CITY OF ARMSTRONG
SUBDIVISION AND DEVELOPMENT
SERVICING BYLAW NO. 1570
2007
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 1
City of Armstrong
City of Armstrong
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
AMENDMENTS
BYLAW NO.
ADOPTION
AMENDMENT
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 2
City of Armstrong
Table of Contents
City of Armstrong
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
Table of Contents
BYLAW:
SECTION 1 - Title
P - 4
SECTION 2 - Interpretation
P - 5
SECTION 3 - Subdivision and Development Requirements and Regulations
P - 9
SECTION 4 - Provision of Services in Subdivisions and Developments
P - 10
SECTION 5 - Servicing Requirements for Subdivisions under Land Title Act
P - 17
SECTION 6 - Servicing Requirements for Developments not Requiring
Subdivision
P - 19
SECTION 7 - Servicing Requirements for Highways Abutting a Site being
Subdivided or Developed
P - 21
SECTION 8 - Administration and Enforcement
P - 25
SECTION 9 - Enactment
P - 29
SCHEDULES:
TITLE
SCHEDULE A
Level of Service
P - 30
SCHEDULE B
Regulations, Standards and Specifications For The Design
and Construction of Highways
P - 36
SCHEDULE C
Regulations, Standards and Specifications For The Design
and Construction of Water Systems
P - 49
SCHEDULE D
Regulations, Standards and Specifications For The Design
and Construction of Sanitary Sewers
P - 60
SCHEDULE E
Regulations, Standards and Specifications For The Design
and Construction of Drainage Systems
P - 69
SCHEDULE F
Regulations, Standards and Specifications For The Design
and Construction of Concrete Curbs, Gutters, Sidewalk,
Stairs
P - 78
SCHEDULE G
Regulations, Standards and Specifications For The Design
and Construction of Street Lighting
P - 82
SCHEDULE H
Regulations, Standards and Specifications For The Design
and Construction of Hydro, Telephone, Gas, CATV
P - 86
SCHEDULE I
Regulations, Standards and Specifications For The Design
and Construction of Landscaping
P - 89
SCHEDULE J
Specification Drawings
P - 92
SCHEDULE K
Regulations, Standards and Specifications For Surveys
and Design Drawings
P - 97
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 3
City of Armstrong
Table of Contents
SCHEDULES:
TITLE
SCHEDULE L
Materials, Construction, Testing Specifications
P - 106
SCHEDULE M
Application for Preliminary Layout Review
P - 153
SCHEDULE M-1 Standard Subdivision / Development Agreement Document P - 156
SCHEDULE N
Statutory Right-of-Way Document
P - 174
SCHEDULE O
Confirmation of Commitment by Owner Regarding Design
and Field Review of Construction By A Professional
Engineer
P - 183
SCHEDULE P
Certificate of Inspection
P - 187
SCHEDULE Q
Certificate of Substantial Completion
P - 189
SCHEDULE R
Certificate of Completion
P - 191
SCHEDULE S
Certificate of Final Acceptance
P - 193
SCHEDULE T
Agreement to Pay Non-Refundable Deposit
P - 195
SCHEDULE U
Cost Sharing Agreement
P - 197
SCHEDULE V
Insurance Certificate
P - 199
SCHEDULE W
Letter of Credit
P - 202
SCHEDULE X
Flushing / Testing / Disinfection Report
P - 204
SCHEDULE Y
Fire Hydrant Flow Test Procedure and Report
P - 207
SCHEDULE Z
Signed Release
P - 210
FORMS
Form M/07
Application for Preliminary Layout Review
P - 153
Form M-1/07
Standard Subdivision / Development Agreement Document P - 156
Form N/07
Statutory Right-of-Way Document
P - 174
Form O/07
Confirmation of Commitment by Owner Regarding Design
and Field Review of Construction By A Professional
Engineer
P - 183
Form P/07
Certificate of Inspection
P - 187
Form Q/07
Certificate of Substantial Completion
P - 189
Form R/07
Certificate of Completion
P - 191
Form S/07
Certificate of Final Acceptance
P - 193
Form T/07
Agreement to Pay Non-Refundable Deposit
P - 195
Form U/07
Cost Sharing Agreement
P - 197
Form V/07
Insurance Certificate
P - 199
Form W/07
Letter of Credit
P - 202
Form X/07
Flushing / Testing / Disinfection Report
P - 204
Form Y/07
Fire Hydrant Flow Test Procedure and Report
P - 207
Form Z/07
Signed Release
P - 210
SPECIFICATION DRAWINGS
Schedule J
Table of Contents
P - 92
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 4
City of Armstrong
SECTION 1 - Title
City of Armstrong
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
A Bylaw to Regulate the Subdivision and Development of Land.
WHEREAS a Municipality may by Bylaw regulate the Subdivision and
Development of land (currently pursuant to Part 26, Division 9 and 11 of the Local
Government Act);
AND WHEREAS it is deemed desirable to regulate the subdivision and
development of land in order to promote the orderly and economic development of the
City;
AND WHEREAS the City of Armstrong wishes to amend the provisions of the
present Subdivision and Development Servicing Bylaw No. 1169, 1994;
NOW THEREFORE, the Council of the City of Armstrong, in open meeting
assembled, ENACTS AS FOLLOWS:
SECTION 1 - TITLE
This Bylaw may be cited as the "City of Armstrong Subdivision and Development
Servicing Bylaw No. 1570, 2007".
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 5
City of Armstrong
SECTION 2 - Interpretation
SECTION 2 - INTERPRETATION
In this Bylaw, unless the context requires otherwise:
"Act" means Local Government Act, Land Title Act, Health Act, and any other Act
named in this Bylaw and found in the revised Statutes of British Columbia, 1996, as
amended from time to time both before and after the date of this Bylaw.
"Applicant" means a person, duly authorized by the Owner of the property proposed to
be subdivided or developed, to act as agent for the Owner.
"Approval, Final" means the Approving Officer's affixation of his/her signature to the
subdivision plan pursuant to Section 88 of the Land Title Act.
"Approval, Preliminary Layout" means written notification of a review of information
presented to the Approving Officer previous to submission of a subdivision plan for final
approval.
"Approving Officer" means the person duly authorized by Council to act as Approving
Officer under Section 77 of the Land Title Act and includes a Deputy Approving Officer.
"As-Built/Record Drawing" means revised design drawings, prepared by or under the
supervision of a Professional Engineer, which accurately detail the location of the final
constructed works.
"Boulevard" means that area between the parcel line of the adjoining property and the
traveled portion of a street or highway but does not include curbs, gutters, sidewalks, or
driveways.
"Building Inspector" means the Building Inspector duly authorized by Council to act
on behalf of the City of Armstrong.
"Building Regulations" means the Building Regulations adopted by Council for
application in the City of Armstrong.
"City Engineer" means the Engineer, or Designate, of the City of Armstrong appointed
as such by the City Council of Armstrong.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 6
City of Armstrong
SECTION 2 - Interpretation
"Contractor" means a company, firm, or employee, bound by a legal contract with the
Owner(s) to complete the Works and Services required for the Subdivision or
Development.
"Council" means the City Council of the City of Armstrong.
"Cul-de-sac" means a street or highway with only one point of intersection with another
street or highway and which terminates in a vehicle-turning area and is designated to be
permanently closed to thru traffic except for a lane or walkway, by the pattern of the
subdivision.
"Development" means an activity that requires a Building Permit or an activity that
alters the existing surficial characteristics of the land.
"Frontage" means the length of a lot boundary which immediately adjoins a street or
highway other than a lane or a walkway.
"Highway" means a street, road, lane, walkway, bridge, viaduct, and any other way
open to public use. Except for highways created under Section 4 of the Highways Act,
the width of a highway is measured from lot line to lot line. A highway does not include
private easements on private property.
"Highway, Arterial" means a street used primarily by fast or heavy traffic of which a
significant portion has both its origin and destination outside of the subdivision area.
"Highway, Collector" means a street which carries traffic from local streets to arterial
streets and includes the principal entrance streets for circulation of traffic within such a
subdivision.
"Highway, Local" means a street used primarily for travel and access to and from the
parcels of land contiguous thereto.
"Irrigation District" means and Irrigation District incorporated under the Local
Government Act or in the Water Act.
"Lane" means a public thoroughfare which affords only secondary means of access to
a lot at the side or rear and is not to be considered a partial street.
"Lot" means an area of land, or lands, designated as a separate, distinct parcel on a
legally recorded subdivision plan or description filed in the Land Title Office, and having
a principal frontage upon a public street or road.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 7
City of Armstrong
SECTION 2 - Interpretation
"Lot Line" means a legally defined boundary of any lot.
"Lot Depth" means the shortest horizontal distance between the front and rear lot lines.
"Lot Width" means the horizontal distance between the side lot lines measured at right
angles to the lot depth.
"Medical Health Officer" means the Medical Health Officer appointed under the Health
Act.
"Municipality" means the City of Armstrong or the area within the city boundaries
thereof as the context may require.
"Owner(s)" means the person or persons registered in the Land Title Office as the
Owner(s) of the parcel of land for which application is being made for subdivision or
development.
"Owner's Engineer" means the Professional Engineer engaged by the Owner to
design and prepare drawings for construction of works in a subdivision or development
and to issue a Certificate of Inspection.
"Potable Water" means water which is approved for drinking purposes by the Medical
Health Officer.
"Professional Engineer" means a person who is registered or duly licensed as such
under the provisions of the Engineers and Geoscientists Act of British Columbia.
"Proven Supply" means that a supply of potable water is available and proven with
respect to volume, delivery and continuity of supply from an on-site groundwater
system, a source requiring a water license from the Ministry of Environment, or a
community water system.
"Roadway" means the portion of the highway that is improved, designed or ordinarily
used for vehicular traffic.
"Service Level" means the standard of municipal services required for the
development of subdivisions and other developments not requiring subdivision under
the provisions of this Bylaw.
"Street" means a highway except a lane, trail, or walkway.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 8
City of Armstrong
SECTION 2 - Interpretation
"Subdivision" means any change in the existing size, shape, number or arrangement
of registered lots, whether or not involving the creation of a greater number of lots than
existing and whether carried out by plan or metes and bounds description.
Consolidation of existing lots and subdivisions and developments carried out under the
provisions of the Strata Property Act shall be included within this definition.
"Top of Slope, Embankment or Escarpment" means the natural defined top edge of
a slope, embankment or escarpment, or, where a gradual steepening exists, the point at
which the slope exceeds 30% grade.
"Walkway" means a highway intended to carry pedestrian and non-motorized traffic.
"Watercourse" means any natural or man-made drainage course or source of water,
whether usually containing water or not, and includes any lake, river, creek, spring,
ravine, swamp, gulch, or source of ground water, whether enclosed in a conduit or not,
or as required by a designated official of the Ministry of Environment of the Province of
British Columbia.
"Works and Services" means any public or private service, facility, or utility which is
required by this Bylaw and without restricting the generality of the foregoing includes:
the supply and distribution of water, including fire hydrants, the collection and disposal
of sewage, the collection and disposal of storm/drainage water, street lighting,
dedicated and constructed highways including asphalt concrete pavement surface, curb
& gutter, landscaping, sidewalks, stairs, fences, boulevards, pavement markings,
signage, street trees, planters, boulevard irrigation, park benches, mail boxes, the
supply and installation of electrical power, telephone, natural gas, and cable television.
"Zone" means an area created by the Zoning Bylaw of the City of Armstrong as
amended or as replaced from time to time both before and after the effective date of this
Bylaw.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 9
City of Armstrong
SECTION 3 - Subdivision and Development Requirements and Regulations
SECTION 3 - SUBDIVISION AND DEVELOPMENT REQUIREMENTS AND
REGULATIONS
Compliance with Bylaw
3.01
No person shall subdivide or undertake subdivision or development of land
in the City of Armstrong except in compliance with the provisions of this
Bylaw.
General Requirements for Design of Subdivisions
3.02
No subdivision of land shall be approved which:
a)
is not suited to the configuration of land being subdivided,
b)
is not suited to the use to which it is intended, or
c)
will make impracticable the future subdivision of the land within the
proposed subdivision or of any adjacent land.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 10
City of Armstrong
SECTION 4 - Provision of Services in Subdivisions and Developments
SECTION 4 - PROVISION OF SERVICES IN SUBDIVISIONS AND DEVELOPMENTS
Level of Service
4.01
Unless otherwise approved by a Development Variance Permit issued by
the Council pursuant to Section 922 of the Local Government Act, all
subdivisions, strata developments, and developments shall be provided
with services as prescribed in Schedule A of this Bylaw and the level of
services required may be different for different zones as established by
the Zoning Bylaw in accordance with the provisions of Schedule A of this
Bylaw.
Subdivisions Where Servicing Requirements May Be Waived
4.02
a)
Notwithstanding Subsection 4.01 of this Section, the servicing
requirements prescribed in Schedule A of this Bylaw may be
waived, by the Approving Officer where the lot created is to be used
solely for the unattended equipment necessary for the operation of:
i)
a community water system,
ii)
a community sewer system,
iii)
a community gas distribution system,
iv)
a community radio or television receiving antennae,
v)
a radio or television broadcasting antenna,
vi)
a telecommunications relay station,
vii)
an automatic telephone exchange,
viii)
an air or marine navigational aid,
ix)
electrical substations or generating stations, or,
x)
any other similar public service or quasi public service facility
or utility.
b)
Notwithstanding Subsection 4.01 of this section, the servicing
requirements prescribed in Schedule A pertaining to provision of
community sanitary sewer systems, community water supply
systems, or storm sewer systems, may be waived provided that all
of the following conditions are met:
i)
the maximum width of the lot after subdivision shall be 60
metres and the minimum lot area after subdivision shall be
5,000 square metres,
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 11
City of Armstrong
SECTION 4 - Provision of Services in Subdivisions and Developments
ii)
the subdivision will not create new highways other than
widening of existing highways,
iii)
the parcel to be subdivided does not adjoin a highway or
easement that contains one or more of the following
services:
-
sanitary sewer,
-
water,
-
storm sewer.
Expense of Services To Be Borne By Owner
4.03
Unless otherwise provided in this Bylaw, all works and services required
in this Bylaw shall be constructed and installed at the expense of the
Owner.
Bonding and Development Agreement Required
4.04
All works and services to be constructed and installed to serve any
proposed subdivision of any lands shall be constructed and installed as
prescribed in Schedules A to H hereto at the expense of the Owner prior
to the approval of such subdivision by the Approving Officer. A plan of
subdivision may be finally approved prior to the completion of the
construction and installation of the required works and services where the
Owner deposits a bond with the City of Armstrong in the amount of One
Hundred and Twenty-Five Percent (125%) of the cost of installing and
paying for all the works and services required as estimated by the
Approving Officer before the subdivision plan is finally approved by the
Approving Officer, and enters into a form of agreement with the City as
contained in Schedule M hereto for subdivisions pursuant to the Land Title
Act of the Province of British Columbia, to do all things required to carry
out and construct the necessary works and services.
Excess or Extended Capacity
4.05
Pursuant to Section 939 of the Local Government Act the City may require
that the Owner provide excess or extended services to provide access to
or service land other than the land being subdivided or developed.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 12
City of Armstrong
SECTION 4 - Provision of Services in Subdivisions and Developments
Right-of-Way Agreement
4.06
Where the provisions of this Bylaw require an Owner to grant a utility or
drainage right-of-way to the City of Armstrong the Owner shall be required
to enter into an agreement as prescribed in Schedule N of this Bylaw and
shall pay all associated costs.
Design and Field Review of Construction by a Professional Engineer
4.07
All engineering drawings required in this Bylaw for works and services
shall be prepared by a Professional Engineer registered to practice in the
Province of British Columbia.
The Owner shall engage a Professional Engineer to carry out all
necessary field reviews and inspections during the construction of works
and services required as a condition of subdivision approval. The
Professional Engineer shall submit a report in the format set out in
Schedule P of this Bylaw certifying that the works and services have been
carried out in compliance with this Bylaw and the plans, drawings, and
supporting documents submitted in support of the subdivision application
which were accepted by the City of Armstrong.
All applications for subdivision shall include a letter of commitment from
the Owner in the format set out in Schedule O of this Bylaw that a
Professional Engineer has been engaged to carry out all necessary design
works and undertake all field services for the subdivision.
a)
Upon completion of the works and services the Owner shall
provide to the City Engineer 2 sets of as-built ANSI D prints
signed and sealed by the Owner's Professional Engineer, 1 - CD
ROM and 1 - Adobe Acrobat PDF CD format scaled to print on
280 mm x 430 mm (11" x 17") ANSI D, of all work constructed or
installed pursuant to the application.
b)
If there are any deficient or missing as-built drawings upon
completion of the work any refund due the Owner will be debited in
the amount of $1,500.00 per drawing and CD.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 13
City of Armstrong
SECTION 4 - Provision of Services in Subdivisions and Developments
Exception For Service Connection
4.08
Notwithstanding Section 4.07 above, in a subdivision where only service
connections to existing works and services are required, the City may not
require that the applicant engage a Professional Engineer to design the
service connections.
Geotechnical/ Slope Stability
4.09
A geotechnical report(s) on slope stability is required prior to land use
redesignation, subdivision, development and/or building approval. A report
is required wherever the slope on the subject lands or portions thereof
exceed fifteen percent (15%) or where past subsidence, slippage or
seepage is evidenced in the vicinity of the site.
The requirement for a geotechnical report for slope stability may be
waived by written authorization from the City Engineer. The City Engineer
may also require a Geotechnical report for sites with soil conditions,
swelling clays, groundwater, or other such conditions, which, in the opinion
of the City Engineer, require special attention.
a)
Slope stability reports shall contain a minimum of the following
information:
i)
Existing property lines shown on plan(s).
ii)
Top of slope, embankment escarpment, and toe of slope.
iii)
Contour mapping as required by the Geotechnical Engineer.
iv)
Stability Limit (S.L.) line(s) shown on the plan(s). The S.L.
line is defined as the line that corresponds to a slope
stability Safety Factor (S.F.) of 1.5 and delineates the
Developable Area where S.F. is greater than 1.5 from the
Undevelopable Area where S.F. is less than 1.5. To define
the S.L. line, the slope is to be analyzed in the existing
natural condition using the highest expected groundwater
condition, both natural and man-made.
v)
The effect of and extent of slope failure on the subject land
and adjacent properties and the methods of protection of the
lands.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 14
City of Armstrong
SECTION 4 - Provision of Services in Subdivisions and Developments
vi)
A setback line, drawn in relation to the S.L. line and within
the developable area, which shall define the point nearest
the S.L. line that structures (including streets, underground
utilities, building foundations, swimming pools, etc.) can be
constructed without jeopardizing the slope stability at the
S.L. line. The building setback line shall be no closer to the
top of slope than:
a)
that line determined by a Geotechnical Engineer
using a method described in this section, or
b)
the "rear yard setback" distance as may be specified
by City of Armstrong Bylaw.
vii)
Identification of proposed fill areas and development of a
filling plan addressing ultimate topography, fill materials,
methodology, inspection, testing, revegetation, slope
stability and setbacks as defined by this section.
viii)
Assessment and recommendations regarding the effects of
rainfall, runoff and irrigation.
b)
Existing lands within areas where the S.F. is less than 1.5 may be
considered for development by the City Engineer if the existing
slope is modified using recognized remedial procedures which will
yield a S.F. greater than 1.5.
c)
A Geotechnical Report shall be provided which comments on, but is
not necessarily limited to; the suitability of the subgrade to support
road construction without settlement, provides recommendations
for road structure design commenting on shrinkage/expansion of
the subgrade found in the City of Armstrong, the suitability of the
subgrade to support water and gravity sanitary and storm
infrastructure without settlement, the suitability of excavated trench
material for utilization as trench backfill, and the suitability of the
subgrade to support residential or commercial development.
d)
Geotechnical and Slope stability reports shall be prepared by a
Professional Geotechnical Engineer.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 15
City of Armstrong
SECTION 4 - Provision of Services in Subdivisions and Developments
e)
It is the responsibility of the Owner to ensure that geotechnical and
slope stability reports are initiated and that development conforms
to the recommendations in the report.
f)
The Geotechnical and Slope Stability report shall include provisions
which permit the City of Armstrong to use and rely on the Report's
findings and recommendations and be signed over seal by a
Geotechnical Engineer duly licensed as such under the provisions
of the Engineers and Geoscientists Act of British Columbia.
Traffic Impact Analysis
4.10
The Approving Officer may require the Owner to provide a traffic impact
analysis.
Off-Site Utilities Impact Analysis
4.11
The Approving Officer may require the Owner to provide an off-site utilities
impact analysis.
Site Preparation
4.12
In no case shall land be excavated, filled, paved or graveled or the surface
features of land otherwise be altered for the purpose of development
without the prior written approval of the Approving Officer or the City
Engineer.
Off-Site Services
4.13
The Owner may be required to contribute towards the costs of upgrading
or upsizing off-site roads and utilities required to service the subdivision
and/or development in accordance with Bylaw 1570.
Works Within Existing Right-of-Ways
4.14
Where a subdivision or development must construct works within a City
road, or right-of-way, the following is required:
a)
Provide engineering drawings for the works in accordance with the
provisions of this Bylaw.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 16
City of Armstrong
SECTION 4 - Provision of Services in Subdivisions and Developments
b)
Provide security in a form acceptable to the City Treasurer in the
amount of One Hundred and Twenty-five (125%) of the cost of
construction of the works within the City road or right-of-way, plus
development, processing, administration, engineering and
inspection fees as set out in Schedule 8.01 of this Bylaw.
c)
Obtain a Permit from the City Engineer for construction within
a right-of-way.
Exception for Property Boundary Adjustments
4.15
Notwithstanding Section 4.01 of this Bylaw, subdivisions involving only
property boundary adjustments where the number of lots is not increased
shall not be subject to the requirements of this Bylaw except in the
following cases:
a)
Where road dedication is required all dedication for future road
widening shall be obtained at the time of the property boundary
adjustment application.
b)
Any unprotected or existing servicing that encroaches on an
adjustment parcels shall be protected by means of easement or
statutory right-of-way or relocated as required by the City Engineer.
Any relocation of services shall be governed by the regulations of
this Bylaw.
c)
The Applicant shall provide a plan prepared in accordance with this
Bylaw showing the location of all existing structures, road and
utilities in order to demonstrate compliance with the above
requirements.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 17
City of Armstrong
SECTION 5 - Servicing Requirements for Subdivisions under Land Title Act
SECTION 5 - SERVICING REQUIREMENTS FOR SUBDIVISIONS UNDER LAND
TITLE ACT
Highways
5.01
All highways created by plan of subdivision including widening of highways
shall:
a)
comply with the dimensions, location, alignment, drainage, and
gradient requirements set out in Schedules A, B and E of this Bylaw
and;
b)
be cleared, graded, surfaced and landscaped in accordance with
standards set out in Schedules A and B of this Bylaw.
Sidewalks, Curbs and Gutters
5.02
(a)
In subdivisions where highways are created, sidewalks, curbs and
gutters shall be provided as required in Schedule A and
constructed in accordance with the standards set out in Schedule F
of this Bylaw.
(b)
Where in the opinion of the City the construction of curb, gutter and
sidewalks would be impractical at the time of subdivision a cash
deposit shall instead be deposited with the City in accordance with
the conditions and requirements of paragraph 7.01 (b) (iii) and
Schedule T of this Bylaw, to be used by the City for the future
construction of curb, gutter and sidewalk improvements on the
highway adjacent to the lands being subdivided.
Street Lighting
5.03
In subdivisions where highways are created, street lighting shall be
provided as required in Schedule A and constructed in accordance with
the standards set out in Schedule G of this Bylaw.
Electrical and Communications Wiring and Gas Distribution System
5.04
In subdivisions where parcels are created each parcel shall be provided
with power supply and communications consistent with the standards set
out in Schedule A and Schedule H of this Bylaw. Where cablevision and
gas service are to be provided such services shall be provided consistent
with the standards set out in Schedules A and H of this Bylaw.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 18
City of Armstrong
SECTION 5 - Servicing Requirements for Subdivisions under Land Title Act
Water Distribution System
5.05
In subdivisions where parcels are created each parcel shall be supplied
with a complete water distribution system connected to a community water
system as required in Schedule A, and all system components shall be
installed in accordance with the standards set out in Schedule C of this
Bylaw.
Sanitary Sewer
5.06
In subdivisions where parcels are created each parcel shall be:
a)
provided with a complete sewage collection system connected to
the community sanitary sewer system, or
b)
provided with an on-site sewage disposal system as required in
Schedule A of this Bylaw, and all system components shall be
installed in accordance with the standards set out in Schedule D of
this Bylaw.
Drainage System
5.07
In subdivisions where parcels are created each parcel shall be provided
with a complete and fully operative drainage system as required in
Schedule A of this Bylaw, and constructed in accordance with the
standards set out in Schedule E of this Bylaw.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 19
City of Armstrong
SECTION 6 - Servicing Requirements for Developments not Requiring Subdivision
SECTION 6 - SERVICING REQUIREMENTS FOR DEVELOPMENTS NOT
REQUIRING SUBDIVISION
Developments Not Requiring Subdivision
6.01
As a condition of the issuance of a Building Permit on a site being
developed the City of Armstrong may require that the Owner provide
works and services which are directly attributable to the development
consistent with the provisions of this section.
Prior to issuing a Building Permit on a site being developed the City of
Armstrong may require the Owner to prepare a site servicing plan and
details prepared by a Professional Engineer which shall identify how the
Owner intends to construct the services on the site. All site servicing plans
are to be approved by the City Engineer.
Domestic Water
6.02
Where the provisions of Schedule A require a parcel containing a
development to be served by a community water system the water
distribution system on the parcel shall be constructed and connected to
the community water system consistent with a site servicing plan
approved by the City Engineer and the provisions of Schedule C of this
Bylaw.
Sanitary Sewer
6.03
Where the provisions of Schedule A require a parcel containing a
development to be served by a community sewer system the sewage
collection system on the parcel shall be constructed and connected to the
community sewer system consistent with a site servicing plan approved by
the City Engineer and the provisions of Schedule D of this Bylaw.
Site Drainage
6.04
The development shall be provided with site drainage collection and
disposal facilities in accordance with a site servicing plan approved by the
City Engineer and the provisions of Schedule E of this Bylaw.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 20
City of Armstrong
SECTION 6 - Servicing Requirements for Developments not Requiring Subdivision
Site Parking and Loading Facilities
6.05
For developments where on-site parking and/or on-site loading facilities
are required the development shall be provided with vehicle access from a
highway or highways in accordance with the Access Permit and a site
servicing plan approved by the City Engineer.
For developments located on sites fronting on a controlled access
highway designated pursuant to the Highway Act, the proposed method of
providing access to the site shall also be subject to the approval of the
Province of British Columbia Ministry of Transportation.
Electrical, Telephone and Cablevision Wiring
6.06
Where the provisions of Schedule A require underground wiring all hydro,
telephone, cablevision, and street light wiring shall be installed
underground consistent with the provisions of Schedules G and H of this
Bylaw.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 21
City of Armstrong
SECTION 7 - Servicing Requirements for Highways Abutting a Site being Subdivided or
Developed
SECTION 7 - SERVICING REQUIREMENTS FOR HIGHWAYS ABUTTING A SITE
BEING SUBDIVIDED OR DEVELOPED
7.01
As a condition of the approval of a subdivision or development or the
issuance of a Building Permit the City of Armstrong shall require that the
Owner provide works and services directly attributable to the development
on that portion of all highways immediately abutting the parcel being
subdivided or developed up to the centre line of the highways for Items (a)
and (b) below only. Works and services which are required include:
a)
i)
Where there is no existing work, highway improvements
including clearing, grading, drainage and surfacing in
accordance with the standards set out in Schedules A and B
of this Bylaw.
ii)
Where existing works are deemed adequate for the
development proposed no highway improvements shall be
required.
b)
i)
Sidewalk, curb and gutter improvements in accordance with
the standards set out in Schedules A and F of this Bylaw
subject to the following:
1.
The construction of a sidewalk may also include
without limiting the generalities of the foregoing, the
construction of additional off-site works such as
curbs, gutters, catch basins, storm sewer main
extensions, handrails and retaining walls such that the
sidewalk can be properly installed and maintained.
Such additional off-site works shall be constructed in
accordance with the standards contained within this
Bylaw. The City Engineer is to confirm the extent and
details of the additional off-site construction works
associated with a required sidewalk.
2.
Sidewalks are not required to be constructed within
the City road right-of-way adjacent to a property for
which a Building Permit or Subdivision Application
has been submitted under the following conditions:
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 22
City of Armstrong
SECTION 7 - Servicing Requirements for Highways Abutting a Site being Subdivided or
Developed
2.1)
A sidewalk has not been designated by the
authority having jurisdiction for the side of the
road right-of-way adjacent to the subject
property under application.
2.2)
A sidewalk is not required as per Table A.2 of
this Bylaw.
2.3)
Where the Subdivision Plan only involves a
consolidation of lots or road dedication or road
closure or phased building strata or lease
plan.
2.4)
Where the Building Permit application only
involves signs or internal renovations or
exterior renovations without additions or
accessory buildings or small public utility
structures such as pump houses and park
washrooms or portable classrooms and
washroom structures or temporary buildings or
minor additions valued at less than $25,000.,
and
2.5)
Where the road right-of-way adjacent to the
subject property under application is
insufficient in width to accommodate the
designed sidewalk and where the right-of-way
acquisition is not part of the application
approval provisions.
ii)
Where the existing works are deemed adequate for the
development proposed, no improvements will be required.
iii)
Where in the opinion of the City the construction of curb,
gutter and sidewalk improvements would be impractical at
the time of subdivision or development a cash deposit shall
instead be deposited with the City to be used by the City for
the future construction of curb, gutter and sidewalk
improvements on the highway adjacent to the lands being
subdivided or developed. The provision of a cash deposit
shall be subject to the following:
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 23
City of Armstrong
SECTION 7 - Servicing Requirements for Highways Abutting a Site being Subdivided or
Developed
1.
The amount of the cash deposit shall be equal to the
total estimated costs of constructing the required
curb, gutter and sidewalk improvements, as
determined by the City, based on the City's unit prices
for such construction and the requirements of Tables
A2 and F.1 of Schedules A and F of this Bylaw.
2.
Without limiting the generality of (a), the construction
of the curb, gutter and sidewalk improvements shall
include all additional and ancillary works including, but
not limited to such items as base and sub-base
aggregate, catch basins, storm sewer main
extensions, steps, handrails and retaining walls
required for the proper installation of the curb, gutter
and sidewalk improvements.
3.
The City shall hold the cash deposit in trust and only
use the deposit for the future construction of curb,
gutter and sidewalk improvements and ancillary
components on the highway adjacent to the lands
being subdivided or developed.
4.
The timing of the future construction of the curb,
gutter and sidewalk improvements shall be at the sole
discretion of the City.
5.
The provisions of the cash deposit shall constitute full
and complete compliance with the requirements of
subsections 7.01 (b) (i) and 5.02 (b) of this Bylaw and
where the actual costs of construction of the curb,
gutter and sidewalk improvements vary from the
amount of the cash deposit, no refund shall be
payable by the City nor shall the applicant be
responsible for the shortfall.
c)
Water system improvements including construction of water
distribution components in accordance with the standards set out in
Schedule C of this Bylaw as required to service the development.
d)
Sewer system improvements including the construction of sewage
collection system components in accordance with the standards set
out in Schedule D of this Bylaw where Schedule A of this Bylaw
requires the development of a sewer system as required to service
the development.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 24
City of Armstrong
SECTION 7 - Servicing Requirements for Highways Abutting a Site being Subdivided or
Developed
e)
Drainage system improvements including the provision of drainage
facilities as required in Schedule A of this Bylaw, and construction
of specific drainage system improvements in accordance with the
standards set out in Schedule E of this Bylaw as required to service
the development.
f)
Where the provisions of Schedule A require underground wiring all
hydro, telephone, electrical and cablevision ducting and junction
facilities shall be installed in accordance with the provisions of
Schedule H of this Bylaw as required to service the development.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 25
City of Armstrong
SECTION 8 - Administration and Enforcement
SECTION 8 - ADMINISTRATION AND ENFORCEMENT
Application Fee (Bylaw No. 1567, 2007)
8.01
a)
All subdivision, strata, and development applications, submitted to
the City, shall be accompanied by any and all fees that relate to
each application, prior to the City commencing any processing,
inspection, advertising or administration processes:
i)
Subdivision - Regular, Bare Land Strata or Building Strata
Conversion
Application Fee - for the first lot proposed to be created $ 500.00
Fee for each additional parcel or strata lot created
$ 155.00
Administration fees on subdivisions and strata developments
creating more than three lots, 3% of the first $500,000.,
2% of the second $500,000. and,
1% of the balance over $1,000,000.,
of the estimated costs of constructing utilities and roads, as
approved by the City Engineer.
Latecomer Agreement
$1,000.00
ii)
Development
Development Permit
$500.00
Development Variance Permit
$600.00
Amendment to a Development Permit
$500.00
Amendment to a Development Variance Permit
$600.00
Joint Development and Development Variance
Permit or Amendment
$700.00
Administration fees on developments
3% of the first $500,000.
2% of the second $500,000. and,
1% of the balance over $1,000,000.,
of the estimated costs of constructing utilities and roads, as
approved by the City Engineer.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 26
City of Armstrong
SECTION 8 - Administration and Enforcement
b)
An Application, for development approval, shall include the
following fees;
i)
At the time of application, any fee payable under the
Building and Plumbing Permit application.
ii)
Prior to the issuance of a permit where a permit is required
or prior to construction where no permit is required, the
Owner shall submit a fee for City administration costs in the
amount set out Clause 8.01 of this Bylaw.
c)
Application fees itemized in Section 8.01 a), i) and ii) shall be in
accordance with the City of Armstrong Bylaw No. 1567, 2007 and
any subsequent amendments thereto.
Preliminary Layout Review
8.02
a)
An Owner may, before causing a plan of subdivision to be prepared
and submitted for approval pursuant to the provisions of the Land
Title Act, make a submission for Preliminary Layout Review. This
submission shall be accompanied by a preliminary plan of the
proposal and shall include information as required by the Approving
Officer to appraise the proposed subdivision.
b)
Preliminary Layout Review of any subdivision shall not be
construed as final approval for land registration or any other
purpose, nor is a submission for Preliminary Layout Review
considered an application under Section 993 of the Local
Government Act. This approval shall not be considered as
acceptance by the City or its Approving Officer of anything except
the general layout of the proposed subdivision, and a list of
minimum conditions which would have to be taken into
consideration in an application for final approval. Preliminary Layout
Review is revocable by the Approving Officer at any time before
final approval is granted.
c)
The approval period for Preliminary Layout Review (PLR) shall be
a maximum of one (1) year with a maximum one (1) year
re-approval period permitted wherein the PLR re-approval
conditions may vary from the initial PLR approval conditions.
d)
Preliminary Layout Review Application shall be submitted on a
Schedule M form "Application for Preliminary Layout Review".
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 27
City of Armstrong
SECTION 8 - Administration and Enforcement
Authorization To Enter On Lands Being Subdivided and/or Developed
8.03
Officers of the City of Armstrong, or their designates are authorized to
enter at all reasonable times upon the lands for which the application to
subdivide and/or develop has been made in order to ascertain whether the
provisions of this Bylaw are being met.
Violation
8.04
Every person who:
a)
Violates any of the provisions of this Bylaw;
b)
Causes or permits any act or thing to be done in contravention or
violation of any of the provisions of this Bylaw;
c)
Neglects or omits to do anything required under this Bylaw;
d)
Carries out, causes or permits to be carried out any development
in a manner prohibited by or contrary to any of the provisions of
this Bylaw;
e)
Fails to comply with an order, direction or notice given under this
Bylaw;
f)
Prevents or obstructs or attempts to prevent or obstruct the
authorized entry of an officer on property under Clause 8.03;
shall be deemed to be guilty upon summary conviction of an offence
under this Bylaw.
Offence
8.05
Each day's continuance of an offence under Section 3 constitutes a new
and distinct offence.
Penalty
8.06
Any person who violates any of the provisions of this Bylaw shall, on
summary conviction, be liable to a penalty not exceeding $2,000. plus the
cost of prosecution for each offence.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 28
City of Armstrong
SECTION 8 - Administration and Enforcement
Completion
8.07
Should any person fail to construct or install any works or services
required under this Bylaw, the City, its agents or servants may construct or
install the works and services at the expense of the person in default, and
at the expense thereof, with interest at the rate of six percent (6%) per
annum with costs, which may be recovered in like manner from the bond
or as municipal taxes.
Severability
8.08
If any section, subsection, sentence, clause or phrase of this Bylaw is for
any reason deemed to be invalid by the decision of any court of competent
jurisdiction the invalid portion shall be severed and the decision that it is
invalid shall not affect the validity of the remainder of this Bylaw.
Schedules Form Part of Bylaw
8.09
Schedules "A" through "Z" are attached to and form part of this Bylaw.
Authorization
8.10
a)
The City of Armstrong Administrator and Clerk are authorized to
sign on behalf of the City the Agreement set out in Schedule M-1
without further resolution of Council if such Agreement conforms
with the provisions of this Bylaw.
b)
The City Engineer and Clerk are authorized to sign on behalf of the
City the Agreements set out in Schedules M-1, T, and U without
further resolution of Council if such Agreements confirm with the
provisions of this Bylaw.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 29
City of Armstrong
SECTION 9 - Enactment
SECTION 9 - ENACTMENT
Repeal of Previous Bylaw
9.01
City of Armstrong Subdivision and Development Servicing Bylaw No.
1169, 1994 and all amendments thereto, are hereby repealed.
9.02
Bylaw Adoption
This Bylaw shall take effect upon adoption by the Council of the City of
Armstrong.
READ A FIRST TIME THIS 22ND day of October, 2007.
READ A SECOND TIME 22ND day of October, 2007.
READ A THIRD TIME 22ND day of October, 2007.
RECONSIDERED AND FINALLY ADOPTED THIS 13TH day of November, 2007.
Signature on File
Mayor
Signature on File
Clerk
Certified to be a true and correct copy
of Bylaw No. 1570 cited as
Subdivision and Development Servicing
Bylaw No. 1570, 2007
Dated this 13th day of November , 2007.
Signature on File
Clerk
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 30
City of Armstrong
SCHEDULE A - Level of Service
SCHEDULE A
LEVEL OF SERVICE
This is Schedule A of the City of Armstrong
Subdivision and Development Servicing
Bylaw No. 1570, 2007
___________________________________
(Clerk)
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 31
City of Armstrong
SCHEDULE A - Level of Service
SCHEDULE A - LEVEL OF SERVICE
Establishment of Service Levels
The type of services to be constructed by an owner prior to obtaining approval for a plan
of subdivision or development shall be based on the zone in which the land is located as
set out on the Official Zoning Map of the Zoning Bylaw of the City of Armstrong as
amended. In Table A.1, the minimum level of service to be provided with respect to
sanitary sewer, water, drainage, street lighting and wiring is set out in Columns 2, 3, 4, 5
and 6, and the zones which are subject to each service level are described in Column 1.
In Table A.2, the required minimum standards for various classifications of highways are
provided in Columns 2, 3, 4 and 5, and the zones which are subject to each standard
are described in Column 1. Boulevard and development landscaping shall be specified
at the time of subdivision and/or development application, Schedule M -1 (Standard
Subdivision Development Agreement Document, Appendices 'B' and 'C').
For the purposes of Table A.1:
"Community Sanitary Sewer System (CSSS)" means construction of a sewage
collection system and connection to a community sanitary sewer.
