsuitable for embankment construction. All suitable excavated materials shall be used, when required, in the embankment construction and utility trench zone backfill. 4.4 The Owners' Representative shall be accepted as the final judge of materials classification. 4.5 Embankment shall be constructed utilizing selected common excavation materials or approved imported select granular material. 4.6 A 'Well-Graded' soil can be defined using the uniformity coefficient (Cu) and coefficient of gradation (Cc) as follows: Cu = D60 / D10 Where 'Dx' is defined as the diameter 'D' at which 'x ' is the percent passing 'D' Cc = D30 2 / (D60 x D10) For a well-graded crushed sand and gravel: Cu > 6 and 1<Cc <3 Well-graded material is defined as material whose grading will produce a smooth curve without sharp breaks when plotted on a semi-log chart. DIVISION 2 - SITEWORK Page 111 City of Armstrong SECTION 2B - ROADS AND EARTHWORKS SCHEDULE L - Materials, Construction, Testing Specifications 4.7 Sub-Base Course Aggregate shall be a 75 mm crushed `Well Graded Base Course Aggregate', composed of inert, clean, tough, durable particles uniform in quality and free from an excess of flat or elongated pieces, supplied conforming to the following grading limits: Sieve Size % Passing by Mass 75 mm 100 37.5 mm 60 - 100 19 mm 35 - 80 9.5 mm 25 - 60 4.75 mm 20 - 43 2.36 mm 15 - 35 1.18 mm 10 - 25 0.300 mm 3 - 13 0.075 mm 2 - 7 4.8 Base Course Aggregate shall be a crushed 25 mm `Well Graded Base Course Aggregate', composed of inert, clean, tough, durable particles uniform in quality and free from an excess of flat or elongated pieces, supplied conforming to the following grading limits: Sieve Size % Passing by Mass 25 mm 100 19 mm 80 - 100 9.5 mm 50 - 100 4.75 mm 35 - 70 2.36 mm 25 - 50 1.18 mm 15 - 35 0.300 mm 5 - 20 0.075 mm 0 - 5 4.9 Shouldering Aggregate shall be a crushed 25 mm `Well Graded Base Course Aggregate', composed of inert, clean, tough, durable particles uniform in quality and free from an excess of flat or elongated pieces, supplied conforming to the following grading limits: Sieve Size % Passing by Mass 25 mm 100 19 mm 85 - 100 9.5 mm 60 - 85 4.75 mm 40 - 70 1.18 mm 20 - 50 0.300 mm 10 - 30 0.075 mm 5 - 15 DIVISION 2 - SITEWORK Page 112 City of Armstrong SECTION 2B - ROADS AND EARTHWORKS SCHEDULE L - Materials, Construction, Testing Specifications 4.10 Drain Rock shall be clean round stone or crushed rock conforming to the following grading limits: 4.11 Select Granular Backfill shall be free of organics and debris, and be composed of inert, clean, tough, durable particles, of rock, gravel, sand, and fines, capable of withstanding the deleterious effects of exposure to water, freeze-thaw, handling and compacting. The aggregate particles shall be uniform in quality and free from an excess of elongated particles. Select Granular Backfill shall meet the following gradation: Sieve Size % Passing by Mass 75 mm 100 19 mm 20 - 100 10 mm 10 - 60 0.6 mm 0 - 45 0.3 mm 0 - 15 0.08 mm 0 - 10 Sieve Size % Passing by Mass 37.5 mm 95% - 100% 9.5 mm 0% - 5% DIVISION 2 - SITEWORK Page 113 City of Armstrong SECTION 2B - ROADS AND EARTHWORKS SCHEDULE L - Materials, Construction, Testing Specifications 4.12 Asphalt Concrete Pavement shall be `Class 2 Medium Asphalt Mix', for new roads and reconstruction and overlays (50 mm > thickness > 38 mm), and, 'Class 2 Medium Fine Mix' for overlays ( < 38 mm), meeting the following specifications: New Roads & Reconstruction Overlays ( > 50 mm) ( < 30 mm) Overlays (50 mm>thickness>38mm) Mix Type Class 2 Medium Class 2 Fine Number Blows/Face 75 50 VMA (min %) 14 14 Air Voids (%) 3 - 5 3 - 5 Marshall Flow (units of 0.25 mm) 8 - 16 8 - 16 Marshall Stability (min kN) 7.0 6.0 Retain Stability 75% 75% Grade Asphalt Cement 80 -100 80 - 100 % Fractured Faces (Retained 4.75 mm sieve) 60 60 Gradation (% Passing) 19.0 mm 100 12.5 mm 84 - 95 100 9.50 mm 73 - 90 70 - 90 4.75 50 - 75 45 - 80 2.36 35 - 57 32 - 64 1.18 26 - 45 24 - 51 0.60 18 - 34 17 - 40 0.30 10 - 26 13 - 29 0.15 6 - 17 7 - 18 0.075 3 - 7 3 - 8 5.0 CONSTRUCTION 5.1 All organic materials such as grass, roots, stumps, fence and fence posts, scrap metal, and miscellaneous structures, shall be cleared and grubbed and be completely removed from the area of the works to the Contractors' own disposal site. 5.2 Topsoil shall be excavated, where designated, and salvaged and stored, in an area designated in the Contract Documents for future use, or wasted off-site, or handled as specified otherwise in the Contract Documents. 5.3 Materials designated unsuitable, by the Owners' Representative, shall be excavated and removed to the Contractor's disposal site unless designated otherwise in the Contract Documents. 5.4 Embankment shall be constructed with approved, suitable, and, where required, selected materials obtained from the excavation areas within the project limits. All suitable excavated materials, required for the construction of the embankment, shall be used in the construction of the embankment. DIVISION 2 - SITEWORK Page 114 City of Armstrong SECTION 2B - ROADS AND EARTHWORKS SCHEDULE L - Materials, Construction, Testing Specifications 5.5 Embankment materials which cannot be compacted to the specified density, due to a high water content, shall be dried by the Contractor, at no additional cost to the Owner, to optimum moisture content in order to achieve the specified density. 5.6 Embankments shall be constructed in successive horizontal layers not exceeding 200 mm in loose thickness except that the top 500 mm shall be constructed in layers not exceeding 100 mm in loose thickness. Each layer shall be compacted to minimum 95% laboratory density obtained by following the current A.S.T.M., Designation D698-91 Method C except in the top 300 mm of the embankment which shall be compacted to minimum 100% of the laboratory density. No organic soils shall be placed in the embankment. Suitable materials, which are frozen, shall be thawed, at the Contractor's own expense, prior to placement in the embankment. Where embankments are constructed on hillsides, or, where a new fill is to be constructed adjacent an existing embankment, the slopes of the embankment or original ground shall be terraced in a continuous series of steps a minimum of 1.5 m wide as the embankment rises. The suitable material from step excavation shall be spread and compacted into the adjoining embankment. No additional payment will be made for excavation or for placing step material into the adjoining fill. The Contractor shall be responsible for selecting equipment and methods of attaining the specified degree of compaction. Water shall be added and incorporated into the soil, using suitable equipment, to increase the natural moisture content to the optimum moisture percentage as determined by the current A.S.T.M. Designation D698-91, Method C. In the event the natural moisture content is greater than the optimum, the soil shall be dried. 5.7 The slopes of all excavations and embankments shall be constructed to the neat lines indicated in the Contract Documents or as staked by the Owners' Representative. Ditches shall be neatly constructed and graded to the grades shown in the Contract Documents. 5.8 The embankment and/or subgrade shall be constructed to within plus or minus 15 mm of specified grade and cross-section but not uniformly high or low. 5.9 Where localized soft spots develop in the finished subgrade, due to poor workmanship, they shall be corrected by excavating the inferior material, to a depth approved by the Owners' Representative, and replacing it with suitable embankment material, and compacting the material as specified, at no additional cost to the Owner. 5.10 Sub-Base Course aggregates shall be placed in horizontal layers not exceeding 150 mm in uncompacted thickness. Each layer shall be immediately compacted to a minimum of 100% of the laboratory density as determined by Test BCH I-14 (ASTM Designation D698-91) Method C. The completed sub-base course surface shall conform to the required line, grade, and cross-section, to an accuracy of ±15 mm. 5.11 Base Course aggregates shall be placed on properly prepared Sub-Base Course aggregates to the depths indicated in the Contract Documents. The Base Course aggregates shall be placed in such a manner that the aggregate is not separated, contaminated, or degraded. The base course shall be immediately compacted to a minimum of 100% of the laboratory density as determined by Test BCH I-14 (ASTM Designation D698-91) Method C. The thickness of the base course shall be substantially uniform and the minimum thickness shall not be less than the nominal thickness indicated in the Contract DIVISION 2 - SITEWORK Page 115 City of Armstrong SECTION 2B - ROADS AND EARTHWORKS SCHEDULE L - Materials, Construction, Testing Specifications Documents. The completed base course surface shall conform to the required line, grade, and cross-section, to an accuracy of r10 mm. 5.12 Embankment, sub-base course and base course works shall be constructed by such methods as to be free draining. Ponding of water on, or adjacent, the works will not be permitted and deterioration of the embankment, sub-base course, and/or base course, as a result of water ponding, will be corrected by the Contractor, in a manner satisfactory to the Owners' Representative, at no additional cost to the Owner. 5.13 Asphalt Concrete Pavement shall be placed as per the current edition of 'Standard Specifications For Highway Construction' as published by MOT, Province of British Columbia, except as noted in Items 5.14 thru 5.18 of Section 2A - Roads and Earthworks. 5.14 The thickness of the asphalt concrete pavement shall be substantially uniform and the minimum thickness shall not be less than the thickness specified in the Contract Documents. The completed asphalt surface shall conform to the required line, grade, and cross-section, to an accuracy of r6 mm. The finished asphalt grade shall be 6 mm higher than the elevation of the top of water valves, manhole frames and covers, and catch basins. 5.15 Traffic shall not be permitted on the finished pavement surface until the asphalt surface has cooled to atmospheric temperature. It shall be the responsibility of the Contractor to supply all traffic control until such time as the asphalt surface has cooled at no additional cost to the Owner. 5.16 The Contractor shall remove all surplus materials, waste asphalt, waste concrete, surplus aggregate, and any other debris, from the site, immediately upon completion of each phase of the works which generated the surplus materials or debris, and, where the paving operation extends over more than one day, site clean-up shall be on a daily basis. 5.17 Gravel for shouldering may not be dumped on, windrowed on, or in any way worked on the freshly compacted asphalt concrete. Shouldering gravel shall be unloaded from haul trucks into an approved shouldering machine for the shouldering works. Where any gravel falls on the asphalt surface, it shall be immediately swept off. Damage to the asphalt during the shouldering works shall be repaired as directed by the Owners' Representative, at no cost to the Owner. 5.18 Where the Asphalt Concrete Pavement is to be placed in two lifts, and the surface of the first lift deteriorates or is dirtied, for any reason, then the Contractor shall repair, clean, and/or tack coat the first lift, as deemed necessary by the Owners' Representative, prior to placing the second lift of asphalt. The remedial works, to the first lift of asphalt, shall be the Contractors' expense. 5.19 Existing asphalt shall be saw-cut immediately prior to paving the tie-in. 5.20 As a condition of final acceptance of the boulevard restoration works the Contractor shall obtain a Signed Release (Form Z/07) from each property owner adjacent the works. DIVISION 2 - SITEWORK Page 116 City of Armstrong SECTION 2B - ROADS AND EARTHWORKS SCHEDULE L - Materials, Construction, Testing Specifications 6.0 TESTING 6.1 The Contractor shall arrange and pay for an independent Testing Agency to provide quality control testing for all materials supplied and incorporated into the works. Material Quality, and Compaction Testing, shall be conducted on aggregates and asphalt and shall include, but not be limited to, the following tests, 6.1.1 Sieve analysis of Sub-base, and Base Course Aggregate (Prior to Placement). 6.1.2 Density analysis of Subgrade, Sub-base Course and Base Course Aggregate. 6.1.3 Density analysis of utility pipe zone and trench zone backfill. 6.1.4 Penetration of oil sample taken at batch plant. 6.1.5 Sample of mix, taken at asphalt screed, tested for: 6.1.5 (a) Asphalt extraction 6.1.5 (b) Sieve analysis 6.1.5 (c) Marshall briquette 6.1.6 Mix temperature immediately in front of roller. 6.1.7 Asphalt Pavement Depth (compacted thickness). 6.1.8 Asphalt density analysis (nuclear). 6.2 The Owner, at his option, may conduct random tests of the materials supplied and work performed to ensure compliance with the Contract Documents. 6.3 Where the Owners' testing reveals the materials, and or works, do not comply with the Contract Documents, and the Contractor is unable to provide successful test results from an independent testing agency, then all works and materials which have failed the Owners testing shall be rejected and the materials removed from the site and the works redone. **End Section 2B** DIVISION 2 - SITEWORK Page 117 City of Armstrong SECTION 2C - WATER DISTRIBUTION WORKS SCHEDULE L - Materials, Construction, Testing Specifications 1.0 GENERAL 1.1 This section refers to the supply of all labour, supervision, equipment, and materials, as specified, necessary to complete the work in accordance with the Contract Drawings and Specifications. 2.0 DESCRIPTION OF WORK 2.1 The work shall include, but not necessarily be limited to the following principal items: 2.1.1 Supply and install all materials as per the drawings and specifications. 2.1.2 Take delivery, including unloading, at the site of all materials and store under suitable conditions to prevent damage, deterioration, or, contamination until incorporated into the works. 2.1.3 Schedule works such that disruption of normal traffic, and inconvenience to residents, in the working area is kept to a minimum, and such that emergency vehicles have suitable access thru the working area at all times. Provide dust control during the course of the Contract. 2.1.4 Maintain the work area in an orderly manner free of accumulated waste, and surplus, materials and debris. Clean-up shall be a continuing daily process over the duration of the Contract. 2.1.5 Trench excavation, pipe bedding, de-watering, backfill and compaction within the pipe zone, trench backfill and compaction, and restoration of all disturbed areas to original condition unless specified otherwise. 2.1.6 Supply and install pipe, bends, fittings, chambers, services, hydrants, thrust blocks, PRV stations, air release and vacuum stations, test points, and standpipes, as required. 2.1.7 Provide barriers, fences, and warning signs, shoring, as required, to protect workmen and the general public. 2.1.8 Notification to public of water service interruption. 2.1.9 Provision of temporary water service. 3.0 EXAMINATION OF THE SITE OF THE PROPOSED WORKS 3.1 The `Tenderer' will carefully examine the site of the proposed works and notify the Owners' Representative, in writing, of any changes which have been made to the site by Others', during the period of `Tender Closing' to `Contract Award', which would affect the proper completion of the Contract. 3.2 Commencement of the work on this Contract shall constitute acceptance of the site and any changes to the work site by `Others'. 4.0 MATERIALS 4.1 Water Pipe shall conform to the following specifications: 4.1.1 Ductile Iron Pipe shall be to AWWA C151, Standard Cement Mortar Lined to AWWA C104 as per Thickness Class specified in the Contract Documents. Pressure Class Ductile Iron Pipe shall be to ANSI/AWWA C104/A21.4. Minimum Pressure Class shall be 350 for 100 mm to 300 mm, 250 for 350 mm to 500 mm, 200 for 600 mm and 150 for 900 mm. DIVISION 2 - SITEWORK Page 118 City of Armstrong SECTION 2C - WATER DISTRIBUTION WORKS SCHEDULE L - Materials, Construction, Testing Specifications Ductile Iron pipe joints shall be rubber gasket for push-on bell and spigot type joints and/or mechanical pipe joints to AWWA C111 Tyton or approved equal. 4.1.2 PVC (Polyvinyl Chloride) Pressure Pipe shall be to AWWA C900 (100 mm dia. to 300 mm dia.) and AWWA C905 (350 mm dia. to 900 mm dia.) as per Thickness Class specified in the Contract Documents. Pipe to be CSA B137.3 (Canadian Standards Association) certified ULC approved and coloured blue. PVC pipe to have Ductile Iron Pipe equivalent outside diameter and to be compatible with push-on joint fittings and valves without use of special adapters. PVC pipe joints shall be push-on integrally thickened bell and spigot type to ASTM D313.9 with single elastomeric gasket to ASTM F477. 4.1.3 Pre-stressed Concrete Pressure Pipe, to be used for chlorination contact chambers only, shall be to AWWA C300, C301, and C303 as per Thickness Class specified in the Contract Documents. Pre-stressed Concrete Pressure Pipe joints shall be push-on bell and spigot joints complete with rubber gasket. 4.1.4 Steel Pipe shall be to AWWA C200 as per the Thickness Class specified in the Contract Documents. Steel Pipe shall be electrically welded. Steel to be in accordance with ASTM A36. Steel Pipe flanges to be in accordance with AWWA C207, and dimensions for fabricated steel water pipe fittings to be in accordance with AWWA C208. Steel Pipe finishes, interior and exterior, to be hot applied coal tar enamel to AWWA C203. 4.1.5 HDPE (High Density Polyethylene) Pipe shall be to AWWA C906 as per the Thickness Class specified in the Contract Documents, coloured blue. HDPE outside diameter to be iron pipe size equivalent and to be compatible with specified mechanical joint fittings and valves without special adapters. HDPE joints shall be heat butt fusion to ASTM D2657 and in accordance with the manufacturer's recommendations. Fabricated fittings shall be mitred fittings to AWWA C906 suitable for the pressure rating specified in the Contract Documents. Moulded fittings shall be to ASTM 3261 suitable for the pressure rating, and fusion to the main pipe dimensions, specified in the Contract Documents. Flanged joints shall be to AWWA C906, flat faced stub end and loose hot-dip galvanized ductile iron (ASTM A536) backup ring drilling to ANSI B16.1, as per the pressure rating specified in the Contract Documents. 4.2 PVC and Ductile Iron Pipe Fittings shall conform to the following specifications: 4.2.1 CI (Cast Iron) Grey-iron fittings shall be to AWWA C110, minimum 1035 kPa pressure rating or higher if specified in the Contract Documents. 4.2.2 DI (Ductile Iron) fittings shall be to AWWA C110, minimum 2415 kPa pressure rating, cement mortar lined as per AWWA C104. 4.2.3 Compact Ductile Iron Fittings shall be to AWWA C153, minimum 2415 kPa pressure rating, cement mortar lined to AWWA C104. 4.2.4 Single Rubber Gaskets for push-on bell and spigot and/or mechanical pipe joints shall be to AWWA C111 Tyton or approved equal. All push-on joint hubs shall have integral tie-rod lugs. DIVISION 2 - SITEWORK Page 119 City of Armstrong SECTION 2C - WATER DISTRIBUTION WORKS SCHEDULE L - Materials, Construction, Testing Specifications 4.2.5 Flanged joints shall be to AWWA C110, flat faced, conforming in dimension and drilling to ANSI B16.1, and pressure rating specified in the Contract Documents. Full face flange gaskets to be manufactured from black natural rubber 3.175 mm thick with layer of cotton on each side. 4.2.6 Bolts to be medium carbon steel or martensitic steel (Type 1 or Type 2), ASTM A325 heavy hex finish, cadmium plated, coarse threads to have Class 2A tolerance before plating. Bolt sizes to AWWA C110. Nuts to be heavy hex carbon steel to ASTM A563, cadmium plated. Washers to be flat hardened steel to ASTM F436, cadmium plated. 4.2.7 Tie-Rods shall be continuous threaded, quenched and tempered alloyed steel to ASTM A354, Grade BC, cadmium plated, coarse threads to have Class 2A tolerance before plating. Tie-rods to be sized as specified in the Contract Documents. 4.2.8 Tie-Rod Nuts and internally threaded couplings to be heavy hex finish to ASTM A563 Grade C, cadmium plated. Washers to be flat hardened steel to ASTM F436, cadmium plated. 4.3 Steel Pipe Fabricated Fittings shall conform to the following specifications: 4.3.1 Fabricated Steel Pipe fittings shall be in accordance with AWWA C208 and AWWA C207 if flanged, with interior and exterior protected with hot applied coal tar enamel to AWWA C203. 4.4 Couplings and Flanged Coupling Adapters shall be compatible with the pressure class specified in the Contract Documents and shall conform to the following specifications: 4.4.1 Ductile Iron castings shall conform to ASTM A536, Grade 65-45-12. 4.4.2 Bolts and nuts shall be high strength low alloy steel conforming to AWWA C111, stainless steel conforming to ASTM F593 of F738 for bolts and ASTM F594 or F836 for heavy hex nuts, or as specified in the Contract Documents. Rolled threads, fit and dimensions to AWWA C111. 4.4.3 Compression gaskets shall conform to AWWA C219. 4.4.4 Anti-corrosion coating of interior and exterior centre sleeve and end rings to conform to AWWA C219. 4.4.5 Flanges shall be to AWWA C110, flat faced, conforming in dimension and drilling to ANSI B16.1. 4.4.6 Full face flange gaskets to be manufactured from black natural rubber 3.175 mm thick with layer of cotton on each side. 4.5 Plain End and Transition Couplings shall conform to the following specifications. 4.5.1 Plain end or transition couplings to be Robar Model 1408 or Canpac CDB, or, where applicable, Robar Model 1506 or Canpac CDSE. 4.6 Flanged Coupling Adapters shall conform to the following specifications. 4.6.1 Flanged coupling adapters to be Robar Model 7404 or Dresser Style 127 or 128, or, where applicable, Robar Model 7506 or Dresser Style 127 or 128 All-Clad. 4.7 Joint Restraint Devices shall conform to the following specifications: 4.7.1 Ductile Iron Castings shall conform to ASTM A536. Anti-Corrosion Coating for Ductile Iron Castings shall conform to AWWA C219, or as specified in the Contract Documents, to AWWA C210, C213, or C550. 4.7.2 Bolts and Nuts shall be High Strength Low Alloy Steel to AWWA C111, or as specified in the Contract Documents, stainless steel to ASTM F593 or F738 for bolts and ASTM F594 or F836 for heavy hex nuts. DIVISION 2 - SITEWORK Page 120 City of Armstrong SECTION 2C - WATER DISTRIBUTION WORKS SCHEDULE L - Materials, Construction, Testing Specifications 4.7.3 Tie-Rods shall be continuous threaded, quenched and tempered alloyed steel to ASTM A354, Grade BC, hot-dip galvanized to ASTM A153, coarse threads to have Class 2A tolerance before galvanizing. Tie-rods to be sized as specified in the Contract Documents. 4.7.4 Restrainers for Ductile Iron pipe with mechanical joint fittings to be EBA Iron Megalug assembly or Uni-flange Series 1300. 4.7.5 Restrainers for PVC pipe with push-on joint fittings with tie-rod lugs to be Uni-flange Series 1300 or Robar Model 4400. Restrainers for bell joints in PVC pipe to be Uni- flange Series 1350 or 1390, or Robar Model 4450 or 4452. 4.8 Tapping Sleeves for Cast Iron, Ductile Iron, Asbestos Cement, PVC (C900), Pre-Stressed Concrete Pressure Pipe, or Steel Mains, for branch connections 75 mm and larger, shall conform to the following specifications: 4.8.1 All materials shall be compatible with the pipe location, type, and pressure class, indicated in the Contract Documents. (Exterior condition, and type, of water mains 'as found' in the field, and/or as directed by the Owners' Representative, may alter the type and/or materials required). 