Subdivision & Development Servicing Bylaw No. 1730, 2000 (Vol. 1 - Development Requirements)

Williams Lake, British Columbia · adopted 2000-04-18

This is the exact embedded text of the captured official document. Snapshot 586421466e96 · verified 2026-08-23 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1730, 2000 VOLUME 1 DEVELOPMENT REQUIREMENTS (CONSOLIDATED FOR CONVENIENCE ONLY) CITY OF WILLIAMS LAKE SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1730, 2000 VOLUME 1 DEVELOPMENT REQUIREMENTS (ii) CITY OF WILLIAMS LAKE BYLAW NO. 1730, 2000 BEING A BYLAW OF THE CITY OF WILLIAMS LAKE TO ESTABLISH SUBDIVISION AND DEVELOPMENT SERVICING STANDARDS AND CONTROLS WITHIN THE CITY OF WILLIAMS LAKE. WHEREAS the City of Williams Lake wishes to revise the provisions of the present Subdivision Control Bylaw No. 713, 1980; AND WHEREAS pursuant to the Local Government Act, the City of Williams Lake, may regulate and require the provision of works and services in respect of the subdivision or development of land; NOW THEREFORE, the Council of the City of Williams Lake, in open meeting assembled, enacts as follows: (iii) THE CITY OF WILLIAMS LAKE SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1730, 2000 TABLE OF CONTENTS VOLUME 1 - Development Requirements Sections Section 1 - Title............................................................................................1 Section 2 - Interpretation............................................................................ 2 Section 3 - General Provisions................................................................... 6 Section 4 - Servicing Requirements......................................................... 17 Section 5 - Fees and Charges ................................................................... 18 Section 6 - Insurance Requirements ........................................................ 20 Section 7 - Schedules and Appendices .................................................... 22 Section 8 - Enactment............................................................................... 24 Schedules Schedule A - Service Levels Schedule B - Regulations, Standards and Specifications for the Design of Site Grading Schedule C - Regulations, Standards and Specifications for the Design of Highways, Lanes and Walkways Schedule D - Regulations, Standards and Specifications for the Design of Curbs and Gutters, Sidewalks and Boulevards Schedule E - Regulations, Standards and Specifications for the Design of Water Systems Schedule F - Regulations, Standards and Specifications for the Design of Sanitary Sewers Schedule G - Regulations, Standards and Specifications for the Design of Drainage Systems Schedule H - Regulations, Standards and Specifications for the Design of Street Lighting Schedule I - Regulations, Standards and Specifications for the Installation of Electrical, Communications Wiring, Cablevision and Gas Distribution System (iv) THE CITY OF WILLIAMS LAKE SUBDIVISION AND DEVELOPMENT SERVICING BYLAW NO. 1730, 2000 TABLE OF CONTENTS cont. VOLUME 1 - Development Requirements Cont. Appendices Appendix 1 - Confirmation of Commitment by Owner Confirmation of Professional Assurance by Civil Engineer Confirmation of Professional Assurance by Geotechnical Engineer Appendix 2 - Sample Standard Statutory Right-of-Way Document Restoration Statement of Release Appendix 3 - Substantial Completion Certificate Construction Completion Certificate Final Acceptance Certificate Appendix 4 - Sample Subdivision Servicing Agreement VOLUME 2 - Drawing Standards ( Bound Separately) Schedules Schedule J - Standards for the Preparation of Design and Construction Record Drawings Appendices Appendix 5 - Sample City of Williams Lake - Service History Sheet Appendix 6 - City of Williams Lake Digital Drawing Standards VOLUME 3 - Specifications and Standard Drawings ( Bound Separately) Sections Section 2 - Interpretation............................................................................ 1 Schedules Schedule K - Specifications for the Construction of Works and Infrastructure Designed Under Schedules B through I Schedule L - Standard Drawings Index and Standard Drawings Appendices Appendix 7 - City of Williams Lake - Approved Products List City of Williams Lake 1 April 2000 Subdivision Bylaw No. 1730 SECTION 1 - TITLE This bylaw may be cited as the City of Williams Lake Subdivision and Development Servicing Bylaw No. 1730, 2000. City of Williams Lake 2 April 2000 Subdivision Bylaw No. 1730 SECTION 2 - INTERPRETATION INTERPRETATION In this bylaw, unless the context requires otherwise: "Adjacent Property Owner" means the owner of any private property adjacent to the development on which construction is required within or across by means of an easement or other agreement. "Agricultural Land Reserve" (ALR) means those lands designated pursuant to the Land Commission Act. "Approving Officer" means the person duly authorized by the City of Williams Lake Council to act as Approving Officer pursuant to the provisions of the Land Title Act. "Building Inspector" means the Building Inspector for the City of Williams Lake or his designate. "Building Regulations" means the City of Williams Lake Building Bylaw as amended from time to time in effect on the date of application for subdivision or a development building permit. "City" means the City of Williams Lake. "Communications Wiring" means Telephone and/or Cable Television wiring. "Community Sewer System" means a sanitary sewer system of sewage disposal works which is owned, operated and maintained by the Municipality. "Community Water System" means a system of waterworks within the meaning of the Health Act which is owned, operated and maintained by the Municipality, an Improvement District under the Water Act or the Local Government Act, or which is regulated under the Water Utilities Act, and authorized by the Municipal Council. "Council" means the Council of the City of Williams Lake. "C.S.A." means the Canadian Standards Association. "Cul-de-sac" means a length of local street made for vehicular use, the end of which is permanently closed either by subdivision design or by a natural feature such as inaccessible terrain. "Design Engineer" means the Professional Civil (or other Professional) Engineer engaged by the owner to design, prepare drawings, inspect and certify construction of works in a subdivision or development, or his authorized representative. "Development" means an activity that requires a Building Permit. City of Williams Lake 3 April 2000 Subdivision Bylaw No. 1730 "Director of Planning and Engineering" means the Director of Planning and Engineering of the City of Williams Lake or a duly authorized representative. "Drainage System" means a system of works designed and constructed to control the flow of storm water, groundwater or both. "Frontage" means the length of a parcel boundary which immediately adjoins a highway other than a lane or a walkway. In the case of a parcel fronting on more than one highway, the narrower side of the parcel abutting a highway shall be its frontage. "Gradient or Grade" expressed as a percentage is determined by dividing the vertical height from the lowest to highest elevation on the parcel by the horizontal distance between the lowest and highest point. "Highway" includes a street, road, lane, bridge, viaduct and any other way open to public use, but does not include a private right-of-way on private property. "Highway, Arterial" means a street which carries large volumes of all types of traffic between the principle areas of traffic generation to collector or other arterial highways. "Highway, Collector" means a street which carries traffic from local highway to arterial highway and includes the principle entrance streets for circulation of traffic within a subdivision. "Highway, Local" means a street used primarily for travel and access to and from the parcels of land contiguous thereto. "Lane" means a highway more than 3 metres but not greater than 8 metres in width, intended to provide secondary access to parcels of land. "Lot" means a parcel of land and the terms lot and parcel are synonymous. "Medical Health Officer" means the Medical Health Officer appointed under the Health Act. "Municipality" means the City of Williams Lake or the area within the municipal boundaries thereof as the context may require. "Off-site Works" means all works and services required to be installed or upgraded between the boundary of the parcel being subdivided or developed and the connection point to the existing City works and services. "On-site Works" means all works and services installed on the parcel being subdivided or developed. "Owner" in respect of real property means the registered owner of an estate in fee simple, and includes: x the tenant for life under a registered life estate; x the registered holder of the last registered agreement for sale; City of Williams Lake 4 April 2000 Subdivision Bylaw No. 1730 x the holder or occupier of land held in the manner mentioned in Sections 356 and 357 of the Local Government Act; x an Indian, who is an owner under the letters patent of a municipality, incorporated under Section 12 of the Local Government Act. "Owner's Contractor" means the Contractor hired by the Owner to complete the construction or the Owner if completing construction with own forces. "Owner's Engineer" means the Design Engineer during construction of a private Owner's development or on a City construction project the Design Engineer or the Director of Planning and Engineering if designed by the City. "Panhandle Parcel" means any parcel which is serviced and gains highway frontage through the use of a narrow strip of land which is an integral part of the parcel (hereinafter called the "Access Strip"). "Parcel" means any lot, block or other area in which land is held or into which land is subdivided, but does not include a highway or portion thereof. "Parcel Area" means the total land area of a parcel contained within all of the parcel lines measured on a horizontal plane and expressed in units of square metres. "Parcel Depth" means the average distance from the front parcel line to the rear parcel line. "Parcel Line" means a line marking the boundary of a parcel. "Parcel Line - Front" means the parcel line which immediately adjoins a highway other than a lane or walkway. In the case of a parcel fronting on more than one highway, the narrower side of the parcel abutting the highway shall be the front parcel line. "Parcel Line - Rear" means the parcel line furthest from and opposite to the front parcel line, except that there shall not be more than one rear parcel line. "Parcel Line - Side" means a parcel line marking the boundary between two parcels or between a parcel and a lane or between a parcel and a highway in the case of a corner parcel of which one or both ends intersect a front parcel line. "Parcel Width" means the horizontal distance between the side parcel lines, excluding access strips of panhandle lots, measured along a line that serves as the front lot line setback as per the lot zoning. "Potable Water" means water which is approved for drinking purposes by the Medical Health Officer. "Professional Engineer" means a person who is registered or duly licensed as such under the provisions of the Engineers and Geoscientists Act of British Columbia. City of Williams Lake 5 April 2000 Subdivision Bylaw No. 1730 "Proven Supply" means that a supply of potable water is available and proven with respect to volume, delivery and continuity of supply from an on-site groundwater system, a source requiring a water license from the Ministry of Sustainable Resource Management or a community water system. "Right-of-Way" includes land or any interest in land acquired for any public purpose, including, but not limited to: a) public rights of passage with or without vehicles; b) constructing, maintaining, or operating any railway; c) erecting and maintaining any pole-line; d) laying, placing, and maintaining drains, ditches, pipes, transmission lines or wires for the conveyance, transmission or transportation of water, electric power, communication, or for the disposal of sewage; e) the operation and maintenance of vehicular traffic and as registered as a public right-of-way. "Roadway" means the portion of the highway that is improved, designed or ordinarily used for vehicular traffic. "Service Level" means the standard of municipal services required for subdivisions or developments under the provisions of this Bylaw. "Street" means a public highway which affords the principal means of access to abutting parcels. "Subdivision" means the division of land into two or more parcels, whether by plan, apt descriptive words, or otherwise. "Utilities" means the use of land whereby water, sanitary sewer, storm sewer, electrical, telephone, cablevision, gas and similar public services are provided and maintained. "Walkway" means a highway intended to carry pedestrian and non-motorized traffic. "Watercourse" means any natural or man-made drainage course or source of water, whether usually containing water or not, and includes any lake, river, creek, spring, ravine, swamp, gulch, or source of ground water, whether enclosed in a conduit or not. "Works and Services" means any public service, facility or utility which is required or regulated by this Bylaw and without restricting the generality of the foregoing includes: the supply and distribution of water; collection and disposal of sanitary sewage and drainage water; street lighting; highways, access roadways, curbs, gutters, walkways, and sidewalks; and natural gas, power, telephone and cablevision services. "Zone" means a zone as provided for in the City of Williams Lake Zoning Bylaw as amended from time to time in effect at the date of an application for subdivision or building permit. City of Williams Lake 6 April 2000 Subdivision Bylaw No. 1730 SECTION 3 - GENERAL PROVISIONS 3.1 SEVERABILITY The provisions of this Bylaw are severable. If any provision is for any reason held to be invalid by the decision of any court of competent jurisdiction, such decision shall not affect the validity of the remaining provisions of this Bylaw. 3.2 APPLICATION This Bylaw shall apply to the following: .1 All subdivisions and developments where the ownership and operation of works and services are taken over by the City; .2 Developments constructed under building permits that are for public use, including but not limited to shopping malls, stores, apartments, townhouses, condominiums, commercial enterprises, institutional facilities, or developments where the requirements of other codes may not provide the standard of service required by the City; Developments where the provisions of this Bylaw do not apply are construction of on-site single family dwellings or two family (duplex) dwellings constructed under building permits on existing serviced parcels. 3.3 ADMINISTRATION This Bylaw shall be administered by the Approving Officer of the City of Williams Lake where works and services are to be provided because of subdivision of land; or the Building Inspector where works and services are to be provided because of a building permit. 3.4 RECORD KEPT The Approving Officer may maintain a record of all applications submitted under this Bylaw with respect to subdivisions. The record will indicate the final disposition of all such applications. The Building Inspector may maintain a record of all occasions when works and services are required in accordance with the standards of this Bylaw and this record will show what works and services were provided and where. City of Williams Lake 7 April 2000 Subdivision Bylaw No. 1730 3.5 AUTHORIZATION OF ENTRY The Approving Officer, Building Inspector or their designate, or any other officer appointed by Council are hereby authorized to enter at all reasonable times upon any property or premises to inspect the same in connection with their duties under this Bylaw and to ascertain whether the provisions of this Bylaw are being observed. 3.6 LEVEL OF SERVICE Unless otherwise approved by a Development Variance Permit or Development Permit issued by the Council, all subdivisions and developments shall be provided with services as prescribed in Schedule A of this Bylaw. 3.7 EXCESS OR EXTENDED CAPACITY Pursuant to Section 939 of the Local Government Act, the City of Williams Lake may require that the Owner provide excess or extended services to provide access to, or service land, other than the land being subdivided or developed. The City will pay for the additional cost of materials only for oversizing to provide the required excess capacity. 3.8 SUBDIVISIONS WHERE SERVICING REQUIREMENTS MAY BE WAIVED Notwithstanding Subsection 3.6, the servicing requirements prescribed in Schedule A of this bylaw may not apply (at the discretion of the Approving Officer) where the parcel created is to be used solely for the unattended equipment necessary for the operation of: .1 a community water system; .2 a community sewer system; .3 a community gas distribution system; .4 a community radio or television receiving antennas; .5 a radio or television broadcasting antenna; .6 a telecommunications relay station; .7 an automatic telephone exchange; .8 an air or marine navigational aid; .9 electrical substations or generating stations; or .10 any other similar public service or quasi public service facility or utility. City of Williams Lake 8 April 2000 Subdivision Bylaw No. 1730 3.9 COMMITMENT REQUIRED BY OWNER Prior to review of any subdivision application by the Approving Officer, the Owner shall enter into an agreement with the City of Williams Lake to confirm the relationship between the Owner, the Owner's Engineer, and the City of Williams Lake. Appendix "1" of this Bylaw contains the "Confirmation of Commitment by Owner". This letter is to be typed on the Owner's letterhead and submitted to the City before or with the submission for preliminary approval. BL1921(22/7/03) 3.10 SUBDIVISION AND DEVELOPMENT ENGINEERING REQUIRED Prior to review of any Subdivision or Development by the City, the Owner's Civil Engineer shall confirm its engagement with the Owner such that it will be providing professional services to the Owner to ensure that the Subdivision or Development is designed and constructed in accordance with this Bylaw, the approved drawings and good practice. Appendix 1 contains the "Confirmation of Professional Assurance" letter to be typed onto the Consulting Engineer's letterhead and submitted to the City before or with the submission for preliminary approval. Unless required by the Approving Officer, the Owner will not be required to designate a Geotechnical Engineer during the initial design phase of a Subdivision. The Owner's Civil Engineer shall therefore be responsible to confirm the suitability of the site for the proposed development and, unless otherwise directed by the Approving Officer, the Owner's requirement to hire a Geotechnical Engineer will be limited to the construction and post- construction phases of the project. 3.11 ENGINEERING CONSULTANTS LIABILITY Civil and Geotechnical Engineering Consultants involved in the design and construction of subdivision and development services throughout the City of Williams Lake shall carry minimum Errors and Omission Liability Insurance coverage of $1,000,000 per claim occurrence and maintain such coverage over a period of three (3) years after the date of Construction Completion. The Consultant shall provide Certificates of Insurance with the submission for Preliminary Subdivision or Preliminary Development approval and annually prove that the appropriate coverage is in force. 3.12 GEOTECHNICAL AND SPECIALIST CONSULTANT OVERVIEW, TOPOGRAPHIC MAPPING AND DEVELOPMENT PHASING .1 Before preliminary layout review, the Owner shall, when requested by the Approving Officer, undertake a geotechnical overview, topographic mapping and development servicing and phasing analysis if the proposed subdivision meets one or more of the following conditions: City of Williams Lake 9 April 2000 Subdivision Bylaw No. 1730 .1 the proposed subdivision will create more than 4 parcels .2 any part of the proposed subdivision is located within a floodplain area as defined by map, bylaw or elevation .3 the proposed subdivision contains land with slopes of greater than 25% .4 the proposed subdivision contains land known or suspected to have sensitive or unstable soil conditions. .5 the proposed subdivision contains land identified in the Official Community Plan as an Environmentally Sensitive or Hazardous Area. .2 The required geotechnical overview, topographic mapping, and development servicing and phasing analysis shall be done at the Owner's cost and shall include all or a portion of the following scope of work as determined by the Approving Officer: x A geotechnical overview report for the overall development area, extending a minimum of 100 metres beyond the subject parcel. At a minimum this geotechnical overview is to address: .1 general site soil conditions; .2 groundwater; .3 soil/site stability; and .4 corrosive or sulphate soils. x A topographic survey of the overall development area, extending a minimum of 100 metres beyond the subject parcel. A survey plot plan shall be prepared at a minimum 1:1000 scale, with 1.0 m contours. x A preliminary road alignment and parcel concept plan showing how development lands, and lands beyond the development boundaries, will be serviced. x A drainage plan showing the flood plain, existing drainage courses, and conceptually how drainage will be accommodated through the site, including any soil erosion mitigation. x A preliminary erosion siltation abatement and sedimentation mitigation plan. x A development servicing concept plan showing preliminary alignment of watermain, sanitary main and storm main sizes. The direction of sanitary sewage, and storm drainage flows shall also be shown. x Development phasing boundaries, showing parks, institutional lands, road hierarchy and parking. x A preliminary cost estimate. Drawings associated with the preceding submissions shall be presented at a minimum 1:1000 scale. City of Williams Lake 10 April 2000 Subdivision Bylaw No. 1730 .3 The Approving Officer may require, regardless of Clause 3.12.1, a limited soil investigation to determine if corrosive or sulphate soils exist and what mitigation would be required for the works to be installed. .4 The Approving Officer may also require specialist consultants to be engaged by the Owner to provide preliminary comments on the mitigation of environmental, biological, or other peculiar situations resulting from the proposed subdivision or development. 3.13 GEOTECHNICAL AND SPECIALIST CONSULTANT DESIGN REQUIRMENTS .1 In addition to the Geotechnical overview undertaken during the preliminary phase of the project, the Owner shall, upon preliminary layout review approval when requested by the Approving Officer, engage a qualified Geotechnical Engineer to undertake a project specific investigation throughout the site. .2 A Geotechnical Report, prepared under seal of a Geotechnical Engineer registered in the Province of British Columbia, shall report his findings and provide clear, definitive recommendations on the geometry and placement of structural and non- structural fill sections, compaction requirements over and above those stipulated in this Bylaw, pavement structures, groundwater mitigation, frost protection, ground bearing loading for building construction or infrastructure appurtenances, such as pump stations, reservoirs, etc. .3 The report shall be prepared and submitted to the Approving Officer indicating that the following five objectives have been satisfied. .1 confirmation that the land is safe for the use intended; .2 the development has been evaluated with consideration of the aquatic setbacks outlined in the City Zoning Bylaw, steep slope and Environmentally Sensitive and Hazardous Areas (ESHA) designations of the Official Community Plan (OCP); .3 mitigative prescriptions that will facilitate the safe development of the subject lands; .4 suitable for the registration on title of the property to advise future owners of the conditions of development; and .5 acknowledgement that the City may rely upon the recommendations stated in the report for the issuance of permits needed for the development of the lands. .4 In addition to a specific geotechnical investigation, specialist consultants as required shall be engaged by the Owner to provide recommendations and/or designs to mitigate environmental, biological or other peculiar situations caused by the proposed subdivision or development. City of Williams Lake 11 April 2000 Subdivision Bylaw No. 1730 3.14 CONNECTION TO THE COMMUNITY WATER SYSTEM All water distribution or fire hydrant systems provided in accordance with this Bylaw shall be connected to the community water system. 