{
 "answer": "In the Village of Valemount, British Columbia, building permit rules are set by Fees & Charges Bylaw No. 869, 2023 (Consolidated) and 1 other bylaw, verified 2026-09-24. Permit fees: $6.00 per $1,000.00 value or fraction thereof. Fees set in: Fees & Charges Bylaw No. 869, 2023. Administered by: building official.",
 "municipality_id": "gx-000147",
 "municipality": "Valemount",
 "status_type": "Village",
 "jurisdiction": "British Columbia",
 "country": "CA",
 "topic": "building_permits",
 "label": "Building permits",
 "status": "found",
 "last_verified": "2026-09-24",
 "official_website": "https://valemount.ca/",
 "documents": [
  {
   "primary": true,
   "is_official": true,
   "title": "Fees & Charges Bylaw No. 869, 2023 (Consolidated)",
   "category": "building_permits",
   "document_type": "bylaw",
   "status": "adopted",
   "adopted_date": "2023-10-24",
   "document_url": "https://valemount.civicweb.net/document/96759",
   "summary": "Sets the actual building permit fee amounts (Simple $100 / Complex $300) that Building Bylaw No. 892, 2024 defers to; recorded here per the fees-in-a-separate-bylaw rule.",
   "discovered_by": "bc-building-2",
   "discovered_at": "2026-09-24",
   "capture_sha256": "1c7b3de7cbbdae90b367e5bc77ed22ccef9066365431ae5ff4255e7c91f99286",
   "captured_at": "2026-09-25T01:10:24+00:00",
   "capture_http_status": 200,
   "document_number": "869",
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/1c7b3de7cbbdae90b367e5bc77ed22ccef9066365431ae5ff4255e7c91f99286.pdf",
   "link_dead": false,
   "facts": {
    "fee_basis": "$6.00 per $1,000.00 value or fraction thereof"
   },
   "fact_citations": {
    "fee_basis": "Schedule 'D', D2: 'For each $1,000.00 value or fraction thereof $6.00'"
   },
   "transcript_url": "/ca/bc/valemount/building-permits/bylaw-869/",
   "transcript_quality": "exact"
  },
  {
   "primary": true,
   "is_official": true,
   "title": "Village of Valemount Building Bylaw No. 892, 2024",
   "category": "building_permits",
   "document_type": "bylaw",
   "status": "adopted",
   "adopted_date": "2024-04-23",
   "document_url": "https://valemount.civicweb.net/document/82291",
   "summary": "Administers the BC Building Code within Valemount; a permit is required for construction/alteration. Application, permit, and inspection fees are NOT set in this bylaw but in Fees & Charges Bylaw No. 869, 2023, which it references throughout.",
   "discovered_by": "bc-building-2",
   "discovered_at": "2026-09-24",
   "capture_sha256": "889b8a26292a9d88616ab9fcfe32adfa44abe70822094914e3bb3987a39b8c6f",
   "captured_at": "2026-09-25T01:10:24+00:00",
   "capture_http_status": 200,
   "document_number": "892",
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/889b8a26292a9d88616ab9fcfe32adfa44abe70822094914e3bb3987a39b8c6f.pdf",
   "link_dead": false,
   "facts": {
    "permit_required_for": "constructing, repairing or altering a building or structure, including a retaining wall; moving; demolishing; occupying; changing use; installing plumbing; fireplaces/solid fuel burning appliances",
    "exemptions": "fences; accessory buildings under 10 square metres; landscape walls 1.2 metres or less; detached decks under 600mm; greenhouses; docks; farm buildings; plumbing fixture repair; roofing; windows/doors",
    "fees_location": "Fees & Charges Bylaw No. 869, 2023",
    "authority": "building official",
    "fine_range": "not more than $50,000 or imprisonment for not more than 6 months, or both"
   },
   "fact_citations": {
    "permit_required_for": "s. 7.1",
    "exemptions": "s. 3.3",
    "fees_location": "s. 10.7(a)",
    "authority": "s. 6.2(a)",
    "fine_range": "s. 17.8"
   },
   "transcript_url": "/ca/bc/valemount/building-permits/bylaw-892/",
   "transcript_quality": "exact"
  }
 ],
 "source": "https://govanswers.org/ca/bc/valemount/building-permits/"
}