"Community Water System (CWS)" means construction of a domestic water
distribution system and connection to the City's domestic water distribution system.
"On-Site Sewage Disposal (On-Site SD)" means on-site effluent disposal.
"On-Site Water Supply (On-Site WS)" means a proven water supply located on each
parcel.
"Ditch System (Ditch)" means a drainage collection and disposal system by open
ditches and culverts.
"Overhead Wiring (Overhead)" means overhead electrical, communications and
CATV wiring.
"Storm Sewer System (SSS)" means construction of a storm water drainage and
collection system and connection to the City's storm sewer system or major drainage
system.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 32
City of Armstrong
SCHEDULE A - Level of Service
"Street Lighting - Thru Subdivision (Thru Subdivisions)" means the provision of
street lighting throughout the subdivision or development to the standards specified in
this Bylaw.
"Street Lighting - Intersections Only (Intersections)" means the provisions of street
lighting at intersections only.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 33
City of Armstrong
SCHEDULE A - Level of Service
TABLE A.1
REQUIRED MINIMUM LEVEL OF SERVICE FOR SANITARY SEWER,
WATER SUPPLY, DRAINAGE, STREET LIGHTING, AND WIRING
COLUMN 1
COLUMN 2
COLUMN 3
COLUMN 4
COLUMN 5
COLUMN 6
ZONE
SANITARY
SEWER
WATER
SUPPLY
DRAINAGE
STREET
LIGHTING
WIRING
Residential &
Public
Assembly
R-1, R-1A,
R-1B, R-2,
R-3, R-4, R-5,
R-6,
RBB
P-1, P-2,
P-3
CSSS
CWS
SSS
Thru Sub-
Division
Thru Sub-
Division
Under-
ground
Under-
Ground
Commercial
C-1, C-2, C-3,
C-4, C-5
CSSS
CWS
SSS
Thru Sub-
Division
Under-
Ground
Industrial
I-1
CSSS
CWS
SSS
Thru Sub-
Division
Overhead
Agricultural -
Small
Holdings
A1
CR
On-Site SD1
On-Site SD1
On-Site CWS
CWS
Ditch
Ditch
Intersections
Intersections
Overhead
Overhead
CSSS -
Community Sanitary Sewer System
CWS -
Community Water system
SSS -
Storm Sewer System
CWS -
Community Water System
SD
-
Sewage Disposal
CR
-
Country Residential
1 Minimum lot size for on-site sewage disposal shall be 1.0 hectare.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 34
City of Armstrong
SCHEDULE A - Level of Service
TABLE A.2 - Part I
REQUIRED MINIMUM HIGHWAY STANDARDS
Column 1
Column 2
Column 3
ZONE
LOCAL HIGHWAYS2
MINOR COLLECTOR HIGWAYS2
R/W
Width1
Pavement
Width
Curb &
Gutter
Sidewalk
R/W
Width
Pavement
Width
Curb &
Gutter
Sidewalk
Side
Width
Side
Width
Residential
R-1, R-1A,
R-1B, R-2,
R-3, R-4,
R-5, R-6,
RBB
Bare Land
Strata
Strata
18.0
14.0
n/a
8.5
8.5
8.5
Yes
Yes
Yes
one
none
none
1.85
-
-
18.0
14.0
n/a
8.5
8.5
8.5
Yes
Yes
Yes
one
none
none
1.85
-
-
Commercial
C-1, C-2, C-
3, C-4,
C-5
20.0
12.0
Yes
both
1.85
20.0
12.0
Yes
both
1.85
Industrial
I-1
20.0
12.0
Yes
none
-
20.0
12.0
Yes
none
-
Public
P-1, P-2,
P-3
20.0
12.0
Yes
one
1.85
20.0
12.0
Yes
one
1.85
Other
A1, CR
18.0
8.5
No
none
-
18.0
8.5
No
none
-
1 All dimensions shown in metres.
2 Landscape requirements shall be specified in Schedule M -1 (Standard Subdivision Development
Agreement Document, Appendices 'B' and 'C').
Notes: In addition to the foregoing, the following standards shall apply to lanes and walkways:
i)
Lanes shall have a Right-of-Way width of not less than 6.0 m and a pavement width of 5.5 m
except all commercial and Industrial zones in which case the main Right-of-way width shall be
7.6 m and the pavement width 7.6 m.
ii) Walkways shall have a Right-of-way width of not less than 3.0 m and a pavement width of 3.0 m.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 35
City of Armstrong
SCHEDULE A - Level of Service
TABLE A.2 - Part II
REQUIRED MINIMUM HIGHWAY STANDARDS
COLUMN 1
COLUMN 4
COLUMN 5
ZONE
MAJOR COLLECTOR HIGHWAYS3
ARTERIAL HIGHWAYS3
R/W
Width1
Pavement
Width
Curb &
Gutter
Sidewalk
R/W
Width
Pavement
Width2
Curb &
Gutter
Sidewalk
Side
Width
Side
Width
Residential
R-1, R-1A,
R-1B, R-2,
R-3, R-4,
R-5, R-6,
RBB
Bare Land
Strata
Strata
18.0
14.0
n/a
8.5
8.5
8.5
Yes
Yes
Yes
one
none
none
1.85
-
-
18.0
14.0
n/a
8.5
8.5
8.5
Yes
Yes
Yes
one
none
none
1.85
-
-
Commercial
C-1, C-2,
C-3, C-4,
C-5
20.0
12.0
Yes
both
1.85
20.0
12.0
Yes
both
1.85
Industrial
I-1
20.0
14.0
Yes
none
-
25.0
14.4
Yes
one
1.85
Public
P-1, P-2,
P-3
20.0
14.0
Yes
one
1.85
25.0
14.4
Yes
one
1.85
Other
A1, CR
20.0
14.0
No
none
-
25.0
14.4
Yes
one
1.85
1 All dimensions shown in metres.
2 Plus width of median.
3 Landscape requirements shall be specified in Schedule M -1 (Standard Subdivision Development
Agreement Document, Appendices 'B' and 'C').
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 36
City of Armstrong
SCHEDULE B - Regulations, Standards and Specifications For The Design and
Construction of Highways
SCHEDULE B
REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE
DESIGN AND CONSTRUCTION OF HIGHWAYS
This is Schedule B of the City of Armstrong
Subdivision and Development Servicing
Bylaw No. 1570, 2007
___________________________________
(Clerk)
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 37
City of Armstrong
SCHEDULE B - Regulations, Standards and Specifications For The Design and
Construction of Highways
SCHEDULE B
REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE
DESIGN AND CONSTRUCTION OF HIGHWAYS
1.0
GENERAL DESIGN
1.01 Where the provisions of Schedule A of this Bylaw require the construction of
roads, the Owner shall construct such roads consistent with the regulations,
standards and specifications set out in this Schedule.
Approval of Engineering Drawings Required Prior to Construction
1.02 Engineering drawings, prepared in accordance with Schedule K of this Bylaw,
showing detailed design of roads shall be submitted to the City Engineer for
approval prior to commencement of construction. These drawings shall show
existing ground line and proposed alignment and grade on the highways,
horizontal and vertical curve information and all other details as may be required.
Grades shall be given at all changes in vertical and horizontal alignments for
centreline and gutter lines. Elevations shall be shown on the drawings at all
changes in vertical alignment. Four (4) sets of size ANSI 'D' design drawings,
date stamped, signed and sealed by a Professional Engineer, shall be submitted
for review. Where required, additional sets of four (4) ANSI 'D' size revised
design drawings shall be date stamped, signed and sealed by a Professional
Engineer for approval.
Classification of Highways
1.03 Prior to design of the road system the City Engineer shall classify each road
proposed with the subdivision and stipulate the required standards in accordance
with the provisions of this Bylaw.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 38
City of Armstrong
SCHEDULE B - Regulations, Standards and Specifications For The Design and
Construction of Highways
Geotechnical Evaluation
1.04 The Owner shall be responsible for engaging the services of a qualified
Geotechnical Engineer duly licensed as such under the provisions of the
Engineers and Geoscientists Act of British Columbia to investigate surface and
sub-surface conditions within the proposed subdivision. The Geotechnical
Engineer shall prepare a report outlining the findings and shall provide clear,
definitive recommendations of the geometry and placement of fill sections,
compaction requirements over and above those stipulated in this Bylaw, cut and
slope geometry, pavement structures for roads, shrinkage/expansion of subgrade
unique to the City of Armstrong, and any other geotechnical issues affecting road
construction within the proposed subdivision. The Geotechnical Report shall
include provisions which permit the City of Armstrong to use and rely on the
Report's findings and recommendations and be signed and sealed by the
Geotechnical Engineer.
2.0
GENERAL DESIGN CRITERIA
General Design Requirements
2.01 In the preparation of engineering plans for highways the Owner shall take into
account the following general design considerations:
2.1.1 Continuation of Existing Streets
The design and arrangement of highways within a subdivision shall
provide for the continuation or projection of existing streets in the
surrounding area. In no case shall the arrangement of highways within a
proposed subdivision make impractical the subdivision of adjoining
parcels.
2.1.2 Topography to be taken into Account
The design and arrangement of highways shall be suited to the
topography of the land proposed to be subdivided.
Consistency with Official Community Plan
2.02 The location, classification and standard of all highways proposed within a
subdivision shall take into account the proposed use of the land and shall
conform to the provisions of the City of Armstrong Official Community Plan.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 39
City of Armstrong
SCHEDULE B - Regulations, Standards and Specifications For The Design and
Construction of Highways
Local Highways
2.03 Local highways within a proposed subdivision shall be arranged so that their use
by through traffic will be discouraged.
Cul-de-Sacs
2.04 Cul-de-sac streets shall not exceed 150 metres in length and shall be provided
with an area designed to permit safe and adequate space for the turning of
emergency and motor vehicles.
Lanes
2.05 Lanes meeting the standards set out in this Bylaw shall be provided where the
City Engineer deems them to be necessary.
Walkways
2.06 Walkways shall be provided where the City Engineer deems them to be
necessary to provide access through a subdivision to schools, parks,
playgrounds, commercial areas or other community facilities, or for the safe and
efficient circulation of pedestrian traffic. Walkways shall be provided with chain
link fencing on each side of the walkway. The height shall be 1.8 m for the entire
length commencing at the setback from frontage property line.
Transit Bays
2.07 Transit Bays shall be provided where the City Engineer deems them necessary.
Intersections
2.08 Intersections shall be designed as follows:
2.8.1 Intersections shall meet substantially at right angles (between 70 degrees
and 110 degrees).
2.8.2 Jogs in highway alignment at intersections shall be avoided except where
the distance between centre lines is sufficient to ensure traffic safety. The
minimum spacing between tee intersections along a street shall be 60 m.
2.8.3 Intersections having more than four intersecting legs shall not be
permitted.
2.8.4 Intersections shall provide adequate crossing sight distances and
stopping sight distances, whichever is greater.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 40
City of Armstrong
SCHEDULE B - Regulations, Standards and Specifications For The Design and
Construction of Highways
Reverse Curves
2.09 If reverse curves are required in a highway alignment the City Engineer may
require that they be separated by means of tangents of sufficient length to
prevent superelevation rotation.
Mail Boxes
2.10 Where required by Canada Post the Owner shall indicate on the engineering
drawings approved locations for local mail boxes. The Owner is referred to
Canada Post for location guidelines and approval.
Street Names and Traffic Signs
2.11 Street names shall be assigned by the City of Armstrong. Street name signs and
traffic signs and road lineage required as a result of constructing or improving
streets shall be provided by the City of Armstrong at the expense of the Owner.
Appurtenances
2.12 The Owner's Engineer shall detail on the engineering drawings the location of all
proposed traffic islands, retaining walls, guardrails, and permanent barricades.
These structures shall be designed in accordance with good engineering
practice.
The design shall show the location of all traffic signs, street signs, and other
traffic control devices required to be placed in the road allowance. Drawings must
show all utility poles, ducts, junction boxes and pipelines. The Owner's Engineer
shall indicate those utilities which require relocation prior to road construction and
shall confirm with the utility the feasibility of their relocation prior to design
completion. For underground systems design drawings shall show the location of
underground wiring and appurtenances including connections to properties.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 41
City of Armstrong
SCHEDULE B - Regulations, Standards and Specifications For The Design and
Construction of Highways
3.0
HIGHWAY DESIGN CRITERIA
3.01 Vertical Alignment
The vertical alignment of the highway shall be set so the grades of the driveways
to adjacent properties will not exceed 15% for a minimum distance of 5 metres
into the property as measured from the property line. Where it is impractical to
meet this criteria the City Engineer may approve the use of private access roads.
The minimum longitudinal gradient at the gutter line shall be 0.50% for all
classifications of streets. The minimum longitudinal gradient around cul-de-sacs
and curb returns shall be 0.80%.
3.02 Design Speeds
The design speeds to be used for design of Highways shall be as per Table B.1.
TABLE B.1
DESIGN SPEED
Arterial (A)
70 km/h
Collector (C)
60 km/h
Local (L)
50 km/h
Road Crossfall
3.03 Minimum road crossfall shall be 3%, maximum crossfall shall be 4%.
Road Grades
3.04 Minimum and maximum road centre line grades shall conform to Table B.2
based on the classification of the road:
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 42
City of Armstrong
SCHEDULE B - Regulations, Standards and Specifications For The Design and
Construction of Highways
TABLE B.2
HIGHWAY GRADES
Road Classification
Minimum Grade
Maximum Grade
Arterial
0.5%
8%
Major Collector
0.5%
9%
Minor Collector
0.5%
9%
Local, Building Permit and
Recommended for Bare Land
Strata, Strata
0.5%
10%
Cul-de-Sac (entry downhill)
0.5%
8%
Cul-de-Sac (entry uphill)
0.5%
10%
Cul-de-Sac (bulbs)
0.5%
6%
Lane
0.5%
9%
Walkway
0.5%
15%
Maximum grades are to be reduced by 1% for each (or part of each) 30 metres that the
centre line radius is less than 150 metres.
Vertical Curves
3.05 Vertical curves shall be designed to provide safe stopping sight distances.
Minimum stopping sight distance is the least distance required to bring the
vehicle to a stop under prevailing vehicle and climatic conditions. Vertical curves
shall be provided at the following grade changes:
Greater than 0.5% for Arterials
Greater than 1.0% for Collectors
Greater than 2.0% for Locals and Lanes
Vertical curve length is calculated by the equation L = KA where:
L
is the length of the vertical curve (Minimum L = 15 m)
K
is a constant related to lines and geometry of a parabolic curve
A
is the algebraic difference in grades in percent
Minimum K values (in metres) for vertical curve design shall be as described in
Table B.3.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 43
City of Armstrong
SCHEDULE B - Regulations, Standards and Specifications For The Design and
Construction of Highways
TABLE B.3
MINIMUM K VALUES (IN METRES) FOR VERTICAL CURVE DESIGN
Road Classification
Crest Curve
Minimum
Sag Curve
Lighting No Lighting
Arterial
22
15
25
Collector
15
10 20
Local, Recommended for
Bare Land Strata, Strata
7
6 11
Centre Line Radii
3.06 The minimum required centre line radius for various superelevation rates for
each classification of highway shall be as described in Table B.3:
TABLE B.4
MINIMUM CENTRELINE RADIUS
Road Classification
Horizontal Curve Radii (m)
Superelevation (m/m)
None 0.02 0.04 0.06
Arterial
n/a 230 200 190
Collector
160 140 130 n/a
* Local, Recommended for Bare Land
Strata, Strata
95 n/a n/a n/a
Development Permit
12 n/a n/a n/a
* Radius may be reduced at the discretion of the City Engineer.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 44
City of Armstrong
SCHEDULE B - Regulations, Standards and Specifications For The Design and
Construction of Highways
Curb Return Radii
3.07 Curb return radii shall conform to the following and be based on the lesser
classified Highway.
Arterial
11.0 m
Collector
11.0 m
Local, Recommended for Bare
Land Strata, Strata
7.5 m
Cul-de-Sac
11.5 m, connecting radii to
tangent = 16.0 m
Industrial
11.0 m
Building Permit - 6.0 m roadway
9.0 m
- 7.3 m roadway
7.5 m
Intersection Design
3.08 Unless indicated elsewhere herein, all intersection design standards shall
conform to those outlined in the latest edition of 'B.C. Supplement to TAC
Geometric Design Guide' as published by the Ministry of Transportation of British
Columbia.
Intersection Grades
3.09 Approach grades for minor streets at intersections to major streets shall not
exceed 75% of the maximum grade allowed for that street classification. The
minor street shall be designed to intersect the major street with a vertical curve of
minimum length required for that street classification. The vertical curve shall
terminate at the curb line using the following K values.
TABLE B.5
INTERSECTION CURVES
Intersecting Street
Minimum K Value
Crest Curve Sag Curve
Arterial
17 15
Collector
7 6
Local, Recommend for Bare Land Strata,
Strata
4 4
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 45
City of Armstrong
SCHEDULE B - Regulations, Standards and Specifications For The Design and
Construction of Highways
Crossfalling a road at an intersection will be permitted where required because of
topographical features in keeping with good engineering practices. The transition
length from a normal cross-sectioned road to a section of road where there is
superelevation shall be calculated based on 10 m for every 1% of change in
grade.
If these conditions are to be used the Owner must submit a preliminary design
showing a centre line profile with existing ground line and proposed grade for all
streets and intersections affected for adverse topography. If prior approval has
not been given by the City Engineer then any design submitted will not be
approved.
Pavement Structure
3.10 The pavement structure shall be designed in accordance with Manual Series MS-
1 of the Asphalt Institute (current edition). The pavement structure shall be
designed for a twenty-five (25) year design life. Staged construction may be
considered in the structural design by the City Engineer when a road is to be
constructed and to be widened at a later date.
Roads shall be classified as follows for purposes of structural design of the total
pavement structure; design traffic values and minimum depths of hot mix asphalt
are defined as well:
TABLE B.6
PAVEMENT STRUCTURE
Road Classification
Design Traffic(1)
(EAL's)
Min. Compacted Depth of
Hot Mix Asphalt (mm)
Arterial
Collector
Industrial
Residential
> 2.8 x 105
2.8 x 105
5.6 x 105
2.8 x 104
See Note (2)
100
100
76
Lanes
Walkways
n/a
n/a
50
50
Notes:
(1)
See Chapter IV of MS-1 of the Asphalt Institute.
(2)
To be specifically designed, based on projected EAL's, in
accordance with MS-1 of the Asphalt Institute.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 46
City of Armstrong
SCHEDULE B - Regulations, Standards and Specifications For The Design and
Construction of Highways
Soils used to construct the roadway subgrade shall be evaluated in accordance with
MS-1 (Chapter V) to determine the load bearing capacity of the subgrade. For this
purpose, the California Bearing Ratio (CBR) test value shall be obtained using soil
molded to the minimum specified compaction level. The design CBR values shall be
determined in the soaked condition in accordance with ASTM Des D1883. This value
shall be used for structural design purposes. The minimum compacted depth of crushed
granular base course, in the total pavement structure, shall be 75 mm.
If the soaked CBR value of the subgrade soil is less than 3, subgrade enhancement
shall be provided to create a soaked CBR of 3, and the pavement structure shall be
designed using a soaked CBR of 3. Subgrade enhancement shall be provided by
placement of an initial layer of granular sub-base of a thickness which has been
calculated to provide the necessary structural improvement to the subgrade.
A minimum pavement structure for roads shall be provided, not withstanding the
structural character of the subgrade. Minimum pavement structures are specified in
Table B.7, and will be considered structurally adequate when the subgrade soil exhibits
a minimum soaked CBR of 6.
TABLE B.7
MINIMUM PAVEMENT STRUCTURES (FOR SUBGRADE CBR P 6)
Road
Construction
Sub-Base
Aggregate (mm)
Crushed Base
Aggregate (mm)
Hot Mix
Asphalt (mm)
Surface Lower
Course Course
Arterial
Structural Design shall be project specific.
Collector
450
75
50 50
Industrial
450
75
50 50
Residential
400
75
38 38
Lanes
400
50
50
Walkways
300
50
50
The design of structural overlays of existing pavements shall be based on the analysis
of the results of Benkelman Beam tests and test hole information acquired from the
existing road which is to be upgraded.
The Transportation Association of Canada procedure for designing structural design of
overlays of existing pavements, as published in the 'Pavement Management Guide',
shall be used. The maximum permissible Benkelman Beam deflections to be used for
overlay design are shown in Table B.8.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 47
City of Armstrong
SCHEDULE B - Regulations, Standards and Specifications For The Design and
Construction of Highways
TABLE B.8
BENKELMAN BEAM DEFLECTIONS
Road Classification
Maximum Permissible
Deflection After Overlay
Arterial
1.00 mm
Collector
1.25 mm
Industrial
See Note (1)
Residential
1.50 mm
Notes:(1) As specified by the City Engineer.
The structural design of pavements for roads shall be performed by a qualified
pavements engineer. Structural designs of pavements shall be submitted to the City
Engineer in an acceptable report format.
Highway Cross-Sections
3.11 The standard street cross-section for various classifications of roadways shall be
as per Table B.9 and on the Specification Drawings.
TABLE B.9
HIGHWAY CROSS-SECTIONS
Road Classification
Typical Cross-Section
(Drawing Number)
Urban:
Arterial
Major Collector
Minor Collector
Industrial
Local
Project Specific
Project Specific
Project Specific
Project Specific
RD-1, RD-2, RD-3, RD-4
Rural:
Local Rural
Lanes
Walkways
RD-1, RD-2, RD-3, RD-4
RD-5
CGS-6
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 48
City of Armstrong
SCHEDULE B - Regulations, Standards and Specifications For The Design and
Construction of Highways
Boulevards
3.12 The City Engineer reserves the right to request that boulevards be landscaped
complete with automatic irrigation systems. Where boulevard landscaping and
irrigation is required the Owner shall prepare a landscaping and irrigation design
drawing in accordance with Schedule I of this Bylaw.
Site Grading Plan
3.13 A Site Grading Plan, for on-site grading, shall illustrate the final lot grading and
lot access locations and access grades. Site grading plans shall include, but not
be limited to, existing and proposed elevations, building elevations, locations and
extent of retaining walls, contours, swales, control/containment of surface water,
cut/fill areas, areas of fill that exceed 0.75 metres in depth, safe building setbacks
where required, and any other information deemed necessary.
4.0
CONSTRUCTION
Materials
4.01 Highways construction materials shall be in accordance with SCHEDULE L -
Division 2 - Sitework Section 2B - Roads and Earthworks.
Construction
4.02 Highways construction shall be in accordance with SCHEDULE L - Division 2 -
Sitework Section 2B - Roads and Earthworks.
Testing
4.03 Highways construction and materials testing shall be in accordance with
SCHEDULE L - Division 2 - Sitework Section 2B - Roads and Earthworks.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 49
City of Armstrong
SCHEDULE C - Regulations, Standards and Specifications For The Design and
Construction of Water Systems
SCHEDULE C
REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE
DESIGN AND CONSTRUCTION OF WATER SYSTEMS
This is Schedule C of the City of Armstrong
Subdivision and Development Servicing
Bylaw No. 1570, 2007
___________________________________
(Clerk)
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 50
City of Armstrong
SCHEDULE C - Regulations, Standards and Specifications For The Design and
Construction of Water Systems
SCHEDULE C
REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE
DESIGN AND CONSTRUCTION OF WATER SYSTEMS
1.0
GENERAL DESIGN
Water Distribution System to be Constructed by Owner
1.01 Where the provisions of Schedule A of this Bylaw require the construction of a
water distribution system, the Owner shall construct a water distribution system
and storage facilities, including water mains, valves, hydrants, service
connections, pump stations, and disinfection systems consistent with the
regulations, standards and specifications set out in this Schedule. All standards
not specifically described in the schedule shall be in accordance with appropriate
American Water Works Association (AWWA) standards or as directed by the City
Engineer.
Approval of Engineering Drawings Required Prior to Construction
1.02 Engineering drawings showing detailed design of the required works shall be
submitted to the City Engineer for approval. Engineering drawings shall also be
submitted for approval to the regional Public Health Engineer of the Ministry of
Health of the Province of British Columbia. The Ministry of Health's Final
Certificate shall be submitted to the City Engineer prior to the construction of any
water system. No construction shall commence until the engineering drawings
have been approved by the City Engineer and the Ministry of Health. These
drawings shall show alignment, size, grade and depths of pipes, pipe bedding
requirements, existing ground line and proposed final ground line over the pipe,
location, elevation and detail of all fittings, valves and hydrants, location of all
service connections, location, access to, size and details of any pump stations
and reservoirs, all easements and all such other details as may be required.
Where a water system is not yet available, rights-of-way may be required to be
provided by the Owner to allow for the eventual installation of the facility. Such
rights-of-way shall be registered to the City of Armstrong at the Owner's expense.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 51
City of Armstrong
SCHEDULE C - Regulations, Standards and Specifications For The Design and
Construction of Water Systems
Compliance with the Standards of Other Authorities
1.03 Where a subdivision is to be supplied by water from any other Authority the
Owner shall comply with all of the specifications of the Authority in addition to
providing a system equivalent to the City of Armstrong system and provided that
offsets and general layout for hydrants and valves shall comply with the minimum
requirements of this schedule.
2.0
DESIGN CRITERIA
Capacity of System and Sizing of Water Mains
2.01 Water distribution systems shall be designed to deliver water in adequate
quantities at adequate pressures for both domestic use under peak consumption
conditions and fire flows. Mains shall be sized to carry the peak hourly flow rate
or the maximum daily flow rate plus the fire flow rate, whichever is the greater.
Mains shall be sized using the Hazen-Williams formula with C = 130 for PVC
mains and C = 120 for all other pipe material for new mains and maximum flow
velocity for peak hourly demand rate of 2.0 m per second. The flow velocity for
fire flow plus the maximum day demand shall not exceed 4.0 m per second.
Domestic Demand Criteria
2.02 For residential areas the daily domestic demand criteria for purposes of
designing water distribution systems shall be:
Average Day Demand (ADD)
850 litres/day/capita
Maximum Day Demand (MDD)
2100 litres/day/capita
Peak Hour / Maximum Day Consumption Ratio:
1.5
For other than residential areas the demand criteria shall be selected to suit the
particular circumstances subject to the approval of the City Engineer.
Design Pressures
2.03 Water main pipe shall be designed to accommodate 1.5 times the maximum
projected working pressure for the applicable pressure zone. Pressure zones
shall generally be set at minimum pressure of 250 kPa under peak hour
conditions and a maximum pressure of 790 kPa under static conditions.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 52
City of Armstrong
SCHEDULE C - Regulations, Standards and Specifications For The Design and
Construction of Water Systems
Thrust Blocks and Joint Thrust Restrainers
2.04 Thrust Blocks and Joint Thrust Restrainers shall be designed for a minimum
1725 kPa water pressure.
Fire Flow Requirements
2.05 Water distribution systems shall also be designed to ensure that fire flows as
required by the Insurer's Advisory Organization (IAO) are available for required
durations. The following fire flows shall be met for the noted zones under
maximum day flow conditions.
TABLE C.1
FIRE FLOW REQUIREMENTS
Single Family
60 litres/sec.
Low/Medium Density Residential, Light
Industrial, Service Commercial
90 litres/sec.
High Density Residential, Urban
Commercial, Institutional
150 litres/sec.
Industrial
200 litres/sec.
Interim fire flows shall be designed for pressures in the range of 210 kPa to 1030
kPa, with 210 kPa measured under peak hourly conditions and 1030 kPa
measured under static conditions. The minimum pressures shall be measured or
calculated at the main floor elevation of the highest proposed house and an
allowance made for pressure loss in the service line to the house wall. Minimum
residual pressure at any hydrant shall not be less than 140 kPa under maximum
day domestic consumption plus fire conditions. Reservoir level shall be assumed
at mid point for calculation of minimum pressures and full for calculation of
maximum static pressures. Design pressures different, but not less than the
above, may be required if sprinkler systems are required. Such pressures must
be designed and confirmed by the Owner's engineer.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 53
City of Armstrong
SCHEDULE C - Regulations, Standards and Specifications For The Design and
Construction of Water Systems
Minimum Pipe Size
2.06 Water main pipe size for all water mains shall be 150 mm diameter in low density
residential areas and 200 mm in medium and high density residential,
commercial, and institutional areas. Minimum water main pipe size for industrial
areas shall be 250 mm. Where no further extensions are possible, water mains of
100 mm in diameter may be installed, downstream of the last fire hydrant, for low
density residential areas on cul-de-sac roads. The City Engineer may require a
hydraulic analysis design calculating flows and pressures and may require
oversizing of distribution or transmission water mains.
Location and Grade of Water Mains
2.07 Water mains shall be located in the road right-of-way as shown on the
Specification Drawings unless otherwise approved by the City Engineer.
There shall be a minimum lineal horizontal clearance of 1 metre between a water
main and other existing or proposed underground services, except sanitary and
storm sewer mains. A minimum of 3 metres horizontal distance between a water
main and a sanitary main or storm main shall be maintained. In special cases
such as installations in rock or hardpan, the horizontal clearance may be
reduced, with the approval of the City Engineer and Ministry of Health, provided
the invert of the water main is a minimum of 450 mm above the crown of the
sanitary main and subject to any Provincial regulations. On side-hill streets, the
main shall, where possible, be located on the cut side of the centre line of the
street.
Water mains shall be normally designed to follow a straight alignment between
intersections. Curved alignments may be accepted provided that the pipe
alignment is at a parallel offset with an established boundary and the radius of
curvature is not less than 60 m or the minimum radius of curvature
recommended by the pipe manufacturer, whichever is the greater.
Water mains shall be designed with a rising grade wherever possible to minimize
high points in the water main. Where a high point is unavoidable, either a service,
fire hydrant, or air release valve shall be installed at that point. Where the slope
of the water main exceeds 15% the design must provide restrained pipe
anchorage.
Where the water main network is deficient the City Engineer may request,
installation of additional interconnecting water mains of a minimum 200 mm
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 54
City of Armstrong
SCHEDULE C - Regulations, Standards and Specifications For The Design and
Construction of Water Systems
diameter to loop to the existing water mains. These interconnecting water mains
may necessitate the provision of rights-of-way in favor of the City of Armstrong.
The maximum length of any permanent non-interconnected water main is 150 m.
All mains exceeding 150 m shall be looped except with the approval of the City
Engineer. Interconnecting mains and rights-of-way when required shall be at the
Owner's cost.
No gas main, electric or telephone duct or other utility line shall be installed in
the same trench with water mains.
Where it is necessary for the water main to cross other underground services,
the crossing shall be made at an angle greater than 70 degrees and the vertical
clearance between services at the crossing point shall be not less than 300 mm
except for sanitary sewers where the clearance shall be 450 mm between the
exterior walls of the pipes.
The engineered drawings shall indicate whether the water main passes over or
under other underground services which it is crossing.
Spacing of Fire Hydrants
2.08 Fire hydrants shall be located, in general, at highway intersections and at
maximum spacing of 150 metres in residential areas and 90 metres in high
density, commercial, and industrial areas. Additional hydrants may be required
by the City Engineer at schools, multiple family developments, commercial
buildings, institutional and public buildings, or other major developments
consistent with the current fire flow requirements of Canadian Underwriter's
Association, the Insurer's Advisory Organization (IAO), and the British Columbia
Building Code. Whenever possible hydrants shall be located near the lowest
point on the water main. Additional fire hydrants required to support new
development which are not required to meet the minimum spacing must be
installed on private property and are considered private hydrants.
Where hydrants are located other than at intersections they should be located on
the projection of the property line dividing two lots. In selecting the location of a
fire hydrant the probable route of firefighting equipment shall be considered.
A fire hydrant shall not be located within 3 metres of a utility pole, light standard,
or hydro transformer, within 1.5 m horizontally of underground service pipes or
open ditches, or within 1 m of the back of curb nor can they protrude into the
walkway.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 55
City of Armstrong
SCHEDULE C - Regulations, Standards and Specifications For The Design and
Construction of Water Systems
Line Valves
2.09 Main line valves shall be the same diameter as the main line pipe and shall be
located at least in the following locations: three (3) valves located at a cross (+)
fitting, two (2) valves required at a tee (T) fitting, one (1) isolation valve required
every 200 metres in residential areas, one (1) isolation so that no more than one
(1) fire hydrant is out of service at any one time, and, one (1) isolation valve at
each end of a statutory right-of-way. In commercial and industrial areas, in
addition to the above, line valves shall be spaced every 120 metres.
Blow Offs
2.10 Permanent blow offs shall be installed at all permanent dead-ends in accordance
with the specification drawings.
Air Release and Vacuum Valves
2.11 Air Release and Vacuum Valves shall be installed, in accordance with the
specification drawings, at the high points in all water main installations.
Fittings and Appurtenances
2.12 Fittings and appurtenances with other than standard hub ends shall be so
indicated on the design drawings. The location of fittings shall be dimensioned on
the design drawings.
Services
2.13 The diameter of water services shall be determined by the City Engineer
provided that in no case shall the diameter be less than 19 mm. If on-site
sprinkling is to be installed the Design Engineer must determine the diameter of
service required and indicate the diameter on the design drawings. No service
connection sizes greater than 50 mm and less than 100 mm will be permitted.
Water services shall be installed in accordance with the specification drawings.
Depth of Cover
2.14 The depth of the water main shall be sufficient to provide all services with a
minimum cover of 1.8 m to the top of the service anywhere within the Right-of-
way. In no instance shall the minimum cover over the crown of the water main be
less than 1.8 m.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 56
City of Armstrong
SCHEDULE C - Regulations, Standards and Specifications For The Design and
Construction of Water Systems
Tie-ins to Existing Water Mains
2.15 Connection of a new water pipe to an existing water main shall be completed by
City Forces unless the existing main has an acceptable provision for a direct
extension. The Owner shall pay for the supply and installation of all materials
required to complete the connection. The connection details shall be indicated on
the design drawings. Only City of Armstrong personnel may operate valves and
curb stops on the existing water mains.
Reservoirs
2.16 Reservoirs where required shall be designed to suit the particular circumstances.
In general, reservoir capacity shall be not less than:
Total Storage Requirement
=
A + B + E, where
A
=
Fire Storage
B
=
Equalization Storage
(25% of maximum day demand)
E
=
Emergency Storage (25% of A + B)
Reservoir design shall incorporate but not be limited to the following features:
-
the Owner shall submit a pre-design report detailing reservoir siting,
geotechnical investigation, sizing, design, construction, access, testing
and disinfection, and all relevant information, to the City Engineer, prior to
proceeding with the detailed design.
-
shall be to current Provincial Ministry of Health standards and a Ministry
of Health Permit to Construct works obtained.
-
shall be constructed of reinforced concrete.
-
shall be a 2-cell design of equal volume
-
shall be below ground and covered, unless specifically approved
otherwise by the City Engineer.
-
shall have SCADA interfaced to the City of Armstrong SCADA system.
-
shall include equipment and operations manuals.
-
shall include construction of access roads and security gates and fencing.
-
shall include overflow piping and discharge accommodation.
-
shall be designed to meet the approval of the City Engineer.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 57
City of Armstrong
SCHEDULE C - Regulations, Standards and Specifications For The Design and
Construction of Water Systems
Reservoir Disinfection and Testing:
-
disinfection shall be in accordance with the latest version of AWWA
Standard C652.
-
testing procedures shall be in accordance with the directions provided by
the City Engineer.
Pump Stations
2.17 Pump stations, where required, shall be designed for the particular
circumstances utilizing current technology and equipment and to the approval of
the City Engineer. In general, pump stations shall be designed to meet maximum
daily demands with the largest pump out of service with balanced storage on line.
A pre-design report providing pump station siting, site plan, geotechnical
investigation, piping schematics, and design calculations shall be submitted by
the Owner for review by the City Engineer prior to detailed design. Upon approval
of the pre-design report by the City Engineer, the Owner can proceed with
detailed design addressing the following general requirements.
A building permit is required prior to construction:
Pump Station design shall incorporate but not be limited to the following
features:
-
the Owner shall submit a pre-design report detailing pump station siting,
geotechnical investigation, building size, design, construction, access,
pump and piping schematics, electrical/electronic line diagrams,
chlorination, testing and disinfection, and all relevant information, to the
City Engineer, prior to proceeding with the detailed design.
-
shall be to current Provincial Ministry of Health standards and a Ministry of
Health Permit to Construct works obtained.
-
pump station design shall comply with WorkSafe BC regulations.
-
shall be constructed of reinforced concrete, all exposed walls to be
constructed of aesthetically concrete block.
-
shall include supply of underground BC Hydro 3 phase service.
-
shall be equipped with an overhead crane or approved mechanical device
for pump removal.
-
SCADA shall monitor building temperature, chlorine residual, turbidity,
pump run times, flow meters, pump bearing temperatures, reservoir
levels, line pressures, pump station entry and pump house intrusion.
-
SCADA to control solenoid valves.
-
pump and motor manufacturer to be acceptable to the City of Armstrong.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 58
City of Armstrong
SCHEDULE C - Regulations, Standards and Specifications For The Design and
Construction of Water Systems
-
shall include MCC and PLC control panels, surge suppressors.
-
shall have radio telemetry modem and antenna equipment.
-
shall have SCADA interfaced to the City of Armstrong SCADA system.
-
shall have on-site computer connected to PLC and interfaced with the City
of Armstrong SCADA system, complete with desk and chair.
-
electronic card-swipe keyless entry compatible with City of Armstrong
remote alarm monitoring.
-
pump station shall have a telephone (u/g from service pole) land line.
-
shall include equipment and operations manuals and equipment
warranties.
-
shall include construction of access roads, security gates, fencing, and
security lighting.
-
shall include asphalt parking lot and site landscaping.
-
shall be designed to meet the approval of the City Engineer.
Pressure Reducing Stations
2.18 Where a Pressure Reducing Station (PRV) is required to provide water at an
adequate reduced pressure to an area it must be designed to meet maximum
daily demand as well as fire flow requirements for the service area and shall
incorporate the following features:
-
to be designed using current technology and equipment.
-
to be designed and constructed to the approval of the City Engineer.
-
be located in a City of Armstrong Right-of-way but not under any
permanent road structures.
-
shall be to current Provincial Ministry of Health standards and a Ministry of
Health Permit to Construct works shall be obtained.
-
pump station design shall comply with WorkSafe BC regulations.
-
shall be constructed of reinforced concrete.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 59
City of Armstrong
SCHEDULE C - Regulations, Standards and Specifications For The Design and
Construction of Water Systems
3.0
CONSTRUCTION
Materials
3.01 Waterworks construction materials shall be in accordance with SCHEDULE L
Division 2 - Sitework Section 2C - Water Distribution Works.
Construction
3.02 Waterworks construction shall be in accordance with SCHEDULE L - Division 2 -
Sitework Section 2C - Water Distribution Works.
Testing
3.03 Waterworks testing and disinfection shall be in accordance with SCHEDULE L -
Division 2 - Sitework Section 2C - Water Distribution Works.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 60
City of Armstrong
SCHEDULE D - Regulations, Standards and Specifications For The Design and
Construction of Sanitary Sewers
SCHEDULE D
REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE
DESIGN AND CONSTRUCTION OF SANITARY SEWERS
This is Schedule D of the City of Armstrong
Subdivision and Development Servicing
Bylaw No. 1570, 2007
___________________________________
(Clerk)
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 61
City of Armstrong
SCHEDULE D - Regulations, Standards and Specifications For The Design and
Construction of Sanitary Sewers
SCHEDULE D
REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE
DESIGN AND CONSTRUCTION OF SANITARY SEWERS
1.0
GENERAL DESIGN
General
1.01 Where sanitary sewage collection and disposal is required, sanitary sewer
facilities including gravity sewer mains, pump stations and force mains if
required, manholes, service connections and related appurtenances shall be
provided by the Owner.