4.8.2 The sleeve and gasket, flange, bolts and nuts, anti-corrosion coating, and casting materials shall conform, where applicable, to AWWA C207, C208, C111, C213, and C219, ASTM A536, F593, F738, F594, and F836, for design, manufacture, and performance. 4.8.3 Tapping sleeves shall be Robar 6506 (Cast Iron and, Ductile Iron Pipe only) or Robar 6906. 4.9 Valves and Valve Boxes shall conform to the following specifications: 4.9.1 Gate Valves shall conform to AWWA C500, 75 mm to 300 mm to working pressure 1380 kPa, gray cast iron or cast ductile iron body, bronze mounted solid wedge, double disk, or resilient-seated, non-rising stem, hub or flanged ends, 50 mm sq. operating nut. 4.9.2 Gate Valves to open counter clockwise, have the manufacturers' name, year of manufacture, size and working pressure indicated on the bonnet or body. 4.9.3 Acceptable manufacturers of gate valves are Clow and TC/Clow, and Mueller Resilient Wedge Gate Valves. 4.9.4 Valves 350 mm and larger to be Butterfly Valves with gear operators. 4.9.5 Butterfly Valves shall be in accordance with AWWA C504 Class 150B, and as specified in the Contract Documents. 4.9.6 Acceptable manufacturers of Butterfly Valves are Pratt, DeZurik and Mueller Lineseal XP. Butterfly Valves shall have lugged pattern, EPDM seat cast iron body, ductile iron with nickel edge disc, stainless steel shaft and suitable gear operator. 4.9.7 Air Release, Air/Vacuum and Combination Air Valves shall be in accordance with AWWA C512, gray cast iron or ductile iron body, threaded or flanged connections, maximum working pressure 2070 kPa. 4.9.8 Mainline Valve Boxes shall be circular Nelson Type (NT) No. D-5 as manufactured by Dobney Foundry, except that Valve Boxes located in asphalt shall be Mueller MVB Valve Boxes. Valve Box Riser pipe to be 150 mm PVC SDR 35. 4.9.9 Service Valve Boxes (Curb Stop Valve Boxes) on 19 mm or 25 mm services shall be a complete Mueller A-726 telescoping assembly complete with stainless steel stinger. DIVISION 2 - SITEWORK Page 121 City of Armstrong SECTION 2C - WATER DISTRIBUTION WORKS SCHEDULE L - Materials, Construction, Testing Specifications Service Valve Boxes on 32 mm and 50 mm services shall be a complete Mueller A- 728 telescoping assembly unless specified otherwise in the Contract Documents. 4.9.10 Check Valves shall conform to AWWA C508: 50 to 300 mm to working pressure 1200 kPa; 400 to 500 mm to working pressure 1035 kPa; gray cast iron or ductile iron body, clear waterway type, metal to metal seat, flanged ends to AWWA C110. 4.9.11 Corporation Stops shall be bronze, conforming to ASTM B62, thread inlet compression outlet, Mueller H-15008. 4.9.12 Curb Stops shall be bronze, conforming to ASTM B62, full flow, full port, compression fitting, Mueller H-15207. 4.10 Service Connection Fittings and Service Pipe shall conform to the following specifications: 4.10.1 19 mm to 50 mm service pipe to be Type K annealed copper conforming to ASTM B88M. or, PEXa pipe to copper tube size, SDR 9 conforming to CSA B137.5, ASTM F876-01 and 877-01 and ANSI/NSF 14 and 61, complete with Meuller or Ford stainless steel liner. PEXa pipe shall be installed with a tracer wire where specified by the City Engineer. The PEXa pipe shall be manufactured with a co-extruded UV shield made from UV resistant high-density polyethylene, colour Sky Blue (International Thermoplastic Colour Code, RAL 1501). 75 mm pipe shall conform to AWWA C901, Pressure Class 200, certified to CSA B137.1.100 mm and larger pipe to be same as specified for mainline pipe. 4.10.2 Saddles for 19 mm to 50 mm services to have a ductile iron body to ASTM A536 with anti-corrosive epoxy nylon coating to AWWA C219, Type 304 double stainless steel U-bolt straps. Saddles to be Meuller DB2S, Robar 2406DS or Canpac CDES-2. 4.10.3 Saddles for PVC Pipe, AWWA C900/905, shall not have lugs or U-bolt straps which may gouge or deform the pipe. Saddles to be all-stainless steel broadband saddle to ANSI T304, double bolt, minimum band width of 190 mm. Saddles to be Meuller SS (D) Series or Canpac CD-2. 19 mm and 25 mm copper tubing to be compression type suitable for 1100 kPa working pressure. For services 75 mm and larger use tapping sleeves in accordance with Clause 4.8 of this section. 4.11 Fire Hydrants shall conform to the following specifications: 4.11.1 AWWA C502 specifications for dry barrel Fire Hydrants. 4.11.2 Shut-Off to be compression type. 4.11.3 Inlet Connection to be 150 mm nominal diameter, bell type, with harness lugs. 4.11.4 Bury shall be the bury length specified in the Contract Documents. 4.11.5 Two 65 mm hose nozzles, and one 100 mm pump nozzle complete with Stortz Fitting, each safeguarded against blowing out, turning, or backing out. 4.11.6 Hose and Pump Nozzle Threads shall be to B.C. Standard for fire hydrants. Each outlet to be provided with nozzle, cap and gasket. 4.11.7 Operating Nut and Cap Nuts to be B.C. Standard for fire hydrants, opening direction shall be counter clockwise. Operating stem to be non-rising. 4.11.8 Working parts to be removable without disturbing barrel or base of hydrant and without excavation. Hydrant to be designed so top section may be rotated to any angle and bolted in place without decreasing its strength or causing it to leak under pressure. DIVISION 2 - SITEWORK Page 122 City of Armstrong SECTION 2C - WATER DISTRIBUTION WORKS SCHEDULE L - Materials, Construction, Testing Specifications 4.11.9 Hydrants to be subjected to hydrostatic pressure test of 2070 kPa in compliance with AWWA C502 and pressure test to be certified by manufacturer. 4.11.10 Hydrants shall be painted and colour coded as specified in the Contract Documents. 4.11.11 Approved Fire Hydrant is Canada Valve (Century). 4.12 Granular Pipe Bedding and Surround Aggregate in the pipe zone shall conform to the following specifications: 4.12.1 Class `A' Pipe Bedding is where the pipe is bedded in a continuous monolithic cradle of concrete as indicated in the Contract Documents. 4.12.2 Class `B' Pipe Bedding shall be imported sand meeting the following gradation: Sieve Designation Percent Passing 12.5 mm 100 4.75 mm 35 - 100 2.36 mm 20 - 70 1.18 mm 13 - 50 0.850 mm 8 - 35 0.300 mm 5 - 25 0.150 mm 2 - 15 0.075 mm 0 - 6 4.12.3 Class `C' Pipe Bedding shall be native material in the trench which meets the gradation for Class `B' Pipe Bedding sand. 4.13 Granular Trench Backfill Aggregate shall conform to the following specifications: 4.13.1 Trench Backfill aggregate shall be `Selected Excavated Materials', including excavated Sub-Base and Base aggregate, which is inert, durable material, reasonably uniform in quality and free from soft or disintegrated particles, free of stones and rocks over 75 mm in diameter, free of organic or foreign matter, capable of compaction to specified density. 4.13.2 Imported Trench Backfill material shall meet the gradation specified for Sub-Base Course Aggregate in Clause 4.6, Section 2B - Roads and Earthworks. 4.14 Cast-in-Place Concrete shall conform to CAN/CSA-A23.1. Concrete for thrust blocks to be Ready-Mix Concrete supplied by a BCRMCA certified plant, 20 MPa at 28 days. 5.0 INSTALLATION 5.1 Trench and pipe bedding details shall conform to the Contract Specification Drawings and the following specifications: 5.1.1 Pipes, fittings, valves, hydrants, and appurtenances, shall be cleaned and inspected for defects prior to installation. Defective materials shall be removed from the job site. 5.1.2 Where material in the trench bottom is deemed by the Owners' Representative to be unstable or otherwise unsuitable for pipe support or the support of appurtenant structures, the trench shall be over-excavated to the depth at which stable material is encountered and the excavation shall be backfilled, with Imported Backfill, to the lower level of the pipe bedding zone. Unsuitable materials shall be disposed of at DIVISION 2 - SITEWORK Page 123 City of Armstrong SECTION 2C - WATER DISTRIBUTION WORKS SCHEDULE L - Materials, Construction, Testing Specifications the Contractors' own disposal site unless directed otherwise in the Contract Documents. 5.1.3 The Pipe Zone is defined as that portion of the trench between the bottom level of the pipe bedding and a level 300 mm above the top of the installed pipe or appurtenances. Materials in the pipe zone shall consist of Class `B' Bedding (4.12.2) or, if present, Class `C' Bedding (4.12.3). The bedding materials shall have a minimum depth under the pipe of 150 mm. Pipe bedding shall extend the full width of the trench and be compacted to 95% laboratory density obtained by following the current A.S.T.M., Designation D698-91 Method C. 5.1.4 Trenches shall be dug to the alignment and depth indicated in the Contract Documents. Water mains and services shall be installed so as to provide a minimum cover of 1.8 metres from finished grade, unless specified otherwise in the Contract Documents. 5.1.5 Trenches shall be maintained such that the pipe can be installed without getting water, muck, silt, gravel, or other foreign materials into the pipe. Trench bottoms which have been allowed to deteriorate, and trench bottoms which have been over- excavated, shall be made good to the design trench bottom grade, with selected site excavated material, or, if ordered, Imported Backfill, and compacted to 95% laboratory density obtained by following the current A.S.T.M., Designation D698-91 Method C, at the Contractors' expense. 5.1.6 Trench excavations shall be kept free of water, by pumping, during the pipe laying, jointing, bedding, and backfill works. Trench water shall not be permitted to enter the pipe being installed. Water shall be discharged from the excavation in such a manner as not to cause nuisance, injury, or damage to property or receiving waters. Previously laid pipe shall not be used for dewatering. 5.1.7 Trenches shall be sheeted and braced, or sloped, as required by the WorkSafe BC regulations. Where sheeting or shoring is required it shall be in accordance with WorkSafe BC regulations. 5.1.8 The Contractor shall replace materials and rectify all failures as a result of settlement of the trench backfill or collapse of the trench walls during the maintenance guarantee period. Where trenches fail, the trench material shall be excavated to the top of the pipe zone and all materials above the pipe zone replaced in accordance with the Contract Documents. The Contractor shall make up for any deficiencies in the quantity of material suitable for backfilling which have been wasted during the construction operation. 5.1.9 The requirements of the Workers' Compensation Board shall take precedence over any conflicting Clauses in these Specifications. Trench excavations and trench walls shall conform to Workers' Compensation Board Regulations. Ledge rock, boulders, and large stones shall be removed to provide a clearance of at least 150 mm below, and on all sides, of the pipe and fittings. 5.1.10 Where asphalt concrete pavement is to be cut the trench width shall be kept as narrow as possible while still complying with WorkSafe BC regulations and the pavement shall be saw-cut along neat straight lines. If pavement breakage occurs outside the limits of the initial pavement cut the asphalt shall be cut back to sound asphalt in neat straight lines before the asphalt restoration paving starts. 5.1.11 When side casting excavated materials the Contractor shall ensure that his operation does not interfere with traffic. Traffic flow must be maintained as specified in the Special Instructions in the Contract Documents. The Contractor DIVISION 2 - SITEWORK Page 124 City of Armstrong SECTION 2C - WATER DISTRIBUTION WORKS SCHEDULE L - Materials, Construction, Testing Specifications shall be responsible for thoroughly cleaning all roadways, on which excavated materials or imported backfill has been hauled, at the end of each working day, or promptly when directed by the Owners' Representative, at the Contractors' own expense. 5.1.12 The Backfill Zone is that section of the trench from the top of the pipe zone to subgrade. The backfill zone shall be backfilled with select excavated materials, or, if directed by the Owners' Representative, with Imported Backfill Materials. The backfill zone shall be compacted to 95% laboratory density obtained by following the current A.S.T.M., Designation D698-91 Method C, at the Contractors' expense. Placing of frozen materials in the backfill zone will not be permitted. 5.1.13 Where trenches are excavated in paved surfaces, the sub-base, base, and asphalt shall be replaced in accordance with Section 2A - Roads and Earthworks. 5.1.14 Pipe shall be handled, laid, cut, and jointed, to the pipe manufacturers' instructions and specifications, PVC pipe to AWWA M23 and Ductile Iron Pipe to AWWA C600 and C151. 5.1.15 Do not exceed one-half the maximum joint deflection recommended for Ductile Iron Pipe. Joint deflection not permitted for PVC pipe. PVC pipe to be deflected using high deflection PVC couplings rated for 1380 kPa operating pressure. 5.1.16 Pipe shall be laid to a horizontal tolerance of 50± mm from design alignment and a vertical tolerance of 25± mm from design grade. For grades 2% and greater pipe shall be laid uphill (bell ends facing uphill). Pipe joint restrainers shall be used where designated in the Contract Documents. 5.1.17 When any stoppage of work occurs, restrain laid pipes to prevent 'creep' and seal the end pipe to prevent contamination. 5.1.18 Test and/or Bleed points shall be Corporation Stops sized to provide a minimum flushing velocity of 0.8 m/s, and located by the Contractor to complete pressure testing and flushing. At the conclusion of the testing and flushing the test and/or bleed points shall be shut-off at the corporation stop and any test pipe disconnected. 5.1.19 Valves shall be installed to the manufacturers' instructions and specifications at the locations indicated on the Contract Drawings. Maximum length of pipe on each side of the valve to be 1 metre. Valve risers to be exactly plumb. 5.1.20 Service connections to be installed, and marked (painted blue), as specified in the Contract Specification Drawings. Water main pressure testing to be completed 'after' corporation stops installed and then corporation stops to be left completely open. 5.1.21 Fire Hydrants shall be installed in accordance with the manufacturers' instructions and specifications, the Contract Specification Drawings, and AWWA Manual of Practice No. M17. Hydrants shall be secured to the hydrant tee lugs with 19 mm galvanized rods and also be thrusted with a concrete thrust block unless directed otherwise by the Owners' Representative. Hydrants shall be covered with a black plastic bag until such time as they have been flushed and flow-tested and the Fire Department has been notified that they are fully operational. 5.1.22 Ready-Mix cast-in-place concrete thrust blocks shall be placed between valves, tees, plugs, caps, bends, reducers, hydrants, and fittings, and the undisturbed ground, in all directions of thrust and as indicated in the Contract Specification Drawings. Place 6 mil polyethylene between the interface of the concrete and the fitting. DIVISION 2 - SITEWORK Page 125 City of Armstrong SECTION 2C - WATER DISTRIBUTION WORKS SCHEDULE L - Materials, Construction, Testing Specifications Joints, lugs, bolts, and couplings to be keep clear of the cast-in-place concrete thrust block. Do not backfill over cast-in-place concrete thrust blocks within 24 hours of placing. 5.1.23 The Contractor shall present his schedule for interruption of water service to the Owners' Representative, at least two working days in advance of the interruption of service. When the interruption of service has been approved by the Owner's Representative, the Contractor shall, at his own expense, notify all affected water customers, in writing, at least one day in advance of the interruption, of the time and duration of the interruption. In the event water service has not been resumed within one hour of the anticipated time, the Contractor shall re-notify all customers of the unscheduled delay in resumption of water service. 6.0 CLEANING, FLUSHING, DISINFECTING, TESTING 6.1 All cleaning, flushing, disinfecting and testing shall be completed by the Contractor, and be witnessed by the Owners' Representative. 6.1.1 The Contractor shall supply, at his own cost, all materials, equipment, labour, and supplies, including test points, temporary caps & thrust blocks, hoses, pumps, new gauges (0 - 250 psi) required to efficiently flush, accurately test, and disinfect, the water mains and appurtenances, including saddles and corporation stops. 6.1.2 Where water may be supplied, for flushing and testing, from Municipal Mains, the Contractor shall obtain written approval from the Owners' Representative to connect to the Municipal system. When requesting approval, the Contractor shall present a valid test certificate for a reduced pressure principle backflow prevention device conforming to AWWA C511, and also supply all hydrant connections, hoses, valves, hydrant wrenches, as may be required. 6.1.3 The Owners' Representative shall be notified at least one working day in advance of the proposed pressure testing. 6.1.4 Perform pressure leakage testing of Ductile Iron Pipe to AWWA C600, PVC Pipe to AWWA M23, and Welded Steel Pipe to AWWA C206 (no leakage allowed). 6.1.5 Water mains shall be tested in sections. Sections shall be between every two adjacent line valves and between the line valve and the temporary cap(s). 6.1.6 The test pressure shall be 1.5 x the maximum working pressure in the section of water main being tested, or, 1,035 kPa, whichever is greater. The maximum allowable leakage rate shall conform to the applicable AWWA standards. All pressure tests shall be for a two hour duration. 6.1.7 Where any test section discloses excessive leakage, that section shall be replaced, or repaired, and the section re-tested until the specified testing requirements are achieved. 6.1.8 Disinfection shall be completed in accordance with AWWA C651, Continuous Feed Method. Initial disinfection shall have 25 mg/L free chlorine in the water system and the chlorine residual, after 24 hours, shall be at least 10 mg/L. When the 24 hour residual is less than 10 mg/L the chlorination procedure shall be repeated until specifications are met. 6.1.9 After successful disinfection, the water in the watermains shall be flushed into the sanitary sewer system, at a minimum velocity of 0.8 m/s. Chlorinated water shall not be flushed into receiving water containing aquatic life. DIVISION 2 - SITEWORK Page 126 City of Armstrong SECTION 2C - WATER DISTRIBUTION WORKS SCHEDULE L - Materials, Construction, Testing Specifications Approval shall be obtained from the Owners' Representative prior to discharging chlorinated water into sanitary sewers. After flushing all test/flush points shall be removed. 6.1.10 Bacteriological water samples shall be collected from the new watermain installations following the satisfactory completion of main chlorination and flushing. The Owner's Engineer may collect water samples. Such bacteriological testing shall be done using full aseptic precautions. The sample shall be taken from a copper gooseneck assembly provided by the Contractor. The Contractor shall be responsible to ensure the gooseneck assembly is contaminant free. Water shall be run from the sample tap for a minimum of 2 minutes prior to sampling. The water shall be run at a constant rate prior to and during the sampling procedure. A sterile water sampling bottle must be obtained from the local Health Unit, or certified Testing Laboratory, and shall be used to collect the water sample. The cap of the bottle shall be removed after the water has run for 2 minutes, taking special precautions to not touch or contaminate the underside of the cap or the bottle rim. The bottle shall be filled to the fill line and then be immediately recapped. Hose pipe shall not be used as a sample source. The sample shall be labelled completely indicating time, location, project, contract number and name of sampler. Sample bottles shall then be immediately placed in a cooler provided with an ice pack. Samples shall be transported to a certified testing laboratory within 8 hours of sampling. In no case shall samples take more than 24 hours to reach the certified testing laboratory. At least 1 sample shall be collected from each new water main. Where water mains exceed 250 metres in length water samples shall be taken at each end of the water main and at 250 metre intervals. At least one sample shall be taken from the source of the water supply to determine the status of the distribution system at the time of sampling. If, in the opinion of the City Engineer, the pipeline has been contaminated with trench water, excessive quantities of dirt or debris, bacteriological water samples shall be collected at 60 metre intervals after water has sat in the water main for at least 16 hours after final flushing. Redisinfection and resampling shall be required for all water mains that do not satisfactorily meet Ministry of Health Planning bacteriological requirements as amended from time to time. Bacteriological sampling and laboratory testing shall be the Contractor's own cost. 6.2 Fire Hydrants shall be flow-tested, bonnet and caps colour coded, and a `City of Armstrong Fire Department Hydrant Maintenance Program' form completed and submitted to the City of Armstrong, with the `as-constructed' drawings, for each hydrant. Refer to Specification Drawing W-3. 6.3 The Contractor shall arrange and pay for an independent Testing Agency to provide quality control testing for all materials supplied and incorporated into the works. Material Quality, and Compaction Testing, shall be conducted on aggregates, bedding sand and trench backfill and shall include, but not be limited to, the following tests: DIVISION 2 - SITEWORK Page 127 City of Armstrong SECTION 2C - WATER DISTRIBUTION WORKS SCHEDULE L - Materials, Construction, Testing Specifications 6.3.1 Density analysis of utility pipe zone and trench zone backfill. The Owner, at his option, may conduct random tests of the materials supplied and work performed to ensure compliance with the Contract Documents. Where the Owners' testing reveals the materials, and or works, do not comply with the Contract Documents, and the Contractor is unable to provide successful test results from an independent testing agency, then all works and materials which have failed the Owners testing shall be rejected and the materials removed from the site and the works redone. **End Section 2C** DIVISION 2 - SITEWORK Page 128 City of Armstrong SECTION 2D - SANITARY SEWER WORKS SCHEDULE L - Materials, Construction, Testing Specifications 1.0 GENERAL 1.1 This section refers to the supply of all labour, supervision, equipment, and materials, as specified, necessary to complete the work in accordance with the Drawings and Specifications. 2.0 DESCRIPTION OF WORK 2.1 The work shall include, but not necessarily be limited to the following principal items: 2.1.1 Supply and install all materials as per the drawings and specifications. 2.1.2 Take delivery, including unloading, at the site of materials and store under suitable conditions to prevent damage, deterioration, or, contamination until incorporated into the works. 