Building Bylaw No. 2021-21

Penticton, British Columbia

This is the exact embedded text of the captured official document. Snapshot 1adb4ad9ca7e · verified 2026-06-08 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

This is a consolidated bylaw prepared by the Corporation of the City of Penticton for convenience only. The city does not warrant that the information contained in this consolidation is current. It is the responsibility of the person using this consolidation to ensure that it accurately reflects current bylaw provisions. The Corporation of the City of Penticton Building Bylaw No. 2021-21 Consolidated for convenience only Amended by Bylaw No. 2024-08 (March 19, 2024) The Corporation of the City of Penticton Bylaw No. 2021-21 A Bylaw for the administration of the Building Code and the regulation of construction. WHEREAS the Council of the City of Penticton may, by bylaw, regulate, prohibit and impose requirements in respect to buildings and structures for the following: (a) the provision of access to a building or other structure, or to part of a building or other structure, for a person with disabilities; (b) the conservation of energy or water; (c) the reduction of greenhouse gas emissions; (d) the health, safety or protection of persons or property; AND WHEREAS the Council of the City of Penticton is enacting this bylaw to regulate construction and administer the British Columbia Building Code in Penticton in accordance with the Community Charter and the Building Act; AND WHEREAS the Council of the City of Penticton has employed trained building officials for the purpose of this bylaw; NOW THEREFORE BE IT RESOLVED that the Municipal Council of the City of Penticton, in open meeting assembled, hereby ENACTS AS FOLLOWS: PART 1. TITLE Citation 1.1. This bylaw may be cited as "Building Bylaw No. 2021-21". Building Bylaw No. 2021-21 Page 2 of 53 PART 2. TABLE OF CONTENTS PART 1. TITLE ............................................................................................................................................................. 1 PART 2. TABLE OF CONTENTS ................................................................................................................................... 2 PART 3. SEVERABILITY ............................................................................................................................................... 3 PART 4. INTERPRETATION ......................................................................................................................................... 3 PART 5. PURPOSE OF THE BYLAW ......................................................................................................................... 8 PART 6. SCOPE AND EXEMPTIONS ........................................................................................................................... 8 PART 7. PROHIBITIONS ............................................................................................................................................ 10 PART 8. POWERS OF A BUILDING OFFICIAL ........................................................................................................... 11 PART 9. OWNER'S RESPONSIBILITIES ...................................................................................................................... 13 PART 10. OBLIGATIONS OF OWNER'S CONSTRUCTOR ............................................................................................ 15 PART 11. REGISTERED PROFESSIONAL'S RESPONSIBILITIES .................................................................................... 16 PART 12. REQUIRED PERMITS ................................................................................................................................... 17 PART 13. CONDITIONS OF PERMIT ........................................................................................................................... 18 PART 14. PERMIT REQUIREMENTS FOR SIMPLE AND COMPLEX BUILDINGS........................................................... 19 PART 15. BUILDING MOVE PERMIT ........................................................................................................................... 38 PART 16. DEMOLITION PERMITS ............................................................................................................................... 39 PART 17. PART 17: FIRE ALARM PERMITS ................................................................................................................ 41 PART 18. MECHANICAL VENTILATION AND HEATING PERMITS .............................................................................. 41 PART 19. PLUMBING AND FIRE SUPPRESSION PERMITS .......................................................................................... 42 PART 20. POOL PERMITS ........................................................................................................................................... 43 PART 21. RETAINING WALLS AND GRADES .............................................................................................................. 45 PART 22. SOLAR PANEL PERMIT ............................................................................................................................... 46 PART 23. TEMPORARY BUILDING PERMIT ................................................................................................................ 47 PART 24. ACCESS ROUTE FOR FIRE DEPARTMENT ACCESS ..................................................................................... 48 PART 25. CLIMATIC DATA ......................................................................................................................................... 48 PART 26. ENERGY CONSERVATION and GHG EMISSIONS REDUCTION ................................................................... 48 PART 27. NUMBERING OF BUILDINGS ...................................................................................................................... 49 PART 28. TEMPORARY RESIDENCE DURING PERIOD OF CONSTRUCTION .............................................................. 50 PART 29. OFFENCES AND ENFORCEMENT ............................................................................................................... 51 PART 30. UNSAFE CONDITIONS ................................................................................................................................ 52 PART 31. REPEAL ....................................................................................................................................................... 53 PART 32. IN FORCE .................................................................................................................................................... 53 Building Bylaw No. 2021-21 Page 3 of 53 PART 3. SEVERABILITY 3.1 If a section, subsection, paragraph, subparagraph or phrase in this bylaw is for any reason declared invalid by a court of competent jurisdiction, the decision will not affect the validity of the remaining portions of this bylaw. PART 4. INTERPRETATION 4.1. Every reference to this bylaw in this or another bylaw of the City is a reference to this bylaw as amended to the date of the reference. 4.2. Every reference to (a) the Building Code is a reference to the current edition as of the date of application the building permit, and (b) a section of the Building Code is a reference to the applicable successor sections, as the code or section may be amended or re-enacted from time to time. 4.3. Definitions of words and phrases used in this bylaw that are not included in the definitions in this part have the meanings commonly assigned to them in the context in which they are used in this bylaw, considering the specialized use of terms with the various trades and professions to which the terminology applies. Definitions 4.4. In this bylaw the following words and terms have the meanings: (a) set out in Section 1.4.1.2. of the Building Code as of the date of the adoption of this bylaw: accessible assembly occupancy, building, building area, building height, business and personal services occupancy, care occupancy, constructor, coordinating registered professional, designer, detention occupancy, excavation, field review, firewall, first storey, grade, high hazard industrial occupancy, industrial occupancy, low hazard industrial occupancy, major occupancy, medium hazard industrial occupancy, mercantile occupancy, occupancy, post disaster occupancy, private sewage disposal system, registered professional, residential occupancy, treatment occupancy or unsafe condition; (b) subject to this bylaw, set out in the Schedule to the Community Charter; assessed value, highway, land, occupier, parcel, public authority, service and soil; and (c) subject to this bylaw, set out in Section 29 of the Interpretation Act: may, must obligation, person, property, writing, written and year. 4.5. In this bylaw, the following words are defined: "accepted" means reviewed by the building official under the applicable provisions of the Building Code and this bylaw; Building Bylaw No. 2021-21 Page 4 of 53 "addition" means an alteration to any building which will increase the total aggregate floor area or the building height (in storeys), and includes the provision of two or more separate buildings with openings between each other for intercommunication; "agent" includes a firm, corporation or other person representing the owner, by written designation or contract, and includes a hired tradesperson or constructor who may be granted a permit for work within the limitations of his or licence; "alternative solution" means an alternative solution authorized under the Building Code; "alteration" means a change, repair or modification of the construction or arrangement of or use of any building or structure, or to an occupancy regulated by this bylaw; "Architects Act" means the current British Columbia's Architects Act "building" means any construction used or intended for supporting or sheltering any use or occupancy and includes a mobile home; "Building Act" means the current British Columbia's Building Act "Building Code" means the British Columbia Building Code as adopted by the Minister responsible under provincial legislation, as amended or re-enacted from time to time; "building official" means the person designated in or appointed to that position by the City and other such person or persons as they may designate from time to time as their assistants; "change of use or occupancy" means changing the use of a building, or portion of a building, to an alternative use, even if no construction or alterations are anticipated; "complex building" means (a) a building used for a major occupancy classified as (i) assembly occupancy; (ii) care or detention occupancy; (iii) high hazard industrial occupancy; (iv) treatment occupancy; or (v) post-disaster building; (b) a building exceeding 600m2 in building area or exceeding three storeys in building height used for a major occupancy classified as (i) residential occupancy; (ii) business and personal services occupancy; (iii) mercantile occupancy; or (iv) medium and low hazard industrial occupancy; Building Bylaw No. 2021-21 Page 5 of 53 "coordinating registered professional" means a registered professional retained pursuant to the Building Code to coordinate all design work and field reviews of the registered professionals required for a development; "construct" or "construction" includes to build, erect, install, repair, alter, add, enlarge, move, locate, relocate, reconstruct, demolish, remove, excavate or shore; "constructor" means a person who constructs; "City" means the City of Penticton; "City Engineer" means the City of Penticton Engineer or designate; "Engineers and Geoscientists Act" means the current British Columbia's Engineers and Geoscientists Act "existing", in respect of a building, means the portion of a building constructed prior to the submission of a permit application required under this bylaw; "foundation" means a system or arrangement of foundation units through which the loads from a building are transferred directly to supporting soil or rock and includes any portion of the exterior walls of a building that lie below the finished grade immediately adjacent to the building; "GHG" means greenhouse gas; "health and safety aspects of the work" means design and construction regulated by Parts 3, 4, 5, 6, 7, 8, 9 and 10, Division B, of the Building Code; and subject to Parts 1 and 2 in relation to Parts 3 through 10, Division B; "manufactured home" means mobile home or modular home as defined in this bylaw; "mobile home" means a manufactured home constructed to the requirements of the CSA National Standard CAN/CSA-Z240MH Series-09 or any preceding or replacement standard; "modular home" means a manufactured home conforming to the requirements of the CSA National Standard CAN/CSA A277-08 or any preceding or replacement standard for certified factory-built homes; "on-site services" means utilities and features which provide for servicing a project within the property on which it is located and includes water service piping and distribution systems, storm and sanitary sewer collection, access roads, natural gas, electric and cable; "off-site services" means services required pursuant to the City Subdivision and Development Bylaw of the day, that are required to be located on public road, public land or statutory right-of-way at final approval of the subdivision or development as the case may be; Building Bylaw No. 2021-21 Page 6 of 53 "owner" means the registered owner of an estate in fee simple of land, or an agent duly authorized by the owner in writing in the prescribed form, and also where the context or circumstances so require (a) a tenant for life under a registered life estate; (b) a registered holder of an agreement for sale; (c) a holder or occupier of land held in the manner mentioned in Sections 228 and 229 of the Community Charter; or (d) a lessee with authority to build on land; "permit" means permission or authorization in writing by the building official to perform work regulated by this bylaw and, in the case of a occupancy inspection notice, to occupy a building or part of a building; "pool" means a structure or constructed depression used or intended to be used for swimming, bathing, wading or diving which is designed to contain water and has a depth, at any point, exceeding 600mm, including an in-ground pool and hot tub; "professional design" means the plans and supporting documents bearing the date, seal or stamp, and signature of a registered professional; "project" means any construction operation; "qualified plumber" means a person who holds a current Certificate of Qualification issued by the Province of British Columbia as a journeyman plumber for which a statement of compliance and assurance is being provided pursuant to Certificate of Plumbing Test; "retaining wall" means any structure other than a building that holds or retains soil or other earth material behind it; "reviewed" means reviewed by the building official under the applicable provisions of the Building Code and this bylaw; "simple building" means a building of three storeys or less in building height, having a building area not exceeding 600m2 and used for a major occupancy classified as (a) residential occupancy; (b) business and personal services occupancy; (c) mercantile occupancy; or (d) medium and low hazard industrial occupancy; "Step Code" means the BC Energy Step Code as references in the British Columbia Building Code Section 9.36.6 as amended from time to time. "structure" means a construction or portion of construction, of any kind, whether fixed to, supported by or sunk into land, airspace or water, and includes foundations or supporting framework for exterior signs, equipment and machinery, interior storage racking greater than 2.6 m in height, retaining walls and pool fences, but specifically excludes paving, fences and landscaping; Building Bylaw No. 2021-21 Page 7 of 53 "temporary building" includes a sales office, construction office or a structure in which tools are stored during construction of a building or other structure; "work" means the same as construct or construction as defined in this bylaw; "Zero Carbon Step Code" means the greenhouse gas (GHG) emission requirements set out in Part 9, Section 9.37 - Greenhouse Gas Emissions and Part 10, Section 10.3 - Greenhouse Gas Emissions of the Building Code, as amended from time to time. (Bylaw No. 2024-08) Building Bylaw No. 2021-21 Page 8 of 53 PART 5. PURPOSE OF THE BYLAW 5.1. Despite any other provisions in this bylaw, this bylaw must be interpreted in accordance with this part. 5.2. Every permit issued under this bylaw is issued expressly subject to the provisions of this part. 5.3. This bylaw is enacted to regulate, prohibit and impose requirements in regard to construction in the City in the public interest. 