A sewer service lateral shall be installed where required to provide a connection
to each lot to be created by the subdivision and to any other existing or possible
future lot which can be serviced from mains installed by or for the subdivision.
The routing of sewers shall be in accordance with the directions of the City
Engineer.
Where sanitary sewer facilities are not required, rights-of-way may be required to
be provided by the Owner to allow for the eventual installation of this facility.
Such rights-of-way shall be registered in favour of the City of Armstrong at the
Owner's expense.
Septic tanks and disposal of effluent to ground shall not be permitted.
Standards and Specifications of this Schedule to Apply to Sewer Works
1.02 Standards and specifications contained in this Schedule shall apply to all sanitary
sewer installations constructed for or in the City of Armstrong. All standards not
specifically covered in these standards shall be as directed by the City Engineer.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 62
City of Armstrong
SCHEDULE D - Regulations, Standards and Specifications For The Design and
Construction of Sanitary Sewers
Approval of Engineering Drawings Required Prior to Construction
1.03 Engineering drawings showing detailed design of the necessary works shall be
submitted to the City Engineer for approval. No construction of sanitary sewers
shall commence until the drawings have been approved by the City Engineer.
These drawings shall show alignment and size of pipes, proposed grades,
distances between manholes, manhole invert elevations, existing ground line and
proposed final ground line over pipe, location of all service locations to the
property line, all easements, lift stations, force mains, pipe bedding requirements
and all other details which may be required by the City Engineer.
2.0
GENERAL CRITERIA
Pipe Capacity
2.01 Sanitary sewer facilities constructed in a subdivision shall be designed to provide
sufficient capacity to carry the required quantity of sewage from the full
contributing area as defined by the City Engineer.
Sewage design flows shall be based on the equivalent population of the
contributing area as determined by the City Engineer but no less than 66 persons
per hectare with an average per capita flow of 360 litres per day. A peaking factor
calculated using the Harmon Peak Factor curve shall be applied to the average
flow as follows:
Peak Factor = 1 + 14
4 + P
Where P = equivalent contributing population in thousands.
An infiltration rate of 5,000 litres per hectare per day shall be used. In areas
where the water table is high 8,000 litres per hectare per day shall be used.
The peaking factor shall be applied to the sanitary contribution only and not to
the infiltration allowance.
Pipe sizes shall be selected so that sewers flow 2/3 to 3/4 full at peak hour
design flow.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 63
City of Armstrong
SCHEDULE D - Regulations, Standards and Specifications For The Design and
Construction of Sanitary Sewers
Sizing of Sewer Mains
2.02 The minimum pipe size for sanitary sewer mains shall be 200 mm. No reduction
of pipe size shall be made downstream irrespective of pipe grade.
2.03 Sanitary Main Location and Alignment
Sanitary sewer service pipe grades shall be in accordance with Table B.1.
Sanitary sewer mains shall be located, wherever possible, where indicated on the
Specification Drawings.
Sanitary sewer mains shall generally be designed to follow a straight alignment
between manholes. Curved alignments within rights-of-way shall be subject to
the approval of the City Engineer and provided the pipe is set at a grade greater
than the specified minimum and pipe alignment is at a parallel offset with an
established boundary. In these cases, the radius of curvature shall be not less
than 50 metres, or twice the minimum radius recommended by the pipe
manufacturer, whichever is greater, the grade shall be not less than 1%, and the
design velocity must exceed 0.91 m/s.
Minimum Velocity and Design Grade
2.04 Minimum velocity for pipe flowing full or half full shall be 0.76 metres per second.
There is no maximum velocity for gravity sewer mains, however, where the
velocity exceeds 3.65 m/s consideration shall be given to possible scour and
hydraulic shock concerns.
Upstream sections of sewers require steeper grades to ensure self-cleansing
velocity under partial flow conditions. The following design alternatives are
acceptable:
2.4.1 The terminal section servicing 6 or less sanitary connections shall have a
grade of 1% greater than the minimum grade specified.
2.4.2 The sewer line servicing the 7th to 12th sanitary connection shall have a
grade of 0.5% greater than the minimum grade specified.
2.4.4 A sewer line servicing the 13th sanitary connection (or more) shall be at
the minimum grade specified, or greater.
2.4.5 The minimum specified pipe grades for sanitary mains are specified in
Table D.1.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 64
City of Armstrong
SCHEDULE D - Regulations, Standards and Specifications For The Design and
Construction of Sanitary Sewers
TABLE D.1
MINIMUM PIPE GRADES FOR SANITARY SEWER
Pipe Size (mm)
Grade (%)
100
2.00
150
1.00
200
0.45
250
0.33
300
0.25
375
0.20
Hydraulic Losses Across Manholes
2.05 The minimum drop in invert elevations across manhole benching shall be:
Straight Run
minimum grade
Deflections up to 45°
50 mm drop
Deflections 45° to 90°
65 mm drop
Minimum Depth of Cover
2.06 The minimum depth of cover for sanitary mains shall be 1.5 metres. Sanitary
mains shall be at a depth sufficient to provide sanitary sewer service to
residential basement elevations.
City of Armstrong approval is required prior to installing sanitary sewer mains
where 1.5 metre cover is not feasible or available.
Sanitary Manhole Spacing
2.07 Sanitary manholes shall be installed at a maximum spacing of 100 metres except
where the pipe grade exceeds 10% where the maximum spacing shall be 60
metres, at the following locations:
-
at all changes in pipe grade and/or alignment (for non curvilinear sewers).
-
at all changes in pipe size.
-
at all pipe junctions and intersections.
-
at the beginning and end of pipe curvature for curvilinear sewers.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 65
City of Armstrong
SCHEDULE D - Regulations, Standards and Specifications For The Design and
Construction of Sanitary Sewers
Where, in the opinion of the City Engineer, the grades of sewer pipes are
sufficient to provide proper cleaning, the maximum spacing of manholes where
the pipe grade is less than 10% may be increased to 120 metres.
Drop Manholes
2.08 Drop manholes shall only be used when the incoming sewers cannot be
steepened or where site conditions do not permit otherwise. Inside ramps may be
utilized when incoming sewers cannot be steepened and the elevation of the inlet
invert is less than 600 mm above the invert elevation of the centre of the
manhole where approved by the City Engineer. An outside drop manhole shall be
installed where the elevation of the inlet invert is 600 mm, or greater, above the
invert elevation of the centre of the manhole channel.
Clean-outs
2.09 Clean-outs shall not be substituted for manholes except where the sanitary main
will be extended for future subdivision/development and the maximum spacing
for manholes has not been exceeded.
Service Connections
2.10 Sanitary sewer services to single family dwellings and to each unit of duplexes
shall be 100 mm diameter. Each service shall be installed with an inspection
chamber in the highway right-of-way at property line.
Sanitary sewer services to multifamily sites, mobile home parks, institutional,
commercial and industrial sites, shall be sized in accordance with the British
Columbia Building Code - Part 7 Plumbing Services. Each service from 100 mm
to 150 mm in diameter shall be installed with an inspection chamber in the
highway right-of-way at property line and each service greater than 150 mm shall
be installed with a sanitary manhole at the sanitary main.
A single sanitary sewer service shall be installed to each legal lot. Strata
developments and other major developments will be permitted one sanitary
service connection unless approved otherwise by the City Engineer.
A service connection entering a manhole shall have its invert elevation at the
crown of the highest main entering the manhole. The service connection shall
discharge in the same direction as the benched flow in the manhole.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 66
City of Armstrong
SCHEDULE D - Regulations, Standards and Specifications For The Design and
Construction of Sanitary Sewers
Sanitary Lift Stations
2.11 The objective of the City of Armstrong is to minimize the number of City operated
and maintained sewage lift stations. All options to avoid the implementation of lift
stations must be thoroughly considered.
The Owner shall obtain approval from the City Engineer for the siting of a lift
station prior to proceeding with detailed design.
Prior to proceeding with a detailed design of a lift station the Owner shall submit
a pre-design report that addresses the design considerations of this criteria to the
City Engineer. Approval of the pre-design concepts must be obtained prior to
commencing the detailed design.
The location and construction pre-design report for a lift station shall include an
assessment of the following considerations:
-
design shall accommodate flows from the overall catchment area.
-
type of station and impact on neighbours, in particular odour impact.
-
construction dewatering requirements where applicable.
-
lift station security and vandal proofing.
-
uplift restraints based on maximum water levels.
-
location of power supply.
-
proximity to water mains and receiving sewer main.
-
vehicular access.
-
geotechnical investigation.
-
WorkSafe BC compliance.
-
Capital costs, operation and maintenance costs.
Sewage Lift Station design requirements shall include, but not be limited to, the
following:
-
to be designed using current technology and equipment.
-
to be designed and constructed to the approval of the City Engineer.
-
be located in a City of Armstrong Right-of-way but not under any
permanent road structures.
-
lift station design shall comply with WorkSafe BC regulations.
-
shall have SCADA interfaced to the City of Armstrong SCADA system.
-
provide minimum 2 hour storage between the high level alarm and the
start of overflow.
-
provide minimum of 3 minutes to elapse between successive pump starts
at peak flow conditions to prevent pump burnout.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 67
City of Armstrong
SCHEDULE D - Regulations, Standards and Specifications For The Design and
Construction of Sanitary Sewers
-
pumps shall operate alternatively.
-
pumps shall pump maximum flow with one pump in failure mode.
-
pump and electric motor manufacturer to be acceptable to City of
Armstrong.
-
provide emergency overflow to a confined storage area which prevents
flooding of buildings connected to the sewer system.
-
control panel to be mounted in isolated kiosk.
-
shall have radio telemetry modem and antenna equipment.
-
provide 347/600 volt connection for standby power, 110/220 volt
receptacle for small power tools, 19 mm pressure reduced water supply
for wash down and, illumination.
-
ball valves and check valves to located horizontally in separate chamber
outside of lift station.
-
paved vehicular access.
-
provide equipment and operations manuals and equipment warranties.
-
particular additional criteria for lift stations may be required by the City
Engineer.
Force Mains
2.12 The minimum force main diameter shall be 100 mm. Force mains shall be
designed and installed in the same manner as a water main. A locating tracer
wire shall be installed with the force main.
The maximum force main velocity shall be 3.65 m/s and the cleansing velocity
shall be 0.9 m/s. Air Release and Vacuum Valves, suitable for sewage flow, shall
be installed at the high points in all force main installations. Force mains shall
enter receiving manholes at crown to crown elevation and direct the flow into the
receiving channel without excessive spray and in the direction of the receiving
sewer flow.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 68
City of Armstrong
SCHEDULE D - Regulations, Standards and Specifications For The Design and
Construction of Sanitary Sewers
3.0
CONSTRUCTION
Materials
3.01 Sanitary Sewer construction materials shall be in accordance with SCHEDULE L
Division 2 - Sitework Section 2D - Sanitary Sewer Works.
Construction
3.02 Sanitary Sewer construction shall be in accordance with SCHEDULE L - Division
2 - Sitework Section 2D - Sanitary Sewer Works.
Testing
3.03 Sanitary Sewer testing shall be in accordance with SCHEDULE - Division 2 -
Sitework Section 2D - Sanitary Sewer Works.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 69
City of Armstrong
SCHEDULE E - Regulations, Standards and Specifications For The Design and
Construction of Drainage Systems
SCHEDULE E
REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE
DESIGN AND CONSTRUCTION OF DRAINAGE SYSTEM
This is Schedule E of the City of Armstrong
Subdivision and Development Servicing
Bylaw No. 1570, 2007
___________________________________
(Clerk)
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 70
City of Armstrong
SCHEDULE E - Regulations, Standards and Specifications For The Design and
Construction of Drainage Systems
SCHEDULE E
REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE
DESIGN AND CONSTRUCTION OF DRAINAGE SYSTEMS
1.0
GENERAL DESIGN
General
1.01 All subdivisions and developments within the City of Armstrong are subject to
compliance with the Provincial Riparian Areas Regulation. The Owner is
encouraged to obtain Ministry of Environment confirmation that the proposed
subdivision, strata or development will not adversely impact the environment at
the earliest stages of the approval process. Discharges to natural drainage
courses shall not adversely affect downstream properties.
The drainage system in the City of Armstrong shall consist of two components,
the minor and major systems. The minor system shall consist of underground
conduits and open channels and watercourses to convey a 25 year return flow
for residential, industrial, commercial, institutional, and high density residential
areas. The major system shall consist of surface flood paths, roadways, and
watercourses to convey a 100 year return flow. In special circumstances where
surface flood paths cannot be established, pipes and appurtenances of the minor
system may be enlarged to accommodate the major system flow.
The presence of an existing City drainage facility does not imply that the facility
has adequate capacity to receive the design flow nor does it indicate that the
drainage pattern of this facility is necessarily acceptable to the City.
All subdivisions and developments shall be adequately drained throughout the
year. Where the whole or part of any proposed subdivision or development has a
high water table or is subject to intermittent or periodic flooding, approval of the
subdivision or development shall be withheld until the City Engineer is satisfied
that appropriate steps have been taken to drain the land or otherwise remedy
such wet or flooding conditions.
Where a subdivision is traversed by a watercourse, drainage way or stream, a
right-of-way shall be provided along such watercourse or its planned realignment
of a width deemed necessary by the City Engineer for construction, maintenance,
conservation and/or beautification purposes.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 71
City of Armstrong
SCHEDULE E - Regulations, Standards and Specifications For The Design and
Construction of Drainage Systems
A natural drainage course shall not be altered or diverted unless such alteration
or diversion has been approved by the City Engineer.
Where it is necessary to convey a drainage system through privately owned land
the Owner shall obtain and grant a right-of-way in favour of the City of Armstrong.
Engineering drawings of the detailed storm water design shall be submitted to
the City Engineer for review. Construction shall not commence until such time as
an acceptable design has been approved by the City Engineer. The storm water
engineering drawings shall indicate both minor and major storm flow routing, and
grades, alignments, inverts, discharge points and all other relevant information,
for storm pipes and appurtenances.
The Owner shall submit a contour map at a 1:2500 scale with contour intervals of
not more than 0.5 metres, for the total drainage area. The total drainage area
boundary is to be indicated on the drawing. The contour map shall indicate the
final elevation for all proposed lot corners and the proposed site grading cuts and
fills.
2.0
DESIGN CRITERIA
Design Flows
2.01 For drainage basins less than 10 ha in size the Design Flows shall be based on
the Rational Method;
Q = CIA
360
where,
Q = Peak Rate of Ruin-off in m3/s
C = Run-off Coefficient
I = Average Rainfall Intensity for a storm whose duration is equal to the time
of concentration for the basin in mm/hr.
A = Area of watershed in hectares
Tc = Time of Concentration
For drainage basins greater than 10 ha in size the design flows shall be based on
computer storm water modeling or other methods acceptable to the City
Engineer.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 72
City of Armstrong
SCHEDULE E - Regulations, Standards and Specifications For The Design and
Construction of Drainage Systems
Design Time of Concentration (Tc) shall be based on calculation and in no case
will the Design Time of Concentration be less than 15 minutes for residential
areas and 10 minutes for industrial and commercial areas.
Storm sewers shall be designed for a 25 year peak storm return frequency for the
appropriate Design Time of Concentration. Refer to Specification Drawing ST-7
Rainfall Intensity-Duration Data. Run-off Coefficient (C) shall be in accordance
with Table E.1.
TABLE E.1
RUN-OFF COEFFICIENT
DESCRIPTION OF AREA
RUNOFF COEFFICIENT
Downtown commercial areas
0.80
Highway commercial and light
Industrial areas
0.60
Apartment and other high density
Multiple family areas
0.60
Single family residential, duplex and low
density multiple family area
0.40
Open areas, parks and playgrounds
0.25
Runoff coefficients other than those specified in this section shall be used only with the
written consent of the City Engineer.
Design Grade
2.02 Gravity storm sewers shall be designed for full flow, calculated using the
Manning Formula:
Q = AR0.667 x S0.5
n
where,
Q = Design flow in m3 per second
A =
Cross sectional area of pipe in m2
R =
Hydraulic radius in metres
S =
Slope of hydraulic grade line in m/m
n = Roughness Coefficient
The Roughness Coefficient (n) for the storm pipe shall be the coefficient certified
by the Manufacturer of the pipe.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 73
City of Armstrong
SCHEDULE E - Regulations, Standards and Specifications For The Design and
Construction of Drainage Systems
Minimum Pipe Grade
2.03 The minimum Storm pipe grades are:
TABLE E.2
MINIMUM PIPE GRADES FOR STORM SEWER
Pipe Diameter (mm)
Grade (%)
200
2.00 (catch basin leads)
250
0.40
300
0.32
375
0.23
400
0.20
450
0.18
525
0.15
600
0.12
675
0.10
750
0.09
900
0.07
Minimum Pipe Diameter
2.04 The minimum pipe diameter for storm mains shall be 250 mm and the minimum
diameter for catch basin leads shall be 200 mm. The minimum pipe diameter for
residential and nonresidential storm services shall be 150 mm.
Velocities and Joint Restraints
2.05 There is no maximum velocity for gravity storm mains, however, where the
velocity exceeds 3.65 m/s consideration shall be given to possible scour and
hydraulic shock problems. Gravity mains installed at grades exceeding 20% shall
be reviewed for joint restraint requirements.
Storm Manhole Spacing
2.06 Storm manholes shall be installed at a maximum spacing of 100 metres except
where the pipe grade exceeds 10% where the maximum spacing shall be 60
metres, at the following locations:
-
at all changes in pipe grade and/or alignment (for non curvilinear sewers).
-
at all changes in pipe size.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 74
City of Armstrong
SCHEDULE E - Regulations, Standards and Specifications For The Design and
Construction of Drainage Systems
-
at all pipe junctions and intersections.
-
at the beginning and end of pipe curvature for curvilinear sewers.
Where, in the opinion of the City Engineer, the grades of sewer pipes are
sufficient to provide proper cleaning, the maximum spacing of manholes where
the pipe grade is less than 10% may be increased to 120 metres.
Clean-outs
2.07 Clean-outs shall not be substituted for manholes except where the storm main
will be extended for future subdivision/development and the maximum spacing
for manholes has not been exceeded.
Catch Basin Spacing
2.08 Catch basins shall be located at maximum spacing of 75 m in the drainage path
and at all intersections. Tributary areas shall not exceed 500 m2 on road grades
up to 5% and 400 m2 on steeper grades, per catch basin.
Catch basins shall be located at all low points or be spaced at intervals such that
not more than 10% of the gutter flow reaching each inlet will pass on to the next
inlet downstream, provided this carry-over is not objectionable to pedestrian or
vehicular traffic and the inlet is not in a sump.
Catch basins shall be located at intervals such that surface drainage does not
exceed gutter or flow channel capacities, to eliminate overflow to driveways,
boulevard, setbacks, sidewalks, or private property.
Catch basins shall be located at all intersections, preferably at the EC or BC of
curb returns. Catch basins shall not be installed in wheelchair ramps, crosswalks,
or driveways.
Side-inlet and/or twin-inlet catch basins shall be provided as sags in road grades
and in downhill cul-de-sacs.
Catch Basin Leads
2.09 Catch basin leads shall discharge into a manhole and not directly into the storm
pipe wherever possible.
Catch basin leads shall have a minimum cover of 0.9 metres.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 75
City of Armstrong
SCHEDULE E - Regulations, Standards and Specifications For The Design and
Construction of Drainage Systems
Inlet and Outlet Structures
2.10 Inlet and Outlet Structures shall be designed and submitted for each application
for review by the City Engineer. Inlet and Outlet Structures shall include trash
racks, safety grillage, energy dissipation, oil separators, safety railings, rip-rap,
monitoring devices, as required.
2.11 Storm Main Location and Alignment
Storm sewer service pipe grades shall be 2% for 100 mm diameter and 1% for
150 mm diameter. Storm sewer mains shall be located, wherever possible, in
accordance with Specifications Drawings.
Storm sewer mains shall generally be designed to follow a straight alignment
between manholes. Curved alignments within rights-of-way shall be subject to
the approval of the City Engineer and provided the pipe is set at a grade greater
than the specified minimum and pipe alignment is at a parallel offset with an
established boundary. In these cases, the radius of curvature shall be not less
than 50 metres, or twice the minimum radius recommended by the pipe
manufacturer, whichever is greater, the grade shall be not less than 1%, and the
design velocity must exceed 0.91 m/s.
Service Connections
2.12 Storm sewer services to single family dwellings and to each unit of duplexes shall
be 150 mm diameter. A storm inspection chamber is not required.
Storm sewer services to multifamily sites, mobile home parks, institutional,
commercial and industrial sites, shall be sized in accordance with the British
Columbia Building Code - Part 7 Plumbing Services. The minimum service size
shall be 150 mm in diameter, a storm inspection chamber is not required,
however, each service greater than 150 mm shall be installed with a storm
manhole at the storm main.
A single storm sewer service shall be installed to each legal lot. Strata
developments and other major developments will be permitted one storm service
connection unless approved otherwise by the City Engineer.
A service connection entering a manhole shall have its invert elevation at the
crown of the highest main entering the manhole. The service connection shall
discharge in the same direction as the benched flow in the manhole.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 76
City of Armstrong
SCHEDULE E - Regulations, Standards and Specifications For The Design and
Construction of Drainage Systems
Major Flow Routing
2.13 Major flow routing for 100 year peak storm frequency shall be identified on the
design drawings. The proportion of flow to be carried along the major flow routing
shall be the total major flow less the flow carried in the minor storm system. All
overland flows, in excess of 0.05 m3/sec shall have specifically designed flow
routes that are protected and preserved by restrictive covenants or rights-of-way.
The major flow routing shall normally be provided along roads and in natural
watercourses. In some cases the major flow may also be carried alongside the
road in grassed swales, and across country in statutory rights-of-way.
In areas where surface major flow routes cannot be provided a pipe system will
be designed to accommodate the required major flow, and sufficient inlet
capacity will be provided to accommodate introduction of the major flow route
into a piped system.
Major flow routing over 0.05 m3/sec shall be shown and sufficient design shall be
carried out to provide assurance to the City Engineer that no serious property
damage or endangering of public safety will occur under major flow conditions.
The discharge point from the development for the major flow route, shall be
coordinated with the downstream routing to outfalls as determined by the City of
Armstrong. Where major flow outfalls to a receiving watercourse, the velocity
shall not exceed 1.5 m3/sec. An energy dissipater shall be provided to minimize
erosion.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 77
City of Armstrong
SCHEDULE E - Regulations, Standards and Specifications For The Design and
Construction of Drainage Systems
3.0
CONSTRUCTION
Materials
3.01 Storm Sewer construction materials shall be in accordance with SCHEDULE L -
Division 2 - Sitework Section 2E - Storm Sewer Works.
Construction
3.02 Storm Sewer construction shall be in accordance with SCHEDULE L - Division 2
- Sitework Section 2E - Storm Sewer Works.
Testing
3.03 Storm Sewer testing shall be in accordance with SCHEDULE L - Division 2 -
Sitework Section 2E - Storm Sewer Works.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 78
City of Armstrong
SCHEDULE F - Regulations, Standards and Specifications For The Design and
Construction of Concrete Curbs, Gutters, Sidewalk, Stairs
SCHEDULE F
REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE DESIGN AND
CONSTRUCTION OF CONCRETE CURBS, GUTTERS, SIDEWALK, STAIRS
This is Schedule F of the City of Armstrong
Subdivision and Development Servicing
Bylaw No. 1570, 2007
___________________________________
(Clerk)
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 79
City of Armstrong
SCHEDULE F - Regulations, Standards and Specifications For The Design and
Construction of Concrete Curbs, Gutters, Sidewalk, Stairs
SCHEDULE F
REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE DESIGN AND
CONSTRUCTION OF CONCRETE CURBS, GUTTERS, SIDEWALK, STAIRS
1.0
GENERAL DESIGN
General
Where the provisions of Schedule A of this Bylaw require the provision of curb
and gutters, sidewalk, boulevard, or concrete stairs, the Owner shall construct
such services in a manner consistent with the regulations, standards, and
specifications set out in this Schedule and elsewhere in this Bylaw.
Engineering drawings showing the detailed design of these works shall be
submitted to the City Engineer for review. No construction of the works shall
commence until the design drawings have been approved by the City Engineer.
Curb, Gutter and Sidewalk Requirements
1.01 Curb, gutter and sidewalk shall be provided in accordance with Table F.1.
TABLE F.1
CURB, GUTTER SIDEWALK REQUIREMENTS
HIGHWAY
CLASSIFICATION
CURB TYPE
REQUIRED
MINIMUM SIDEWALK
WIDTHS
Residential Zones
Arterial
Major Collector
Minor Collector
Local
Non-mountable (CGS-1)
Non-mountable (CGS-1)
Mountable (CGS-2)
Mountable (CGS-2)
1.85 m
1.85 m
1.85 m
1.85 m
Commercial Zone
Arterial
Major Collector
Minor Collector
Non-mountable (CGS-1)
Non-mountable (CGS-1)
Non-mountable (CGS-1)
1.85 m
1.85 m
1.85 m
Industrial
Arterial
Major Collector
Minor Collector
Local
Non-mountable (CGS-1)
Non-mountable (CGS-1)
Non-mountable (CGS-1)
Non-mountable (CGS-1)
1.85 m
1.85 m
1.85 m
1.85 m
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 80
City of Armstrong
SCHEDULE F - Regulations, Standards and Specifications For The Design and
Construction of Concrete Curbs, Gutters, Sidewalk, Stairs
Location of Sidewalk
1.02 Where sidewalk is required on one side of a highway, the sidewalk shall be
located on the same side as the street lights where the street lights are davit
lights on hydro poles. Where new street lights are to be installed, the City
Engineer shall determine the side of the highway to locate both the sidewalk and
the street lights.
2.0
DESIGN CRITERIA
Design Gradient
2.01 The design gradient for curb and gutters shall be as specified for highways in
Schedule B of this Bylaw, except that the minimum gradient around curb returns
and around cul-de-sacs shall be 0.8%.
Curb Return
2.02 The minimum curb return radius shall be as set out in Schedule B of this Bylaw.
Elevations shall be shown on the design drawings for the beginning and end of
the curb return, and at any grade changes in between. Design drawings shall
provide all geometric details both vertically and horizontally for curb returns.
Grading of Boulevards
2.03 Upon completion of road, curb and gutter and sidewalk construction, boulevards
shall be shaped, graded and landscaped as shown on the Design Drawings.
Unless otherwise approved, boulevards shall be graded to drain to the curb and
gutter.
Sidewalk Cross-Sections
2.04 Sidewalk Cross -sections shall have the concrete thickness and steel reinforcing
as detailed on Specification Drawings CGS-4, CGS-5 and CGS-6.
Driveway Access
2.05 Driveway access grades across highway boulevards shall be not less than 4%
and not more than 6%.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 81
City of Armstrong
SCHEDULE F - Regulations, Standards and Specifications For The Design and
Construction of Concrete Curbs, Gutters, Sidewalk, Stairs
Curb and Gutter Cross-Sections
2.06 Curb and gutter cross-sections, for non-mountable and mountable concrete curb
and gutter, shall be as detailed on Specification Drawings CGS-1 and CGS-2.
Commercial and Industrial Reinforced Concrete Accesses
2.07 Commercial and Industrial reinforced concrete accesses shall be as detailed in
Specification Drawing CGS-4.
Wheelchair Ramps
2.08 Wheelchair ramps shall be provided at all intersections on highways provided
with sidewalks and at all designated cross-walks. Wheelchair ramps shall be
constructed in accordance with Specification Drawing CGS-5.
3.0
CONSTRUCTION
Materials
3.01 Concrete curbs, gutters, sidewalks, stairs construction materials shall be in
accordance with SCHEDULE L - Division 2 - Sitework Section 2F - Concrete
Curbs, Gutters, Sidewalk, Stairs.
Construction
3.02 Concrete curbs, gutters, sidewalks, stairs construction shall be in accordance
with SCHEDULE L - Division 2 - Sitework Section 2F - Concrete Curbs, Gutters,
Sidewalk, Stairs.
Testing
3.03 Concrete curbs, gutters, sidewalks, stairs testing shall be in accordance with
SCHEDULE L - Division 2 - Sitework Section 2F - Concrete Curbs, Gutters,
Sidewalk, Stairs.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 82
City of Armstrong
SCHEDULE G - Regulations, Standards and Specifications For The Design and
Construction of Street Lighting
SCHEDULE G
REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE
DESIGN AND CONSTRUCTION OF STREET LIGHTING
This is Schedule G of the City of Armstrong
Subdivision and Development Servicing
Bylaw No. 1570, 2007
___________________________________
(Clerk)
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 83
City of Armstrong
SCHEDULE G - Regulations, Standards and Specifications For The Design and
Construction of Street Lighting
SCHEDULE G
REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE
DESIGN AND CONSTRUCTION OF STREET LIGHTING
1.0
GENERAL DESIGN
General
Where the provisions of Schedule A of this Bylaw require the provision of street
lighting, the Owner shall construct street lighting including all conduit, conductor,
bases, poles, luminaries, lamps, fixtures, photo cells, control equipment, permits
and fees, and all related appurtenances consistent with the regulations,
standards, and specifications set out in this Schedule and the requirements of
the Province of British Columbia Electrical Inspector.
Detailed design drawings shall be submitted to the City Engineer for review.
Construction shall not commence until the design drawings have been approved
by the City Engineer. Electrical record drawings and wiring diagrams shall be
submitted for review by the City Engineer prior to acceptance of the street
lighting design by the City Engineer.
Electrical Permit and Fees
1.01 The Owner shall be responsible for obtaining all required electrical permits,
paying for all fees for such permits, and for arranging for all electrical inspections
for the electrical works.
2.0
DESIGN CRITERIA
Levels of Illumination
2.01 The average levels of illumination in lux, measured 1.45 m above the roadway
shall be in accordance with Table G.1. The maximum uniformity ratio for urban
roads shall be 6:1 and for collector and arterial roads shall be 3:1.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 84
City of Armstrong
SCHEDULE G - Regulations, Standards and Specifications For The Design and
Construction of Street Lighting
TABLE G.I
LEVELS OF ILLUMINATION
Road Classification
Residential Area
(Lux)
Commercial/Industrial
Area (Lux)
Arterial
10
22
Collector
10
13
Local/Industrial
4.5
10
Pole Locations
2.02 Davit poles and fixtures shall be located on all collector and arterial classified
highways and post top poles and fixtures shall be located on all local classified
highways, in accordance with Specification Drawings SL-1, SL-2, SL-3, SL-4, and
SL-5.
Pole locations, in general, shall be aligned with property lines and shall not
conflict with driveways, fire hydrants, and underground services. Street light
poles shall be off-set as indicated on Specification Drawings RD-1, RD-2, RD-3
and RD-4.
Connection to Utility
2.03 Provide for a maximum of 8 post top street lights per electrical service
connection. Each connection to BC Hydro shall be made with an underground
service to the power base pole.
3.0
CONSTRUCTION
Materials
3.01 Street Lighting construction materials shall be in accordance with SCHEDULE L -
Division 2 - Sitework Section 2G - Street Lighting.
Construction
3.02 Street Lighting construction shall be in accordance with SCHEDULE L - Division
2 - Sitework Section 2G - Street Lighting.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 85
City of Armstrong
SCHEDULE G - Regulations, Standards and Specifications For The Design and
Construction of Street Lighting
Testing
3.03 Street Lighting testing shall be in accordance with SCHEDULE L - Division 2 -
Sitework Section 2G - Street Lighting.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 86
City of Armstrong
SCHEDULE H - Regulations, Standards and Specifications For The Design and
Construction of Hydro, Telephone, Gas, CATV
SCHEDULE H
REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE
DESIGN AND CONSTRUCTION OF HYDRO, TELEPHONE, GAS. CATV
This is Schedule H of the City of Armstrong
Subdivision and Development Servicing
Bylaw No. 1570, 2007
___________________________________
(Clerk)
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 87
City of Armstrong
SCHEDULE H - Regulations, Standards and Specifications For The Design and
Construction of Hydro, Telephone, Gas, CATV
SCHEDULE H
REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE
DESIGN AND CONSTRUCTION OF HYDRO, TELEPHONE, GAS, CATV
1.0
GENERAL DESIGN
General
Where the provisions of Schedule A of this Bylaw require the provision of hydro,
telephone, gas, and catv, the Owner shall coordinate the design of the City
infrastructure with the Utility Company design, supply and construct all materials
in accordance with the respective Utility company plans and specifications. All
Utility Company infrastructure designs shall be submitted for review by the City
Engineer. Utility Company works shall not proceed until their design(s) have been
approved by the City Engineer.
Fees
1.01 The Owner shall secure all permits and pay for all fees and material costs
required for the installation of the hydro, telephone, gas and catv utilities.
2.0
DESIGN CRITERIA
Horizontal Location
2.01 The preferred horizontal location for underground hydro, telephone and catv
ducting, and gas main piping, is shown on Specification Drawings RD-1, RD-2,
RD-3 and RD-4. Hydro, telephone, catv, and gas design drawings shall recognize
municipal utilities and the final design shall have the approval of the City
Engineer.
Vertical Location
2.02 All hydro, telephone, catv, and gas main piping shall have the minimum cover as
specified by the respective Utility Company.
Detailed Design
2.03 Detailed design drawings shall be in accordance with the latest issue of the
following specifications:
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 88
City of Armstrong
SCHEDULE H - Regulations, Standards and Specifications For The Design and
Construction of Hydro, Telephone, Gas, CATV
2.3.1 BC Hydro Specification No. 1323.
2.3.2 Telus Specification No. 6020.
2.3.3 Terasen Gas Specification No. CSA-Z184-M92.
2.3.4 CATV materials shall conform to Telus Specification No. 6020 except that
CATV duct shall be 50 mm PVC 700 series orange teleduct.
Boulevard Restoration
2.04 The Owner is responsible to ensure that roads and boulevards, which have been
disturbed by the Utility Companies works, are restored to the City of Armstrong
road and boulevard specifications immediately upon completion of the Utility
works.
3.0
CONSTRUCTION
Materials
3.01 Hydro, Telephone, Gas, CATV construction materials shall be in accordance with
SCHEDULE L - Division 2 - Sitework Section 2H - Hydro, Telephone, Gas,
CATV.
Construction
3.02 Hydro, Telephone, Gas, CATV construction shall be in accordance with
SCHEDULE L - Division 2 - Sitework Section 2H - Hydro, Telephone, Gas,
CATV.
Testing
3.03 Hydro, Telephone, Gas, CATV testing shall be in accordance with SCHEDULE L
- Division 2 - Sitework Section 2H - Hydro, Telephone, Gas, CATV.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 89
City of Armstrong
SCHEDULE I - Regulations, Standards and Specifications For The Design and
Construction of Landscaping
SCHEDULE I
REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE
DESIGN AND CONSTRUCTION OF LANDSCAPING
This is Schedule I of the City of Armstrong
Subdivision and Development Servicing
Bylaw No. 1570, 2007
___________________________________
(Clerk)
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 90
City of Armstrong
SCHEDULE I - Regulations, Standards and Specifications For The Design and
Construction of Landscaping
SCHEDULE I
REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE
DESIGN AND CONSTRUCTION OF LANDSCAPING
1.0
GENERAL DESIGN
General
Where the provisions of Schedule A of this Bylaw require the provision for
boulevard and/or right-of-way landscaping and irrigation the Owner shall submit
landscaping and irrigation drawings to the City Engineer for review. The
landscaping and irrigation works shall not proceed until design drawings have
been approved by the City Engineer.
2.0
DESIGN CRITERIA
General
2.01 Landscaping material shall be compatible with the climatic conditions enjoyed by
the City of Armstrong. Where, in opinion of the City Engineer, the landscape
design requires the expertise of a Landscape Architect the Owner shall engage a
Landscape Architect to prepare the landscape and irrigation design and
specifications for review by the City Engineer.
Grading of Boulevards
2.02 Upon completion of road, curb and gutter and sidewalk construction, boulevards
shall be shaped, graded and landscaped a shown on the Design Drawings.
Unless otherwise approved, boulevards shall be graded to drain to the curb and
gutter.
3.0
CONSTRUCTION
Materials
3.01 Landscaping construction materials shall be in accordance with SCHEDULE L -
Division 2 - Sitework Section 2I - Landscaping.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 91
City of Armstrong
SCHEDULE I - Regulations, Standards and Specifications For The Design and
Construction of Landscaping
Construction
3.02 Landscaping construction shall be in accordance with SCHEDULE L - Division 2 -
Sitework Section 2I - Landscaping.
Testing
3.03 Landscaping testing shall be in accordance with SCHEDULE L - Division 2 -
Sitework Section 2I - Landscaping.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 92
City of Armstrong
SCHEDULE J - Specification Drawings
SCHEDULE J
SPECIFICATION DRAWINGS
This is Schedule J of the City of Armstrong
Subdivision and Development Servicing
Bylaw No. 1570, 2007
___________________________________
(Clerk)
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 93
City of Armstrong
SCHEDULE J - Specification Drawings
SCHEDULE J
SPECIFICATION DRAWINGS
1.0
GENERAL
Application of Specification Drawings
1.01 Specification Drawings are applicable where the provisions of Schedule A of this
Bylaw require the preparation of design drawings for: roads, water, sanitary
sewer, drainage, curbs, gutters, sidewalk, underground hydro, telephone, catv,
gas, street lighting, landscaping, and other permanent structures.
The application of Specification Drawings is project specific. Where required, the
City Engineer will clarify which Specification Drawings are applicable to the
Subdivision or Development for which application has been made.
Where no standard in these Specification Drawings is applicable for the works
and services required, instructions and requirements may be obtained from the
City Engineer.