2.1.3 Schedule works such that disruption of normal traffic, and inconvenience to residents, in the working area is kept to a minimum, and such that emergency vehicles have suitable access thru the working area at all times. Provide dust control during the course of the Contract. 2.1.4 Maintain the work area in an orderly manner free of accumulated waste, and surplus, materials and debris. Clean-up shall be a continuing daily process over the duration of the Contract. 2.1.5 Trench excavation, pipe bedding, de-watering, backfill and compaction within the pipe zone, trench backfill and compaction, and restoration of all disturbed areas to original condition unless specified otherwise. 2.1.6 Supply and install pipe, bends, fittings, manholes, services, force main and appurtenances, as required. 2.1.7 Provide barriers, fences, and warning signs, shoring, as required, to protect workmen and the general public. 3.0 EXAMINATION OF THE SITE OF THE PROPOSED WORKS 3.1 The `Tenderer' will carefully examine the site of the proposed works and notify the Owners' Representative, in writing, of any changes which have been made to the site by `Others', during the period of `Tender Closing' to `Contract Award', which would affect the proper completion of the Contract. 3.2 Commencement of the work on this Contract shall constitute acceptance of the site and any changes to the work site by `Others'. 4.0 MATERIALS 4.1 Sanitary Gravity Sewer Pipe shall conform to the following specifications: 4.1.1 Polyvinyl chloride (PVC) pipe up to 100 mm in diameter shall be DR28 meeting or exceeding all of the requirements of ASTM Specification D3034 and CSA Standards B182.1 and B182.2. Minimum pipe stiffness (F/Y) shall be 320 kPa at 5.0% deflection, ASTM D2412. Manning "n" coefficient to be 0.009. DIVISION 2 - SITEWORK Page 129 City of Armstrong SECTION 2D - SANITARY SEWER WORKS SCHEDULE L - Materials, Construction, Testing Specifications 4.1.2 Polyvinyl chloride (PVC) pipe, and fittings, 150 mm to 675 mm in diameter shall be DR35 meeting or exceeding all of the requirements of ASTM Specification D3034 and CSA Standards B182.1 and B182.2, and shall be coloured green. Minimum pipe stiffness (F/Y) shall be 320 kPa at 5.0% deflection, ASTM D2412. Manning "n" coefficient to be 0.009. Pipe joints to have bell and spigot ends with rubber gaskets to ASMT 477. 4.1.3 Ribbed Polyvinyl chloride (PVC) pipe, and fittings, 750 mm to 900 mm in diameter shall meet or exceed all of the requirements of ASTM F794 and CSA Standards B182.4, and shall be coloured green. Ribbed Pipe to have a minimum pipe stiffness of 320 kPa at 5.0%. Pipe to be marked to clearly indicated class rating as required under ASTM F794. Pipe joints to have bell and spigot ends with rubber gaskets to ASMT 477. Manning "n" coefficient to be 0.009. 4.1.4 Non-reinforced concrete pipe 750 mm to 900 mm in diameter shall meet or exceed all of the requirements of ASTM Specification C14M. Rubber gasket joints shall be to ASTM C443M. 4.1.5 Reinforced concrete pipe greater than 900 mm in diameter shall meet or exceed all of the requirements of ASTM Specification ASTM C76M. Rubber gasket joints shall be to ASTM C443M. Pipe shall have not more than two lifting holes per length and shall be provided with pre-fabricated PVC plugs to seal lift holes water tight after installation. 4.1.6 Sanitary Manhole Barrels shall be Precast Reinforced Concrete Manhole Sections, minimum diameter 1050 mm, or larger to accommodate larger pipes, meeting the requirements of ASTM Specification C478. Precast Concrete Lid shall be designed for H-20 Loading. Ladder Rungs to be 300 mm wide polypropylene coated ladder rungs cast with manhole sections. Polypropylene to ASTM D-4101, Reinforcing to ASTM A-615. Adjusting rings to ASTM C478, Concrete Spacer Rings (Grade Rings) designed for H-20 Loading. Refer to Specification Drawings. 4.1.7 Sanitary Manhole Frames and Covers shall be C-44 designation, Round Base. The Cast Iron Frame shall have a 610 mm access opening. The Sanitary Manhole Cover shall be labelled "Sanitary Sewer". 4.2 Sanitary Sewer Force main Pipe shall conform to the following specifications: 4.2.1 Ductile Iron Pipe shall be to AWWA C151, Standard Cement Mortar Lined to AWWA C104 as per Thickness Class specified in the Contract Documents. Ductile Iron pipe joints shall be rubber gasket for push-on bell and spigot type joints and/or mechanical pipe joints to AWWA C111 Tyton or approved equal. 4.2.2 PVC (Polyvinyl Chloride) Pressure Pipe shall be to AWWA C900 (100 mm dia. to 300 mm dia.) and AWWA C905 (350 mm dia. to 900 mm dia.) as per Thickness Class specified in the Contract Documents. Pipe to be CSA B137.3 (Canadian Standards Association) certified and ULC approved, coloured white. PVC pipe to have Ductile Iron Pipe equivalent outside diameter and to be compatible with push-on joint fittings and valves without use of special adapters. PVC pipe joints shall be push-on integrally thickened bell and spigot type to ASTM D313.9 with single elastomeric gasket to ASTM F477. DIVISION 2 - SITEWORK Page 130 City of Armstrong SECTION 2D - SANITARY SEWER WORKS SCHEDULE L - Materials, Construction, Testing Specifications 4.2.3 Steel Pipe shall be to AWWA C200 as per the Thickness Class specified in the Contract Documents. Steel Pipe shall be electrically welded. Steel to be in accordance with ASTM A36. Steel Pipe flanges to be in accordance with AWWA C207, and dimensions for fabricated steel water pipe fittings to be in accordance with AWWA C208. Steel Pipe finishes, interior and exterior, to be hot applied coal tar enamel to AWWA C203. 4.2.4 HDPE (High Density Polyethylene) Pipe shall be to AWWA C906 as per the Thickness Class specified in the Contract Documents. HDPE outside diameter to be iron pipe size equivalent and to be compatible with specified mechanical joint fittings and valves without special adapters. Pipe shall be colour coded green for gravity, and white for pressure, applications. HDPE joints shall be heat butt fusion to ASTM D2657 and in accordance with the manufacturer's recommendations. Fabricated fittings shall be mitred fittings to AWWA C906 suitable for the pressure rating specified in the Contract Documents. Moulded fittings shall be to ASTM 3261 suitable for the pressure rating, and fusion to the main pipe dimensions, specified in the Contract Documents. Flanged joints shall be to AWWA C906, flat faced stub end and loose hot-dip galvanized ductile iron (ASTM A536) backup ring drilling to ANSI B16.1, as per the pressure rating specified in the Contract Documents. 4.3 PVC and Ductile Iron Pipe Fittings shall conform to the following specifications: 4.3.1 CI (Cast Iron) Grey-iron fittings shall be to AWWA C110, minimum 2415 kPa pressure rating or higher if specified in the Contract Documents. 4.3.2 DI (Ductile Iron) fittings shall be to AWWA C110, minimum 2415 kPa pressure rating, cement mortar lined as per AWWA C104. 4.3.3 Compact Ductile Iron Fittings shall be to AWWA C153, minimum 2415 kPa pressure rating, cement mortar lined to AWWA C104. 4.3.4 Single Rubber Gaskets for push-on bell and spigot and/or mechanical pipe joints shall be to AWWA C111 Tyton or approved equal. All push-on joint hubs shall have integral tie-rod lugs. 4.3.5 Flanged joints shall be to AWWA C110, flat faced, conforming in dimension and drilling to ANSI B16.1, and pressure rating specified in the Contract Documents. Full face flange gaskets to be manufactured from black natural rubber 3.175 mm thick with layer of cotton on each side. 4.3.6 Bolts to be medium carbon steel or martensitic steel (Type 1 or Type 2), ASTM A325 heavy hex finish, hot-dip galvanized to ASTM A153, coarse threads to have Class 2A tolerance before galvanizing. Bolt sizes to AWWA C110. Nuts to be heavy hex carbon steel to ASTM A563 Grade C hot-dip galvanized to ASTM A153. Washers to be flat hardened steel to ASTM F436 hot-dip galvanized to ASTM A153. 4.3.7 Tie-Rods shall be continuous threaded, quenched and tempered alloyed steel to ASTM A354, Grade BC, hot-dip galvanized to ASTM A153, coarse threads to have Class 2A tolerance before galvanizing. Tie-rods to be sized as specified in the Contract Documents. DIVISION 2 - SITEWORK Page 131 City of Armstrong SECTION 2D - SANITARY SEWER WORKS SCHEDULE L - Materials, Construction, Testing Specifications 4.3.8 Tie-Rod Nuts and internally threaded couplings to be heavy hex finish to ASTM A563 Grade C hot-dip galvanized to ASTM A153. Washers to be flat hardened steel to ASTM F436 hot dip galvanized to ASTM A153. 4.4 Steel Pipe Fabricated Fittings shall conform to the following specifications: 4.4.1 Fabricated Steel Pipe fittings shall be in accordance with AWWA C208 and AWWA C207 if flanged, with interior and exterior protected with hot applied coal tar enamel to AWWA C203. 4.5 Couplings and Flanged Coupling Adapters shall be compatible with the pressure class specified in the Contract Documents and shall conform to the following specifications: 4.5.1 Ductile Iron castings shall conform to ASTM A536, Grade 65-45-12. 4.5.2 Bolts and nuts shall be high strength low alloy steel conforming to AWWA C111, stainless steel conforming to ASTM F593 of F738 for bolts and ASTM F594 or F836 for heavy hex nuts, or as specified in the Contract Documents. Rolled threads, fit and dimensions to AWWA C111. 4.5.3 Compression gaskets shall conform to AWWA C219. 4.5.4 Anti-corrosion coating of interior and exterior centre sleeve and end rings to conform to AWWA C219. 4.5.5 Flanges shall be to AWWA C110, flat faced, conforming in dimension and drilling to ANSI B16.1. 4.5.6 Full face flange gaskets to be manufactured from black natural rubber 3.175 mm thick with layer of cotton on each side. 4.6 Plain End and Transition Couplings shall conform to the following specifications. 4.6.1 Plain end or transition couplings to be Robar Model 1408 or Canpac CDB, or as specified in the Contract Documents Robar Model 1506 or Canpac CDSE. 4.7 Flanged Coupling Adapters shall conform to the following specifications. 4.7.1 Flanged coupling adapters to be Robar Model 7404 or Dresser Style 127 or 128, or as specified in the Contract Documents, Robar Model 7506 or Dresser Style 127 or 128 All-Clad. 4.8 Joint Restraint Devices shall conform to the following specifications: 4.8.1 Ductile Iron Castings shall conform to ASTM A536. Anti-Corrosion Coating for Ductile Iron Castings shall conform to AWWA C219, or as specified in the Contract Documents, to AWWA C210, C213, or C550. 4.8.2 Bolts and Nuts shall be High Strength Low Alloy Steel to AWWA C111, or as specified in the Contract Documents, stainless steel to ASTM F593 or F738 for bolts and ASTM F594 or F836 for heavy hex nuts. 4.8.3 Tie-Rods shall be continuous threaded, quenched and tempered alloyed steel to ASTM A354, Grade BC, hot-dip galvanized to ASTM A153, coarse threads to have Class 2A tolerance before galvanizing. Tie-rods to be sized as specified in the Contract Documents. 4.8.4 Restrainers for Ductile Iron pipe with mechanical joint fittings to be EBA Iron Megalug assembly or Uni-flange Series 1300. 4.8.5 Restrainers for PVC pipe with push-on joint fittings with tie-rod lugs to be Uni-flange Series 1300 or Robar Model 4400. Restrainers for bell joints in PVC pipe to be Uni- flange Series 1350 or 1390, or Robar Model 4450 or 4452. DIVISION 2 - SITEWORK Page 132 City of Armstrong SECTION 2D - SANITARY SEWER WORKS SCHEDULE L - Materials, Construction, Testing Specifications 4.9 Valves and Valve Boxes shall conform to the following specifications: 4.9.1 Gate Valves shall conform to AWWA C500, 75 mm to 300 mm to working pressure 1380 kPa, 400 mm and larger to working pressure 1035 kPa, gray cast iron or cast ductile iron body, bronze mounted solid wedge, double disk, or resilient-seated, non- rising stem, hub or flanged ends, 50 mm sq. operating nut. 4.9.2 Gate Valves to open counter clockwise, have the manufacturers' name, year of manufacture, size and working pressure indicated on the bonnet or body. 4.9.3 Gate Valves 400 mm and larger to have by-pass sized to AWWA C500 and have gear operators. 4.9.4 Acceptable manufacturers of gate valves are Clow and TC/Clow. 4.9.5 Air Release, Air/Vacuum and Combination Air Valves shall be in accordance with AWWA C512, gray cast iron or ductile iron body, threaded or flanged connections, maximum working pressure 2070 kPa, for sewage service. 4.9.6 Mainline Valve Boxes shall be circular Nelson Type (NT) No. D-5 as manufactured by Dobney Foundry. Valve Boxes in asphalt to be Mueller MVB. Valve Box Riser pipe to be 150 mm PVC SDR 35. 4.10 Granular Pipe Bedding and Surround Aggregate in the pipe zone shall conform to the following specifications: 4.10.1 Class `A' Pipe Bedding is where the pipe is bedded in a continuous monolithic cradle of concrete as indicated in the Contract Documents. 4.10.2 Class `B' Pipe Bedding shall be imported sand meeting the following gradation: Sieve Designation Percent Passing 12.5 Mm 100 4.75 Mm 35 - 100 2.36 Mm 20 - 70 1.18 Mm 13 - 50 0.850 Mm 8 - 35 0.300 Mm 5 - 25 0.150 Mm 2 - 15 0.075 Mm 0 - 6 4.10.3 Class `C' Pipe Bedding shall be native material in the trench which meets the gradation for Class `B' Pipe Bedding sand. 4.11 Granular Trench Backfill Aggregate shall conform to the following specifications: 4.11.1 Trench Backfill aggregate shall be `Selected Excavated Materials', inert, durable material, reasonably uniform in quality and free from soft or disintegrated particles, free of stones and rocks over 20 mm in diameter, free of organic or foreign matter, capable of compaction to specified density. 4.11.2 Imported Trench Backfill material shall meet the gradation specified for Sub-Base Course Aggregate in Clause 4.6, Section 2B - Roads and Earthworks. 4.12 Cast-in-Place Concrete shall conform to CAN/CSA-A23.1. Concrete for Sanitary Works to be 25 MPa at 28 days. DIVISION 2 - SITEWORK Page 133 City of Armstrong SECTION 2D - SANITARY SEWER WORKS SCHEDULE L - Materials, Construction, Testing Specifications 4.13 Fibreglass Manhole Liners shall be one piece consisting of unlayered and homogeneous fibreglass reinforced plastic with full flow channels with side walls to crown of pipe, watertight gasketed bells graded and aligned to comply with design to suit specified pipe, inner surface of liner benching to have anti-skid surface, outer surface of liner to be sand coated and to have sufficient steel spirals bonded to the fibreglass reinforced plastic to assure a continuous physical connection to the concrete base. 5.0 INSTALLATION 5.1 Trench and pipe bedding details shall conform to the Contract Drawings and the following specifications: 5.1.1 Pipes, fittings, manholes, and appurtenances, shall be cleaned and inspected for defects prior to installation. Defective materials shall be removed from the job site. 5.1.2 Where material in the trench bottom is deemed by the Owners' Representative to be unstable or otherwise unsuitable for pipe support or the support of appurtenant structures, the trench shall be over-excavated to the depth at which stable material is encountered and the excavation shall be backfilled, with Imported Backfill, to the lower level of the pipe bedding zone. Unsuitable materials shall be disposed of at the Contractors' own disposal site unless directed otherwise in the Contract Documents. 5.1.3 The Pipe Zone is defined as that portion of the trench between the bottom level of the pipe bedding and a level 300 mm above the top of the installed pipe or appurtenances. Materials in the pipe zone shall consist of Class `B' Bedding (4.2.2) or, if present, Class `C' Bedding (4.2.3). The bedding materials shall have a minimum depth under the pipe of 150 mm. Pipe bedding shall extend the full width of the trench and be compacted to 95% laboratory density obtained by following the current A.S.T.M., Designation D698-91 Method C. 5.1.4 Trenches shall be dug to the alignment and depth indicated in the Contract Documents. Sanitary mains and services shall be installed so as to provide a minimum cover of 1.5 metres from finished grade, unless specified otherwise in the Contract Documents. 5.1.5 Trenches shall be maintained such that the pipe can be installed without getting water, muck, silt, gravel, or other foreign materials into the pipe. Trench bottoms which have been allowed to deteriorate, and trench bottoms which have been over- excavated, shall be made good to the design grade, with selected site excavated material, or, if ordered, Imported Backfill, and compacted to 95% laboratory density obtained by following the current A.S.T.M., Designation D698-91 Method C, at the Contractors' expense. 5.1.6 Trench excavations shall be kept free of water, by pumping, during the pipe laying, jointing, bedding, and backfill works. Trench water shall not be permitted to enter the pipe being installed. Water shall be discharged from the excavation in such a manner as not to cause nuisance, injury, or damage to property or receiving waters. Previously laid pipe shall not be used for dewatering. 5.1.7 Trenches shall be sheeted and braced, or sloped as required by WorkSafe BC regulations. Where sheeting or shoring is required it shall be in accordance with WorkSafe BC regulations. DIVISION 2 - SITEWORK Page 134 City of Armstrong SECTION 2D - SANITARY SEWER WORKS SCHEDULE L - Materials, Construction, Testing Specifications 5.1.8 The Contractor shall replace materials and rectify all failures as a result of settlement of the trench backfill or collapse of the trench walls during the maintenance guarantee period. Where trenches fail, the trench material shall be excavated to the top of the pipe zone and all materials above the pipe zone replaced in accordance with the Contract Documents. The Contractor shall make up for any deficiencies in the quantity of material suitable for backfilling which have been wasted during the construction operation. 5.1.9 The requirements of the WorkSafe BC shall take precedence over any conflicting Clauses in these Specifications. Trench excavations and trench walls shall conform to WorkSafe BC regulations. Ledge rock, boulders, and large stones shall be removed to provide a clearance of at least 150 mm below, and on all sides, of the pipe and fittings. 5.1.10 Where asphalt concrete pavement is to be cut the trench width shall be kept as narrow as possible while still complying with WorkSafe BC regulations and the pavement shall be saw-cut along neat straight lines. If pavement breakage occurs outside the limits of the initial pavement cut the asphalt shall be cut back to sound asphalt in neat straight lines before the asphalt restoration paving starts. 5.1.11 When sidecasting excavated materials the Contractor shall ensure that his operation does not interfere with traffic. Traffic flow must be maintained as specified in the Special Instructions in the Contract Documents. The Contractor shall be responsible for thoroughly cleaning all roadways, on which excavated materials or imported backfill has been hauled, at the end of each working day, or promptly when directed by the Owners' Representative, at the Contractors' own expense. 5.1.12 The Backfill Zone is that section of the trench from the top of the pipe zone to subgrade. The backfill zone shall be backfilled with select excavated materials, or, if directed by the Owners' Representative, with Imported Backfill Materials. The backfill zone shall be compacted to 95% laboratory density obtained by following the current A.S.T.M., Designation D698-91 Method C, at the Contractors' expense. Placing of frozen materials in the backfill zone will not be permitted. 5.1.13 Where trenches are excavated in paved surfaces, the sub-base, base, and asphalt shall be replaced in accordance with Section 2B - Roads and Earthworks. 5.1.14 Pipe shall be handled, laid, cut, and jointed, to the pipe manufacturers' instructions and specifications, PVC pipe to CSA B182.11. 5.1.15 Joint deflection not permitted for smooth profile PVC pipe. For Concrete Pipe and Ribbed PVC Pipe do not exceed one-half permissible joint deflection recommended by pipe manufacturer. In no case is radius of curvature to exceed 300 times the outside diameter of the barrel for 100 mm to 300 mm smooth profile PVC Pipe. 5.1.16 Pipe shall be laid to a horizontal tolerance of 10± mm from design alignment and a vertical tolerance of 5± mm from design grade. For grades 2% and greater pipe shall be laid uphill (bell ends facing uphill). Pipe Joint Restrainers shall be used where designated in the Contract Documents. 5.1.17 When any stoppage of work occurs, restrain laid pipes to prevent 'creep' and cap the end pipe to keep the pipe free of foreign materials, dirt and debris. 5.1.18 Service connections to be installed, using prefabricated saddles or wyes, and marked (painted red) as specified in the Contract Drawings. Joint to be structurally DIVISION 2 - SITEWORK Page 135 City of Armstrong SECTION 2D - SANITARY SEWER WORKS SCHEDULE L - Materials, Construction, Testing Specifications sound and watertight without encroachment into inner circle of mainline sewer pipe. Refer to Specification Drawing. 5.1.19 Manhole joints to be watertight using SuperSeal rubber gaskets. Precast riser sections to be set plumb with joints and gaskets to ASTM C443 and ASTM C361. Refer to Specification Drawings for installation of Manholes. 5.1.20 Pre-benched manhole fibreglass reinforced plastic liners shall be installed in accordance with the Manufacturers recommendations. 5.1.21 Where manhole base is constructed cast-in-place form channelling using half- sections of pipe. Benching to direct flow parallel to main flow of sewer. Top of benching to be as high as crown of sewer pipe. Finish concrete to smooth surface using steel trowel. 5.1.22 Where Ribbed PVC Pipe is utilized, the first pipe joint, on each side of a cast-in- place manhole base, shall be located between 0.5 m and 1.0 m from the outside face of the manhole barrel. 6.0 CLEANING, TESTING 6.1 All cleaning and testing shall be completed by the Contractor, and be witnessed by the Owners' Representative. 6.1.1 The Contractor shall supply, at his own cost, all materials, equipment, labour, and supplies, to clean, and accurately test, the sanitary mains and appurtenances. 6.1.2 Manholes shall be exfiltration tested using water. Manholes shall be filled with water to 2.0 m above invert of pipe, or to elevation 351.0 m, whichever is greater. No measurable drop in 1 hour will constitute an acceptance test. 6.1.3 All sanitary mains shall be tested using a low pressure air test. Air pressure test equipment to be regulated to prevent pressure inside test section from exceeding 35 kPa above average ground water pressure. Internal air pressure, in test section to be maintained at 25 kPa above average ground water pressure for at least 5 minutes immediately prior to test. Test period to start when pressure decreases to 24 kPa above average groundwater pressure and ends when the pressure decreases to 20.5 kPa above average groundwater pressure. If test period is less than: 2 minutes and 32 seconds for 100 mm pipe 3 minutes and 50 seconds for 150 mm pipe 5 minutes and 6 seconds for 200 mm pipe 6 minutes and 22 seconds for 250 mm pipe 7 minutes and 39 seconds for 300 mm pipe 8 minutes and 56 seconds for 350 mm pipe 9 minutes and 35 seconds for 375 mm pipe 10 minutes and 12 seconds for 400 mm pipe 11 minutes and 34 seconds for 450 mm pipe 12 minutes and 45 seconds for 500 mm pipe 13 minutes and 45 seconds for 525 mm pipe the sewer pipe shall be deemed to have failed the test and shall be retested upon completion of repairs of any leaks. DIVISION 2 - SITEWORK Page 136 City of Armstrong SECTION 2D - SANITARY SEWER WORKS SCHEDULE L - Materials, Construction, Testing Specifications 6.1.4 All sanitary sewers are to be video inspected immediately following completion of installation of individual sections. Repair all sags in the pipe to achieve uniform grade. Clean Pipe. 6.1.5 Repair visible leaks regardless of test results. 