5.4. The purpose of this bylaw does not extend to (a) the protection of owners, designers, constructors, or any other persons from economic loss; (b) the assumption by the City or any building official of any responsibility for ensuring the compliance by any owner, his or her representatives or any employees, constructors or designers retained by the owner, with the Building Code, the requirements of this bylaw, or other applicable enactments, codes or standards; (c) providing any person a warranty of design or workmanship with respect to any building or structure for which a building permit or occupancy permit is issued under this bylaw; (d) providing any person a warranty or assurance that construction undertaken under building permits issued by the City is free from latent, or any, defects; or (e) the protection of adjacent real property from incidental damage or nuisance. PART 6. SCOPE AND EXEMPTIONS Application 6.1. This bylaw applies to the geographical area of the City and to land, the surface of water, air space, buildings or structures in the City. 6.2. This bylaw applies to the design, construction or occupancy of new buildings or structures, and the alteration, reconstruction, demolition, removal, relocation or occupancy or change of use or occupancy of existing buildings and structures, including Farm Buildings as regulated by the National Farm Code. 6.3. This bylaw does not apply to (a) except as set out in Part 21 of this bylaw, a fence; (b) an accessory building with a floor area of less than 10m2, that does not constitute a potential unsafe condition; (c) a trellis or arbour; (d) a retaining wall supporting soil that is: (i) less than 1.2m in height, Building Bylaw No. 2021-21 Page 9 of 53 (ii) a sequence of retaining walls less than 1.2m in height spaced greater than two horizontal to one vertical, or (iii) in the opinion of the building official does not constitute a potential unsafe condition; (e) landscaping or other surfacing of land, except when creating a public parking lot; (f) bridges other than pedestrian and vehicular bridges attached to buildings; (g) docks or wharves; (h) decks or patios which are less than 600mm from the ground or finished grade, which are not attached to a building and have no walls or roofs; (i) factory built housing and components complying with CAN/CSA-Z240 MH Series standard, but this exemption does not extend to on site preparations (foundations, anchorage), connection to services and installation of appliances; (j) repair and maintenance of lawfully-conforming structures where the level of life safety and building performance shall not be decreased below a level that already exists; (k) the cleaning or repair of mechanical heating and ventilation systems; and (l) the clearing of stoppages or the repairing of leaks in pipes, valves or fixtures, or the replacement of tubs, showers, toilets, lavatories or sinks if the work does not involve or require the rearrangement of valves, pipes or fixtures or hot water tanks. Limited Application to Existing Buildings 6.4. Except as provided in the Building Code or to the extent an existing building is under construction or does not have an occupancy permit, when an existing building has been constructed before the enactment of this bylaw, the enactment of this bylaw is not to be interpreted as requiring that the building must be reconstructed and altered, unless it is expressly so provided by this or another bylaw, regulation or statute. 6.5. This bylaw applies if the whole or any part of an existing building is moved either within or into the City, including relocation relative to parcel lines created by subdivision or consolidation. Part 15 applies to building moves. 6.6. If an alteration is made to an existing building the alteration must comply with this bylaw and the Building Code and the entire building must be made to comply with this bylaw and the Building Code, but only to the extent necessary to addresses any new infractions in the remainder of the building as a result of the alteration. 6.7. If an alteration creates an addition to an existing building, the alteration or addition must comply with this bylaw and the Building Code and the entire building must be made to comply with this bylaw and the Building Code, but only to the extent necessary to address any new infractions introduced in the remainder of the building as a result of the alteration or addition. Building Bylaw No. 2021-21 Page 10 of 53 PART 7. PROHIBITIONS 7.1. A person must not commence or continue any construction, alteration, excavation, reconstruction, demolition, removal, relocation or change the use or occupancy of any building or structure, including other work related to construction (a) except in conformity with the requirements of the Building Code and this bylaw; and (b) unless a building official has issued a valid and subsisting permit for the work under this bylaw. 7.2. A person must not occupy or permit the occupancy of any building or structure or part of any building or structure (a) unless a subsisting occupancy inspection notice has been issued by a building official for the building or structure or the part of the building or structure; or (b) contrary to the terms of any permit issued or any notice given by a building official. 7.3. A person must not knowingly submit false or misleading information to a building official in relation to any permit application or construction undertaken pursuant to this bylaw. 7.4. Except in accordance with this bylaw, including acceptance of revised plans or supporting documents, a person must not erase, alter or modify plans and supporting documents after the same have been reviewed by the building official, or plans and supporting documents which have been filed for reference with the building official after a permit has been issued. 7.5. A person must not, unless authorized in writing by a building official, reverse, alter, deface, cover, remove or in any way tamper with any notice, permit or certificate posted or affixed to a building or structure pursuant to this bylaw. 7.6. A person must not do any work that is substantially at variance with the reviewed design or plans of a building, structure or other works for which a permit has been issued, unless that variance has been authorized in writing by a building official. 7.7. A person must not interfere with or obstruct the entry of a building official or other authorized official of the City on property in the administration of this bylaw. 7.8. A person must not construct on a parcel unless the civic address is conspicuously posted on the front of the premises or on a sign post so it may be easily read from the public highway from which it takes its address. 7.9. A person must not contravene an administrative requirement of a building official made under Section 8.6 or any other provision of this bylaw. 7.10. A person must not change the use, occupancy or both of a building or structure or a part of a building or structure without first applying for and obtaining a building permit under this bylaw. 7.11. A person must not cover or conceal any works required to be inspected under this bylaw without first obtaining written acceptance from a building official. Building Bylaw No. 2021-21 Page 11 of 53 7.12. A person must not continue any work if a Stop Work Order is posted by a building official other than the remedial actions required by the notice. 7.13. A person must not occupy a building, structure, or part of a building or structure if a Do Not Occupy Notice is posted by a building official. PART 8. POWERS OF A BUILDING OFFICIAL Administration 8.1. Words defining the authority of building officials are to be construed as internal administrative powers and not as creating a duty. 8.2. A building official may (a) administer this bylaw, but owes no public duty to enforce or administer this bylaw; (b) keep records of applications received, permits, notices and orders issued, inspections and tests made, and may retain copies of all digital, or hard copy papers and documents connected with the administration of this bylaw; (c) establish or require an owner to establish whether a method or type of construction or material used in the construction of a building or structure complies with the requirements and provisions of this bylaw and the Building Code; and (d) direct that tests of materials, equipment, devices, construction methods, structural assemblies or foundations be carried out, or that sufficient evidence or proof be submitted by the owner, or at the owner's sole expense, where such evidence or proof is necessary to determine whether the material, equipment, device, construction or foundation condition complies with this bylaw and the Building Code. Refusal and Revocation of Permits 8.3. A building official may refuse to issue a permit where in their opinion (a) the proposed work will contravene the requirements of the Building Code or the provisions of this or any other bylaw of the City, and must state the reasons in writing; (b) the results of the tests on materials, devices, construction methods, structural assemblies or foundation conditions are not satisfactory to the building official; or (c) the parcel referred to in the permit application does not (i) have vehicular access; or (ii) meet requirements of other City bylaws. 8.4. A building official may revoke a permit if, in their opinion, there is a violation of (a) a condition under which the permit was issued; Building Bylaw No. 2021-21 Page 12 of 53 (b) any requirement of the Building Code or of this or another bylaw of the City; (c) the permit was issued in error; (d) cancellation or termination of Homeowner Protection Office Registration occurs prior to finalization of permit; (e) the permit was issued on the basis of false or incorrect information; or (f) the results of any tests carried out pursuant are not satisfactory to the building official; (g) such permit revocation may be delivered by written notice to the owner. Right of Entry 8.5 Subject to Section 16 of the Community Charter, a building official may enter any property at any time to ascertain whether the requirements of this bylaw are being met, or if the building official has any reason to believe that an unsafe condition exists. Powers 8.6 Subject to applicable enactments, a building official may, by notice in writing, require (a) a person who contravenes any provision of this bylaw to comply with that provision within the time ordered; (b) an owner to stop work on a building or structure, or any part of a building or structure, if the work is proceeding in contravention of this bylaw, the Building Code, or any other enactment of the City or other applicable enactments, or if there is deemed to be an unsafe condition, and may enter any property to affix or post a stop work order in the prescribed form; (c) an owner to remove or prevent any unauthorized encroachment on a public parcel, a statutory right of way or easement, or a setback or yard required under an enactment; (d) an owner to remove any building or structure, or any part of a building or structure, constructed in contravention of a provision of this bylaw; (e) an owner to have work inspected by a building official prior to covering; (f) an owner to uncover and replace, at the owner's expense, any work that has been covered without inspection contrary to this bylaw or an order issued by a building official; (g) a person to cease any occupancy in contravention of a provision of this bylaw; (h) a person to cease any occupancy if any unsafe condition exists because of work being undertaken but not complete and where the building official has not issued a occupancy inspection notice for the work; (i) an owner to correct any unsafe condition; and Building Bylaw No. 2021-21 Page 13 of 53 (j) an owner to correct any work that contravenes this bylaw, the Building Code, or any other enactment. 8.7 Every reference to "owner" in Section 8.6 includes a reference to the owner's agent or constructor. 8.8 Every person served with a notice under this part must comply with that notice (a) within the time ordered, or (b) if no time is ordered, immediately. PART 9. OWNER'S RESPONSIBILITIES Owner's Obligations 9.1. Subject to Part 12 of this bylaw, every owner must apply for and obtain a permit, prior to (a) Construction or replacement of new buildings and structures; (b) Additions to buildings or structures; (c) Interior and exterior alterations of buildings and structures; (d) Construction of foundations for, and installation of, manufactured homes; (e) Installation of plumbing systems; (f) Alterations and additions to plumbing systems, including the installation of solar hot water systems; (g) Installation and alteration of fire protection sprinkler systems; (h) Installation of temporary buildings, including fabric covered structures; (i) Installation or alteration of mechanical exhaust and fire protection systems for commercial cooking equipment pursuant to NFPA 96 Ventilation Control and Fire Protection of Commercial Cooking Operations; (j) Installation or alteration of spray booths or spray room equipment pursuant to NFPA 33 and wood dust collection to systems to NFPA 664; (k) Construction, installation, or alteration of chimneys or fire places; (l) Installation of solid fuel burning appliances; (m) Construction, additions, or alterations of on-site services for manufactured home parks; (n) Construction, additions, or alterations of on-site services for campgrounds or recreation vehicle parks; 9.2. Every owner must Building Bylaw No. 2021-21 Page 14 of 53 (a) comply with the Building Code, the requirements of this bylaw and the conditions of a permit, and must not omit any work required by the Building Code, this bylaw or the conditions of a permit; (b) ensure that all permits, all plans and specifications and supporting documents on which a permit was based, all municipal inspection certificates, and all professional field reviews are available at the site of the work for inspection during working hours of the building official, and that all permits are posted conspicuously on the site during the entire execution of the work; and (c) prior to the issuance of a building permit, execute and submit to the City an owner's undertaking in the prescribed form, where required by the building official. 9.3. Every owner and every owner's agent, must carry out construction or have the construction carried out in accordance with the requirements of the Building Code, this bylaw and other bylaws of the City and none of the issuance of a permit under this bylaw, the review of plans and supporting documents, or inspections made be a building official or a registered professional shall relieve the owner, or his or her agent, from full and sole responsibility to perform the work in strict accordance with this bylaw, the Building Code and all other applicable codes, standards and enactments. 9.4. Every owner must allow a building official to enter any building or premises at any reasonable time to administer and enforce this bylaw. 