2.0
SPECIFICATION DRAWINGS
Highways - (Schedule B)
2.01 Specification Drawings
RD-1
18 m R/W Urban Local Road Cross-Section
RD-2
20 m R/W Urban Local Road Cross-Section
RD-3
18 m R/W Urban Road & Cul-de-Sac
RD-4
20 m R/W Urban Road & Cul-de-Sac
RD-5
6 m and 7.6 m R/W Lane Cross-Section
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 94
City of Armstrong
SCHEDULE J - Specification Drawings
Water Systems - (Schedule C)
2.02 Specification Drawings
W-1
Thrust Block Details
W-2
Typical 19 mm Water Service Connection
W-3
Standard Fire Hydrant Detail
W-4
Standard Fire Hydrant Detail c/w Mueller MVB Valve Box
W-5
Typical Blow Off Assembly
W-6
Standard Valve Box Assembly
W-7
Mueller MVB Valve Box
W-8
Air Release Valve
W-9
H-20 Manhole Frame & Cover
W-10
Residential Water Meter
W-11
Commercial Water Meter
W-12
Pit Setter Water Meter
Sanitary Sewers - (Schedule D)
2.03 Specification Drawings
SAN-1
Typical 1050 mm Sanitary Manhole
SAN-2
H-20 Manhole Frame & Cover
SAN-3
Typical 1050 mm Sanitary Drop Manhole
SAN-4
Typical 100 mm Sanitary Service Connection
SAN-5
Inspection Chamber for Sanitary Connection
Drainage Systems - (Schedule E)
2.04 Specification Drawings
ST-1
Precast Reinforced Conc. Catch Basin
ST-2
Typical 1050 Storm Manhole
ST-3
H-20 Manhole Frame & Cover
ST-4
Typical 150 mm Storm Service Connection
ST-5
150 mm Inserta Tee Storm Service Connection
ST-6
Manhole Requirements for Storm Sewer Services
ST-7
Rainfall Intensity-Duration Data
ST-8
Typical Concrete Inlet Structure
ST-9
Typical Concrete Outlet Structure
ST-10
Twin Inlet Catch Basin Frame
ST-11
Typical Drainage Drywell
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 95
City of Armstrong
SCHEDULE J - Specification Drawings
Servicing - (Schedules C, D, E)
2.05 Specification Drawings
SER-1
Typical Lot Servicing
Curbs, Gutter, Sidewalk, Stairs - (Schedule F)
2.06 Specification Drawings
SP-1
Typical Sign Post Base
CGS-1
Standard High-Back Curb & Gutter
CGS-2
Mountable Curb & Gutter
CGS-3
Standard Sidewalk
CGS-4
Sidewalk Crossing at Driveway Entrance
CGS-5
Wheelchair Sidewalk Ramp
CGS-6
Standard Walkway
CGS-7
Standard Pathway
RS-1
Reinforced Concrete Stairs
RS-2
Sidewalk Railing
RS-3
Sidewalk Fence
Street Lighting - (Schedule G)
2.07 Specification Drawings
SL-1
9.00 m Davit Street Lights
SL-2
9.00 m Davit Concrete Pedestal
SL-3
Post Top Street Light
SL-3-I
Post Top Street Light with Irrigation & Electrical Outlet
SL-4
Post Top Street Light/Power Base
SL-4-I
Post Top Street Light/Power Base with Irrigation & Electrical Outlet
SL-5
5.00 m Post Top Concrete Pedestal
SL-6
Bracket for Hanging Baskets
Hydro, Telephone, Gas, CATV - (Schedule H)
2.08 Specification Drawings
(To Hydro, Telephone, Gas, and CATV Specifications)
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 96
City of Armstrong
SCHEDULE J - Specification Drawings
Landscaping - (Schedule I)
2.09 Specification Drawings
TRE-1
Typical Double Tree Stakes For Trees Over 2 m High
TRE-2
Typical Tree (with grate, guard, and receptacle)
Engineering Drawings - (Schedule K)
2.10 Specification Drawings
DD-PL
ANSI 'D' Size Plan Sheet
DD-PP
ANSI 'D' Size Plan/Profile Sheet
DD-LG
ANSI 'D' Size Legend
SC-1
Utility Service Card
Miscellaneous
2.11 Specification Drawings
S-1
Typical Road Construction Ahead Sign
UT-1
Typical Trench in Roadway
UT-2
Typical Trench in Boulevard
UT-3
Utility Main Relocation Details
SG-1
Lockable Swing Gate
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 97
City of Armstrong
SCHEDULE K - Regulations, Standards and Specifications For Surveys and Design
Drawings
SCHEDULE K
REGULATIONS, STANDARDS AND SPECIFICATIONS FOR
SURVEYS AND DESIGN DRAWINGS
This is Schedule K of the City of Armstrong
Subdivision and Development Servicing
Bylaw No. 1570, 2007
___________________________________
(Clerk)
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 98
City of Armstrong
SCHEDULE K - Regulations, Standards and Specifications For Surveys and Design
Drawings
SCHEDULE K
REGULATIONS, STANDARDS AND SPECIFICATIONS FOR
SURVEYS AND DESIGN DRAWINGS
1.0
GENERAL DESIGN
General
Where the provisions of Schedule A of this Bylaw require the preparation of
design drawings for: roads, water, sanitary sewer, drainage, curbs, gutters,
sidewalk, underground hydro, telephone, catv, gas, street lighting, landscaping,
and other permanent structures, the following regulations, standards, and
specifications for surveys and design drawings shall apply.
Where no standard is defined in this schedule for the preparation of a design
drawing to define a particular service, structure, or other item, instructions and
requirements may be obtained from the City Engineer.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 99
City of Armstrong
SCHEDULE K - Regulations, Standards and Specifications For Surveys and Design
Drawings
2.0
DESIGN CRITERIA
General
2.01 The Owner shall not proceed with any construction until such time as engineering
drawings have been accepted by the City of Armstrong. Acceptance of
engineering drawings is indicated by date and signature of the City Engineer, or
authorized delegate, on the accepted design drawings indicating that the design
drawings have been 'Approved in Principle'.
Design and Construction Administration
2.02 Where works and services are required under Schedule A of this Bylaw the
Owner shall appoint a qualified Engineer to undertake the project engineering
survey, design, field reviews, and record drawings in accordance with the
provisions of this Bylaw. The Owner shall provide a confirmation of Professional
Assurance Certificate, in accordance with Schedule O of this Bylaw, which has
been dated, witnessed, and signed by both the Owner and the Engineer.
Proof of Engineers Professional Liability Insurance (Errors and Omissions) shall
be provided for all projects where the value of the works and services exceeds
One Hundred Thousand Dollars ($100,000.00).
The City of Armstrong review and approval in principle of the engineering design
drawings does not confirm the accuracy or adequacy of the design nor does the
City of Armstrong accept responsibility for any damages or costs incurred due to
errors or omissions, or deficiencies in the design or location of any existing or
new works and services.
Legal Surveys
2.03 The Owner shall utilize a registered British Columbia Land Surveyor (B.C.L.S.)
for project legal survey and preparation of plans for registered at the British
Columbia Land Title Office.
For new development the survey plan shall be prepared in a manner to dedicate
as 'road' - corner cuts 3.0 metres by 3.0 metres on local streets and 5.0 metres
by 5.0 metres on collector and arterial streets at all street intersections.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 100
City of Armstrong
SCHEDULE K - Regulations, Standards and Specifications For Surveys and Design
Drawings
Design Surveys
2.04 Design surveys shall be conducted in a manner which will not create a nuisance
to traffic or the Public. The permission of registered property owners is required
before entering private property.
All elevations shall be referenced to Geodetic Survey of Canada (GSC) datum.
2.05 Design Drawings
Design drawings shall provide the following information plus any additional
information deemed necessary to fully describe the design and scope of the
proposed works. Where applicable, existing works shall be indicated on the
design drawings.
North Arrow
RV Parking (where applicable)
Legend
Storm Manholes & Inverts
Referenced Geodetic Benchmark
Catch Basins, Leads & Inverts
Legal Property Lines
Storm Main Plans & Profiles
Lot Dimensions and Bearings
Storm Services
Found Iron Pins
Sanitary Manholes and Inverts
Buried/Destroyed Iron Pins
Sanitary Mains Plans & Profiles
Coordinates for Reference Iron Pins
Sanitary Services
Road Plans and Profiles including Curb,
Water Main Plans & Profiles
Gutter & Sidewalk Plans and Profiles
Water Main Valves & Fittings
Hydro, Telephone & Street Light Poles
Water Services & Curb Stops
U/G Power, Telephone, CATV
Fire Hydrants
Prominent Features within the R/W
Air Release Valves
Road Cross-Sections
Blow-offs
Pavement Structure
Gas Mains
Aggregate Depths
Transit Bus Bays
Pavement Elevations
Information Signs
Curve & Spiral Data
Regulatory Signs
Lot Corner Elevations
Lot Grades
Control/Containment of Surface Water
Major Flow Routing
Lot & Plan Numbers
Stationing and Off-sets
Drainage Courses
Retention Ponds
Site Grading Details
Canada Post Mail Boxes
Any additional information as determined
by the City Engineer
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 101
City of Armstrong
SCHEDULE K - Regulations, Standards and Specifications For Surveys and Design
Drawings
2.5.1 The existing information shall be illustrated with a 0.18 mm line size and
proposed construction shall be illustrated with a 0.70 mm line size.
2.5.2 The scale of all design drawings shall be 1:500 Horizontal and
1:50 Vertical. Any deviation shall first be approved by the City Engineer.
2.5.3 The Project Cover Sheet / Key Plan shall indicate the Designers Name,
Address, Telephone and Fax Number, the Project Number, the Site
Location, the Legal Description of Properties involved, and an Index of the
Design Drawings.
2.5.4 Design Drawings shall be organized and individual plan/profile drawings
shall be submitted as follows;
-
Street design including curb and gutter, sidewalks and other
related surface works on plan/profile drawings.
-
Water works, storm and sanitary mains and service connections
and related appurtenances on plan/profile drawings.
-
Road cross-sections and specific construction details on
plan/profile drawings.
-
Street and signal lighting on plan drawings.
-
General arrangement plan indicating all private utility servicing.
2.5.5 All backup design calculations shall be retained by the Owners Engineer
and submitted when requested by the City Engineer.
Design Drawing Submission
2.06 All design drawings shall be submitted in the City of Armstrong standard format
as shown in specification drawings. The City of Armstrong has available a
standard CD-ROM with all the standard symbols, line types, layering
conventions, etc., for preparation of the design drawings.
The Owner's Engineer shall submit four (4) complete sets on size ANSI 'D' and
one (1) set reduced to 280 mm x 430 mm (11" x 17") of design drawing prints,
date stamped, sealed and signed by the Engineer, for review by the City
Engineer.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 102
City of Armstrong
SCHEDULE K - Regulations, Standards and Specifications For Surveys and Design
Drawings
Additional sets of revised drawings are to be submitted by the Owner on request
of the City Engineer until such time as the revised design drawings are approved
by the City Engineer.
The Owner shall arrange for the design and submission of four (4) complete sets
of hydro, telephone, gas, and catv design drawings.
The Owner shall arrange for the submission of signed and sealed engineering
drawings to the Provincial Ministry of Health for a Certificate to Construct Water
Works.
Pre-Construction Requirements
2.07 No construction shall occur until such time as engineering drawings have been
accepted by the City Engineer. Such acceptance is indicated only by the
signature of the City Engineer, or authorized delegate, on the submitted design
drawings. These design drawings shall be referred to as the City of Armstrong
'Approved in Principle' Design Drawings.
The Owner shall provide the following documentation after acceptance of the
Engineering Submission and before commencing any works within the City of
Armstrong rights-of-way as follows:
2.7.1 A Signed and Sealed Servicing Agreement substantially in accordance
with Schedule M.
2.7.2 Proof of Insurance in accordance with the terms and conditions provided
in the Servicing Agreement, naming the City of Armstrong as a 'Named
Additional Insured'. The Applicant's insurance provider must submit a
completed Schedule V.
2.7.3 Submission of Performance Security in the amount equal to One Hundred
and Twenty-Five (125%) Percent of the estimated off-site servicing costs.
Performance Security shall be cash or clean irrevocable letter of credit. A
letter of credit shall be in a form acceptable to the City of Armstrong.
2.7.4 Provision of a Field Review of Construction By A Professional Engineer
Schedule O signed by the Owner's Engineer.
2.7.5 Submission of a copy of the WorkSafe BC 'Notice of Project'.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 103
City of Armstrong
SCHEDULE K - Regulations, Standards and Specifications For Surveys and Design
Drawings
2.7.6 Submission of a testing schedule for quality control of the construction
materials and construction works, including the name of the Testing Firm
and the Testing Firm contact person.
2.7.7 Submission of approvals, where applicable, from Provincial Ministry of
Highways, Federal Fisheries and Oceans Canada, Provincial Ministry of
Environment, and any other Provincial or Federal approvals required for
approval of the proposed works.
Post Construction and City of Armstrong Acceptance
2.08 On completion of works and services the Owner's Engineer shall submit a bound
construction completion report to the City Engineer that contains the following
documentation:
2.8.1 A Certificate of Inspection signed and sealed by the Owner's Engineer.
2.8.2 Complete Materials and Workmanship Testing Reports including,
aggregate sieves, proctor test, in-situ density tests, asphalt
marshal/compaction densities, concrete tests, sanitary sewer
pressure/leakage tests, water main pressure leakage tests, water
bacteriological tests and certification in accordance with Schedule X. All
materials testing reports shall be signed and sealed by the Engineer for
the Owner's testing agency and confirm that all works tested meet or
exceed the requirements of this Bylaw.
2.8.3 Fire Hydrant Flow Test and Test Report for all newly installed fire hydrants
in accordance with Schedule Y. The hydrant(s) shall be colour coded and
an identification number stamped on the hydrant spindle in accordance
with Specification Drawing W-3. The City of Armstrong shall provide the
paint colour and the identification number.
2.8.4 Letters of acceptance from BC Hydro, Telus, Terasen Gas, and CATV,
confirming acceptance of the installation of their private utilities.
2.8.5 Certificate from the Provincial Electrical Inspector accepting the street light
electrical infrastructure.
2.8.6 Signed releases from the registered property owners of properties affected
by, or adjacent to, the construction works in accordance with Schedule Z.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 104
City of Armstrong
SCHEDULE K - Regulations, Standards and Specifications For Surveys and Design
Drawings
2.8.7 Utility videos, complete with inspection report for all new sanitary and
storm sewer installations.
2.8.8 Confirmation that Canada Post has been notified of the completed
subdivision or development.
2.8.9 Certification form the Owner's Engineer that rough lot grading has
been completed to with +/- 75 mm of the design lot grades.
On completion of the Works and Services the Owner shall notify the City
Engineer. The City Engineer will, upon receipt of the notice and bound
completion report prepared by the Owners Engineer, inspect the Works and
Services and, if necessary, issue a list of deficiencies that shall be corrected. If
the City Engineer determines the Works and Services are substantially complete
and can be put into service, a Certificate of Substantial Completion shall be
dated and issued where all of the monies held by he City shall be released, less
Ten Percent (10%) of the total cost of the Works and Services to be used as a
Maintenance Security plus a Deficiency Amount of two (2) times the value of any
deficiencies to be rectified. Upon completion of the deficiencies acceptable to the
City Engineer, a Certificate of Completion shall be dated and issued and the
Deficiency Amount, only, released.
Record Drawings
2.09 The Owner shall submit Record Drawings, which accurately portray the as-
constructed information for the works constructed by the Owner, to the City
Engineer within four weeks of the completion of the installation of said works.
As-built measurements and dimensions shall be recorded during the construction
of the works, and prior to works being buried, and shall be accurate in 3
dimensions. The Record Drawings shall be signed and sealed by the Owner's
Engineer.
Where works include the installation of water, sanitary sewer, and storm sewer
services the Owner shall provide accurate (surveyed) Utility Service cards in
accordance with Specification Drawing SC-1.
The Record Drawing submission shall include CD ROM(s) containing the Record
Drawings in AutoCAD format and Adobe Acrobat PDF format scaled to print on
11" x 17" and ANSI D. The digital files shall be in structured formats and software
versions that are the current release or the previous release. The City
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 105
City of Armstrong
SCHEDULE K - Regulations, Standards and Specifications For Surveys and Design
Drawings
of Armstrong will provide a standard file naming structure for the digital drawing
submission.
Record Drawings shall include the installed location for hydro, telephone, gas
and CATV ducting, mains and appurtenances.
Final Acceptance
2.10 The City Engineer will release the Maintenance Security, less the cost of any
repairs chargeable to the Owner, upon expiry of the Maintenance Period when so
requested by the Owner. Upon release of the Maintenance Security the City
Engineer will issue a Certificate of Final Acceptance.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 106
City of Armstrong
SCHEDULE L - Materials, Construction, Testing Specifications
SCHEDULE L
MATERIALS, CONSTRUCTION, TESTING SPECIFICATIONS
This is Schedule L of the City of Armstrong
Subdivision and Development Servicing
Bylaw No. 1570, 2007
___________________________________
(Clerk)
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 107
City of Armstrong
SCHEDULE L - Materials, Construction, Testing Specifications
SCHEDULE L
MATERIALS, CONSTRUCTION, TESTING SPECIFICATIONS
1.0
GENERAL DESIGN
General
Where the provisions of Schedule A of this Bylaw require the construction of
roads, water, sanitary sewer, drainage, curbs, gutters, sidewalk, underground
hydro, telephone, catv, gas, street lighting, landscaping, and other permanent
structures, the following regulations, standards, and specifications for materials,
construction, and testing shall apply:
Section 2B Roads and Earthworks
referenced to Schedule B
Section 2C Water Distribution Works
referenced to Schedule C
Section 2D Sanitary Sewer Works
referenced to Schedule D
Section 2E Drainage/Storm Sewer Works
referenced to Schedule E
Section 2F Concrete Curbs, Gutters, Sidewalk,
Stairs
referenced to Schedule F
Section 2G Street Lighting
referenced to Schedule G
Section 2H Hydro, Telephone, Gas, CATV
referenced to Schedule H
Section 2I
Landscaping
referenced to Schedule I
Where no regulation, standards or specifications for materials, construction, and
testing, is defined in this schedule for the construction of a particular service,
structure, or other item, instructions and specifications may be obtained from the
City Engineer.
Material Alternatives
1.01 Material specifications, other than those specified in this Bylaw may be
acceptable subject to the prior approval of the City Engineer. Where the Owner
requests a material specification alternative the Owner shall supply all
information, specifications, and certification for the material alternate as may be
requested by the City Engineer to assist the City Engineer's evaluation.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 108
City of Armstrong
SCHEDULE L - Materials, Construction, Testing Specifications
SCHEDULE L
MATERIALS, CONSTRUCTION, TESTING SPECIFICATIONS
Division 2 - Siteworks
Section 2B - Roads and Earthworks
Division 2 - Siteworks
Section 2C - Water Distribution Works
Division 2 - Siteworks
Section 2D - Sanitary Sewer Works
Division 2 - Siteworks
Section 2E - Storm Sewer Works
Division 2 - Siteworks
Section 2F - Curbs, Gutters, Sidewalk, Stairs
Division 2 - Siteworks
Section 2G - Street Lighting
Division 2 - Siteworks
Section 2H - Hydro, Telephone, Gas, CATV
Division 2 - Siteworks
Section 2I - Landscaping
DIVISION 2 - SITEWORK Page 109
City of Armstrong
SECTION 2B - ROADS AND EARTHWORKS
SCHEDULE L - Materials, Construction, Testing Specifications
1.0
GENERAL
1.1
This section refers to the supply of all labour, supervision, equipment, and materials, as
specified, necessary to complete the work in accordance with the City of Armstrong
approved Drawings, Special Provisions and these Specifications.
2.0
DESCRIPTION OF WORK
2.1
The work shall include, but not necessarily be limited to the following principal items:
2.1.1
Supply and install all materials as per the drawings and specifications.
2.1.2
Take delivery, including unloading at the site, and store under suitable conditions to
prevent damage, deterioration, or, contamination until incorporated into the works.
2.1.3
Schedule works such that disruption of normal traffic, and inconvenience to
residents, in the working area is kept to a minimum, and such that emergency
vehicles have suitable access thru the working area at all times. Provide dust control
during the course of the Contract.
2.1.4
Maintain the work area in an orderly manner free of accumulated waste, and surplus
materials and debris. Clean-up shall be a continuing daily process over the duration
of the Contract.
2.1.5
Clearing, grubbing, and removal of all debris.
2.1.6
Stripping of topsoil and preservation of designated trees, shrubs, hedges, and
landscaping features.
2.1.7
Excavation and subgrade embankment construction for road works, drainage works,
site grading, excavation and embankment construction, removal of designated
concrete and asphalt, for work designated in the Contract Documents, or as may be
directed by the Owner's Representative.
2.1.8
Sub-base Course and Base Course construction for road works, sidewalks, and any
other areas designated in the Contract Documents.
2.1.9
Asphalt Concrete Paving.
3.0
EXAMINATION OF THE SITE OF THE PROPOSED WORKS
3.1
The `Tenderer' will carefully examine the site of the proposed works and notify the Owners'
Representative, in writing, of any changes which have been made to the site by `Others',
during the period of `Tender Closing' to `Contract Award', which would affect the proper
completion of the Contract.
3.2
Commencement of the work on this Contract shall constitute acceptance of the site and any
changes which have been made to the work site by `Others'.
4.0
MATERIALS
4.1
Clearing and grubbing shall consist of the removal and disposal of trees, stumps, shrubs,
deadfalls, roots, grass, fences, scrap metal, and miscellaneous structures within the project
area, to the Contractors' disposal site, unless specifically noted to the contrary. Trees,
shrubs, hedges and landscaping features designated for preservation, either on the
Contract Drawings or by the Owner's Representative, shall not be damaged.
DIVISION 2 - SITEWORK Page 110
City of Armstrong
SECTION 2B - ROADS AND EARTHWORKS
SCHEDULE L - Materials, Construction, Testing Specifications
4.2
Stripping shall include the excavation and complete removal and disposal and/or stockpiling
of all organic material to the mineral soil wherever excavation or embankment construction
is to be performed. The Contractor shall not excavate deeper than is required to remove
such objectionable matter. Should he do so, the Contractor shall replace all over-stripped
material at no cost to the Owner.
4.3
Excavated Materials shall be either Common Materials, Topsoil, Unsuitable Materials, or
Rock.
4.3.1
Common Materials shall be that which is neither Topsoil, Unsuitable Materials, or
Rock.
4.3.2
Topsoil excavation is defined as approved surface materials suitable for landscaping
or restoration of garden areas.
4.3.3
Rock excavation is the removal of solid ledge rock which requires drilling and
blasting for its removal.
Removal of soft or disintegrated rock which can be removed with a hand pick or
power-operated excavator, or previously blasted or broken stone in rock fills or
elsewhere, shall not be classified as rock excavation.
Excavation of permanently frozen materials, or of seasonally frozen materials, shall
be considered as native material excavation and shall not be considered as rock
excavation.
4.3.4
The Contractor shall immediately notify the Owners' Representative when solid
ledge rock formations are encountered, and the Contractor shall clean off the upper
and lower surfaces of the solid ledge rock, at his own cost, when instructed, so that
measurements can be taken for volume calculations.
4.3.5
Unsuitable Materials shall be any organic, or inorganic, materials which are soft,
unstable, or otherwise, which in the opinion of the Owners' Representative, are
unsuitable for embankment construction. All suitable excavated materials shall be
used, when required, in the embankment construction and utility trench zone
backfill.
4.4
The Owners' Representative shall be accepted as the final judge of materials classification.
4.5
Embankment shall be constructed utilizing selected common excavation materials or
approved imported select granular material.
4.6
A 'Well-Graded' soil can be defined using the uniformity coefficient (Cu) and coefficient of
gradation (Cc) as follows:
Cu = D60 / D10 Where 'Dx' is defined as the diameter 'D' at which 'x ' is the percent
passing 'D'
Cc = D30
2 / (D60 x D10)
For a well-graded crushed sand and gravel: Cu > 6 and 1<Cc <3
Well-graded material is defined as material whose grading will produce a smooth curve
without sharp breaks when plotted on a semi-log chart.
DIVISION 2 - SITEWORK Page 111
City of Armstrong
SECTION 2B - ROADS AND EARTHWORKS
SCHEDULE L - Materials, Construction, Testing Specifications
4.7
Sub-Base Course Aggregate shall be a 75 mm crushed `Well Graded Base Course
Aggregate', composed of inert, clean, tough, durable particles uniform in quality and free
from an excess of flat or elongated pieces, supplied conforming to the following grading
limits:
Sieve Size
% Passing by Mass
75 mm
100
37.5 mm
60 - 100
19 mm
35 - 80
9.5 mm
25 - 60
4.75 mm
20 - 43
2.36 mm
15 - 35
1.18 mm
10 - 25
0.300 mm
3 - 13
0.075 mm
2 - 7
4.8
Base Course Aggregate shall be a crushed 25 mm `Well Graded Base Course Aggregate',
composed of inert, clean, tough, durable particles uniform in quality and free from an excess
of flat or elongated pieces, supplied conforming to the following grading limits:
Sieve Size
% Passing by Mass
25 mm
100
19 mm
80 - 100
9.5 mm
50 - 100
4.75 mm
35 - 70
2.36 mm
25 - 50
1.18 mm
15 - 35
0.300 mm
5 - 20
0.075 mm
0 - 5
4.9
Shouldering Aggregate shall be a crushed 25 mm `Well Graded Base Course Aggregate',
composed of inert, clean, tough, durable particles uniform in quality and free from an excess
of flat or elongated pieces, supplied conforming to the following grading limits:
Sieve Size
% Passing by Mass
25 mm
100
19 mm
85 - 100
9.5 mm
60 - 85
4.75 mm
40 - 70
1.18 mm
20 - 50
0.300 mm
10 - 30
0.075 mm
5 - 15
DIVISION 2 - SITEWORK Page 112
City of Armstrong
SECTION 2B - ROADS AND EARTHWORKS
SCHEDULE L - Materials, Construction, Testing Specifications
4.10
Drain Rock shall be clean round stone or crushed rock conforming to the following grading
limits:
4.11
Select Granular Backfill shall be free of organics and debris, and be composed of inert,
clean, tough, durable particles, of rock, gravel, sand, and fines, capable of withstanding the
deleterious effects of exposure to water, freeze-thaw, handling and compacting. The
aggregate particles shall be uniform in quality and free from an excess of elongated
particles. Select Granular Backfill shall meet the following gradation:
Sieve Size
% Passing by Mass
75 mm
100
19 mm
20 - 100
10 mm
10 - 60
0.6 mm
0 - 45
0.3 mm
0 - 15
0.08 mm
0 - 10
Sieve Size
% Passing by Mass
37.5 mm
95% -
100%
9.5 mm
0% -
5%
DIVISION 2 - SITEWORK Page 113
City of Armstrong
SECTION 2B - ROADS AND EARTHWORKS
SCHEDULE L - Materials, Construction, Testing Specifications
4.12 Asphalt Concrete Pavement shall be `Class 2 Medium Asphalt Mix', for new roads and
reconstruction and overlays (50 mm > thickness > 38 mm), and, 'Class 2 Medium Fine Mix'
for overlays ( < 38 mm), meeting the following specifications:
New Roads & Reconstruction
Overlays
( > 50 mm)
( < 30 mm)
Overlays
(50 mm>thickness>38mm)
Mix Type
Class 2 Medium
Class 2 Fine
Number Blows/Face
75
50
VMA (min %)
14
14
Air Voids (%)
3 - 5
3 - 5
Marshall Flow (units of 0.25 mm)
8 - 16
8 - 16
Marshall Stability (min kN)
7.0
6.0
Retain Stability
75%
75%
Grade Asphalt Cement
80 -100
80 - 100
% Fractured Faces
(Retained 4.75 mm sieve)
60
60
Gradation (% Passing)
19.0 mm
100
12.5 mm
84 - 95
100
9.50 mm
73 - 90
70 - 90
4.75
50 - 75
45 - 80
2.36
35 - 57
32 - 64
1.18
26 - 45
24 - 51
0.60
18 - 34
17 - 40
0.30
10 - 26
13 - 29
0.15
6 - 17
7 - 18
0.075
3 - 7
3 - 8
5.0
CONSTRUCTION
5.1
All organic materials such as grass, roots, stumps, fence and fence posts, scrap metal, and
miscellaneous structures, shall be cleared and grubbed and be completely removed from
the area of the works to the Contractors' own disposal site.
5.2
Topsoil shall be excavated, where designated, and salvaged and stored, in an area
designated in the Contract Documents for future use, or wasted off-site, or handled as
specified otherwise in the Contract Documents.
5.3
Materials designated unsuitable, by the Owners' Representative, shall be excavated and
removed to the Contractor's disposal site unless designated otherwise in the Contract
Documents.
5.4
Embankment shall be constructed with approved, suitable, and, where required, selected
materials obtained from the excavation areas within the project limits. All suitable excavated
materials, required for the construction of the embankment, shall be used in the construction
of the embankment.
DIVISION 2 - SITEWORK Page 114
City of Armstrong
SECTION 2B - ROADS AND EARTHWORKS
SCHEDULE L - Materials, Construction, Testing Specifications
5.5
Embankment materials which cannot be compacted to the specified density, due to a high
water content, shall be dried by the Contractor, at no additional cost to the Owner, to
optimum moisture content in order to achieve the specified density.
5.6
Embankments shall be constructed in successive horizontal layers not exceeding 200 mm
in loose thickness except that the top 500 mm shall be constructed in layers not exceeding
100 mm in loose thickness. Each layer shall be compacted to minimum 95% laboratory
density obtained by following the current A.S.T.M., Designation D698-91 Method C except
in the top 300 mm of the embankment which shall be compacted to minimum 100% of the
laboratory density.
No organic soils shall be placed in the embankment. Suitable materials, which are frozen,
shall be thawed, at the Contractor's own expense, prior to placement in the embankment.
Where embankments are constructed on hillsides, or, where a new fill is to be constructed
adjacent an existing embankment, the slopes of the embankment or original ground shall be
terraced in a continuous series of steps a minimum of 1.5 m wide as the embankment rises.
The suitable material from step excavation shall be spread and compacted into the
adjoining embankment. No additional payment will be made for excavation or for placing
step material into the adjoining fill.
The Contractor shall be responsible for selecting equipment and methods of attaining the
specified degree of compaction.
Water shall be added and incorporated into the soil, using suitable equipment, to increase
the natural moisture content to the optimum moisture percentage as determined by the
current A.S.T.M. Designation D698-91, Method C. In the event the natural moisture content
is greater than the optimum, the soil shall be dried.
5.7
The slopes of all excavations and embankments shall be constructed to the neat lines
indicated in the Contract Documents or as staked by the Owners' Representative.
Ditches shall be neatly constructed and graded to the grades shown in the Contract
Documents.
5.8
The embankment and/or subgrade shall be constructed to within plus or minus 15 mm of
specified grade and cross-section but not uniformly high or low.
5.9
Where localized soft spots develop in the finished subgrade, due to poor workmanship, they
shall be corrected by excavating the inferior material, to a depth approved by the Owners'
Representative, and replacing it with suitable embankment material, and compacting the
material as specified, at no additional cost to the Owner.
5.10
Sub-Base Course aggregates shall be placed in horizontal layers not exceeding 150 mm in
uncompacted thickness.
Each layer shall be immediately compacted to a minimum of 100% of the laboratory density
as determined by Test BCH I-14 (ASTM Designation D698-91) Method C. The completed
sub-base course surface shall conform to the required line, grade, and cross-section, to an
accuracy of ±15 mm.
5.11
Base Course aggregates shall be placed on properly prepared Sub-Base Course
aggregates to the depths indicated in the Contract Documents. The Base Course
aggregates shall be placed in such a manner that the aggregate is not separated,
contaminated, or degraded.
The base course shall be immediately compacted to a minimum of 100% of the laboratory
density as determined by Test BCH I-14 (ASTM Designation D698-91) Method C.
The thickness of the base course shall be substantially uniform and the minimum thickness
shall not be less than the nominal thickness indicated in the Contract
DIVISION 2 - SITEWORK Page 115
City of Armstrong
SECTION 2B - ROADS AND EARTHWORKS
SCHEDULE L - Materials, Construction, Testing Specifications
Documents. The completed base course surface shall conform to the required line, grade,
and cross-section, to an accuracy of r10 mm.
5.12
Embankment, sub-base course and base course works shall be constructed by such
methods as to be free draining. Ponding of water on, or adjacent, the works will not be
permitted and deterioration of the embankment, sub-base course, and/or base course, as a
result of water ponding, will be corrected by the Contractor, in a manner satisfactory to the
Owners' Representative, at no additional cost to the Owner.
5.13
Asphalt Concrete Pavement shall be placed as per the current edition of 'Standard
Specifications For Highway Construction' as published by MOT, Province of British
Columbia, except as noted in Items 5.14 thru 5.18 of Section 2A - Roads and Earthworks.
5.14
The thickness of the asphalt concrete pavement shall be substantially uniform and the
minimum thickness shall not be less than the thickness specified in the Contract
Documents. The completed asphalt surface shall conform to the required line, grade, and
cross-section, to an accuracy of r6 mm. The finished asphalt grade shall be 6 mm higher
than the elevation of the top of water valves, manhole frames and covers, and catch basins.
5.15
Traffic shall not be permitted on the finished pavement surface until the asphalt surface has
cooled to atmospheric temperature. It shall be the responsibility of the Contractor to supply
all traffic control until such time as the asphalt surface has cooled at no additional cost to the
Owner.
5.16
The Contractor shall remove all surplus materials, waste asphalt, waste concrete, surplus
aggregate, and any other debris, from the site, immediately upon completion of each phase
of the works which generated the surplus materials or debris, and, where the paving
operation extends over more than one day, site clean-up shall be on a daily basis.
5.17
Gravel for shouldering may not be dumped on, windrowed on, or in any way worked on the
freshly compacted asphalt concrete. Shouldering gravel shall be unloaded from haul trucks
into an approved shouldering machine for the shouldering works. Where any gravel falls on
the asphalt surface, it shall be immediately swept off. Damage to the asphalt during the
shouldering works shall be repaired as directed by the Owners' Representative, at no cost
to the Owner.
5.18
Where the Asphalt Concrete Pavement is to be placed in two lifts, and the surface of the
first lift deteriorates or is dirtied, for any reason, then the Contractor shall repair, clean,
and/or tack coat the first lift, as deemed necessary by the Owners' Representative, prior to
placing the second lift of asphalt. The remedial works, to the first lift of asphalt, shall be the
Contractors' expense.
5.19
Existing asphalt shall be saw-cut immediately prior to paving the tie-in.
5.20
As a condition of final acceptance of the boulevard restoration works the Contractor shall
obtain a Signed Release (Form Z/07) from each property owner adjacent the works.
DIVISION 2 - SITEWORK Page 116
City of Armstrong
SECTION 2B - ROADS AND EARTHWORKS
SCHEDULE L - Materials, Construction, Testing Specifications
6.0
TESTING
6.1
The Contractor shall arrange and pay for an independent Testing Agency to provide quality
control testing for all materials supplied and incorporated into the works.
Material Quality, and Compaction Testing, shall be conducted on aggregates and asphalt
and shall include, but not be limited to, the following tests,
6.1.1
Sieve analysis of Sub-base, and Base Course Aggregate (Prior to Placement).
6.1.2
Density analysis of Subgrade, Sub-base Course and Base Course Aggregate.
6.1.3
Density analysis of utility pipe zone and trench zone backfill.
6.1.4
Penetration of oil sample taken at batch plant.
6.1.5
Sample of mix, taken at asphalt screed, tested for:
6.1.5 (a)
Asphalt extraction
6.1.5 (b)
Sieve analysis
6.1.5 (c)
Marshall briquette
6.1.6
Mix temperature immediately in front of roller.
6.1.7
Asphalt Pavement Depth (compacted thickness).
6.1.8
Asphalt density analysis (nuclear).
6.2
The Owner, at his option, may conduct random tests of the materials supplied and work
performed to ensure compliance with the Contract Documents.
6.3
Where the Owners' testing reveals the materials, and or works, do not comply with the
Contract Documents, and the Contractor is unable to provide successful test results from an
independent testing agency, then all works and materials which have failed the Owners
testing shall be rejected and the materials removed from the site and the works redone.
**End Section 2B**
DIVISION 2 - SITEWORK Page 117
City of Armstrong
SECTION 2C - WATER DISTRIBUTION WORKS
SCHEDULE L - Materials, Construction, Testing Specifications
1.0
GENERAL
1.1
This section refers to the supply of all labour, supervision, equipment, and materials, as
specified, necessary to complete the work in accordance with the Contract Drawings and
Specifications.
2.0
DESCRIPTION OF WORK
2.1
The work shall include, but not necessarily be limited to the following principal items:
2.1.1
Supply and install all materials as per the drawings and specifications.
2.1.2
Take delivery, including unloading, at the site of all materials and store under
suitable conditions to prevent damage, deterioration, or, contamination until
incorporated into the works.
2.1.3
Schedule works such that disruption of normal traffic, and inconvenience to
residents, in the working area is kept to a minimum, and such that emergency
vehicles have suitable access thru the working area at all times. Provide dust control
during the course of the Contract.
2.1.4
Maintain the work area in an orderly manner free of accumulated waste, and
surplus, materials and debris. Clean-up shall be a continuing daily process over the
duration of the Contract.
2.1.5
Trench excavation, pipe bedding, de-watering, backfill and compaction within the
pipe zone, trench backfill and compaction, and restoration of all disturbed areas to
original condition unless specified otherwise.
2.1.6
Supply and install pipe, bends, fittings, chambers, services, hydrants, thrust blocks,
PRV stations, air release and vacuum stations, test points, and standpipes, as
required.
2.1.7
Provide barriers, fences, and warning signs, shoring, as required, to protect
workmen and the general public.
2.1.8
Notification to public of water service interruption.
2.1.9
Provision of temporary water service.
3.0
EXAMINATION OF THE SITE OF THE PROPOSED WORKS
3.1
The `Tenderer' will carefully examine the site of the proposed works and notify the Owners'
Representative, in writing, of any changes which have been made to the site by Others',
during the period of `Tender Closing' to `Contract Award', which would affect the proper
completion of the Contract.
3.2
Commencement of the work on this Contract shall constitute acceptance of the site and any
changes to the work site by `Others'.
4.0
MATERIALS
4.1
Water Pipe shall conform to the following specifications:
4.1.1
Ductile Iron Pipe shall be to AWWA C151, Standard Cement Mortar Lined to AWWA
C104 as per Thickness Class specified in the Contract Documents. Pressure Class
Ductile Iron Pipe shall be to ANSI/AWWA C104/A21.4. Minimum Pressure Class
shall be 350 for 100 mm to 300 mm, 250 for 350 mm to 500 mm, 200 for 600 mm
and 150 for 900 mm.
DIVISION 2 - SITEWORK Page 118
City of Armstrong
SECTION 2C - WATER DISTRIBUTION WORKS
SCHEDULE L - Materials, Construction, Testing Specifications
Ductile Iron pipe joints shall be rubber gasket for push-on bell and spigot type joints
and/or mechanical pipe joints to AWWA C111 Tyton or approved equal.
4.1.2
PVC (Polyvinyl Chloride) Pressure Pipe shall be to AWWA C900 (100 mm dia. to
300 mm dia.) and AWWA C905 (350 mm dia. to 900 mm dia.) as per Thickness
Class specified in the Contract Documents. Pipe to be CSA B137.3 (Canadian
Standards Association) certified ULC approved and coloured blue.
PVC pipe to have Ductile Iron Pipe equivalent outside diameter and to be
compatible with push-on joint fittings and valves without use of special adapters.
PVC pipe joints shall be push-on integrally thickened bell and spigot type to ASTM
D313.9 with single elastomeric gasket to ASTM F477.
4.1.3
Pre-stressed Concrete Pressure Pipe, to be used for chlorination contact chambers
only, shall be to AWWA C300, C301, and C303 as per Thickness Class specified in
the Contract Documents.
Pre-stressed Concrete Pressure Pipe joints shall be push-on bell and spigot joints
complete with rubber gasket.
4.1.4
Steel Pipe shall be to AWWA C200 as per the Thickness Class specified in the
Contract Documents.
Steel Pipe shall be electrically welded. Steel to be in accordance with ASTM A36.
Steel Pipe flanges to be in accordance with AWWA C207, and dimensions for
fabricated steel water pipe fittings to be in accordance with AWWA C208.
Steel Pipe finishes, interior and exterior, to be hot applied coal tar enamel to AWWA
C203.
4.1.5
HDPE (High Density Polyethylene) Pipe shall be to AWWA C906 as per the
Thickness Class specified in the Contract Documents, coloured blue. HDPE outside
diameter to be iron pipe size equivalent and to be compatible with specified
mechanical joint fittings and valves without special adapters.
HDPE joints shall be heat butt fusion to ASTM D2657 and in accordance with the
manufacturer's recommendations.
Fabricated fittings shall be mitred fittings to AWWA C906 suitable for the pressure
rating specified in the Contract Documents.
Moulded fittings shall be to ASTM 3261 suitable for the pressure rating, and fusion
to the main pipe dimensions, specified in the Contract Documents.