3.15 CONNECTION TO THE COMMUNITY SEWER SYSTEM All sanitary sewage collection systems provided in accordance with this Bylaw shall be connected to the community sanitary sewer system. 3.16 CONNECTION TO THE COMMUNITY DRAINAGE SYSTEM All drainage collection systems provided in accordance with this Bylaw shall, when within reasonable proximity of an existing community drainage system, be connected to the community drainage system; however the rate of discharge into the existing system will be subject to regulation by the City. 3.17 INSUFFICIENT CAPACITY IN EXISTING SYSTEMS Should the existing City infrastructure not have sufficient capacity to accommodate the proposed subdivision or development, the Owner shall construct one or more of the following works at its cost which may include but are not limited to: .1 construct on-site or off-site works that will provide the capacity required; .2 upgrade existing City infrastructure; or .3 construct attenuation works that will modulate demand on existing City infrastructure. 3.18 PANHANDLE LOTS Panhandle lots are generally not permitted, however if required to efficiently develop a parcel of land they shall conform to the following: .1 the access strip to one parcel, where there is no possibility of further subdivision shall be a minimum 7.5 m wide, with a minimum 3.5 m wide access road; the access strip shall not be calculated as part of the minimum parcel area. .2 where a panhandle lot is capable of further subdivision, dependent on access through the panhandle, the access strip shall be a minimum 20 m wide, with a minimum 3.5 m wide access road to serve a single lot. Upon further subdivision the access road shall be constructed in accordance with Schedule A of this Bylaw. City of Williams Lake 12 April 2000 Subdivision Bylaw No. 1730 3.19 DEVELOPMENT ROADS Minimum 7.3 m wide roads shall be constructed through private developments, and designed with respect to geometry and structural strength to accommodate fire fighting and garbage collection vehicles. Adequate manoeuvring space shall also be provided to allow subject vehicles to turn around where required or pickup garbage containers without making awkward and unsafe turning and reversing movements. 3.20 COST OF SERVICES Unless otherwise provided in this Bylaw, all on-site and off-site works and services required in this Bylaw shall be constructed and installed at the expense of the Owner of the land being subdivided or developed. 3.21 SUBMISSIONS During the various phases of the work, from preliminary approvals to finalization of the project, the Owner shall make submissions to the Approving Officer. 3.22 OTHER JURISDICTIONS Where applicable the Owner shall obtain approvals, pay for utility designs and construction, and execute the work required by other jurisdictions, in accordance with the requirements of each respective jurisdiction. Such jurisdictions include: x Ministry of Transportation x Ministry of Water, Land and Air Protection x Ministry of Sustainable Resource Development x Ministry of Health x Department of Fisheries and Oceans x BC Hydro and Power Authority x Telus x BC Gas x Shaw Cable x Canada Post x Westcoast Energy Inc. x BC Rail Approvals from other jurisdictions not listed above may be required by the Approving Officer. City of Williams Lake 13 April 2000 Subdivision Bylaw No. 1730 3.23 TECHNICAL SPECIFICATIONS REQUIRED The specifications comprising this Bylaw should not be considered complete enough for tendering and construction of the work. The Owner's engineer shall, when requested by the Approving Officer, prepare the appropriate supplementary specifications and general provisions and submit them to the Approving Officer with each submission for final subdivision or development approval. The Approving Officer will review the submission together with the standard specifications, attached as Schedule K of this Bylaw, to ensure that the scope and quality of work is adequately defined, that the City's interests are protected, and that the work will be executed in accordance with this Bylaw. 3.24 QUALITY OF CONSTRUCTION MATERIALS All construction materials, where applicable, used throughout subdivision and development projects shall be CSA approved, and be in accordance with the approved products list maintained by the City of Williams Lake. 3.25 RIGHT-OF-WAY AGREEMENT Where statutory right-of-ways or easements are required to facilitate the installation of utility mains, the Owner shall enter into an agreement with the City for each right-of-way or easement. The Owner shall pay for all costs relating to registry of each right-of-way or easement on each respective land title. Appendix 2 contains a sample Standard Statutory Right-of-Way Agreement document. 3.26 CONNECTIONS TO EXISTING CITY INFRASTRUCTURE The City of Williams Lake will construct all connections to existing water mains, sanitary sewer mains and drainage mains, unless directed otherwise by the Approving Officer. The City will construct each connection and charge the Owner accordingly. 3.27 LIABILITY INSURANCE Prior to construction start-up of any subdivision or development requiring work within or about existing Dedicated Road or City Property, the Owner shall submit to the Approving Officer proof of liability insurance in accordance with Section 6 - Insurance Requirements of this Bylaw. 3.28 SECURITY DEPOSITS The Owner shall post with the City of Williams Lake, Security Deposits in accordance with Section 5 - Fees and Charges, to assure general conformance to the Subdivision and Development Servicing Bylaw. Security Deposits are not required for private developments not requiring Subdivision or work within Dedicated Road or City Property. City of Williams Lake 14 April 2000 Subdivision Bylaw No. 1730 3.29 CONSTRUCTION 1. Prior to construction start-up the following steps are necessary. The Owner shall: (a) submit to the Director of Planning and Engineering a construction schedule listing an approximate start date for each phase of construction. (b) Provided the appropriate proof of insurance. (c) Post required inspection and performance fees and securities with the City. (d) Submit completed BC Building Code Schedule B-1 and B-2 forms to the Building Inspector (for development only). (e) Receive a Construction Permit issued by the Approving Officer to proceed with subdivision construction or a Building Permit issued by the Building Inspector for developments. 2. Execute construction in accordance with the Specifications set out in Schedule K and Standard Drawings in Schedule L of this Bylaw. 3. Execute construction in accordance with the requirements of other jurisdictions having authority over various aspects of the work. 3.30 CITY WITNESSES FIELD CONDITIONS AND ALL FIELD TESTS During the course of construction, the Director of Planning and Engineering or his designate shall be advised and be in attendance at various stages of construction. The minimum advance time notice for each is as follows: CONSTRUCTION STAGE MINIMUM NOTICE x After grubbing and stripping and prior to construction. 24 hours x Sub-grade proof rolling 24 hours x Prior to placement of curb and gutter and sidewalk 48 hours x Prior to paving 48 hours x Water system pressure/leakage tests 24 hours x Sanitary sewer system leakage tests 24 hours x Storm Drainage system leakage tests 24 hours x Start-up of Pump Stations, Reservoirs, etc. 48 hours x Substantial Completion Inspection 48 hours x Construction Completion Inspection 48 hours City of Williams Lake 15 April 2000 Subdivision Bylaw No. 1730 3.31 CONSTRUCTION COMPLETION CERTIFICATION REQUIRED Upon completion of subdivision and development projects, the Owner's Engineer of record shall certify construction completion in accordance with this Bylaw by submitting the following, for approval and issuance by the Director of Planning and Engineering: .1 On Subdivisions x A Substantial Completion Certificate when the project is 98% complete and available for the purpose intended upon which deficiencies to be rectified are listed. x A Construction Completion Certificate after the deficiencies listed on the Substantial Completion Certificate have been rectified to the satisfaction of the Director of Planning and Engineering. x A Final Acceptance Certificate after all deficiencies noted during the One Year Maintenance Inspection, have been rectified to the satisfaction of the Director of Planning and Engineering. The City of Williams Lake standard Substantial Completion, Construction Completion and Final Acceptance Certificates contained in Appendix 3 shall be used. The certificates are not valid until the Director of Planning and Engineering has signed and issued them back to the Owner. The effective date of each certificate shall be the date of signing by the Director of Planning and Engineering. The one (1) year maintenance period shall commence after the date of Construction Completion. .2 On Development Projects: x BC Building Code Schedule B - C forms. 3.32 CONSTRUCTION RECORDS At time of submission of the Construction Completion Certificate, the Owner's Engineer shall also submit Construction Record Documentation, as outlined in Schedules B though J of this Bylaw. Alternatively if Construction Record Documentation is not completed at time of submission of the Construction Completion Certificate, the Owner may post with the City of Williams Lake a Construction Record Security as specified in Section 5 Fees and Charges. A Construction Completion Certificate will not be issued by the Director of Planning and Engineering until either acceptable Construction Record Documentation or Construction Record Security is received by the Director of Planning and Engineering. City of Williams Lake 16 April 2000 Subdivision Bylaw No. 1730 3.33 CITY INSPECTIONS The Owner's Engineer(s) shall take complete responsibility for the integrity of construction work; however, the Director of Planning and Engineering will make periodic site inspections to ensure general conformance to this Bylaw. If the Director of Planning and Engineering is not satisfied with the quality of construction work, or is not satisfied that the Owner's Engineer is providing the appropriate level of inspection, the Director of Planning and Engineering will, after twenty four (24) hours written notice, engage an inspector to provide a satisfactory level of inspection over the duration of the project. Payment for this inspection will be taken from the Inspection and Performance Security posted with the City by the Owner prior to construction. 3.34 COMPLIANCE WITH BYLAW No person shall subdivide or develop land in the City of Williams Lake except in compliance with the provisions of this Bylaw. 3.35 VIOLATION Every person who: .1 violates any of the provisions of the Bylaw; .2 causes or permits any act or thing to be done in contravention or violation of any of the provisions of this Bylaw; .3 neglects or omits to do anything required under this Bylaw; .4 carries out, causes or permits to be carried out any subdivision or development in a manner prohibited by or contrary to any of the provisions of this Bylaw; .5 fails to comply with an order, direction or notice given under this Bylaw; or .6 prevents or obstructs or attempts to prevent or obstruct the authorized entry of an officer of the Municipality on property, shall be deemed to be guilty upon summary conviction of an offence under this Bylaw. 3.36 OFFENCE Each day's continuance of a violation constitutes a new and distinct offence. 3.37 PENALTY Every person who commits an offence under this Bylaw is liable on summary conviction to penalties prescribed in the Offence Act. City of Williams Lake 17 April 2000 Subdivision Bylaw No. 1730 SECTION 4 - SERVICING REQUIREMENTS 4.1 REQUIREMENTS As a condition of the approval of a subdivision or issuance of a building permit for development, the Council requires that the owner of the land being subdivided or developed provide services as follows: .1 Highways, Lanes and Walkways in accordance with the level of service and standards set out in Schedules A and C of this Bylaw; .2 site grading in accordance with Schedule B of this Bylaw; .3 curb, gutter, sidewalks and boulevards in accordance with the level of service set out in Schedule A and standards set out in Schedule D of this Bylaw; .4 water systems in accordance with the level of service set out in Schedule A and standards set out in Schedule E of this Bylaw; .5 sanitary sewer systems in accordance with the level of service set out in Schedule A and standards set out in Schedule F of this bylaw; .6 drainage systems in accordance with the level of service set out in Schedule A and standards set out in Schedule G of this Bylaw; .7 street lighting in accordance with the level of service set out in Schedule A and standards set out in Schedule H of this Bylaw; .8 electrical and communications wiring in accordance with the level of service set out in Schedule A and standards set out in Schedule I of this Bylaw; .9 preparation of design and construction record drawings in accordance with Schedule J of this Bylaw; .10 specifications for construction of works and infrastructure set out in Schedule K of this Bylaw; and .11 standard drawings for construction of works set out in Schedule L of this Bylaw. 4.2 MINIMUM STANDARDS The standards and specifications that are set out in Schedules B through L are the minimum standards. The Design Engineer shall provide supplemental design drawings and specifications in particular circumstances that warrant a higher standard. City of Williams Lake 18 April 2000 Subdivision Bylaw No. 1730 SECTION 5 - FEES AND CHARGES 5.1 APPLICATION FEES Application fees for Subdivision and Development shall be in accordance with the City of Williams Lake Procedures Bylaw. BL1918 (22/7/03) 5.2 ADMINISTRATION / INSPECTION FEES Administration / Inspection fees for Subdivision and Development shall be equal to 1% of the approved Engineer's Cost Estimate to cover normal City inspection and administration costs. 5.3 SECURITY DEPOSITS The Owner shall post with the City of Williams Lake, Security Deposits in the form of cash or a letter of Irrevocable Credit, to assure general conformance to the Subdivision and Development Servicing Bylaw. The required Security amounts and circumstances in which they are required are as follows; TYPE OF SECURITY AMOUNT * CIRCUMSTANCE REQUIRED WHEN REQUIRED Inspection 10% of approved Engineer's Cost Estimate All Subdivisions or Developments containing works to be taken over by the City upon Completion Prior to City Issuing Construction Permit One year maintenance 10% of approved Engineer's Cost Estimate Upon Construction Completion Required for all Subdivisions Prior to City Signing Subdivision Plan Construction Record 15% of approved Engineer's Cost Estimate Owner wishes to have Subdivision Plan signed prior to Construction Record Drawing Acceptance Prior to City Signing Subdivision Plan Performance 125% of approved Engineer's Cost Estimate to complete remaining construction Owner wishes to have Subdivision Plan Signed after all buried utilities installed and roads constructed to top of Granular Sub-Base Prior to City Signing Subdivision Plan * Interest will not be paid on any Security amounts deposited with the City. The above deposits are cumulative, not inclusive. City of Williams Lake 19 April 2000 Subdivision Bylaw No. 1730 Security Deposits are not required for private developments not requiring Subdivision or work within Dedicated Road or City Property. BL1918 (22/7/03) Security Deposits posted with the City will be refunded as follows; - Inspection Securities - refunded upon issuance of a Construction Completion Certificate by the Director of Planning and Engineering. - Performance Securities - refunded upon issuance of a Construction Completion Certificate by the Director of Planning and Engineering. - Construction Record Security - refunded upon receipt of approved Construction Record Drawings, Operation and Maintenance Manuals and Construction Documentation. - Maintenance Security - refunded after One Year maintenance inspection, and issuance of the Final Acceptance Certificate by the Director of Planning and Engineering. Upon completion of all works in conformance with this Bylaw to the satisfaction of the Approving Officer, all security deposits will be refunded to the owner. City of Williams Lake 20 April 2000 Subdivision Bylaw No. 1730 SECTION 6 - INSURANCE REQUIREMENTS 6.1 The Owner shall save and hold harmless the City of Williams Lake from and against any and all suits or claims alleging damage or injury (including death) to any person or property that may occur or that may be alleged to have occurred, in the course of the performance of this Subdivision or Development, whether such claim shall be made by an employee of the Owner, or by a third person and whether or not it shall be claimed that the alleged damage or injury (including death) was caused through the negligent act or omission of the Owner, its officers, servants, agents or employees or a wilful or negligent act or omission of any of its Contractors or Subcontractors or any of their officers, services, agents or employees: and at its own expense, the Owner shall defend any and all such actions and pay all legal charges, costs and other expense arising therefrom. 6.2 The Owner will at the Owner's expense, carry with an insurance company or companies and under policies of insurance acceptable to and approved by the City of Williams Lake the following insurance with limits not less than shown in the respective items: 6.2.1 Automotive Liability Insurance (Owned and Non-Owned Units) Limits: Bodily Injury and Property Damage - inclusive each accident $3,000,000. The Owner shall, at the Owner's expense, throughout the term of the Contract, maintain such insurance as required under the Insurance (Motor Vehicle) Act of British Columbia. The Owner shall provide the City of Williams Lake with a Certificate of Insurance, I.C.B.C. form No. APV 47, for owned or leased vehicles as evidence of third party motor vehicle insurance coverage. 6.2.2 Comprehensive General Bodily Injury and Property Damage Liability Insurance Limits: Bodily Injury - inclusive $3,000,000 The insurance shall include Contractor's Contingent Liability, and Contractual Liability of sufficient scope to include the liability assumed by the Owner under the terms of this Bylaw, and Completed Operations Liability. The policy shall include the Owner, the City of Williams Lake and all Subcontractors as additional insureds with a cross liability clause. Any property damage deductible shall be for the account of the Owner and shall not exceed $2,500.00 for any one occurrence. 6.3 The above specified insurance policies shall have the right of subrogation waived as against the City of Williams Lake and its respective employees, servants and agents. 6.4 Prior to commencement of any Work, the Owner shall provide the City of Williams Lake with satisfactory evidence that the insurance required to be provided by the Owner under this Bylaw is in full force and effect. City of Williams Lake 21 April 2000 Subdivision Bylaw No. 1730 6.5 The City of Williams Lake makes no representation or warranty with respect to the extent or adequacy of the insurance protection afforded by the policies above. It shall be the full responsibility of the Owner and its Contractors to determine their own additional insurance coverages, that are necessary and advisable for their own protection or to fulfil their obligations under this Bylaw. Any such additional insurance shall be provided and maintained by the Owner at the Owner's own expense. 6.6 All policies referred to shall provide that thirty (30) days notice of cancellation will be given in writing to each insured, including the City of Williams Lake, otherwise the policies are to remain in full force and effect until the Work has been completed. Notwithstanding the foregoing, the Comprehensive General Bodily Injury and Property Damage Liability Insurance, referred to above, shall remain in full force and effect from the commencement of the performance of the Work for a period of not less than twelve (12) months following Total Completion and, with respect to completed operations coverage, for a period of not less than 12 months following Total Completion. 6.7 The Owner is responsible for ensuring that its Subcontractors comply with the same insurance requirements as outlined in this Bylaw. City of Williams Lake 22 April 2000 Subdivision Bylaw No. 1730 SECTION 7 - SCHEDULES and APPENDICES 7.1 The following is a list of schedules attached hereto and forming part of this Bylaw: .1 SCHEDULE A - Service Levels; .2 SCHEDULE B - Regulations, Standards and Specifications for the Design of Site Grading; .3 SCHEDULE C - Regulations, Standards and Specifications for the Design of Highways, Lanes and Walkways; .4 SCHEDULE D - Regulations, Standards and Specifications for the Design of Curbs and Gutters, Sidewalks and Boulevards; .5 SCHEDULE E - Regulations, Standards and Specifications for the Design of Water Systems; .6 SCHEDULE F - Regulations, Standards and Specifications for the Design of Sanitary Sewers; .7 SCHEDULE G - Regulations, Standards and Specifications for the Design of Drainage Systems; .8 SCHEDULE H - Regulations, Standards and Specifications for the Design of Street Lighting; .9 SCHEDULE I - Regulations, Standards and Specifications for the Installation of Electrical, Communications Wiring, Cablevision and Gas Distribution System; .10 SCHEDULE J - Standards for the Preparation of Design and Construction Record Drawings (bound separately); .11 SCHEDULE K - Specifications for the Construction of Works and Infrastructure Designed Under Schedules B Through I (bound separately); and .12 SCHEDULE L - Standard Drawing Index and Standard Drawings (bound separately). City of Williams Lake 23 April 2000 Subdivision Bylaw No. 1730 7.2 The following is a list of standard letters contained in Appendix 1 to be submitted by the Owner and his Engineers on their letterhead to the City, and are included for convenience only and do not form part of this bylaw: .1 Confirmation of Commitment by Owner; .2 Confirmation of Professional Assurance by Civil Engineer; .3 Confirmation of Professional Assurance by Geotechnical Engineer; 7.3 The following list of Right-of-Way Agreement Documents contained in Appendix 2 are included for convenience only and do not form part of this Bylaw. .1 Sample Standard Statutory Right-of-Way Document .2 Restoration Statement of Release 7.4 The following list of Certificates contained in Appendix 3 are included for convenience only and do not form part of this Bylaw. .1 Substantial Completion Certificate .2 Construction Completion Certificate .3 Final Acceptance Certificate 7.5 The following Subdivision Servicing Agreement contained in Appendix 4 is included for convenience only and does not form part of this Bylaw. .1 Sample Subdivision Servicing Agreement 7.6 The following Property History Sheet contained in Appendix 5 is included for convenience only and does not form part of this Bylaw. .1 City of Williams Lake - Service History Sheet. 7.7 The following Digital Drawing Standards contained in Appendix 6 are included for convenience only and do not form part of this Bylaw. .1 City of Williams Lake - Digital Drawing Standards. 7.8 The following Approved Product List contained in Appendix 7 is included for convenience only and does not form part of this Bylaw. .1 City of Williams Lake - Approved Products List. City of Williams Lake 24 April 2000 Subdivision Bylaw No. 1730 SECTION 8 - ENACTMENT 8.1 Repeal of Previous Bylaw Subdivision Control Bylaw Number 713, 1980 and all amendments thereto, is hereby repealed. 