6.1.6 Force mains shall be tested a 1.5 times the working pressure applied at the highest elevation in each section. The maximum allowable leakage rate shall conform to the applicable AWWA standards for water pressure pipe. All pressure tests shall be for a two hour duration. 6.2 The Contractor shall arrange and pay for an independent Testing Agency to provide quality control testing for all materials supplied and incorporated into the works. Material Quality, and Compaction Testing, shall be conducted on aggregates, bedding sand and trench backfill and shall include, but not be limited to, the following tests: 6.2.1 Density analysis of utility pipe zone and trench zone backfill The Owner, at his option, may conduct random tests of the materials supplied and work performed to ensure compliance with the Contract Documents. Where the Owners' testing reveals the materials, and or works, do not comply with the Contract Documents, and the Contractor is unable to provide successful test results from an Independent Testing Agency, then all works and materials which have failed the Owners testing shall be rejected and the materials removed from the site and the works redone. **End Section 2D** DIVISION 2 - SITEWORK Page 137 City of Armstrong SECTION 2E - STORM SEWER WORKS SCHEDULE L - Materials, Construction, Testing Specifications 1.0 GENERAL 1.1 This section refers to the supply of all labour, supervision, equipment, and materials, as specified, necessary to complete the work in accordance with the Drawings and Specifications. 2.0 DESCRIPTION OF WORK 2.1 The work shall include, but not necessarily be limited to the following principal items: 2.1.1 Supply and install all materials as per the drawings and specifications, (except as specifically stated as `Supplied by Owner'). 2.1.2 Take delivery, including unloading, at the site of materials and store under suitable conditions to prevent damage, deterioration, or, contamination until incorporated into the works. 2.1.3 Schedule works such that disruption of normal traffic, and inconvenience to residents, in the working area is kept to a minimum, and such that emergency vehicles have suitable access thru the working area at all times. Provide dust control during the course of the Contract. 2.1.4 Maintain the work area in an orderly manner free of accumulated waste, and surplus, materials and debris. Clean-up shall be a continuing daily process over the duration of the Contract. 2.1.5 Trench excavation, pipe bedding, de-watering, backfill and compaction within the pipe zone, trench backfill and compaction, and restoration of all disturbed areas to original condition unless specified otherwise. 2.1.6 Supply and install pipe, bends, fittings, manholes, services, catch basins, inlets, and outfalls, as required. 2.1.7 Provide barriers, fences, and warning signs, shoring, as required, to protect workmen and the general public. 3.0 EXAMINATION OF THE SITE OF THE PROPOSED WORKS 3.1 The `Tenderer' will carefully examine the site of the proposed works and notify the Owners' Representative, in writing, of any changes which have been made to the site by `Others', during the period of `Tender Closing' to `Contract Award', which would affect the proper completion of the Contract. 3.2 Commencement of the work on this Contract shall constitute acceptance of the site and any changes to the work site by `Others'. 4.0 MATERIALS 4.1 Storm Sewer Pipe shall conform to the following specifications: 4.1.1 Polyvinyl chloride (PVC) pipe up to 100 mm in diameter shall be DR28 meeting or exceeding all of the requirements of ASTM Specification D3034 and CSA Standards B182.1 and B182.2. Minimum pipe stiffness (F/Y) shall be 320 kPa at 5.0% deflection, ASTM D2412. Manning "n" coefficient to be 0.009. DIVISION 2 - SITEWORK Page 138 City of Armstrong SECTION 2E - STORM SEWER WORKS SCHEDULE L - Materials, Construction, Testing Specifications 4.1.2 Polyvinyl chloride (PVC) pipe, and fittings, 150 mm to 250 mm in diameter shall be DR35 meeting or exceeding all of the requirements of ASTM Specification D3034 and CSA Standards B182.1 and B182.2, and shall be coloured green. Minimum pipe stiffness (F/Y) shall be 320 kPa at 5.0% deflection, ASTM D2412. Manning "n" coefficient to be 0.009. Pipe joints to have bell and spigot ends with rubber gaskets to ASMT 477. 4.1.3 Ribbed Polyvinyl chloride (PVC) pipe, and fittings, 250 mm to 900 mm in diameter shall meet or exceed all of the requirements of ASTM F794 and CSA Standards B182.4, and shall be coloured green. Ribbed Pipe to have a minimum pipe stiffness of 320 kPa at 5.0%. Pipe to be marked to clearly indicated class rating as required under ASTM F794. Pipe joints to have bell and spigot ends with rubber gaskets to ASMT 477. Manning "n" coefficient to be 0.009. 4.1.4 Non-reinforced concrete pipe up to 900 mm in diameter shall meet or exceed all of the requirements of ASTM Specification C14M. Rubber gasket joints shall be to ASTM C443M. 4.1.5 Reinforced concrete pipe greater than 900 mm in diameter shall meet or exceed all of the requirements of ASTM Specification ASTM C76M. Rubber gasket joints shall be to ASTM C443M. Pipe shall have not more than two lifting holes per length and shall be provided with pre-fabricated PVC plugs to seal lift holes water tight after installation. 4.1.6 Corrugated Steel pipe shall conform to CAN3-G401. 4.1.7 Storm Manhole Barrels shall be Precast Reinforced Concrete Manhole Sections, minimum diameter 1050 mm, or larger to accommodate larger pipes, meeting the requirements of ASTM Specification C478. Precast Concrete Lid shall be designed for H-20 Loading. Ladder Rungs to be 300 mm wide polypropylene coated ladder rungs cast with manhole sections. Polypropylene to ASTM D-4101, Reinforcing to ASATM A-615. Adjusting rings to ASTM C478, Concrete Spacer Rings (Grade Rings) designed for H-20 Loading. Refer to Specification Drawing. 4.1.8 Storm Manhole Frames and Covers shall be C-44 designation, Round Base. The Cast Iron Frame shall have a 610 mm access opening. The Storm Manhole Cover shall be labelled "Storm Sewer". 4.1.9 Precast Reinforced Concrete Catch Basins shall be precast reinforced concrete to ASTM Specification C-478, 750 mm inside diameter. Precast Concrete Lid shall be designed for H-20 loading. Refer to Standard Specification Drawing. 4.1.10 Storm Catch Basin Frames and Grates shall be B-19A (Frame) and B-19A Modified (Grate) Left and Right as applicable. All storm catch basins shall be supplied with Dobney Foundry #9 Trapping Hoods. Twin Inlet Catch Basins shall have minimum 250mm diameter PVC-SDR35 pipe connection to storm main. Trapping Hood Rods shall be cast in place and shall be 15 mm diameter galvanized. 4.2 Granular Pipe Bedding and Surround Aggregate in the pipe zone shall conform to the following specifications: 4.2.1 Class `A' Pipe Bedding is where the pipe is bedded in a continuous monolithic cradle of concrete as indicated in the Contract Documents. DIVISION 2 - SITEWORK Page 139 City of Armstrong SECTION 2E - STORM SEWER WORKS SCHEDULE L - Materials, Construction, Testing Specifications 4.2.2 Class `B' Pipe Bedding shall be imported sand meeting the following gradation: Sieve Designation Percent Passing 12.5 mm 100 4.75 mm 35 - 100 2.36 mm 20 - 70 1.18 mm 13 - 50+1 0.850 mm 8 - 35 0.300 mm 5 - 25 0.150 mm 2 - 15 0.075 mm 0 - 6 4.2.3 Class `C' Pipe Bedding shall be native material in the trench which meets the gradation for Class `B' Pipe Bedding sand. 4.3 Granular Trench Backfill Aggregate shall conform to the following specifications: 4.3.1 Trench Backfill aggregate shall be `Selected Excavated Materials', inert, durable material, reasonably uniform in quality and free from soft or disintegrated particles, free of stones and rocks over 20 mm in diameter, free of organic or foreign matter, capable of compaction to specified density. 4.3.2 Imported Trench Backfill material shall meet the gradation specified for Sub-Base Course Aggregate in Clause 4.6, Section 2AB- Roads and Earthworks. 4.4 Cast-in-Place Concrete shall conform to CAN/CSA-A23.1. Concrete for Storm Sewer Works to be 25 MPa at 28 days. 4.5 Fibreglass Manhole Liners shall be one piece consisting of unlayered and homogeneous fibreglass reinforced plastic with full flow channels with side walls to crown of pipe, watertight gasketed bells graded and aligned to comply with design to suit specified pipe, inner surface of liner benching to have anti-skid surface, outer surface of liner to be sand coated and to have sufficient steel spirals bonded to the fibreglass reinforced plastic to assure a continuous physical connection to the concrete base. 5.0 INSTALLATION 5.1 Trench and pipe bedding details shall conform to the Contract Drawings and the following specifications: 5.1.1 Pipes, fittings, manholes, catch basins, and appurtenances, shall be cleaned and inspected for defects prior to installation. Defective materials shall be removed from the job site. 5.1.2 Where material in the trench bottom is deemed by the Owners' Representative to be unstable or otherwise unsuitable for pipe support or the support of appurtenant structures, the trench shall be over-excavated to the depth at which stable material is encountered and the excavation shall be backfilled, with Imported Backfill, to the lower level of the pipe bedding zone. Unsuitable materials and ripped rock and blasted rock shall be disposed of at the Contractors' own disposal site unless directed otherwise in the Contract Documents. DIVISION 2 - SITEWORK Page 140 City of Armstrong SECTION 2E - STORM SEWER WORKS SCHEDULE L - Materials, Construction, Testing Specifications 5.1.3 The Pipe Zone is defined as that portion of the trench between the bottom level of the pipe bedding and a level 300 mm above the top of the installed pipe or appurtenances. Materials in the pipe zone shall consist of Class 'B' Bedding (4.2.2) or, if present, Class `C' Bedding (4.2.3). The bedding materials shall have a minimum depth under the pipe of 150 mm. Pipe bedding shall extend the full width of the trench and be compacted to 95% laboratory density obtained by following the current A.S.T.M., Designation D698-91 Method C. 5.1.4 Trenches shall be dug to the alignment and depth indicated in the Contract Documents. Storm mains and services shall be installed so as to provide a minimum cover of 1.2 metres from finished grade, unless specified otherwise in the Contract Documents. 5.1.5 Trenches shall be maintained such that the pipe can be installed without getting water, muck, silt, gravel, or other foreign materials into the pipe. Trench bottoms which have been allowed to deteriorate, and trench bottoms which have been over- excavated, shall be made good to the design grade, with selected site excavated material, or, if ordered, Imported Backfill, and compacted to 95% laboratory density obtained by following the current A.S.T.M., Designation D698-91 Method C, at the Contractors' expense. 5.1.6 Trench excavations shall be kept free of water, by pumping, during the pipe laying, jointing, bedding, and backfill works. Trench water shall not be permitted to enter the pipe being installed. Water shall be discharged from the excavation in such a manner as not to cause nuisance, injury, or damage to property or receiving waters. Previously laid pipe shall not be used for dewatering. 5.1.7 Trenches shall be sheeted and braced, or sloped, as required by WorkSafe BC regulations. Where sheeting or shoring is required it shall be in accordance with WorkSafe BC regulations. 5.1.8 The Contractor shall replace materials and rectify all failures as a result of settlement of the trench backfill or collapse of the trench walls during the maintenance guarantee period. Where trenches fail, the trench material shall be excavated to the top of the pipe zone and all materials above the pipe zone replaced in accordance with the Contract Documents. The Contractor shall make up for any deficiencies in the quantity of material suitable for backfilling which have been wasted during the construction operation. 5.1.9 The requirements of WorkSafe BC shall take precedence over any conflicting Clauses in these Specifications. Trench excavations and trench walls shall conform to WorkSafe BC regulations. Ledge rock, boulders, and large stones shall be removed to provide a clearance of at least 150 mm below, and on all sides, of the pipe and fittings. 5.1.10 Where asphalt concrete pavement is to be cut the trench width shall be kept as narrow as possible, while still complying with WorkSafe BC regulations, and the pavement shall be saw-cut along neat straight lines. If pavement breakage occurs outside the limits of the initial pavement cut the asphalt shall be cut back to sound asphalt in neat straight lines before the asphalt restoration paving starts. DIVISION 2 - SITEWORK Page 141 City of Armstrong SECTION 2E - STORM SEWER WORKS SCHEDULE L - Materials, Construction, Testing Specifications 5.1.11 When sidecasting excavated materials the Contractor shall ensure that his operation does not interfere with traffic. Traffic flow must be maintained as specified in the Special Instructions in the Contract Documents. The Contractor shall be responsible for thoroughly cleaning all roadways, on which excavated materials or imported backfill has been hauled, at the end of each working day, or promptly when directed by the Owners' Representative, at the Contractors' own expense. 5.1.12 The Backfill Zone is that section of the trench from the top of the pipe zone to subgrade. The backfill zone shall be backfilled with select excavated materials, or, if directed by the Owners' Representative, with Imported Backfill Materials. The backfill zone shall be compacted to 95% laboratory density obtained by following the current A.S.T.M., Designation D698-91 Method C, at the Contractors' expense. Placing of frozen materials in the backfill zone will not be permitted. 5.1.13 Where trenches are excavated in paved surfaces, the sub-base, base, and asphalt shall be replaced in accordance with Section 2B - Roads and Earthworks. 5.1.14 Pipe shall be handled, laid, cut, and jointed, to the pipe manufacturers' instructions and specifications, PVC pipe to CSA B182.11. 5.1.15 Joint deflection not permitted for smooth profile PVC pipe. For Concrete Pipe and Ribbed PVC Pipe do not exceed one-half permissible joint deflection recommended by pipe manufacturer. In no case is radius of curvature to exceed 300 times the outside diameter of the barrel for 100 mm to 300 mm smooth profile PVC Pipe. 5.1.16 Pipe shall be laid to a horizontal tolerance of 20± mm from design alignment and a vertical tolerance of 10± mm from design grade. For grades 2% and greater pipe shall be laid uphill (bell ends facing uphill). Pipe joint restrainers shall be used where designated in the Contract Documents. 5.1.17 When any stoppage of work occurs, restrain laid pipes to prevent 'creep' and cap the end pipe to keep the pipe free of foreign materials, dirt and debris. 5.1.18 Service connections to be installed, using prefabricated saddles, wyes, and inserta tees, and marked (painted green) as specified in the Contract Drawings. Joint to be structurally sound and watertight without encroachment into inner circle of mainline sewer pipe. Refer to Specification Drawing. 5.1.19 Manhole and Catch Basin joints to be constructed watertight using SuperSeal rubber gaskets. Precast riser sections to be set plumb with joints and gaskets to ASTM C443 and ASTM C361. Refer to Specification Drawings for installation of Manholes and Catch Basins. 5.1.20 Pre-benched manhole fibreglass reinforced plastic liners shall be installed in accordance with the Manufacturers recommendations. 5.1.21 Where manhole base is constructed cast-in-place form channelling using half- sections of pipe. Benching to direct flow parallel to main flow of sewer. Top of benching to be as high as crown of sewer pipe. Finish concrete to smooth surface using steel trowel. 5.1.22 Where Ribbed PVC Pipe is utilized, the first pipe joint, on each side of a cast-n- place manhole base, shall be located between 0.5 m and 1.0 m from the outside face of the manhole. DIVISION 2 - SITEWORK Page 142 City of Armstrong SECTION 2E - STORM SEWER WORKS SCHEDULE L - Materials, Construction, Testing Specifications 6.0 CLEANING, TESTING 6.1 All cleaning and testing shall be completed by the Contractor, and be witnessed by the Owners' Representative. 6.1.1 The Contractor shall supply, at his own cost, all materials, equipment, labour, required to clean, and accurately test, the storm mains and appurtenances. 6.1.2 Infiltration and exfiltration testing is not required. 6.1.3 Pass a rubber ball, mandrel or test plug having a minimum cross-section area of 95% of the sewer pipe cross-section area completely through the pipes and appurtenances. A light test may be performed in lieu of the ball test at discretion of the Owners Representative. 6.1.4 All storm sewers are to be video inspected immediately following completion of installation of individual sections. Repair all sags in the pipe to achieve uniform grade. Clean pipe. 6.1.5 Repair visible leaks regardless of test results. 6.2 The Contractor shall arrange and pay for an independent Testing Agency to provide quality control testing for all materials supplied and incorporated into the works. Material Quality, and Compaction Testing, shall be conducted on aggregates, bedding sand and trench backfill and shall include, but not be limited to, the following tests: 6.2.1 Density analysis of utility pipe zone and trench zone backfill The Owner, at his option, may conduct random tests of the materials supplied and work performed to ensure compliance with the Contract Documents. Where the Owners' testing reveals the materials, and or works, do not comply with the Contract Documents, and the Contractor is unable to provide successful test results from an independent testing agency, then all works and materials which have failed the Owners testing shall be rejected and the materials removed from the site and the works redone. **End Section 2E** DIVISION 2 - SITEWORK Page 143 City of Armstrong SECTION 2F - CONCRETE CURBS, GUTTERS, SIDEWALK, STAIRS SCHEDULE L - Materials, Construction, Testing Specifications 1.0 GENERAL 1.1 This section refers to the supply of all labour, supervision, equipment, and materials, as specified, necessary to complete the work in accordance with the Drawings and Specifications. 2.0 DESCRIPTION OF WORK 2.1 The work shall include, but not necessarily be limited to the following principal items: 2.1.1 Supply and install all materials as per the drawings and specifications. 2.1.2 Take delivery, including unloading, at the site of any materials and store under suitable conditions to prevent damage, deterioration, or, contamination until incorporated into the works. 2.1.3 Schedule works such that disruption of normal traffic, and inconvenience to residents, in the working area is kept to a minimum, and such that emergency vehicles have suitable access thru the working area at all times. Provide dust control during the course of the Contract. 2.1.4 Maintain the work area in an orderly manner free of accumulated waste, and surplus, materials and debris. Clean-up shall be a continuing daily process over the duration of the Contract. 2.1.5 Excavation, de-watering, backfill and compaction of all disturbed areas to original or specified condition. 2.1.6 Supply and install combined curb & gutter, sidewalks, stairs, hand rails, excavation, backfill, sub-base, base, curing compound, security for fresh concrete, and all other works necessary for a complete project. 2.1.7 Provide barriers, fences, and warning signs, as required, to protect workmen and the general public. 3.0 EXAMINATION OF THE SITE OF THE PROPOSED WORKS 3.1 The `Tenderer' will carefully examine the site of the proposed works and notify the Owners' Representative, in writing, of any changes which have been made to the site by `Others', during the period of `Tender Closing' to `Contract Award', which would affect the proper completion of the Contract. 3.2 Commencement of the work on this Contract shall constitute acceptance of the site and any changes to the work site by `Others'. DIVISION 2 - SITEWORK Page 144 City of Armstrong SECTION 2F - CONCRETE CURBS, GUTTERS, SIDEWALK, STAIRS SCHEDULE L - Materials, Construction, Testing Specifications 4.0 MATERIALS 4.1 All concrete supply shall conform to the requirements of the latest version of CSA A23.1-04 / A23.2-04. 4.1.1 Concrete shall be ready-mixed supplied by a company certified by the British Columbia Ready-Mix Concrete Association for conformance for Concrete Production Facilities. 4.1.2 Minimum Compressive Strength shall be 32 MPa at 28 days. 4.1.3 Coarse Aggregate maximum particle size shall not exceed 19 mm. 4.1.4 Minimum Cement Content shall be 350 kg/m3. 4.1.5 Entrained Air at job-site shall be 5 - 8%. 4.1.6 Slump shall be between 10 - 25 mm for extruded concrete and maximum 65 mm for poured in place concrete. 4.1.7 Maximum Water - Cement Ratio shall be 0.45. 4.1.8 Curing Compound shall be Insul-Mastic 3101 or equal. 4.2 All Concrete Reinforcing Steel shall conform to the following requirements: 4.2.1 CAN/CSA-G30.12 - 300 MPa. 4.3 All Sidewalk Fence materials shall conform to the following requirements: 4.3.1 Posts and rails to be 48 mm O.D. to A.S.T.M. A 120 `Standard' weight (Schedule 40) galvanized pipe. 4.3.2 Pipe Fittings shall be galvanized malleable iron with case hardened set-screws conforming to A.S.T.M. A 47 grade 32510 and A.S.T.M. A 153 Class A (610 g/m2 of zinc coating). 4.3.3 Zinc Coating shall conform to CGSB 1-GP-181 M. 4.4 Sub-Base Course and Base Course Materials shall conform to Section 2B - Roads and Earthworks. 5.0 INSTALLATION 5.1 All concrete supply and placement shall conform to the requirements of the latest version of CSA A23.1-04 / A23.2-04. 5.2 Concrete works shall conform to the cross-sections and dimensions shown on the Contract Drawings and the following specifications: 5.2.1 The sub-base and base for curb and gutter, and sidewalk, shall extend 300 mm on either side of the limits of the concrete works. 5.2.2 The depths of the sub-base and base course shall be as specified on the Specification Drawings. 5.2.3 The concrete finish shall be as specified on Specification Drawings. 5.2.4 Curing compound shall be applied in accordance with the Manufacturer's Recommendations. 5.3 No materials shall be placed on or adjacent the newly poured concrete for at least 5 days. Sub-Base and Base Course Materials shall be placed in accordance with Section 2B - Roads and Earthworks. DIVISION 2 - SITEWORK Page 145 City of Armstrong SECTION 2F - CONCRETE CURBS, GUTTERS, SIDEWALK, STAIRS SCHEDULE L - Materials, Construction, Testing Specifications 5.4 The Contractor shall monitor and protect the curing of the concrete to ensure that the surface is not marred or vandalized in any way. Where the surface is `marred', or `vandalized' the works shall be removed between adjacent control joints and replaced. `Patching' is not acceptable. 5.5 When the concrete forms are removed all debris shall be immediately removed to the Contractor's disposal site. During the interval when the forms are stripped and the concrete works are backfilled any grade separations shall be marked to provide for pedestrian safety. 