Flanged joints shall be to AWWA C906, flat faced stub end and loose hot-dip
galvanized ductile iron (ASTM A536) backup ring drilling to ANSI B16.1, as per the
pressure rating specified in the Contract Documents.
4.2
PVC and Ductile Iron Pipe Fittings shall conform to the following specifications:
4.2.1
CI (Cast Iron) Grey-iron fittings shall be to AWWA C110, minimum 1035 kPa
pressure rating or higher if specified in the Contract Documents.
4.2.2
DI (Ductile Iron) fittings shall be to AWWA C110, minimum 2415 kPa pressure
rating, cement mortar lined as per AWWA C104.
4.2.3
Compact Ductile Iron Fittings shall be to AWWA C153, minimum 2415 kPa pressure
rating, cement mortar lined to AWWA C104.
4.2.4
Single Rubber Gaskets for push-on bell and spigot and/or mechanical pipe joints
shall be to AWWA C111 Tyton or approved equal.
All push-on joint hubs shall have integral tie-rod lugs.
DIVISION 2 - SITEWORK Page 119
City of Armstrong
SECTION 2C - WATER DISTRIBUTION WORKS
SCHEDULE L - Materials, Construction, Testing Specifications
4.2.5
Flanged joints shall be to AWWA C110, flat faced, conforming in dimension and
drilling to ANSI B16.1, and pressure rating specified in the Contract Documents. Full
face flange gaskets to be manufactured from black natural rubber 3.175 mm thick
with layer of cotton on each side.
4.2.6
Bolts to be medium carbon steel or martensitic steel (Type 1 or Type 2), ASTM
A325 heavy hex finish, cadmium plated, coarse threads to have Class 2A tolerance
before plating. Bolt sizes to AWWA C110.
Nuts to be heavy hex carbon steel to ASTM A563, cadmium plated.
Washers to be flat hardened steel to ASTM F436, cadmium plated.
4.2.7
Tie-Rods shall be continuous threaded, quenched and tempered alloyed steel to
ASTM A354, Grade BC, cadmium plated, coarse threads to have Class 2A
tolerance before plating. Tie-rods to be sized as specified in the Contract
Documents.
4.2.8
Tie-Rod Nuts and internally threaded couplings to be heavy hex finish to ASTM
A563 Grade C, cadmium plated.
Washers to be flat hardened steel to ASTM F436, cadmium plated.
4.3
Steel Pipe Fabricated Fittings shall conform to the following specifications:
4.3.1
Fabricated Steel Pipe fittings shall be in accordance with AWWA C208 and AWWA
C207 if flanged, with interior and exterior protected with hot applied coal tar enamel
to AWWA C203.
4.4
Couplings and Flanged Coupling Adapters shall be compatible with the pressure class
specified in the Contract Documents and shall conform to the following specifications:
4.4.1
Ductile Iron castings shall conform to ASTM A536, Grade 65-45-12.
4.4.2
Bolts and nuts shall be high strength low alloy steel conforming to AWWA C111,
stainless steel conforming to ASTM F593 of F738 for bolts and ASTM F594 or F836
for heavy hex nuts, or as specified in the Contract Documents. Rolled threads, fit
and dimensions to AWWA C111.
4.4.3
Compression gaskets shall conform to AWWA C219.
4.4.4
Anti-corrosion coating of interior and exterior centre sleeve and end rings to conform
to AWWA C219.
4.4.5
Flanges shall be to AWWA C110, flat faced, conforming in dimension and drilling to
ANSI B16.1.
4.4.6
Full face flange gaskets to be manufactured from black natural rubber 3.175 mm
thick with layer of cotton on each side.
4.5
Plain End and Transition Couplings shall conform to the following specifications.
4.5.1
Plain end or transition couplings to be Robar Model 1408 or Canpac CDB, or, where
applicable, Robar Model 1506 or Canpac CDSE.
4.6
Flanged Coupling Adapters shall conform to the following specifications.
4.6.1
Flanged coupling adapters to be Robar Model 7404 or Dresser Style 127 or 128, or,
where applicable, Robar Model 7506 or Dresser Style 127 or 128 All-Clad.
4.7
Joint Restraint Devices shall conform to the following specifications:
4.7.1
Ductile Iron Castings shall conform to ASTM A536.
Anti-Corrosion Coating for Ductile Iron Castings shall conform to AWWA C219, or
as specified in the Contract Documents, to AWWA C210, C213, or C550.
4.7.2
Bolts and Nuts shall be High Strength Low Alloy Steel to AWWA C111, or as
specified in the Contract Documents, stainless steel to ASTM F593 or F738 for bolts
and ASTM F594 or F836 for heavy hex nuts.
DIVISION 2 - SITEWORK Page 120
City of Armstrong
SECTION 2C - WATER DISTRIBUTION WORKS
SCHEDULE L - Materials, Construction, Testing Specifications
4.7.3
Tie-Rods shall be continuous threaded, quenched and tempered alloyed steel to
ASTM A354, Grade BC, hot-dip galvanized to ASTM A153, coarse threads to have
Class 2A tolerance before galvanizing. Tie-rods to be sized as specified in the
Contract Documents.
4.7.4
Restrainers for Ductile Iron pipe with mechanical joint fittings to be EBA Iron
Megalug assembly or Uni-flange Series 1300.
4.7.5
Restrainers for PVC pipe with push-on joint fittings with tie-rod lugs to be Uni-flange
Series 1300 or Robar Model 4400. Restrainers for bell joints in PVC pipe to be Uni-
flange Series 1350 or 1390, or Robar Model 4450 or 4452.
4.8
Tapping Sleeves for Cast Iron, Ductile Iron, Asbestos Cement, PVC (C900), Pre-Stressed
Concrete Pressure Pipe, or Steel Mains, for branch connections 75 mm and larger, shall
conform to the following specifications:
4.8.1
All materials shall be compatible with the pipe location, type, and pressure class,
indicated in the Contract Documents. (Exterior condition, and type, of water mains
'as found' in the field, and/or as directed by the Owners' Representative, may alter
the type and/or materials required).
4.8.2
The sleeve and gasket, flange, bolts and nuts, anti-corrosion coating, and casting
materials shall conform, where applicable, to AWWA C207, C208, C111, C213, and
C219, ASTM A536, F593, F738, F594, and F836, for design, manufacture, and
performance.
4.8.3
Tapping sleeves shall be Robar 6506 (Cast Iron and, Ductile Iron Pipe only) or
Robar 6906.
4.9
Valves and Valve Boxes shall conform to the following specifications:
4.9.1
Gate Valves shall conform to AWWA C500, 75 mm to 300 mm to working pressure
1380 kPa, gray cast iron or cast ductile iron body, bronze mounted solid wedge,
double disk, or resilient-seated, non-rising stem, hub or flanged ends, 50 mm sq.
operating nut.
4.9.2
Gate Valves to open counter clockwise, have the manufacturers' name, year of
manufacture, size and working pressure indicated on the bonnet or body.
4.9.3
Acceptable manufacturers of gate valves are Clow and TC/Clow, and Mueller
Resilient Wedge Gate Valves.
4.9.4
Valves 350 mm and larger to be Butterfly Valves with gear operators.
4.9.5
Butterfly Valves shall be in accordance with AWWA C504 Class 150B, and as
specified in the Contract Documents.
4.9.6
Acceptable manufacturers of Butterfly Valves are Pratt, DeZurik and Mueller
Lineseal XP. Butterfly Valves shall have lugged pattern, EPDM seat cast iron body,
ductile iron with nickel edge disc, stainless steel shaft and suitable gear operator.
4.9.7
Air Release, Air/Vacuum and Combination Air Valves shall be in accordance with
AWWA C512, gray cast iron or ductile iron body, threaded or flanged connections,
maximum working pressure 2070 kPa.
4.9.8
Mainline Valve Boxes shall be circular Nelson Type (NT) No. D-5 as manufactured
by Dobney Foundry, except that Valve Boxes located in asphalt shall be Mueller
MVB Valve Boxes.
Valve Box Riser pipe to be 150 mm PVC SDR 35.
4.9.9
Service Valve Boxes (Curb Stop Valve Boxes) on 19 mm or 25 mm services shall
be a complete Mueller A-726 telescoping assembly complete with stainless steel
stinger.
DIVISION 2 - SITEWORK Page 121
City of Armstrong
SECTION 2C - WATER DISTRIBUTION WORKS
SCHEDULE L - Materials, Construction, Testing Specifications
Service Valve Boxes on 32 mm and 50 mm services shall be a complete Mueller A-
728 telescoping assembly unless specified otherwise in the Contract Documents.
4.9.10 Check Valves shall conform to AWWA C508: 50 to 300 mm to working pressure
1200 kPa; 400 to 500 mm to working pressure 1035 kPa; gray cast iron or ductile
iron body, clear waterway type, metal to metal seat, flanged ends to AWWA C110.
4.9.11 Corporation Stops shall be bronze, conforming to ASTM B62, thread inlet
compression outlet, Mueller H-15008.
4.9.12 Curb Stops shall be bronze, conforming to ASTM B62, full flow, full port,
compression fitting, Mueller H-15207.
4.10
Service Connection Fittings and Service Pipe shall conform to the following specifications:
4.10.1 19 mm to 50 mm service pipe to be Type K annealed copper conforming to ASTM
B88M. or, PEXa pipe to copper tube size, SDR 9 conforming to CSA B137.5, ASTM
F876-01 and 877-01 and ANSI/NSF 14 and 61, complete with Meuller or Ford
stainless steel liner. PEXa pipe shall be installed with a tracer wire where specified
by the City Engineer. The PEXa pipe shall be manufactured with a co-extruded UV
shield made from UV resistant high-density polyethylene, colour Sky Blue
(International Thermoplastic Colour Code, RAL 1501). 75 mm pipe shall conform to
AWWA C901, Pressure Class 200, certified to CSA B137.1.100 mm and larger pipe
to be same as specified for mainline pipe.
4.10.2 Saddles for 19 mm to 50 mm services to have a ductile iron body to ASTM A536
with anti-corrosive epoxy nylon coating to AWWA C219, Type 304 double stainless
steel U-bolt straps.
Saddles to be Meuller DB2S, Robar 2406DS or Canpac CDES-2.
4.10.3 Saddles for PVC Pipe, AWWA C900/905, shall not have lugs or U-bolt straps which
may gouge or deform the pipe. Saddles to be all-stainless steel broadband
saddle to ANSI T304, double bolt, minimum band width of 190 mm.
Saddles to be Meuller SS (D) Series or Canpac CD-2.
19 mm and 25 mm copper tubing to be compression type suitable for 1100 kPa
working pressure.
For services 75 mm and larger use tapping sleeves in accordance with Clause 4.8
of this section.
4.11
Fire Hydrants shall conform to the following specifications:
4.11.1
AWWA C502 specifications for dry barrel Fire Hydrants.
4.11.2
Shut-Off to be compression type.
4.11.3 Inlet Connection to be 150 mm nominal diameter, bell type, with harness lugs.
4.11.4
Bury shall be the bury length specified in the Contract Documents.
4.11.5
Two 65 mm hose nozzles, and one 100 mm pump nozzle complete with Stortz
Fitting, each safeguarded against blowing out, turning, or backing out.
4.11.6
Hose and Pump Nozzle Threads shall be to B.C. Standard for fire hydrants.
Each outlet to be provided with nozzle, cap and gasket.
4.11.7
Operating Nut and Cap Nuts to be B.C. Standard for fire hydrants, opening
direction shall be counter clockwise. Operating stem to be non-rising.
4.11.8
Working parts to be removable without disturbing barrel or base of hydrant and
without excavation. Hydrant to be designed so top section may be rotated to any
angle and bolted in place without decreasing its strength or causing it to leak
under pressure.
DIVISION 2 - SITEWORK Page 122
City of Armstrong
SECTION 2C - WATER DISTRIBUTION WORKS
SCHEDULE L - Materials, Construction, Testing Specifications
4.11.9
Hydrants to be subjected to hydrostatic pressure test of 2070 kPa in compliance
with AWWA C502 and pressure test to be certified by manufacturer.
4.11.10
Hydrants shall be painted and colour coded as specified in the Contract
Documents.
4.11.11
Approved Fire Hydrant is Canada Valve (Century).
4.12
Granular Pipe Bedding and Surround Aggregate in the pipe zone shall conform to the
following specifications:
4.12.1
Class `A' Pipe Bedding is where the pipe is bedded in a continuous monolithic
cradle of concrete as indicated in the Contract Documents.
4.12.2
Class `B' Pipe Bedding shall be imported sand meeting the following gradation:
Sieve
Designation
Percent
Passing
12.5
mm
100
4.75
mm
35 - 100
2.36
mm
20 - 70
1.18
mm
13 - 50
0.850
mm
8 - 35
0.300
mm
5 - 25
0.150
mm
2 - 15
0.075
mm
0 - 6
4.12.3 Class `C' Pipe Bedding shall be native material in the trench which meets the
gradation for Class `B' Pipe Bedding sand.
4.13
Granular Trench Backfill Aggregate shall conform to the following specifications:
4.13.1 Trench Backfill aggregate shall be `Selected Excavated Materials', including
excavated Sub-Base and Base aggregate, which is inert, durable material,
reasonably uniform in quality and free from soft or disintegrated particles, free of
stones and rocks over 75 mm in diameter, free of organic or foreign matter, capable
of compaction to specified density.
4.13.2 Imported Trench Backfill material shall meet the gradation specified for Sub-Base
Course Aggregate in Clause 4.6, Section 2B - Roads and Earthworks.
4.14
Cast-in-Place Concrete shall conform to CAN/CSA-A23.1. Concrete for thrust blocks to be
Ready-Mix Concrete supplied by a BCRMCA certified plant, 20 MPa at 28 days.
5.0
INSTALLATION
5.1
Trench and pipe bedding details shall conform to the Contract Specification Drawings and
the following specifications:
5.1.1
Pipes, fittings, valves, hydrants, and appurtenances, shall be cleaned and inspected
for defects prior to installation. Defective materials shall be removed from the job
site.
5.1.2
Where material in the trench bottom is deemed by the Owners' Representative to be
unstable or otherwise unsuitable for pipe support or the support of appurtenant
structures, the trench shall be over-excavated to the depth at which stable material
is encountered and the excavation shall be backfilled, with Imported Backfill, to the
lower level of the pipe bedding zone. Unsuitable materials shall be disposed of at
DIVISION 2 - SITEWORK Page 123
City of Armstrong
SECTION 2C - WATER DISTRIBUTION WORKS
SCHEDULE L - Materials, Construction, Testing Specifications
the Contractors' own disposal site unless directed otherwise in the Contract
Documents.
5.1.3
The Pipe Zone is defined as that portion of the trench between the bottom level of
the pipe bedding and a level 300 mm above the top of the installed pipe or
appurtenances. Materials in the pipe zone shall consist of Class `B' Bedding (4.12.2)
or, if present, Class `C' Bedding (4.12.3). The bedding materials shall have a
minimum depth under the pipe of 150 mm. Pipe bedding shall extend the full width
of the trench and be compacted to 95% laboratory density obtained by following the
current A.S.T.M., Designation D698-91 Method C.
5.1.4
Trenches shall be dug to the alignment and depth indicated in the Contract
Documents. Water mains and services shall be installed so as to provide a minimum
cover of 1.8 metres from finished grade, unless specified otherwise in the Contract
Documents.
5.1.5
Trenches shall be maintained such that the pipe can be installed without getting
water, muck, silt, gravel, or other foreign materials into the pipe. Trench bottoms
which have been allowed to deteriorate, and trench bottoms which have been over-
excavated, shall be made good to the design trench bottom grade, with selected site
excavated material, or, if ordered, Imported Backfill, and compacted to 95%
laboratory density obtained by following the current A.S.T.M., Designation D698-91
Method C, at the Contractors' expense.
5.1.6
Trench excavations shall be kept free of water, by pumping, during the pipe laying,
jointing, bedding, and backfill works. Trench water shall not be permitted to enter the
pipe being installed. Water shall be discharged from the excavation in such a
manner as not to cause nuisance, injury, or damage to property or receiving waters.
Previously laid pipe shall not be used for dewatering.
5.1.7
Trenches shall be sheeted and braced, or sloped, as required by the WorkSafe BC
regulations. Where sheeting or shoring is required it shall be in accordance with
WorkSafe BC regulations.
5.1.8
The Contractor shall replace materials and rectify all failures as a result of
settlement of the trench backfill or collapse of the trench walls during the
maintenance guarantee period. Where trenches fail, the trench material shall be
excavated to the top of the pipe zone and all materials above the pipe zone
replaced in accordance with the Contract Documents.
The Contractor shall make up for any deficiencies in the quantity of material suitable
for backfilling which have been wasted during the construction operation.
5.1.9
The requirements of the Workers' Compensation Board shall take precedence over
any conflicting Clauses in these Specifications. Trench excavations and trench walls
shall conform to Workers' Compensation Board Regulations. Ledge rock, boulders,
and large stones shall be removed to provide a clearance of at least 150 mm below,
and on all sides, of the pipe and fittings.
5.1.10 Where asphalt concrete pavement is to be cut the trench width shall be kept as
narrow as possible while still complying with WorkSafe BC regulations and the
pavement shall be saw-cut along neat straight lines. If pavement breakage occurs
outside the limits of the initial pavement cut the asphalt shall be cut back to sound
asphalt in neat straight lines before the asphalt restoration paving starts.
5.1.11 When side casting excavated materials the Contractor shall ensure that his
operation does not interfere with traffic. Traffic flow must be maintained as specified
in the Special Instructions in the Contract Documents. The Contractor
DIVISION 2 - SITEWORK Page 124
City of Armstrong
SECTION 2C - WATER DISTRIBUTION WORKS
SCHEDULE L - Materials, Construction, Testing Specifications
shall be responsible for thoroughly cleaning all roadways, on which excavated
materials or imported backfill has been hauled, at the end of each working day, or
promptly when directed by the Owners' Representative, at the Contractors' own
expense.
5.1.12 The Backfill Zone is that section of the trench from the top of the pipe zone to
subgrade. The backfill zone shall be backfilled with select excavated materials, or, if
directed by the Owners' Representative, with Imported Backfill Materials.
The backfill zone shall be compacted to 95% laboratory density obtained by
following the current A.S.T.M., Designation D698-91 Method C, at the Contractors'
expense. Placing of frozen materials in the backfill zone will not be permitted.
5.1.13 Where trenches are excavated in paved surfaces, the sub-base, base, and asphalt
shall be replaced in accordance with Section 2A - Roads and Earthworks.
5.1.14 Pipe shall be handled, laid, cut, and jointed, to the pipe manufacturers' instructions
and specifications, PVC pipe to AWWA M23 and Ductile Iron Pipe to AWWA C600
and C151.
5.1.15 Do not exceed one-half the maximum joint deflection recommended for Ductile Iron
Pipe. Joint deflection not permitted for PVC pipe. PVC pipe to be deflected using
high deflection PVC couplings rated for 1380 kPa operating pressure.
5.1.16 Pipe shall be laid to a horizontal tolerance of 50± mm from design alignment and a
vertical tolerance of 25± mm from design grade. For grades 2% and greater pipe
shall be laid uphill (bell ends facing uphill). Pipe joint restrainers shall be used where
designated in the Contract Documents.
5.1.17 When any stoppage of work occurs, restrain laid pipes to prevent 'creep' and seal
the end pipe to prevent contamination.
5.1.18 Test and/or Bleed points shall be Corporation Stops sized to provide a minimum
flushing velocity of 0.8 m/s, and located by the Contractor to complete pressure
testing and flushing. At the conclusion of the testing and flushing the test and/or
bleed points shall be shut-off at the corporation stop and any test pipe disconnected.
5.1.19 Valves shall be installed to the manufacturers' instructions and specifications at the
locations indicated on the Contract Drawings. Maximum length of pipe on each side
of the valve to be 1 metre. Valve risers to be exactly plumb.
5.1.20 Service connections to be installed, and marked (painted blue), as specified in the
Contract Specification Drawings. Water main pressure testing to be completed 'after'
corporation stops installed and then corporation stops to be left completely open.
5.1.21 Fire Hydrants shall be installed in accordance with the manufacturers' instructions
and specifications, the Contract Specification Drawings, and AWWA Manual of
Practice No. M17. Hydrants shall be secured to the hydrant tee lugs with 19 mm
galvanized rods and also be thrusted with a concrete thrust block unless directed
otherwise by the Owners' Representative. Hydrants shall be covered with a black
plastic bag until such time as they have been flushed and flow-tested and the Fire
Department has been notified that they are fully operational.
5.1.22 Ready-Mix cast-in-place concrete thrust blocks shall be placed between valves,
tees, plugs, caps, bends, reducers, hydrants, and fittings, and the undisturbed
ground, in all directions of thrust and as indicated in the Contract Specification
Drawings.
Place 6 mil polyethylene between the interface of the concrete and the fitting.
DIVISION 2 - SITEWORK Page 125
City of Armstrong
SECTION 2C - WATER DISTRIBUTION WORKS
SCHEDULE L - Materials, Construction, Testing Specifications
Joints, lugs, bolts, and couplings to be keep clear of the cast-in-place concrete
thrust block.
Do not backfill over cast-in-place concrete thrust blocks within 24 hours of placing.
5.1.23 The Contractor shall present his schedule for interruption of water service to the
Owners' Representative, at least two working days in advance of the interruption of
service. When the interruption of service has been approved by the Owner's
Representative, the Contractor shall, at his own expense, notify all affected water
customers, in writing, at least one day in advance of the interruption, of the time and
duration of the interruption. In the event water service has not been resumed within
one hour of the anticipated time, the Contractor shall re-notify all customers of the
unscheduled delay in resumption of water service.
6.0
CLEANING, FLUSHING, DISINFECTING, TESTING
6.1
All cleaning, flushing, disinfecting and testing shall be completed by the Contractor, and be
witnessed by the Owners' Representative.
6.1.1
The Contractor shall supply, at his own cost, all materials, equipment, labour, and
supplies, including test points, temporary caps & thrust blocks, hoses, pumps, new
gauges (0 - 250 psi) required to efficiently flush, accurately test, and disinfect, the
water mains and appurtenances, including saddles and corporation stops.
6.1.2
Where water may be supplied, for flushing and testing, from Municipal Mains, the
Contractor shall obtain written approval from the Owners' Representative to connect
to the Municipal system. When requesting approval, the Contractor shall present a
valid test certificate for a reduced pressure principle backflow prevention device
conforming to AWWA C511, and also supply all hydrant connections, hoses, valves,
hydrant wrenches, as may be required.
6.1.3
The Owners' Representative shall be notified at least one working day in advance of
the proposed pressure testing.
6.1.4
Perform pressure leakage testing of Ductile Iron Pipe to AWWA C600, PVC Pipe to
AWWA M23, and Welded Steel Pipe to AWWA C206 (no leakage allowed).
6.1.5
Water mains shall be tested in sections. Sections shall be between every two
adjacent line valves and between the line valve and the temporary cap(s).
6.1.6
The test pressure shall be 1.5 x the maximum working pressure in the section of
water main being tested, or, 1,035 kPa, whichever is greater. The maximum
allowable leakage rate shall conform to the applicable AWWA standards. All
pressure tests shall be for a two hour duration.
6.1.7
Where any test section discloses excessive leakage, that section shall be replaced,
or repaired, and the section re-tested until the specified testing requirements are
achieved.
6.1.8
Disinfection shall be completed in accordance with AWWA C651, Continuous Feed
Method. Initial disinfection shall have 25 mg/L free chlorine in the water system and
the chlorine residual, after 24 hours, shall be at least 10 mg/L.
When the 24 hour residual is less than 10 mg/L the chlorination procedure shall be
repeated until specifications are met.
6.1.9
After successful disinfection, the water in the watermains shall be flushed into the
sanitary sewer system, at a minimum velocity of 0.8 m/s.
Chlorinated water shall not be flushed into receiving water containing aquatic life.
DIVISION 2 - SITEWORK Page 126
City of Armstrong
SECTION 2C - WATER DISTRIBUTION WORKS
SCHEDULE L - Materials, Construction, Testing Specifications
Approval shall be obtained from the Owners' Representative prior to discharging
chlorinated water into sanitary sewers. After flushing all test/flush points shall be
removed.
6.1.10 Bacteriological water samples shall be collected from the new watermain
installations following the satisfactory completion of main chlorination and flushing.
The Owner's Engineer may collect water samples. Such bacteriological testing shall
be done using full aseptic precautions. The sample shall be taken from a copper
gooseneck assembly provided by the Contractor. The Contractor shall be
responsible to ensure the gooseneck assembly is contaminant free. Water shall be
run from the sample tap for a minimum of 2 minutes prior to sampling. The water
shall be run at a constant rate prior to and during the sampling procedure. A sterile
water sampling bottle must be obtained from the local Health Unit, or certified
Testing Laboratory, and shall be used to collect the water sample. The cap of the
bottle shall be removed after the water has run for 2 minutes, taking special
precautions to not touch or contaminate the underside of the cap or the bottle rim.
The bottle shall be filled to the fill line and then be immediately recapped. Hose pipe
shall not be used as a sample source.
The sample shall be labelled completely indicating time, location, project, contract
number and name of sampler. Sample bottles shall then be immediately placed in a
cooler provided with an ice pack. Samples shall be transported to a certified testing
laboratory within 8 hours of sampling. In no case shall samples take more than 24
hours to reach the certified testing laboratory. At least 1 sample shall be collected
from each new water main. Where water mains exceed 250 metres in length water
samples shall be taken at each end of the water main and at 250 metre intervals. At
least one sample shall be taken from the source of the water supply to determine
the status of the distribution system at the time of sampling.
If, in the opinion of the City Engineer, the pipeline has been contaminated with
trench water, excessive quantities of dirt or debris, bacteriological water samples
shall be collected at 60 metre intervals after water has sat in the water main for at
least 16 hours after final flushing. Redisinfection and resampling shall be required
for all water mains that do not satisfactorily meet Ministry of Health Planning
bacteriological requirements as amended from time to time. Bacteriological
sampling and laboratory testing shall be the Contractor's own cost.
6.2
Fire Hydrants shall be flow-tested, bonnet and caps colour coded, and a `City of Armstrong
Fire Department Hydrant Maintenance Program' form completed and submitted to the City
of Armstrong, with the `as-constructed' drawings, for each hydrant. Refer to Specification
Drawing W-3.
6.3
The Contractor shall arrange and pay for an independent Testing Agency to provide quality
control testing for all materials supplied and incorporated into the works.
Material Quality, and Compaction Testing, shall be conducted on aggregates, bedding sand
and trench backfill and shall include, but not be limited to, the following tests:
DIVISION 2 - SITEWORK Page 127
City of Armstrong
SECTION 2C - WATER DISTRIBUTION WORKS
SCHEDULE L - Materials, Construction, Testing Specifications
6.3.1
Density analysis of utility pipe zone and trench zone backfill.
The Owner, at his option, may conduct random tests of the materials supplied and
work performed to ensure compliance with the Contract Documents.
Where the Owners' testing reveals the materials, and or works, do not comply with
the Contract Documents, and the Contractor is unable to provide successful test
results from an independent testing agency, then all works and materials which
have failed the Owners testing shall be rejected and the materials removed from the
site and the works redone.
**End Section 2C**
DIVISION 2 - SITEWORK Page 128
City of Armstrong
SECTION 2D - SANITARY SEWER WORKS
SCHEDULE L - Materials, Construction, Testing Specifications
1.0
GENERAL
1.1
This section refers to the supply of all labour, supervision, equipment, and materials, as
specified, necessary to complete the work in accordance with the Drawings and
Specifications.
2.0
DESCRIPTION OF WORK
2.1
The work shall include, but not necessarily be limited to the following principal items:
2.1.1
Supply and install all materials as per the drawings and specifications.
2.1.2
Take delivery, including unloading, at the site of materials and store under suitable
conditions to prevent damage, deterioration, or, contamination until incorporated into
the works.
2.1.3
Schedule works such that disruption of normal traffic, and inconvenience to
residents, in the working area is kept to a minimum, and such that emergency
vehicles have suitable access thru the working area at all times. Provide dust control
during the course of the Contract.
2.1.4
Maintain the work area in an orderly manner free of accumulated waste, and
surplus, materials and debris. Clean-up shall be a continuing daily process over the
duration of the Contract.
2.1.5
Trench excavation, pipe bedding, de-watering, backfill and compaction within the
pipe zone, trench backfill and compaction, and restoration of all disturbed areas to
original condition unless specified otherwise.
2.1.6
Supply and install pipe, bends, fittings, manholes, services, force main and
appurtenances, as required.
2.1.7
Provide barriers, fences, and warning signs, shoring, as required, to protect
workmen and the general public.
3.0
EXAMINATION OF THE SITE OF THE PROPOSED WORKS
3.1
The `Tenderer' will carefully examine the site of the proposed works and notify the Owners'
Representative, in writing, of any changes which have been made to the site by `Others',
during the period of `Tender Closing' to `Contract Award', which would affect the proper
completion of the Contract.
3.2
Commencement of the work on this Contract shall constitute acceptance of the site and any
changes to the work site by `Others'.
4.0
MATERIALS
4.1
Sanitary Gravity Sewer Pipe shall conform to the following specifications:
4.1.1
Polyvinyl chloride (PVC) pipe up to 100 mm in diameter shall be DR28 meeting or
exceeding all of the requirements of ASTM Specification D3034 and CSA Standards
B182.1 and B182.2. Minimum pipe stiffness (F/Y) shall be 320 kPa at 5.0%
deflection, ASTM D2412. Manning "n" coefficient to be 0.009.
DIVISION 2 - SITEWORK Page 129
City of Armstrong
SECTION 2D - SANITARY SEWER WORKS
SCHEDULE L - Materials, Construction, Testing Specifications
4.1.2
Polyvinyl chloride (PVC) pipe, and fittings, 150 mm to 675 mm in diameter shall be DR35
meeting or exceeding all of the requirements of ASTM Specification D3034 and CSA
Standards B182.1 and B182.2, and shall be coloured green. Minimum pipe stiffness (F/Y)
shall be 320 kPa at 5.0% deflection, ASTM D2412. Manning "n" coefficient to be 0.009.
Pipe joints to have bell and spigot ends with rubber gaskets to ASMT 477.
4.1.3
Ribbed Polyvinyl chloride (PVC) pipe, and fittings, 750 mm to 900 mm in diameter
shall meet or exceed all of the requirements of ASTM F794 and CSA Standards
B182.4, and shall be coloured green. Ribbed Pipe to have a minimum pipe stiffness
of 320 kPa at 5.0%. Pipe to be marked to clearly indicated class rating as required
under ASTM F794. Pipe joints to have bell and spigot ends with rubber gaskets to
ASMT 477.
Manning "n" coefficient to be 0.009.
4.1.4
Non-reinforced concrete pipe 750 mm to 900 mm in diameter shall meet or exceed
all of the requirements of ASTM Specification C14M. Rubber gasket joints shall be
to ASTM C443M.
4.1.5
Reinforced concrete pipe greater than 900 mm in diameter shall meet or exceed all
of the requirements of ASTM Specification ASTM C76M. Rubber gasket joints shall
be to ASTM C443M. Pipe shall have not more than two lifting holes per length and
shall be provided with pre-fabricated PVC plugs to seal lift holes water tight after
installation.
4.1.6
Sanitary Manhole Barrels shall be Precast Reinforced Concrete Manhole Sections,
minimum diameter 1050 mm, or larger to accommodate larger pipes, meeting the
requirements of ASTM Specification C478. Precast Concrete Lid shall be designed
for H-20 Loading. Ladder Rungs to be 300 mm wide polypropylene coated ladder
rungs cast with manhole sections. Polypropylene to ASTM D-4101, Reinforcing to
ASTM A-615. Adjusting rings to ASTM C478, Concrete Spacer Rings (Grade Rings)
designed for H-20 Loading. Refer to Specification Drawings.
4.1.7
Sanitary Manhole Frames and Covers shall be C-44 designation, Round Base. The
Cast Iron Frame shall have a 610 mm access opening. The Sanitary Manhole Cover
shall be labelled "Sanitary Sewer".
4.2
Sanitary Sewer Force main Pipe shall conform to the following specifications:
4.2.1
Ductile Iron Pipe shall be to AWWA C151, Standard Cement Mortar Lined to AWWA
C104 as per Thickness Class specified in the Contract Documents.
Ductile Iron pipe joints shall be rubber gasket for push-on bell and spigot type joints
and/or mechanical pipe joints to AWWA C111 Tyton or approved equal.
4.2.2
PVC (Polyvinyl Chloride) Pressure Pipe shall be to AWWA C900 (100 mm dia. to
300 mm dia.) and AWWA C905 (350 mm dia. to 900 mm dia.) as per Thickness
Class specified in the Contract Documents. Pipe to be CSA B137.3 (Canadian
Standards Association) certified and ULC approved, coloured white.
PVC pipe to have Ductile Iron Pipe equivalent outside diameter and to be
compatible with push-on joint fittings and valves without use of special adapters.
PVC pipe joints shall be push-on integrally thickened bell and spigot type to ASTM
D313.9 with single elastomeric gasket to ASTM F477.
DIVISION 2 - SITEWORK Page 130
City of Armstrong
SECTION 2D - SANITARY SEWER WORKS
SCHEDULE L - Materials, Construction, Testing Specifications
4.2.3
Steel Pipe shall be to AWWA C200 as per the Thickness Class specified in the
Contract Documents.
Steel Pipe shall be electrically welded. Steel to be in accordance with ASTM A36.
Steel Pipe flanges to be in accordance with AWWA C207, and dimensions for
fabricated steel water pipe fittings to be in accordance with AWWA C208.
Steel Pipe finishes, interior and exterior, to be hot applied coal tar enamel to AWWA
C203.
4.2.4
HDPE (High Density Polyethylene) Pipe shall be to AWWA C906 as per the
Thickness Class specified in the Contract Documents. HDPE outside diameter to be
iron pipe size equivalent and to be compatible with specified mechanical joint fittings
and valves without special adapters. Pipe shall be colour coded green for gravity,
and white for pressure, applications.
HDPE joints shall be heat butt fusion to ASTM D2657 and in accordance with the
manufacturer's recommendations.
Fabricated fittings shall be mitred fittings to AWWA C906 suitable for the pressure
rating specified in the Contract Documents.
Moulded fittings shall be to ASTM 3261 suitable for the pressure rating, and fusion
to the main pipe dimensions, specified in the Contract Documents.
Flanged joints shall be to AWWA C906, flat faced stub end and loose hot-dip
galvanized ductile iron (ASTM A536) backup ring drilling to ANSI B16.1, as per the
pressure rating specified in the Contract Documents.
4.3
PVC and Ductile Iron Pipe Fittings shall conform to the following specifications:
4.3.1
CI (Cast Iron) Grey-iron fittings shall be to AWWA C110, minimum 2415 kPa
pressure rating or higher if specified in the Contract Documents.
4.3.2
DI (Ductile Iron) fittings shall be to AWWA C110, minimum 2415 kPa pressure
rating, cement mortar lined as per AWWA C104.
4.3.3
Compact Ductile Iron Fittings shall be to AWWA C153, minimum 2415 kPa pressure
rating, cement mortar lined to AWWA C104.
4.3.4
Single Rubber Gaskets for push-on bell and spigot and/or mechanical pipe joints
shall be to AWWA C111 Tyton or approved equal.
All push-on joint hubs shall have integral tie-rod lugs.
4.3.5
Flanged joints shall be to AWWA C110, flat faced, conforming in dimension and
drilling to ANSI B16.1, and pressure rating specified in the Contract Documents. Full
face flange gaskets to be manufactured from black natural rubber 3.175 mm thick
with layer of cotton on each side.
4.3.6
Bolts to be medium carbon steel or martensitic steel (Type 1 or Type 2), ASTM
A325 heavy hex finish, hot-dip galvanized to ASTM A153, coarse threads to have
Class 2A tolerance before galvanizing. Bolt sizes to AWWA C110.
Nuts to be heavy hex carbon steel to ASTM A563 Grade C hot-dip galvanized to
ASTM A153.
Washers to be flat hardened steel to ASTM F436 hot-dip galvanized to ASTM A153.
4.3.7
Tie-Rods shall be continuous threaded, quenched and tempered alloyed steel to
ASTM A354, Grade BC, hot-dip galvanized to ASTM A153, coarse threads to have
Class 2A tolerance before galvanizing. Tie-rods to be sized as specified in the
Contract Documents.
DIVISION 2 - SITEWORK Page 131
City of Armstrong
SECTION 2D - SANITARY SEWER WORKS
SCHEDULE L - Materials, Construction, Testing Specifications
4.3.8
Tie-Rod Nuts and internally threaded couplings to be heavy hex finish to ASTM
A563 Grade C hot-dip galvanized to ASTM A153.
Washers to be flat hardened steel to ASTM F436 hot dip galvanized to ASTM A153.
4.4
Steel Pipe Fabricated Fittings shall conform to the following specifications:
4.4.1
Fabricated Steel Pipe fittings shall be in accordance with AWWA C208 and AWWA
C207 if flanged, with interior and exterior protected with hot applied coal tar enamel
to AWWA C203.
4.5
Couplings and Flanged Coupling Adapters shall be compatible with the pressure class
specified in the Contract Documents and shall conform to the following specifications:
4.5.1
Ductile Iron castings shall conform to ASTM A536, Grade 65-45-12.
4.5.2
Bolts and nuts shall be high strength low alloy steel conforming to AWWA C111,
stainless steel conforming to ASTM F593 of F738 for bolts and ASTM F594 or F836
for heavy hex nuts, or as specified in the Contract Documents. Rolled threads, fit
and dimensions to AWWA C111.
4.5.3
Compression gaskets shall conform to AWWA C219.
4.5.4
Anti-corrosion coating of interior and exterior centre sleeve and end rings to conform
to AWWA C219.
4.5.5
Flanges shall be to AWWA C110, flat faced, conforming in dimension and drilling to
ANSI B16.1.
4.5.6
Full face flange gaskets to be manufactured from black natural rubber 3.175 mm
thick with layer of cotton on each side.
4.6
Plain End and Transition Couplings shall conform to the following specifications.
4.6.1
Plain end or transition couplings to be Robar Model 1408 or Canpac CDB, or as
specified in the Contract Documents Robar Model 1506 or Canpac CDSE.
4.7
Flanged Coupling Adapters shall conform to the following specifications.
4.7.1
Flanged coupling adapters to be Robar Model 7404 or Dresser Style 127 or 128, or
as specified in the Contract Documents, Robar Model 7506 or Dresser Style 127 or
128 All-Clad.
4.8
Joint Restraint Devices shall conform to the following specifications:
4.8.1
Ductile Iron Castings shall conform to ASTM A536.
Anti-Corrosion Coating for Ductile Iron Castings shall conform to AWWA C219, or
as specified in the Contract Documents, to AWWA C210, C213, or C550.
4.8.2
Bolts and Nuts shall be High Strength Low Alloy Steel to AWWA C111, or as
specified in the Contract Documents, stainless steel to ASTM F593 or F738 for bolts
and ASTM F594 or F836 for heavy hex nuts.
4.8.3
Tie-Rods shall be continuous threaded, quenched and tempered alloyed steel to
ASTM A354, Grade BC, hot-dip galvanized to ASTM A153, coarse threads to have
Class 2A tolerance before galvanizing. Tie-rods to be sized as specified in the
Contract Documents.
4.8.4
Restrainers for Ductile Iron pipe with mechanical joint fittings to be EBA Iron
Megalug assembly or Uni-flange Series 1300.