8.2 Bylaw Adoption Read a FIRST time this 22nd day of February , 2000. Read a SECOND time this 22nd day of February , 2000. Read a THIRD time this 4th day of April , 2000. RECONSIDERED AND ADOPTED this 18th day of April , 2000. "original signed by" MAYOR "original signed by" MUNICIPAL CLERK I WAYNE K. THIESSEN, MUNICIPAL CLERK OF THE CITY OF WILLIAMS LAKE, DO HEREBY CERTIFY THIS TO BE A TRUE COPY OF BYLAW 1730 AS RECONSIDERED AND ADOPTED BY COUNCIL AT ITS REGULAR MEETING HELD 18 APRIL, 2000. "original signed by" _________________________________ MUNICIPAL CLERK SCHEDULE A SERVICE LEVELS I, WAYNE K. THIESSEN, MUNICIPAL CLERK OF THE CITY OF WILLIAMS LAKE, DO HEREBY CERTIFY THIS TO BE SCHEDULE "A" TO BYLAW NO. 1730. "original signed by" ________________________________________________ MUNICIPAL CLERK A-1 SCHEDULE A SERVICE LEVEL 1. All Subdivisions and Developments throughout the City of Williams Lake shall be constructed in accordance with the development standards outlined on Table A.1 and Table A.2 conforming to the following: .1 Site grading in accordance with Schedule B. .2 Asphaltic concrete paving on roadways, lanes and walkways in accordance with Schedule C. .3 Curb and gutter and sidewalks in accordance with Schedule D. .4 Water distribution system and connection to community water system in accordance with Schedule E. .5 Sanitary sewer collection system and connection to community sanitary sewer system in accordance with Schedule F. .6 Storm sewer drainage in accordance with a drainage plan in accordance with Schedule G. .7 Street lighting in accordance with Schedule H. .8 Underground, hydro, telephone and cablevision in accordance with Schedule I, however: x If permitted by the Approving Officer, new subdivisions or developments through areas serviced by overhead hydro, telephone and cablevision from a lane, may be serviced overhead from the lane. x Industrial subdivisions may be serviced by overhead hydro, telephone and cablevision. Industrial subdivisions adjacent to commercial or residential subdivisions may require underground servicing in the bordering areas, at the discretion of the Approving Officer. A-2 TABLE A.1 DEVELOPMENT STANDARDS BY ROAD CLASSIFICATION Road Classification Right-of-Way Width Pavement Width 1 Traffic Lane Widths Curb Type Minimum Sidewalk Width 2 Hydro/Telephone/ Cablevision Downtown Commercial 20.0 m 14.5 m 3.75 m Upright 2.6 m both underground but overhead in lanes 4 Lane Collector 25.0 m 15.0 m 3.75 m Upright 2.0 m both underground 2 Lane Collector 20.0 m 13.0 m 3.75 m Upright 3 1.5 m both 4 underground Industrial 20.0 m 13.0 m 3.5 m Upright 1.5 m one side 5 overhead Local 20.0 m 11.0 m 3.50 m Roll Over 1.5 m one side underground Cul-de-sac - entrance 20.0 m 10.0 m 3.00 m Roll Over 1.5 m one side 5 underground - terminus 15 m radius 12 m radius Roll Over 1.5 m halfway 5 underground Lanes 6.0 m 6.0 m 3.0 m Not required not applicable not applicable Pedestrian Walkways 3.0m min. 3.0m - Not required not applicable not applicable Developments N/A 7.3 m 3.65 m As required as required underground 1 Pavement width is defined as the width between the curb gutter lines (face of curb) on each side of the road. 2 The width of sidewalk is measured from the back of curb. 3 The City may allow rollover curbs on 2 lane collectors as determined by the Director of Planning and Engineering. 4 The City may allow a 1.5 m wide sidewalk on only one side of a 2 lane collector as determined by the Director of Planning and Engineering. 5 A sidewalk may not be required, as determined by the Director of Planning and Engineering. A-3 TABLE A.2 DEVELOPMENT STANDARDS BY LAND USE DESIGNATION Land Use Designation from Official Community Plan Domestic Water Water Supply for Fire Protection Sanitary Sewer Storm Sewer / Drainage Street Lighting Residential Yes Yes Yes Underground Underground Westside (1) Yes Yes Yes Underground Underground South Lakeside Residential Yes Yes Yes Underground Underground Town Centre Yes Yes Yes Underground Underground Highway Commercial Yes Yes Yes Underground Underground Service Commercial Yes Yes Yes Underground Underground Light Industrial Yes Yes Yes Underground On Hydro Poles Heavy Industrial Yes Yes Yes Ditch On Hydro Poles Airport Industrial Yes Yes Yes Ditch On Hydro Poles Sand and Gravel N/A N/A N/A N/A N/A Institutional Yes Yes Yes Underground Underground RC Cotton Special Planning Area Yes Yes Yes Underground Underground Parks, Recreation and Natural Environment Yes (2) No Yes (3) Ditch Underground Large Holdings Well No Field (4) Ditch On Hydro Poles Agricultural Land Reserve Well No Field (4) Ditch On Hydro Poles (1) Except areas zoned Acreage Reserve (A-1) or Rural Residential (RR-1) which shall be permitted the same Development Standards as Large Holdings. (2) Irrigation Water Service for Developed Park Land with Landscaping. (3) Sanitary Service may be required when Developed for Sports Fields Etc. (4) Private Septic Field or Lagoon - Requires Ministry of Health and Director of Planning and Engineering Approval. SCHEDULE B REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE DESIGN OF SITE GRADING I, WAYNE K. THIESSEN, MUNICIPAL CLERK OF THE CITY OF WILLIAMS LAKE, DO HEREBY CERTIFY THIS TO BE SCHEDULE "B" TO BYLAW NO. 1730. "original signed by" ________________________________________________ MUNICIPAL CLERK B-1 SCHEDULE B REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE DESIGN OF SITE GRADING B - 1.0 GENERAL Through areas of steep topography the Owner shall undertake site grading work as requested by the Approving Officer in order to provide developable building sites, reasonable lot access, and accommodate or enhance drainage. The Owner shall execute site grading work in accordance with the regulations, standards and specifications set out in this Schedule. B - 1.01 Approval of Engineering Drawings Required Prior to Construction Prior to commencement of construction, engineering drawings for site grading work shall be submitted to the Approving Officer for approval. These drawings shall explicitly show: x clearing and grubbing boundaries x fill and excavation areas (by shading) x structural fill areas x lot grading elevations and sections x drainage works x siltation abatement and control x profiles along excavation and embankment control lines No construction of the work shall commence until the Owner has received written approval from the Approving Officer. B - 1.02 Geotechnical Evaluation In addition to the geotechnical overview undertaken during the initial phases of the project, the Owner shall engage the services of a qualified Geotechnical Engineer to investigate surface and sub-surface conditions with respect to site grading within the proposed subdivisions. The Geotechnical Engineer shall prepare a report outlining his findings and shall provide clear, definitive recommendations on the geometry and placement of fill sections, compaction requirements for structural and non-structural fills, cut and fill slope geometry, pavement structures for roads and any other goetechnical issues affecting site grading construction within the proposed subdivision. A copy of the geotechnical evaluation shall be submitted to the Approving Officer at the time the engineering drawings are submitted for approval. B-2 B - 1.03 Drainage Supplemental to the requirements for drainage systems outlined in Schedule G of this Bylaw, the Owner shall design site grading and drainage works to: x accommodate drainage through the site; x accommodate drainage generated on-site; x mitigate drainage from one property to another; x mitigate sub-surface drainage/groundwater problems; x mitigate soil erosion potential; and x negate siltation of adjacent or receiving streams and watercourses. The Engineer shall prepare the appropriate drawings to explicitly show the works required to accommodate site drainage. B - 1.04 Detail Site Survey Detail site surveys are required throughout the site to ensure grading in accordance with the requirements of this Bylaw with respect to assuring the competence of non-structural and structural fills and to accommodate site drainage during and after construction of the subdivision or development. B - 2.0 DESIGN CRITERIA B - 2.01 General The intent of site grading plans is to ensure that the following parameters are accommodated: x Overall site drainage to provide: - conveyance of off-site runoff onto and through the site; - conveyance of on-site runoff into existing watercourses or new drainage infrastructure; - abatement of drainage from one lot to another; and - abatement of sub-surface groundwater problems. B-3 x Buildable lots are created that provide: - reasonable access from fronting roadways; - drainage from each lot and into drainage infrastructure; - structural competence of undisturbed and embanked soils to support building loads. x Provide drawings that are easy to interpret by approving authorities and contractors to construct the work. B - 2.02 Site Preparation All areas of the site where excavations or embankments are to be constructed shall be cleared of trees, structures and debris, grubbed and stripped of organic topsoil. Marketable timber shall be salvaged; waste wood, roots, structures and debris shall be loaded, hauled and disposed of at an approved location off-site (Municipal / Regional Landfill). B - 2.03 Excavation and Embankment Slopes Unless specified otherwise by the Geotechnical Engineer, maximum (steepest) excavation and embankment slopes shall be 2 m horizontal by 1 m vertical (2:1). B - 2.04 Compaction Unless specified otherwise by the Geotechnical Engineer all embankment shall be compacted as follows: x Non-Structural Embankments - Minimum 95% Standard Proctor Density x Structural Embankments - Minimum 100% Standard Proctor Density B - 2.05 Lot Grading Wherever possible, lots shall be graded towards roadways, and in no case shall lots be permitted to drain onto an adjacent lot. Through areas where site topography prohibits drainage to roadways, lots may be graded to lot lines with drainage swales graded out to the roadways. Drainage swales shall be protected by registration of a covenant and a statutory right-of-way on the lot title. Where lot grading is undertaken maximum lot grades shall be 15% graded to 20 m back from the front property line and minimum lot grades 2%. B-4 B - 2.06 Lot Access Maximum 12% access grades measured from the property line elevation shall be provided to each lot. B - 2.07 Landscaping and Hydroseeding Upon completion of earthworks, all excavation and embankment slopes shall be covered with an adequate thickness of organic topsoil, stripped during the site preparation phase of the project and hydroseeded as follows: 1. Schedule all operations to ensure optimum environmental protection and seeding operations. Schedule hydraulic seeding to follow as soon as practical after growing medium placement and finish grading to provide vegetative cover as soon as possible. 2. Schedule seeding after frost has left ground and before June 15, or between August 31 and September 30. 3. Do not perform work under adverse field conditions such as winds greater than 10 km per hour, frozen soil, hot and arid conditions, excessively wet or dry soil or soil covered with snow, ice or standing water. 4. No seeding shall be carried out in areas or over surfaces that are not properly prepared. The Contractor is to examine site before starting work to verify all surfaces are properly prepared. 5. All seed, mulch, fertilizers and related materials, where required, to be stored in dry, weatherproof storage place and to be protected from damage by heat, moisture, rodents or other causes until time of seeding. Labels or other identification not to be removed or defaced. 6. A slow release fertilizer formulation based on analysis of soil to be seeded shall be applied in conjunction with the hydroseed application. 7. Mulch shall be specially prepared wood cellulose and/or textile fabric of a type commonly used and approved for hydraulic seeding. 8. Blend hydroseed application into adjacent grass and forest to form uniform surfaces. 9. Maintain hydroseed areas as necessary to establish a complete coverage of grass in a healthy and growing condition until final acceptance. 10. Hydroseed areas will be accepted when seeded areas are uniformly established and areas are free of rutted, eroded, bare or dead spots and free of weeds. Products Seed Grass seed to meet requirements of Canada Seed Act for Canada No. 1 seed. Seed mixes shall be supplied by a recognized supplier of certified seed. Seed to be packed and delivered in original containers clearly showing: B-5 1. Name of supplier 2. Analysis of seed mixture 3. Percentage of pure seed 4. Year of production 5. Net weight 6. Date and location of bagging Installed seed mixes and application rates are to take into account site specific variables such as altitude, micro-climate, soil type, and soil organic content, as well as water availability, seed availability, seed germination rates, and time of seeding. All seed species, installed on sites where no additional water supplementation is to be applied other than natural rainfall, shall be drought tolerant varieties. A seed mix shall be specified from the following seed species for a typical installation in populated areas i.e., subdivisions, roadside cover slopes, and empty lots: 1. Hard fescue 2. Creeping red fescue 3. Sheep fescue 4. Annual ryegrass 5. Perennial ryegrass 6. Crested wheatgrass 7. Mountain bromegrass No less than three species of seed of which no portion is less than 20% shall be used in each custom blend. Percentages and application rate for custom mixes shall be specified by the supplier and shall be not less than 30 kg/ha. Nitrogen fixing legumes such as alfalfa or clover may be used in limited quantity in seed mixes where a quick short term (less than 3 years) cover crop is required to control erosion or to establish native dryland grasses. Inclusion of legumes in seed mixes is to be approved prior to application. Mulch Slurry application 1. Mulch material application at 2,000 kg/ha 2. Tackifier application at 60 kg/ha 3. Fertilizer application as required to bring top soil to required levels of fertility. 4. Sufficient water to suspend the components in a slurry and provide a uniform coverage of the soil surface of the components at the specified rates. B-6 B- 2.08 Siltation Abatement and Erosion Control Siltation abatement and erosion control works shall be designed and implemented during construction, in consultation with and in accordance with the requirements specified by the City, the Provincial Ministry of Water, Land and Air Protection, and the Federal Department of Fisheries and Oceans. Specialist drainage, environmental and biological consultants shall be engaged by the owner as required to mitigate siltation and erosion control concerns to the satisfaction of the City, Provincial and Federal Agencies. B-3.0 RECORD DOCUMENTATION B - 3.01 Construction Record Drawings Prior to issuance of a Construction Completion Certificate by the Director of Planning and Engineering, the Owner's Engineer shall submit the following: x a site plan at minimum 1:500 scale showing the; - cadastral lot layout - road and other Rights of Ways - location of excavation areas - non-structural, and structural embankments - drainage courses and drainage works x Above information to be provided in format and standards specified in Schedule J - Drawing Standards - of this bylaw. C - 3.02 Construction Documentation x Detailed site data Report for each structural fill lot showing: - cadastral lot layout - site topography after stripping - site topography after completion of structural fills - a profile through each lot showing the original ground line profile (after stripping) and the finished gradeline profile - a geotechnical report under seal of a Professional Engineer, documenting site inspections, compaction testing and certification of the fill, together with recommendations for building construction. SCHEDULE C REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE DESIGN OF HIGHWAYS, LANES AND WALKWAYS I, WAYNE K. THIESSEN, MUNICIPAL CLERK OF THE CITY OF WILLIAMS LAKE, DO HEREBY CERTIFY THIS TO BE SCHEDULE "C" TO BYLAW NO. 1730. "original signed by" ________________________________________________ MUNICIPAL CLERK C-1 SCHEDULE C REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE DESIGN OF HIGHWAYS, LANES AND WALKWAYS C - 1.0 GENERAL Where the provisions of Schedule A of this Bylaw require the construction of roads, the Owner shall construct such roads in accordance with the regulations, standards and specifications set out in this Schedule. C - 1.01 Approval of Engineering Drawings Required Prior to Construction Engineering drawings for subdivisions and developments showing detailed design of roads shall be submitted to the City Approving Officer for approval prior to commencement of construction. These drawings shall be prepared in accordance with the City's specification found in Schedule J and shall show existing groundline and proposed alignment and grade of the highway, horizontal and vertical curve information and all other details as may be required. Grades shall be given at all changes in vertical and horizontal alignments for centreline and gutter lines. Elevations shall be shown on the drawings at all changes in vertical alignments. Construction work shall not commence until the Owner has been advised of approval by the Approving Officer in writing. C - 1.02 Classification of Highways Prior to design of the road system, the Director of Planning and Engineering shall classify each road proposed within the subdivision and stipulate the required standards in accordance with the provisions of this Bylaw. C - 1.03 Geotechnical Evaluation In addition to the geotechnical overview undertaken during the initial phases of the project, the Owner shall engage the services of a qualified Geotechnical Engineer to investigate surface and sub-surface conditions with respect to roadworks within the proposed subdivision. The Geotechnical Engineer shall prepare a report outlining his findings and shall provide clear, definitive recommendations on the geometry and placement of fill sections, compaction requirements over and above those stipulated in this Bylaw, cut slope geometry, pavement structures for roads, and any other geotechnical issues affecting road construction within the proposed subdivision. A copy of the Geotechnical evaluation shall be submitted to the Approving Officer at the time the engineering drawings are submitted for approval. C-2 C - 2.0 DESIGN CRITERIA C - 2.01 General Design Requirements In the preparation of engineering plans for highways, the Owner shall take into account the following general design considerations: .1 Continuation of Existing Streets The design and arrangement of highways within a subdivision shall provide for the continuation or projection of existing streets in the surrounding area. In no case shall the arrangement of highways within a proposed subdivision make impractical the subdivision of adjoining parcels. .2 Topography to be Taken into Account The design and arrangement of highways shall be suited to the topography of the land proposed to be subdivided. C - 2.02 Conformance with Official Community Plan The location, classification and standard of all highways, lanes and walkways proposed within a subdivision shall take into account the proposed use of the land and shall conform to the provisions of the City of Williams Lake Official Community Plan. C - 2.03 Local Highways Local highways within a proposed subdivision shall be arranged so that their use by through traffic will be discouraged. C - 2.04 Cul-de-Sacs Cul-de-sac streets shall not exceed 150 metres in length measured from the centreline of intersection to the centre of the cul-de-sac in accordance with the applicable standard drawings. C - 2.05 Lanes Lanes, meeting the standards set out in this bylaw, shall be provided where the Director of Planning and Engineering deems them to be necessary. C-3 C - 2.06 Walkways and Fences .1 Walkways shall be provided where the Director of Planning and Engineering deems them to be necessary to provide access through a subdivision to schools, parks, playgrounds, commercial areas or other community facilities, or for the safe and efficient circulation of pedestrian traffic. .2 Walkways shall be chain link fenced for their full length on both sides. The minimum height shall be 1.5 meters to the back parcel line, but may vary at the discretion of the Director of Planning and Engineering according to individual situations and the height requirements of the City's Zoning Bylaw. The fence may also extend beyond the back parcel line, as directed by the Approving Officer. C - 2.07 Driveways .1 General .1 No driveway access from a street shall be closer than 8 meters from the intersection of two streets measured along the property lines. .2 Single Family Residential Driveway: .1 Minimum driveway width shall be 3.0 metres. .2 Driveway widths (surfaced) in excess of 9.0 metres must be approved in writing by the Director of Planning and Engineering. .3 Maximum driveway grade across the boulevard shall be 5%, and the maximum grade within the lot shall not exceed 12%. .4 Minimum driveway surface shall be compacted all weather gravel surface. .5 Surface water from driveway on private property must be contained on-site, unless otherwise approved in writing by the Director of Planning and Engineering. .6 Driveway access roads must have a minimum of 9.0 m centre line radius on all curves and corners along the road. .7 Turn around facilities are to be provided for any dead-end access driveway fronting an arterial roadway. .8 Unless otherwise approved in writing by the Director of Planning and Engineering, only one driveway will be permitted into each lot. .3 Reciprocal Access Driveway for Three (3) or more Single Family Residences, Multi-Family and Commercial Developments: .1 Minimum driveway width shall be 6.0 metres. .2 Driveway widths (surfaced) in excess of 9.0 metres must be approved in writing by the Director of Planning and Engineering. .3 Minimum driveway surface shall be hot mix asphaltic pavement. .4 Maximum driveway grade within the lot shall not exceed 12%. C-4 .5 The finished elevation of the driveway at the road property line shall not vary more than 150 mm from the elevation of the centreline of the existing road, unless otherwise approved in writing by the Director of Planning and Engineering. .6 Curb and gutter shall be installed as required. .7 Surface water from driveways on private property must be contained on-site, unless otherwise approved in writing by the Director of Planning and Engineering. A connection to the City drainage system may be permitted but at a controlled rate of discharge. .8 Driveway access roads must have a minimum of 11 m inside edge radius on all curves and corners along the road. .9 Turn around facilities are to be provided for any dead-end access driveway in accordance with the BC Building Code. .10 Unless otherwise approved in writing by the Director of Planning and Engineering a maximum of two access driveways will be permitted into a development. C - 2.08 Highway Right-Of-Way Requirements .1 Highway rights-of-way widths shall be in accordance with Table A.1 of Schedule A. .2 The tops of road cuts and the toes of road fills that are outside the highway right-of- way shall be identified and legally protected. .3 The toe of existing cut slopes (at the property line) and the top of all fill slopes (at the property line) shall not be cut or filled by more than 150 mm above or below the existing top of curb elevation. C - 2.09 Intersections Intersections shall be designed as follows: x intersecting highways shall meet substantially at right angles (between 70 degrees and 110 degrees); x jogs in highway alignment at intersections shall be avoided except where the distance between centrelines is sufficient to ensure traffic safety. The minimum spacing between the intersections along a street shall be 40 m; x intersections having more than four intersecting legs shall not be permitted. x intersections shall provide adequate crossing sight distances and stopping sight distances, as specified in the Geometric Design Guide for Canadian Roads (current edition); x a property line corner cut-off of 5.0 m shall be shown at all intersections. C-5 C - 2.10 Reverse Curves If reverse curves are required in a highway alignment, the Director of Planning and Engineering may require that they be separated by means of tangents of sufficient length to allow superelevation rotation. C - 2.11 Mail Boxes Where required by Canada Post, the Owner shall construct a base for mailboxes in the location specified by Canada Post and approved by the Director of Planning and Engineering. The Owner shall obtain location and design guidelines for mailboxes from Canada Post. The Director of Planning and Engineering may require construction of a pullout at the mailbox location depending on traffic volumes and number of residences serviced from the location. The Design Engineer shall provide copies of correspondence with Canada Post confirming no requirement for mailboxes or the desired location if mailboxes are required prior to issuance of the Construction Permit. C - 2.12 Street Names and Traffic Signs Street name signs and traffic signs required as a result of constructing or improving streets shall be provided by the City of Williams Lake at the expense of the Owner. Street names shall be assigned by the City of Williams Lake. C - 2.13 Appurtenances The Design Engineer shall detail on the design drawings the location of all proposed traffic islands, retaining walls, guardrails, and permanent barricades. These structures shall be designed in accordance with good engineering practices. The design shall show the location of all traffic signs, street signs, and other traffic control devices required to be placed in the road allowance. Where applicable, the drawings shall show all utility poles and indicate the poles to be relocated to accommodate the proposed subdivision or development design. Design drawings for underground hydro, telephone, and cablevision system shall show the location of underground conduits, and appurtenances including the connections to properties. C - 2.14 Vertical Alignment The vertical alignment of a road shall be set so the grades of the driveway to adjacent properties shall be in accordance with Clause C - 2.07. The minimum longitudinal gradient at the gutter line shall be 0.50% for all classifications of streets. C-6 C - 2.15 Design Speeds The design speeds used for design of Highways shall be as in Table C.1. TABLE C.1 DESIGN SPEED 4 Lane Collector 70 km/h 2 Lane Collector 60 km/h Local 50 km/h C - 2.16 Road Crown The road crown shall be 2%. Crossfalls may be permitted through areas of adverse topography, only with written permission of the Director of Planning and Engineering. Inverted crowns and crossfalls may be used through developments. C - 2.17 Road Grades Minimum and maximum road centreline grades shall conform to Table C.2 based on the classification of the road: TABLE C.2 ROAD GRADES Road Classification Minimum Grade Maximum Grade 4 Lane Collector 0.5% 8% 2 Lane Collector 0.5% 8% Local 0.5% 10% Cul-de-Sac (entry downhill) 0.5% 8% Cul-de-Sac (entry uphill) 0.5% 10% Cul-de-Sac (bulbs) 0.5% 6% Lane 0.5% 10% Walkway 0.5% 12% Maximum grades are to be reduced by 1% for each (or part of each) 30 metres that the centreline radius is less than 150 m. C-7 C - 2.18 Vertical Curves Vertical curves shall be designed to provide safe stopping sight distances. Minimum stopping sight distance is the least distance required to bring the vehicle to a stop under prevailing vehicle and climatic conditions. Vertical curves shall be provided at all grade changes greater than 1.0%. Vertical curve length is calculated by the equation L = KA where: L is the length of the vertical curve in metres K is a constant related to lines and geometry of a parabolic curve A is the algebraic difference of grades in percent L shall not be less than the design speed in kilometres per hour Minimum K values for vertical curve design shall be as described in Table C.3. TABLE C.3 MINIMUM K VALUES FOR VERTICAL CURVE DESIGN Crest Curve Sag Curve Road Classification Minimum Lighting No Lighting 4 Lane Collector 22 15 25 2 Lane Collector 15 10 20 Local 7 6 11 C - 2.19 Horizontal Alignment Centre Line Radii The minimum required centreline radius for various superelevation rates for each classification of roadways are as follows: TABLE C.4 MINIMUM CENTRELINE RADIUS Horizontal Curve Radii (m) Road Classification Superelevation (m/m) None 0.02 0.04 0.06 N/A 230 200 190 160 140 130 N/A 4 Lane Collector (70 kph design speed) 2 Lane Collector (60 kph design speed) Local* (50 kph design speed) 95 N/A N/A N/A * Radius may be reduced at the discretion of the Director of Planning & Engineering. Spiral curves shall be designed on 4 Lane Collector Highways. C-8 C - 2.20 Curb Return Radii Curb return radii shall conform to the following and be based on the lesser classified Highway. 