9.5. Every owner to whom a permit is issued must, during construction, (a) post a civic address on the property so that it may be easily read from the public highway from which the property takes its address; (b) post the permit placard on the property so that it may be easily read from the public highway from which the property takes its address; (c) provide building officials with safe access to the work site and all areas requiring inspection. Damage to Municipal Works 9.6. Every owner to whom a permit is issued is responsible for the cost to repair any damage to municipal works or land that occurs during and arises directly or indirectly from the work authorized by the permit. 9.7. In addition to payment of the security deposit under City bylaws, every owner must pay to the City, within 30 days of receiving an invoice for same from the City and prior to Occupancy, the cost to repair any damage to public property or works located on public property arising directly or indirectly for which a permit was issued. Notice 9.8. Every owner must, at least 24 hours prior to commencing work at a building site, give written or online notice to a building official of the date on which the owner intends to begin such work. 9.9. Every owner must give written or online to a building official of any change in or termination of engagement of a registered professional, including coordinating registered professional, during construction, within 24 hours of when the change or termination occurs. Building Bylaw No. 2021-21 Page 15 of 53 9.10. If an owner or a registered professional terminates the engagement of the registered professional, including a coordinating registered professional, the owner must terminate all work under a building permit until the owner has engaged a new registered professional, including a coordinating registered professional, and has delivered to a building official new letters of assurance in the form of a Schedule A and or B as outlined in the Building Code. 9.11. Without limiting Sections 14.45 to 14.50, every owner must give at least 24 hours' online or written notice to a building official (a) of intent to do work that is required or ordered to be corrected during construction; (b) of intent to cover work that is required under this bylaw to be, or has been ordered to be inspected prior to covering; and (c) when work has been completed so that a occupancy inspection can be made. 9.12. Every owner must give notice in writing to a building official and pay the non-refundable fee set out in the City's Fees & Charges Bylaw immediately upon any change in ownership or change in the address of the owner, which occurs prior to the issuance of an occupancy permit. 9.13. Every owner must give such other notice to a building official as may be required by the building official or by a provision of this bylaw. 9.14. Every owner shall obtain, prior to the occupancy of a building or part thereof, written permission from the building official to occupy the building or part thereof, pursuant to Part 14. PART 10. OBLIGATIONS OF OWNER'S CONSTRUCTOR 10.1. Every constructor must ensure that all construction is done in compliance with all requirements of the Building Code, this bylaw and all other applicable codes, standards and enactments. 10.2. Every constructor must ensure that no excavation or other work is undertaken on public property, and that no public property is disturbed, no building or structure erected, and no materials stored thereon, in whole or in part, without first having obtained approval in writing from the appropriate authority over such public property. 10.3. For the purposes of the administration and enforcement of this bylaw, every constructor is responsible jointly and severally with the owner for all work undertaken. Building Bylaw No. 2021-21 Page 16 of 53 PART 11. REGISTERED PROFESSIONAL'S RESPONSIBILITIES Professional design and Field Review 11.1. The provision by the owner to the City of letters of assurance in accordance with the requirements of the Building Code shall occur prior to (a) the pre-occupancy site review coordinated by the coordinating registered professional or other registered professional for a complex building; or (b) an occupancy inspection for a simple building in circumstances where letters of assurance have been required in accordance with the requirements of the Building Code, in which case the owner must provide the City with letters of assurance in the form of Schedules C-A or C-B, as appropriate, as outlined in the Building Code. 11.2. If a registered professional provides letters of assurance in accordance with the Building Code, they must also provide proof of professional liability insurance to the building official. Requirement for a Registered Professional 11.3. The owner must retain a registered professional to provide a professional design and plan certification and letters of assurance in the form of Schedules A , B, C-A and C-B as referred to in the Building Code, in respect of a permit application (a) prior to the pre-occupancy site review coordinated by the coordinating registered professional or other registered professional for a complex building; or (b) prior to an occupancy inspection for a simple building in circumstances where letters of assurance have been required in accordance with the requirements of the Building Code, in which case the owner must provide the City with letter of assurance in the form of Schedules C-A or C-B, as appropriate, referred to in the Building Code; (c) foundation and excavation components of new simple buildings and additions greater than 55m2 to simple buildings in accordance with the Building Code; except where an unsafe condition may exist; (d) a building that is designed with common egress systems for the occupants and requires the use of firewalls in accordance with the Building Code; (e) prior to alterations to a building, or to structural component of a building described in paragraph (b); (f) for a building in respect of which the building official determines that site conditions, size or complexity so warrant in the interests of safety or persons or protection of property under the Building Code; (g) if the building envelope components of the building fall under Division B Part 3 of the Building Code, the building contains more than 5 ( five) dwellings, or if the building envelopes do not comply with the prescriptive requirements of Division B Part 9 of the Building Code; and Building Bylaw No. 2021-21 Page 17 of 53 (h) for a parcel of land on which a building or structure is proposed if the building official believes the parcel is or is likely to be subject to flooding (including high ground water), mud flows, debris flows, debris torrents, erosion, land slip, rock falls, subsidence or avalanche, and the requirements for a professional design is in addition to a requirement under Division 8 of Part 3 of the Community Charter (i) for a report certified by a professional engineer with experience in geotechnical engineering that the parcel may be used safely for the use intended; and (ii) that the plans submitted with the application comply with the relevant provisions of the Building Code and applicable bylaws of the City. 11.4. The building official may require any registered professional carrying out the professional design and field review required under Section 11.1 to 11.3 to provide evidence that they have experience and expertise in respect of the professional design and field review of the context and scope required and at the discretion of the building official, a peer review may be required prior to the acceptance of any design or field reviews conducted by a registered professional. 11.5. Any registered professional required by this bylaw to provide letters of assurance shall show proof of professional liability insurance at time of building permit application. PART 12. REQUIRED PERMITS 12.1. Subject to Part 12 of this bylaw, every owner must apply for and obtain a permit, prior to: (a) construction or placement of new buildings and structures; (b) additions to buildings and structures; (c) interior and exterior alterations of buildings and structures; (d) construction of foundations for, and installation of manufactured homes; (e) installation of plumbing systems; (f) alterations and addition to plumbing systems including the installation of solar hot water systems; (g) installation and alteration of fire protection sprinkler systems; (h) installation and alteration of fire alarm systems; (i) repair and alteration of fire separation assemblies; (j) installation of temporary buildings; including fabric covered structures; (k) installation or alteration of heating and ventilation systems for residential simple buildings; (l) installation or alteration of mechanical exhaust and fire protection systems for commercial cooking equipment pursuant to NFPA 96 Ventilation Control and Fire Protection of Commercial Cooking Operations; Building Bylaw No. 2021-21 Page 18 of 53 (m) installation or alteration of spray booths or spray room equipment pursuant to NFPA 33 and wood dust collection systems pursuant to NFPA 664; (n) construction, installation or alteration of chimneys or fireplaces; (o) installation of solid fuel burning appliances; (p) construction of retaining walls (i) over 1.2m in height, (ii) a sequence of retaining walls less than 1.2m in height but spaced less than two horizontal to one vertical, or (iii) in the opinion of the building official constitutes a potential unsafe condition; (q) the moving or relocating of new or existing buildings, including site construction; (r) construction or alteration of pools or pool fences; (s) change of occupancy classification for a building or part of a building; (t) construction of a new secondary or accessory suite; (u) demolition of buildings or structures; (v) installation of solar photovoltaic or passive hot water systems; and for (w) new or altered driveway access, sidewalk(s) and crossover(s) to a City highway. unless the works are the subject of another valid and subsisting building permit. PART 13. CONDITIONS OF PERMIT 13.1. A permit is required if work regulated under this bylaw is to be undertaken. 13.2. A building permit or an application for a building permit that is in process may not be transferred or assigned until the owner has notified the building official in writing, the building official has authorized the transfer or assignment in writing and the owner has paid the non-refundable fee required in the City's Fees and Charges Bylaw. The transfer or assignment of a building permit is not an extension of a building permit. 13.3. The review of plans and supporting documents and issuance of a building permit do not prevent the building official from subsequently requiring the correction of errors in the plans and supporting documents, or from prohibiting building construction or occupancy being carried on when in violation of this or another bylaw. 13.4. Neither the issuance of a permit under this bylaw, nor the acceptance or review of plans, drawings, specifications or supporting documents, nor any inspections made by or on behalf of the City will in any way Building Bylaw No. 2021-21 Page 19 of 53 (a) relieve the owner (and if the owner is acting through an agent, the agent of the owner) from full and sole responsibility to perform the work in respect of which the permit was issued in strict compliance with this bylaw, the Building Code, and all other applicable codes, standards and enactments; (b) constitute a representation, warranty, assurance or statement that the Building Code, this bylaw or any other applicable enactments respecting safety, protection, land use and zoning have been complied with; (c) or constitute a representation or warranty that the building or structure meets any standard of materials or workmanship. Alternative solutions 13.5 An owner who wishes to provide alternative solutions to satisfy one or more of the requirements of the Building Code or this bylaw must submit sufficient evidence, certified by a professional engineer, Architect or qualified person(s), to demonstrate that the proposed alternative solutions will provide the level of performance required by the Building Code or this bylaw and pay the fee specified in City's Fees and Charges Bylaw. PART 14. PERMIT REQUIREMENTS FOR SIMPLE AND COMPLEX BUILDINGS 14.1 Every owner shall apply for and obtain a permit before constructing, altering, repairing, demolishing or moving a building or structure. 14.2 The City shall provide application forms for all application processes required under this bylaw. Forms shall be adopted by the City through policy from time to time. Additional Permits 14.3 Where required, separate permits and inspections may be required in the following cases: (a) Building Move in accordance with Part 15; (b) Demolition or partial demolition of buildings in accordance with Part 16; (c) Fire Alarms in accordance with Part 17; (d) Mechanical Ventilation or Heating Systems in accordance with Part 18; (e) Plumbing and Fire Suppression Systems in accordance with Part 19; (f) Pool Permit in accordance with Part 20; (g) Retaining walls in accordance with Part 21; (h) Solar Panel Systems in accordance with Part 22; (i) Temporary buildings in accordance with Part 23. Building Bylaw No. 2021-21 Page 20 of 53 14.4 Prior to an application of a building permit, the owner must satisfy the following requirements or conditions: (a) the owner must apply for and obtain a development permit if the building or structure is in an area designated by the City's Official Community Plan as a development permit area; (b) the owner must ensure the proposed building or structure complies with all bylaws of the City, except to the extent a variance of a bylaw is authorized by a development permit, development variance permit or order of the Board of Variance; (c) an approving officer must have approved the subdivision plan that, once registered, would create the parcel on which the proposed building or structure will be constructed, and the subdivision plan must have been registered in the Land Title Office; (d) the owner must provide evidence to the building official showing that the person applying for the building permit is either the owner of the parcel that is the subject of the proposed building permit, or is the agent of the owner, in which case, the agent must provide the name and contact information of the owner; (e) the subject property or building shall be addressed in accordance with City bylaws; (f) the owner must show proof of application for registration or exemptions for home warranty for projects governed under the Home Protection Act; (g) if the parcel that is the subject of the building permit application is not intended to be connected to the City's sewage disposal system, the owner must apply for and obtain approval from the City and other applicable public authorities for an alternate private sewage disposal system; (h) if the parcel that is the subject of the building permit application is not intended to be connected to the City's water system, the owner must apply for and obtain approval from the City and other applicable public authorities for an alternate water supply system; (i) if the parcel that is the subject of the building permit application must provide design for on-site storm water drainage system unless the owner applies for and obtains approval from the City to connect the City's storm water system; (j) if all on-site and off-site works and services required by the City bylaws and other enactments have not been completed in accordance with the enactments, the owner must enter into a completion agreement with the City and deliver to the City letters of credit or cash security for completion of the works and service. Building Permit Applications for Complex buildings 14.5 An application for a building permit with respect to a complex building must: (a) be made in the prescribed form and signed by the owner, or a signing office if the owner is a corporation; Building Bylaw No. 2021-21 Page 21 of 53 (b) pay applicable application fee as prescribed with the City of Penticton Fees & Charges Bylaw; (c) be accompanied by the owner's acknowledgement of