{
 "answer": "In the Village of New Denver, British Columbia, building permit rules are set by Building Bylaw (Consolidated), verified 2026-08-28. Exemptions: Buildings <9.33m2, retaining walls <1.5m, decks <600mm high, existing chimneys, plumbing repairs without piping changes, seasonal greenhouses <28m2. Permit fees: current building permit fees of the Regional District of Central Kootenay. Administered by: Building Official.",
 "municipality_id": "gx-000086",
 "municipality": "New Denver",
 "status_type": "Village",
 "jurisdiction": "British Columbia",
 "country": "CA",
 "topic": "building_permits",
 "label": "Building permits",
 "status": "found",
 "last_verified": "2026-08-28",
 "official_website": "https://newdenver.ca/",
 "documents": [
  {
   "primary": true,
   "is_official": true,
   "title": "Building Bylaw (Consolidated)",
   "category": "building_permits",
   "document_type": "bylaw",
   "status": "adopted",
   "adopted_date": null,
   "document_url": "https://newdenver.ca/wp-content/uploads/2018/11/Consolidated-Building-Bylaw-595-670.pdf",
   "summary": "Sets standards for construction, alteration, and demolition of buildings within the Village; requires permits and inspections.",
   "capture_sha256": "32a7d74b9d3ee1bb68edf8405abe4d262a8b25037773750b8b111145a909b2aa",
   "captured_at": "2026-06-08T05:38:58+00:00",
   "capture_http_status": 200,
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/32a7d74b9d3ee1bb68edf8405abe4d262a8b25037773750b8b111145a909b2aa.pdf",
   "link_dead": false,
   "facts": {
    "permit_required_for": "Construction, alteration, demolition, removal, relocation, occupancy change of buildings, structures, plumbing systems, pools, manufactured homes, solid fuel appliances.",
    "exemptions": "Buildings <9.33m2, retaining walls <1.5m, decks <600mm high, existing chimneys, plumbing repairs without piping changes, seasonal greenhouses <28m2.",
    "fee_basis": "current building permit fees of the Regional District of Central Kootenay",
    "authority": "Building Official",
    "fine_range": "not less than $100.00 (One Hundred Dollars) and not more than the maximum penalty prescribed by law"
   },
   "fact_citations": {
    "permit_required_for": "s. 6.1, s. 8.1",
    "exemptions": "s. 5.2",
    "fee_basis": "Schedule \"A\"",
    "authority": "s. 7.1.1",
    "fine_range": "s. 22.1"
   },
   "transcript_url": "/ca/bc/new-denver/building-permits/building-bylaw/",
   "transcript_quality": "exact"
  }
 ],
 "source": "https://govanswers.org/ca/bc/new-denver/building-permits/"
}