{
 "answer": "In the Village of Gold River, British Columbia, building permit rules are set by Bylaw No 651, 2005 Building Bylaw, verified 2026-08-28. Permit required for: Construction, alteration, placement, reconstruction, demolition, removal, relocation or change of occupancy of any building or structure. Permit fees: $50.00; $50.00 for first $5,000 plus $6.50 for each additional $1 000.00; $7.00 per $1,000.00. Administered by: Building Official.",
 "municipality_id": "gx-000043",
 "municipality": "Gold River",
 "status_type": "Village",
 "jurisdiction": "British Columbia",
 "country": "CA",
 "topic": "building_permits",
 "label": "Building permits",
 "status": "found",
 "last_verified": "2026-08-28",
 "official_website": "http://www.goldriver.ca",
 "documents": [
  {
   "primary": true,
   "is_official": true,
   "title": "Bylaw No 651, 2005 Building Bylaw",
   "category": "building_permits",
   "document_type": "bylaw",
   "status": "adopted",
   "adopted_date": null,
   "document_url": "https://goldriver.ca/wp-content/uploads/2022/07/Bylaw-No-651-2005-Building-Bylaw.pdf",
   "summary": "Establishes building construction standards and permitting requirements in Gold River; amendments 651.1 (2007) and 651.2 (2020) incorporated.",
   "capture_sha256": "6fa2952ad27e885aaf50e9debc54f3c27b0ffe0bc2c2875c5f4c88c57f079c6c",
   "captured_at": "2026-06-08T05:38:58+00:00",
   "capture_http_status": 200,
   "document_number": "651",
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/6fa2952ad27e885aaf50e9debc54f3c27b0ffe0bc2c2875c5f4c88c57f079c6c.pdf",
   "link_dead": false,
   "facts": {
    "permit_required_for": "Construction, alteration, placement, reconstruction, demolition, removal, relocation or change of occupancy of any building or structure.",
    "exemptions": "Retaining structures <1.2m, fences, non-structural re-roofing/siding/cosmetic work, non-structural repairs <$2500 (discretionary), pipe repairs, accessory buildings <=10m2, one storey, <=3m height.",
    "fee_basis": "$50.00; $50.00 for first $5,000 plus $6.50 for each additional $1 000.00; $7.00 per $1,000.00",
    "authority": "Building Official",
    "fine_range": "not more than Ten Thousand ($10,000.00) Dollars or to imprisonment for not more than six months"
   },
   "fact_citations": {
    "permit_required_for": "s. 6.1",
    "exemptions": "s. 5.2",
    "fee_basis": "Schedule \"A\"",
    "authority": "s. 2.1",
    "fine_range": "s. 27.1"
   },
   "transcript_url": "/ca/bc/gold-river/building-permits/bylaw-651/",
   "transcript_quality": "exact"
  }
 ],
 "source": "https://govanswers.org/ca/bc/gold-river/building-permits/"
}