responsibility and undertaking in the prescribed form and signed by the owner, or a signing officer if the owner is a corporation; (d) ensure that plans submitted with a permit application bear the name, phone number, address and email address of the designer of the building or structure; (e) include a Building Code compliance summary including the applicable edition of the Building Code, such as without limitation the building is designed under Part 3 of the Building Code, major occupancy classification(s) of the building, building area, and building height, number of streets the building faces, and accessible entrances, work areas, washrooms, firewalls and facilities; (f) include a copy of a survey plan prepared by a British Columbia Land Surveyor except that the building official may waive the requirement for a survey plan, in whole or in part, where conditions warrant; (g) include a construction fire safety plan, material staging and trucking route plan; (h) include a site plan prepared by a registered professional showing: (all dimensions are to be shown in metric and imperial measurements) i. the bearing and dimensions of the parcel taken from the registered subdivision plan; ii. the legal description and civic address of the parcel; iii. the location and dimensions of existing and proposed statutory rights of way, easements and setback requirements, adjacent streets and lane names; iv. the location and dimensions of existing and proposed buildings or structures on the parcel; v. setbacks to the natural boundary of any lake, swamp, pond or watercourse; vi. north arrow; vii. if applicable, location of an approved existing or proposed private or other alternative sewage disposal system, water supply system, or storm water drainage system; viii. zoning compliance summary; ix. the location, dimensions and gradient of parking and parking access; x. proposed and existing setbacks to property lines; xi. natural and finished grades in geodetic elevations at building corners and significant breaks in the building plan and proposed grade around the building faces in order to ascertain foundation height; xii. on-site storm water management plan; xiii. first storey floor elevation in geodetic elevation; xiv. location, setbacks and elevations of all retaining walls, steps, stairs and decks; xv. line of upper floors and maximum building height in geodetic elevations; xvi. location and geodetic elevations of curbs, driveways, sidewalks, manholes, and service poles; xvii. location and depth of existing and proposed service connections; xviii. location of top bank and water courses; xix. access routes for firefighting; xx. accessible paths of travel from the street to the building; Building Bylaw No. 2021-21 Page 22 of 53 xxi. geodetic elevation of the underside of a wood floor system or the top of a finished concrete slab of a building or structure where the City's land use regulations or provincial flood mapping regulations establish siting requirements related to minimum floor elevation, and xxii. Where the parcel of land contains slopes in excess of 15%, and upon the request of the Building official, be accompanied by; 1. 0.5 meter contours of the existing ground surface of the parcel; 2. 0.5 meter contours of the proposed final grading 3. The elevation of all floor areas of the building, the location of all retaining, driveways, parking areas and other structures on the parcel; 4. The drainage provisions as outlined in the approved subdivision grading plans, if any, or the approved sedimentation control and storm water management plans. except that the building official may waive, in whole or in part, the requirements for a site plan, if the permit is sought for repair or alteration of an existing building or structure; (i) include floor plans showing the dimensions and uses and occupancy classification of all areas, including: the dimensions and height of crawl and roof spaces; the location, size and swing of doors; the location, size and opening of windows; floor, wall and ceiling finishes; fire separations; plumbing fixtures; structural elements; and stair dimensions; (j) include a minimum of two cross-sections through the building or structure in sufficient detail and locations to illustrate foundations, drainage, ceiling heights and constructions systems, including thermal and building envelope assemblies; (k) include elevations of all side of the building or structure showing finish details, roof slopes, windows, doors, natural and finished grade, spatial separations and ridge height to comply with the Building Code and to illustrate that the building or structure conforms with the City Zoning Bylaw and development permit area guidelines; (l) include cross-sectional details drawn at an appropriate scale and at sufficient locations to illustrate that the building conforms to the Building Code; (m) include all other requirements of Sections 2.2.1., 2.2.3, 2.2.4, 2.2.5, 2.2.6 and 2.2.9, Division C of the Building Code; (n) include copies of approvals required under any enactment relating to health and safety, including, without limitations, sewage disposal permits, highway access permits and Ministry of Health approvals; (o) include a letter of assurance in the form of Schedule A referred to in the Building Code, signed by the owner, or a signing officer is the owner is a corporation, and the coordinating registered professional; (p) include letter of assurance in the form of Schedule B referred to in the Building Code, each signed by such registered professionals as the building official or Building Code may require to prepare the design for and conduct field reviews of the construction of the building; (q) include two sets of drawings at a suitable scale of the design prepared by each registered professional containing the information set out in (g) to (m) of this section; Building Bylaw No. 2021-21 Page 23 of 53 (r) include fire flow calculations confirming adequate water supply for firefighting; (s) include all documentation required by City procedure, as amended from time to time. (t) Include Alternative Solution as per 13.5 14.6 In addition to the requirements of Section 14.5 of this bylaw, a building official may require the following to be submitted with a permit application for the construction of a complex building if the complexity of the proposed building or structure or siting circumstances warrant (a) site servicing and on-site storm water management drawings, including sufficient detail of off-site services to indicate locations at the property line, prepared and sealed by a registered professional, in accordance with the City's Bylaws; (b) a section through the site showing grades, buildings, structures, parking areas and driveways where any slopes on the subject parcel exceed 15%; and (c) any other information required by the building official or the Building Code to establish substantial compliance with this bylaw, the Building Code and other bylaws and enactments relating to the building or structure. Building Permit Applications for Simple buildings 14.7 An application for a building permit with respect to a simple building must (a) be made in the prescribed form and signed by the owner, or a signing officer if the owner is a corporation; (b) pay applicable application fee as prescribed with the City's Fees and Charges Bylaw; (c) be accompanied by the owner's acknowledgement of responsibility and undertaking in the prescribed form and signed by the owner, or a signing officer if the owner is a corporation; (d) include a copy of a title search for the relevant property made within 30 days of the date of the permit application; (e) ensure that plans submitted with a permit application bear the name, phone number, address and email address of the designer of the building or structure; (f) include a copy of a survey plan prepared by a British Columbia Land Surveyor except that the building official may waive the requirement for a survey plan, in whole or in part, where conditions warrant; (g) include a site plan showing: (all dimensions are to be shown in metric and imperial measurements) i) the bearing and dimensions of the parcel taken from the registered subdivision plan; ii) the legal description and civic address of the parcel; Building Bylaw No. 2021-21 Page 24 of 53 iii) the location and dimensions of existing and proposed statutory rights of way, easements and setbacks requirements, adjacent streets and lane names; iv) the location and dimensions of existing and proposed buildings or structures on the parcel; v) setbacks to the natural boundary of any lake, swamp, pond or watercourse; vi) north arrow; vii) if applicable, location of an approved existing or proposed alternative private or other sewage disposal system, water supply system or storm water drainage system; viii) the location, dimensions and gradient of parking and driveway access; ix) proposed and existing setbacks to property lines; x) natural and finished grades in geodetic elevations at building corners and datum determination points; xi) on-site storm water management; xii) first storey floor elevation in geodetic elevations; xiii) location, setbacks and elevations of all retaining walls, steps, stairs and decks; xiv) line of upper floors and maximum building height in geodetic elevations; xv) location and geodetic elevation of curbs, driveways, sidewalks, manholes and service poles; xvi) location and depth of existing and proposed service connections; xvii) location of top bank and water courses; xviii) access routes for firefighting; xix) accessible paths of travel from the street to the building; xx) zoning compliance summary; and xxi) the geodetic elevation of the underside of a wood floor system or the top of a finished concrete slab of a building or structure where the City's land use regulations or provincial flooding mapping regulations establish siting requirements related to minimum floor elevation, and xxii) where the parcel of land contains slopes in excess of 15%, and upon the request of the Building official, be accompanied by; a. 0.5 meter contours of the existing ground surface of the parcel; b. 0.5 meter contours of the proposed final grading; Building Bylaw No. 2021-21 Page 25 of 53 c. The elevation of all floor areas of the building, the location of all retaining, driveways, parking areas and other structures on the parcel; d. The drainage provisions as outlined in the approved subdivision grading plans, if any, or the approved sedimentation control and storm water management plans. except that for a simple building the building official may waive, in whole or in part, the requirements for a site plan if the permit is sought for the repair or alteration of an existing building; (h) include floor plans showing the dimensions and uses of all areas, including: the dimensions and height of crawl and roof spaces; the location, size and swing of doors; the location, size and opening of windows; floor, wall and ceiling finishes; plumbing fixtures; solar ready provisions, structural elements; and stair dimensions; (i) include a minimum of two cross-sections through the building illustrating foundations, drainage, ceiling heights and construction systems, including thermal and building envelope assemblies; (j) include elevations of all sides of the building showing finish details, roof slopes, windows, doors, the grade, the maximum building height line, ridge height, spatial separations and natural and finished grade to comply with the Building Code and to illustrate that the building or structure conforms with the City of Penticton Zoning Bylaw and Official Community Plan; (k) include cross-sectional details drawn at an appropriate scale and at sufficient locations to illustrate that the building or structure substantially conforms to the Building Code; (l) include copies of approvals required under any enactment relating to health and safety, including, without limitations, sewage disposal permits, highway access permits and Ministry of Health approvals; (m) include an excavation & storm water management plan design prepared by a registered professional in accordance with the Building Code; (n) include geotechnical letters of assurance, in addition to a required geotechnical report, if the building official determines that the site conditions so warrant; (o) include two sets of drawings at a suitable scale of design including the information set out in (f) to (i) of this section; (p) include a Building Code compliance summary including the applicable edition of the Building Code, such as, without limitation, the building is designed under Part 9 and compliance with article 2.2.2.1.(2), Division C of the Building Code; (q) Alternative Solution as per 13.5; and (r) include all documentation required by City procedures, as amended from time to time. 14.8 In addition to the requirements of Section 14.7 of this part, if a project involves (a) two or more buildings, the gross floor areas of which in the aggregate total more than 1000m2; Building Bylaw No. 2021-21 Page 26 of 53 (b) two or more buildings that will contain four or more dwelling units; or (c) otherwise if the complexity of the proposed building or structure or siting circumstances warrant, (d) a building official may require the following be submitted with a permit application for the construction of each simple building in the project: i) site servicing drawings, including sufficient detail of off-site services to indicate locations at the property line, prepared and sealed by a registered professional, in accordance with the City's Bylaws; ii) a construction fire safety, material staging and trucking route plan; iii) a section through the site showing grades, buildings, structures, parking areas and driveways; iv) a roof plan and roof height calculations in geodetic elevations; v) structural, electrical, plumbing, mechanical or fire suppression drawings prepared and sealed by a registered professional; vi) letters of assurance in the form of Schedule B referenced in the Building Code, signed by a registered professional; vii) any other information required by the building official or the Building Code to establish substantial compliance with this bylaw, the Building Code and other bylaws and enactments relating to the building or structure, and Site and Location Information 14.9 Without limiting Sections 14.5(g) or 14.7 (g) of this part, the building official may in writing require an owner to submit an up-to-date plan or survey prepared by a registered British Columbia Land Surveyor which contains sufficient information respecting the site and location of any building to (a) establish, before construction begins, that all the provisions of this bylaw in relation to this information will be complied with; (b) verify, on completion of the construction, that all provisions of this and other applicable bylaw have been complied with; (c) in relation to an existing building, substantiate its location, size, including appurtenances whether above, at or below ground level, relative to the site or its relationship to neighbouring grades; and (d) in relation to construction of a new building, or addition to an existing building, prior to the placement of concrete for foundations, show the elevation at proposed top of concrete on all building elevations and at all significant changes of elevation to substantiate its size, location and elevation, Building Bylaw No. 2021-21 Page 27 of 53 and every person served with a written requirement under this section must comply with this requirement. 14.10 An application for a permit may be refused when (a) Any of the requirements of this section have not been satisfied; (b) The proposed construction would contravene the requirements of the Building Code or the provisions of this or any other bylaw of the City; or (c) The applicant or owner has been notified of a violation of this or any other bylaw of the City with regard to construction, occupancy or use any building, structure or part thereof, and such violation has not been remedied. Building Permit Fee 14.11 Before receiving a building permit for a building or structure, the owner must first pay to the City (a) the building permit fee prescribed in the City's Fees and Charges Bylaw; and (b) any fees, fines, charges, levies or taxes imposed by the City and payable under an enactment at the time of issuance of the building permit. 