4 Lane Collector 11 m 2 Lane Collector 11 m Industrial 11 m Local 9.0 m Cul-de-Sac Entrance 9.0 m Cul-de-Sac Terminus 12.0 m C - 2.21 Intersection Design Unless indicated elsewhere herein, all intersection design standards shall conform to those outlined in the latest edition of "Geometric Design Standards for Canadian Roads and Streets" as published by the Transportation Association of Canada (TAC). C - 2.22 Intersection Grades Approach grades for a crest curve of minor streets at intersections to major streets shall not exceed 75% of the maximum grade allowed for that street classification. The minor street shall be designed to intersect the major street with a vertical curve of minimum length required for that street classification listed in Table C.3. Providing the minor intersecting street is marked with a STOP sign, the following may be used for the minor street. The minor street may be designed to intersect the major street with a vertical curve of minimum length required for that street classification listed in Table C.5. The vertical curve shall terminate at the projected curb line of the major street meeting the crossfall of the major street. In extreme cases, with the approval of the Director of Planning and Engineering, sag curves may terminate at the curb line of the major street at a 0% slope. TABLE C.5 MINIMUM K VALVES FOR VERTICAL CURVES AT INTERSECTIONS Minimum K Value (in metres) Sag Curve Intersecting Street Crest Curve With Lighting Without Lighting 4 Lane Collector 17 17 17 2 Lane Collector 7 7 10 Local 4 4 6 C-9 C - 2.23 Pavement Structure The pavement structure shall be designed in accordance with Manual Series MS-1 of the Asphalt Institute (1981 or most recent edition). The pavement structure shall be designed for a fifteen (15) year design life. Staged construction may be considered by the Director of Planning and Engineering when a road is planned to be widened at a later date. Roads shall be classified as follows for purposes of structural design of the total pavement structure; design traffic values and minimum depths of hot mix asphalt are defined as well: TABLE C.6 PAVEMENT STRUCTURE Road Classification Design Traffic (EAL'S) Min. Depth of Hot Mix Asphalt (mm) 4 Lane Collector > 2.8 x 105 See Note 2 2 Lane Collector 2.8 x 105 75 Industrial 5.6 x 105 75 Residential 2.8 x 104 75 Lanes Not Applicable 50 Walkways Not Applicable 50 NOTE 1: See Chapter IV of MS-1 of the Asphalt Institute. NOTE 2: To be specifically designed, based on projected EAL's, in accordance with MS-1 of the Asphaltic Institute. Soils used to construct the roadway subgrade shall be evaluated in accordance with MS-1 (see Chapter V) to determine the load bearing capacity of the subgrade. For this purpose, the California Bearing Ratio (CBR) test value shall be obtained using soil moulded to the minimum specified compaction level. The design CBR values shall be determined in the soaked condition in accordance with ASTM Des D1883. This value shall be used for structural design purposes. The minimum compacted depth of crushed granular base course, in the total pavement structure, shall be 100 mm. If the soaked CBR value of the subgrade soil is less than 3, subgrade enhancement shall be provided to create a soaked CBR of 3, and the pavement structure shall be designed using a soaked CBR of 3. Subgrade enhancement shall be provided by placement of an initial layer of granular sub-base of a thickness which has been calculated to provide the necessary structural improvement to the subgrade. C-10 A minimum pavement structure for roads shall be provided, not withstanding the structural character of the subgrade. Following minimum pavement structures are specified, and will be considered structurally adequate when the subgrade soil exhibits a minimum soaked CBR of 6: TABLE C.7 MINIMUM PAVEMENT STRUCTURE Road Classification Granular Sub-base (mm) Granular Base (mm) Hot Mix Asphalt (mm) 4 Lane Collector Structural Design shall be project specific 2 Lane Collector 450 150 75 in 2 lifts Industrial 450 150 75 in 2 lifts Local & Cul-de- sac 300 75 75 in 2 lifts Lanes 300 75 50 Walkways 200 50 50 The design of structural overlays of existing pavements shall be based on the analysis of the results of Benkelman beam tests and test hole information acquired from the existing road which is to be upgraded. The Transportation Association of Canada procedure for designing structural design of overlays of existing pavements, as published in "The Pavement Management Guide", shall be used. The maximum permissible Benkelman beam deflections to be used for overlay design are: TABLE C.8 MAXIMUM ROAD DEFLECTIONS Road Classification Maximum Permissible Deflection After Overlay 4 Lane Collector 1.00 mm 2 Lane Collector 1.25 mm Industrial See Note (1) Residential 1.50 mm NOTE:(1) As specified by the Director of Planning & Engineering. C-11 The structural design of pavements for roads shall be performed by a qualified pavements engineer. Structural designs of pavements shall be submitted to the Director of Planning and Engineering in an acceptable report format. Other payment evaluation systems may be considered upon consultation with the Director of Planning and Engineering. C - 2.24 Highway Cross-Sections The standard street cross-section for various classifications of roadways shall be as per Table A.1 and the applicable Standard Drawings. C-3.0 RECORD DOCUMENTATION C - 3.01 Construction Record Drawings Prior to issuance of a Construction Completion Certificate by the Director of Planning and Engineering, the Owner's Engineer shall submit the following: x road plan/profile drawings at minimum 1:500 scale showing: - road centreline horizontal and vertical alignments c/w curve data - original ground profile - road widths, lane configuration and Right of Way widths. - Curb and gutter line c/w return radius. - Curb type (Roll Curb) and if not Concrete include material (Asphalt Roll Curb) - All existing utilities in area of road construction. x Above information to be provided in format and standards specified in Schedule J - Drawing Standards - of this bylaw. C - 3.02 Construction Documentation x Material Testing Reports, including all Concrete, Asphalt, Compaction and Gradation results on original copies signed by the testing firm. SCHEDULE D REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE DESIGN OF CURBS AND GUTTERS, SIDEWALKS AND BOULEVARDS I, WAYNE K. THIESSEN, MUNICIPAL CLERK OF THE CITY OF WILLIAMS LAKE, DO HEREBY CERTIFY THIS TO BE SCHEDULE "D" TO BYLAW NO. 1730. "original signed by" ________________________________________________ MUNICIPAL CLERK D-1 SCHEDULE D REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE DESIGN OF CURBS AND GUTTERS, SIDEWALKS AND BOULEVARDS D - 1.0 GENERAL D - 1.01 Standards and Specifications of this Schedule to Apply to All Works Where the provisions of Schedule A of this Bylaw require the provision of curbs and gutters, sidewalks and boulevards, the Owner shall construct such services in accordance with the regulations, standards and specifications set out in this Schedule. D - 1.02 Approval of Engineering Drawings Required prior to Construction Prior to construction, engineering drawings prepared in accordance with the City's specifications for drawings in Schedule J showing detailed design of the necessary works shall be submitted to the City Approving Officer for approval. No construction of the works shall commence until the design drawings have been approved by the City Approving Officer and the Owner advised accordingly in writing. D - 1.03 Curb, Gutter and Sidewalk Requirements Curb, gutter and sidewalk shall be as per Table A.1 and the applicable Standard Drawings. D - 2.0 DESIGN CRITERIA D - 2.01 Design Gradient The design gradient shall be as specified for roads in Schedule C of this Bylaw, except that the minimum gradient around curb returns and around cul-de-sacs shall be 0.5%. D - 2.02 Curb Returns The minimum curb return radius shall be as set out in Article 2.20 of Schedule C of this Bylaw. Elevations shall be shown on the engineering drawings for the beginning and end of the curb return, as well as at any changes in grades in between. Engineering drawings shall provide all horizontal and vertical geometric details for curb returns. D-2 D - 2.03 Grading of Boulevards Upon completion of road, curb and gutter and sidewalk constructions, boulevards shall be shaped and graded as shown on the Standard Drawings. Native material shall be placed flush with the top of curb or back of walk and shaped to conform with general lot grading. Unless otherwise approved, boulevards shall be graded to drain to the curb at a minimum slope of 2% and a maximum slope of 10% between the back of curb or sidewalk to the property line. D - 2.04 Granular Sub-Base and Base Gravel Depths Granular sub-base and base gravel depths for curb and gutters, sidewalks, driveways and commercial crossovers shall conform to the depths of sub-base and base gravels specified for the road as noted in Table C.7 of Schedule C. D - 2.05 Sidewalks Cross Section Concrete sidewalks shall have a thickness not less than 100 mm and shall be constructed in accordance with the Standard Drawings. The sidewalk shall be graded to drain to the curb at a slope of 2%. D - 2.06 Driveway Access Across Boulevards Driveway access across all City boulevards shall be as set out in Article 2.07 of Schedule C of this Bylaw. D - 2.07 Curb and Gutter Cross Section Curbs and gutters shall be constructed consistent with the applicable Standard Drawings contained within Schedule L of this Bylaw. D - 2.08 Commercial Crossovers Commercial crossovers shall be provided at all access locations for uses other than residential. Commercial crossovers shall be constructed consistent with the applicable Standard Drawings. D - 2.09 Wheelchair Ramps Wheelchair ramps shall be provided at all intersections of streets provided with sidewalks and shall be constructed in accordance with the applicable Standard Drawings. D-3 D-3.0 RECORD DOCUMENTATION D - 3.01 Construction Record Drawings Prior to issuance of a Construction Completion Certificate by the Director of Planning and Engineering, the Owner's Engineer shall submit the following: x plan/profile drawings at minimum 1:500 scale showing: - curb horizontal and vertical alignments c/w return radius - original ground profile - driveway crossings and wheelchair ramps - sidewalk crossfalls and widths - Curb type (Roll Curb) and if not Concrete include material (Asphalt Roll Curb) - All existing utilities in area of road construction. x Above information to be provided in format and standards specified in Schedule J - Drawing Standards - of this bylaw. D - 3.02 Construction Documentation x Material Testing Reports, including all Concrete, Asphalt, Compaction and Gradation results on original copies signed by the testing firm. SCHEDULE E REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE DESIGN OF WATER SYSTEMS I, WAYNE K. THIESSEN, MUNICIPAL CLERK OF THE CITY OF WILLIAMS LAKE, DO HEREBY CERTIFY THIS TO BE SCHEDULE "E" TO BYLAW NO. 1730. "original signed by" ________________________________________________ MUNICIPAL CLERK E-1 SCHEDULE E REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE DESIGN OF WATER SYSTEMS E - 1.0 GENERAL E - 1.01 Water Distribution System to be Constructed by Owner Where the provisions of Schedule A of this Bylaw require the construction of a water distribution system, the Owner shall provide a water distribution system and storage facilities including water mains, valves, hydrants, service connections, pump stations, reservoirs and pressure reducing stations in accordance with the regulations, standards and specifications set out in this Schedule. All standards not specifically described in this schedule shall be in accordance with appropriate American Water Works Association (AWWA) standards or as directed by the Director of Planning and Engineering. E - 1.02 Approval of Engineering Drawings Required prior to Construction Engineering drawings showing detailed design of the necessary works shall be prepared in accordance with the City's specification for drawings contained in Schedule J and submitted to the City Approving Officer for approval. No construction shall commence until the engineering drawings have been approved by the Approving Officer. These drawings shall show alignment, size and depths of pipes, pipe bedding requirements, existing ground line and proposed final ground line over the pipe, location and detail of all fittings, valves and hydrants, location of all service connections, location, access to, size and details of any pump stations and reservoirs, all easements and all such other details as may be required. Where a water system is not yet available, rights-of-way may be required to be provided by the Owner to allow for the eventual installation of this facility. Such rights-of-way shall be registered in favour of the City of Williams Lake at the Owner's expense. E - 2.0 DESIGN CRITERIA E - 2.01 Capacity of System and Sizing of Water Mains Water distribution systems shall be designed to deliver water in adequate quantities at adequate pressures for both domestic use under peak consumption conditions and fire flows. Mains shall be sized to carry the peak hourly flow rate or the maximum daily flow rate plus the fire flow rate, whichever is the greater. Mains shall be sized using the Hazen-William formula with "C" equal to 120 and maximum flow velocity for peak hourly demand rate of 2.0 m per second. For fire flow, plus the maximum day rate, the flow velocity shall not exceed 3.0 m per second. E-2 E - 2.02 Domestic Demand Criteria For residential areas, the daily domestic demand criteria for purposes of designing water distribution systems shall be assumed to be: Average day: 1000 Litres/day/capita Maximum Day: 2500 Litres/day/capita Peak Hour/Maximum day Consumption Ratio: 2 For other than residential areas, the demand criteria shall be selected to suit the particular circumstances subject to the Approval of the Director of Planning and Engineering. E - 2.03 Fire Flow Requirements Water distribution systems shall also be designed to ensure that fire flows as required by the Fire Underwriters' Survey are available for required duration. Fire flows shall not be less than 4000 Litres per minute. The amount and duration of design fire flows shall be provided to the Director of Planning and Engineering for his approval prior to final design of the water distribution system. E - 2.04 Design Pressures Water systems shall be designed for pressures in the range of 245 KPa to 630 KPa, with 245 KPa measured under peak hourly conditions and 630 KPa measured under static conditions. The minimum pressure shall be measured or calculated at the main floor elevation of the highest proposed house and an allowance made for pressure loss in the service line to the house wall. Minimum residual pressure at any hydrant shall not be less than 140 KPa under maximum day domestic consumption plus fire conditions. Reservoir level shall be assumed at mid point for calculation of minimum pressures and full for calculation of maximum static pressures. E - 2.05 Minimum Pipe Size The minimum pipe size for all water mains shall be 150mm diameter. The City may require water mains larger than 150mm diameter if on main feeder lines. E-3 E - 2.06 Location and Grade of Water Mains Water mains shall be located in the road right-of-way as shown on the Standard Drawings unless otherwise approved by the Director of Planning and Engineering. Where the location of the watermain is not practical due to topography or other factors, the watermain shall be located in a utility right-of-way registered in favour of the City of Williams Lake and having a width of not less than 6.0 m. There shall be a minimum lineal horizontal clearance of 1 m between a water main and other existing or proposed underground services, except sanitary sewer mains. A minimum of 3.5 m horizontal distance between the centerline of a watermain and the centreline of a sanitary sewer main shall be maintained. In special cases such as installations in rock or hardpan, the horizontal clearance may be reduced, with the approval of the Director of Planning and Engineering, provided the invert of the water main is a minimum of 450 mm above the crown of the sanitary sewer and subject to any Ministry of Health regulations. On side-hill streets, the main shall, where possible, be located on the cut side of the centreline of the street. Water mains shall be normally designed to follow a straight alignment between intersections, at grades parallel to the road centreline. Curved alignments may be accepted provided that the pipe alignment is at a parallel offset with an established boundary and the radius of curvature is not less than twice the minimum radius of curvature recommended by the pipe manufacturer. The design drawings shall indicate where short lengths or pipe bends are required on curves. Water mains shall be designed with a rising grade wherever possible to minimize high points in the main. Where a high point is unavoidable, either a blow off, service or air release valve shall be installed at that point. Where the water main network is weak, installation of supplementary mains of a minimum of 150 mm diameter connected to existing mains may be required at the discretion of the Director of Planning and Engineering and may necessitate the provision of rights-of-way in favour of the City of Williams Lake. No gas main, electric or telephone duct or other utility line shall be installed in the same trench with water mains. Where it is necessary for the water main to cross other underground services, the crossing shall be made at an angle greater than 20 degrees and the vertical clearance between services at the crossing point shall be not less than 200mm, except for sanitary sewers where the clearance shall be greater than 450mm between the pipes. The drawings shall indicate whether the water main passes over or under other underground services which it is crossing. E-4 E - 2.07 Spacing of Fire Hydrants Fire hydrants shall be located, in general, at highway intersections and at maximum spacing of 150 metres in low density residential areas and 100 metres in high density residential, commercial and industrial areas. Additional hydrants may be required by the Director of Planning and Engineering at schools, major multiple family developments, commercial buildings or other major developments consistent with the current fire flow requirements of the Fire Underwriters' Survey. Where hydrants are located other than at intersections, they should be located on the projection of the property line dividing two lots. In selecting the location of a hydrant, the probable route of the fire engine shall be considered. A hydrant shall not be located within 3 m of a utility pole, pad mounted transformer or light standard, within 1.5 m horizontally of underground service pipes or open ditches, or within 1 m of the curb line or back of sidewalk. E - 2.08 Line Valves Line valves in residential areas shall be located at a maximum spacing of 250 m in a continuous line and shall generally be located so that not more than 2 hydrants or 50 dwelling units will be without adequate pressure in the event of any one water break. In commercial and industrial areas, line valves shall have a maximum spacing of 120 m and be located so that not more than one hydrant will be out of service during water system repairs. Each tee shall have a minimum of two line valves; each cross shall have a minimum of three line valves. Each line valve shall be the same diameter as the pipe on each downstream branch of the tee or cross. At the discretion of the Director of Planning and Engineering, line valves may be required on all branches of a wye or tee. All valves at watermain intersections shall be flanged to the fitting. A line valve may be required on a new pipeline near each point of connection to existing mains. E - 2.09 Blow Offs Permanent blow offs shall be installed at all permanent dead-ends and an adapter will be required for connecting a standard 63 mm fire hose for flushing the main, as shown on the Standard Drawings. Temporary blow offs (usually a corporation cock) may be installed to facilitate chlorination and flushing of any part of the system. After flushing, the temporary blow off shall be removed as directed by the Director of Planning and Engineering. E-5 E - 2.10 Air Relief Valves Double acting air relief valves shall normally be installed at all summits in the mains in accordance with the applicable standard drawing. E - 2.11 Fittings and Appurtenances Fittings and appurtenances with other than standard hub ends shall be so indicated. Where practical, all fittings shall be located in respect to each other so that flanges or standard pipe lengths can be used to connect them. The centre-to-centre dimension between fittings near each other shall be shown on the final engineering drawing. E - 2.12 Service Connections The diameter of water services shall be determined by the Design Engineer and is subject to approval of the Director of Planning and Engineering, and in no case shall the diameter be less than 19mm. A water service shall be installed where required to provide a connection to each lot created by the subdivision and to any other existing or possible future lot which can be serviced from mains installed by or for the subdivision. The curb stop at the end of each service pipe shall be located 0.3 m in front of the street/property boundary line, and 3.5 m from the lowest corner lot pin in accordance with the Standard Drawings. Where such location will conflict with other services, the location may be revised with the