4.8.5
Restrainers for PVC pipe with push-on joint fittings with tie-rod lugs to be Uni-flange
Series 1300 or Robar Model 4400. Restrainers for bell joints in PVC pipe to be Uni-
flange Series 1350 or 1390, or Robar Model 4450 or 4452.
DIVISION 2 - SITEWORK Page 132
City of Armstrong
SECTION 2D - SANITARY SEWER WORKS
SCHEDULE L - Materials, Construction, Testing Specifications
4.9
Valves and Valve Boxes shall conform to the following specifications:
4.9.1
Gate Valves shall conform to AWWA C500, 75 mm to 300 mm to working pressure
1380 kPa, 400 mm and larger to working pressure 1035 kPa, gray cast iron or cast
ductile iron body, bronze mounted solid wedge, double disk, or resilient-seated, non-
rising stem, hub or flanged ends, 50 mm sq. operating nut.
4.9.2
Gate Valves to open counter clockwise, have the manufacturers' name, year of
manufacture, size and working pressure indicated on the bonnet or body.
4.9.3
Gate Valves 400 mm and larger to have by-pass sized to AWWA C500 and have
gear operators.
4.9.4
Acceptable manufacturers of gate valves are Clow and TC/Clow.
4.9.5
Air Release, Air/Vacuum and Combination Air Valves shall be in accordance with
AWWA C512, gray cast iron or ductile iron body, threaded or flanged connections,
maximum working pressure 2070 kPa, for sewage service.
4.9.6
Mainline Valve Boxes shall be circular Nelson Type (NT) No. D-5 as manufactured
by Dobney Foundry. Valve Boxes in asphalt to be Mueller MVB. Valve Box Riser
pipe to be 150 mm PVC SDR 35.
4.10
Granular Pipe Bedding and Surround Aggregate in the pipe zone shall conform to the
following specifications:
4.10.1 Class `A' Pipe Bedding is where the pipe is bedded in a continuous monolithic
cradle of concrete as indicated in the Contract Documents.
4.10.2 Class `B' Pipe Bedding shall be imported sand meeting the following gradation:
Sieve
Designation
Percent
Passing
12.5
Mm
100
4.75
Mm
35 - 100
2.36
Mm
20 - 70
1.18
Mm
13 - 50
0.850
Mm
8 - 35
0.300
Mm
5 - 25
0.150
Mm
2 - 15
0.075
Mm
0 - 6
4.10.3 Class `C' Pipe Bedding shall be native material in the trench which meets the
gradation for Class `B' Pipe Bedding sand.
4.11
Granular Trench Backfill Aggregate shall conform to the following specifications:
4.11.1 Trench Backfill aggregate shall be `Selected Excavated Materials', inert, durable
material, reasonably uniform in quality and free from soft or disintegrated particles,
free of stones and rocks over 20 mm in diameter, free of organic or foreign matter,
capable of compaction to specified density.
4.11.2 Imported Trench Backfill material shall meet the gradation specified for Sub-Base
Course Aggregate in Clause 4.6, Section 2B - Roads and Earthworks.
4.12
Cast-in-Place Concrete shall conform to CAN/CSA-A23.1. Concrete for Sanitary Works to
be 25 MPa at 28 days.
DIVISION 2 - SITEWORK Page 133
City of Armstrong
SECTION 2D - SANITARY SEWER WORKS
SCHEDULE L - Materials, Construction, Testing Specifications
4.13
Fibreglass Manhole Liners shall be one piece consisting of unlayered and homogeneous
fibreglass reinforced plastic with full flow channels with side walls to crown of pipe,
watertight gasketed bells graded and aligned to comply with design to suit specified pipe,
inner surface of liner benching to have anti-skid surface, outer surface of liner to be sand
coated and to have sufficient steel spirals bonded to the fibreglass reinforced plastic to
assure a continuous physical connection to the concrete base.
5.0
INSTALLATION
5.1
Trench and pipe bedding details shall conform to the Contract Drawings and the following
specifications:
5.1.1
Pipes, fittings, manholes, and appurtenances, shall be cleaned and inspected for
defects prior to installation. Defective materials shall be removed from the job site.
5.1.2
Where material in the trench bottom is deemed by the Owners' Representative to be
unstable or otherwise unsuitable for pipe support or the support of appurtenant
structures, the trench shall be over-excavated to the depth at which stable material
is encountered and the excavation shall be backfilled, with Imported Backfill, to the
lower
level of the pipe bedding zone. Unsuitable materials shall be disposed of at the
Contractors' own disposal site unless directed otherwise in the Contract Documents.
5.1.3
The Pipe Zone is defined as that portion of the trench between the bottom level of
the pipe bedding and a level 300 mm above the top of the installed pipe or
appurtenances. Materials in the pipe zone shall consist of Class `B' Bedding (4.2.2)
or, if present, Class `C' Bedding (4.2.3). The bedding materials shall have a
minimum depth under the pipe of 150 mm. Pipe bedding shall extend the full width
of the trench and be compacted to 95% laboratory density obtained by following the
current A.S.T.M., Designation D698-91 Method C.
5.1.4
Trenches shall be dug to the alignment and depth indicated in the Contract
Documents. Sanitary mains and services shall be installed so as to provide a
minimum cover of 1.5 metres from finished grade, unless specified otherwise in the
Contract Documents.
5.1.5
Trenches shall be maintained such that the pipe can be installed without getting
water, muck, silt, gravel, or other foreign materials into the pipe. Trench bottoms
which have been allowed to deteriorate, and trench bottoms which have been over-
excavated, shall be made good to the design grade, with selected site excavated
material, or, if ordered, Imported Backfill, and compacted to 95% laboratory density
obtained by following the current A.S.T.M., Designation D698-91 Method C, at the
Contractors' expense.
5.1.6
Trench excavations shall be kept free of water, by pumping, during the pipe laying,
jointing, bedding, and backfill works. Trench water shall not be permitted to enter the
pipe being installed. Water shall be discharged from the excavation in such a
manner as not to cause nuisance, injury, or damage to property or receiving waters.
Previously laid pipe shall not be used for dewatering.
5.1.7
Trenches shall be sheeted and braced, or sloped as required by WorkSafe BC
regulations. Where sheeting or shoring is required it shall be in accordance with
WorkSafe BC regulations.
DIVISION 2 - SITEWORK Page 134
City of Armstrong
SECTION 2D - SANITARY SEWER WORKS
SCHEDULE L - Materials, Construction, Testing Specifications
5.1.8
The Contractor shall replace materials and rectify all failures as a result of
settlement of the trench backfill or collapse of the trench walls during the
maintenance guarantee period. Where trenches fail, the trench material shall be
excavated to the top of the pipe zone and all materials above the pipe zone
replaced in accordance with the Contract Documents.
The Contractor shall make up for any deficiencies in the quantity of material suitable
for backfilling which have been wasted during the construction operation.
5.1.9
The requirements of the WorkSafe BC shall take precedence over any conflicting
Clauses in these Specifications. Trench excavations and trench walls shall conform
to WorkSafe BC regulations. Ledge rock, boulders, and large stones shall be
removed to provide a clearance of at least 150 mm below, and on all sides, of the
pipe and fittings.
5.1.10 Where asphalt concrete pavement is to be cut the trench width shall be kept as
narrow as possible while still complying with WorkSafe BC regulations and the
pavement shall be saw-cut along neat straight lines. If pavement breakage occurs
outside the limits of the initial pavement cut the asphalt shall be cut back to sound
asphalt in neat straight lines before the asphalt restoration paving starts.
5.1.11 When sidecasting excavated materials the Contractor shall ensure that his
operation does not interfere with traffic. Traffic flow must be maintained as specified
in the Special Instructions in the Contract Documents. The Contractor shall be
responsible for thoroughly cleaning all roadways, on which excavated materials or
imported backfill has been hauled, at the end of each working day, or promptly when
directed by the Owners' Representative, at the Contractors' own expense.
5.1.12 The Backfill Zone is that section of the trench from the top of the pipe zone to
subgrade. The backfill zone shall be backfilled with select excavated materials, or, if
directed by the Owners' Representative, with Imported Backfill Materials.
The backfill zone shall be compacted to 95% laboratory density obtained by
following the current A.S.T.M., Designation D698-91 Method C, at the Contractors'
expense. Placing of frozen materials in the backfill zone will not be permitted.
5.1.13 Where trenches are excavated in paved surfaces, the sub-base, base, and asphalt
shall be replaced in accordance with Section 2B - Roads and Earthworks.
5.1.14 Pipe shall be handled, laid, cut, and jointed, to the pipe manufacturers' instructions
and specifications, PVC pipe to CSA B182.11.
5.1.15 Joint deflection not permitted for smooth profile PVC pipe. For Concrete Pipe and
Ribbed PVC Pipe do not exceed one-half permissible joint deflection recommended
by pipe manufacturer. In no case is radius of curvature to exceed 300 times the
outside diameter of the barrel for 100 mm to 300 mm smooth profile PVC Pipe.
5.1.16 Pipe shall be laid to a horizontal tolerance of 10± mm from design alignment and a
vertical tolerance of 5± mm from design grade. For grades 2% and greater pipe shall
be laid uphill (bell ends facing uphill). Pipe Joint Restrainers shall be used where
designated in the Contract Documents.
5.1.17 When any stoppage of work occurs, restrain laid pipes to prevent 'creep' and cap
the end pipe to keep the pipe free of foreign materials, dirt and debris.
5.1.18 Service connections to be installed, using prefabricated saddles or wyes, and
marked (painted red) as specified in the Contract Drawings. Joint to be structurally
DIVISION 2 - SITEWORK Page 135
City of Armstrong
SECTION 2D - SANITARY SEWER WORKS
SCHEDULE L - Materials, Construction, Testing Specifications
sound and watertight without encroachment into inner circle of mainline sewer pipe.
Refer to Specification Drawing.
5.1.19 Manhole joints to be watertight using SuperSeal rubber gaskets.
Precast riser sections to be set plumb with joints and gaskets to ASTM C443 and
ASTM C361. Refer to Specification Drawings for installation of Manholes.
5.1.20 Pre-benched manhole fibreglass reinforced plastic liners shall be installed in
accordance with the Manufacturers recommendations.
5.1.21 Where manhole base is constructed cast-in-place form channelling using half-
sections of pipe. Benching to direct flow parallel to main flow of sewer. Top of
benching to be as high as crown of sewer pipe. Finish concrete to smooth surface
using steel trowel.
5.1.22 Where Ribbed PVC Pipe is utilized, the first pipe joint, on each side of a cast-in-
place manhole base, shall be located between 0.5 m and 1.0 m from the outside
face of the manhole barrel.
6.0
CLEANING, TESTING
6.1
All cleaning and testing shall be completed by the Contractor, and be witnessed by the
Owners' Representative.
6.1.1
The Contractor shall supply, at his own cost, all materials, equipment, labour, and
supplies, to clean, and accurately test, the sanitary mains and appurtenances.
6.1.2
Manholes shall be exfiltration tested using water. Manholes shall be filled with water
to 2.0 m above invert of pipe, or to elevation 351.0 m, whichever is greater. No
measurable drop in 1 hour will constitute an acceptance test.
6.1.3
All sanitary mains shall be tested using a low pressure air test. Air pressure test
equipment to be regulated to prevent pressure inside test section from exceeding 35
kPa above average ground water pressure. Internal air pressure, in test section to
be maintained at 25 kPa above average ground water pressure for at least 5
minutes immediately prior to test. Test period to start when pressure decreases to
24 kPa above average groundwater pressure and ends when the pressure
decreases to 20.5 kPa above average groundwater pressure. If test period is less
than:
2 minutes and 32 seconds for 100 mm pipe
3 minutes and 50 seconds for 150 mm pipe
5 minutes and 6 seconds for 200 mm pipe
6 minutes and 22 seconds for 250 mm pipe
7 minutes and 39 seconds for 300 mm pipe
8 minutes and 56 seconds for 350 mm pipe
9 minutes and 35 seconds for 375 mm pipe
10 minutes and 12 seconds for 400 mm pipe
11 minutes and 34 seconds for 450 mm pipe
12 minutes and 45 seconds for 500 mm pipe
13 minutes and 45 seconds for 525 mm pipe
the sewer pipe shall be deemed to have failed the test and shall be retested upon
completion of repairs of any leaks.
DIVISION 2 - SITEWORK Page 136
City of Armstrong
SECTION 2D - SANITARY SEWER WORKS
SCHEDULE L - Materials, Construction, Testing Specifications
6.1.4
All sanitary sewers are to be video inspected immediately following completion of
installation of individual sections. Repair all sags in the pipe to achieve uniform
grade. Clean Pipe.
6.1.5
Repair visible leaks regardless of test results.
6.1.6
Force mains shall be tested a 1.5 times the working pressure applied at the highest
elevation in each section. The maximum allowable leakage rate shall conform to the
applicable AWWA standards for water pressure pipe. All pressure tests shall be for
a two hour duration.
6.2
The Contractor shall arrange and pay for an independent Testing Agency to provide quality
control testing for all materials supplied and incorporated into the works.
Material Quality, and Compaction Testing, shall be conducted on aggregates, bedding sand
and trench backfill and shall include, but not be limited to, the following tests:
6.2.1
Density analysis of utility pipe zone and trench zone backfill
The Owner, at his option, may conduct random tests of the materials supplied and
work performed to ensure compliance with the Contract Documents.
Where the Owners' testing reveals the materials, and or works, do not comply with
the Contract Documents, and the Contractor is unable to provide successful test
results from an Independent Testing Agency, then all works and materials which
have failed the Owners testing shall be rejected and the materials removed from the
site and the works redone.
**End Section 2D**
DIVISION 2 - SITEWORK Page 137
City of Armstrong
SECTION 2E - STORM SEWER WORKS
SCHEDULE L - Materials, Construction, Testing Specifications
1.0
GENERAL
1.1
This section refers to the supply of all labour, supervision, equipment, and materials, as
specified, necessary to complete the work in accordance with the Drawings and
Specifications.
2.0
DESCRIPTION OF WORK
2.1
The work shall include, but not necessarily be limited to the following principal items:
2.1.1
Supply and install all materials as per the drawings and specifications, (except as
specifically stated as `Supplied by Owner').
2.1.2
Take delivery, including unloading, at the site of materials and store under suitable
conditions to prevent damage, deterioration, or, contamination until incorporated into
the works.
2.1.3
Schedule works such that disruption of normal traffic, and inconvenience to
residents, in the working area is kept to a minimum, and such that emergency
vehicles have suitable access thru the working area at all times. Provide dust control
during the course of the Contract.
2.1.4
Maintain the work area in an orderly manner free of accumulated waste, and
surplus, materials and debris. Clean-up shall be a continuing daily process over the
duration of the Contract.
2.1.5
Trench excavation, pipe bedding, de-watering, backfill and compaction within the
pipe zone, trench backfill and compaction, and restoration of all disturbed areas to
original condition unless specified otherwise.
2.1.6
Supply and install pipe, bends, fittings, manholes, services, catch basins, inlets, and
outfalls, as required.
2.1.7
Provide barriers, fences, and warning signs, shoring, as required, to protect
workmen and the general public.
3.0
EXAMINATION OF THE SITE OF THE PROPOSED WORKS
3.1
The `Tenderer' will carefully examine the site of the proposed works and notify the Owners'
Representative, in writing, of any changes which have been made to the site by `Others',
during the period of `Tender Closing' to `Contract Award', which would affect the proper
completion of the Contract.
3.2
Commencement of the work on this Contract shall constitute acceptance of the site and any
changes to the work site by `Others'.
4.0
MATERIALS
4.1
Storm Sewer Pipe shall conform to the following specifications:
4.1.1
Polyvinyl chloride (PVC) pipe up to 100 mm in diameter shall be DR28 meeting or
exceeding all of the requirements of ASTM Specification D3034 and CSA Standards
B182.1 and B182.2. Minimum pipe stiffness (F/Y) shall be 320 kPa at 5.0%
deflection, ASTM D2412. Manning "n" coefficient to be 0.009.
DIVISION 2 - SITEWORK Page 138
City of Armstrong
SECTION 2E - STORM SEWER WORKS
SCHEDULE L - Materials, Construction, Testing Specifications
4.1.2
Polyvinyl chloride (PVC) pipe, and fittings, 150 mm to 250 mm in diameter shall be
DR35 meeting or exceeding all of the requirements of ASTM Specification D3034
and CSA Standards B182.1 and B182.2, and shall be coloured green. Minimum
pipe stiffness (F/Y) shall be 320 kPa at 5.0% deflection, ASTM D2412. Manning "n"
coefficient to be 0.009.
Pipe joints to have bell and spigot ends with rubber gaskets to ASMT 477.
4.1.3
Ribbed Polyvinyl chloride (PVC) pipe, and fittings, 250 mm to 900 mm in diameter
shall meet or exceed all of the requirements of ASTM F794 and CSA Standards
B182.4, and shall be coloured green. Ribbed Pipe to have a minimum pipe stiffness
of 320 kPa at 5.0%. Pipe to be marked to clearly indicated class rating as required
under ASTM F794. Pipe joints to have bell and spigot ends with rubber gaskets to
ASMT 477.
Manning "n" coefficient to be 0.009.
4.1.4
Non-reinforced concrete pipe up to 900 mm in diameter shall meet or exceed all of
the requirements of ASTM Specification C14M. Rubber gasket joints shall be to
ASTM C443M.
4.1.5
Reinforced concrete pipe greater than 900 mm in diameter shall meet or exceed all
of the requirements of ASTM Specification ASTM C76M. Rubber gasket joints shall
be to ASTM C443M. Pipe shall have not more than two lifting holes per length and
shall be provided with pre-fabricated PVC plugs to seal lift holes water tight after
installation.
4.1.6
Corrugated Steel pipe shall conform to CAN3-G401.
4.1.7
Storm Manhole Barrels shall be Precast Reinforced Concrete Manhole Sections,
minimum diameter 1050 mm, or larger to accommodate larger pipes, meeting the
requirements of ASTM Specification C478. Precast Concrete Lid shall be designed
for H-20 Loading. Ladder Rungs to be 300 mm wide polypropylene coated ladder
rungs cast with manhole sections. Polypropylene to ASTM D-4101, Reinforcing to
ASATM A-615. Adjusting rings to ASTM C478, Concrete Spacer Rings (Grade
Rings) designed for H-20 Loading. Refer to Specification Drawing.
4.1.8
Storm Manhole Frames and Covers shall be C-44 designation, Round Base. The
Cast Iron Frame shall have a 610 mm access opening. The Storm Manhole Cover
shall be labelled "Storm Sewer".
4.1.9
Precast Reinforced Concrete Catch Basins shall be precast reinforced concrete to
ASTM Specification C-478, 750 mm inside diameter. Precast Concrete Lid shall be
designed for H-20 loading. Refer to Standard Specification Drawing.
4.1.10 Storm Catch Basin Frames and Grates shall be B-19A (Frame) and B-19A Modified
(Grate) Left and Right as applicable. All storm catch basins shall be supplied with
Dobney Foundry #9 Trapping Hoods. Twin Inlet Catch Basins shall have minimum
250mm diameter PVC-SDR35 pipe connection to storm main.
Trapping Hood Rods shall be cast in place and shall be 15 mm diameter galvanized.
4.2
Granular Pipe Bedding and Surround Aggregate in the pipe zone shall conform to the
following specifications:
4.2.1
Class `A' Pipe Bedding is where the pipe is bedded in a continuous monolithic
cradle of concrete as indicated in the Contract Documents.
DIVISION 2 - SITEWORK Page 139
City of Armstrong
SECTION 2E - STORM SEWER WORKS
SCHEDULE L - Materials, Construction, Testing Specifications
4.2.2
Class `B' Pipe Bedding shall be imported sand meeting the following gradation:
Sieve
Designation
Percent
Passing
12.5
mm
100
4.75
mm
35 - 100
2.36
mm
20 - 70
1.18
mm
13 - 50+1
0.850
mm
8 - 35
0.300
mm
5 - 25
0.150
mm
2 - 15
0.075
mm
0 - 6
4.2.3
Class `C' Pipe Bedding shall be native material in the trench which meets the
gradation for Class `B' Pipe Bedding sand.
4.3
Granular Trench Backfill Aggregate shall conform to the following specifications:
4.3.1
Trench Backfill aggregate shall be `Selected Excavated Materials', inert, durable
material, reasonably uniform in quality and free from soft or disintegrated particles,
free of stones and rocks over 20 mm in diameter, free of organic or foreign matter,
capable of compaction to specified density.
4.3.2
Imported Trench Backfill material shall meet the gradation specified for Sub-Base
Course Aggregate in Clause 4.6, Section 2AB- Roads and Earthworks.
4.4
Cast-in-Place Concrete shall conform to CAN/CSA-A23.1. Concrete for Storm Sewer Works
to be 25 MPa at 28 days.
4.5
Fibreglass Manhole Liners shall be one piece consisting of unlayered and homogeneous
fibreglass reinforced plastic with full flow channels with side walls to crown of pipe,
watertight gasketed bells graded and aligned to comply with design to suit specified pipe,
inner surface of liner benching to have anti-skid surface, outer surface of liner to be sand
coated and to have sufficient steel spirals bonded to the fibreglass reinforced plastic to
assure a continuous physical connection to the concrete base.
5.0
INSTALLATION
5.1
Trench and pipe bedding details shall conform to the Contract Drawings and the following
specifications:
5.1.1
Pipes, fittings, manholes, catch basins, and appurtenances, shall be cleaned and
inspected for defects prior to installation. Defective materials shall be removed from
the job site.
5.1.2
Where material in the trench bottom is deemed by the Owners' Representative to be
unstable or otherwise unsuitable for pipe support or the support of appurtenant
structures, the trench shall be over-excavated to the depth at which stable material
is encountered and the excavation shall be backfilled, with Imported Backfill, to the
lower level of the pipe bedding zone. Unsuitable materials and ripped rock and
blasted rock shall be disposed of at the Contractors' own disposal site unless
directed otherwise in the Contract Documents.
DIVISION 2 - SITEWORK Page 140
City of Armstrong
SECTION 2E - STORM SEWER WORKS
SCHEDULE L - Materials, Construction, Testing Specifications
5.1.3
The Pipe Zone is defined as that portion of the trench between the bottom level of
the pipe bedding and a level 300 mm above the top of the installed pipe or
appurtenances. Materials in the pipe zone shall consist of Class 'B' Bedding (4.2.2)
or, if present, Class `C' Bedding (4.2.3). The bedding materials shall have a
minimum depth under the pipe of 150 mm. Pipe bedding shall extend the full width
of the trench and be compacted to 95% laboratory density obtained by following the
current A.S.T.M., Designation D698-91 Method C.
5.1.4 Trenches shall be dug to the alignment and depth indicated in the Contract
Documents. Storm mains and services shall be installed so as to provide a minimum
cover of 1.2 metres from finished grade, unless specified otherwise in the Contract
Documents.
5.1.5
Trenches shall be maintained such that the pipe can be installed without getting
water, muck, silt, gravel, or other foreign materials into the pipe. Trench bottoms
which have been allowed to deteriorate, and trench bottoms which have been over-
excavated, shall be made good to the design grade, with selected site excavated
material, or, if ordered, Imported Backfill, and compacted to 95% laboratory density
obtained by following the current A.S.T.M., Designation D698-91 Method C, at the
Contractors' expense.
5.1.6
Trench excavations shall be kept free of water, by pumping, during the pipe laying,
jointing, bedding, and backfill works. Trench water shall not be permitted to enter the
pipe being installed. Water shall be discharged from the excavation in such a
manner as not to cause nuisance, injury, or damage to property or receiving waters.
Previously laid pipe shall not be used for dewatering.
5.1.7
Trenches shall be sheeted and braced, or sloped, as required by WorkSafe BC
regulations. Where sheeting or shoring is required it shall be in accordance with
WorkSafe BC regulations.
5.1.8
The Contractor shall replace materials and rectify all failures as a result of
settlement of the trench backfill or collapse of the trench walls during the
maintenance guarantee period. Where trenches fail, the trench material shall be
excavated to the top of the pipe zone and all materials above the pipe zone
replaced in accordance with the Contract Documents.
The Contractor shall make up for any deficiencies in the quantity of material suitable
for backfilling which have been wasted during the construction operation.
5.1.9
The requirements of WorkSafe BC shall take precedence over any conflicting
Clauses in these Specifications. Trench excavations and trench walls shall conform
to WorkSafe BC regulations. Ledge rock, boulders, and large stones shall be
removed to provide a clearance of at least 150 mm below, and on all sides, of the
pipe and fittings.
5.1.10 Where asphalt concrete pavement is to be cut the trench width shall be kept as
narrow as possible, while still complying with WorkSafe BC regulations, and the
pavement shall be saw-cut along neat straight lines. If pavement breakage occurs
outside the limits of the initial pavement cut the asphalt shall be cut back to sound
asphalt in neat straight lines before the asphalt restoration paving starts.
DIVISION 2 - SITEWORK Page 141
City of Armstrong
SECTION 2E - STORM SEWER WORKS
SCHEDULE L - Materials, Construction, Testing Specifications
5.1.11 When sidecasting excavated materials the Contractor shall ensure that his operation
does not interfere with traffic. Traffic flow must be maintained as specified in the
Special Instructions in the Contract Documents. The Contractor shall be responsible
for thoroughly cleaning all roadways, on which excavated materials or imported
backfill has been hauled, at the end of each working day, or promptly when directed
by the Owners' Representative, at the Contractors' own expense.
5.1.12 The Backfill Zone is that section of the trench from the top of the pipe zone to
subgrade. The backfill zone shall be backfilled with select excavated materials, or, if
directed by the Owners' Representative, with Imported Backfill Materials.
The backfill zone shall be compacted to 95% laboratory density obtained by
following the current A.S.T.M., Designation D698-91 Method C, at the Contractors'
expense. Placing of frozen materials in the backfill zone will not be permitted.
5.1.13 Where trenches are excavated in paved surfaces, the sub-base, base, and asphalt
shall be replaced in accordance with Section 2B - Roads and Earthworks.
5.1.14 Pipe shall be handled, laid, cut, and jointed, to the pipe manufacturers' instructions
and specifications, PVC pipe to CSA B182.11.
5.1.15 Joint deflection not permitted for smooth profile PVC pipe. For Concrete Pipe and
Ribbed PVC Pipe do not exceed one-half permissible joint deflection recommended
by pipe manufacturer. In no case is radius of curvature to exceed 300 times the
outside diameter of the barrel for 100 mm to 300 mm smooth profile PVC Pipe.
5.1.16 Pipe shall be laid to a horizontal tolerance of 20± mm from design alignment and a
vertical tolerance of 10± mm from design grade. For grades 2% and greater pipe
shall be laid uphill (bell ends facing uphill). Pipe joint restrainers shall be used where
designated in the Contract Documents.
5.1.17 When any stoppage of work occurs, restrain laid pipes to prevent 'creep' and cap
the end pipe to keep the pipe free of foreign materials, dirt and debris.
5.1.18 Service connections to be installed, using prefabricated saddles, wyes, and inserta
tees, and marked (painted green) as specified in the Contract Drawings. Joint to be
structurally sound and watertight without encroachment into inner circle of mainline
sewer pipe. Refer to Specification Drawing.
5.1.19 Manhole and Catch Basin joints to be constructed watertight using SuperSeal
rubber gaskets. Precast riser sections to be set plumb with joints and gaskets to
ASTM C443 and ASTM C361. Refer to Specification Drawings for installation of
Manholes and Catch Basins.
5.1.20 Pre-benched manhole fibreglass reinforced plastic liners shall be installed in
accordance with the Manufacturers recommendations.
5.1.21 Where manhole base is constructed cast-in-place form channelling using half-
sections of pipe. Benching to direct flow parallel to main flow of sewer. Top of
benching to be as high as crown of sewer pipe. Finish concrete to smooth surface
using steel trowel.
5.1.22 Where Ribbed PVC Pipe is utilized, the first pipe joint, on each side of a cast-n-
place manhole base, shall be located between 0.5 m and 1.0 m from the outside
face of the manhole.
DIVISION 2 - SITEWORK Page 142
City of Armstrong
SECTION 2E - STORM SEWER WORKS
SCHEDULE L - Materials, Construction, Testing Specifications
6.0
CLEANING, TESTING
6.1
All cleaning and testing shall be completed by the Contractor, and be witnessed by the
Owners' Representative.
6.1.1
The Contractor shall supply, at his own cost, all materials, equipment, labour,
required to clean, and accurately test, the storm mains and appurtenances.
6.1.2
Infiltration and exfiltration testing is not required.
6.1.3
Pass a rubber ball, mandrel or test plug having a minimum cross-section area of
95% of the sewer pipe cross-section area completely through the pipes and
appurtenances. A light test may be performed in lieu of the ball test at discretion of
the Owners Representative.
6.1.4
All storm sewers are to be video inspected immediately following completion of
installation of individual sections. Repair all sags in the pipe to achieve uniform
grade. Clean pipe.
6.1.5
Repair visible leaks regardless of test results.
6.2
The Contractor shall arrange and pay for an independent Testing Agency to provide quality
control testing for all materials supplied and incorporated into the works.
Material Quality, and Compaction Testing, shall be conducted on aggregates, bedding sand
and trench backfill and shall include, but not be limited to, the following tests:
6.2.1
Density analysis of utility pipe zone and trench zone backfill
The Owner, at his option, may conduct random tests of the materials supplied and
work performed to ensure compliance with the Contract Documents.
Where the Owners' testing reveals the materials, and or works, do not comply with
the Contract Documents, and the Contractor is unable to provide successful test
results from an independent testing agency, then all works and materials which
have failed the Owners testing shall be rejected and the materials removed from the
site and the works redone.
**End Section 2E**
DIVISION 2 - SITEWORK Page 143
City of Armstrong
SECTION 2F - CONCRETE CURBS, GUTTERS, SIDEWALK, STAIRS
SCHEDULE L - Materials, Construction, Testing Specifications
1.0
GENERAL
1.1
This section refers to the supply of all labour, supervision, equipment, and materials, as
specified, necessary to complete the work in accordance with the Drawings and
Specifications.
2.0
DESCRIPTION OF WORK
2.1
The work shall include, but not necessarily be limited to the following principal items:
2.1.1
Supply and install all materials as per the drawings and specifications.
2.1.2
Take delivery, including unloading, at the site of any materials and store under
suitable conditions to prevent damage, deterioration, or, contamination until
incorporated into the works.
2.1.3
Schedule works such that disruption of normal traffic, and inconvenience to
residents, in the working area is kept to a minimum, and such that emergency
vehicles have suitable access thru the working area at all times. Provide dust control
during the course of the Contract.
2.1.4
Maintain the work area in an orderly manner free of accumulated waste, and
surplus, materials and debris. Clean-up shall be a continuing daily process over the
duration of the Contract.
2.1.5
Excavation, de-watering, backfill and compaction of all disturbed areas to original or
specified condition.
2.1.6
Supply and install combined curb & gutter, sidewalks, stairs, hand rails, excavation,
backfill, sub-base, base, curing compound, security for fresh concrete, and all other
works necessary for a complete project.
2.1.7
Provide barriers, fences, and warning signs, as required, to protect workmen and
the general public.
3.0
EXAMINATION OF THE SITE OF THE PROPOSED WORKS
3.1
The `Tenderer' will carefully examine the site of the proposed works and notify the Owners'
Representative, in writing, of any changes which have been made to the site by `Others',
during the period of `Tender Closing' to `Contract Award', which would affect the proper
completion of the Contract.
3.2
Commencement of the work on this Contract shall constitute acceptance of the site and any
changes to the work site by `Others'.
DIVISION 2 - SITEWORK Page 144
City of Armstrong
SECTION 2F - CONCRETE CURBS, GUTTERS, SIDEWALK, STAIRS
SCHEDULE L - Materials, Construction, Testing Specifications
4.0
MATERIALS
4.1
All concrete supply shall conform to the requirements of the latest version of CSA A23.1-04
/ A23.2-04.
4.1.1
Concrete shall be ready-mixed supplied by a company certified by the British
Columbia Ready-Mix Concrete Association for conformance for Concrete
Production Facilities.
4.1.2
Minimum Compressive Strength shall be 32 MPa at 28 days.
4.1.3
Coarse Aggregate maximum particle size shall not exceed 19 mm.
4.1.4
Minimum Cement Content shall be 350 kg/m3.
4.1.5
Entrained Air at job-site shall be 5 - 8%.
4.1.6
Slump shall be between 10 - 25 mm for extruded concrete and maximum 65 mm for
poured in place concrete.
4.1.7
Maximum Water - Cement Ratio shall be 0.45.
4.1.8
Curing Compound shall be Insul-Mastic 3101 or equal.
4.2
All Concrete Reinforcing Steel shall conform to the following requirements:
4.2.1
CAN/CSA-G30.12 - 300 MPa.
4.3
All Sidewalk Fence materials shall conform to the following requirements:
4.3.1
Posts and rails to be 48 mm O.D. to A.S.T.M. A 120 `Standard' weight (Schedule
40) galvanized pipe.
4.3.2
Pipe Fittings shall be galvanized malleable iron with case hardened set-screws
conforming to A.S.T.M. A 47 grade 32510 and A.S.T.M. A 153 Class A (610 g/m2 of
zinc coating).
4.3.3
Zinc Coating shall conform to CGSB 1-GP-181 M.
4.4
Sub-Base Course and Base Course Materials shall conform to Section 2B - Roads and
Earthworks.
5.0
INSTALLATION
5.1
All concrete supply and placement shall conform to the requirements of the latest version of
CSA A23.1-04 / A23.2-04.
5.2
Concrete works shall conform to the cross-sections and dimensions shown on the Contract
Drawings and the following specifications:
5.2.1
The sub-base and base for curb and gutter, and sidewalk, shall extend 300 mm on
either side of the limits of the concrete works.
5.2.2
The depths of the sub-base and base course shall be as specified on the
Specification Drawings.
5.2.3
The concrete finish shall be as specified on Specification Drawings.
5.2.4
Curing compound shall be applied in accordance with the Manufacturer's
Recommendations.
5.3
No materials shall be placed on or adjacent the newly poured concrete for at least 5 days.
Sub-Base and Base Course Materials shall be placed in accordance with Section 2B -
Roads and Earthworks.
DIVISION 2 - SITEWORK Page 145
City of Armstrong
SECTION 2F - CONCRETE CURBS, GUTTERS, SIDEWALK, STAIRS
SCHEDULE L - Materials, Construction, Testing Specifications
5.4
The Contractor shall monitor and protect the curing of the concrete to ensure that the
surface is not marred or vandalized in any way.
Where the surface is `marred', or `vandalized' the works shall be removed between
adjacent control joints and replaced. `Patching' is not acceptable.
5.5
When the concrete forms are removed all debris shall be immediately removed to the
Contractor's disposal site.
During the interval when the forms are stripped and the concrete works are backfilled any
grade separations shall be marked to provide for pedestrian safety.
5.6
Sign Post Bases shall be installed in accordance with the Specification.
Where a sign post bases protrudes above a sidewalk it shall be marked to advise
pedestrians until such time as the sign post is installed.
6.0
TESTING
6.1
All concrete testing shall be completed by the Contractor, be certified by an Independent
Testing Laboratory, and conform to CSA A23.1-04 / A23.2-04.
6.1.1
The Contractor shall supply, at his own cost, all materials, equipment, labour, and
supplies, required to efficiently and accurately test, the concrete strength, slump,
and air content.
6.1.2
The test results, from the tests specified in Clause 6.1.1, shall be certified by an
Independent Testing Laboratory and the test results shall be forwarded to the
Owners' Representative immediately when they are known.
6.1.3
The Owner may, or may not, elect to complete his own testing, however, testing by
the Owner shall not relieve the Contractor of his obligations in Clauses 6.1.1 and
6.1.2.
**End Section 2F**
DIVISION 2 - SITEWORK Page 146
City of Armstrong
SECTION 2G - STREET LIGHTING
SCHEDULE L - Materials, Construction, Testing Specifications
1.0
GENERAL
1.1
This section refers to the supply of all labour, supervision, equipment, and materials, as
specified, (except as specifically stated as `Supplied by Owner'), necessary to complete the
work in accordance with the Plans and Specifications.
2.0
DESCRIPTION OF WORK
2.1
The work shall include, but not necessarily be limited to the following principal items:
2.1.1
Supply and install all materials as per the plans and specifications, (except as
specifically stated as `Supplied by Owner').
2.1.2
Take delivery, including unloading, at the site of any materials specifically stated as
'Supplied by Owner' and store under suitable conditions to prevent damage,
deterioration, or, contamination until incorporated into the works.
2.1.3
Schedule works such that disruption of normal traffic, and inconvenience to
residents, in the working area is kept to a minimum, and such that emergency
vehicles have suitable access thru the working area at all times. Provide dust control
during the course of the Contract.
2.1.4
Maintain the work area in an orderly manner free of accumulated waste, and
surplus, materials and debris. Clean-up shall be a continuing daily process over the
duration of the Contract.
2.1.5
Excavation, de-watering, backfill and compaction of all disturbed areas to original or
specified condition.
2.1.6
Supply and installation of street lights, poles, bases, conduits, conductors, control
bases, service boxes, splice boxes, power bases, Hydro services, fixtures, warning
tape, excavation and backfill, and, acquisition of Electrical Permits, all other works
necessary for a complete project.
2.1.7
Provide barriers, fences, and warning signs, as required, to protect workmen and
the general public.
3.0
EXAMINATION OF THE SITE OF THE PROPOSED WORKS
3.1
The `Tenderer' will carefully examine the site of the proposed works and notify the Owners'
Representative, in writing, of any changes which have been made to the site by `Others',
during the period of `Tender Closing' to `Contract Award', which would affect the proper
completion of the Contract.
3.2
Commencement of the work on this Contract shall constitute acceptance of the site and any
changes to the work site by `Others'.
4.0
MATERIALS
4.1
Street light bases shall conform to Specification Drawings No. SL-2 and SL-5.
4.2
Street Light Poles, Power Bases, Fixtures, and Ballasts, shall conform to Specification
Drawings No. SL-1, SL-2, SL-3, SL-4 and SL-5.
4.3
Rigid PVC Street Light Ducting shall CSA approved and shall be subject to approval of the
Electrical Safety Branch Inspector. Fish Cord shall be polypropylene.
DIVISION 2 - SITEWORK Page 147
City of Armstrong
SECTION 2G - STREET LIGHTING
SCHEDULE L - Materials, Construction, Testing Specifications
4.4
Junction and Pull Boxes shall be equal to WCE-173f complete with galvanized steel lid and
braces.
4.5
Service Cabinets shall meet the requirements of CSA and the Canadian Electrical Code.
The Contractor shall install the service cabinet in the pole power base and service cabinet
grounding in accordance with the Canadian Electrical Code.
4.6
Conductors shall be new stranded copper conductors RW90 X-Link of the size and type
specified in the Contract Documents. The ground conductor shall be green TWH.
Colour coding is required and shall be as outlined in the Canadian Electrical Code.
4.7
Ground Rods shall be provided for each street light, and each steel junction/pull box lid, in
accordance with the Canadian Electrical Code requirements.
4.8
Electrical Energy Supply will be supplied from the BC Hydro secondary distribution system.
The Contractor is responsible for making the necessary arrangements for connection of the
new services and if necessary, disconnection of the existing services.
4.9
Warning Tape shall be polyethylene, yellow in colour, 150 mm wide, and marked
"CAUTION ELECTRIC LINE BURIED BELOW" at intervals not exceeding 1.0 m.
4.10
The Contractor shall apply and pay for all necessary permits before he commences work.