14.12 The application fee shall be credited against the permit fee when the permit is issued. Valuation for Permit 14.13 The valuation of construction set out in the application for a permit shall be the total current monetary worth of all construction or work related to the building or structure, and shall include (a) site preparation and civil work including excavation and the use of hoisting, pile driving, compaction or erection devices; (b) all design documents, labour and fees involved in the design, investigative testing, consulting services, construction labour and management, even if provided by the owner, or donated voluntarily by others, contractor's profit and overhead, sales taxes and the construction insurance; and (c) all mechanical, electrical, plumbing, drainage and gas installations necessary for the carrying out of the construction to its completed form. 14.14 The building official may place a value on the construction or work for the purposes of determining applicable permit fees by using an appropriate method from the "Marshall Valuation Services" publications with the updated "current cost multipliers," or such universal source of calculating valuation, as the building official deems reasonable, practical and expedient. Security Deposit with Building Permit Application Building Bylaw No. 2021-21 Page 28 of 53 14.15 An applicant for a building permit must pay to the City, at the time of application, the following security deposit as prescribed within the City of Penticton Fees and Charges Bylaw for: (a) Building Moves; (b) Delayed Demolition permits; (c) Foundation only building permits for Complex projects; (d) Temporary building permits; and (e) Occupancy Deposit (Partial) 14.16 The security deposit sum set out in Section 14.15 of this part (a) covers the cost borne by the City to maintain, restore or replace any public works or public lands which are destroyed, damaged or otherwise impaired in the carrying out of the work referred to in any building permit held by the applicant; (b) covers the cost borne by the City to make the site safe if the permit holder abandons or fails to complete the work as designated on the permit; (c) serves as a security deposit to effect compliance with any condition under which the permit was issued. 14.17 The security deposit or applicable portion must be returned to the applicant (a) when the City is satisfied that no further damage to public works or public lands will occur; (b) when the inspections required by this bylaw are complete and acceptable to the building official; and (c) when the conditions or provisions of a provisional certificate of occupancy are completed to the satisfaction of the building official; only if the applicant has requested the return of the security. 14.18 Any credit greater than the amount of the security deposit used by the City for the purposes described in Part 14 will be returned to the permit holder unless otherwise so directed by the permit holder. Any amount in excess of the security deposit required by the City to complete corrective work to public lands, public works, or the site is recoverable by the City from the permit holder, the constructor or the owner of the property. 14.19 If the proposed work includes excavation or construction on lands within 3.0 meters of works or services owned by the City, the owner must deliver to the building official a signed agreement in a form prescribed by the City under which the owner acknowledges and agrees that any damage to municipal works or services arising from the construction associated with the building permit will be repaired by the owner at its expense and to the satisfaction of the City's Public Works Superintendent, and the owner must deposit with the City security in accordance with Sections 14.15 to 14.16. Building Bylaw No. 2021-21 Page 29 of 53 Permit Fee Refunds 14.20 No fee or part of a fee paid to the City may be refunded if construction of the building has started. 14.21 The building official may approve a refund of a fee or portion thereof only if plan checking has not commenced. 14.22 A building permit or other permit fee may be partially refunded as set out in the City bylaws, only if (a) the owner has submitted a written request for a refund; (b) the building official has certified a start has not been made on the construction of the building or structure; and (c) the permit has not expired. 14.23 A building permit or other permit fee is not refundable after the permit has been extended under Section 14.61 of this part. 14.24 Except as otherwise provided in this bylaw, all fees and charges paid or payable under this bylaw shall be non-refundable. Design Modification 14.25 If an issued building permit or other permit is active and the owner proposed modification to the building design whereby the value of the work does not increase or the value of the work decreases, the owner must pay to the City a building permit fee based on the plan review hourly rate set out in City's Fees and Charges bylaw. Construction Before Permit Issued 14.26 The building permit or other permit fee is doubled for every permit application if construction commenced before the building official issued a permit, to a maximum of $10, 000. 14.27 If construction has advanced without inspection to a stage where compliance with this bylaw or other applicable bylaws or enactments cannot be readily determined, the building official may require tests and investigations by an independent agency at the owner's expense to establish compliance or provide recommended remedial measures to be taken, prior to the issuance of a permit. Expiration of Application for a Permit 14.28 A building permit application expires 90 days from the date of an application unless the permit is not issued or the delay is caused the City. Cancellation of Application 14.29 When an application is cancelled (a) the application fee is forfeited to the City; and Building Bylaw No. 2021-21 Page 30 of 53 (b) the applicant will be notified in writing confirming cancellation of application and that plans and related documents submitted with the application will be held for a period of 30 days, then destroyed. Confirmation of Permit Application Reviews 14.30 Upon receiving a completed permit application, the building official shall provide written confirmation that the City will either issue a permit, or refuse issuance with reasons for the denial within: (a) 21 working days for Simple building permit applications; or (b) 45 working days for Complex building permit applications. 14.31 If the denial notice is not provided within the timeframes outlined in Section 14.30 (a) or (b), the permit fee is to be reduced as prescribed within the City's Fees and Charges Bylaw. Issuance of a Building Permit 14.32 Each building, structure or part thereof constructed on a site requires a separate permit and shall be assessed a separate permit fee based on the value of that building, structure or part thereof. 14.33 If (a) a completed application in compliance with Sections 14.4 and 14.5 to 14.6 or 14.7 to 14.8, including all required supporting documentation, has been submitted; (b) the owner has paid all applicable fees set out in Sections 14.15, 14.16 and 14.17 to 14.23 of the part and the City bylaws; (c) the owner or his representative has paid all charges and met all requirements imposed by any other statute or bylaw; (d) the owner has retained a professional engineer or geoscientist if required under this bylaw; (e) the owner has retained an architect if required under this bylaw; (f) no covenant, agreement, resolution or regulation of the City requires or authorizes the permit to be withheld; and (g) the owner has provided a hazardous materials assessment and remediation compliance letter for additions or alterations to buildings constructed prior to 1992. the building official must issue the permit, in the prescribed form, for which the application is made, and the date of issuance is deemed to be the date the City gives written notice to the owner that the permit is ready to be picked up by the owner. Compliance with the Homeowner Protection Act Building Bylaw No. 2021-21 Page 31 of 53 14.34 If the application in respect of a building that includes, or will include, a residential occupancy governed by the Homeowner Protection Act, the building permit must not be issued unless the owner provides evidence under Section 30(1) of the Homeowner Protection Act, that the proposed building (a) is covered by home warranty insurance; and (b) the constructor is a licensed "residential builder" as defined in that Act. 14.35 Section 12.30 of this part does not apply if the owner is not required to be licensed and to obtain home warranty in accordance with Sections 20(1) or 30(1) of the Homeowner Protection Act. 14.36 Every permit is issued subject to the owner and constructor maintaining compliance with the Homeowner Protection Act and negotiations under it during the term of the permit. Issuance of Partial Permits 14.37 The building official may issue a permit for a portion of a building or structure before the design, plans and supporting documents for the entire building or structure have been reviewed provided sufficient information has been provided to the City to demonstrate to the building official that the portion authorized to be constructed substantially complies with this and any other applicable City bylaws and the permit fee applicable to that portion of the building or structure has been paid. Notwithstanding the issuance of the permit, the requirements of this bylaw shall apply to the remainder of the building or structure as if the permit for the portion of the building or structure had not been issued. 14.38 If a site has been excavated under a building permit for excavation issued under this bylaw and a building permit is not subsequently issued or a subsisting building permit has expired under Section 14.41, but without the construction of the building or structure for which the building permit was issued having commenced, the owner must fill in the excavation to restore the original gradients to the site within 60 days of being served notice by the City to do so. 14.39 If a building permit has expired and partial construction has progressed, with no extension requested of the building official under Section 14.42, permanent type fencing with privacy screen complying with the City's Zoning Bylaw, must be erected around the building site for protection to the public. Sanitary Facilities during construction 14.40 During the time a building permit has been issued and remains valid under this bylaw, the owner must provide on the parcel of land in respect of which the permit has been issued, sanitary facilities for the disposal of human waste from individual persons who enter on the parcel in relations to the work referred to in the permit, which facilities must be accessible and unlocked when not occupied while work is being carried out on the parcel under this bylaw, and every sanitary facility that is not connected to a (a) sanitary sewer; or (b) septic disposal system approved under the Health Act, by plumbing that complies with the Building Code and this bylaw, must be provided, at all times the facility is required under this bylaw, with toilet paper, a locking door for privacy, and ventilation, and must be kept in sanitary condition without leaking beyond the facility and without overflowing within Building Bylaw No. 2021-21 Page 32 of 53 the facility. Such facilities must be located so as not to create a nuisance to neighbouring parcels or highways. Inspections for Simple buildings 14.41 Despite the requirement for the building official's acceptance of the work outlined in Section 14.48, if a registered professional provides letters of assurance, the City will rely solely on field reviews undertaken by the registered professional and the letters of assurance submitted pursuant to this bylaw as assurance that the aspects of the construction referenced by those letters of assurance substantially conform to the design, plans and specifications and that the construction complies with the Building Code, this bylaw and other applicable enactments respecting safety. Copies of all field reviews must be submitted to the City. 14.42 Despite Section 14.45 of this part, a building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professionals. 14.43 A building official may attend periodically at the site of the construction of simple buildings or structures to ascertain whether the work is being carried out in substantial conformance with the Building Code, this bylaw and any other applicable enactments concerning safety. 14.44 For all work in respect of simple buildings the owner must give at least 24 hours' notice to the City when requesting an inspection and must obtain an inspection and receive a building official's written acceptance of the following aspects of the work prior to concealing them: (a) Pre-construction on-site orientation - site review when required by the building official; (b) Footings/excavation - after preparation for footings are complete, prior to placement of concrete; (c) Foundation - after forms for foundation walls are completed, location certificate submitted and reviewed by a building official, prior to placement of concrete; (d) Dampproofing/draintile/roof drains - after damp-proofing and foundation drainage are in place, prior to backfilling; (e) Sewer services - sanitary sewer service, after sewer line is in place and under test, prior to backfilling; (f) Domestic water service - after the water service lines are in place and water has been turned on, prior to backfilling; (g) Plumbing under-slab - plumbing and underground fire suppression supply lines, prior to covering; (h) Foundation/Slab Insulation - prior to backfilling foundation walls or pouring slabs where required insulation would be covered (i) Radon/Soil Gas Control - after slab preparation for soil gas requirements, the preparation of ground, including ground cover when required, perimeter insulation of inside of concrete foundation walls are in place, prior to covering; Building Bylaw No. 2021-21 Page 33 of 53 (j) Plumbing Rough-in - installation of rough-in plumbing, on-site constructed tubs or showers and tub or shower trap tests when complete and under test, prior to covering; (k) installation of mechanical ventilation and heating systems, including solar ready installations prior to covering; (l) Framing - framing, sheathing, fire stopping, bracing, with installation of chimney and ductwork, rough wiring, rough plumbing, rough heating, gas venting, exterior doors and windows, but prior to the installation of insulation, interior finishes, sheathing paper or exterior finishes which would conceal such work; (m) Fire Separations/fire blocking - installation of required fire separations prior to covering (n) Insulation Vapour/Air Barrier - insulation, air and vapour barrier, after all insulation and vapour barrier is in place but prior to interior finish being applied which conceal the work; (o) Plumbing Final - all plumbing requirements for occupancy; and (p) Occupancy / Completion - after the health and safety aspects of the work and the conservation, GHG emissions reduction and accessibility aspects of the work when the building or structure is substantially complete, ready for occupancy but prior to occupancy. 