approval of the Director of Planning and Engineering. All non-metallic service connection piping shall have an insulated tracing wire installed along side. The tracing wire shall run from the main line to the curb stop and terminate inside the top of the service box. E - 2.13 Depth of Cover The depth of the water main shall be sufficient to provide all services with a minimum cover depth of 1.8 m to the top of the service anywhere within the Right-of-Way. A minimum cover depth of 1.8 m shall be provided over the crown of the main. Water service connections installed on private property shall have a minimum depth of cover of 1.8 m. E-6 E - 2.14 Tie-ins to Existing Water Mains Connection of a new pipe to an existing water main generally shall be done by wet tap (hot tap) and shall be done by the City unless the existing main has an acceptable provision for a direct extension. The Owner shall pay for the supply of all materials, equipment and labour required to construct the tie-in. This portion of the work, including details of materials required, shall be clearly indicated on the design drawings. Only the City may operate valves on the existing water mains. Application for tie-in shall be made a minimum of one week in advance of the proposed work. E - 2.15 Reservoirs Reservoirs, where required, shall be designed in consultation with the Director of Planning and Engineering to suit the particular circumstances. In general, reservoir capacity shall not be less than: Total Storage Requirement = A + B + C where: A = Fire Storage (as per Article 2.03 of this Schedule) B = Equalization Storage (25% of maximum day demand) C = Emergency Storage (25% of A + B) A Geotechnical Investigation shall be undertaken prior to site approval being given. Reservoir design, at minimum, shall incorporate the following features: - sufficient geotechnical data to prove the site suitable for reservoir construction; - structures to be below ground and covered, unless specifically approved otherwise; - material - reinforced concrete; - 2 cells, each containing one-half of total required volume and capable of being drained and filled independently; - lockable access opening in roof for cleaning and maintenance - minimum dimension 1 m x 1 m to be located between overflow pipe and wall; - ventilation pipes or openings; - slope floor to sump; - sub-drain under floor to collect and drain any leakage (connect to overflow pipe in a manhole); - interior wall ladder from roof access to floor (no exterior ladder required); - inlet, outlet pipe to be perforated and designed to disperse water throughout the reservoir; - overflow drain to be provided and sized to transmit the maximum pump discharge. The overflow drain shall be connected to an acceptable point of discharge; - access roads; - telemetry control and alarm system, to match, and be connected to, the City's existing system, at the Owner's expense. E-7 Reservoir valve chamber design shall incorporate: - sump in valve chamber floor, connected to overflow pipe; - 50 mm valved outlet off supply line within valve chamber for water supply for cleaning reservoir; - valves shall have open or closed indicators. E - 2.16 Pump Stations Pump stations, where required, shall be designed in consultation with the Director of Planning and Engineering to suit the particular circumstances. In general, pump stations shall be designed to meet maximum daily demands with the largest pump out of service with balanced storage on line. If equalization storage is not on line, pump station capacity must meet peak hour demand with the largest pump out of service. A Geotechnical Investigation shall be undertaken prior to site approval being given. Pump station design, at minimum, shall incorporate the following features: - reinforced concrete, block work or brick construction, aesthetically pleasing; - lockable access doorways sized so that the largest piece of equipment may be safely removed and replaced. Lifting hooks or rails with pulley blocks as required; - pumps to start and stop individually. Start and stop to be based on water levels in control reservoir. Automatic alternation of pump sequence; - power failure protection with manual reset; - high water override start plus alarm; - high pressure (discharge) override start; - low pressure (discharge) override start plus alarm; - low pressure/no flow (suction) override start; - alarms to be audible and visible; - control valves to minimize starting and stopping surges; - duplicate control cables (without splices) between pump stations and reservoirs; - power factor correction as required by Power Authority; - hour meters and amp meters on each pump; - recording flow meter at each pump station; - recording suction and discharge pressure gauges at each pump station; - automatic heating, ventilating and dehumidifying systems; - in-station lighting; - floor drainage; - interconnection with the City's alarm telemetry system; - Standby Power Receptacle - Female 3 Phase, 3 Wire, 400 Amp, 600 Volt, pin and sleeve type c/w Back Box and Cover. - electrical phase loss protection; - electrical drawing schematics for control panels; - access roads; - pump manuals. E-8 For each design submission to the City, an extra set of drawings pertaining to the design of the pump station, key plan, and a location plan shall be provided for the maintenance department to review. Before commencement of construction, the Owner shall provide four sealed sets of mechanical shop drawings and four sealed sets of electrical line diagrams for review by the Director of Planning and Engineering. Two sealed copies of design calculations shall be provided for documentation. Before acceptance of the completed station, by the City, the Owner shall provide three (3) copies of an Operation and Maintenance Manual to the City as per Article E-3.02 of this Schedule. E - 2.17 Pressure Reducing Stations Pressure reducing stations, where required, shall be designed to suit the particular circumstances. In general, each pressure reducing station shall have a separate; pressure reducing valve and appurtenances for maximum daily demand and a separate pressure reducing valve and appurtenances for fire flows. Pressure reducing station design, at minimum, shall incorporate the following features: - access road to chamber; - precast or cast in place concrete chamber suitable for H20 Highway loading; - insulated with 50mm of rigid styrofoam insulation to a depth of 1.2m, - lockable, insulated access hatch (914mm x 914mm minimum); - aluminium ladder and safety port; - free draining sump or sump with sump pump assembly; - lighting, heating, venting and one electrical outlet; - pressure reducing valves with downstream surge control; - wye strainers; - isolating gate valves with open and closed indicators; - victaulic couplings; - pressure gauges; - one 20mm hose bib connection; - pipe stands - ceiling and wall of chamber to be painted with two coats of latex white paint; For each design submission to the City, three sets of drawings pertaining to the design of the pressure reducing station, key plan and a location plan shall be submitted. E-9 E - 2.18 Access Vehicular access shall be provided to all reservoirs and pump stations. The minimum standard shall be as for a paved lane as shown on Standard Drawings with curbing and drainage provisions as may be required by the Director of Planning and Engineering. E-3.0 RECORD DOCUMENTATION E - 3.01 Construction Record Drawings Prior to issuance of a Construction Completion Certificate by the Director of Planning and Engineering, the Owner's Engineer shall submit the following: x Mainline plan/profile drawings at minimum 1:500 scale showing: - horizontal alignment of watermain c/w curve data and offsets from property line - vertical alignment of watermain c/w curve data, invert elevations and depth - valve and appurtenances locations and elevations - fire hydrant locations, elevations, manufacturer and model - service locations and elevations (saddles, curb stops and bends) - pipe sizes, material types and pressure classes - details of all fitting and connections - all existing utilities in area of watermain. x Reservoir plan/profile drawings at minimum 1:500 scale showing: - site layout and location - landscaping and fencing - mechanical layout, details and elevations - structural plan, details and elevations - telemetry plans, details and schematics x Pump Station plan/profile drawings at minimum 1:250 scale showing; - site layout and building location - landscaping and fencing - mechanical layout, details and elevations - structural floor plan, details and elevations - electrical and control plans, details and schematics x Above information to be provided in format and standards specified in Schedule J - Drawing Standards - of this bylaw E-10 E - 3.02 Construction Documentation x Material Testing Reports, including all Concrete, Asphalt, Compaction and Gradation results on original copies signed by the testing firm. x Water leakage test reports for water mains and reservoirs. x Bacteriological test reports for all water mains and reservoirs. x A geotechnical report under seal of a Professional Engineer, documenting site inspections, concrete testing, compaction testing, soils testing and certification of the foundation soils of any structures constructed. x A structural report under seal of a Professional Engineer, documenting site inspections, testing and certification of any structures constructed. x Operation and Maintenance Manuals for all Pump Stations and Pressure Reducing Stations containing: - Cover page and table of contents. - As constructed shop drawings. - Equipment layout drawings. - Electrical, control, and alarm wiring diagrams. - Operating instructions for all equipment. - Maintenance instructions for all equipment, including frequency of maintenance. - Equipment data sheets. - Certified head/capacity curves for pumps. - Equipment part lists. - Emergency operating procedures. The maintenance manuals shall be hardback bound documents with the name of the facility embossed on the cover. Each section of the manual shall be identified by plastic covered tabbed dividers, with the section name identified on the tab. SCHEDULE F REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE DESIGN OF SANITARY SEWERS I, WAYNE K. THIESSEN, MUNICIPAL CLERK OF THE CITY OF WILLIAMS LAKE, DO HEREBY CERTIFY THIS TO BE SCHEDULE "F" TO BYLAW NO. 1730. "original signed by" ________________________________________________ MUNICIPAL CLERK F-1 SCHEDULE F REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE DESIGN OF SANITARY SEWERS F - 1.0 GENERAL F - 1.01 Where a sanitary sewage collection and disposal system is required, sanitary sewer facilities including gravity sewer mains, pump stations, force mains, manholes, service connections and all related appurtenances shall be provided. A sewer service connection shall be installed where required to provide a connection to each parcel to be created by the subdivision and to any other existing or possible future parcels which can be serviced from mains installed by or for the subdivision. The routing of sewers shall be in accordance with the directions of the Director of Planning and Engineering. Where sanitary sewer facilities are not required, rights-of-way may be required to be provided by the Owner to allow for the eventual installation of this facility. Such rights-of-way shall be registered in favour of the City of Williams Lake at the Owner's expense. F - 1.02 Approval of Engineering Drawings Required Prior to Construction Prior to construction, engineering drawings prepared in accordance with the City's specification for drawings contained in Schedule J showing detailed design of the necessary works shall be submitted to the City Approving Officer for approval. No construction of sanitary sewers shall commence until the drawings have been approved by the Approving Officer and the Owner advised accordingly in writing. Engineering drawings shall show alignment and size of pipes, proposed grades, distances between manholes, manhole invert elevations, existing ground line and proposed final ground line over pipe, location of all service connections to the property line, all easements, lift stations, force mains, pipe bedding requirements and all other details which may be required by the Director of Planning and Engineering. F - 2.0 DESIGN CRITERIA F - 2.01 Pipe Capacity Sanitary sewer facilities constructed in a subdivision shall be designed to provide sufficient capacity to carry the required quantity of sewage flow from the fully developed upstream contributing area, as defined by the Director of Planning and Engineering. F-2 Sewage design flows shall be based on the equivalent population of the contributing area as determined by the Director of Planning and Engineering but no less than 66 persons per hectare with an average per capita flow of 510 Litres per day. A peaking factor calculated using the Harmon Peak Factor curve shall be applied to the average flow as follows: Peak Factor = 1 + 14 4 + P½ Where P = equivalent contributing population in thousands. An infiltration rate of 5,000 Litres per hectare per day shall be used. In areas where the water table is higher than the sewer main inverts, 8000 Litres per hectare per day shall be used. The peaking factor shall be applied to the sanitary contribution only and not to the infiltration allowance. Pipe sizes shall be selected so that sewers flow 2/3 to 3/4 full at peak hour design flow. F - 2.02 Minimum Velocity and Design Grade Minimum velocity for pipe flowing full or half full shall be 0.6 metres per second. Minimum grades are as follows, assuming a pipe roughness coefficient "n" of 0.013: Pipe Dia. Min. Grade Pipe Dia. Min. Grade 100 mm 2.00% 375 mm 0.15% 150 mm 1.00% 450 mm 0.12% 200 mm 0.40% 525 mm 0.095% 250 mm 0.28% 600 mm 0.080% 300 mm 0.22% There shall be no change in the grades of pipe between manholes. F - 2.03 Sizing of Sewer Mains The minimum pipe size for all sewer mains shall be 200 mm. Through areas where five or fewer services are connected and where future extension of the sewer main is not possible, the minimum size may be reduced to 150 mm, upon approval of the Director of Planning and Engineering. No reduction of pipe size shall be made downstream, irrespective of pipe grade. F-3 F - 2.04 Depth of Cover The depth of the main shall be sufficient to provide all service connection piping with a minimum cover of 1.5 m to top of the service piping anywhere within the finished sewer system. Sanitary mains shall be designed such that gravity drainage is possible from the full basement level of all parcels. A minimum cover of 1.5 m shall be provided over the crown of gravity mains. A minimum cover of 1.8 m shall be provided over the crown of forcemains. F - 2.05 Manhole Spacing Manholes shall be installed at a maximum spacing of 120 m and in the following locations: .1 at the end of each line; .2 at all changes in grade and/or alignment (for non curvilinear sewers); .3 at all changes in pipe size; .4 at all pipe junctions; .5 at all intersections. Manholes shall normally be constructed in accordance with the details as shown on the applicable Standard Drawings. In cases where these details will not suffice, a detailed design drawing must be prepared by the Owner's Engineer and approved by the Director of Planning and Engineering. Only exterior drop manholes on sanitary sewers may be allowed where particular circumstances preclude the use of normal manholes and where invert elevations differ by more than 600 mm. Where practical, sewermain grades between manholes shall be designed to keep manhole inlet and outlet elevations to less than 100mm difference. The relative elevations of sanitary sewers entering and leaving a manhole are to be such as to ensure that the manhole does not substantially reduce the hydraulic capacity of the system. Minimum fall through the manhole shall be 20 mm. F - 2.06 Cleanouts Cleanouts rather than manholes are permitted only on developments where works are not maintained by the City. Cleanouts shall be constructed in conformance with the applicable Standard Drawing. F - 2.07 Service Connections The diameter of sewer services shall be determined by the Design Engineer, subject to the approval of the Director of Planning and Engineering, but in no case shall the diameter be less than 100 mm. F-4 Sewer services shall be installed 3.0 metres from the lowest elevation corner lot pin in accordance with the Standard Drawings. Service connections shall be made with an approved branch wye and be installed in a straight line and at a uniform grade from the terminus at the property line to the 45 degree long radius bend at the main. An approved saddle may only be used to connect a 100 mm diameter service to an existing main. The minimum pipe grade for sewer service pipes shall be: 2% for 100 mm service pipe 1% for 150 mm service pipe In areas where the depth of the service pipe at the main is less than that of the sewer main, service risers shall be constructed consistent with the applicable Standard Drawings. For services 200 mm and larger, a manhole shall be installed at the intersection of the main and the service. A wye or saddle will not be accepted for services 200 mm or larger. F - 2.08 Location of Sewer Mains Sanitary sewer mains shall, wherever possible be located in the road right-of-way as shown on the Standard Drawings. Where the location of the sewer main within the road right-of-way is not practical due to topography or other factors, the sewer main shall be located in a utility right-of-way registered in favour of the City of Williams Lake and having a width of not less than 6.0 m. The Director of Planning and Engineering may require a utility right-of-way wider than 6.0 m in the case where services in addition to sanitary sewer will be placed in the same right-of-way or where the depth of the sewer main requires a wider easement. The entire length and width of each right-of-way shall be graded to provide access for maintenance vehicles. There shall be a minimum clear lateral distance between the outside walls of sanitary sewers and storm sewers of 300mm. F - 2.09 Alignment of Sewer Mains Sewer mains shall be installed a minimum horizontal distance of 3.5 m between the centreline of the watermain and the centreline of the sanitary sewermain and generally be designed to follow a straight alignment between manholes. Curved alignments within rights-of-way shall be subject to the approval of the Director of Planning and Engineering and provided that the pipe is set at a grade greater than the specified minimum and pipe alignment is at a parallel offset with an established boundary. In these cases, the radius of curvature shall be not less than twice the minimum radius recommended by the pipe manufacturer. F-5 F - 2.10 Sanitary Lift Station - Pre-design Requirements The objective of the City of Williams Lake is to minimize the number of sewage lift stations required and thoroughly consider other options to avoid lift stations wherever practical. The Design Engineer shall obtain approval from the Director of Planning and Engineering as to the location of the lift station. Prior to commencing detailed design of a lift station, the Design Engineer shall submit a pre-design report that addresses the design considerations of the station to the Director of Planning and Engineering. Approval of the pre-design concepts must be obtained prior to the Design Engineer commencing detailed design. This requirement covers both dry well and submersible sewage lift stations. Larger capacity sewage lift stations or lift stations with special design or location requirements may require additional assessment and review of criteria. The location and layout of a lift station shall include, at minimum, an assessment of the following basic design considerations: - Shall be designed to handle the flows of the designated catchment area. - Type of station and impact on neighbours. - Construction dewatering requirements. - Access for construction and maintenance complete with asphalt driveway or approved equivalent of sufficient strength to handle heavy trucks and with enough space to accommodate turning. - Aesthetics, noise, odour, and landscaping requirements. - Security against vandalism and theft. - Flood elevations. Station uplift design shall be based on 100 year flood level. - Proximity of receiving sewers, watermains, and adequate power supply. - Minimizing energy requirements. - Standby power and its requirements and compatibility. - Geotechnical investigation shall be undertaken prior to site approval being given. - Convenience of operation and maintenance. - Safety of operators and the public. - Capital costs and operation and maintenance costs. F-6 F - 2.11 Sanitary Lift Station - Design Requirements All sewage lift stations shall meet the following design requirements: - Pumps shall meet maximum flow condition with one pump in failure mode. The pump shall handle the maximum flow with the smallest impeller for that pump size to allow for any future expansion. Pump specifications shall be approved by the Director of Planning and Engineering. - Pumps shall operate alternately. However, a further safety feature shall allow for both pumps to operate at the same time during extreme flows. - Pumps shall have non-clog impellers that will pass a 60 mm minimum spherical solid. - Control panel shall be mounted in the dry well or in a suitable kiosk on a concrete pad and it shall contain a Female 3 Phase, 3 Wire pin and sleeve type Power Receptacle with manual transfer switch suitable for connecting standby power at 400 Amp, 600 Volts and should be capable of handling the pumps with the largest impeller installed and running simultaneously. An extra power outlet for small hand tools operating at 110/220 volts is also required. - Sloping bottom and filleted corners in wet well to direct the flow to the pump suction inlet and prevent solids deposition. - Minimum 38 mm stand pipe water supply within 10 m of the station for wash down complete with a pressure reducer and a ball shutoff valve. Water supply to be installed minimum 1.8m deep, in an accessible chamber. Back flow preventers must be installed. - Liquid level sensing system EHN-10 float switches as provided by Flygt Canada Ltd. or an equivalent acceptable to the Director of Planning and Engineering. - Compatible telemetering system connected to the City's alarm/monitoring system. - Emergency pump-out arrangement approved by the Director of Planning and Engineering. - Sufficient access to remove components for repair. - Minimum 150 mm diameter pipe vent with vandal proof insect screen on outlet for the ventilation of the wet well. Explosion-proof exhaust fan which has sufficient capacity to exchange the total volume of air inside the well with fresh air within 3 minutes. - Check valve and isolating valve for each pump must be provided. Where possible, locate valves in a horizontal position. Where surge pressures for the check valve would be excessive, an electric activated slow closing resilient seated eccentric plug valve, with battery standby, shall be used. F-7 - A Workers' Compensation Board approved aluminium ladder for access to wet well and dry well. - Sump pump for the interior of the dry well discharging above the Top Water Level (TWL) in the wet well. - Minimum 2 hour storage between the high level alarm and the start of overflow to be provided within the wet well and influent pipes at peak wet weather flow. - The wet well shall be sized to allow a minimum of 3 minutes to elapse between successive pump starts at peak flow conditions to prevent pump burn-out. - Emergency overflow should prevent flooding of buildings connected to the sewer system and prevent damage of components in the lift station. Overflow should be to a confined storage area. - All equipment must be CSA approved. - An explosion proof light with protective cover activated by a switch inside the kiosk shall be provided. - Gate valve on the pressure line from the pump station is required. - Bell mouth on pump intake required on all dry well pumps. - Inside deck plates to be light weight fibre glass or aluminium complete with stainless steel hinges. Open grate deck plates preferred. - Special flex joints shall be used at the inlet pipe such as Flex-Tend by EBAA Iron Inc. or an approved equivalent. - The outlet pipe and all other connections to the station shall be brought to within 1.8 m of the expected ground line around the pump station by the use of risers either on the inside of the station or attached to the outside of the station. - Particular criteria for submersible and for dry well stations are to be reviewed with the Director of Planning and Engineering. For each design submission to the City, an extra set of drawings pertaining to the design of the pump station, the