5.6 Sign Post Bases shall be installed in accordance with the Specification. Where a sign post bases protrudes above a sidewalk it shall be marked to advise pedestrians until such time as the sign post is installed. 6.0 TESTING 6.1 All concrete testing shall be completed by the Contractor, be certified by an Independent Testing Laboratory, and conform to CSA A23.1-04 / A23.2-04. 6.1.1 The Contractor shall supply, at his own cost, all materials, equipment, labour, and supplies, required to efficiently and accurately test, the concrete strength, slump, and air content. 6.1.2 The test results, from the tests specified in Clause 6.1.1, shall be certified by an Independent Testing Laboratory and the test results shall be forwarded to the Owners' Representative immediately when they are known. 6.1.3 The Owner may, or may not, elect to complete his own testing, however, testing by the Owner shall not relieve the Contractor of his obligations in Clauses 6.1.1 and 6.1.2. **End Section 2F** DIVISION 2 - SITEWORK Page 146 City of Armstrong SECTION 2G - STREET LIGHTING SCHEDULE L - Materials, Construction, Testing Specifications 1.0 GENERAL 1.1 This section refers to the supply of all labour, supervision, equipment, and materials, as specified, (except as specifically stated as `Supplied by Owner'), necessary to complete the work in accordance with the Plans and Specifications. 2.0 DESCRIPTION OF WORK 2.1 The work shall include, but not necessarily be limited to the following principal items: 2.1.1 Supply and install all materials as per the plans and specifications, (except as specifically stated as `Supplied by Owner'). 2.1.2 Take delivery, including unloading, at the site of any materials specifically stated as 'Supplied by Owner' and store under suitable conditions to prevent damage, deterioration, or, contamination until incorporated into the works. 2.1.3 Schedule works such that disruption of normal traffic, and inconvenience to residents, in the working area is kept to a minimum, and such that emergency vehicles have suitable access thru the working area at all times. Provide dust control during the course of the Contract. 2.1.4 Maintain the work area in an orderly manner free of accumulated waste, and surplus, materials and debris. Clean-up shall be a continuing daily process over the duration of the Contract. 2.1.5 Excavation, de-watering, backfill and compaction of all disturbed areas to original or specified condition. 2.1.6 Supply and installation of street lights, poles, bases, conduits, conductors, control bases, service boxes, splice boxes, power bases, Hydro services, fixtures, warning tape, excavation and backfill, and, acquisition of Electrical Permits, all other works necessary for a complete project. 2.1.7 Provide barriers, fences, and warning signs, as required, to protect workmen and the general public. 3.0 EXAMINATION OF THE SITE OF THE PROPOSED WORKS 3.1 The `Tenderer' will carefully examine the site of the proposed works and notify the Owners' Representative, in writing, of any changes which have been made to the site by `Others', during the period of `Tender Closing' to `Contract Award', which would affect the proper completion of the Contract. 3.2 Commencement of the work on this Contract shall constitute acceptance of the site and any changes to the work site by `Others'. 4.0 MATERIALS 4.1 Street light bases shall conform to Specification Drawings No. SL-2 and SL-5. 4.2 Street Light Poles, Power Bases, Fixtures, and Ballasts, shall conform to Specification Drawings No. SL-1, SL-2, SL-3, SL-4 and SL-5. 4.3 Rigid PVC Street Light Ducting shall CSA approved and shall be subject to approval of the Electrical Safety Branch Inspector. Fish Cord shall be polypropylene. DIVISION 2 - SITEWORK Page 147 City of Armstrong SECTION 2G - STREET LIGHTING SCHEDULE L - Materials, Construction, Testing Specifications 4.4 Junction and Pull Boxes shall be equal to WCE-173f complete with galvanized steel lid and braces. 4.5 Service Cabinets shall meet the requirements of CSA and the Canadian Electrical Code. The Contractor shall install the service cabinet in the pole power base and service cabinet grounding in accordance with the Canadian Electrical Code. 4.6 Conductors shall be new stranded copper conductors RW90 X-Link of the size and type specified in the Contract Documents. The ground conductor shall be green TWH. Colour coding is required and shall be as outlined in the Canadian Electrical Code. 4.7 Ground Rods shall be provided for each street light, and each steel junction/pull box lid, in accordance with the Canadian Electrical Code requirements. 4.8 Electrical Energy Supply will be supplied from the BC Hydro secondary distribution system. The Contractor is responsible for making the necessary arrangements for connection of the new services and if necessary, disconnection of the existing services. 4.9 Warning Tape shall be polyethylene, yellow in colour, 150 mm wide, and marked "CAUTION ELECTRIC LINE BURIED BELOW" at intervals not exceeding 1.0 m. 4.10 The Contractor shall apply and pay for all necessary permits before he commences work. The Contractor shall also arrange for all inspections of the work as required by the Safety Engineering Services Division, Ministry of Labour. The Contractor shall pay for all fees, permits, and costs which may be incurred during testing inspection by the Electrical Safety Branch Inspector. 5.0 INSTALLATION 5.1 All conduit trenches shall be excavated and backfilled in accordance with Standard Specification Drawings No. UT-1 and UT-2. Warning tape shall be installed 450 mm above the invert of the conduit. 5.2 All service boxes shall be set in the boulevard and the lid shall be set 25 mm above final landscape grade. 5.3 Street light concrete bases shall be installed as per Standard Specification Drawings No. SL-2 and SL-5. 5.4 Post Top Poles shall be factory painted as per Standard Specification Drawings No. SL-1, SL-3, and SL-4. Davit Pole finish shall be double hot dip galvanizing. 6.0 TESTING 6.1 All street light Electrical Branch inspections and approvals shall be obtained by the Contractor, at his own cost. 6.2 The Contractor shall furnish Certificates of Acceptance from the Electrical Safety Branch Inspector. 6.3 The Contractor shall notify BC Hydro that the street lights have been approved and ready to be energized. **End Section 2G** DIVISION 2 - SITEWORK Page 148 City of Armstrong SECTION 2H - HYDRO, TELEPHONE, GAS, CATV SCHEDULE L - Materials, Construction, Testing Specifications 1.0 GENERAL 1.1 This section refers to the supply of all labour, supervision, equipment, and materials, as specified, (except as specifically stated as `Supplied by Owner'), necessary to complete the work in accordance with the Plans and Specifications. 2.0 DESCRIPTION OF WORK 2.1 The work shall include, but not necessarily be limited to the following principal items: 2.1.1 Supply and install all materials as per the plans and specifications, (except as specifically stated as `Supplied by Owner'). 2.1.2 Take delivery, including unloading, F.O.B. suppliers yard, of any materials specifically stated as `Supplied by Owner' and store under suitable conditions to prevent damage, deterioration, or, contamination until incorporated into the works. 2.1.3 Schedule works such that disruption of normal traffic, and inconvenience to residents, in the working area is kept to a minimum, and such that emergency vehicles have suitable access thru the working area at all times. Provide dust control during the course of the Contract. 2.1.4 Maintain the work area in an orderly manner free of accumulated waste, and surplus, materials and debris. Clean-up shall be a continuing daily process over the duration of the Contract. 2.1.5 Excavation, de-watering, backfill and compaction of all disturbed areas to original or specified condition. 2.1.6 Supply and installation of ducting, conduit, pull boxes, service boxes, transformer bases, splice boxes, pilasters, vaults, casings, warning tape, excavation and backfill, and, acquisition of Electrical Permits, all other works necessary for the complete installation of the BC Hydro, Telus, CATV, and Terasen Gas works. 2.1.7 Provide barriers, fences, and warning signs, as required, to protect workmen and the general public. 3.0 EXAMINATION OF THE SITE OF THE PROPOSED WORKS 3.1 The `Tenderer' will carefully examine the site of the proposed works and notify the Owners' Representative, in writing, of any changes which have been made to the site by `Others', during the period of `Tender Closing' to `Contract Award', which would affect the proper completion of the Contract. 3.2 Commencement of the work on this Contract shall constitute acceptance of the site and any changes to the work site by `Others'. 4.0 MATERIALS 4.1 The Contractor shall supply all materials in accordance with the following specifications: 4.1.1 BC Hydro Specification No. 1323 4.1.2 Telus Specification No. 6020 4.1.3 Terasen Gas Specification No. CSA-Z184-M92 4.1.4 CATV materials shall conform to Telus Specification No. 6020 except that CATV duct shall be 50 mm PVC 700 series orange teleduct. DIVISION 2 - SITEWORK Page 149 City of Armstrong SECTION 2H - HYDRO, TELEPHONE, GAS, CATV SCHEDULE L - Materials, Construction, Testing Specifications 4.2 Where the Owner supplies BC Hydro materials the Contractor shall take delivery of these materials, FOB Supplier, and shall be responsible for shipment to the job-site. 5.0 INSTALLATION 5.1 All BC Hydro, Telus, CATV and Terasen Gas works shall be installed in accordance with the following specifications: 5.1.1 BC Hydro Specification No. 1323 5.1.2 CATV and Telus to Telus Specification No. 6020 5.1.3 Terasen Gas Specification No. CSA-Z184-M92 5.2 The Contractor shall be ensure that all BC Hydro, Telus, CATV and Terasen Gas trenches are backfilled in accordance with Standard Specification Drawings No. UT-1 and UT-2. 5.3 All BC Hydro, Telus and CATV above ground appurtenances shall be set level and plumb to design boulevard grade. 6.0 CLEANING AND TESTING 6.1 All BC Hydro, Telus, CATV and Terasen Gas works shall be cleaned and tested in accordance with the following specifications: 6.1.1 BC Hydro Specification No. 1323 6.1.2 CATV and Telus to Telus Specification No. 6020 6.1.3 Terasen Gas Specification No. CSA-Z184-M9 **End Section 2H** DIVISION 2 - SITEWORK Page 150 City of Armstrong SECTION 2I- LANDSCAPING SCHEDULE L - Materials, Construction, Testing Specifications 1.0 GENERAL 1.1 This section refers to the supply of all labour, supervision, equipment, and materials, as specified, (except as specifically stated as `Supplied by Owner'), necessary to complete the work in accordance with the Plans and Specifications. 2.0 DESCRIPTION OF WORK 2.1 The work shall include, but not necessarily be limited to the following principal items: 2.1.1 Supply and install all materials as per the plans and specifications, (except as specifically stated as `Supplied by Owner'). 2.1.2 Take delivery, including unloading, F.O.B. suppliers yard, of any materials specifically stated as `Supplied by Owner' and store under suitable conditions to prevent damage, deterioration, or, contamination until incorporated into the works. 2.1.3 Schedule works such that disruption of normal traffic, and inconvenience to residents, in the working area is kept to a minimum, and such that emergency vehicles have suitable access thru the working area at all times. Provide dust control during the course of the Contract. 2.1.4 Maintain the work area in an orderly manner free of accumulated waste, and surplus, materials and debris. Clean-up shall be a continuing daily process over the duration of the Contract. 2.1.5 Excavation, de-watering, backfill and compaction of all disturbed areas to original or specified condition. 2.1.6 Supply and installation of rough grading, topsoil, sod, grass growth, trees, shrubs, fertilizers, hydro seeding, plant materials, complete irrigations systems and irrigation system controllers and controls, landscape fabric, bark mulch, decorative rock, decorative shale, and all other works deemed necessary for a complete landscaping installation. 2.1.7 Provide barriers, fences, and warning signs, as required, to protect workmen and the general public, and to provide the landscaping works from trespass and vandalism. 3.0 EXAMINATION OF THE SITE OF THE PROPOSED WORKS 3.1 The `Tenderer' will carefully examine the site of the proposed works and notify the Owners' Representative, in writing, of any changes which have been made to the site by `Others', during the period of `Tender Closing' to `Contract Award', which would affect the proper completion of the Contract. 3.2 Commencement of the work on this Contract shall constitute acceptance of the site and any changes to the work site by `Others'. DIVISION 2 - SITEWORK Page 151 City of Armstrong SECTION 2I- LANDSCAPING SCHEDULE L - Materials, Construction, Testing Specifications 4.0 MATERIALS 4.1 The Contractor shall supply all materials in accordance with the following specifications: 4.1.1 Topsoil shall be imported soil with a sandy loam or loamy sand texture (not less than 50% sand by weight) containing between 4% and 15% organic matter (dry weight basis). Soil shall be virtually free from subsoil, wood including woody plant parts, weeds, toxic materials, stones over 25 mm and foreign objects. Topsoil shall be free of propagules of plant species designated as noxious weeks under the BC Weed Control Act and Regulation and other perennial, weedy plants such as couch-grass and horsetail. At least 80% of imported soil shall pass a Tyler #10 sieve after appropriate crushing of structural units using accepted laboratory test methods. 4.1.2 Sod shall be approved, nursery grown, conforming to the Standards of the Nursery Sod Grower's Association and their Nursery Sod Specifications. Seed shall be approved by the Canada Department of Agriculture, free of diseases, clovers, stones, pests, weeds, and debris. 4.1.3 Sod Fertilizer shall have an analysis of 13-16-10 (or pre-approved equivalent). 4.1.4 Landscape Fabric shall be `Pro 5 Weed Barrier' (or per-approved equivalent). 4.1.5 Hydro Seed Fertilizer shall be a commercial synthetic slow release fertilizer with minimum 35% water soluble nitrogen, Formulation Ratio: 1:4:1. 4.1.6 HydroSeed Seed Mix shall be: 50% Fairway Crested Wheatgrass 35% Hard or Sheep's Fescue 15% Annual Ryegrass 4.1.7 Shale Mulch rock shall be graded with the largest average piece being 75 mm and the smallest average piece being 19 mm. 4.1.8 Bark Mulch shall be 25 mm and minus Douglas Fir or Hemlock bark chips and fines, free of chunks and sticks, soil, stones, roots, and any other extraneous matter. 4.1.9 All nursery grown plants shall comply with the British Columbia Landscape Standard and the Landscape/Paysage Canada Guide Specification for Nursery Stock. All nursery grown plants shall as a minimum, comply with Landscape/Paysage Canada Guide Specification for Nursery Stock and the B.C.N.T.A. Standard for Container Grown Plants with respect to sizing, grading, and quality. 4.1.10 All components of the irrigation system shall be manufactured by either `Toro' or `Rainbird'. The Contractor shall submit shop drawings of the irrigation vault and lid, showing the control valve, blow-out connection, double check back flow preventer, water meter and pressure reducing valve. 5.0 INSTALLATION 5.1.1 All Work shall be done in strict accordance with applicable plumbing, health and electrical codes and other codes as they apply. Where provisions of the drawings and specifications are at variance with such codes, the codes shall govern, except where the drawings and specifications call for or describe materials, workmanship, or construction of higher quality standards or sizes than required under the codes, the drawings and specifications shall take precedence. DIVISION 2 - SITEWORK Page 152 City of Armstrong SECTION 2I- LANDSCAPING SCHEDULE L - Materials, Construction, Testing Specifications 5.1.2 Area Preparation is applicable to all areas within the project limits scheduled to be planted, hydroseeded, or sodded. Area Preparation entails rough grading, fine grading, and the removal of rocks and debris to the Contractor's disposal site. All rocks over 25 mm in diameter, all wood or metal refuse, and all other extraneous material shall be gleaned from the top 75 mm of the surface, to the Contractor's disposal site. Rough grading shall be to a grade which provides for the additional topsoil thickness. Area preparation shall be to a consistent 80 - 85% Standard Proctor Density. 5.1.3 Topsoil shall be placed to the compacted depth indicated on the Contract Drawings. Topsoil shall be compacted by light rolling such that it is firm against deep footprints. Topsoil shall not be compacted more than necessary to meet this requirement. Topsoil shall not be placed when wet or frozen. 5.1.4 Sod shall be machine cut by accepted methods and strips shall be 1 m2 in size (457 mm wide and 2.19 m long). 5.1.5 Sod Fertilizer shall be applied at a rate of 5 kg per 100 square metres. 5.1.6 Hydro Seed application rate shall be: Seed Mixture: 22.5 kg / 1,000 m2 Mulch: 160.0 kg / 1,000 m2 Fertilizer: 34.0 kg / 1,000 m2 Water: 1,000 litres / 1,000 m2 6.0 CONDITIONS FOR ACCEPTANCE 6.1 Plants and planted areas will be accepted by the Owner when the following conditions exist: 6.1.1 Topsoil and sod quality, fertility levels, depths and surface conditions, are as specified in the Contract Documents. 6.1.2 All plants are of the species and varieties specified and planted in the locations shown on the Contract Drawings. 6.1.3 All plants are healthy and turgid. 6.1.4 The water content in the topsoil and sod is to the satisfaction of the Owner. 6.1.5 All trees are staked, as specified, and pruned to the satisfaction of the Owner. 6.1.6 All planting beds and tree pits are free of weeds. 6.1.7 Mulch is in place as specified. 6.1.8 Unmulched areas are cultivated to leave a loose, friable, water-permeable surface. 6.2 The Irrigation System will be accepted by the Owner when the following conditions exist: 6.2.1 The sprinkler system has been adjusted to give satisfactory coverage to all areas. 6.2.2 Pressure at the sprinkler heads and/or Q.C. valves are as noted on the Drawings. 6.2.3 Turf heads, lawn heads, and Q.C. valves are set flush with the final turf grade. 6.2.4 All landscaped and irrigation surplus material has been removed from the site. 6.2.5 Acceptable `as-constructed' drawings have been submitted to the Owner. 6.2.6 A copy of the certificate issued by the Ministry of Labour indicating compliance with the Electrical Code has been submitted to the Owner. 6.2.7 The system has been pressure tested, flushed, and operated. 6.3 As a condition of final acceptance of the boulevard restoration works the Contractor shall obtain a Signed Release (Form Z/07) from each property owner adjacent the works. **End Section 2I** SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 153 City of Armstrong SCHEDULE M - Application for Preliminary Layout Review SCHEDULE M APPLICATION FOR PRELIMINARY LAYOUT REVIEW This is Schedule M of the City of Armstrong Subdivision and Development Servicing Bylaw No. 1570, 2007 ___________________________________ (Clerk) SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 154 City of Armstrong SCHEDULE M - Application for Preliminary Layout Review APPLICATION FOR PRELIMINARY LAYOUT REVIEW City of Armstrong email: [email protected] Street Address: 3570 Bridge Street Mailing Address: P.O. Box 40 Telephone: (250) 546-3023 Armstrong, BC Fax: (250) 546-3710 V0E 1B0 INFORMATION TO BE SUPPLIED BY APPLICANT DATE OF APPLICATION: PROPERTY Name (Print): Signature: OWNER(S): Address: Phone No.: ( ) APPLICANT: Name (Print): Signature: AGENT: Address: Phone No.: ( ) LEGAL DESCRIPTION OF PROPERTY(S): CIVIC ADDRESS: NO. OF LOTS PROPOSED: PRESENT LOT SIZE: WATER SUPPLY - Existing: Proposed: PROPOSED SEWAGE DISPOSAL METHOD: PRESENT ZONING: PROPOSED USE: FEE ENCLOSED: $ $500.00 for the first lot proposed to be created plus $155.00 for each additional lot, which fee is payable at the time of subdivision application. Include proposed survey plan of subdivision. Receipt # Form M/07 Municipal Office File No.: R.D.N.O. File No. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 155 City of Armstrong SCHEDULE M - Application for Preliminary Layout Review APPLICANTS SHOULD BE FAMILIAR WITH THE EFFECT THAT ANY OF THE FOLLOWING MATTERS MAY HAVE ON THEIR PROPOSED SUBDIVISION PRIOR TO SUBMISSION OF THIS APPLICATION TO THE APPROVING OFFICER. APPLICANTS ARE URGED TO CONTACT A BRITISH COLUMBIA LAND SURVEYOR, CONSULTING PROFESSIONAL ENGINEER OR THE DEVELOPMENT SERVICES DEPARTMENT OF THE REGIONAL DISTRICT OF NORTH OKANAGAN FOR ASSISTANCE IN THIS REGARD. IS THE SUBJECT PROPERTY: YES NO - located in the Agricultural Land Reserve? - currently used, or has it ever been used, for commercial or industrial purposes? - adjacent to a Controlled Access Highway (Highway 97A)? - adjacent to a Major Road designated on the City of Armstrong O.C.P.? - in a Flood Plain area or area subject to flood? - in a development permit area designated on the City of Armstrong O.C.P.? - the subject of any other land use controls, eg: Land Use Contract, Covenants? IS A WAIVER OF THE MINIMUM LOT FRONTAGE REQUIREMENT OF THE CITY OF ARMSTRONG ZONING BY-LAW REQUIRED? IS A CAPITAL COST CONTRIBUTION PAYABLE FOR THIS PROPOSED SUBDIVISION? IN SUPPORT OF THIS APPLICATION I/WE SUBMIT HEREWITH TEN (10) PRINTS OF A SKETCH PLAN OF SUBDIVISION, DRAWN TO SCALE, SHOWING THE EXISTING AND PROPOSED ROADS AND/OR LOTS TOGETHER WITH A CURRENT STATE OF TITLE CERTIFICATE. FOR THE INFORMATION OF THE APPLICANT THE PLAN MUST SHOW: - dimensions and areas of each proposed lot - existing buildings accurately identified and located - the nature, location and dimensions of any existing or proposed restrictive covenants, easements or rights-of-way affecting the proposed subdivision - existing and proposed wells and sewage disposal areas including soil inspection holes and percolation test holes - an accurate illustration of all lakes, rivers and drainage courses including high water marks Form M/07 Municipal Office File No.: R.D.N.O. File No. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 156 City of Armstrong SCHEDULE M-1 - Standard Subdivision and Development Agreement Document SCHEDULE M-1 STANDARD SUBDIVISION AND DEVELOPMENT AGREEMENT DOCUMENT This is Schedule M-1 of the City of Armstrong Subdivision and Development Servicing Bylaw No. 1570, 2007 ___________________________________ (Clerk) SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 157 City of Armstrong SCHEDULE M-1 - Standard Subdivision and Development Agreement Document SCHEDULE M - 1 STANDARD SUBDIVISION AND DEVELOPMENT AGREEMENT DOCUMENT THIS AGREEMENT made this ___________ day of ___________ A.D, 20_____ BETWEEN: THE CORPORATION OF THE CITY OF ARMSTRONG, a body corporate, duly incorporated under the laws of the Province of British Columbia, having an office at 3570 Bridge Street, in the City of Armstrong, Province of British Columbia V0E 1B0. (hereinafter call the "City") OF THE FIRST PART AND: (hereinafter call the "Owner") OF THE SECOND PART WHEREAS: A. The Owner is the registered Owner or holder of a Registered Right to Purchase lands and premises situate, lying and being in the City of Armstrong, Province of British Columbia, and more particularly known and described as: (hereinafter called the "Land") B. The Owner wishes to subdivide and/or develop the Land, or part thereof, in the manner shown on a Plan of Subdivision which has been submitted by the Owner to the Approving Officer of the City for approval, a copy of which such plan is attached hereto as Appendix "A", and is hereinafter call the "Subdivision Plan". C. The Owner is desirous of entering into this Agreement with the City pursuant to the provisions of Section 991 of the Local Government Act, in order to obtain approval from the Approving Officer of the Subdivision Plan prior to completion of the construction and installation on and/or off the Land of all works and services required by the City to be constructed and installed on the Land and/or on one- half of any highway immediately adjacent to the Land by the Owner. Form M-1/07 SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 158 City of Armstrong SCHEDULE M-1 - Standard Subdivision and Development Agreement Document D. The Owner is also desirous of voluntarily providing works and services beyond the Land and the highway immediately adjacent to the Land in order to obtain approval from the City of the subdivision and/or development, as the City deems it to be too costly to provide those works at the expense of the ratepayers. NOW THIS AGREEMENT WITNESSETH that in consideration of the premises and of the mutual covenants and agreements herein contained, the parties hereto covenant and agree as follows: Appendices 1. The following Appendices are to be initialed by each Party for identification and will be read with and form part of this Agreement. Appendix "A" - A copy of the subdivision plan for the Lands. Appendix "B" - A list of the Works and Services and an estimate of their respective construction costs. Appendix "C" - Construction drawings to be used for the construction of the Works and Services. Appendix "D" - Non-Refundable Administration Fee and Performance Security. Owner To Do Work 2. The Owner covenants and agrees to construct and provide all the Works and Services listed and shown on Appendices "B" and "C" hereto, as approved by the City, in accordance with the standards contained in the City of Armstrong Subdivision and Development Servicing Bylaw No. 1570. The Owner shall employ only bonded and qualified contractors to carry out and complete the Works and Services. Form M-1/07 SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 159 City of Armstrong SCHEDULE M-1 - Standard Subdivision and Development Agreement Document Transfer of Interest in Works 3. The Owner covenants and agrees with the City to assign, transfer and convey to the City all of its right, title and interest in the Works and Services, upon their completion, (as witnessed by the issuance of a Certificate of Substantial Completion). The Owner will from time to time and at all times so long as it exercises any rights of ownership in the Lands upon request of the City, make, do and execute or cause or procure to be made, done and executed, all such further acts, deeds, right(s)-of-way, easements and assurances for the more effectual carrying out of this Agreement. Permission To Do Work 4. The City covenants and agrees to permit the Owner to construct the Works and Services, including that portion of the Works and Services to be constructed on dedicated highways and other right(s)-of-way controlled by the City; on the terms and conditions herein, and in the manner required by and at the places specified in Appendix "C" of this Agreement and Specifications contained and forming part of the Subdivision and Development Servicing Bylaw No. 1570; provided that nothing in this Agreement shall be construed as an undertaking, promise or covenant on the part of the City to make available the use of or access to the Works and Services for any purpose, and without limiting the foregoing for the purpose of servicing the Lands or any other real property whatsoever either owned or controlled by the Owner or its associates or otherwise, but rather the City reserves the right in its sole and absolute discretion to make available, operate, alter, use, extend, diminish, discontinue, tear up, sell, rent or otherwise dispose of the Works and Services as its Council from time to time deems fit. 5. Completion of Work The Owner shall complete the construction of the Works and Services, specified in Appendix "C" of this Agreement as Project No. _________ of the City, to the satisfaction of the City, within One (1) year from the date of this Agreement. Changes To Bylaws 6. The Owner covenants and agrees to comply with any changes in subdivision requirements or standards enacted by the Subdivision and Development Servicing Bylaw No. 1570 prior to the actual commencement of the Works and Services contemplated by the Agreement. Form M-1/07 SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 160 City of Armstrong SCHEDULE M-1 - Standard Subdivision and Development Agreement Document Design By Professional Engineer 7. The Owner covenants and agrees that all Plans, Specifications and Works and Services required herein shall be prepared, designed, and sealed by a Professional Engineer, who shall be registered with the Association of Professional Engineers and Geoscientists of British Columbia and retained by the Owner as the Owner's Engineer. Plans and specifications for the Works and Services shall be prepared by or under the direct supervision of the Owner's Engineer and all plans shall bear his/her professional seal and signature. Where the estimated cost of the Works and Services exceeds One Hundred Thousand Dollars ($100,000.00) as detailed in Appendix "B" of this Agreement, the Owner covenants and agrees to ensure that the Owner's Engineer maintains professional liability, errors and omissions insurance to a value of $___________ per occurrence during the terms of the Owner's Professional Engineer's engagement. The Owner covenants and agrees to retain the Professional Engineer during the construction period for the purposes of inspection to ensure compliance with the approved design, to ensure sufficient materials testing, and to provide certification of the as-built records. Refer to Schedule O. Engineering Drawings 8. The Owner covenants and agrees that the intent of this Agreement is that the Owner shall construct fully completed Works and Services, and grant all necessary statutory right(s)-of-way as shown in the Drawings and Specifications prepared by: ________________________________________________________________ Under Drawing Nos. _______________________________ _______________________________ _______________________________ _______________________________ _______________________________ _______________________________ and as approved in principle for the purposes of this Agreement by the City of Armstrong Engineer on the _________ day of _______________, 20___. Form M-1/07 SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 161 City of Armstrong SCHEDULE M-1 - Standard Subdivision and Development Agreement Document Changes To Design By City of Armstrong 9. The City Engineer may alter the drawings, because of the conditions at the site, so that the Works and Services function and operate in a manner satisfactory to the City Engineer. Should the Works and Services, as provided herein, prove to be in any way defective or should they not operate to the satisfaction of the City Engineer, then the Owner shall, at his own cost modify and reconstruct the Works and Services so that the Works and Services shall be fully operative and function to the satisfaction of the City Engineer. Start Of Work 10. The Owner covenants and agrees not to commence work until the City Engineer provides the Owner with written permission to proceed with the construction. Substantial Completion 11. A Certificate of Substantial Completion shall be provided by the City Engineer on the completion of the construction of the Works and Services, listing all the deficiencies. This Certificate of Substantial Completion shall not be construed as acceptance of the Works and Services. Substantial Completion shall occur when the Owners Engineer has provided written notice to the City of Armstrong, under seal and signature, that not less than ninety-five (95%) percent of the value of the works and services specified in Appendix 'B' of Schedule M-1 have been completed in accordance with the plans and specifications included in Appendix 'C' of Schedule M-1. Refer to Schedule Q. Certificate Of Completion 12. A Certificate of Completion shall be provided by the City Engineer on the completion of the construction and correction of all deficiencies. Refer to Schedule R. As-Built Submission 13. The Owner covenants and agrees to submit to the City the final as-built/record drawings and records of construction, and test results, as required by the City Engineer, pursuant to Schedule J of the Subdivision and Development Servicing Bylaw No. 1570, within 60 days of the date of the Certificate of Substantial Completion. Form M-1/07 SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 162 City of Armstrong SCHEDULE M-1 - Standard Subdivision and Development Agreement Document Maintenance Period And Responsibility 14. The Owner covenants and agrees to maintain every part of the Works and Services in perfect order and in complete repair for a period of one (1) year from the date shown on the Certificate of Completion in accordance with the requirements of this Agreement and Subdivision and Development Servicing Bylaw No. 1570. Should the Owner, for any reason, fail to maintain when ordered, then the City Engineer, at the Engineer's option, after giving the Owner seven (7) days written notice (or without notice if an emergency or danger to the public exists), may do so, and the whole costs, charges and expenses so incurred by the City will be payable by the Owner, as provided for herein. The decision of the City Engineer will be final with respect to the necessity for repairs, or the adequacy of any work done. Once any water mains covered by this Agreement are connected to the City water system, only City workers or contractors under the direct supervision of the City may undertake work on such water mains. As such, City workers or contractors retained by the City will correct any defects, imperfections, acts of vandalism, settlements and/or rechlorination and flushing of such water mains which is deemed by the City Engineer to be necessary, during the one (1) year period from the date shown on the Certificate of Completion, and the whole of such costs, charges and expenses so incurred by the City in undertaking such work including but not limited to contractor costs will be payable by the Owner as provided for herein. Any rechlorination and flushing work on any water main, or water main break, shall be considered to be "emergency work" and as such the Owner may not receive prior notice that such work is being undertaken by the City. Prior to the release of the Performance Security for the works and services the Owner will deliver to the City a maintenance security in accordance with Subdivision and Development Servicing Bylaw No. 1570. Form M-1/07 SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 163 City of Armstrong SCHEDULE M-1 - Standard Subdivision and Development Agreement Document Certificate Of Final Acceptance 15. The City covenants and agrees that upon satisfactory completion by the Owner of all the covenants and conditions in this Agreement, including the maintenance of the Works and Services in complete repair for a period of one (1) year, to provide the Owner with a Certificate of Final Acceptance of the Works and Services, signed by the City Engineer. Notice of Final Acceptance of the Works and Services will be issued by the City Engineer when all deficiencies have been corrected, as-built drawings and service record cards received, and the maintenance period outlined herein has expired. Refer to Schedule S. All such Works and Services remain at the risk of the Owner until the Certificate of Final Acceptance for the Works and Services has been issued. Final Building Inspection Withheld 16. The Owner acknowledges and agrees that the City will withhold the granting of a Final Inspection for the use of any building or part thereof, constructed upon the Lands until all the Works and Services required herein have been completed to the satisfaction of the City Engineer. Owner Indemnifies City 17. The Owner covenants and agrees to save harmless and indemnify the City against: (a) all actions and proceedings, costs, damages, expenses, claims, and demands whatsoever and by whomsoever brought by reason of the construction, installation, maintenance or repair of the Works and Services; (b) all expenses and costs which may be incurred by reason of the construction, installation, maintenance or repair of the Works and Services resulting in damage to any property owned in whole or in part by the City for which the City by duty or custom is obliged, directly or indirectly, in any way or to any degree, to construct, install, maintain or repair; (c) all expenses and costs which may be incurred by reason of liens for non- payment of labour or materials, WorkSafe BC assessments, Employment Insurance, Canada Pension Plan, Federal and Provincial Tax, Property Reinstatements or encroachments owing to mistakes in survey. Form M-1/07 SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 164 City of Armstrong SCHEDULE M-1 - Standard Subdivision and Development Agreement Document (d) all expenses and costs which may be incurred by the City as a result of faulty workmanship and defective material in any of the Works and Services installed by the Owner. The above sub-clauses shall not be construed as to extinguish any rights which the City would have were it not for the inclusion of this Clause 17 (seventeen) of this Agreement. Insurance Coverage By Owner 18. The Owner covenants and agrees to provide the following insurance coverage, and to provide the City with a copy of the insurance policy prior to the commencement of any construction of the Works and Services. (a) To protect the Owner and the City against all claims arising out of: (i) Death or injury to persons and, (ii) Damage to or loss of any City buildings, structures, stores, equipment and materials included in or required for the carrying out of the Works and Services. (b) Every policy of insurance required shall: (i) Name "THE CITY OF ARMSTRONG" as an 'Additional Insured' and, (ii) State that the policy applies to each insured in the same manner and to the same extent as if a separate policy had been issued to each Insured and, (iii) State that the policy cannot be canceled, lapsed or materially changed without at least thirty (30) days written notice to the City, delivered to the City Engineer. The Owner shall at his sole expense throughout the currency of this Servicing Agreement carry Comprehensive Liability Insurance acceptable to the City of Armstrong in the amount of at least Two Million Dollars ($2,000,000.) with insurance companies licensed to carry on business in the Province of British Columbia in partial discharge of the Owners obligation under Clause 17 (seventeen) of this Agreement. Refer to Schedule V. Form M-1/07 SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 165 City of Armstrong SCHEDULE M-1 - Standard Subdivision and Development Agreement Document WCB Designated Prime Contractor 19. Where the Owner constructs Works and Services on dedicated highways and other right(s)-of-way controlled by the City, on the terms and conditions herein, and in the manner required by and at the places specified in Appendix "C" of this Agreement and Specifications contained and forming part of the Subdivision and Development Servicing Bylaw No. 1570, the Owner shall, seven (7) days prior to the start of the construction works and services, complete and submit to the city, a completed WCB Designated Prime Contractor form. (Appendix E) Performance Security 20. As Security for the due performance of all of the covenants and promises contained in this Agreement, the Owner will on signing this Agreement deposit with the City of Armstrong a Performance Security Deposit, calculated in Appendix 'D' (Item D.2), of this Agreement, in the amount of $____________ in the form of Cash or an Irrevocable Letter of Credit acceptable to the City (herein called the Performance Security). Forefeit Of Performance Security 21. In the event that the Owner fails to construct and install the Works and Services prescribed herein within the time specified in Clause 5 (five) of this Agreement, the said Performance Security of $_________ will be forefeited to the City. Consent To Forfeiture of Performance Security For Deferred Works 22. The Owner acknowledges that construction of the following Works and Services are premature and/or may give rise to risk of public safety and agrees therefore to forefeit the amount of the Performance Security indicated. The City will retain this amount and will use it to construct the said Works and Services at a future time of its choosing. The City will not claim any further compensation from the Owner and the Owner will have no entitlement to return any part of the forefeited amount. Proposed Works and Services Security Amount Forefeited ___________________________ __________________________ ___________________________ __________________________ ___________________________ __________________________ Form M-1/07 SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 166 City of Armstrong SCHEDULE M-1 - Standard Subdivision and Development Agreement Document Use Of Performance Security 23. The Owner agrees that if all the Works and Services or obligations are not completed, installed or performed pursuant to this Agreement, the City may complete or fulfill the Works and Services or obligations at the cost of the Owner and deduct from the Performance Security held by the City the cost of such completion, and the balance of the deposit shall be returned to the Owner, less any additional administration fees or costs incurred. If there is insufficient money on deposit with the City, then the Owner will pay such deficiency to the City immediately upon receipt of the City's bill for completion. It is understood that the City may do such Works and Services either by itself or by contractors employed by the City. If the Works and Services are completed as herein provided, then the deposit shall be returned to the depositor. Release Of Security And Provision Of One Year Maintenance Security 24. If the City Engineer is of the opinion that the Works and Services or any portion thereof have been adequately completed, and the Owner's covenants performed in compliance with this Agreement, and if there is no litigation pending or threatened by any third party against the City as a result of, or arising from, the construction of the Works and Services, the City Engineer may return all, or any portion of the Performance Security to the Owner at such times and in such amounts as the City Engineer may deem proper, provided only that the City Engineer will retain an amount equal to Ten (10%) Percent of the Performance Security Deposit, with a minimum of One Thousand ($1,000.) to secure the performance of the maintenance required of the Owner (hereinafter called the Maintenance Security). Return Of Maintenance Security 25. If at the end of the one (1) year maintenance period the City Engineer is satisfied that the Owner has complied with the covenants contained in this Agreement and if there is no litigation pending or threatened by any third party against the City as a result of, or arising from, the construction of the Works and Services, the City Engineer may direct that the Maintenance Security or any portion thereof, be returned to the Owner and thereinafter the Owner's responsibility for the Works and Services shall cease. Form M-1/07 SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 167 City of Armstrong SCHEDULE M-1 - Standard Subdivision and Development Agreement Document Administration Fee 26. The Owner covenants and agrees to pay to the City a non-refundable administration fee, in the amount calculated in Appendix 'D' (Item D.1), of this Agreement, to cover City administration and processing costs. This administration fee is payable by cash or cheque prior to signing of this Agreement and the commencement of the Works and Services. No Other Representations 27. It is understood and agreed that the City has made no representations, covenants, warranties, guarantees, promises or agreements (verbal or otherwise) with the Owner other than those in this Agreement. Compliance With Bylaws 28. Subject to this Agreement, the proposed Works and Services and the development herein shall comply with all of the Bylaws of the City of Armstrong. No Waiver 29. The Owner covenants and agrees that nothing contained or implied herein shall prejudice or affect the rights and powers of the City in the exercise of its functions under any public and private statues, bylaws, orders and regulations, all of which may be fully and effectively exercised in relation to the said Lands as if the Agreement had not been executed and delivered by the Owner. Notice to Owner 30. Any demand or notice required or permitted to be given under the provisions of this agreement shall be in writing and may be given by mailing such notice by prepaid registered post to the party concerned at the address of such party first above-recited, and any such notice or demand mailed as aforesaid shall be deemed to have been received by the party to whom it is addressed on the second business day after the date of posting thereof. Form M-1/07 SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 168 City of Armstrong SCHEDULE M-1 - Standard Subdivision and Development Agreement Document THIS CONTRACT shall enure to the benefit of and be binding upon the parties hereto, their respective successors and assigns. IN WITNESS WHEREOF the parties hereto have executed this Agreement the day and year first above written. FOR SIGNED, SEALED AND DELIVERED ) The Corporate Seal of ) ) _______________________________ ) ) Was hereunto affixed in the presence of ) ) Signature _______________________ ) ) Name _______________________ ) ) Title _______________________ ) SEAL FOR SIGNED, SEALED AND DELIVERED ) By the above named in the presence ) Of (witness): ) ) Signature _______________________ ) __________________ ) Owner's Signature Name _______________________ ) ) Occupation______________________ ) ) Address _______________________ ) __________________ ) Owner's Signature _______________________ ) FOR THE SIGNED, SEALED AND DELIVERED ) CITY OF The Corporate Seal of the City of ) ARMSTRONG Armstrong was hereunto affixed in ) The presence of: ) ) _____________________________ ) Mayor of the City of Armstrong ) ) ______________________________ ) Administrator of the City of Armstrong ) Form M-1/07 SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 169 City of Armstrong SCHEDULE M-1 - Standard Subdivision and Development Agreement Document APPENDIX "A" A copy of the subdivision plan of the Lands. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 170 City of Armstrong SCHEDULE M-1 - Standard Subdivision and Development Agreement Document APPENDIX "B" A list of the Works and Services and an estimate of their respective construction costs. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 171 City of Armstrong SCHEDULE M-1 - Standard Subdivision and Development Agreement Document APPENDIX "C" Construction drawings to be used for the construction of the Works and Services. SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 172 City of Armstrong SCHEDULE M-1 - Standard Subdivision and Development Agreement Document APPENDIX "D" Non-Refundable Administration Fee and Performance Security Non-Refundable Administration Fee D.1 In accordance with Clause 26 of Subdivision and Development Servicing Bylaw No. 1570 the Owner covenants and agrees to pay the City of Armstrong a non- refundable administration fee to cover City administration and processing costs. the non-refundable administration fee is calculated as follows: Total cost for Construction of Works and Services as per Appendix "B" $ ____________ (B) 3% of the first $500,000.(of B) $____________ 2% of the next $500,000.(of B) $____________ 1% of balance exceeding $1,000,000.(of B) $____________ Total non-refundable administration fee $____________ (Cash or Cheque) Refundable Performance Security D.2 Total cost for Construction of Works and Services as per Appendix "B" $ ____________(B) Performance Security $ ____________(B) X 1.25 = $____________ (Cash or Irrevocable Letter of Credit) Form M-1/07 SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 173 City of Armstrong SCHEDULE M-1 - Standard Subdivision and Development Agreement Document APPENDIX "E" WCB DESIGNATED PRIME CONTRACTOR Designation of Contractor as Prime Contractor for City Project City of Armstrong Information Contract Number: ____________________________________________________________ Description: _________________________________________________________________ Contact Person: _____________________________________________________________ Prime Contractor Information Name of Prime Contractor: _____________________________________________________ Address: ___________________________________________________________________ ___________________________________________________________________________ Phone: ______________________________________________________________ Prime Contractor WCB Account Number: ___________________________________ Person in Charge of Project:____________________________________________________ Person Responsible for Coordinating Health and Safety Activities: ______________________ ___________________________________________________________________________ Prime Contractor's Declaration as per Workers' Compensation Act I/we acknowledge, in accordance with the Workers' Compensation Act (RSBC 1996) Chapter 492, Part 3, Division 3, Sections 115, 116, 117, 118, 119, 120, 121, 122, 123, and 124 that I/we are the "Prime Contractor" and are qualified to act as the "Prime Contractor". I/we accept the duties and responsibilities for coordination of health and safety in accordance with the Workers Compensation Act. And further that I/we will do everything that is reasonably practicable to establish and maintain a system or process that will insure compliance with the Workers Compensation Act and the Occupational Health and Safety Regulations. ___________________________________ Prime Contractor's Signature Date: ___________________________ Form M-1/07 SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 174 City of Armstrong SCHEDULE N - Statutory Right-of-Way Document SCHEDULE N STATUTORY RIGHT-OF-WAY DOCUMENT This is Schedule N of the City of Armstrong Subdivision and Development Servicing Bylaw No. 1570, 2007 ___________________________________ (Clerk) SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 175 City of Armstrong SCHEDULE N - Statutory Right-of-Way Document SCHEDULE N STATUTORY RIGHT-OF-WAY AGREEMENT THIS INDENTURE made this ___________ day of ___________ A.D, 20_____ BETWEEN: (hereinafter call the "Grantor") OF THE FIRST PART AND: THE CORPORATION OF THE CITY OF ARMSTRONG, a body corporate, duly incorporated under the laws of the Province of British Columbia, having an office at 3570 Bridge Street, in the City of Armstrong, Province of British Columbia, V0E 1B0. (hereinafter call the "Grantee") OF THE SECOND PART WHEREAS the Grantor is the registered Owner of, or is entitled to become the registered Owner of, an estate in fee simple of ALL AND SINGULAR those certain parcels or tracts of lands and premises situate, lying and being in the City of Armstrong, in the Province of British Columbia, and being more particularly known and described as: (hereinafter called the "Lands of the Grantor") AND WHEREAS the Grantor and Grantee have agreed to enter into this agreement pursuant to Section 214 of the Land Title Act, RSBC 1996, Chapter 219 and amendments thereto: AND WHEREAS it is necessary for the operation and maintenance of the Grantee's undertaking, hereinafter described, to install and maintain a system of sewerage works, and/or water works, and/or drainage works, and/or gas works including all pipes, valves, fittings, buildings and facilities in connection therewith and/or hydro electric works including all wires, poles, conduits and other facilities in connection therewith: (hereinafter called the "Works") Form N/07 SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 176 City of Armstrong SCHEDULE N - Statutory Right-of-Way Document The Grantor has agreed to permit the construction by the Grantee for the aforementioned works on a portion of the said Land and to grant for that purpose the right-of-way hereinafter described: NOW THEREFORE THIS INDENTURE WITNESSETH that in consideration of the sum of _________________ Dollars ($ ) of lawful money of Canada, now paid by the Grantee to the Grantor (the receipt and sufficiency of which is hereby acknowledged by the Grantor), and in consideration of the covenants and conditions hereinafter contained to be observed and performed by the Grantee and for other valuable consideration: 1.0 THE GRANTOR DOTH HEREBY: 1.01 Grant, convey, confirm and transfer, in perpetuity, unto the Grantee the full, free and uninterrupted right, license, liberty, privilege, permission and right-of-way to lay down, install, construct, entrench, operate, maintain, inspect, alter, remove, replace, bury, cleanse, string and otherwise establish one or more systems of Works upon, over, under and across that part of the Land of the Grantor as shown outlined in heavy black on right-of-way Plan Number: _______ and designated as _____________ . (hereinafter called the "Perpetual Right-of-Way") 1.02 Covenant and agree to and with the Grantee that for the purposes aforesaid and upon, over, under and across the Perpetual Right-of-Way the Grantee shall for itself and its servants, agents, workmen, machinery, vehicles, equipment and materials be entitled at all time to enter, use, pass and repass, labour, construct, erect, install, dig, carry away soil or other surface or subsurface materials, clear of all trees, growth, buildings or obstruction now or hereafter in existence, as may be necessary, useful, or convenient in connection with the operations of the Grantee in relation to the Works; 1.03 Grant, convey, confirm and transfer unto the Grantee for itself and its servants, agents, workman, contractors and all other licensees of the Grantee, together with machinery, vehicles, equipment and materials the right at all reasonable times to enter upon and to pass and repass over such of the Lands of the Grantor as may be reasonably be required for the purpose of ingress to and egress from the Perpetual Right-of-Way; Form N/07 SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 177 City of Armstrong SCHEDULE N - Statutory Right-of-Way Document 1.04 Grant, convey, confirm and transfer unto the Grantee for itself and its servants, agents, workmen, contractors, and all other licensees of the Grantee, together with machinery, vehicles, equipment and materials for a period of _________ days only from the date of this Agreement, the full, free and uninterrupted right, license, liberty, privilege, permission and right-of-way to enter upon, pass and repass, clear, labour, and use for the purpose of ingress to and egress from the Perpetual Right-of-Way and for the purpose of storing machinery, equipment, material or supplies used or to be used in connection with the construction of the Works herein described, and for the purpose of placing or storing the surface or subsurface material to be excavated from the Perpetual Right-of-Way upon and over, but not under that part or parts of the Lands of the Grantor, shown outlined in green on the Right-of-Way Plan Number: ____________ : (hereinafter called the "Working Right-of-Way") Provided always, and it is hereby agreed that nothing herein contained shall permit the Grantee to dig, trench or otherwise disturb the sub-surface of the Working Right-of-Way, and the Grantee shall only clear such trees and growth and interfere and disturb the surface of the Working Right-of-Way in a manner that is reasonably necessary in the conduct of its operations thereon; 2.0 THE GRANTOR HEREBY COVENANTS TO AND AGREES WITH THE GRANTEE, as follows: 2.01 That the Grantor will not, nor permit any other person, to erect, place, install or maintain any building, structure, mobile home, concrete or asphalt driveway or patio, pipe, wire or other conduit on, over or under any portion of the Perpetual Right-of-Way so that it in any way interferes with or damages or prevents access to, or is likely to cause harm to Works authorized hereby to be installed in or upon the Perpetual Right-of-Way. 2.02 That the Grantor will not do nor knowingly permit to be done any act or thing which will interfere with or injure the said Works, and in particular, will not carry out any blasting on or adjacent to the Perpetual Right-of-Way without the consent in writing of the Grantee, provided that such consent shall not be unreasonably withheld; 2.03 That the Grantor will not substantially diminish the soil cover over any of the Works installed in the Perpetual Right-of-Way, and in particular, without in any way limiting the generality of the foregoing, will not construct open drains or ditches along or across any Works installed in the Perpetual Right-of-Way; Form N/07 SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 178 City of Armstrong SCHEDULE N - Statutory Right-of-Way Document 2.04 That the Grantor will from time to time and at all times upon every reasonable request, and at the cost of the Grantee do and execute or cause to be made, done or executed all such further and other lawful acts, deeds, things, devices, conveyances and assurances in law whatsoever for the better, assuring unto the Grantee of the rights hereby granted; 3.0 THE GRANTEE HEREBY COVENANTS TO AND AGREES WITH THE GRANTOR, as follows: 3.01 That the Grantee will not bury any debris or rubbish or any kind in excavations or backfill, and will remove shoring and like temporary structures as backfilling proceeds; 3.02 That the Grantee will thoroughly clean all lands to which it has had access hereunder of all rubbish and construction debris created or placed thereon by the Grantee, and will leave such lands in a neat and clean condition; 3.03 That the Grantee will, as soon as weather and soil conditions permit, and so often as it may exercise its right of entry hereunder to any of the lands of the Grantor, replace the surface soil as nearly as may be reasonably possible to the same condition as it was prior to such entry, in order to restore the natural drainage to such lands; PROVIDED, HOWEVER, that nothing herein contained shall require the Grantee to restore any trees or other surface growth, but the Grantee shall leave such lands in a condition which will not inhibit natural regeneration of such growth; 3.04 That the Grantee will, as far as reasonably possible, carry out all work in a proper and workmanlike manner so as to do as little injury to the Lands of the Grantor as possible; 3.05 That the Grantee will make good at its own expense all damage or disturbance which may be caused to the surface soil of the Lands of the Grantor in the exercise of its rights hereunder: 3.06 That the Grantee will, as far as reasonably possible, restore any fences, lawns, flower beds, at the Grantee's cost as nearly as may be possible to the same condition that they were in prior to any entry by the Grantee upon the Lands. Form N/07 SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 179 City of Armstrong SCHEDULE N - Statutory Right-of-Way Document 4.0 THE PARTIES HERETO EACH HEREBY COVENANT TO AND AGREE WITH THE OTHER, as follows: 4.01 The said Works referred to above, together with all pipes, manholes, valves and conduits, wires, casings, fittings, lines, meters, appliances, facilities, attachments or devices used in connection therewith shall constitute the Works; 4.02 Notwithstanding any rule of law or equity to the contrary, the Works brought on to, set, constructed, laid, erected in, upon or under the Perpetual Right-of-Way by the Grantee shall at all times remain the property of the Grantee, notwithstanding that the same may be annexed or affixed to the freehold and shall at any time and from time to time be removable in whole or in part by the Grantee; 4.03 In the event the Grantee abandons the Works or any part thereof the Grantee may, if it so elects, leave the whole or any part thereof in place; 4.04 That no part of the title in fee simple to the soil shall pass to or be vested in the Grantee under or by virtue of these presents and the Grantor may fully use and enjoy all of the Lands of the Grantor subject only to the rights and restrictions herein contained; 4.05 That the covenants herein contained shall be covenants running with the land and that none of the covenants herein contained shall be personal or binding upon the parties hereto, save and except during the Grantor's seisin or ownership of any interest in the Lands of the Grantor, and with respect only to that portion of the Lands of the Grantor of which the Grantor shall be seised or in which he shall have an interest, but that the Lands of the Grantor, nevertheless, be and remain at all times charged therewith; 4.06 If at the date hereof the Grantor is not the sole registered Owner of the Lands of the Grantor, this agreement shall nevertheless bind the Grantor to the full extent of his interest therein, and if he shall acquire a greater or the entire interest in fee simple this Agreement shall likewise extend to such after-acquired interests; 4.07 Where the expression "Grantor" includes more than one person, all covenants herein on the part of the Grantor shall be construed as being several as well as joint; Form N/07 SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 180 City of Armstrong SCHEDULE N - Statutory Right-of-Way Document 4.08 This agreement shall endure to the benefit of and be binding upon the parties hereto and their respective heirs, administrators, executors, successors and assigns, as the case may be; and wherever the singular or masculine is used, it shall be construed as if the plural or the feminine or neuter, as the case may be, had been used; where the parties of the context hereto so require and the rest of the sentence shall be construed as if the grammatical and terminological changes thereby rendered necessary had been made. IN WITNESS WHEREOF the parties hereto have executed these presents in the manner and on the date hereinafter appearing. THE COMMON SEAL OF THE GRANTOR was hereto ) affixed this ______ day of _________ 20 ___ in the ) presence of: ) ) ____________________________________________ ) Signature of Witness: ) ) SEAL ____________________________________________ ) Address: ) ) ____________________________________________ ) ) ) ____________________________________________ ) Occupation: ) (as to all signatures of the Grantor) ) THE CORPORATE SEAL OF THE CITY OF ARMSTRONG ) was hereunto affixed this _______ day of ______________ ) __________, 20 ____, in the presence of: ) ) _____________________________ ) Mayor of the City of Armstrong ) SEAL ) _____________________________ ) Administrator of the City of Armstrong ) Form N/07 SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 181 City of Armstrong SCHEDULE N - Statutory Right-of-Way Document CONSENT TO GRANT OF RIGHT-OF-WAY KNOW ALL MEN BY THESE PRESENTS THAT ___________________________ is the registered holder of a charge by way of ____________________ against the within- described property, which said charge is registered in the Land Title Office, City of Kamloops, under Numbers _________________________, for and in consideration of the sum of One Dollar ($1.00) paid by the City of Armstrong to the said charge holder (the receipt whereof is hereby acknowledged), agrees with the City of Armstrong, its successors and assigns, that the within Right-of-Way shall be an encumbrance upon the within-described property in priority to the said charge in the same manner and to the same effect as if it had been dated and registered prior to the said charge. IN WITNESS WHEREOF the parties hereto have caused these presents to be signed, sealed and delivered in the presence of its duly authorized officers this ________ day of _____________, 20 _____ . SIGNED, SEALED AND DELIVERED BY THE Grantor ) this _________ day of ________ 20 ___ in the presence of ) ) ) ____________________________________________ ) Signature of Witness: ) ) SEAL ____________________________________________ ) Address: ) ) ____________________________________________ ) ) ____________________________________________ ) Occupation: ) (as to all signatures of the Grantor) ) ) THE CORPORATE SEAL OF THE CITY OF ARMSTRONG ) was hereunto affixed this _______ day of ______________ ) __________, 20 ____, in the presence of: ) ) ) _____________________________ ) Mayor of the City of Armstrong ) SEAL ) _____________________________ ) Administrator of the City of Armstrong ) Form N/07 SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 182 City of Armstrong SCHEDULE N - Statutory Right-of-Way Document LAND TITLE ACT FORM 6 (Section 46) PROOF OF EXECUTION BY CORPORATION I CERTIFY that on the ___________ day of ___________ , 20 ___ at ______________ in British Columbia, _________________ , personally known to me, appeared before me and acknowledged to me that he/she is the authorized signatory of ________________ and that he/she is the person who subscribed his/her name and affixed the Seal of the Corporation to the instrument, that he/she was authorized to subscribe his/her name and affix the Seal to it, and that the Corporation existed at the date the instrument was executed by the Corporation. IN TESTIMONY of which I set my hand at ______________ , British Columbia, this ______________ day of _______________, 20 _____ . _____________________________________________ A Commissioner for Taking Affidavits for British Columbia Form N/07 SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 183 City of Armstrong SCHEDULE O - Confirmation of Commitment by Owner Regarding Design and Field Review of Construction By A Professional Engineer SCHEDULE O CONFIRMATION OF COMMITMENT BY OWNER REGARDING DESIGN AND FIELD REVIEW OF CONSTRUCTION BY A PROFESSIONAL ENGINEER This is Schedule O of the City of Armstrong Subdivision and Development Servicing Bylaw No. 1570, 2007 ___________________________________ (Clerk) SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 184 City of Armstrong SCHEDULE O - Confirmation of Commitment by Owner Regarding Design and Field Review of Construction By A Professional Engineer SCHEDULE O CONFIRMATION OF COMMITMENT BY OWNER REGARDING DESIGN AND FIELD REVIEW OF CONSTRUCTION BY A PROFESSIONAL ENGINEER The City of Armstrong 3570 Bridge Street Armstrong British Columbia V0E 1B0 Attention City Engineer Dear Sir: Re: (Description and Address) of Subdivision or Development I, ________________________ have retained _______________________ as my/our (Owner's Name) (Professional Engineer's Name) Professional Engineer to undertake and/or coordinate and review all associated design criteria and "field reviews" required for this project. It is understood that my/our "Engineer" will take all such steps as regulated under the Provincial Statute for his/her profession and by the definition of "field reviews" herein under set forth, to ascertain that the design will comply and construction of the project will substantially conform in all material respects with the provisions of the City of Armstrong's Subdivision and Development Servicing Bylaw No. 1570, all other amendments thereof, and other applicable permits, Bylaws, Acts and regulations which apply to this project. My/our "Engineer" will also ensure that all work is completed in accordance with the construction drawings approved by the City of Armstrong. My/our "Engineer" will ascertain that only qualified personnel are retained to carry out tests, inspect or carry out design work, detailing or "field reviews". As used herein, "field review" shall mean such reviews of the work at the project site, or at the fabrication locations, where applicable, as the "Engineer", in his/her professional discretion, considers necessary in order to ascertain that the work substantially conforms in all material respects to the plans and supporting documents "accepted" by the City of Armstrong. This will include keeping records of all site visits and any corrective actions taken as a result thereof. Form O/07 SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 185 City of Armstrong SCHEDULE O - Confirmation of Commitment by Owner Regarding Design and Field Review of Construction By A Professional Engineer The undersigned has given a contractual mandate to the "Engineer" to review reports of other testing and inspection agencies and disciplines where necessary, comment on their acceptability, determine the corrective action to take if unacceptable, and maintain a detailed record of every such report and comments thereof. The "Engineer" will automatically submit a monthly summary progress report to the City Engineer, including all field reports, testing results and change orders. The Owner will notify the City Engineer in writing thirty (30) days prior to the intended termination of or by the "Engineer". It is understood that the work on the above project will cease as of the effective date of termination, until such time as a new appointment is made. __________________________________ _______________________________ Witness Name (Print) Owner or Owner's Appointed Agent (Print) __________________________________________ ______________________________________ Witness Signature Owner or Owner's Appointed Agent (Signature) __________________________________________ ______________________________________ Address (Print) Date __________________________________________ ______________________________________ Occupation Title of Agent (if applicable) The Corporate Seal of _______________________________ was hereunto affixed in the presence of: _______________________________ _______________________________ Form O/07 SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 186 City of Armstrong SCHEDULE O - Confirmation of Commitment by Owner Regarding Design and Field Review of Construction By A Professional Engineer The above must be signed by the Owner or his/her appointed Agent. The signature must be witnessed. If the Owner is a company, the corporate seal of the company must be affixed to the document in the presence of it's duly authorized officers. The officers must also sign, setting forth their positions in the company. The "Engineer" acknowledges that he/she has been retained to ascertain that the design will comply and construction of the project will substantially conform in all material respects with the Bylaws as set out above and will submit letter(s) of Professional Design Assurances from others, as needed, for the approval of the subdivision or development. Furthermore, the "Engineer" hereby convenants that their firm presently carries Errors and Omissions insurance in the amount of $ . My/our "Engineer" will upon completion of the work provide a completed "Certificate Of Inspection" form in accordance with Subdivision and Development Servicing Bylaw No. 1570. My/our "Engineer" will further provide upon completion all supporting documentation required by the City of Armstrong to verify conformance of the work. __________________________________ _______________________________ Name of Professional (Print) Signature of Professional Engineer ______________________________________ Date ______________________________________ Mailing Address (Print) ______________________________________ ______________________________________ Phone Form O/07 SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 187 City of Armstrong SCHEDULE P - Certificate of Inspection SCHEDULE P CERTIFICATE OF INSPECTION This is Schedule P of the City of Armstrong Subdivision and Development Servicing Bylaw No. 1570, 2007 ___________________________________ (Clerk) SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 188 City of Armstrong SCHEDULE P - Certificate of Inspection SCHEDULE P CERTIFICATE OF INSPECTION I hereby certify that all engineering and construction services, required under the Subdivision and Development Servicing Bylaw No. 1570 of the City of Armstrong for the subdivision of: LEGAL DESCRIPTION: _______________________________________________ PROJECT NO: _______________________________________________ Which services were designed by: NAME OF FIRM: _______________________________________________ ADDRESS: _______________________________________________ And approved for construction on drawing numbers: Drawing No. Date Drawing No. Date ___________________ __________ ___________________ __________ ___________________ __________ ___________________ __________ ___________________ __________ ___________________ __________ Have been inspected for compliance with this Bylaw 1570 by, or under the direction of,: _____________________________________________________________________ I further certify that the "As-Built/Record" drawings hereby submitted represent the works and services as installed for the aforementioned subdivision and/or Development. Signature and Name of Professional Engineer's Seal Engineer responsible for Design Form P/07 SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 189 City of Armstrong SCHEDULE Q - Certificate of Substantial Completion SCHEDULE Q CERTIFICATE OF SUBSTANTIAL COMPLETION This is Schedule Q of the City of Armstrong Subdivision and Development Servicing Bylaw No. 1570, 2007 ___________________________________ (Clerk) SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 190 City of Armstrong SCHEDULE Q - Certificate of Substantial Completion SCHEDULE Q CERTIFICATE OF SUBSTANTIAL COMPLETION OWNER: ____________________________________ CONTRACTOR: ____________________________________ PROJECT NO: ____________________________________ FILE NO: ____________________________________ SERVICING AGREEMENT NO.: ____________________________________ DATE: ____________________________________ This certificate is issued pursuant to Schedule "B" Part 1, Clause 1.8 of the Subdivision and Development Servicing Bylaw No. 1570 and applies to the following Works and Services: Roads and Civil Works Ƒ Sanitary Sewer System Ƒ Drainage and Storm Sewer Works Ƒ Waterworks System Ƒ The Maintenance Period for the Works & Services will begin on _________________ The Maintenance Period for the Works & Services will end on _________________ The Certificate of Completion will be issued when all deficiencies have been corrected. The Certificate of Final Acceptance will be issued when the maintenance period expires and all deficiencies that have arisen over the maintenance period have been corrected, and the City Engineer has been satisfied all conditions of the Servicing and Development Agreement have been fulfilled. This Certificate has been made to the best of the City Engineer's knowledge, information and belief. It does not constitute acceptance of any work not in accordance with the requirements of the Subdivision and Development Servicing Bylaw No. 1570, and not listed as a deficiency herein, whether or not such defect(s) could have been observed or discovered during construction. The following is a List of Deficiencies related to the Work: ________________________________ ______________________________ ________________________________ ______________________________ ______________________________ City of Engineer Form Q/07 SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 191 City of Armstrong SCHEDULE R - Certificate of Completion SCHEDULE R CERTIFICATE OF COMPLETION This is Schedule R of the City of Armstrong Subdivision and Development Servicing Bylaw No. 1570, 2007 ___________________________________ (Clerk) SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 192 City of Armstrong SCHEDULE R - Certificate of Completion SCHEDULE R CERTIFICATE OF COMPLETION OWNER: ____________________________________ CONTRACTOR: ____________________________________ PROJECT NO: ____________________________________ FILE NO: ____________________________________ LOCATION.: ____________________________________ DATE: ____________________________________ The final construction inspection was held on ______________________ and all deficient Items have been addressed to City of Armstrong satisfaction. I _______________________, Professional Engineer of __________________ hereby certify that all works and services reflect City of Armstrong standards and specifications, and that all works and services have been completed in accordance with the approved construction design drawings. The City of Armstrong's acknowledgment of this certificate does not represent acceptance of the work, nor shall this act by the City of Armstrong prejudice any requirements of the agreement with the Owner, nor operate to relieve the Owner of any of his/her responsibilities thereunder. ______________________________ Owner ______________________________ Professional Engineer ______________________________ City of Engineer Form R/07 SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 193 City of Armstrong SCHEDULE S - Certificate of Final Acceptance SCHEDULE S CERTIFICATE OF FINAL ACCEPTANCE This is Schedule S of the City of Armstrong Subdivision and Development Servicing Bylaw No. 1570, 2007 ___________________________________ (Clerk) SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 194 City of Armstrong SCHEDULE S - Certificate of Final Acceptance SCHEDULE S CERTIFICATE OF FINAL ACCEPTANCE OWNER: ____________________________________ CONTRACTOR: ____________________________________ PROJECT NO: ____________________________________ FILE NO: ____________________________________ SERVICING AGREEMENT NO.: ____________________________________ DATE: ____________________________________ All deficiencies, defects or faults in the Works and Services observed or discovered within the period preceding the date of this Certificate have been rectified, this Certificate is issued pursuant to the referenced Subdivision and Development Servicing Bylaw No. 1570. This Certificate has been made to the best of the City Engineer's knowledge, information and belief. It does not constitute acceptance of any work not in accordance with the requirements of the Subdivision and Development Servicing Agreement, whether or not such defect(s) could have been observed during construction. ______________________________ City of Engineer cc: Owner Form S/07 SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 195 City of Armstrong SCHEDULE T - Agreement to Pay Non-Refundable Deposit SCHEDULE T AGREEMENT TO PAY NON-REFUNDABLE DEPOSIT This is Schedule T of the City of Armstrong Subdivision and Development Servicing Bylaw No. 1570, 2007 ___________________________________ (Clerk) SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 196 City of Armstrong SCHEDULE T - Agreement to Pay Non-Refundable Deposit SCHEDULE T AGREEMENT TO PAY NON-REFUNDABLE DEPOSIT I, (NAME) _________________________________________________________ (Owner) ADDRESS: _________________________________________________________ Agree to pay the amount of $_____________________ as a non-refundable deposit towards the installation described as: This payment is made pursuant to Clause 7.01 of Subdivision and Servicing Bylaw No. 1570, and is made in lieu of construction of the Works and Services as itemized on the attached form identified as "Estimate of Non-Refundable Deposit". This payment is made as full compensation for the itemized works and services and fulfills all the requirements of the Subdivision and Development Servicing Bylaw No. 1570. FOR SIGNED, SEALED AND DELIVERED ) CORPORATE The Corporation Seal of ) BODY Was hereunto affixed in the presence of ) SEAL ) Signature: ___________________________________ ) ) Title __________________________________ ) FOR SIGNED, SEALED AND DELIVERED ) PRIVATE By the above named in the presence ) INDIVIDUAL Of (witness) ) ) Signature ___________________________________ ) (Witness) ) Name: ___________________________________ ) ________________ ) Owner's Signature Address: ___________________________________ ) ) ___________________________________ ) FOR THE CITY SIGNED, SEALED AND DELIVERED ) OF ARMSTRONG The Corporate Seal of the City of Armstrong ) was hereunto fixed in the presence of ) SEAL ) Mayor: ___________________________________ ) ) Administrator ____________________________ ) Form T/07 SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 197 City of Armstrong SCHEDULE U - Cost Sharing Agreement SCHEDULE U COST SHARING AGREEMENT This is Schedule U of the City of Armstrong Subdivision and Development Servicing Bylaw No. 1570, 2007 ___________________________________ (Clerk) SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 198 City of Armstrong SCHEDULE U - Cost Sharing Agreement SCHEDULE U COST SHARING AGREEMENT BETWEEN CITY OF ARMSTRONG (City) and NAME _________________________________________________________ (Owner) ADDRESS: _________________________________________________________ The City agrees to pay up to the amount of $______________________ towards the installation described as: 1. It is agreed between the parties to this agreement that the above amount paid by the City shall be full compensation for the excess or extended services under Section 939 of the Local Government Act required by the City and that all costs associated in any way whatsoever with this installation which are in excess of the above amount shall be the full responsibility of the Owner to pay. 2. It is further agreed that the above amount will be paid as follows: (a) Upon issuance of substantial completion $________________ (b) Upon receipt of all "Record Drawings" $________________ 3. It is agreed that it is the sole responsibility of the Owner/Developer to arrange for the design and installation of the works according to City requirements. FOR SIGNED, SEALED AND DELIVERED ) CORPORATE The Corporation Seal of ) BODY Was hereunto affixed in the presence of ) SEAL ) Signature: ___________________________________ ) ) Title __________________________________ ) FOR SIGNED, SEALED AND DELIVERED ) PRIVATE By the above named in the presence ) INDIVIDUAL Of (witness) ) Signature ___________________________________ ) (Witness) ) Name: ___________________________________ ) ________________ ) Owner's Signature Address: ___________________________________ ) FOR THE CITY SIGNED, SEALED AND DELIVERED ) OF ARMSTRONG The Corporate Seal of the City of Armstrong ) was hereunto fixed in the presence of ) SEAL ) Mayor: ___________________________________ ) ) Administrator ____________________________ ) Form U/07 SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 199 City of Armstrong SCHEDULE V - Insurance Certificate SCHEDULE V INSURANCE CERTIFICATE This is Schedule V of the City of Armstrong Subdivision and Development Servicing Bylaw No. 1570, 2007 ___________________________________ (Clerk) SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 200 City of Armstrong SCHEDULE V - Insurance Certificate SCHEDULE V INSURANCE CERTIFICATE OWNER: ____________________________________ PROJECT NO: ____________________________________ INSURANCE POLICY NO.: ____________________________________ DATE: ____________________________________ PURSUANT TO the Standard Subdivision and Development Agreement Document (Form M-1), the Owner is required to obtain and maintain in force during the term of the Agreement Document, an insurance policy acceptable to the City of Armstrong. I hereby certify that the attached insurance policy provides insurance coverage as required pursuant to Clause 18 of the Agreement Document between the City of Armstrong and the Owner and that the attached insurance policy is valid for the one (1) year term of the Agreement Document (Schedule M-1, Standard Subdivision and Development Agreement Document). Certified by: Authorized Insurance Agent: ____________________________________ Company: ____________________________________ Address: ____________________________________ ____________________________________ Form V/07 SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 201 City of Armstrong SCHEDULE V - Insurance Certificate SCHEDULE V INSURANCE CERTIFICATE Insurance Coverage By Owner 18. The Owner covenants and agrees to provide the following insurance coverage, and to provide the City with a copy of the insurance policy prior to the commencement of any construction of the Works and Services. (a) To protect the Owner and the City against all claims arising out of: (i) Death or injury to persons; and (ii) Damage to or loss of any City buildings, structures, stores, equipment and materials included in or required for the carrying out of the Works and Services. (b) Every policy of insurance required shall: (i) Name "THE CITY OF ARMSTRONG" as an 'Additional Insured'; and (ii) State that the policy applies to each insured in the same manner and to the same extent as if a separate policy had been issued to each Insured; and (iii) State that the policy cannot be canceled, lapsed or materially changed without at least thirty (30) days written notice to the City, delivered to the City Engineer. The Owner shall at his sole expense throughout the currency of this Servicing Agreement carry Comprehensive Liability Insurance acceptable to the City of Armstrong in the amount of at least Two Million Dollars ($2,000,000.) with insurance companies licensed to carry on business in the Province of British Columbia in partial discharge of the Owners obligation under Clause 17 (seventeen) of the Subdivision and Development Servicing Agreement. Form V/07 SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 202 City of Armstrong SCHEDULE W - Letter of Credit SCHEDULE W LETTER OF CREDIT This is Schedule W of the City of Armstrong Subdivision and Development Servicing Bylaw No. 1570, 2007 ___________________________________ (Clerk) SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 203 City of Armstrong SCHEDULE W - Letter of Credit SCHEDULE W LETTER OF CREDIT (To Be On Bank Letterhead) Letter of Credit No.:___________________ Amount $__________________ Initial Expiry Date: ___________________ CITY OF ARMSTRONG 3570 BRIDGE STREET P.O. BOX 40 ARMSTRONG, B.C. V0E 1B0 WE HEREBY AUTHORIZE YOU TO DRAW ON THE (name and address of bank) for account of (name of Owner/Developer) UP TO AN AGGREGATE AMOUNT OF (dollars in writing and in numbers) available on demand. PURSUANT TO THE REQUEST OF our customer, (name of Owner), we the (name of bank) hereby establish and give you an Irrevocable Letter of Credit in you favour in the above amount which may be drawn on by you at any time and from time to time, upon written demand for payment made upon us by you, which demand we shall honour without enquiring whether you have the right as between yourself and the said customer to make such demand, and without recognizing any claim of our said customer, or objection by it to payment by us. THE LETTER OF CREDIT we understand relates to those services and financial obligations set out in an agreement between the customer and the CITY OF ARMSTRONG and referred to as (description of agreement and works and services covered). THE AMOUNT of this Letter of Credit will continue in force for a period of one year, but shall be subject to the condition hereinafter set forth. IT IS A CONDITION of this Letter of Credit that it shall be deemed to be automatically extended without amendment from year to year from the present or any future expiration date hereof, unless at least thirty (30) days prior to the present or any future expiration date, we notify you in writing by registered mail that we elect not to consider this Letter of Credit to be renewable for any additional period. DATED at ____________________ , British Columbia this ________ day of _______, 20___ COUNTERSIGNED BY: _______________________________________ (name of bank) per: Form W/07 SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 204 City of Armstrong SCHEDULE X - Flushing / Testing / Disinfection Report SCHEDULE X FLUSHING / TESTING / DISINFECTION REPORT This is Schedule X of the City of Armstrong Subdivision and Development Servicing Bylaw No. 1570, 2007 ___________________________________ (Clerk) SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 205 City of Armstrong SCHEDULE X - Flushing / Testing / Disinfection Report SCHEDULE X FLUSHING / TESTING / DISINFECTION REPORT PROJECT: _______________________________ DATE: LOCATION: _______________________________ FILE #: DESCRIPTION: FLUSHING: Water Source: ______________ Minimum flushing volume (Pipe Volume x 3): Estimate flow rate: Estimated flow time required Flushing completed: PRESSURE TEST: Allowable leakage = NDP½/(65000)(2Hr) N = Number of pipe joints =_______ D = Nominal diameter of pipe (mm) = Static Pressure: _____ kPa P = Average test pressure during leakage test = [1.5 x Static Pressure (Minimum = 1,380 kPa (200 psi)] Allowable leakage calculated _______________ Start time: _________ End time Test leakage recorded: _________________ Pass: ______ Fail: ________ _____________________________________________________________________ DISINFECTION: Chlorine Source: Calculated dosage: Background residual Start time Starting residual End time End residual Chlorine flushed: 24 Hour stand time start: End _____________________________________________________________________ BACTERIOLOGICAL TEST: Sample Date: Time: Testing Laboratory: Number of Samples Required: Sample(s) collected by: Test Results: Pass Fail (Copy of Laboratory Results Attached) Testing/Flushing points removed at Corporation Stop Form X/07 SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 206 City of Armstrong SCHEDULE X - Flushing / Testing / Disinfection Report SCHEDULE X FLUSHING / TESTING / DISINFECTION REPORT _____________________________________________________________________ PROFESSIONAL ENGINEERS CERTIFICATION: I hereby certify that all flushing, disinfection and testing has been completed in accordance with the requirements of Subdivision and Development Servicing Bylaw No. 1570. ______________________________ ______________________________ Signature and name of the Professional Engineer responsible for design Engineer's Seal _____________________________________________________________________ CITY CONNECTION APPROVAL _________________ ________________________ Date City Engineer Form X/07 SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 207 City of Armstrong SCHEDULE Y - Fire Hydrant Flow Test Procedure and Report SCHEDULE Y FIRE HYDRANT FLOW TEST PROCEDURE AND REPORT This is Schedule Y of the City of Armstrong Subdivision and Development Servicing Bylaw No. 1570, 2007 ___________________________________ (Clerk) SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 208 City of Armstrong SCHEDULE Y - Fire Hydrant Flow Test Procedure and Report SCHEDULE Y FIRE HYDRANT FLOW TEST PROCEDURE AND REPORT Location: __________________________________________________________ Date: _____________________ Time: _________________ 1. Tested By: ________________ Pressure Zone: _______________ 2. Map Reference No. ___________________________ 3. Location of Flow Hydrant: ______________________ 4. Gauge Hydrant #1 Location: ____________________ 5. Gauge Hydrant #2 Location _____________________ 6. Gauge Hydrant #3 Location _____________________ FLOW TEST RESULTS One Port Open One Port Open Flow Hyd. Gauge Hyd.#1 Gauge Hyd.#2 Gauge Hyd.#3 Flow Hyd. Gauge Hyd.#1 Gauge Hyd.#2 Gauge Hyd.#3 Date/Time: System static pressure prior to start of flow test (PSI) Pitot Pressure (PPSI) Residual pressure after Flow Hydrant Opened (PSI) Flow Recorded @ Flow Hydrant (USGPM) Discharge Port Diameter (in) Discharge Coefficient Mainline W/M dia @ Flow Hydrant (in) The flow hydrant must be located downstream of the gauge hydrant, so that the source of water is flowing past the gauge hydrant to the flow hydrant. Note: A pressure drop of 25% from the static pressure is required in the pitot pressure to obtain a valid hydrant flow test. Note: All flow tests shall be undertaken in general conformance with the Fire Underwriters Survey recommended test procedures. Form Y/07 SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 209 City of Armstrong SCHEDULE Y - Fire Hydrant Flow Test Procedure and Report SCHEDULE Y FIRE HYDRANT FLOW TEST PROCEDURE AND REPORT Test Date: _________________ Test Time: _________________ Gauge Hydrant: Flow Test #1 Flow Test #2 HYDRANT NUMBER _________________ HYDRANT LOCATION _________________ STATIC PRESSURE _______ psi 0 psi RESIDUAL PRESSURE: _______ psi _______ psi Flow Hydrant: HYDRANT NUMBER _________________ HYDRANT LOCATION _________________ STATIC PRESSURE _______ psi 0 psi PITOT GAUGE READING (PRESSURE) _______ psi _______ psi FLOW OPENING DIAMETER: 2.5 inches 2.5 inches NUMBER OF PORTS OPEN 1 ports 2 ports NFPA Section 2.3: DROP IN PRESSURE >25% FOR VALID TEST _______ 0% FLOW CALCULATIONS G = 24.84 x D2 x C x P½ G = FLOW IN igpm D = NOZZLE DIAMETER IN INCHES P = PITOT GAUGE READING IN PSI C = COEFFICIENT (USUALLY 0.9 FOR FULL FLOW) Q(r) = Q(f) x (H(r) /H(f))0.54 Q(r) = COMPUTED DISCHARGE AT THE SPECIFIED RESIDUAL PRESSURE IN igpm Q(f) = TOTAL DISCHARGE DURING TEST IN igpm H(r) = DROP IN PRESSURE FROM INITIAL VALUE (STATIC PRESSURE AT GAUGE HYDRANT) TO SPECIFIED RESIDUAL IN psi H(f) = PRESSURE DROP DURING TEST IN psi Flow Test Flow Test # 1 # 2 CALCULATED FLOW AT FLOW HYDRANT ______ igpm ________ igpm THEORETICAL FLOW AT FLOW AT A DESIRED RESIDUAL PRESSURE 20 psi ______ igpm ________ igpm Based on this hydrant flow test, and background demand at time of the test, the theoretical flow at Hydrant No. ______ is _____ igpm at a residual pressure of 20 psi. Form Y/07 SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 210 City of Armstrong SCHEDULE Z - Signed Release SCHEDULE Z SIGNED RELEASE This is Schedule Z of the City of Armstrong Subdivision and Development Servicing Bylaw No. 1570, 2007 ___________________________________ (Clerk) SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 211 City of Armstrong SCHEDULE Z - Signed Release SCHEDULE Z SIGNED RELEASE To Property Owner of: Your signature indicates that you are completely satisfied with the work done in the restoration of your property. Property Owner: __________________________ __________________________ Print Signature Street Address: ________________________________________________________ Legal Description: ______________________________________________________ Date: ________________________________________________________________ Form Z/07