The Contractor shall also arrange for all inspections of the work as required by the Safety
Engineering Services Division, Ministry of Labour. The Contractor shall pay for all fees,
permits, and costs which may be incurred during testing inspection by the Electrical Safety
Branch Inspector.
5.0
INSTALLATION
5.1
All conduit trenches shall be excavated and backfilled in accordance with Standard
Specification Drawings No. UT-1 and UT-2. Warning tape shall be installed 450 mm above
the invert of the conduit.
5.2
All service boxes shall be set in the boulevard and the lid shall be set 25 mm above final
landscape grade.
5.3
Street light concrete bases shall be installed as per Standard Specification Drawings No.
SL-2 and SL-5.
5.4
Post Top Poles shall be factory painted as per Standard Specification Drawings No. SL-1,
SL-3, and SL-4. Davit Pole finish shall be double hot dip galvanizing.
6.0
TESTING
6.1
All street light Electrical Branch inspections and approvals shall be obtained by the
Contractor, at his own cost.
6.2
The Contractor shall furnish Certificates of Acceptance from the Electrical Safety Branch
Inspector.
6.3
The Contractor shall notify BC Hydro that the street lights have been approved and ready to
be energized.
**End Section 2G**
DIVISION 2 - SITEWORK Page 148
City of Armstrong
SECTION 2H - HYDRO, TELEPHONE, GAS, CATV
SCHEDULE L - Materials, Construction, Testing Specifications
1.0
GENERAL
1.1
This section refers to the supply of all labour, supervision, equipment, and materials, as
specified, (except as specifically stated as `Supplied by Owner'), necessary to complete the
work in accordance with the Plans and Specifications.
2.0
DESCRIPTION OF WORK
2.1
The work shall include, but not necessarily be limited to the following principal items:
2.1.1
Supply and install all materials as per the plans and specifications, (except as
specifically stated as `Supplied by Owner').
2.1.2
Take delivery, including unloading, F.O.B. suppliers yard, of any materials
specifically stated as `Supplied by Owner' and store under suitable conditions to
prevent damage, deterioration, or, contamination until incorporated into the works.
2.1.3
Schedule works such that disruption of normal traffic, and inconvenience to
residents, in the working area is kept to a minimum, and such that emergency
vehicles have suitable access thru the working area at all times. Provide dust control
during the course of the Contract.
2.1.4
Maintain the work area in an orderly manner free of accumulated waste, and
surplus, materials and debris. Clean-up shall be a continuing daily process over the
duration of the Contract.
2.1.5
Excavation, de-watering, backfill and compaction of all disturbed areas to original or
specified condition.
2.1.6
Supply and installation of ducting, conduit, pull boxes, service boxes, transformer
bases, splice boxes, pilasters, vaults, casings, warning tape, excavation and backfill,
and, acquisition of Electrical Permits, all other works necessary for the complete
installation of the BC Hydro, Telus, CATV, and Terasen Gas works.
2.1.7
Provide barriers, fences, and warning signs, as required, to protect workmen and
the general public.
3.0
EXAMINATION OF THE SITE OF THE PROPOSED WORKS
3.1
The `Tenderer' will carefully examine the site of the proposed works and notify the Owners'
Representative, in writing, of any changes which have been made to the site by `Others',
during the period of `Tender Closing' to `Contract Award', which would affect the proper
completion of the Contract.
3.2
Commencement of the work on this Contract shall constitute acceptance of the site and any
changes to the work site by `Others'.
4.0
MATERIALS
4.1
The Contractor shall supply all materials in accordance with the following specifications:
4.1.1
BC Hydro Specification No. 1323
4.1.2
Telus Specification No. 6020
4.1.3
Terasen Gas Specification No. CSA-Z184-M92
4.1.4
CATV materials shall conform to Telus Specification No. 6020 except that CATV
duct shall be 50 mm PVC 700 series orange teleduct.
DIVISION 2 - SITEWORK Page 149
City of Armstrong
SECTION 2H - HYDRO, TELEPHONE, GAS, CATV
SCHEDULE L - Materials, Construction, Testing Specifications
4.2
Where the Owner supplies BC Hydro materials the Contractor shall take delivery of these
materials, FOB Supplier, and shall be responsible for shipment to the job-site.
5.0
INSTALLATION
5.1
All BC Hydro, Telus, CATV and Terasen Gas works shall be installed in accordance with
the following specifications:
5.1.1
BC Hydro Specification No. 1323
5.1.2
CATV and Telus to Telus Specification No. 6020
5.1.3
Terasen Gas Specification No. CSA-Z184-M92
5.2
The Contractor shall be ensure that all BC Hydro, Telus, CATV and Terasen Gas trenches
are backfilled in accordance with Standard Specification Drawings No. UT-1 and UT-2.
5.3
All BC Hydro, Telus and CATV above ground appurtenances shall be set level and plumb to
design boulevard grade.
6.0
CLEANING AND TESTING
6.1
All BC Hydro, Telus, CATV and Terasen Gas works shall be cleaned and tested in
accordance with the following specifications:
6.1.1 BC Hydro Specification No. 1323
6.1.2
CATV and Telus to Telus Specification No. 6020
6.1.3
Terasen Gas Specification No. CSA-Z184-M9
**End Section 2H**
DIVISION 2 - SITEWORK Page 150
City of Armstrong
SECTION 2I- LANDSCAPING
SCHEDULE L - Materials, Construction, Testing Specifications
1.0
GENERAL
1.1
This section refers to the supply of all labour, supervision, equipment, and materials, as
specified, (except as specifically stated as `Supplied by Owner'), necessary to complete the
work in accordance with the Plans and Specifications.
2.0
DESCRIPTION OF WORK
2.1
The work shall include, but not necessarily be limited to the following principal items:
2.1.1
Supply and install all materials as per the plans and specifications, (except as
specifically stated as `Supplied by Owner').
2.1.2
Take delivery, including unloading, F.O.B. suppliers yard, of any materials
specifically stated as `Supplied by Owner' and store under suitable conditions to
prevent damage, deterioration, or, contamination until incorporated into the works.
2.1.3
Schedule works such that disruption of normal traffic, and inconvenience to
residents, in the working area is kept to a minimum, and such that emergency
vehicles have suitable access thru the working area at all times. Provide dust control
during the course of the Contract.
2.1.4
Maintain the work area in an orderly manner free of accumulated waste, and
surplus, materials and debris. Clean-up shall be a continuing daily process over the
duration of the Contract.
2.1.5
Excavation, de-watering, backfill and compaction of all disturbed areas to original or
specified condition.
2.1.6
Supply and installation of rough grading, topsoil, sod, grass growth, trees, shrubs,
fertilizers, hydro seeding, plant materials, complete irrigations systems and irrigation
system controllers and controls, landscape fabric, bark mulch, decorative rock,
decorative shale, and all other works deemed necessary for a complete landscaping
installation.
2.1.7
Provide barriers, fences, and warning signs, as required, to protect workmen and
the general public, and to provide the landscaping works from trespass and
vandalism.
3.0
EXAMINATION OF THE SITE OF THE PROPOSED WORKS
3.1
The `Tenderer' will carefully examine the site of the proposed works and notify the Owners'
Representative, in writing, of any changes which have been made to the site by `Others',
during the period of `Tender Closing' to `Contract Award', which would affect the proper
completion of the Contract.
3.2
Commencement of the work on this Contract shall constitute acceptance of the site and any
changes to the work site by `Others'.
DIVISION 2 - SITEWORK Page 151
City of Armstrong
SECTION 2I- LANDSCAPING
SCHEDULE L - Materials, Construction, Testing Specifications
4.0
MATERIALS
4.1
The Contractor shall supply all materials in accordance with the following specifications:
4.1.1
Topsoil shall be imported soil with a sandy loam or loamy sand texture (not less than
50% sand by weight) containing between 4% and 15% organic matter (dry weight
basis). Soil shall be virtually free from subsoil, wood including woody plant parts,
weeds, toxic materials, stones over 25 mm and foreign objects. Topsoil shall be free
of propagules of plant species designated as noxious weeks under the BC Weed
Control Act and Regulation and other perennial, weedy plants such as couch-grass
and horsetail. At least 80% of imported soil shall pass a Tyler #10 sieve after
appropriate crushing of structural units using accepted laboratory test methods.
4.1.2
Sod shall be approved, nursery grown, conforming to the Standards of the Nursery
Sod Grower's Association and their Nursery Sod Specifications. Seed shall be
approved by the Canada Department of Agriculture, free of diseases, clovers,
stones, pests, weeds, and debris.
4.1.3
Sod Fertilizer shall have an analysis of 13-16-10 (or pre-approved equivalent).
4.1.4
Landscape Fabric shall be `Pro 5 Weed Barrier' (or per-approved equivalent).
4.1.5
Hydro Seed Fertilizer shall be a commercial synthetic slow release fertilizer with
minimum 35% water soluble nitrogen, Formulation Ratio: 1:4:1.
4.1.6
HydroSeed Seed Mix shall be:
50% Fairway Crested Wheatgrass
35% Hard or Sheep's Fescue
15% Annual Ryegrass
4.1.7
Shale Mulch rock shall be graded with the largest average piece being 75 mm and
the smallest average piece being 19 mm.
4.1.8
Bark Mulch shall be 25 mm and minus Douglas Fir or Hemlock bark chips and fines,
free of chunks and sticks, soil, stones, roots, and any other extraneous matter.
4.1.9
All nursery grown plants shall comply with the British Columbia Landscape Standard
and the Landscape/Paysage Canada Guide Specification for Nursery Stock. All
nursery grown plants shall as a minimum, comply with Landscape/Paysage Canada
Guide Specification for Nursery Stock and the B.C.N.T.A. Standard for Container
Grown Plants with respect to sizing, grading, and quality.
4.1.10 All components of the irrigation system shall be manufactured by either `Toro' or
`Rainbird'. The Contractor shall submit shop drawings of the irrigation vault and lid,
showing the control valve, blow-out connection, double check back flow preventer,
water meter and pressure reducing valve.
5.0
INSTALLATION
5.1.1
All Work shall be done in strict accordance with applicable plumbing, health and
electrical codes and other codes as they apply. Where provisions of the drawings
and specifications are at variance with such codes, the codes shall govern, except
where the drawings and specifications call for or describe materials, workmanship,
or construction of higher quality standards or sizes than required under the codes,
the drawings and specifications shall take precedence.
DIVISION 2 - SITEWORK Page 152
City of Armstrong
SECTION 2I- LANDSCAPING
SCHEDULE L - Materials, Construction, Testing Specifications
5.1.2
Area Preparation is applicable to all areas within the project limits scheduled to be
planted, hydroseeded, or sodded.
Area Preparation entails rough grading, fine grading, and the removal of rocks and
debris to the Contractor's disposal site. All rocks over 25 mm in diameter, all wood
or metal refuse, and all other extraneous material shall be gleaned from the top 75
mm of the surface, to the Contractor's disposal site. Rough grading shall be to a
grade which provides for the additional topsoil thickness.
Area preparation shall be to a consistent 80 - 85% Standard Proctor Density.
5.1.3
Topsoil shall be placed to the compacted depth indicated on the Contract Drawings.
Topsoil shall be compacted by light rolling such that it is firm against deep footprints.
Topsoil shall not be compacted more than necessary to meet this requirement.
Topsoil shall not be placed when wet or frozen.
5.1.4
Sod shall be machine cut by accepted methods and strips shall be 1 m2 in size (457
mm wide and 2.19 m long).
5.1.5
Sod Fertilizer shall be applied at a rate of 5 kg per 100 square metres.
5.1.6
Hydro Seed application rate shall be:
Seed Mixture: 22.5 kg / 1,000 m2
Mulch: 160.0 kg / 1,000 m2
Fertilizer: 34.0 kg / 1,000 m2
Water: 1,000 litres / 1,000 m2
6.0
CONDITIONS FOR ACCEPTANCE
6.1
Plants and planted areas will be accepted by the Owner when the following conditions exist:
6.1.1
Topsoil and sod quality, fertility levels, depths and surface conditions, are as
specified in the Contract Documents.
6.1.2
All plants are of the species and varieties specified and planted in the locations
shown on the Contract Drawings.
6.1.3
All plants are healthy and turgid.
6.1.4
The water content in the topsoil and sod is to the satisfaction of the Owner.
6.1.5
All trees are staked, as specified, and pruned to the satisfaction of the Owner.
6.1.6
All planting beds and tree pits are free of weeds.
6.1.7
Mulch is in place as specified.
6.1.8
Unmulched areas are cultivated to leave a loose, friable, water-permeable surface.
6.2
The Irrigation System will be accepted by the Owner when the following conditions exist:
6.2.1
The sprinkler system has been adjusted to give satisfactory coverage to all areas.
6.2.2
Pressure at the sprinkler heads and/or Q.C. valves are as noted on the Drawings.
6.2.3
Turf heads, lawn heads, and Q.C. valves are set flush with the final turf grade.
6.2.4
All landscaped and irrigation surplus material has been removed from the site.
6.2.5
Acceptable `as-constructed' drawings have been submitted to the Owner.
6.2.6
A copy of the certificate issued by the Ministry of Labour indicating compliance with
the Electrical Code has been submitted to the Owner.
6.2.7
The system has been pressure tested, flushed, and operated.
6.3
As a condition of final acceptance of the boulevard restoration works the Contractor shall
obtain a Signed Release (Form Z/07) from each property owner adjacent the works.
**End Section 2I**
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 153
City of Armstrong
SCHEDULE M - Application for Preliminary Layout Review
SCHEDULE M
APPLICATION FOR PRELIMINARY LAYOUT REVIEW
This is Schedule M of the City of Armstrong
Subdivision and Development Servicing
Bylaw No. 1570, 2007
___________________________________
(Clerk)
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 154
City of Armstrong
SCHEDULE M - Application for Preliminary Layout Review
APPLICATION FOR PRELIMINARY LAYOUT REVIEW
City of Armstrong
email:
[email protected]
Street Address: 3570 Bridge Street
Mailing Address:
P.O. Box 40
Telephone: (250) 546-3023
Armstrong, BC
Fax: (250) 546-3710
V0E 1B0
INFORMATION TO BE SUPPLIED BY APPLICANT
DATE OF APPLICATION:
PROPERTY
Name (Print):
Signature:
OWNER(S):
Address:
Phone No.:
( )
APPLICANT:
Name (Print):
Signature:
AGENT:
Address:
Phone No.:
( )
LEGAL DESCRIPTION OF PROPERTY(S):
CIVIC ADDRESS:
NO. OF LOTS PROPOSED:
PRESENT LOT SIZE:
WATER SUPPLY - Existing:
Proposed:
PROPOSED SEWAGE DISPOSAL METHOD:
PRESENT ZONING:
PROPOSED USE:
FEE ENCLOSED: $
$500.00 for the first lot proposed to be created plus
$155.00 for each additional lot, which fee is payable at the time of
subdivision application. Include proposed survey plan of
subdivision.
Receipt #
Form M/07
Municipal Office File No.:
R.D.N.O. File No.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 155
City of Armstrong
SCHEDULE M - Application for Preliminary Layout Review
APPLICANTS SHOULD BE FAMILIAR WITH THE EFFECT THAT ANY OF THE FOLLOWING
MATTERS MAY HAVE ON THEIR PROPOSED SUBDIVISION PRIOR TO SUBMISSION OF
THIS APPLICATION TO THE APPROVING OFFICER. APPLICANTS ARE URGED TO
CONTACT A BRITISH COLUMBIA LAND SURVEYOR, CONSULTING PROFESSIONAL
ENGINEER OR THE DEVELOPMENT SERVICES DEPARTMENT OF THE REGIONAL
DISTRICT OF NORTH OKANAGAN FOR ASSISTANCE IN THIS REGARD.
IS THE SUBJECT PROPERTY:
YES NO
- located in the Agricultural Land Reserve?
- currently used, or has it ever been used, for commercial or industrial purposes?
- adjacent to a Controlled Access Highway (Highway 97A)?
- adjacent to a Major Road designated on the City of Armstrong O.C.P.?
- in a Flood Plain area or area subject to flood?
- in a development permit area designated on the City of Armstrong O.C.P.?
- the subject of any other land use controls, eg: Land Use Contract, Covenants?
IS A WAIVER OF THE MINIMUM LOT FRONTAGE REQUIREMENT OF THE
CITY OF ARMSTRONG ZONING BY-LAW REQUIRED?
IS A CAPITAL COST CONTRIBUTION PAYABLE FOR THIS PROPOSED
SUBDIVISION?
IN SUPPORT OF THIS APPLICATION I/WE SUBMIT HEREWITH TEN (10) PRINTS OF A
SKETCH PLAN OF SUBDIVISION, DRAWN TO SCALE, SHOWING THE EXISTING AND
PROPOSED ROADS AND/OR LOTS TOGETHER WITH A CURRENT STATE OF TITLE
CERTIFICATE.
FOR THE INFORMATION OF THE APPLICANT THE PLAN MUST SHOW:
- dimensions and areas of each proposed lot
- existing buildings accurately identified and located
- the nature, location and dimensions of any existing or proposed restrictive covenants,
easements or rights-of-way affecting the proposed subdivision
- existing and proposed wells and sewage disposal areas including soil inspection holes and
percolation test holes
- an accurate illustration of all lakes, rivers and drainage courses including high water marks
Form M/07
Municipal Office File No.:
R.D.N.O. File No.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 156
City of Armstrong
SCHEDULE M-1 - Standard Subdivision and Development Agreement Document
SCHEDULE M-1
STANDARD SUBDIVISION AND DEVELOPMENT AGREEMENT DOCUMENT
This is Schedule M-1 of the City of Armstrong
Subdivision and Development Servicing
Bylaw No. 1570, 2007
___________________________________
(Clerk)
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 157
City of Armstrong
SCHEDULE M-1 - Standard Subdivision and Development Agreement Document
SCHEDULE M - 1
STANDARD SUBDIVISION AND DEVELOPMENT AGREEMENT DOCUMENT
THIS AGREEMENT made this ___________ day of ___________ A.D, 20_____
BETWEEN: THE CORPORATION OF THE CITY OF ARMSTRONG, a body
corporate, duly incorporated under the laws of the Province of British
Columbia, having an office at 3570 Bridge Street, in the City of Armstrong,
Province of British Columbia V0E 1B0.
(hereinafter call the "City")
OF THE FIRST PART
AND:
(hereinafter call the "Owner")
OF THE SECOND PART
WHEREAS:
A.
The Owner is the registered Owner or holder of a Registered Right to Purchase
lands and premises situate, lying and being in the City of Armstrong, Province of
British Columbia, and more particularly known and described as:
(hereinafter called the "Land")
B.
The Owner wishes to subdivide and/or develop the Land, or part thereof, in the
manner shown on a Plan of Subdivision which has been submitted by the Owner
to the Approving Officer of the City for approval, a copy of which such plan is
attached hereto as Appendix "A", and is hereinafter call the "Subdivision Plan".
C. The Owner is desirous of entering into this Agreement with the City pursuant to
the provisions of Section 991 of the Local Government Act, in order to obtain
approval from the Approving Officer of the Subdivision Plan prior to completion of
the construction and installation on and/or off the Land of all works and services
required by the City to be constructed and installed on the Land and/or on one-
half of any highway immediately adjacent to the Land by the Owner.
Form M-1/07
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 158
City of Armstrong
SCHEDULE M-1 - Standard Subdivision and Development Agreement Document
D.
The Owner is also desirous of voluntarily providing works and services beyond
the Land and the highway immediately adjacent to the Land in order to obtain
approval from the City of the subdivision and/or development, as the City deems
it to be too costly to provide those works at the expense of the ratepayers.
NOW THIS AGREEMENT WITNESSETH that in consideration of the premises and of
the mutual covenants and agreements herein contained, the parties hereto covenant
and agree as follows:
Appendices
1.
The following Appendices are to be initialed by each Party for identification and
will be read with and form part of this Agreement.
Appendix "A" - A copy of the subdivision plan for the Lands.
Appendix "B" - A list of the Works and Services and an estimate of their
respective construction costs.
Appendix "C" - Construction drawings to be used for the construction of the
Works and Services.
Appendix "D" - Non-Refundable Administration Fee and Performance Security.
Owner To Do Work
2.
The Owner covenants and agrees to construct and provide all the Works and
Services listed and shown on Appendices "B" and "C" hereto, as approved by the
City, in accordance with the standards contained in the City of Armstrong
Subdivision and Development Servicing Bylaw No. 1570. The Owner shall
employ only bonded and qualified contractors to carry out and complete the
Works and Services.
Form M-1/07
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 159
City of Armstrong
SCHEDULE M-1 - Standard Subdivision and Development Agreement Document
Transfer of Interest in Works
3.
The Owner covenants and agrees with the City to assign, transfer and convey to
the City all of its right, title and interest in the Works and Services, upon their
completion, (as witnessed by the issuance of a Certificate of Substantial
Completion). The Owner will from time to time and at all times so long as it
exercises any rights of ownership in the Lands upon request of the City, make,
do and execute or cause or procure to be made, done and executed, all such
further acts, deeds, right(s)-of-way, easements and assurances for the more
effectual carrying out of this Agreement.
Permission To Do Work
4.
The City covenants and agrees to permit the Owner to construct the Works and
Services, including that portion of the Works and Services to be constructed on
dedicated highways and other right(s)-of-way controlled by the City; on the terms
and conditions herein, and in the manner required by and at the places specified
in Appendix "C" of this Agreement and Specifications contained and forming part
of the Subdivision and Development Servicing Bylaw No. 1570; provided that
nothing in this Agreement shall be construed as an undertaking, promise or
covenant on the part of the City to make available the use of or access to the
Works and Services for any purpose, and without limiting the foregoing for the
purpose of servicing the Lands or any other real property whatsoever either
owned or controlled by the Owner or its associates or otherwise, but rather the
City reserves the right in its sole and absolute discretion to make available,
operate, alter, use, extend, diminish, discontinue, tear up, sell, rent or otherwise
dispose of the Works and Services as its Council from time to time deems fit.
5.
Completion of Work
The Owner shall complete the construction of the Works and Services, specified
in Appendix "C" of this Agreement as Project No. _________ of the City, to the
satisfaction of the City, within One (1) year from the date of this Agreement.
Changes To Bylaws
6.
The Owner covenants and agrees to comply with any changes in subdivision
requirements or standards enacted by the Subdivision and Development
Servicing Bylaw No. 1570 prior to the actual commencement of the Works and
Services contemplated by the Agreement.
Form M-1/07
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 160
City of Armstrong
SCHEDULE M-1 - Standard Subdivision and Development Agreement Document
Design By Professional Engineer
7.
The Owner covenants and agrees that all Plans, Specifications and Works and
Services required herein shall be prepared, designed, and sealed by a
Professional Engineer, who shall be registered with the Association of
Professional Engineers and Geoscientists of British Columbia and retained by the
Owner as the Owner's Engineer. Plans and specifications for the Works and
Services shall be prepared by or under the direct supervision of the Owner's
Engineer and all plans shall bear his/her professional seal and signature.
Where the estimated cost of the Works and Services exceeds One Hundred
Thousand Dollars ($100,000.00) as detailed in Appendix "B" of this Agreement,
the Owner covenants and agrees to ensure that the Owner's Engineer maintains
professional liability, errors and omissions insurance to a value of $___________
per occurrence during the terms of the Owner's Professional Engineer's
engagement.
The Owner covenants and agrees to retain the Professional Engineer during the
construction period for the purposes of inspection to ensure compliance with the
approved design, to ensure sufficient materials testing, and to provide
certification of the as-built records. Refer to Schedule O.
Engineering Drawings
8.
The Owner covenants and agrees that the intent of this Agreement is that the
Owner shall construct fully completed Works and Services, and grant all
necessary statutory right(s)-of-way as shown in the Drawings and Specifications
prepared by:
________________________________________________________________
Under Drawing Nos.
_______________________________ _______________________________
_______________________________ _______________________________
_______________________________ _______________________________
and as approved in principle for the purposes of this Agreement by the
City of Armstrong Engineer on the _________ day of _______________, 20___.
Form M-1/07
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 161
City of Armstrong
SCHEDULE M-1 - Standard Subdivision and Development Agreement Document
Changes To Design By City of Armstrong
9.
The City Engineer may alter the drawings, because of the conditions at the site,
so that the Works and Services function and operate in a manner satisfactory to
the City Engineer. Should the Works and Services, as provided herein, prove to
be in any way defective or should they not operate to the satisfaction of the City
Engineer, then the Owner shall, at his own cost modify and reconstruct the
Works and Services so that the Works and Services shall be fully operative and
function to the satisfaction of the City Engineer.
Start Of Work
10.
The Owner covenants and agrees not to commence work until the City Engineer
provides the Owner with written permission to proceed with the construction.
Substantial Completion
11.
A Certificate of Substantial Completion shall be provided by the City Engineer on
the completion of the construction of the Works and Services, listing all the
deficiencies. This Certificate of Substantial Completion shall not be construed as
acceptance of the Works and Services. Substantial Completion shall occur when
the Owners Engineer has provided written notice to the City of Armstrong, under
seal and signature, that not less than ninety-five (95%) percent of the value of the
works and services specified in Appendix 'B' of Schedule M-1 have been
completed in accordance with the plans and specifications included in
Appendix 'C' of Schedule M-1. Refer to Schedule Q.
Certificate Of Completion
12.
A Certificate of Completion shall be provided by the City Engineer on the
completion of the construction and correction of all deficiencies. Refer to
Schedule R.
As-Built Submission
13.
The Owner covenants and agrees to submit to the City the final as-built/record
drawings and records of construction, and test results, as required by the City
Engineer, pursuant to Schedule J of the Subdivision and Development Servicing
Bylaw No. 1570, within 60 days of the date of the Certificate of Substantial
Completion.
Form M-1/07
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 162
City of Armstrong
SCHEDULE M-1 - Standard Subdivision and Development Agreement Document
Maintenance Period And Responsibility
14.
The Owner covenants and agrees to maintain every part of the Works and
Services in perfect order and in complete repair for a period of one (1) year from
the date shown on the Certificate of Completion in accordance with the
requirements of this Agreement and Subdivision and Development Servicing
Bylaw No. 1570.
Should the Owner, for any reason, fail to maintain when ordered, then the City
Engineer, at the Engineer's option, after giving the Owner seven (7) days written
notice (or without notice if an emergency or danger to the public exists), may do
so, and the whole costs, charges and expenses so incurred by the City will be
payable by the Owner, as provided for herein. The decision of the City Engineer
will be final with respect to the necessity for repairs, or the adequacy of any work
done.
Once any water mains covered by this Agreement are connected to the City
water system, only City workers or contractors under the direct supervision of the
City may undertake work on such water mains. As such, City workers or
contractors retained by the City will correct any defects, imperfections, acts of
vandalism, settlements and/or rechlorination and flushing of such water mains
which is deemed by the City Engineer to be necessary, during the one (1) year
period from the date shown on the Certificate of Completion, and the whole of
such costs, charges and expenses so incurred by the City in undertaking such
work including but not limited to contractor costs will be payable by the Owner as
provided for herein. Any rechlorination and flushing work on any water main, or
water main break, shall be considered to be "emergency work" and as such the
Owner may not receive prior notice that such work is being undertaken by the
City.
Prior to the release of the Performance Security for the works and services the
Owner will deliver to the City a maintenance security in accordance with
Subdivision and Development Servicing Bylaw No. 1570.
Form M-1/07
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 163
City of Armstrong
SCHEDULE M-1 - Standard Subdivision and Development Agreement Document
Certificate Of Final Acceptance
15.
The City covenants and agrees that upon satisfactory completion by the Owner
of all the covenants and conditions in this Agreement, including the maintenance
of the Works and Services in complete repair for a period of one (1) year, to
provide the Owner with a Certificate of Final Acceptance of the Works and
Services, signed by the City Engineer. Notice of Final Acceptance of the Works
and Services will be issued by the City Engineer when all deficiencies have been
corrected, as-built drawings and service record cards received, and the
maintenance period outlined herein has expired. Refer to Schedule S.
All such Works and Services remain at the risk of the Owner until the Certificate
of Final Acceptance for the Works and Services has been issued.
Final Building Inspection Withheld
16.
The Owner acknowledges and agrees that the City will withhold the granting of a
Final Inspection for the use of any building or part thereof, constructed upon the
Lands until all the Works and Services required herein have been completed to
the satisfaction of the City Engineer.
Owner Indemnifies City
17.
The Owner covenants and agrees to save harmless and indemnify the City
against:
(a)
all actions and proceedings, costs, damages, expenses, claims, and
demands whatsoever and by whomsoever brought by reason of the
construction, installation, maintenance or repair of the Works and
Services;
(b)
all expenses and costs which may be incurred by reason of the
construction, installation, maintenance or repair of the Works and Services
resulting in damage to any property owned in whole or in part by the City
for which the City by duty or custom is obliged, directly or indirectly, in any
way or to any degree, to construct, install, maintain or repair;
(c)
all expenses and costs which may be incurred by reason of liens for non-
payment of labour or materials, WorkSafe BC assessments, Employment
Insurance, Canada Pension Plan, Federal and Provincial Tax, Property
Reinstatements or encroachments owing to mistakes in survey.
Form M-1/07
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 164
City of Armstrong
SCHEDULE M-1 - Standard Subdivision and Development Agreement Document
(d)
all expenses and costs which may be incurred by the City as a result of
faulty workmanship and defective material in any of the Works and
Services installed by the Owner.
The above sub-clauses shall not be construed as to extinguish any rights which
the City would have were it not for the inclusion of this Clause 17 (seventeen) of
this Agreement.
Insurance Coverage By Owner
18.
The Owner covenants and agrees to provide the following insurance coverage,
and to provide the City with a copy of the insurance policy prior to the
commencement of any construction of the Works and Services.
(a)
To protect the Owner and the City against all claims arising out of:
(i)
Death or injury to persons and,
(ii)
Damage to or loss of any City buildings, structures, stores,
equipment and materials included in or required for the carrying out
of the Works and Services.
(b)
Every policy of insurance required shall:
(i)
Name "THE CITY OF ARMSTRONG" as an 'Additional Insured'
and,
(ii)
State that the policy applies to each insured in the same manner
and to the same extent as if a separate policy had been issued to
each Insured and,
(iii)
State that the policy cannot be canceled, lapsed or materially
changed without at least thirty (30) days written notice to the City,
delivered to the City Engineer.
The Owner shall at his sole expense throughout the currency of this Servicing
Agreement carry Comprehensive Liability Insurance acceptable to the City of
Armstrong in the amount of at least Two Million Dollars ($2,000,000.) with
insurance companies licensed to carry on business in the Province of British
Columbia in partial discharge of the Owners obligation under Clause 17
(seventeen) of this Agreement. Refer to Schedule V.
Form M-1/07
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 165
City of Armstrong
SCHEDULE M-1 - Standard Subdivision and Development Agreement Document
WCB Designated Prime Contractor
19.
Where the Owner constructs Works and Services on dedicated highways and
other right(s)-of-way controlled by the City, on the terms and conditions herein,
and in the manner required by and at the places specified in Appendix "C" of this
Agreement and Specifications contained and forming part of the Subdivision and
Development Servicing Bylaw No. 1570, the Owner shall, seven (7) days prior to
the start of the construction works and services, complete and submit to the city,
a completed WCB Designated Prime Contractor form. (Appendix E)
Performance Security
20.
As Security for the due performance of all of the covenants and promises
contained in this Agreement, the Owner will on signing this Agreement deposit
with the City of Armstrong a Performance Security Deposit, calculated in
Appendix 'D' (Item D.2), of this Agreement, in the amount of $____________ in
the form of Cash or an Irrevocable Letter of Credit acceptable to the City (herein
called the Performance Security).
Forefeit Of Performance Security
21.
In the event that the Owner fails to construct and install the Works and Services
prescribed herein within the time specified in Clause 5 (five) of this Agreement,
the said Performance Security of $_________ will be forefeited to the City.
Consent To Forfeiture of Performance Security For Deferred Works
22.
The Owner acknowledges that construction of the following Works and Services
are premature and/or may give rise to risk of public safety and agrees therefore
to forefeit the amount of the Performance Security indicated. The City will retain
this amount and will use it to construct the said Works and Services at a future
time of its choosing. The City will not claim any further compensation from the
Owner and the Owner will have no entitlement to return any part of the forefeited
amount.
Proposed Works and Services
Security Amount Forefeited
___________________________
__________________________
___________________________
__________________________
___________________________
__________________________
Form M-1/07
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 166
City of Armstrong
SCHEDULE M-1 - Standard Subdivision and Development Agreement Document
Use Of Performance Security
23.
The Owner agrees that if all the Works and Services or obligations are not
completed, installed or performed pursuant to this Agreement, the City may
complete or fulfill the Works and Services or obligations at the cost of the Owner
and deduct from the Performance Security held by the City the cost of such
completion, and the balance of the deposit shall be returned to the Owner, less
any additional administration fees or costs incurred. If there is insufficient money
on deposit with the City, then the Owner will pay such deficiency to the City
immediately upon receipt of the City's bill for completion. It is understood that the
City may do such Works and Services either by itself or by contractors employed
by the City. If the Works and Services are completed as herein provided, then the
deposit shall be returned to the depositor.
Release Of Security And Provision Of One Year Maintenance Security
24.
If the City Engineer is of the opinion that the Works and Services or any portion
thereof have been adequately completed, and the Owner's covenants performed
in compliance with this Agreement, and if there is no litigation pending or
threatened by any third party against the City as a result of, or arising from, the
construction of the Works and Services, the City Engineer may return all, or any
portion of the Performance Security to the Owner at such times and in such
amounts as the City Engineer may deem proper, provided only that the City
Engineer will retain an amount equal to Ten (10%) Percent of the Performance
Security Deposit, with a minimum of One Thousand ($1,000.) to secure the
performance of the maintenance required of the Owner (hereinafter called the
Maintenance Security).
Return Of Maintenance Security
25.
If at the end of the one (1) year maintenance period the City Engineer is satisfied
that the Owner has complied with the covenants contained in this Agreement and
if there is no litigation pending or threatened by any third party against the City as
a result of, or arising from, the construction of the Works and Services, the City
Engineer may direct that the Maintenance Security or any portion thereof, be
returned to the Owner and thereinafter the Owner's responsibility for the Works
and Services shall cease.
Form M-1/07
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 167
City of Armstrong
SCHEDULE M-1 - Standard Subdivision and Development Agreement Document
Administration Fee
26.
The Owner covenants and agrees to pay to the City a non-refundable
administration fee, in the amount calculated in Appendix 'D' (Item D.1), of this
Agreement, to cover City administration and processing costs. This
administration fee is payable by cash or cheque prior to signing of this
Agreement and the commencement of the Works and Services.
No Other Representations
27.
It is understood and agreed that the City has made no representations,
covenants, warranties, guarantees, promises or agreements (verbal or
otherwise) with the Owner other than those in this Agreement.
Compliance With Bylaws
28.
Subject to this Agreement, the proposed Works and Services and the
development herein shall comply with all of the Bylaws of the City of Armstrong.
No Waiver
29.
The Owner covenants and agrees that nothing contained or implied herein shall
prejudice or affect the rights and powers of the City in the exercise of its functions
under any public and private statues, bylaws, orders and regulations, all of which
may be fully and effectively exercised in relation to the said Lands as if the
Agreement had not been executed and delivered by the Owner.
Notice to Owner
30.
Any demand or notice required or permitted to be given under the provisions of
this agreement shall be in writing and may be given by mailing such notice by
prepaid registered post to the party concerned at the address of such party first
above-recited, and any such notice or demand mailed as aforesaid shall be
deemed to have been received by the party to whom it is addressed on the
second business day after the date of posting thereof.
Form M-1/07
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 168
City of Armstrong
SCHEDULE M-1 - Standard Subdivision and Development Agreement Document
THIS CONTRACT shall enure to the benefit of and be binding upon the parties hereto,
their respective successors and assigns.
IN WITNESS WHEREOF the parties hereto have executed this Agreement the day and
year first above written.
FOR
SIGNED, SEALED AND DELIVERED
)
The Corporate Seal of
)
)
_______________________________ )
)
Was hereunto affixed in the presence of )
)
Signature _______________________ )
)
Name _______________________ )
)
Title _______________________ )
SEAL
FOR
SIGNED, SEALED AND DELIVERED
)
By the above named in the presence
)
Of (witness):
)
)
Signature _______________________ ) __________________
) Owner's Signature
Name _______________________ )
)
Occupation______________________ )
)
Address _______________________ ) __________________
) Owner's Signature
_______________________ )
FOR THE
SIGNED, SEALED AND DELIVERED
)
CITY OF
The Corporate Seal of the City of
)
ARMSTRONG
Armstrong was hereunto affixed in
)
The presence of:
)
)
_____________________________
)
Mayor of the City of Armstrong
)
)
______________________________
)
Administrator of the City of Armstrong
)
Form M-1/07
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 169
City of Armstrong
SCHEDULE M-1 - Standard Subdivision and Development Agreement Document
APPENDIX "A"
A copy of the subdivision plan of the Lands.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 170
City of Armstrong
SCHEDULE M-1 - Standard Subdivision and Development Agreement Document
APPENDIX "B"
A list of the Works and Services and
an estimate of their respective construction costs.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 171
City of Armstrong
SCHEDULE M-1 - Standard Subdivision and Development Agreement Document
APPENDIX "C"
Construction drawings to be used for the construction of
the Works and Services.
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 172
City of Armstrong
SCHEDULE M-1 - Standard Subdivision and Development Agreement Document
APPENDIX "D"
Non-Refundable Administration Fee and Performance Security
Non-Refundable Administration Fee
D.1
In accordance with Clause 26 of Subdivision and Development Servicing Bylaw
No. 1570 the Owner covenants and agrees to pay the City of Armstrong a non-
refundable administration fee to cover City administration and processing costs.
the non-refundable administration fee is calculated as follows:
Total cost for Construction of Works and Services
as per Appendix "B" $ ____________ (B)
3% of the first $500,000.(of B)
$____________
2% of the next $500,000.(of B)
$____________
1% of balance exceeding $1,000,000.(of B)
$____________
Total non-refundable administration fee
$____________
(Cash or Cheque)
Refundable Performance Security
D.2
Total cost for Construction of Works and Services
as per Appendix "B" $ ____________(B)
Performance Security $ ____________(B) X 1.25
=
$____________
(Cash or Irrevocable Letter of Credit)
Form M-1/07
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 173
City of Armstrong
SCHEDULE M-1 - Standard Subdivision and Development Agreement Document
APPENDIX "E"
WCB DESIGNATED PRIME CONTRACTOR
Designation of Contractor as Prime Contractor for City Project
City of Armstrong Information
Contract Number: ____________________________________________________________
Description: _________________________________________________________________
Contact Person: _____________________________________________________________
Prime Contractor Information
Name of Prime Contractor: _____________________________________________________
Address: ___________________________________________________________________
___________________________________________________________________________
Phone: ______________________________________________________________
Prime Contractor WCB Account Number: ___________________________________
Person in Charge of Project:____________________________________________________
Person Responsible for Coordinating Health and Safety Activities: ______________________
___________________________________________________________________________
Prime Contractor's Declaration as per Workers' Compensation Act
I/we acknowledge, in accordance with the Workers' Compensation Act (RSBC 1996) Chapter 492, Part 3, Division 3,
Sections 115, 116, 117, 118, 119, 120, 121, 122, 123, and 124 that I/we are the "Prime Contractor" and are qualified
to act as the "Prime Contractor". I/we accept the duties and responsibilities for coordination of health and safety in
accordance with the Workers Compensation Act. And further that I/we will do everything that is reasonably practicable
to establish and maintain a system or process that will insure compliance with the Workers Compensation Act and the
Occupational Health and Safety Regulations.