14.45 Where required, additional inspections may be required in the following cases: (a) Retaining walls shall be inspected in accordance with Section 21 of this bylaw; (b) Moving of building shall be inspected in accordance with the requirements of Section15 of the bylaw; (c) Swimming pools and fences shall be inspected upon completion and prior to filling the pool with water pursuant to Section 20 of this bylaw; (d) On-site services shall be inspected in accordance with Section 19 and any other inspection that may be required pursuant of this bylaw; (e) Manufactured home parks, campgrounds and RV parks shall require inspections pursuant to Section 23 of this bylaw; 14.46 A building official will only carry out an inspection under Section 14.44 if the owner or the owner's agent has requested the inspection online or in writing in accordance with this bylaw. 14.47 No person may conceal any aspect of the work referred to in Section 14.44 of this bylaw until a building official has accepted it in writing. Complex building Commissioning 14.48 For work in respect of complex buildings, the owner must (a) give at least 48 hours' online or written notice to the City when requesting a preconstruction meeting with the building official prior to the start of construction, and the owner or his or her Building Bylaw No. 2021-21 Page 34 of 53 representative must ensure that the coordinating registered professional, the constructor, as well as representatives of major trades, are in attendance; (b) give at least 48 hours' online or written notice to the City when requesting a pre-occupancy coordinated by the coordinating registered professional or other registered professional to have the owner, the constructor, and the registered professionals demonstrate to the building official and City Fire Department the compliance with the health and safety aspects of the work, the coordination and integration of the fire and life safety system, applicable City requirements and other enactments respecting safety and the conservation, GHG emissions and accessibility aspects of the work; and (c) cause the coordinating registered professional, at least 48 hours prior to the pre-occupancy coordinated site review coordinated by the coordinating registered professional, to deliver to the building official the Confirmation of Required Documentation described in the prescribed form, complete with all documentation in a hard covered three ring binder and in digital pdf format on a memory stick. Stop Work Orders 14.49 The building official may direct the immediate suspension or correction of all or a portion of the construction on a building or structure by attaching a stop work order notice in the prescribed form on the premises when it is found that the work is not being performed in accordance with the requirements of the Building Code, any applicable bylaw of the City or the applicable provisions of the Homeowner Protection Act. 14.50 The coordinating registered professional may request, in writing, that the building official order the immediate suspension or correction of all of a portion of the construction on a building or structure by attaching a stop work order notice on the premises. The building official must consider such request and, if not acted upon, must respond, in writing, to the coordinating registered professional and give reasons. 14.51 If a registered professional's services are terminated, the owner must immediately stop any work that is subject to his or her design or field review and the building official is deemed to have issued a stop work order under Section 14.49. 14.52 The owner must immediately, after the posting of a notice under Section 14.49, secure the construction and the lands and premises surrounding the construction in compliance with the safety requirements of every statute, regulation or order of the Province or of a Provincial agency and of every applicable bylaw of the City. 14.53 Subject to 14.49, no work other than the required remedial measures may be carried out on the parcel affected by the notice referred to in Section 14.49 until the stop work order notice has been removed by the building official. 14.54 The notice referred to in Section 14.49 must remain posted on the premises until that which is contrary to the enactments has been remedied. Building Bylaw No. 2021-21 Page 35 of 53 Do Not Occupy Notice 14.55 If a person occupies a building or structure or part of a building or structure in contravention of this bylaw, a building official may post a Do Not Occupy Notice in the prescribed form on the affected part of the building or structure. 14.56 If a notice is posted under Section 14.55, the owner of a parcel on which a Do Not Occupy Notice has been posted, and every other person, must cease occupancy of the building or structure immediately and refrain from further occupancy until all applicable provisions of the Building Code and this bylaw have been substantially complied with and the Do Not Occupy Notice has been rescinded in writing by a building official. Inspection and Other Fees 14.57 In addition to the fees required under other provisions of this bylaw, the owner must pay the non- refundable fee set out in City bylaws for (a) a second and each subsequent re-inspection where it has been determined by the building official that due to non-compliance with the provisions of this bylaw or due to non-complying work, more than one visit is required for any required inspection; (b) a special inspection during the City's normal business hours to establish the condition of a building, or if an inspection requires special arrangements because of time, location, or construction techniques; and (c) an inspection required under this bylaw which cannot be carried out during the City's normal business hours. Permit Expiration 14.58 Every permit is issued on the condition that the permit expires and the rights of the owner under the permit terminate if (a) the work authorized by the permit is not commenced within 180 days from the date of issuance of the permit unless extended under Part 12; (b) work is discontinued for a period of 180 days; or (c) the work is not completed within 24 months for Simple and Complex projects, unless otherwise specified by the Building official, of the date of issuance of the permit. 14.59 Where a permit has expired, the work shall cease and the construction shall be removed, unless a new permit application is made within 90 days of the expiry date of the permit. 14.60 Where a permit has expired, and a new permit application is made, all construction shall comply with this bylaw, the Building Code and any other City bylaws and enactments in force at the time of the new application. Building Bylaw No. 2021-21 Page 36 of 53 Permit Extension 14.61 Where construction has not commenced within 180 days from the date the permit was issued, the building official may extend the permit for a period not more than 180 days from the date of expiry of the original permit, but the permit shall then be void if construction has not started within 360 days from the original date of the issuance of the permit, if (a) application for the extension is made at least 30 days prior to the date of permit expiration, and (b) the non-refundable fee set out in the City's Fees and Charges Bylaw has been paid. 14.62 Where construction has commenced and has not been discontinued or suspended for a period of more than 180 days, the building official may extend the expiry date for the permit for a period of time as the building official considers reasonable to a maximum of one year, where the building official is satisfied that there exists a reasonable excuse for the delay in completing construction, if (a) application for the extension is made at least 30 days prior to the date of permit expiration; and (b) the non-refundable fee set out in the City's Fees and Charges Bylaw has been paid. Building Permit Cancellation by Owner 14.63 A building permit, or a building permit application, may be cancelled by the owner, or his or her agent, on delivery of written notification of the cancellation to the building official. 14.64 On receipt of the written cancellation notice, the building official must mark on the application, and a permit if applicable, the date of cancellation and the word "cancelled". 14.65 If the owner, or his or her agent, submits changes to an application after a permit has been issued and the changes, in the opinion of the building official, substantially alter the scope of work, design or intent of the application in respect of which the permit was issued, the building official may cancel or amend the permit and mark on the permit the date of cancellation or amendment and the work "cancelled" or "amended". 14.66 If a building permit application or permit is cancelled, and construction has not commenced under the permit, the building official must return to the owner any fees deposited under the City's Fees and Charges Bylaw. Partial Occupancy 14.67 Upon written request by the owner/agent, a building official may issue a partial occupancy inspection notice for a portion of a building or structure under construction when (a) that portion of the building or structure is self-contained and provided with essential services respecting health and safety aspects of the work, and if applicable, accessibility, GHG emissions and conservation; and (b) the requirements set out in Section 14.71 have been met with respect to it, and Building Bylaw No. 2021-21 Page 37 of 53 (c) security deposit fees are paid as prescribed by the City of Penticton Fees and Charges Bylaw. 14.68 The owner, developer or builder shall ensure that no unsafe condition exists or will exist resulting from the work being undertaken or not completed. 14.69 The building official may withhold an occupancy permit until the building, structure or part thereof complies with this bylaw, the Building Code and any other applicable bylaws or enactments. 14.70 The building official may revoke an approval for partial occupancy for failure to comply with any conditions of the approval. Occupancy 14.71 No person may occupy a building or structure or part of a building or structure until an occupancy inspection notice has been issued by a building official for (a) occupancy of a building or structure or part thereof after completion of construction; or (b) any change of class of occupancy of any building or structure or part thereof. 14.72 An occupancy inspection notice will not be issued unless (a) all letters of assurance have been submitted when required in accordance with this bylaw; (b) all aspects of the work requiring inspection and acceptance pursuant to Sections 14.41 to 14.47 and 14.48 of this bylaw have both been inspected and accepted or the inspections and acceptance are not required in accordance with this bylaw; (c) the owner has provided to the City a building survey prepared by a British Columbia Land Surveyor showing the building height, size, location and elevation determined in accordance with the City's land use regulations; (d) all other documentation required under applicable enactments has been delivered to the City; (e) where any of the requirements for life and fire safety have been deemed to be satisfied by an alternative solution pursuant to provisions of the Building Code, the owner shall submit to the building official, prior to use or occupancy of the building or structure, certification Qualified Person(s) responsible the alternative solution, that the construction substantially complies with the requirements set out in the alternative solution report. 14.73 When a registered professional provides letters of assurance in accordance with this bylaw, the City will rely solely on the letters of assurance when issuing a certificate authorizing occupancy as assurance that the items identified on the letters of assurance substantially comply with the design, the Building Code, this bylaw and other applicable enactments respecting safety. Completion 14.74 A Completion inspection will stand for projects such as retaining walls, pools, solar panels, mobile- modular homes, and demolition permits. Building Bylaw No. 2021-21 Page 38 of 53 PART 15. BUILDING MOVE PERMIT 15.1 Without limiting Section 6.3 of this bylaw, no person shall relocate a manufactured home, structure, building or part thereof into the City or from one property to another within the City unless the owner or agent has first obtained a building permit for that purpose as provided for in this bylaw. Application Requirements 15.2 An application for a building permit with respect to a building move permit must: (a) be made in the prescribed form and signed by the owner, or a signing officer if the owner is a corporation; (b) pay applicable application fee as prescribed in the City of Penticton Fees and Charges Bylaw; (c) provide a site plan showing: i) the location of the proposed building and any accessory buildings in relation to existing buildings on the property in the form of a site plan drawn to scale; ii) distances from the proposed building and all existing buildings to the property boundaries; (d) drawings showing construction details for on-site construction as outlined in Section 14.5 or 14.7; and (e) written confirmation from the manufactured home park owner or authorized representative. 15.3 The relocation of manufactured homes factory constructed and assembled more than 30 years prior to the date of permit application is prohibited. The year, make, model and serial numbers shall be determined by the CSA Rating Plate and/or the Province of British Columbia Mobile home Registry. 15.4 A building official may require a report from an accredited restoration company or registered professional with experience in environmental engineering stating that there are no environmental issues or hazards regarding health and safety to occupants prior to issuing a building permit to relocate a manufactured home, mobile home or other building. 15.5 Where a manufactured home or mobile home is less than five years old, the building evaluation may be waived by the building official. Permit Issuance 15.6 The building official may issue a permit for construction involved in the moving of any building, structure or part thereof into or within the City when the owner has (a) finalized disconnection of services; (b) finalized any outstanding taxes owing and utility billing accounts to the City; (c) have approval for safe route transport in the form of Schedule G as prescribed by the City's Public Works department; Building Bylaw No. 2021-21 Page 39 of 53 (d) provided a hazardous assessment and clearance letter for the demolition of any existing on-site construction for buildings constructed prior to 1992, and (e) deposited with the City a security deposit as prescribed within the City's Fees and Charges Bylaw. Completion Conditions 15.7 All construction including relocations, alterations and additions for relocated manufactured homes, mobile homes or other buildings shall be completed with 180 days of the date the permit was issued. 15.8 If the owner does not move the building, structure or part thereof for which a permit is issued and complete construction within the time specified in Section 15.7, the building official may notify the owner in writing and direct the owner to complete that work within 30 days from the date of the notice. 15.9 If the work is not completed within the 30 days, the City or its agent may enter, clean and tidy the site at the expense of the owner and the costs shall be deducted from the security deposit. 