sanitary mains and forcemains, key plan and a location plan shall be provided for the maintenance department to review. Before commencement of construction, the Design Engineer shall provide four sealed sets of mechanical shop drawings and four sealed sets of electrical line diagrams for review by the Director of Planning and Engineering. Two sealed copies of design calculations shall be provided for documentation. F-8 Before acceptance of the completed station, by the City, the Owner shall provide three (3) copies of an Operation and Maintenance Manual to the City as per Article F- 3.02 of this Schedule. F - 2.12 Access Vehicular access shall be provided to sewage lift stations. The minimum standard shall be as for a paved lane as shown on the Standard Drawings, with curbing and drainage provisions as may be required by the Director of Planning and Engineering. F - 2.13 Force Mains At the lowest pump delivery rate anticipated to occur at least once per day, a cleansing velocity of at least 0.9 m/s should be maintained. Maximum velocity should not exceed 3.5 m/s. An automatic air relief valve shall be placed at high points in the force main to prevent air locking. Force mains should enter the gravity sewer system at a point not more than 600 mm above the flow line of the gravity sewer. The minimum size for mains discharging raw sewage shall be 100 mm diameter. The materials selected for force mains shall meet City standards and shall adapt to local conditions, such as character of industrial wastes, soil characteristics, exceptionally heavy external loads, abrasion and similar problems. A tracing wire shall be installed for the purpose of locating the force main. All force mains shall be designed to prevent damage from superimposed loads, or from water hammer or column separation phenomena. F - 2.14 Tie-ins to Existing Sewer Mains Connection of a new pipe to an existing sewer main shall be done by the City unless advised otherwise by the Director of Planning and Engineering. However, the Contractor shall co-ordinate the work with the Director of Planning and Engineering and make an application for tie-in one week in advance of the proposed work. F-9 F - 2.15 Pipe Class and Bedding Class The quality of pipe and bedding shall be so selected such that the installation will adequately support the loads to be placed on it during construction and in operation. For concrete pipe, the calculations shall follow the method shown in Water Pollution Control Federation Manual of Practice No. 9, latest edition. A safety factor of 1.5 shall be used for concrete pipe and the bedding classifications shall be as identified on the Standard Drawing. For PVC pipe, the calculations shall follow the methods outlined in the Uni-Bell Plastic Pipe Association publication Handbook of PVC Pipe - Design and Construction, latest edition. Pipe class and bedding class must be identified on all engineering drawings. Pipe shall have at least Class B bedding. F-3.0 RECORD DOCUMENTATION F - 3.01 Construction Record Drawings Prior to issuance of a Construction Completion Certificate by the Director of Planning and Engineering, the Owner's Engineer shall submit the following: x Mainline plan/profile drawings at minimum 1:500 scale showing: - horizontal alignment of sewermain c/w curve data and offsets from property line - vertical alignment of sewermain c/w curve data, invert elevations and depth - manhole and appurtenances locations and elevations - service locations and elevations (saddles, inspection chambers and bends) - pipe sizes, material types and classes - details of all fitting and connections - all existing utilities in area of sewermain. x Pump Station plan/profile drawings at minimum 1:250 scale showing; - site layout and building location - landscaping and fencing - mechanical layout, details and elevations - structural floor plan, details and elevations - electrical and control plans, details and schematics x Above information to be provided in format and standards specified in Schedule J - Drawing Standards - of this bylaw F-10 F - 3.02 Construction Documentation x Material Testing Reports, including all Concrete, Asphalt, Compaction and Gradation results on original copies signed by the testing firm. x Sewer leakage test reports for mains. x Video Inspection tapes of mains x A geotechnical report under seal of a Professional Engineer, documenting site inspections, concrete testing, compaction testing, soils testing and certification of the foundation soils of any structures constructed. x A structural report under seal of a Professional Engineer, documenting site inspections, testing and certification of any structures constructed. x Operation and Maintenance Manuals for all Lift Stations containing: - Cover page and table of contents. - As constructed shop drawings. - Equipment layout drawings. - Electrical, control, and alarm wiring diagrams. - Operating instructions for all equipment. - Maintenance instructions for all equipment, including frequency of maintenance. - Equipment data sheets. - Certified head/capacity curves for pumps. - Equipment part lists. - Emergency operating procedures. The maintenance manuals shall be hardback bound documents with the name of the facility embossed on the cover. Each section of the manual shall be identified by plastic covered tabbed dividers, with the section name identified on the tab. SCHEDULE G REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE DESIGN OF DRAINAGE SYSTEMS I, WAYNE K. THIESSEN, MUNICIPAL CLERK OF THE CITY OF WILLIAMS LAKE, DO HEREBY CERTIFY THIS TO BE SCHEDULE "G" TO BYLAW NO. 1730. "original signed by" ________________________________________________ MUNICIPAL CLERK G-1 SCHEDULE G REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE DESIGN OF DRAINAGE SYSTEMS G - 1.0 GENERAL Where the provisions of Schedule A of this Bylaw require the construction of a storm drainage system, the Owner shall provide a storm drainage system including sewer mains, manholes, service connections, and all related appurtenances consistent with the standards and specifications contained in this Section. Through areas, where recommended by a Geotechnical Engineer or requested by the Approving Officer, each lot shall have a storm sewer connection service. G - 1.01 Approval of Engineering Drawings Required Prior to Construction Prior to construction, engineering drawings prepared in accordance with the City's specifications contained in Schedule J (showing detailed design of the necessary works) shall be submitted to the Approving Officer for approval. The drawings shall show overland drainage systems, the alignment and size of pipes, proposed grades, distances between manholes, manhole invert elevations, existing ground line, proposed final ground line over the pipe, location of all service connections to the property line, all easements, pipe bedding requirements and all other details as may be required. Construction may only start after the Owner has been advised by the Approving Officer in writing of drainage design approval. G - 1.02 Where Storm Drainage Collection System Not Required Where storm drainage facilities are not required at the time of development, the City of Williams Lake may require rights-of-way to be provided by the Owner to allow for the eventual installation of these facilities. Such rights-of-way shall be registered in favour of the City of Williams Lake at the Owner's expense. In this instance, the Owner will be required to provide for surface drainage as required by the Approving Officer, with all catch basins and other appurtenances designed to facilitate connection to the future storm sewer system. G - 1.03 Stormwater Management All drainage systems in the City of Williams Lake shall be designed considering the overall management of stormwater. The primary purpose will be to limit the effect of peak flows and volumes of runoff on property, receiving streams, and watercourses. G-2 G - 1.04 Minor and Major Drainage Systems The drainage system shall consist of two components: minor systems and major systems. The minor system will consist of underground conduits, open channels and watercourses designed to convey a 10 year return period flow for residential, industrial, commercial and institutional subdivisions. The major system will consist of surface flood paths, roadways and watercourses designed to convey the 100 year return period flow. In special conditions where surface flood paths cannot be established, pipes and culverts of the minor system may be enlarged to accommodate the major system flow. G - 1.05 Adequate Drainage All subdivisions shall be adequately drained throughout the year. Where the whole or part of any proposed subdivision is wet or subject to intermittent or periodic flooding, approval of the subdivision will be withheld until the Approving Officer is satisfied that appropriate steps have been taken to drain the land or otherwise remedy such wet or flooding conditions. G - 1.06 Existing and Natural Watercourses Where a subdivision is traversed by a watercourse, drainage way or stream, a right-of-way shall be provided along such watercourse or its planned re-alignment of a width deemed necessary by the Approving Officer for construction, maintenance, conservation, and beautification purposes. No natural drainage course shall be altered or diverted unless such alteration or diversion has been approved by the City of Williams Lake, the Provincial Ministry of Water, Land and Air Protection and the Department of Fisheries and Oceans if draining into a fish bearing stream. Storm water shall only be discharged from a subdivision to a drain, ditch as may, in the opinion of the Approving Officer, be adequate to receive the discharge therefrom, or which has been declared a part of the City of Williams Lake drainage system. Storm water discharged into a watercourse, stream or other waterway draining into a fish bearing stream requires approval of the Provincial Ministry of Water, Land and Air Protection and the Department of Fisheries and Oceans. G - 1.07 Drainage Systems Through Private Property Where it is necessary to construct a drainage system through privately-owned land, the Owner shall obtain or grant a right-of-way in favour of the City of Williams Lake to guarantee the right of access, in perpetuity, to the drainage facility. In general all drainage systems though private property shall be piped systems, unless otherwise approved by the Approving Officer. G-3 G - 2.0 DESIGN CRITERIA G - 2.01 Sizing of Systems The system shall be of sufficient capacity to accommodate all tributary areas as defined by the City. For drainage areas 20 ha and smaller, the Rational formula shall be used: Q = KCIA Where: Q = Flow in m3/s K = Constant to establish units of compatibility (.00278) C = Dimensionless runoff coefficient I = Rainfall intensity (mm/hr) A = Runoff area in ha For the minor system, the 10 year frequency curve shall be used. For the major system, and for special structures such as in the design of storm retention basins, underpass drainage or arterial roads, the 100 year rainfall curve shall be used. The time of concentration, or inlet time, will vary with topography and the nature of the drainage areas, but will generally be ten minutes or greater for residential and commercial areas. Inlet times shall be determined by the Design Engineer and approved by the Director of Planning and Engineering. Runoff coefficients for storm sewer design shall be assumed to be not less than the values specified in Table G.1. TABLE G.1 RUNOFF COEFFICIENTS Type of Development Description of Area Runoff Coefficient Commercial x Downtown x Neighbourhood 0.82 0.60 Industrial x Light area x Heavy area 0.65 0.75 Residential x Suburban x Single - family x Multiunits - detached x Multiunits - attached x Apartment dwelling area 0.30 0.40 0.55 0.65 0.60 Parks, cemeteries Playgrounds Unimproved areas 0.15 0.25 0.15 G-4 Runoff coefficients other than those specified in this section shall be used only with the express written consent of the Director of Planning and Engineering. For tributary areas greater than 20 hectares, the method used by the Design Engineer to calculate storm flows shall be approved by the Director of Planning and Engineering. G - 2.02 Design Grade The minimum design grade shall be calculated by use of the Manning Formula such that a minimum velocity of 0.6 m/s shall be maintained during the design flow. Pipes shall be designed to carry the required quantity when flowing 3/4 full for pipes sized 450 mm and smaller. Pipes sized 525 mm or larger shall be sized to carry the required quantity when flowing full. G - 2.03 Roughness Coefficients Roughness coefficients for use with the Manning's Formula shall be as specified in Table G.2. TABLE G.2 ROUGHNESS COEFFICIENTS Pipe or Channel Material Roughness Coefficient Concrete Pipe 0.013 PVC Pipe 0.011 Corrugated Steel Pipe (CSP) * x Unpaved x 25% paved x 100% paved 0.024 - 0.033 0.021 - 0.028 0.013 Smooth Asphalt 0.012 Asphalt or Concrete Paving 0.014 Packed Clay 0.030 Light Turf 0.200 Dense Turf 0.350 Dense Shrubbery 0.400 Minimum velocity of pipes, flowing full, shall be 1.0 m per second. * CSP for Culverts only, not accepted on mains. G-5 There are no maximum allowable velocities except that the designer shall ensure that supercritical flow does not occur. Where grades exceed 15%, scour protection may be needed and anchor blocks will be required. These criteria may be modified by the Director of Planning and Engineering to meet local conditions. G - 2.04 Minimum Pipe Size Minimum pipe size shall be 250 mm for mains, 200 mm for catch basins leads, 100 mm for residential service connections, and 200 mm for non-residential service connections. The minimum pipe size for mains accepting flows from open ditches shall be 300 mm and suitable silt traps shall be provided. G - 2.05 Culverts Where an open ditch system is required to cross a road, street or driveway, the ditch shall be enclosed by means of a culvert. All culverts shall be of sufficient size to properly drain all of the area naturally draining into the channel or ditch feeding into the culvert but shall be a minimum 450 mm diameter. Allowance shall be made for future flows as a result of full development of the upstream tributary area. G - 2.06 Location of Storm Mains Storm sewer mains shall, wherever possible, be located in the road right-of-way as shown on the Standard Drawings. Where the location of the sewer main within the road right-of-way is not practical due to topography or other factors, the sewer main shall be located in a utility right-of-way registered in favour of the City of Williams Lake and having a width of not less than 6.0 m. The Director of Planning and Engineering may require a utility right-of-way wider than 6.0 m in the case where services in addition to storm sewer will be placed in the same right-of-way or where the depth of the sewer main requires a wider easement. The entire length and width of each utility right-of-way shall be graded to permit maintenance vehicle access. There shall be a minimum clear lateral distance between the outside walls of storm sewers and sanitary sewers of 300mm. G - 2.07 Alignment of Storm Mains Storm sewer mains shall generally be designed to follow a straight alignment between manholes. Curved alignments within rights-of-way shall be subject to the approval of the Director of Planning and Engineering and provided that the pipe is set at a grade greater than the specified minimum and pipe alignment is at a parallel offset with an established boundary. In these cases, the radius of curvature shall be twice the minimum radius recommended by the pipe manufacturer. G-6 G - 2.08 Depth of Cover The minimum depth of storm sewer mains shall be sufficient to provide all service connection piping with a minimum cover of 1.2 m to the top of the service, anywhere within the finished right-of-way. In no instance shall the cover over the crown of the main be less than 1.2 m. G - 2.09 Manholes Manholes shall be installed at a maximum spacing of 120 m and in the following locations: .1 All changes in grade. .2 All changes in alignment, including non-curvilinear sewers. .3 All changes in pipe size. .4 All pipe junctions. .5 All intersections. Manholes shall normally be constructed in accordance with the details as shown on the applicable Standard Drawings. In cases where these details will not suffice, a detailed design drawing must be approved by the Director of Planning and Engineering. The relative elevations of storm sewers entering and leaving a manhole are to be such as to ensure that the manhole does not substantially reduce the hydraulic capacity of the system. Minimum fall through the manhole shall be 20 mm. There shall be no change in the grades of pipe between manholes. G - 2.10 Catchbasins Catchbasins shall be constructed as shown on the Standard Drawings. Catchbasins shall be located at a maximum spacing of 75 m along the drainage path, at all intersections, at all low points, or spaced at intervals such that not more than 10% of the gutter flow reaching each inlet will pass on to the next inlet downstream, provided this carry-over is not objectionable to pedestrian or vehicle traffic and the inlet is not at a low point. Catch basins shall be located at intervals such that surface drainage does not exceed gutter or flow channel capacities, to prevent overflow to driveways, boulevards, sidewalks, or private property. Maximum design catchbasin capacities are shown in Table G.3, G-7 TABLE G.3 CATCHBASIN CAPACITIES CATCHBASIN TYPE ROAD GRADE CAPACITIES Type 1 Catchbasin > 3% 20 l/s < 3% 30 l/s At Low Point 50 l/s Type 2 Catchbasin > 3% 20 l/s (with side inlet) < 3% 30 l/s At Low Point 70 l/s G - 2.11 Catchbasin Leads Catch basin leads shall discharge into a manhole and not directly into the storm sewer pipe wherever possible. When connection into the main is allowed by the Director of Planning and Engineering, the use of a wye fitting is required for new construction, or approved saddle to tie-into existing mains. Catch basin leads shall be minimum 200 mm PVC and have a minimum cover of 1.0 m. G - 2.12 Service Connections Storm sewer service connections shall be provided to all lots other than single and two family residential, except in areas of high ground water where services shall be provided to all lots. Storm sewer service connections shall only be used for foundation perimeter drains, roof drains and parking lot drainage unless otherwise approved by the Director of Planning and Engineering. On-site retention shall be designed into all developments to reduce discharge into City Drainage Systems to predevelopment rates. The diameter of storm sewer service connections shall be determined by the Design Engineer, but shall be minimum 100 mm diameter for a single family residential service. Non-residential service connection shall be 200 mm or larger complete with inlet restrictions where on-site retention is required. Service connections shall be made with an approved branch wye and be installed in a straight line and at a uniform grade from the terminus at the property line to the 45 degree long radius bend at the main. An approved wye saddle may be used to connect a 100m diameter service to an existing main. The minimum pipe grade for sewer service pipes shall be: 2% for 100 mm service pipe 1% for 150 mm and larger service pipe G-8 For services 250 mm and larger, a manhole shall be installed at the intersection of the main and service. Storm sewer services shall be installed 4.0 metres from the lowest elevation lot corner in accordance with the Standard Drawings. G - 2.13 Pipe Class and Bedding Class The quality of pipe and bedding shall be so selected such that the installation will adequately support the loads to be placed on it during construction and in operation. Pipe class and bedding class must be identified on all engineering drawings. Pipe shall have at least Class B bedding, as defined by the Standard Drawings. For concrete pipe, the calculations shall follow the method shown in the latest edition of the Water Pollution Control Federation Manual of Practice No. 9. A safety factor of 1.5 shall be used for concrete pipe and the bedding classifications shall be as identified on the Standard Drawing. For PVC pipe, the calculations shall follow the methods outlined in the latest edition of the Uni-Bell PVC Pipe Association publication Handbook of PVC Pipe - Design and Construction. For Corrugated Steel Pipe (CSP) pipe, the calculations shall follow the methods outlined in the latest edition of the American Iron and Steel Institute publication Handbook of Steel Drainage & Road Construction Products. CSP shall be used only for Culverts, not for main line piping. G - 2.14 Major Flow Routing All overland flows in excess of 0.05 m3/sec shall have specifically designed flow routes, that are protected by restrictive covenants or rights-of-way. The major flow routing shall normally be provided along roads and in natural watercourses. In some cases, the major flow may also be carried alongside the road in grassed swales, across country in rights-of-way and along public walkways. In special circumstances, or where desired to enable lower building elevations, the pipes and culverts, which form a part of the minor system, may be enlarged or supplemented to accommodate the major flow. All habitable areas of buildings shall be above the major flow hydraulic grade line, except where specific flood prevention measures have been taken and which are acceptable to the Director of Planning and Engineering. The proportion of flow to be carried along the major routing shall be the total major flow less the flow carried in the minor system. G-9 Where the road is used to accommodate major flow, it shall be formed, graded and sufficiently depressed below the surrounding property lines to provide adequate hydraulic capacity. On arterial roads, the 100 year hydraulic grade shall not be higher than centreline of the pavement with the maximum flow depth not to exceed 300 mm. On collector and local roads, the entire roadway may be used as a major flood path with the maximum flow depth not to exceed 300 mm. Where roadways used for major flows intersect, care shall be taken to lower the intersection to allow flows to pass over the cross street. Where major flow routes turn at intersections, similar care in the road grading design is required. In areas where surface major flow routes cannot be provided, a pipe system will be designed to accommodate the required major flow, and sufficient inlet capacity will be provided to accommodate introduction of the major flow into a piped system. Major flow routing over 0.05 m3/s shall be shown on the engineering drawings and sufficient design shall be carried out to provide assurance to the Director of Planning and Engineering that no property damage or endangering of public safety will occur under major flow conditions. The Design Engineer shall provide the Director of Planning and Engineering with the depth of flow along the major flow route and shall show on the Design Drawings the hydraulic grade line above the design curb and gutter or above the finished surface of other drainage courses. The discharge point from the development for the major flow route shall be co-ordinated with the downstream routing to outfalls as determined by the City of Williams Lake. Where major flow outfalls to a receiving watercourse, the velocity shall not exceed 1.5 m/s, or energy dissipaters shall be provided to minimize erosion. The use of catchbasin inlet control devices to separate major and minor hydraulic grade lines may be allowed, subject to the satisfaction of the Director of Planning and Engineering regarding the suitability of such control devices. Where catchbasin inlet control devices are used, building elevations may be controlled by the hydraulic grade line occurring in the minor system. G - 2.15 Drainage Drywells Where drainage drywells are used as a means for disposal, drainage drywell wall surface areas shall be sized using Darcy's Empirical Law: Q = A K i Where: Q = rate of flow in m3/s A = cross-sectional area of soil through which flow takes place in m2 K = coefficient of permeability in m/s i = hydraulic gradient over a given flow distance G-10 Typical values for the Coefficient of Permeability, K, are presented in Table G.4. TABLE G.4 TYPICAL VALUES OF COEFFICIENT OF PERMEABILITY Typical Soil Relative Permeability Typical Value of K, m/s Coarse Gravel High Permeability over 10-3 Sand, Fine Sand Medium Permeability 10-3 to 10-5 Silty Sand, Dirty Sand Low Permeability 10-5 to 10-7 Silt Very Low Permeability 10-7 to 10-9 Clay Practically Impervious Less Than 10-9 Upon determination of permeability factor, a safety factor of 2 shall be applied. Drainage drywells shall, unless otherwise approved by the Director of Planning