___________________________________
Prime Contractor's Signature
Date: ___________________________
Form M-1/07
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 174
City of Armstrong
SCHEDULE N - Statutory Right-of-Way Document
SCHEDULE N
STATUTORY RIGHT-OF-WAY DOCUMENT
This is Schedule N of the City of Armstrong
Subdivision and Development Servicing
Bylaw No. 1570, 2007
___________________________________
(Clerk)
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 175
City of Armstrong
SCHEDULE N - Statutory Right-of-Way Document
SCHEDULE N
STATUTORY RIGHT-OF-WAY AGREEMENT
THIS INDENTURE made this ___________ day of ___________ A.D, 20_____
BETWEEN:
(hereinafter call the "Grantor")
OF THE FIRST PART
AND:
THE CORPORATION OF THE CITY OF ARMSTRONG, a body
corporate, duly incorporated under the laws of the Province of British
Columbia, having an office at 3570 Bridge Street, in the City of Armstrong,
Province of British Columbia, V0E 1B0.
(hereinafter call the "Grantee")
OF THE SECOND PART
WHEREAS the Grantor is the registered Owner of, or is entitled to become the
registered Owner of, an estate in fee simple of ALL AND SINGULAR those certain
parcels or tracts of lands and premises situate, lying and being in the City of Armstrong,
in the Province of British Columbia, and being more particularly known and described
as:
(hereinafter called the "Lands of the Grantor")
AND WHEREAS the Grantor and Grantee have agreed to enter into this agreement
pursuant to Section 214 of the Land Title Act, RSBC 1996, Chapter 219 and
amendments thereto:
AND WHEREAS it is necessary for the operation and maintenance of the Grantee's
undertaking, hereinafter described, to install and maintain a system of sewerage works,
and/or water works, and/or drainage works, and/or gas works including all pipes, valves,
fittings, buildings and facilities in connection therewith and/or hydro electric works
including all wires, poles, conduits and other facilities in connection therewith:
(hereinafter called the "Works")
Form N/07
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 176
City of Armstrong
SCHEDULE N - Statutory Right-of-Way Document
The Grantor has agreed to permit the construction by the Grantee for the
aforementioned works on a portion of the said Land and to grant for that purpose the
right-of-way hereinafter described:
NOW THEREFORE THIS INDENTURE WITNESSETH that in consideration of the sum
of _________________ Dollars ($
) of lawful money of Canada, now paid
by the Grantee to the Grantor (the receipt and sufficiency of which is hereby
acknowledged by the Grantor), and in consideration of the covenants and conditions
hereinafter contained to be observed and performed by the Grantee and for other
valuable consideration:
1.0
THE GRANTOR DOTH HEREBY:
1.01 Grant, convey, confirm and transfer, in perpetuity, unto the Grantee the full, free
and uninterrupted right, license, liberty, privilege, permission and right-of-way to
lay down, install, construct, entrench, operate, maintain, inspect, alter, remove,
replace, bury, cleanse, string and otherwise establish one or more systems of
Works upon, over, under and across that part of the Land of the Grantor as
shown outlined in heavy black on right-of-way Plan Number: _______ and
designated as _____________ .
(hereinafter called the "Perpetual Right-of-Way")
1.02 Covenant and agree to and with the Grantee that for the purposes aforesaid and
upon, over, under and across the Perpetual Right-of-Way the Grantee shall for
itself and its servants, agents, workmen, machinery, vehicles, equipment and
materials be entitled at all time to enter, use, pass and repass, labour, construct,
erect, install, dig, carry away soil or other surface or subsurface materials, clear
of all trees, growth, buildings or obstruction now or hereafter in existence, as may
be necessary, useful, or convenient in connection with the operations of the
Grantee in relation to the Works;
1.03 Grant, convey, confirm and transfer unto the Grantee for itself and its servants,
agents, workman, contractors and all other licensees of the Grantee, together
with machinery, vehicles, equipment and materials the right at all reasonable
times to enter upon and to pass and repass over such of the Lands of the
Grantor as may be reasonably be required for the purpose of ingress to and
egress from the Perpetual Right-of-Way;
Form N/07
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 177
City of Armstrong
SCHEDULE N - Statutory Right-of-Way Document
1.04 Grant, convey, confirm and transfer unto the Grantee for itself and its servants,
agents, workmen, contractors, and all other licensees of the Grantee, together
with machinery, vehicles, equipment and materials for a period of _________
days only from the date of this Agreement, the full, free and uninterrupted right,
license, liberty, privilege, permission and right-of-way to enter upon, pass and
repass, clear, labour, and use for the purpose of ingress to and egress from the
Perpetual Right-of-Way and for the purpose of storing machinery, equipment,
material or supplies used or to be used in connection with the construction of the
Works herein described, and for the purpose of placing or storing the surface or
subsurface material to be excavated from the Perpetual Right-of-Way upon and
over, but not under that part or parts of the Lands of the Grantor, shown outlined
in green on the Right-of-Way Plan Number: ____________ :
(hereinafter called the "Working Right-of-Way")
Provided always, and it is hereby agreed that nothing herein contained shall
permit the Grantee to dig, trench or otherwise disturb the sub-surface of the
Working Right-of-Way, and the Grantee shall only clear such trees and growth
and interfere and disturb the surface of the Working Right-of-Way in a manner
that is reasonably necessary in the conduct of its operations thereon;
2.0
THE GRANTOR HEREBY COVENANTS TO AND AGREES WITH THE
GRANTEE, as follows:
2.01 That the Grantor will not, nor permit any other person, to erect, place, install or
maintain any building, structure, mobile home, concrete or asphalt driveway or
patio, pipe, wire or other conduit on, over or under any portion of the Perpetual
Right-of-Way so that it in any way interferes with or damages or prevents access
to, or is likely to cause harm to Works authorized hereby to be installed in or
upon the Perpetual Right-of-Way.
2.02 That the Grantor will not do nor knowingly permit to be done any act or thing
which will interfere with or injure the said Works, and in particular, will not carry
out any blasting on or adjacent to the Perpetual Right-of-Way without the consent
in writing of the Grantee, provided that such consent shall not be unreasonably
withheld;
2.03 That the Grantor will not substantially diminish the soil cover over any of the
Works installed in the Perpetual Right-of-Way, and in particular, without in any
way limiting the generality of the foregoing, will not construct open drains or
ditches along or across any Works installed in the Perpetual Right-of-Way;
Form N/07
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 178
City of Armstrong
SCHEDULE N - Statutory Right-of-Way Document
2.04 That the Grantor will from time to time and at all times upon every reasonable
request, and at the cost of the Grantee do and execute or cause to be made,
done or executed all such further and other lawful acts, deeds, things, devices,
conveyances and assurances in law whatsoever for the better, assuring unto the
Grantee of the rights hereby granted;
3.0
THE GRANTEE HEREBY COVENANTS TO AND AGREES WITH THE
GRANTOR, as follows:
3.01 That the Grantee will not bury any debris or rubbish or any kind in excavations or
backfill, and will remove shoring and like temporary structures as backfilling
proceeds;
3.02 That the Grantee will thoroughly clean all lands to which it has had access
hereunder of all rubbish and construction debris created or placed thereon by the
Grantee, and will leave such lands in a neat and clean condition;
3.03 That the Grantee will, as soon as weather and soil conditions permit, and so
often as it may exercise its right of entry hereunder to any of the lands of the
Grantor, replace the surface soil as nearly as may be reasonably possible to the
same condition as it was prior to such entry, in order to restore the natural
drainage to such lands;
PROVIDED, HOWEVER, that nothing herein contained shall require the Grantee
to restore any trees or other surface growth, but the Grantee shall leave such
lands in a condition which will not inhibit natural regeneration of such growth;
3.04 That the Grantee will, as far as reasonably possible, carry out all work in a proper
and workmanlike manner so as to do as little injury to the Lands of the Grantor as
possible;
3.05 That the Grantee will make good at its own expense all damage or disturbance
which may be caused to the surface soil of the Lands of the Grantor in the
exercise of its rights hereunder:
3.06 That the Grantee will, as far as reasonably possible, restore any fences, lawns,
flower beds, at the Grantee's cost as nearly as may be possible to the same
condition that they were in prior to any entry by the Grantee upon the Lands.
Form N/07
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 179
City of Armstrong
SCHEDULE N - Statutory Right-of-Way Document
4.0
THE PARTIES HERETO EACH HEREBY COVENANT TO AND AGREE WITH
THE OTHER, as follows:
4.01 The said Works referred to above, together with all pipes, manholes, valves and
conduits, wires, casings, fittings, lines, meters, appliances, facilities, attachments
or devices used in connection therewith shall constitute the Works;
4.02 Notwithstanding any rule of law or equity to the contrary, the Works brought on
to, set, constructed, laid, erected in, upon or under the Perpetual Right-of-Way by
the Grantee shall at all times remain the property of the Grantee, notwithstanding
that the same may be annexed or affixed to the freehold and shall at any time
and from time to time be removable in whole or in part by the Grantee;
4.03 In the event the Grantee abandons the Works or any part thereof the Grantee
may, if it so elects, leave the whole or any part thereof in place;
4.04 That no part of the title in fee simple to the soil shall pass to or be vested in the
Grantee under or by virtue of these presents and the Grantor may fully use and
enjoy all of the Lands of the Grantor subject only to the rights and restrictions
herein contained;
4.05 That the covenants herein contained shall be covenants running with the land
and that none of the covenants herein contained shall be personal or binding
upon the parties hereto, save and except during the Grantor's seisin or
ownership of any interest in the Lands of the Grantor, and with respect only to
that portion of the Lands of the Grantor of which the Grantor shall be seised or in
which he shall have an interest, but that the Lands of the Grantor, nevertheless,
be and remain at all times charged therewith;
4.06 If at the date hereof the Grantor is not the sole registered Owner of the Lands of
the Grantor, this agreement shall nevertheless bind the Grantor to the full extent
of his interest therein, and if he shall acquire a greater or the entire interest in fee
simple this Agreement shall likewise extend to such after-acquired interests;
4.07 Where the expression "Grantor" includes more than one person, all covenants
herein on the part of the Grantor shall be construed as being several as well as
joint;
Form N/07
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 180
City of Armstrong
SCHEDULE N - Statutory Right-of-Way Document
4.08 This agreement shall endure to the benefit of and be binding upon the parties
hereto and their respective heirs, administrators, executors, successors and
assigns, as the case may be; and wherever the singular or masculine is used, it
shall be construed as if the plural or the feminine or neuter, as the case may be,
had been used; where the parties of the context hereto so require and the rest of
the sentence shall be construed as if the grammatical and terminological
changes thereby rendered necessary had been made.
IN WITNESS WHEREOF the parties hereto have executed these presents in the
manner and on the date hereinafter appearing.
THE COMMON SEAL OF THE GRANTOR was hereto
)
affixed this ______ day of _________ 20 ___ in the
)
presence of:
)
)
____________________________________________
)
Signature of Witness:
)
)
SEAL
____________________________________________
)
Address:
)
)
____________________________________________
)
)
)
____________________________________________
)
Occupation:
)
(as to all signatures of the Grantor)
)
THE CORPORATE SEAL OF THE CITY OF ARMSTRONG )
was hereunto affixed this _______ day of ______________ )
__________, 20 ____, in the presence of:
)
)
_____________________________
)
Mayor of the City of Armstrong
)
SEAL
)
_____________________________
)
Administrator of the City of Armstrong
)
Form N/07
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 181
City of Armstrong
SCHEDULE N - Statutory Right-of-Way Document
CONSENT TO GRANT OF RIGHT-OF-WAY
KNOW ALL MEN BY THESE PRESENTS THAT ___________________________ is
the registered holder of a charge by way of ____________________ against the within-
described property, which said charge is registered in the Land Title Office, City of
Kamloops, under Numbers _________________________, for and in consideration of
the sum of One Dollar ($1.00) paid by the City of Armstrong to the said charge holder
(the receipt whereof is hereby acknowledged), agrees with the City of Armstrong, its
successors and assigns, that the within Right-of-Way shall be an encumbrance upon
the within-described property in priority to the said charge in the same manner and to
the same effect as if it had been dated and registered prior to the said charge.
IN WITNESS WHEREOF the parties hereto have caused these presents to be signed,
sealed and delivered in the presence of its duly authorized officers this ________ day
of _____________, 20 _____ .
SIGNED, SEALED AND DELIVERED BY THE Grantor
)
this _________ day of ________ 20 ___ in the presence of )
)
)
____________________________________________
)
Signature of Witness:
)
)
SEAL
____________________________________________
)
Address:
)
)
____________________________________________
)
)
____________________________________________
)
Occupation:
)
(as to all signatures of the Grantor)
)
)
THE CORPORATE SEAL OF THE CITY OF ARMSTRONG )
was hereunto affixed this _______ day of ______________ )
__________, 20 ____, in the presence of:
)
)
)
_____________________________
)
Mayor of the City of Armstrong
)
SEAL
)
_____________________________
)
Administrator of the City of Armstrong
)
Form N/07
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 182
City of Armstrong
SCHEDULE N - Statutory Right-of-Way Document
LAND TITLE ACT
FORM 6
(Section 46)
PROOF OF EXECUTION BY CORPORATION
I CERTIFY that on the ___________ day of ___________ , 20 ___ at ______________
in British Columbia, _________________ , personally known to me, appeared before
me and acknowledged to me that he/she is the authorized signatory of
________________ and that he/she is the person who subscribed his/her name and
affixed the Seal of the Corporation to the instrument, that he/she was authorized to
subscribe his/her name and affix the Seal to it, and that the Corporation existed at the
date the instrument was executed by the Corporation.
IN TESTIMONY of which I set my hand at ______________ , British Columbia, this
______________ day of _______________, 20 _____ .
_____________________________________________
A Commissioner for Taking Affidavits for British Columbia
Form N/07
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 183
City of Armstrong
SCHEDULE O - Confirmation of Commitment by Owner Regarding Design and Field
Review of Construction By A Professional Engineer
SCHEDULE O
CONFIRMATION OF COMMITMENT BY OWNER
REGARDING DESIGN AND FIELD REVIEW OF CONSTRUCTION
BY A PROFESSIONAL ENGINEER
This is Schedule O of the City of Armstrong
Subdivision and Development Servicing
Bylaw No. 1570, 2007
___________________________________
(Clerk)
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 184
City of Armstrong
SCHEDULE O - Confirmation of Commitment by Owner Regarding Design and Field
Review of Construction By A Professional Engineer
SCHEDULE O
CONFIRMATION OF COMMITMENT BY OWNER
REGARDING DESIGN AND FIELD REVIEW OF CONSTRUCTION
BY A PROFESSIONAL ENGINEER
The City of Armstrong
3570 Bridge Street
Armstrong
British Columbia
V0E 1B0
Attention City Engineer
Dear Sir:
Re:
(Description and Address) of Subdivision or Development
I, ________________________ have retained _______________________ as my/our
(Owner's Name)
(Professional Engineer's Name)
Professional Engineer to undertake and/or coordinate and review all associated design
criteria and "field reviews" required for this project. It is understood that my/our
"Engineer" will take all such steps as regulated under the Provincial Statute for his/her
profession and by the definition of "field reviews" herein under set forth, to ascertain that
the design will comply and construction of the project will substantially conform in all
material respects with the provisions of the City of Armstrong's Subdivision and
Development Servicing Bylaw No. 1570, all other amendments thereof, and other
applicable permits, Bylaws, Acts and regulations which apply to this project. My/our
"Engineer" will also ensure that all work is completed in accordance with the
construction drawings approved by the City of Armstrong. My/our "Engineer" will
ascertain that only qualified personnel are retained to carry out tests, inspect or carry
out design work, detailing or "field reviews".
As used herein, "field review" shall mean such reviews of the work at the project site, or
at the fabrication locations, where applicable, as the "Engineer", in his/her professional
discretion, considers necessary in order to ascertain that the work substantially
conforms in all material respects to the plans and supporting documents "accepted" by
the City of Armstrong. This will include keeping records of all site visits and any
corrective actions taken as a result thereof.
Form O/07
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 185
City of Armstrong
SCHEDULE O - Confirmation of Commitment by Owner Regarding Design and Field
Review of Construction By A Professional Engineer
The undersigned has given a contractual mandate to the "Engineer" to review reports of
other testing and inspection agencies and disciplines where necessary, comment on
their acceptability, determine the corrective action to take if unacceptable, and maintain
a detailed record of every such report and comments thereof. The "Engineer" will
automatically submit a monthly summary progress report to the City Engineer, including
all field reports, testing results and change orders.
The Owner will notify the City Engineer in writing thirty (30) days prior to the intended
termination of or by the "Engineer". It is understood that the work on the above project
will cease as of the effective date of termination, until such time as a new appointment
is made.
__________________________________
_______________________________
Witness Name (Print)
Owner or Owner's Appointed Agent (Print)
__________________________________________
______________________________________
Witness Signature
Owner or Owner's Appointed Agent (Signature)
__________________________________________
______________________________________
Address (Print)
Date
__________________________________________
______________________________________
Occupation
Title of Agent (if applicable)
The Corporate Seal of
_______________________________
was hereunto affixed in the presence of:
_______________________________
_______________________________
Form O/07
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 186
City of Armstrong
SCHEDULE O - Confirmation of Commitment by Owner Regarding Design and Field
Review of Construction By A Professional Engineer
The above must be signed by the Owner or his/her appointed Agent. The signature
must be witnessed. If the Owner is a company, the corporate seal of the company must
be affixed to the document in the presence of it's duly authorized officers. The officers
must also sign, setting forth their positions in the company.
The "Engineer" acknowledges that he/she has been retained to ascertain that the
design will comply and construction of the project will substantially conform in all
material respects with the Bylaws as set out above and will submit letter(s) of
Professional Design Assurances from others, as needed, for the approval of the
subdivision or development. Furthermore, the "Engineer" hereby convenants that their
firm presently carries Errors and Omissions insurance in the amount of
$
.
My/our "Engineer" will upon completion of the work provide a completed "Certificate Of
Inspection" form in accordance with Subdivision and Development Servicing Bylaw No.
1570. My/our "Engineer" will further provide upon completion all supporting
documentation required by the City of Armstrong to verify conformance of the work.
__________________________________
_______________________________
Name of Professional (Print)
Signature of Professional Engineer
______________________________________
Date
______________________________________
Mailing Address (Print)
______________________________________
______________________________________
Phone
Form O/07
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 187
City of Armstrong
SCHEDULE P - Certificate of Inspection
SCHEDULE P
CERTIFICATE OF INSPECTION
This is Schedule P of the City of Armstrong
Subdivision and Development Servicing
Bylaw No. 1570, 2007
___________________________________
(Clerk)
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 188
City of Armstrong
SCHEDULE P - Certificate of Inspection
SCHEDULE P
CERTIFICATE OF INSPECTION
I hereby certify that all engineering and construction services, required under the
Subdivision and Development Servicing Bylaw No. 1570 of the City of Armstrong for the
subdivision of:
LEGAL DESCRIPTION:
_______________________________________________
PROJECT NO:
_______________________________________________
Which services were designed by:
NAME OF FIRM:
_______________________________________________
ADDRESS:
_______________________________________________
And approved for construction on drawing numbers:
Drawing No.
Date
Drawing No.
Date
___________________
__________
___________________
__________
___________________
__________
___________________
__________
___________________
__________
___________________
__________
Have been inspected for compliance with this Bylaw 1570 by, or under the direction of,:
_____________________________________________________________________
I further certify that the "As-Built/Record" drawings hereby submitted represent the
works and services as installed for the aforementioned subdivision and/or Development.
Signature and Name of Professional
Engineer's Seal
Engineer responsible for Design
Form P/07
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 189
City of Armstrong
SCHEDULE Q - Certificate of Substantial Completion
SCHEDULE Q
CERTIFICATE OF SUBSTANTIAL COMPLETION
This is Schedule Q of the City of Armstrong
Subdivision and Development Servicing
Bylaw No. 1570, 2007
___________________________________
(Clerk)
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 190
City of Armstrong
SCHEDULE Q - Certificate of Substantial Completion
SCHEDULE Q
CERTIFICATE OF SUBSTANTIAL COMPLETION
OWNER:
____________________________________
CONTRACTOR:
____________________________________
PROJECT NO:
____________________________________
FILE NO:
____________________________________
SERVICING AGREEMENT NO.:
____________________________________
DATE:
____________________________________
This certificate is issued pursuant to Schedule "B" Part 1, Clause 1.8 of the Subdivision and Development
Servicing Bylaw No. 1570 and applies to the following Works and Services:
Roads and Civil Works
Ƒ
Sanitary Sewer System
Ƒ
Drainage and Storm Sewer Works
Ƒ
Waterworks System
Ƒ
The Maintenance Period for the Works & Services will begin on _________________
The Maintenance Period for the Works & Services will end on _________________
The Certificate of Completion will be issued when all deficiencies have been corrected. The Certificate of
Final Acceptance will be issued when the maintenance period expires and all deficiencies that have
arisen over the maintenance period have been corrected, and the City Engineer has been satisfied all
conditions of the Servicing and Development Agreement have been fulfilled.
This Certificate has been made to the best of the City Engineer's knowledge, information and belief. It
does not constitute acceptance of any work not in accordance with the requirements of the Subdivision
and Development Servicing Bylaw No. 1570, and not listed as a deficiency herein, whether or not such
defect(s) could have been observed or discovered during construction.
The following is a List of Deficiencies related to the Work:
________________________________
______________________________
________________________________
______________________________
______________________________
City of Engineer
Form Q/07
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 191
City of Armstrong
SCHEDULE R - Certificate of Completion
SCHEDULE R
CERTIFICATE OF COMPLETION
This is Schedule R of the City of Armstrong
Subdivision and Development Servicing
Bylaw No. 1570, 2007
___________________________________
(Clerk)
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 192
City of Armstrong
SCHEDULE R - Certificate of Completion
SCHEDULE R
CERTIFICATE OF COMPLETION
OWNER:
____________________________________
CONTRACTOR:
____________________________________
PROJECT NO:
____________________________________
FILE NO:
____________________________________
LOCATION.:
____________________________________
DATE:
____________________________________
The final construction inspection was held on ______________________ and all
deficient Items have been addressed to City of Armstrong satisfaction.
I _______________________, Professional Engineer of __________________ hereby
certify that all works and services reflect City of Armstrong standards and specifications,
and that all works and services have been completed in accordance with the approved
construction design drawings.
The City of Armstrong's acknowledgment of this certificate does not represent
acceptance of the work, nor shall this act by the City of Armstrong prejudice any
requirements of the agreement with the Owner, nor operate to relieve the Owner of any
of his/her responsibilities thereunder.
______________________________
Owner
______________________________
Professional Engineer
______________________________
City of Engineer
Form R/07
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 193
City of Armstrong
SCHEDULE S - Certificate of Final Acceptance
SCHEDULE S
CERTIFICATE OF FINAL ACCEPTANCE
This is Schedule S of the City of Armstrong
Subdivision and Development Servicing
Bylaw No. 1570, 2007
___________________________________
(Clerk)
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 194
City of Armstrong
SCHEDULE S - Certificate of Final Acceptance
SCHEDULE S
CERTIFICATE OF FINAL ACCEPTANCE
OWNER:
____________________________________
CONTRACTOR:
____________________________________
PROJECT NO:
____________________________________
FILE NO:
____________________________________
SERVICING AGREEMENT NO.:
____________________________________
DATE:
____________________________________
All deficiencies, defects or faults in the Works and Services observed or discovered
within the period preceding the date of this Certificate have been rectified, this
Certificate is issued pursuant to the referenced Subdivision and Development Servicing
Bylaw No. 1570.
This Certificate has been made to the best of the City Engineer's knowledge,
information and belief. It does not constitute acceptance of any work not in accordance
with the requirements of the Subdivision and Development Servicing Agreement,
whether or not such defect(s) could have been observed during construction.
______________________________
City of Engineer
cc:
Owner
Form S/07
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 195
City of Armstrong
SCHEDULE T - Agreement to Pay Non-Refundable Deposit
SCHEDULE T
AGREEMENT TO PAY NON-REFUNDABLE DEPOSIT
This is Schedule T of the City of Armstrong
Subdivision and Development Servicing
Bylaw No. 1570, 2007
___________________________________
(Clerk)
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 196
City of Armstrong
SCHEDULE T - Agreement to Pay Non-Refundable Deposit
SCHEDULE T
AGREEMENT TO PAY NON-REFUNDABLE DEPOSIT
I, (NAME)
_________________________________________________________
(Owner)
ADDRESS: _________________________________________________________
Agree to pay the amount of $_____________________ as a non-refundable deposit
towards the installation described as:
This payment is made pursuant to Clause 7.01 of Subdivision and Servicing Bylaw No. 1570, and is
made in lieu of construction of the Works and Services as itemized on the attached form identified as
"Estimate of Non-Refundable Deposit".
This payment is made as full compensation for the itemized works and services and fulfills all the
requirements of the Subdivision and Development Servicing Bylaw No. 1570.
FOR
SIGNED, SEALED AND DELIVERED
)
CORPORATE
The Corporation Seal of
)
BODY
Was hereunto affixed in the presence of
)
SEAL
)
Signature: ___________________________________ )
)
Title
__________________________________ )
FOR
SIGNED, SEALED AND DELIVERED
)
PRIVATE
By the above named in the presence
)
INDIVIDUAL
Of (witness)
)
)
Signature ___________________________________ )
(Witness)
)
Name: ___________________________________ ) ________________
) Owner's Signature
Address: ___________________________________ )
)
___________________________________ )
FOR THE CITY
SIGNED, SEALED AND DELIVERED
)
OF ARMSTRONG The Corporate Seal of the City of Armstrong
)
was hereunto fixed in the presence of
)
SEAL
)
Mayor: ___________________________________
)
)
Administrator ____________________________
)
Form T/07
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 197
City of Armstrong
SCHEDULE U - Cost Sharing Agreement
SCHEDULE U
COST SHARING AGREEMENT
This is Schedule U of the City of Armstrong
Subdivision and Development Servicing
Bylaw No. 1570, 2007
___________________________________
(Clerk)
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 198
City of Armstrong
SCHEDULE U - Cost Sharing Agreement
SCHEDULE U
COST SHARING AGREEMENT
BETWEEN
CITY OF ARMSTRONG (City)
and
NAME
_________________________________________________________
(Owner)
ADDRESS: _________________________________________________________
The City agrees to pay up to the amount of $______________________ towards the
installation described as:
1.
It is agreed between the parties to this agreement that the above amount paid by the City shall be
full compensation for the excess or extended services under Section 939 of the Local
Government Act required by the City and that all costs associated in any way whatsoever with
this installation which are in excess of the above amount shall be the full responsibility of the
Owner to pay.
2.
It is further agreed that the above amount will be paid as follows:
(a)
Upon issuance of substantial completion
$________________
(b)
Upon receipt of all "Record Drawings"
$________________
3.
It is agreed that it is the sole responsibility of the Owner/Developer to arrange for the design and
installation of the works according to City requirements.
FOR
SIGNED, SEALED AND DELIVERED
)
CORPORATE
The Corporation Seal of
)
BODY
Was hereunto affixed in the presence of
)
SEAL
)
Signature: ___________________________________ )
)
Title
__________________________________ )
FOR
SIGNED, SEALED AND DELIVERED
)
PRIVATE
By the above named in the presence
)
INDIVIDUAL
Of (witness)
)
Signature ___________________________________ )
(Witness)
)
Name: ___________________________________ ) ________________
) Owner's Signature
Address: ___________________________________ )
FOR THE CITY
SIGNED, SEALED AND DELIVERED
)
OF ARMSTRONG
The Corporate Seal of the City of Armstrong )
was hereunto fixed in the presence of
)
SEAL
)
Mayor: ___________________________________
)
)
Administrator ____________________________
)
Form U/07
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 199
City of Armstrong
SCHEDULE V - Insurance Certificate
SCHEDULE V
INSURANCE CERTIFICATE
This is Schedule V of the City of Armstrong
Subdivision and Development Servicing
Bylaw No. 1570, 2007
___________________________________
(Clerk)
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 200
City of Armstrong
SCHEDULE V - Insurance Certificate
SCHEDULE V
INSURANCE CERTIFICATE
OWNER:
____________________________________
PROJECT NO:
____________________________________
INSURANCE POLICY NO.:
____________________________________
DATE:
____________________________________
PURSUANT TO the Standard Subdivision and Development Agreement Document
(Form M-1), the Owner is required to obtain and maintain in force during the term of the
Agreement Document, an insurance policy acceptable to the City of Armstrong.
I hereby certify that the attached insurance policy provides insurance coverage as
required pursuant to Clause 18 of the Agreement Document between the City of
Armstrong and the Owner and that the attached insurance policy is valid for the one (1)
year term of the Agreement Document (Schedule M-1, Standard Subdivision and
Development Agreement Document).
Certified by:
Authorized Insurance Agent:
____________________________________
Company:
____________________________________
Address:
____________________________________
____________________________________
Form V/07
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 201
City of Armstrong
SCHEDULE V - Insurance Certificate
SCHEDULE V
INSURANCE CERTIFICATE
Insurance Coverage By Owner
18.
The Owner covenants and agrees to provide the following insurance coverage,
and to provide the City with a copy of the insurance policy prior to the
commencement of any construction of the Works and Services.
(a)
To protect the Owner and the City against all claims arising out of:
(i)
Death or injury to persons; and
(ii)
Damage to or loss of any City buildings, structures, stores,
equipment and materials included in or required for the carrying out
of the Works and Services.
(b)
Every policy of insurance required shall:
(i)
Name "THE CITY OF ARMSTRONG" as an 'Additional Insured';
and
(ii)
State that the policy applies to each insured in the same manner
and to the same extent as if a separate policy had been issued to
each Insured; and
(iii)
State that the policy cannot be canceled, lapsed or materially
changed without at least thirty (30) days written notice to the City,
delivered to the City Engineer.
The Owner shall at his sole expense throughout the currency of this Servicing
Agreement carry Comprehensive Liability Insurance acceptable to the City of
Armstrong in the amount of at least Two Million Dollars ($2,000,000.) with
insurance companies licensed to carry on business in the Province of British
Columbia in partial discharge of the Owners obligation under Clause 17
(seventeen) of the Subdivision and Development Servicing Agreement.
Form V/07
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 202
City of Armstrong
SCHEDULE W - Letter of Credit
SCHEDULE W
LETTER OF CREDIT
This is Schedule W of the City of Armstrong
Subdivision and Development Servicing
Bylaw No. 1570, 2007
___________________________________
(Clerk)
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 203
City of Armstrong
SCHEDULE W - Letter of Credit
SCHEDULE W
LETTER OF CREDIT
(To Be On Bank Letterhead)
Letter of Credit No.:___________________
Amount $__________________
Initial Expiry Date: ___________________
CITY OF ARMSTRONG
3570 BRIDGE STREET
P.O. BOX 40
ARMSTRONG, B.C. V0E 1B0
WE HEREBY AUTHORIZE YOU TO DRAW ON THE (name and address of bank) for account
of (name of Owner/Developer) UP TO AN AGGREGATE AMOUNT OF (dollars in writing and in
numbers) available on demand.
PURSUANT TO THE REQUEST OF our customer, (name of Owner), we the (name of bank)
hereby establish and give you an Irrevocable Letter of Credit in you favour in the above amount
which may be drawn on by you at any time and from time to time, upon written demand for
payment made upon us by you, which demand we shall honour without enquiring whether you
have the right as between yourself and the said customer to make such demand, and without
recognizing any claim of our said customer, or objection by it to payment by us.
THE LETTER OF CREDIT we understand relates to those services and financial obligations set
out in an agreement between the customer and the CITY OF ARMSTRONG and referred to as
(description of agreement and works and services covered).
THE AMOUNT of this Letter of Credit will continue in force for a period of one year, but shall be
subject to the condition hereinafter set forth.
IT IS A CONDITION of this Letter of Credit that it shall be deemed to be automatically extended
without amendment from year to year from the present or any future expiration date hereof,
unless at least thirty (30) days prior to the present or any future expiration date, we notify you in
writing by registered mail that we elect not to consider this Letter of Credit to be renewable for
any additional period.
DATED at ____________________ , British Columbia this ________ day of _______, 20___
COUNTERSIGNED BY:
_______________________________________
(name of bank)
per:
Form W/07
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 204
City of Armstrong
SCHEDULE X - Flushing / Testing / Disinfection Report
SCHEDULE X
FLUSHING / TESTING / DISINFECTION REPORT
This is Schedule X of the City of Armstrong
Subdivision and Development Servicing
Bylaw No. 1570, 2007
___________________________________
(Clerk)
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 205
City of Armstrong
SCHEDULE X - Flushing / Testing / Disinfection Report
SCHEDULE X
FLUSHING / TESTING / DISINFECTION REPORT
PROJECT:
_______________________________ DATE:
LOCATION:
_______________________________ FILE #:
DESCRIPTION:
FLUSHING:
Water Source: ______________ Minimum flushing volume (Pipe Volume x 3):
Estimate flow rate:
Estimated flow time required
Flushing completed:
PRESSURE TEST:
Allowable leakage = NDP½/(65000)(2Hr)
N = Number of pipe joints =_______ D = Nominal diameter of pipe (mm) =
Static Pressure: _____ kPa P = Average test pressure during leakage test =
[1.5 x Static Pressure (Minimum = 1,380 kPa (200 psi)]
Allowable leakage calculated _______________
Start time: _________ End time
Test leakage recorded: _________________ Pass: ______ Fail: ________
_____________________________________________________________________
DISINFECTION:
Chlorine Source:
Calculated dosage:
Background residual
Start time
Starting residual
End time
End residual
Chlorine flushed:
24 Hour stand time start:
End
_____________________________________________________________________
BACTERIOLOGICAL TEST:
Sample Date:
Time:
Testing Laboratory:
Number of Samples Required:
Sample(s) collected by:
Test Results: Pass
Fail
(Copy of Laboratory Results Attached)
Testing/Flushing points removed at Corporation Stop
Form X/07
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007 PAGE 206
City of Armstrong
SCHEDULE X - Flushing / Testing / Disinfection Report
SCHEDULE X
FLUSHING / TESTING / DISINFECTION REPORT
_____________________________________________________________________
PROFESSIONAL ENGINEERS CERTIFICATION:
I hereby certify that all flushing, disinfection and testing has been completed in accordance with
the requirements of Subdivision and Development Servicing Bylaw No. 1570.
______________________________
______________________________
Signature and name of the Professional
Engineer responsible for design
Engineer's
Seal
_____________________________________________________________________
CITY CONNECTION APPROVAL
_________________
________________________
Date
City Engineer
Form X/07
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 207
City of Armstrong
SCHEDULE Y - Fire Hydrant Flow Test Procedure and Report
SCHEDULE Y
FIRE HYDRANT FLOW TEST PROCEDURE AND REPORT
This is Schedule Y of the City of Armstrong
Subdivision and Development Servicing
Bylaw No. 1570, 2007
___________________________________
(Clerk)
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 208
City of Armstrong
SCHEDULE Y - Fire Hydrant Flow Test Procedure and Report
SCHEDULE Y
FIRE HYDRANT FLOW TEST PROCEDURE AND REPORT
Location:
__________________________________________________________
Date: _____________________ Time: _________________
1.
Tested By: ________________ Pressure Zone: _______________
2.
Map Reference No. ___________________________
3.
Location of Flow Hydrant: ______________________
4.
Gauge Hydrant #1 Location: ____________________
5.
Gauge Hydrant #2 Location _____________________
6.
Gauge Hydrant #3 Location _____________________
FLOW TEST RESULTS
One Port Open
One Port Open
Flow
Hyd.
Gauge
Hyd.#1
Gauge
Hyd.#2
Gauge
Hyd.#3
Flow
Hyd.
Gauge
Hyd.#1
Gauge
Hyd.#2
Gauge
Hyd.#3
Date/Time:
System static pressure
prior to start of flow
test (PSI)
Pitot Pressure (PPSI)
Residual pressure after
Flow Hydrant Opened
(PSI)
Flow Recorded @
Flow Hydrant (USGPM)
Discharge Port
Diameter (in)
Discharge Coefficient
Mainline W/M dia @
Flow Hydrant (in)
The flow hydrant must be located downstream of the gauge hydrant, so that the source of water is flowing
past the gauge hydrant to the flow hydrant.
Note:
A pressure drop of 25% from the static pressure is required in the pitot pressure to obtain
a valid hydrant flow test.
Note: All flow tests shall be undertaken in general conformance with the Fire Underwriters Survey
recommended test procedures.
Form Y/07
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 209
City of Armstrong
SCHEDULE Y - Fire Hydrant Flow Test Procedure and Report
SCHEDULE Y
FIRE HYDRANT FLOW TEST PROCEDURE AND REPORT
Test Date:
_________________
Test Time: _________________
Gauge Hydrant:
Flow Test #1 Flow Test #2
HYDRANT NUMBER _________________
HYDRANT LOCATION _________________
STATIC PRESSURE
_______ psi 0 psi
RESIDUAL PRESSURE:
_______ psi _______ psi
Flow Hydrant:
HYDRANT NUMBER _________________
HYDRANT LOCATION _________________
STATIC PRESSURE
_______ psi 0 psi
PITOT GAUGE READING (PRESSURE)
_______ psi _______ psi
FLOW OPENING DIAMETER:
2.5 inches 2.5 inches
NUMBER OF PORTS OPEN
1 ports 2
ports
NFPA Section 2.3: DROP IN PRESSURE >25% FOR VALID TEST _______
0%
FLOW CALCULATIONS
G = 24.84 x D2 x C x P½
G =
FLOW IN igpm
D =
NOZZLE DIAMETER IN INCHES
P =
PITOT GAUGE READING IN PSI
C =
COEFFICIENT (USUALLY 0.9 FOR FULL FLOW)
Q(r) = Q(f) x (H(r) /H(f))0.54
Q(r) = COMPUTED DISCHARGE AT THE SPECIFIED
RESIDUAL PRESSURE IN igpm
Q(f) = TOTAL DISCHARGE DURING TEST IN igpm
H(r) = DROP IN PRESSURE FROM INITIAL VALUE
(STATIC PRESSURE AT GAUGE HYDRANT) TO
SPECIFIED RESIDUAL IN psi
H(f) =
PRESSURE DROP DURING TEST IN psi
Flow Test Flow Test
# 1
# 2
CALCULATED FLOW AT FLOW HYDRANT
______ igpm ________ igpm
THEORETICAL FLOW AT FLOW AT A
DESIRED RESIDUAL PRESSURE
20 psi ______ igpm ________ igpm
Based on this hydrant flow test, and background demand at time of the test, the
theoretical flow at Hydrant No. ______ is _____ igpm at a residual pressure of 20 psi.
Form Y/07
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 210
City of Armstrong
SCHEDULE Z - Signed Release
SCHEDULE Z
SIGNED RELEASE
This is Schedule Z of the City of Armstrong
Subdivision and Development Servicing
Bylaw No. 1570, 2007
___________________________________
(Clerk)
SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1570, 2007
PAGE 211
City of Armstrong
SCHEDULE Z - Signed Release
SCHEDULE Z
SIGNED RELEASE
To Property Owner of:
Your signature indicates that you are completely satisfied with the work done in the
restoration of your property.
Property Owner: __________________________ __________________________
Print
Signature
Street Address: ________________________________________________________
Legal Description: ______________________________________________________
Date: ________________________________________________________________
Form Z/07