15.10 If the building, structure or part thereof to be moved is located on a property in the City, then the property must be returned to a safe, clean and tidy condition within 120 days from the date of issuance of the permit. PART 16. DEMOLITION PERMITS 16.1 Without limiting Section 6.3 of this bylaw, a person must not demolish or partially demolish a building or structure without making application and receiving a valid building permit. Application Requirements 16.2 An application for a building permit with respect to a demolition permit must (a) be made in the prescribed form and signed by the owner, or a signing officer if the owner is a corporation; (b) pay applicable application fee as prescribed in the City of Penticton Fees and Charges Bylaw; (c) provide a site plan showing all buildings and structures and servicing locations; (d) provide vacancy date; (e) provide a hazardous materials assessment and remediation clearance letter for buildings constructed prior to 1992; (f) pay capping fees as set out in the City's bylaws governing water, electrical and sewer utilities; and (g) ensure that all municipal services and other services are capped and terminated at the property line in a City standards. Building Bylaw No. 2021-21 Page 40 of 53 Demolition sites 16.3 The following items shall be required at demolition sites to the satisfaction of the building official: (a) the demolition of buildings and structures shall be in accordance with Part 8 of the Building Code "Safety Measures at Construction and Demolition Sites"; (b) all construction material and debris, including concrete foundations and septic tanks are to be removed from the site; (c) all services and utilities are to be disconnected at the property lines; (d) the site shall be left in a clean and tidy condition within 90 days from the date of issuance of the demolition permit; (e) should demolition not have commenced by the 90 day expiry date the building official may at his or her discretion cancel the permit by written notification. There shall be no refund for the demolition inspection permit and where applicable the security deposit shall be returned; (f) any request to extend the 90 day time limit shall be received 30 days prior to the date of expiry. The request shall be in writing from the owner or their agent and approved in writing by the building official; and (g) where required for industrial and commercial demolition sites the Environmental Management Act shall apply. Delayed Demolition Requests 16.4 Upon written request by the owner, a demolition permit may be issued without service disconnects or hazardous materials remediation for a period of up to 180 days. Security for Delayed Demolitions 16.5 Security deposits for demolition permits shall be required for all delayed demolitions of buildings or structure requiring a permit in an amount prescribed within the City of Penticton Fees and Charges Bylaw. (a) the security deposit shall be held by the City until the site is restored to a safe and tidy condition to the satisfaction of the building official; (b) if the owner fails to leave the site in a clean and tidy condition to the satisfaction of the building official with the 90 day time limit the City or its agent may enter, clean and tidy the site at the expense of the owner and costs shall be deducted from the security deposit; (c) if the security deposit is insufficient to cover the costs of tidying and cleaning the site the owner shall within 30 days of invoice from the City pay the balance of the costs over the amount of the security deposit; and (d) if the costs are unpaid on the 31st day of December in the year on which the demolition occurred the costs shall be added to and form part of the property taxes payable as taxes in arrears. Building Bylaw No. 2021-21 Page 41 of 53 PART 17. PART 17: FIRE ALARM PERMITS 17.1 Without limiting Section 6.3 of this bylaw, a person must not install, replace or alter a fire alarm system without making application and receiving a valid building permit. Application Requirements 17.2 An application for a fire alarm permit with respect to any occupancy must (a) be made in the prescribed form and signed by the owner, or a signing officer if the owner is a corporation; (b) pay applicable application fee as prescribed with the City of Penticton Fees and Charges Bylaw, and (c) two (2) sets design drawings and specifications prepared by a registered professional along with letters of assurance. Professional design and Commissioning 17.3 The design, installation, commissioning and maintenance shall conform to: (a) the B.C. Building Code; and (b) all relevant standards of the National Fire Protection Agency, (NFPA), pertaining to fire alarm systems. 17.4 Where a permit is required, no engineered system shall be put into use until it has been tested and accepted by the registered professional who is responsible for its design, as applicable. PART 18. MECHANICAL VENTILATION AND HEATING PERMITS 18.1 Without limiting Section 6.3 of this bylaw, a person must not install, replace or alter a mechanical ventilation or heating system without making application and receiving a valid building permit. Application Requirements 18.2 An application for a mechanical permit with respect to a residential occupancy for Simple buildings must (a) be made in the prescribed form and signed by the owner, or a signing officer if the owner is a corporation; (b) pay applicable application fee as prescribed in the City of Penticton Fees and Charges Bylaw; (c) provide heat load worksheet, appliance selection worksheet, and ventilation checklist. 18.3 An application for commercial cooking system, spray booth operation or wood dust collection system permit shall (a) be made in the prescribed form and signed by the owner, or a signing officer if the owner is a corporation; Building Bylaw No. 2021-21 Page 42 of 53 (b) pay applicable application fee as prescribed in the City of Penticton Fees and Charges Bylaw; (c) two (2) sets design drawings, prepared by a registered professional along with letters of assurance. Design Standards 18.4 The design, installation and maintenance for commercial cooking system, spray booth operation or wood dust collection system shall conform to: (a) the B.C. Building Code, Division B, Part 6 Heating and Ventilation and Air-conditioning; (b) the B.C. Building Code, Division B, Part 3, Section 3.2.5 Provisions for Fire Fighting; and (c) all relevant standards of the National Fire Protection Agency, (NFPA), pertaining to fire suppression systems. Inspections and Commissioning 18.5 Where a mechanical and ventilation system has been installed or altered under permit for simple buildings or residential use, an inspection shall be requested before: (a) the system is covered up; or (b) the system is used. 18.6 Where a mechanical system has installed or altered under permit for a commercial kitchen, spray booth or wood dust collection system, it shall not be put into use until it has been tested and accepted by the registered professional who is responsible for its design and installation, as applicable. PART 19. PLUMBING AND FIRE SUPPRESSION PERMITS 19.1 Without limiting Section 6.3 of this bylaw, a person must not install, replace or alter a plumbing or fire suppression system making application and receiving a valid building permit. Application Requirements 19.2 An application for a plumbing or fire suppression permit shall (a) be made in the prescribed form and signed by the owner, or a signing officer if the owner is a corporation; (b) pay applicable application fee as prescribed in the City of Penticton Fees and Charges Bylaw; (c) provide two (2) sets of isometric drawings where works are not performed by a qualified plumber for single family dwellings projects; or (d) provide two (2) sets drawings including design drawings, including storm water management systems, prepared by a registered professional along with letters of assurance. 19.3 The design, installation and maintenance of plumbing and fire suppression systems shall conform to: Building Bylaw No. 2021-21 Page 43 of 53 (a) the B.C. Plumbing Code; (b) the B.C. Building Code, Division B, Part 3, Section 3.2.5 Provisions for Fire Fighting; and (c) all relevant standards of the National Fire Protection Agency, (NFPA), pertaining to fire suppression systems. Inspections and Commissioning 19.4 Where a plumbing system has been installed or altered under permit for a simple building, an inspection shall be requested before: (a) the system is covered up; or (b) the system is used. 19.5 Where a plumbing system or fire suppression system has been installed or altered under permit for a complex building it shall not be put into use until it has been tested and accepted by the registered professional who is responsible for its design, as applicable. PART 20. POOL PERMITS 20.1 Without limiting Section 6.3 of this bylaw, a person must not construct, or structurally repair, a pool without making application and receiving a valid building permit. Application Requirements 20.2 An application for a building permit with respect to a pool permit must: (a) be made in the prescribed form and signed by the owner, or a signing officer if the owner is a corporation; (b) pay applicable application fee as prescribed in the City's Fees and Charges Bylaw; (c) provide a site plan showing the location and distances of the proposed pool and any accessory buildings in relation to existing buildings on the property; (d) construction details for the pool and the proposed method of enclosure of the pool area; and (e) approval of design from the Local Health Authority having jurisdiction, if the pool is accessible for public use. Professional design 20.3 In accordance with Section 11.3 of this Bylaw, professional design and field reviews may be required, subject to the complexity of the design and the condition of soils where the pool is to be located. Building Bylaw No. 2021-21 Page 44 of 53 Fencing 20.4 A swimming pool, including a spa or hot tub must be enclosed within a fence constructed without footholds or grips that children may use to climb into the enclosed area, having a minimum height of 1.22m and no openings greater than 100mm at their greatest dimension. Where the access to the swimming pool is from a dwelling located on the same property as the swimming pool, the access may be directly from the dwelling. 20.5 The fence or equivalent barrier referred to in Section 20.4 shall be of chain link type material, provided the openings do not exceed five centimetres (5 cm), solid material with a flat vertical surface, or vertically oriented material. 20.6 A swimming pool fence or equivalent temporary barrier shall be in place, inspected and approved prior to placing the water in a pool. 20.7 Fences or barriers for swimming pools are not required on properties zoned Agricultural or Rural Residential, as established by the City of Penticton Zoning Bylaw, where the pool is located forty-five metres (45 m) or more from the nearest property line Pool Gate 20.8 Access through a fence enclosing a swimming pool, spa or hot tub must be only through a self-closing and self-latching gate designed and constructed or installed so as to cause the gate to return to a closed position when not in use and secured by a latch located on the swimming pool, spa or hot tub side of the gate. 20.9 All openings or gates in the fence or barrier shall be locked closed when not in use. Spa or Hot Tub Lid 20.10 In lieu of a fence, a spa or hot tub may be covered with a locking cover, which would prevent unauthorized access to the water. Above Ground Pools 20.11 A swimming pool which is located above ground and has vertical sides of at least 1.2m may be protected from access by fencing the access ladder to limit access, with a child resistant self-closing and self-latching gate through the fence. Maintenance 20.12 A person may not use or occupy a swimming pool, including a spa or hot tub unless the owner or occupier of property on or in which a pool, spa or hot tub is located maintains every fence or cover required under Sections 20.4 to 20.11 in good order, and without limitation maintains and repairs in good order at all times all sagging gates, loose parts, torn mesh, missing materials, worn latches, locks or broken or binding members. Leaks or Other Failures Building Bylaw No. 2021-21 Page 45 of 53 20.13 A person may not obtain a valid and subsisting building permit for or use or occupy a pool without first delivering to the building official at the time of the building permit application an opinion of a registered professional that the design of the pool will not cause or result in leaks or other failures of the pool. Drainage 20.14 Drainage from pools must be contained and disposed of on the same property as the pool is located and discharged to ground where practical to do so. Public Pools 20.15 Pools intended for public use shall not be occupied until an Operating Permit for the pool has been issued by the Local Health Authority. PART 21. RETAINING WALLS AND GRADES 21.1 Without limiting Section 6.3 of this bylaw, a person must not construct, or structurally repair, a retaining wall without a valid building permit. Application Requirements 21.2 An application for a building permit with respect to a retaining building permit must (a) be made in the prescribed form and signed by the owner, or a signing officer if the owner is a corporation; (b) pay applicable application fee as prescribed in the City of Penticton Fees and Charges Bylaw; (c) provide a site plan showing all buildings and structures and servicing locations. Professional design and Permit closure 21.3 A registered professional shall undertake the design and conduct field reviews of the construction and drainage of a retaining structure; (a) greater than 1.2m in height; or (b) where a sequence of walls are located closer than 2 horizontal to 1 vertical. (c) where site drainage is impacted as determined by the City; (d) where other geotechnical concerns exist as determined the City; or (e) where the retaining wall is supporting another building or structure, a letter of assurance in the form of Schedule B pursuant to the Building Code, signed by a registered professional. Site Safety Conditions 21.4 If a building official determines that an unsafe condition exists as the result of the construction of a retaining wall requiring a building permit, a guard or fence may be required. Building Bylaw No. 2021-21 Page 46 of 53 Finished Grades and Slope Retention 21.5 Except as certified by a professional engineer with expertise in geotechnical engineering registered in the Province of British Columbia, fill material placed or excavation into natural grade on a parcel must not have a surface slope exceeding a ratio of one linear unit vertically to two linear units horizontally, unless restrained by a permitted retaining wall. 21.6 Retaining walls are not permitted to be constructed of stacked un-cemented rock or boulders or creosoted timbers. 21.7 No person may occupy a building unless the finished grade complies with all applicable enactments. 21.8 The maximum grade for a residential driveway shall not exceed 20%. PART 22. SOLAR PANEL PERMIT 22.1 Without limiting Section 4.3 of this bylaw, a person must not install or alter a solar domestic hot water system or photovoltaic solar panel system without making application and receiving a valid building permit. Application Requirements 22.2 An application for a building permit with respect to solar panel system must (a) be made in the prescribed form and signed by the owner, or a signing officer if the owner is a corporation; (b) pay applicable application fee as prescribed in the City's Fees and Charges Bylaw; (c) be accompanied by plans showing the location of the proposed solar panel location in relation to existing buildings on the property in the form of a site plan drawn to scale; (d) construction details for the attachment of the panels to the building and provide a sealed drawing by a registered professional to confirm loading on structural members of building are designed to accommodate the anticipated loads for solar domestic hot water systems and where photovoltaic solar systems incorporate a ballast system. 