and Engineering, be located in the road boulevard or in other lands dedicated to the City for the purpose of drainage disposal. In conjunction with drainage drywell installation, perforated pipe may be installed as per the Standard Drawings to the approval of the Director of Planning and Engineering. The depth of the drywell will vary in accordance with the requirements derived from Darcy's empirical law. Drainage drywells shall be constructed as shown on the Standard Drawings. G -3.0 RECORD DOCUMENTATION G - 3.01 Construction Record Drawings Prior to issuance of a Construction Completion Certificate by the Director of Planning and Engineering, the Owner's Engineer shall submit the following: x Mainline plan/profile drawings at minimum 1:500 scale showing: - horizontal alignment of storm main c/w curve data and offsets from property line - vertical alignment of storm main c/w curve data, invert elevations and bury depth - design hydraulic grade line for major flows - manhole and appurtenances locations and elevations - catchbasin locations and elevations - service locations and elevations (saddles, inspection chambers and bends) G-11 - pipe sizes, material types and classes - details of all fitting and connections - all existing utilities in area of storm main. - major flow routing over 0.05 m3/s x Above information to be provided in format and standards specified in Schedule J - Drawing Standards - of this bylaw G - 3.02 Construction Documentation x Material Testing Reports, including all Concrete, Asphalt, Compaction and Gradation results on original copies signed by the testing firm. x Sewer leakage test reports for mains. x Video Inspection tapes of mains SCHEDULE H REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE DESIGN OF STREET LIGHTING I, WAYNE K. THIESSEN, MUNICIPAL CLERK OF THE CITY OF WILLIAMS LAKE, DO HEREBY CERTIFY THIS TO BE SCHEDULE "H" TO BYLAW NO. 1730. "original signed by" ________________________________________________ MUNICIPAL CLERK H-1 SCHEDULE H REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE DESIGN OF STREET LIGHTING H - 1.0 GENERAL H - 1.01 Street Lighting To Be Provided By Owner Where the provisions of Schedule A require the provision of street lighting, the Owner shall provide street lighting including all conduits, service wiring, bases, poles, luminaires, lamps, photo cells, control equipment and all related appurtenances; consistent with the regulations, standards and specifications set out in this Schedule and the requirements of the Provincial Inspector of Electrical Energy. All street lighting shall be underground type unless approved otherwise by the Director of Planning and Engineering. H - 1.02 Approval of Engineering Drawings Required Prior To Construction Prior to construction engineering drawings prepared in accordance with the City's specifications for drawings showing detailed design of the necessary works shall be approved by the Approving Officer who will advise the Owner accordingly in writing. The street lighting system shall be designed in accordance with the Canadian Standard Practice for Street and Highway Lighting. H - 1.03 Permit Fees To Be Paid By Owner The Owner shall be responsible for obtaining all required electrical permits, arranging for all electrical inspections covering his work and pay all fees for such permits. A copy of the permits are to be submitted to the Director of Planning and Engineering at the time of application for final approval. The Owner shall be responsible for paying all connection fees and charges. H-2 H - 2.0 DESIGN CRITERIA H - 2.01 Levels of Illumination The average levels of illumination in lux shall be as follows: TABLE H.1 LEVELS OF ILLUMINATION Residential Commercial and Industrial .1 4 Lane Collector 10.0 lux 21.5 lux .2 2 Lane Collector 6.5 lux 11.0 lux .3 Local & Cul-de-Sac 4.5 lux 10.0 lux The maximum uniformity ratio for local residential highways shall be 6:1; all other highways shall be 3:1. H - 2.02 Pole Locations In general, poles shall be installed as follows: .1 4 Lane Collector - opposite or staggered spacing; .2 2 Lane Collector - staggered spacing; .3 Local & Cul-de-sac - spaced one side of streets behind the sidewalk. Poles shall be located within 0.6 m of the property corners and shall be checked for conflict with driveways, underground services and fire hydrants. H - 2.03 Rules and Regulations Equipment, installation, wiring methods, and materials used shall be in accordance with the latest edition, (including amendments), of the Rules and Regulations for the Installation and Maintenance of Electrical Equipment as issued by the Province of British Columbia and all bulletins issued thereto. Work shall also be in accordance with all applicable Municipal Codes and Regulations, Provincial Statutes in effect at the site, and the Fire Marshall and Workers' Compensation Acts, hereinafter called the Rules and Regulations. H-3 Wherever the drawings or specifications call for material, workmanship, arrangement or construction of a superior quality than is required by the rules and regulations, the drawings and specifications shall prevail. Otherwise, should there be a conflict between the rules and regulations and the drawings and specifications, the rules and regulations shall prevail. The Owner shall obtain, and pay for all permits, and arrange for all electrical inspections covering his work, and pay all other fees and charges, and make all deposits that are in any way connected with the installation of the systems specified as shown on the Drawings. He shall give all necessary notices to authorities having jurisdiction, and shall be responsible for keeping all applicable public ordinances. Scheduling with B.C. Hydro and Power Authority shall be the Owner's responsibility. Systems shall be compatible with power services available. Where costs are incurred with B.C. Hydro and Power Authority in installing the light system, these shall be considered as part of the cost of the system. Before acceptance of any part or all of the system, it shall meet the requirements of Schedule I. H - 2.04 Connection to Utility An allowance for a minimum of 8 street lights per electrical connection shall be made and future extension of the street lighting system should accommodate this requirement. Each connection to B.C. Hydro will be made at a junction box or a service base as shown on the applicable Standard Drawings. All fees and charges for connection shall be responsibility of the Owner. H -3.0 RECORD DOCUMENTATION H - 3.01 Construction Record Drawings Prior to issuance of a Construction Completion Certificate by the Director of Planning and Engineering, the Owner's Engineer shall submit the following: x Plan drawings at minimum 1:500 scale showing: - horizontal alignment of conduits c/w curve data and offsets from property line - poles and appurtenances locations, elevations and phasing - power service locations and details - conduit sizes and material types. x Above information to be provided in format and standards specified in Schedule J - Drawing Standards - of this bylaw H-4 H - 3.02 Construction Documentation x Material Testing Reports, including all Concrete, Asphalt, Compaction and Gradation results on original copies signed by the testing firm. x Certificate of Inspection by the governing electrical authorities showing that the installation is unconditionally approved. SCHEDULE I REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE INSTALLATION OF ELECTRICAL, COMMUNICATIONS WIRING, CABLEVISION AND GAS DISTRIBUTION SYSTEM I, WAYNE K. THIESSEN, MUNICIPAL CLERK OF THE CITY OF WILLIAMS LAKE, DO HEREBY CERTIFY THIS TO BE SCHEDULE "I" TO BYLAW NO. 1730. "original signed by" _________________________________________________ MUNICIPAL CLERK I-1 SCHEDULE I REGULATION, STANDARDS AND SPECIFICATIONS FOR THE INSTALLATION OF ELECTRICAL, COMMUNICATIONS WIRING, CABLEVISION AND GAS DISTRIBUTION SYSTEM I - 1.0 GENERAL I - 1.01 Standards and Specifications to Apply to All Electrical, Communications Wiring, Cablevision and Natural Gas Electrical, telephone, cablevision and natural gas distribution systems shall be provided to serve each parcel within the subdivision consistent with the standards and specifications set out in this Schedule and Schedule A, unless approved otherwise by the Approving Officer. Design and construction shall be in accordance with the Specifications set out in Schedule K and Standard Drawings in Schedule L of this Bylaw. I - 1.02 Approval of Engineering Drawings Required Prior to Construction Prior to construction, engineering drawings for each respective utility showing detailed design of the necessary works shall be acquired by the Design Engineer and forwarded to the Approving Officer as detailed below. The Design Engineer shall assemble all utility company drawings and superimpose them onto the subdivision drawings to ensure there are no conflicts between any of the private utilities and the City services and above ground structures and driveways. The original utility company drawings and the combined drawings are to be submitted to the Approving Officer for approval. Construction shall not start on the subdivision until all drawings have been approved by the Approving Officer and written notice provided to the Owner. The engineering drawings shall clearly indicate the locations of poles, structures, conduits, pipes and any other facilities required. Design elevations for all pole bases, junction boxes and other structures shall be shown on the engineering drawings. I - 1.03 Construction In Compliance With Engineering Drawings All poles, structures and facilities shall be constructed or installed in compliance with the engineering drawings approved by the Director of Planning and Engineering. I-2 I - 1.04 Construction In Accordance With B.C. Hydro, Telus, Shaw Cablevision, and B.C. Gas Requirements Electrical, Telephone and Cablevision services shall be installed in accordance with the requirements of the B.C. Hydro and Power Authority, the Telus, Shaw Cable, or other communications utility company licenced by the C.R.T.C., and the Inspector of Electrical Energy of the Province of B.C. Natural gas distribution works shall be installed in accordance with the requirements of B.C. Gas. I - 1.05 Underground Electrical Systems Underground systems shall include the supply and installation of all necessary conduits, wiring, transformers, service runs and connections for a complete and fully operative underground electrical system as laid out by the B.C. Hydro and Power Authority and approved by the Director of Planning and Engineering and the Inspector of Electrical Energy of the Province of B.C. I - 1.06 Underground Telephone and Cablevision Underground telephone and cable vision shall include the supply and installation of the necessary conduits, wiring, service runs and connections for a complete and fully operative underground telephone system as laid out by the Telus, Shaw Cable or other licenced communications utility company and approved by the Director of Planning and Engineering. I - 1.07 Gas Distribution System Where the proposed subdivision is to be served by a natural gas distribution system, the location of such a system shall be designed by B.C. Gas and shall be approved by the Director of Planning and Engineering prior to the construction and installation of such a system. All mains forming part of a gas distribution system shall be buried at a minimum depth of 750 mm. The system or extension shall be installed following installation of sewer and watermains and prior to the installation of curb and gutters and asphalt. Rehabilitation of boulevards shall be the responsibility of the Owner. I-3 I - 2.0 DESIGN CRITERIA I - 2.01 Horizontal Location Horizontal location of underground ducting and gas main piping shall be as shown on the applicable Standard Drawings. Systems shall be laid out with due regard for other utilities, and shall have the approval of the Director of Planning and Engineering as well as the utility company involved. Where overhead distribution is allowed, pole locations and any anchor easements shall be approved by both the Director of Planning and Engineering and the appropriate utility company. Care shall be taken to eliminate any aerial trespass. I - 2.02 Vertical Location All conduit and gas main piping to have a minimum of 750 mm cover or to the depths specified by the utility company, whichever is greater. I - 2.03 Detailed Design Details of design such as vertical and horizontal location of service boxes, size and type of conduits and gas mains, kiosk dimensions and ducting and all wiring details shall be as per specifications and drawings provided by B.C. Hydro and Power Authority, Telus, Shaw Cable, or other licenced communications utility company, and B.C. Gas. I -3.0 RECORD DOCUMENTATION I - 3.01 Construction Record Drawings Prior to issuance of a Construction Completion Certificate by the Director of Planning and Engineering, the Owner's Engineer shall submit the following: x Consolidated engineering plan drawings at minimum 1:500 scale showing: - horizontal alignment of all utilities c/w offsets from property line - junction boxes and appurtenances locations - service locations and details - conduit sizes and material types. x Above information to be provided in format and standards specified in Schedule J - Drawing Standards - of this bylaw x Utility company construction record drawings. I-4 I - 3.02 Construction Documentation x Material Testing Reports, including all Concrete, Asphalt, Compaction and Gradation results on original copies signed by the testing firm. x Certificate of Inspection by the governing authorities showing that the installations are unconditionally approved. APPENDIX 1 Confirmation of Commitment by Owner Confirmation of Professional Assurance by Civil Engineer Confirmation of Professional Assurance by Geotechnical Engineer 1 CONFIRMATION OF COMMITMENT BY OWNER 2 Note: To be submitted to the Approving Officer prior to or with Preliminary Design Approval Documents on the Owner's letterhead. CONFIRMATION OF COMMITMENT BY OWNER The City of Williams Lake 450 Mart Street WILLIAMS LAKE, BC V2G 1N3 Attention: Approving Officer Dear Sir/Madam: Re: (Legal Description and Address of Project) Engineering Design We (Name of Property Owner) propose to develop a subdivision or development on the above referenced property. To assist with this project we have engaged Engineering Consultants as follows: Civil Predesign and Design We have retained as our Professional Engineer, , P.Eng., of the consulting firm, (consulting firm) to provide Professional Engineering Services as the Design Engineer on this project with respect to design of the works, liaison with the City on technical matters, and submissions to the City Approving Officer for approval. The Design Engineer will be responsible to confirm the suitability of the site for the proposed development and, unless otherwise directed by the Approving Officer, the employment by us of a Geotechnical Engineer will be limited to the construction and post construction phases of the project. Geotechnical Predesign and Design We have also retained , P.Eng., of the geotechnical consulting firm, as our Geotechnical and Materials Testing Consultant, to undertake required geotechnical investigations during the preliminary and detailed design phases of the project. (The above section need only be included if directed by the Approving Officer) BL 1921 (22/7/03) 3 Specialist Consultants We understand that as site conditions may dictate we will engage specialist consultants as required to provide assistance with the mitigation of environmental, biological, or other peculiar situations that may result from our proposed project. Civil Construction Assurance Upon final approval of the engineering design drawings, and receipt of written authorization to proceed with construction, we have engaged , P.Eng., of the consulting firm, as the Engineer of Record or his qualified designate to undertake field reviews and inspect construction of the work in accordance with his professional discretion, to assure that construction of the work is executed in compliance with the Subdivision and Development Servicing Bylaw, the approved drawings and good workmanship and practice. will prepare and submit to the Director of Planning and Engineering a weekly report and an inspection report on each site visit. Upon construction completion, they will also inspect the project, and prepare a Substantial Completion Certificate. have been engaged to provide Geotechnical and Materials Testing Services during the course of construction, to assure that construction materials are placed in accordance with the Subdivision and Development Servicing Bylaw. Reports will be submitted to the Director of Planning and Engineering as geotechnical matters are addressed and testing results are available. Unsatisfactory Construction Assurance We understand that the City is very much concerned about the quality of construction work with respect to conformance to the Subdivision and Development Servicing Bylaw and good workmanship and practice. We commit to having our consultants provide the appropriate level of inspection, and that if the City is not satisfied with the quality of construction or the level of inspection provided by our engineers, we will be given a minimum twenty four (24) hours advance notice, after which time, if the problem is not resolved to the City's satisfaction we will be issued a "stop work" order. We understand that before construction operations can resume the following must be provided: - a written inspection program for the duration of the project by the Owner's Engineer to be submitted to, reviewed and approved in writing by the Director of Planning and Engineering. Post Construction Upon substantial completion of the work, , P.Eng., the Engineer of Record will prepare construction record drawings in accordance with the standards set out in the Subdivision and Development Servicing Bylaw, prepare Operations and Maintenance Manuals, where required, final inspect the work and prepare a Construction Completion Certificate. 4 Termination of Consultant Should for some reason the relationship with our Engineering Consultants be terminated, we will immediately provide advance notice to the City. We understand that construction work will cease during the interim should we not have a smooth transition between when one consultant finishes and the next one starts. Insurance and Security We understand that prior to construction start-up that we will have to provide proof of Insurance Coverage and Security in the form of cash or a letter of Irrevocable Credit to indemnify the City and assure general conformance to the Subdivision & Development Servicing Bylaw. The required Insurance and Securities that we will post with the City are: Insurance Insurance coverage will be provided in accordance with the City of Williams Lake's insurance requirements specified in Section 6 of the Subdivision and Development Servicing Bylaw which generally specifies: - Comprehensive General Liability Insurance $ 3,000,000 - Automobile Liability Insurance $ 3,000,000 Administration / Inspection Fees - 1% of the approved Engineer's Cost Estimate in the form of a cash deposit to cover normal City inspection costs, posted with the City after subdivision or development approval but prior to construction start-up. Security - An Inspection security in the amount of 10% of the approved Engineer's Cost Estimate in the form of cash or Letter of Irrevocable Credit to serve as Construction Inspection Security, to be posted with the City prior to the Issuance of a Construction Permit. (Required when Subdivision or Development contains works to be taken over by the City upon Completion.) - A one (1) year maintenance security in the amount of 10% of the approved Engineer's Cost Estimate in the form of cash or Letter of Irrevocable Credit to be posted with the City prior to the City signing the subdivision (legal) plan. - A Construction Record Security in the amount of 15% of the approved Engineer's Cost Estimate in the form of cash or Letter of Irrevocable Credit to serve as a Construction Record Drawing Security, should we desire to have the subdivision registered before the Construction Record Drawings have been submitted and approved in writing by the Director of Planning and Engineering. 5 - A Performance Security in the amount of 125% of the approved Engineer's Cost Estimate to complete the work in the form of cash or Letter of Irrevocable Credit should we request that the City signs the subdivision (legal) plan after all buried utilities are installed all lots serviced and the roads constructed to the top of granular sub-base elevation. - Interest will not be paid on any Security amounts deposited with the City. Security Refunds We understand that securities posted with the City will be refunded as follows: - Inspection Securities - refunded upon issuance of a Construction Completion Certificate by the Director of Planning and Engineering. - Performance Securities - refunded upon issuance of a Construction Completion Certificate by the Director of Planning and Engineering. - Construction Record Security - refunded upon receipt of approved Construction Records Drawings and Operation and Maintenance Manuals and construction documentation. - Maintenance Security - refunded after One Year maintenance inspection, and issuance of the Final Acceptance Certificate by the Director of Planning and Engineering. We look forward to a mutually amicable relationship through the predesign, design and construction and post construction phases of this project. Yours truly, (Owner) (Corporate Seal) or ______________________ (Date) (Witness) CONFIRMATION OF PROFESSIONAL ASSURANCE BY DESIGN ENGINEER 1 CONFIRMATION OF PROFESSIONAL ASSURANCE BY DESIGN ENGINEER (To be typed onto the Engineering Consultant's letterhead) The City of Williams Lake 450 Mart Street WILLIAMS LAKE, BC V2G 1N3 Attention: Approving Officer Dear Sir/Madame: Re: (Name of Owner and Project Description and Address) This letter is to advise that (consulting firm) has been retained by (owner) to provide Professional Engineering Services as the Design Engineer on the above referenced project. I, P.Eng., (engineer) am a Professional Engineer licenced to practice in the Province of British Columbia. I understand and acknowledge that I am responsible for the integrity of the project with respect to design and construction in accordance with the City of Williams Lake Subdivision and Development Servicing Bylaw, the approved engineering design drawings prepared for the project, and good workmanship and practice. I will be involved in all aspects of the project from Preliminary Design through to Construction Completion. With respect to each phase of the project my responsibilities include but are not limited to: Predesign Phase - co-ordinate site survey and geotechnical investigations through the site. - liaison with the City of Williams Lake with respect to project requirements. - preparation of preliminary design drawings. - preparation of a preliminary cost estimate. - submission(s) to the Approving Officer to Design Phase and the project submission. - co-ordinate specialist consultants that may be involved in the project. 2 Design Phase - design the work and prepare the appropriate drawings to explicitly define the work for approvals and construction. - ensure design complies with intent of the City of Williams Lake Subdivision and Development Servicing Bylaw. - undertake drawing amendments as required to meet City approvals. - sign and seal all design drawings or have specialist consultants sign and seal their respective drawings. - submit design drawings and other supporting documentation to the Approving Officer for Approval. Construction Phase - tender the work. - undertake "field reviews" and inspections of the Contractor's work to assure compliance to the City of Williams Lake Subdivision and Development Servicing Bylaw, the approved drawings and good workmanship and practice. - submit weekly inspection reports to the Director of Planning and Engineering. I understand that "field reviews" shall mean such reviews of the work at the project site and at fabrication locations where applicable as the Professional Engineer, in his professional discretion, considers to be necessary in order to ascertain that the work substantially conforms in all material aspects to the plans and drawings approved by the City of Williams Lake. - co-ordinate materials testing of trench backfill soils, sub-grade, sub-base and base coarse soils, concrete and asphalt. - resolve problems or anomalies that may develop during construction, in consultation with the Director of Planning and Engineering. - witness all water system, sanitary sewer system and drainage system pressure/leakage tests. - witness all sub-grade proof rolling operations including full remediation. - collect as-constructed data as the work progresses. - advise the Director of Planning and Engineering of events requiring City attendance or witnessing. - upon Substantial Completion undertake an inspection of the work with the Director of Planning and Engineering and prepare and submit a Substantial Completion Certificate. 