22.3 For hot water systems, compliance with CAN/CSA-F383-87, Installation Code for Solar Domestic Hot Water Systems, as referred to in the British Columbia Building Code. 22.4 Prior to obtaining a permit for a photovoltaic solar panel system with connection to the City's electric system shall enter into a net-metering agreement with the City. Commissioning 22.5 Prior to operating a solar panel system the owner shall provide: (a) verification from the registered professional of record, where applicable, and Building Bylaw No. 2021-21 Page 47 of 53 (b) for photovoltaic systems a fire safety plan approved by the City of Penticton Fire Department for the identification of shut down procedures in the event of an emergency. PART 23. TEMPORARY BUILDING PERMIT 23.1 Subject to the bylaws of the City and order of Council, the building official may issue a building permit for the erection or placement of a temporary building or structure for occupancy if (a) the permit is for a period not exceeding one year; and (b) the building or structure is located in compliance with the City's Zoning Bylaw, built in compliance with the Building Code and this bylaw, and connected, as required by enactments, to City utility services. Application requirements 23.2 An application for a building permit for the erection or placement of a temporary building or structure must be made in the form of a temporary permit application on the prescribed form, signed by the owner or agent, and must include: (a) plans and supporting documents showing the location and building height of the building or structure on the parcel; (b) plans and supporting documents showing construction details of the building or structure; (c) application fee as prescribed in the City's Fees and Charges Bylaw; (d) a statement by the owner indicating the intended use and duration of the use; (e) plans and supporting documents showing the proposed parking and loading space; (f) a written description of the project explaining why the building is temporary; (g) a copy of an issued development permit, if required; (h) in the case of a manufactured building, a CSA label in respect of manufacture and, without limitation, a Quonset or other steel building must be certified in accordance with CSA Standard A660; (i) a report or drawing by an engineer, architect or designer confirming compliance with the Building Code, this bylaw, the City's Zoning Bylaw and other applicable bylaws; (j) security as prescribed in the City's Fees and Charges Bylaw, which security may be used by the City to remove the building after one year of the date of the occupancy inspection required under this bylaw; or (k) must be returned to the owner if the owner removes the temporary building within one year of the date of the occupancy inspection of the temporary building required under this bylaw; and Building Bylaw No. 2021-21 Page 48 of 53 (l) in the case of a temporary building, information to comply with article 1.1.1.1(2)(f), Division C of the Building Code. 23.3 Before receiving a building permit for a temporary building or structure for occupancy, the owner must pay to the City the applicable building permit fee set out in the City's Fees and Charges Bylaw. A permit fee for a temporary building or structure is not refundable. PART 24. ACCESS ROUTE FOR FIRE DEPARTMENT ACCESS 24.1 Prior to the issuance of a building permit for a Simple building of multi-family or commercial occupancy under Part 9 of the Building Code, the owner must satisfy the building official that the building or structure for which the permit is issued will be served by a fire access route that satisfies the following: (a) the width of an access route must be not less than 6.0 meters; (b) the centerline radius of an access route must be less than 12.0 meters; (c) the overhead clearance of an access route must be 5.0 meters; (d) the gradient of the access route must not change more than 1 in 12.5 over a minimum distance of 15.0 meters; (e) the access route must comply with the bearing load and surface material standards of the City's Subdivision and Servicing Bylaw, as amended or replaced from time to time; and (f) the length above which a dead-end portion of an access route requires turnaround facilities is 90.0 meters. PART 25. CLIMATIC DATA 25.1 The climatic data for the design of buildings in the City shall be the date listed in the current edition of Division B Appendix C to the Building Code for Penticton, British Columbia. PART 26. ENERGY CONSERVATION and GHG EMISSIONS REDUCTION Step Code Requirements 26.1 In relation to Energy Efficiency, the City incorporates by reference the performance requirements set out in subsection 9.36.5 - Energy Performance Compliance of the Building Code. (Bylaw No. 2024-08) 26.2 Any new building or structure to which Part 3 or Part 9 of the Building Code applies, and is within the scope of the application of the Zero Carbon Step Code, as described in the Building Code, must be designed and constructed to meet performance requirements specified in EL-1 (measure only) of the Zero Carbon Step Code. (Bylaw No. 2024-08) Building Bylaw No. 2021-21 Page 49 of 53 26.3 For a Part 9 or Part 3 building or structure that is designed in compliance with the applicable step of the BC Energy Step Code but where the constructed building or structure does not meet the performance requirements of the applicable step of the energy Step Code, the building official may issue an inspection note for partial occupancy, or occupancy of the building or structure and a Section 57 of the Community Charter will be registered against the property title stating that the building or structure has not met the design requirements for the applicable step of the BC Energy Step Code. 26.4 The owner of any building subject to a requirement under section 26.1 or section 26.2 must do the following prior to the issuance of any occupancy permit in respect of the building: (a) submit to the City a BC Energy Compliance Report - As built with all sections including section "F" completed; and (b) affix one of the following home energy labels to the building in a conspicuous location, upon or in close proximity to the electrical panel: (i) an EnerGuide Rating System label' (ii) a Passive House Certification; or (iii) a comparable home energy label acceptable to the City's Manager of Building and Permitting Services. 26.5. Any dwelling, which achieves a minimum of Step 04 of the Step Code, will receive a building permit fee discount rebate as prescribed with City of Penticton Fees and Charges Bylaw for which the permit was authorized. 26.6. Prior to receiving a building official's written acceptance for sub-section 14.4 (n), the owner shall submit a mid-construction compliance report as prescribed within the BC Building Code. Solar Hot Water & Photovoltaic Solar Ready 26.7. Except for 26.5, applications for building permits for construction of new buildings of residential occupancy that contain one dwelling unit or one dwelling unit and one secondary suite must contain plans or other information satisfactory to the Building Official to confirm that the construction complies with the Solar Hot Water Ready Regulation, BC Reg. 101/2011, as it may be amended or replaced from time to time. 26.8. Where it is shown to the satisfaction of the Building Official that building site conditions do not permit the effective use of solar hot water heating or PV systems, section 26.7 does not apply. Refer to Part 22, Solar Panel Permit for installing a solar PV or hot water system. PART 27. NUMBERING OF BUILDINGS 27.1 Immediately upon issuance of a building permit governing the construction, alteration or repair of a building, or prior to and during occupancy of a building, the owner or occupant must display the address number assigned to it by the City: Building Bylaw No. 2021-21 Page 50 of 53 (a) on or over the entrance to the building or where landscaping or structures obscure the visibility of a building entrance from the adjacent highway, on the building property within sight of the adjacent highway; and (b) until such time as the building is removed from the site or has been demolished. 27.2 Despite Section 27.1 the City's Engineer may renumber or alter the assigned numbers in respect of any building or any parcel, including those already in existence or numbered. 27.3 Without limiting Sections 27.1 or 27.2, a building official must, on the issuance of a building permit, designate a house number or set of house numbers related to the building authorized by the permit. The owner or occupier must post the number or numbers on the site immediately after obtaining the building permit and keep the numbers posted in a conspicuous location at all times during construction. 27.4 Without limiting Sections 27.1 through 27.3, on issuance of an occupancy permit, the owner or occupier of the parcel must affix the numbers permanently in a conspicuous place on the building such that the number is visible from an adjacent highway that is not a lane. PART 28. TEMPORARY RESIDENCE DURING PERIOD OF CONSTRUCTION 28.1 Where a temporary residence is required during the period of construction of a new residence, the following conditions shall apply: (a) no more than one temporary residence shall be permitted on a lot and the lot shall be not smaller than 0.4ha (0.9884 acres); (b) the temporary residence may include a modular manufactured home or an existing single family dwelling legally sited on the subject property; (c) a manufactured home or modular manufactured home that is used for a temporary dwelling shall be sited in conformity with the regulations of this bylaw and the Provincial Health Act and shall not be sited on a permanent foundation with a basement excavation; (d) the temporary residence shall be removed from the owner's land within 30 days of the end of the period of construction of the new residence except that the temporary residence may be converted to any non-residential use permitted within the applicable zone subject to compliance with all other regulations of the applicable zone with respect to density and the siting, size, and dimensions of the building; (e) removal of all kitchen and bathroom cabinets, plumbing fixtures, hot water tanks, furnaces, and sewer connections except that some of said facilities may be retained for home occupation and workshop purposes as determined by the building official; (f) refinishing of the exterior of the building to portray a building intended for the proposed use; and (g) completion of the conversion within 30 days of the end of the period of construction of the new residence; Building Bylaw No. 2021-21 Page 51 of 53 (h) a covenant shall be registered pursuant to Section 219 of the Land Title Act to permit the temporary residence during the period of construction and to prohibit the temporary residential use from continuing after the period of construction ends. The covenant shall also include an agreement by the owner to indemnify and save harmless the City against all costs and expenses incurred by the City, in default by the owner, in the conversion, demolition, or removal of the temporary residence, and/or legal costs incurred in pursuing such legal remedies as the City sees fit. The covenant shall be registered as a condition precedent to the issuance of a building permit for the new residence; (i) a blanket statutory right-of-way shall be granted to the City permitting the City to enter onto the owner's land for the purpose of converting, demolishing, or removing the temporary residence in the event that the owner defaults. The statutory right-of-way plan shall be registered as a condition precedent to the issuance of a building permit for the new residence; (j) an irrevocable unconditional letter of credit shall be drafted in favour of the City, to be held as security for performance by the owner of his covenants and obligations with respect to the conversion, demolition or removal of the temporary residence. The amount of the letter of credit shall be 1.5 times the estimated cost of conversion, demolition, or removal of the temporary residence, which estimate shall be obtained from a qualified building, demolition, or moving contractor. The letter of credit shall be provided as a condition precedent to the issuance of a building permit for the new residence. Notwithstanding the above provisions and where a manufactured home is intended to be used as the temporary residence, a letter of credit or certified cheque in the amount of $1,500.00 may be accepted by the Building official. Where a modular manufactured home is intended to be used as the temporary residence, a letter of credit or certified cheque in the amount of $3,000.00 may be accepted by the building official; and (k) for the purposes of this section, "period of construction" shall mean the period of time commencing when a building permit is issued for the new residence and ending either one year from the date of issuance of the permit or when a notice of conversion, demolition, or removal is delivered to the owner, whichever event first occurs. The notice of conversion, demolition, or removal of the temporary residence shall be in writing and delivered from the office of the building official of the City. PART 29. OFFENCES AND ENFORCEMENT Violations 29.1 Without limiting Part 7 of this bylaw, every person who (a) violates a provision of this bylaw; (b) permits, suffers or allows any act to be done in violation of any provision of this bylaw; and (c) neglects to do anything required to be done under any provision of this bylaw; commits an offence and on summary conviction by a court of competent jurisdiction, the person is subject to a fine of not more than $10,000.00, a term of imprisonment not exceeding three months, or Building Bylaw No. 2021-21 Page 52 of 53 both, in addition to the costs of prosecution. Each day during which a violation, contravention or breach of this bylaw continues is deemed to be a separate offence. 29.2 Every person who fails to comply with any order or notice issued by a building official, or who allows a violation of this bylaw to continue, contravenes this bylaw. 29.3 Every person who commences work requiring a building permit without first obtaining such a permit must, if a Stop Work Order is issued and remains outstanding for 30 days, pay an additional charge as outlined in the City bylaws. Deemed Offence 29.4 An owner is deemed to have knowledge of and be liable under this bylaw in respect of any construction on the parcel the owner owns and any change in the use, occupancy or both of a building or structure or part of a building or structure on that parcel. 29.5 No person is deemed liable under Section 29.4 who establishes, on a balance of probabilities, that the construction of change of use or occupancy occurred before they became the owner of the parcel. 29.6 Nothing in Section 29.5 affects (a) the City's right to require and the owner's obligation to obtain a permit; and (b) the obligation of the owner to comply with this bylaw. Ticketing 29.7 The offences in the Bylaw Notice Enforcement Bylaw and Municipal Ticketing Information Bylaw are designated for enforcement under Section 264 of the Community Charter. PART 30. UNSAFE CONDITIONS 30.1 If the supply of electricity or natural gas have been disconnected due to a hazardous or potentially hazardous situation existing in the building or structure or part thereof, the supply of electricity or natural gas to the building or structure shall not be reconnected, the building shall not be occupied until (a) the owner has applied to the building official for a special safety inspection pursuant to this part and has paid the required fees; (b) the building, structure or part thereof has been inspected by the building official and, if considered necessary by the building official, by the City Fire Chief for compliance with this bylaw and any other bylaws or Provincial statutes or regulations relating to building, electrical, gas or fire safety; (c) the owner has obtained permits required to carry out the works necessary to bring the building, structure or part thereof into compliance with the bylaws, statutes, and regulations; and (d) all of the works referred to in Section 30.1(c) have been completed and the building or structure has been brought into compliance with bylaws, statutes and regulations. Building Bylaw No. 2021-21 Page 53 of 53 PART 31. REPEAL 31.1 City of Penticton "Building Bylaw No. 2018-01" and all amendments thereto are hereby repealed upon adoption of this bylaw. PART 32. IN FORCE 32.1 This bylaw is effective date of adoption. READ A FIRST time this 1 day of June, 2021 READ A SECOND time this 1 day of June, 2021 READ A THIRD time this 1 day of June, 2021 ADOPTED this 15 day of June, 2021 John Vassilaki, Mayor Angie Collison, Corporate Officer