3 Post Construction - inspect the project with the City to verify rectification of deficiencies listed on the Substantial Completion Certificate and prepare and submit a Construction Completion Certificate. - prepare construction record drawings in accordance with City standards. - prepare Operation and Maintenance Manuals for lift stations, pump stations, reservoirs or other mechanical/electrical infrastructure. - submit construction documentation such as pressure/leakage test, specialist consultant reports, etc. carries $ / per occurrence Name of Consulting Firm Errors and Omissions Liability Insurance and a Proof of Insurance Certificate is attached and will be in force for three (3) years after the date of Construction Completion. Name of Professional Engineer (Print) Signature of Professional (Design Engineer) Date: Mailing Address (Print) Phone: (PROFESSIONAL SEAL) CONFIRMATION OF PROFESSIONAL ASSURANCE BY GEOTECHNICAL ENGINEER 1 CONFIRMATION OF PROFESSIONAL ASSURANCE BY GEOTECHNICAL ENGINEER (To be typed onto the Engineering Consultant's letterhead) The City of Williams Lake 450 Mart Street WILLIAMS LAKE, BC V2G 1N3 Attention: Approving Officer Dear Sir/Madame: Re: (Name of Owner and Project Description and Address) This letter is to advise that (consulting firm) has been retained by (owner) to provide Professional Engineering Services on the above referenced project. I, P.Eng., (engineer) am a Professional Geotechnical Engineer licenced to practice in the Province of British Columbia. I understand and acknowledge that I am responsible for the geotechnical integrity of the project with respect to design and construction of works required under the City of Williams Lake Subdivision and Development Servicing Bylaw, the approved engineering design drawings prepared for the project, and good workmanship and practice. I will be involved in all aspects of the project from Preliminary Design through to Construction Completion with respect to each phase of the project. My responsibilities include but are not limited to: Predesign Phase - general on-site and adjacent site soil conditions - groundwater problems - soil/site stability - corrosive or sulphate soils Prepare a report documenting items, investigation findings and recommendations concerning development of the site. 2 Design Phase Undertake additional geotechnical investigations as required to determine site specific requirements with respect to: - overall site stability - site grading - deep utilities - soil strength with respect to infrastructure appurtenances, such as pump stations, reservoirs, buildings - groundwater mitigation - frost protection - building construction Prepare a written report. It is understood that the following objectives are to be satisfied by this report: .1 confirmation that the land is safe for the use intended; .2 the development has been evaluated with consideration of the aquatic and steep slope setbacks, as outlined in the City Zoning Bylaw, and Environmentally Sensitive and Hazardous Area (ESHA) designations of the Official Community Plan; .3 mitigative prescriptions that will facilitate the safe development of the subject lands; .4 suitable for the registration on title of the property to advise future owners of the conditions of development; and .5 acknowledgement that the City may rely upon the recommendations stated in the report for the issuance of permits needed for the development of the lands. Construction Phase During construction I will provide materials testing services to ensure that soils, concrete and asphalt used to construct the proposed development are constructed in accordance with the Subdivision and Development Servicing Bylaw, good workmanship and practice. I will also provide geotechnical advice during the coarse of the project on an as required basis to resolve any geotechnical problems or anomalies that may arise. 3 Post Construction Upon completion of construction I will ensure that all test reports are assembled, collated and submitted to the Director of Planning and Engineering. carries $ / per occurrence Name of Consulting Firm Errors and Omissions Liability Insurance and a Proof of Insurance Certificate is attached and will be in force for three (3) years after the date of Construction Completion. Name of Professional Engineer (Print) Signature of Professional Date: Mailing Address (Print) Phone: (PROFESSIONAL SEAL) APPENDIX 2 Sample Standard Statutory Right-of-Way Document Restoration Statement of Release SAMPLE STANDARD STATUTORY RIGHT OF WAY DOCUMENT LAND TITLE ACT FORM C (Section 233) Province of British Columbia GENERAL INSTRUMENT - PART 1 (This area for Land Title Office use) Page 1 of 9 pages 1. APPLICATION: (Name, address, phone number and signature of applicant, applicant=s solicitor or agent) 2. PARCEL IDENTIFIER(S) AND LEGAL DESCRIPTION(S) OF LAND:* (PID) (LEGAL DESCRIPTION) 3. NATURE OF INTEREST:* DESCRIPTION DOCUMENT REFERENCE PERSON ENTITLED TO INTEREST (page and paragraph) Statutory Right-of-Way Entire Document (Pages 3-9) Transferee 4. TERMS: Part 2 of this instrument consists of (select one only) (a) Filed Standard Charge Terms 9 D.F. No. (b) Express Charge Terms : Annexed as Part 2 (c) Release 9 There is no Part 2 of this instrument A selection of (a) includes any additional or modified terms referred to in item 7 or in a schedule annexed to this instrument. If (c) is selected, the charge described in item 3 is released or discharged as a charge on the land described in Item 2. 5. TRANSFEROR(S):* (Property Owner Name and Address) 6. TRANSFEREE(S): (including postal address(es) and postal code(s)* City of Williams Lake 450 Mart Street Williams Lake, BC V2G 1N3 7. ADDITIONAL OR MODIFIED TERMS:* N/A 8. EXECUTION(S):**This instrument creates, assigns, modifies, enlarges, discharges or governs the priority of the interest(s) described in Item 3 and the Transferor(s) and every other signatory agree to be bound by this instrument, and acknowledge(s) receipt of a true copy of the filed standard charge terms, if any. Execution Date Officer Signature(s) Party(ies) Signature(s) Y M D (Sign in presence of Officer) (Print Name) (Note: Use Black Ink Only) OFFICER CERTIFICATION: Your signature constitutes a representation that you are a solicitor, notary public or other person authorized by the Evidence Act, R.S.B.C. 1996, c. 124, to take affidavits for use in British Columbia and certifies the matters set out in Part 5 of the Land Title Act as they pertain to the execution of this instrument. * If space insufficient, enter ASEE SCHEDULE@, attach schedule in Form E. ** If space insufficient, continue executions on additional page(s) in Form D. LAND TITLE ACT FORM D Province of British Columbia EXECUTIONS CONTINUED PAGE 2 OF 9 PAGES Execution Date Officer Signature(s) Party(ies) Signature(s) (As to Both Signatures) Y M D City of Williams Lake by its authorized signatory(ies): Mayor: Director of Corporate Administration: OFFICER CERTIFICATION: Your signature constitutes a representation that you are a solicitor, notary public or other person authorized by the Evidence Act, R.S.B.C. 1996, c. 124, to take affidavits for use in British Columbia and certifies the matters set out in Part 5 of the Land Title Act as they pertain to the execution of this instrument. TERMS OF INSTRUMENT - PART 2 STATUTORY RIGHT OF WAY AGREEMENT This Agreement dated for reference _______________________, 20 , is BETWEEN: ("Grantor") OF THE FIRST PART AND: CITY OF WILLIAMS LAKE, a municipality incorporated under the Municipal Act, R.S.B.C. 1996, c.323 and having its office at 450 Mart Street, Williams Lake, BC V2G 1N3 ("Municipality") OF THE SECOND PART RECITALS: A. The Grantor is the registered owner in fee simple of land within the City of Williams Lake, legally described as: Parcel Identifier: _____________ Lot ____ Block ____ District Lot ____ Cariboo District Plan ________ (the "Lands"); B. To facilitate the establishment, construction, operation, maintenance, repair, extension, addition, alteration, protection or improvement of one or more systems of: (i) sewer works and related fixtures and equipment for the collection, conveyance and disposal of sewage, [and/or] (ii) drainage works and related fixtures and equipment for the impounding, conveying and discharging of surface and other waters, [and/or] (iii) water works and related fixtures and equipment for the collection, storage and distribution of water (collectively the "Works") the Grantor has agreed to grant a statutory right of way to the Municipality. C. The statutory right of way is necessary for the operation and maintenance of the Municipality's undertaking. NOW THEREFORE in consideration of $1.00 paid by the Municipality to the Grantor (the receipt and sufficiency whereof is acknowledged) and in consideration of the terms herein: 1. Grant of Statutory Right of Way - The Grantor hereby grants, conveys and confirms to the Municipality, in perpetuity, the full, free and uninterrupted right, liberty, easement and statutory right of way for the Municipality, its officers, employees, contractors, licencees, agents, invitees and others of the Municipality, in common with the Grantor, at all times hereafter and from time to time at their will and pleasure to lay down, install, construct, entrench, maintain, inspect, alter, remove, replace, bury, use, protect and otherwise establish and operate one or more systems of: (a) Sewer Works for the collection, conveyance and disposal of sewage; (b) Drainage Works for the impounding, conveying and discharging of surface and other water; (c) Water Works for the collection, storage and distribution of water, in, upon, under and across that part or parts of the Lands as shown outlined in heavy black on the [Explanatory/Reference] Plan of Lot ___, Block ___, District Lot ____, Cariboo District, Plan _____ deposited in the Land Title Office under section 99(1)(e) of the Land Title Act and certified correct on [date] by [name of surveyor], B.C.L.S. (the "Right of Way Area") to: (d) construct and install the Works upon the Right of Way Area and to remove, replace, repair, alter, maintain, clean, inspect, patrol (including aerial patrol) and operate the Works from time to time in the Municipality's discretion; (e) to have unobstructed access to and from the Right of Way Area at any and all times; (f) make surveys and tests; (g) establish grades and levels; (h) excavate or otherwise alter the contours of the Right of Way Area and to backfill trenches; (i) store all personal property (including equipment) necessary to install, remove, repair, alter, maintain, clean, inspect, patrol (including aerial patrol) or replace the Works, provided that the Grantee shall consult the Grantor as to the duration and location of such storage; (j) remove from the Right of Way Area such structures, improvements, fixtures, fences, gates, cattle guards, trees, shrubs, plants, vehicles, mobile or manufactured homes, storage facilities and other obstructions whatsoever as, in the Grantee's opinion, is necessary in order to construct, install, remove, repair, alter, operate, maintain, clean, inspect, patrol (including aerial patrol) or replace the Works; (k) do all other things on the Right of Way Area as may be reasonably necessary, desirable or incidental to the business and undertaking of the Grantee or in connection with the foregoing. 2. Licence Coupled With Grant - The Grantor hereby grants to the Municipality an irrevocable licence, coupled with the statutory right of way herein, to enter on and cross over the Lands outside the Right of Way Area for purposes of access to the Right of Way Area, and for access to any contiguous right of way on land adjoining the Lands, and to use, in conjunction with the performance of Works on the Right of Way Area, a strip of land 1 metre in width defined by lines equidistant from, and parallel and external to the boundaries of the Right of Way Area. 3. Grantor's Obligations - The Grantor must: (a) not do or permit to be done anything which in the opinion of the Municipality may interfere with, injure or impair the operating efficiency of, or obstruct access to or the use of, the Right of Way Area, the Works or the rights granted under this Statutory Right of Way; (b) trim or, if the Municipality requires, permit the Municipality to trim or cut down any tree or other growth on the Land which in the opinion of the Municipality constitutes or may constitute a danger, impairment or obstruction to those using the Right of Way Area or to the Works; (c) permit the Municipality to peaceably hold and enjoy the rights hereby granted; (d) permit the Municipality, at its sole discretion, to: (i) maintain and clean the surface of the Right of Way Area and remove grass and other growth from the surface of the Right of Way Area; and (ii) to do all other things which in the opinion of the Municipality are reasonably necessary for the safe use and preservation of the Right of Way Area and the Statutory Right of Way; (e) not deposit or place garbage, debris or other material on the Right of Way Area; (f) not place, install or construct any building, structure, mobile or manufactured home or other improvement (including any paving, walls or fences) on the Right of Way Area; (g) not use the Right of Way Area for storage (including the storage of vehicles) or as a junk yard; (h) not carry on blasting on or adjacent to the Right of Way Area without the Municipality's approval; (i) not diminish or increase the soil cover over any Works installed in the Right of Way Area without the Municipality's approval; (j) at its own expense, do or cause to be done all acts necessary to grant priority to the Statutory Right of Way over all charges and encumbrances which are registered, or pending registration, against title to the Land in the Land Title Office, save and except those that have been approved by the Municipality or have been granted in favour of the Municipality; (k) at the Municipality's expense, do or execute or cause to be done or executed all such further and other lawful acts, deeds, things, conveyances and assurances whatsoever for better assuring to the Municipality the rights, liberties and statutory right of way hereby granted. 4. Municipality's Obligations - The Municipality must: (a) not bury any debris or rubbish of any kind in excavation or backfill and will remove shoring and like temporary structures as backfilling proceeds; (b) thoroughly clean the Statutory Right of Way Area of all rubbish and construction debris created or placed thereon by the Municipality; (c) as soon as weather and soil conditions permit, and so often as it may exercise its right of entry through the Statutory Right of Way Area, replace the surface soil as nearly as may be reasonably possible to the same condition as it was prior to such entry, in order restore the natural drainage to such Statutory Right of Way Area, provided however, that nothing herein contained shall require the Municipality to restore any trees or other surface growth, but the Municipality shall leave the Statutory Right of Way Area in a condition which will not inhibit natural regeneration of such growth; (d) as far as reasonably possible, carry out all work in a proper and workmanlike manner so as to do as little injury to the Statutory Right of Way Area as possible; (e) make good, at its own expense, all damage or disturbances which may be caused to the surface soil of the Statutory Right of Way Area in the exercise of its rights hereunder; (f) in exercising its rights under the licence granted herein, take reasonable care to minimize any damage to the Lands and improvements outside of the Statutory Right of Way Area and remedy at its cost any damage so caused. 5. No Obligation to Maintain - No right herein granted to or reserved by the Municipality requires the Municipality to clean, repair or maintain the Works or the Statutory Right of Way Area unless the Municipality is expressly required herein to perform such cleaning, repairing or maintenance. 6. Municipality's Rights - The Municipality: (a) is entitled to peaceably hold and enjoy the rights, liberties and Statutory Right of Way hereby granted without hindrance, molestation or interruption by the Grantor or any person, firm or corporation claiming by, through, under or in trust for the Grantor; (b) in its sole discretion may at any time remove any or all of the Works installed by the Municipality in, upon or under the Right of Way Area, all of which remain chattels and the property of the Municipality, notwithstanding that they may be annexed or affixed to the freehold; (c) may remove anything placed on the Right of Way Area by the Grantor in contravention of the Grantor's obligations under section 3; (d) on default by the Grantor of any of its obligations under this Agreement, may, but is not obliged to, rectify the default at the expense of the Grantor, provided that, except in the case of an emergency, the Municipality must first give 20 days prior notice to the Grantor specifying the default and requiring it to be remedied; (e) despite section 6(d), if the Municipality abandons, releases or discharges the Statutory Right of Way, the Municipality is not responsible or obligated in any way to remove or pay for the cost of removal of any Works from the Right of Way Area. 7. Miscellaneous - The parties agree as follows: (a) notwithstanding any rule of law or equity to the contrary, the Works within the Right of Way Area shall remain the property of the Municipality and may be removed in whole or in part by the Municipality; (b) no waiver of default by either party is effective unless expressed in writing by the party waiving default, and no condoning, overlooking or excusing by either party of a previous default of the other is to be taken to operate as a waiver of any subsequent default or continuing default, or to in any way defeat or affect the rights and remedies of the non-defaulting party; (c) this Agreement does not (i) affect or limit the discretion, rights, duties or powers of the Municipality under the common law or any statute, bylaw, or other enactment; (ii) affect or limit the common law or any statute, bylaw or other enactment applying to the Land; or (iii) relieve the Grantor from complying with the common law or any statute, bylaw, or other enactment; (d) wherever in this Agreement the approval of the Municipality is required, some act or thing is to be done to the Municipality's satisfaction, the Municipality is entitled to form an opinion, or the Municipality is given a sole discretion: (i) the relevant provision is not deemed to have been fulfilled or waived unless the approval, opinion or expression of satisfaction is in writing signed by the Municipality's Director of Planning and Engineering ("Director"); (ii) the approval, opinion or satisfaction is in the discretion of the Director acting reasonably in accordance with municipal engineering practice; (iii) any discretion of the Director is not subject to public law duties and the principles of procedural fairness and the rules of natural justice have no application; and (iv) the sole discretion of the Municipality is deemed to be the sole, absolute and unfettered discretion of the Municipality and the principles of procedural fairness and the rules of natural justice have no application; (e) if any section, subsection, sentence, clause or phrase in this Agreement is for any reason held to be invalid by the decision of a court of competent jurisdiction, the invalid portion is to be severed and the decision that it is invalid does not affect the validity of the remainder of this Agreement, the parties hereby agreeing that they would have entered into the Agreement without the severed provision; (f) this Agreement is the entire agreement between the parties and neither the Municipality nor the Grantor has given or made representations, warranties, guarantees, promises, covenants or agreements to the other except those expressed in writing in this Agreement, and no amendment of this Agreement, is valid or binding unless in writing and executed by the parties; (g) if at the date hereof the Grantor is not the sole registered owner of the Lands, this Agreement shall nevertheless bind the Grantor to the full extent of its interest in fee simple, and this Agreement shall extend to any after acquired interest; (h) the headings in this Statutory Right of Way are inserted for reference and convenience only and must not be used to construe or interpret the provisions hereof; (i) every reference in this Agreement to a party is deemed to include the heirs, executors, administrators, successors, assigns, employees, agents, officers, and invitees of such party wherever the context so requires or allows; (j) the Statutory Right of Way, and licence granted hereby, severally run with the Land and each and every party into which the Land may be subdivided or consolidated by any means (including subdivision plan, reference plan or explanatory plan, strata plan, bare land strata plan or lease), but no part of the fee of the Land passes to or is vested in the Municipality under or by this Agreement and the Grantor may fully use the Right of Way Area and Land subject only to the common law and the rights, obligations and restrictions expressly set out in this Agreement. This Statutory Right of Way enures to the benefit of and is binding on the parties notwithstanding any rule of law or equity to the contrary; (k) as evidence of their agreement to be bound by the above terms, the parties each have executed and delivered this Agreement by executing Part 1 of the Land Title Act Form C which this Agreement is attached and which forms part of this Agreement. END OF DOCUMENT RESTORATION STATEMENT OF RELEASE RESTORATION STATEMENT OF RELEASE To be signed by all Property Owners where works impacted 3rd party Private Property Property Owner : Address of Property : Legal Description : Contractor=s Name : Owner=s Engineer : In regards to the Landscape and Property Restoration of the Property listed above, all work has been completed as agreed upon and the Contractor has cleaned up all debris and repaired any damage. This Statement of Release confirms completion of the work required within the Property listed above, and sets the start of the one year maintenance period during which time the Contractor will be responsible for repair of any settlement within the work area and any damages caused by such settlement. Restoration Accepted this ____ day of ________, 20___. ______________________________________________ Property Owner APPENDIX 3 Substantial Completion Certificate Construction Completion Certificate Final Acceptance Certificate SUBSTANTIAL COMPLETION CERTIFICATE CITY OF WILLIAMS LAKE SUBDIVISION CONSTRUCTION SUBSTANTIAL COMPLETION CERTIFICATE Subdivision Name: Subdivision Owner: Engineering Firm: Contractor: Description: 1. SUBSTANTIAL COMPLETION 1.1 CONSULTING ENGINEERING FIRM: I, , P.Eng., of the firm of Certify that the works comprising the above referenced project have been constructed in accordance with the plans and specifications approved pursuant to the City of Williams Lake Subdivision & Development Servicing Bylaw No. 1730 and are substantially complete. I hereby recommend this subdivision construction work be accepted as substantially complete. Drawing Number(s) Professional Engineer (sign) P.ENG. SEAL Date of Substantial Completion List of Deficiencies found at final inspection (to be completed before Construction Completion and start of the maintenance period). 1.2 CITY OF WILLIAMS LAKE: Pending deficiency correction, this subdivision construction work has: Preliminary Acceptance on : Director of Planning & Engineering (sign) CONSTRUCTION COMPLETION CERTIFICATE CITY OF WILLIAMS LAKE SUBDIVISION CONSTRUCTION CONSTRUCTION COMPLETION CERTIFICATE Subdivision Name: Subdivision Owner: Engineering Firm: Contractor: Description: Date of Substantial Completion: 2. CONSTRUCTION COMPLETION 2.1 CONSULTING ENGINEERING FIRM: I, , P.Eng., of the firm of Certify that deficiencies listed on the Substantial Completion Certificate have now been corrected and the Subdivision Construction is in accordance with the plans and specifications approved pursuant to the City of Williams Lake Subdivision & Development Servicing Bylaw No. 1730 and are complete. I hereby recommend to the City of Williams Lake that this subdivision construction work be accepted as complete. Drawing Number(s) Professional Engineer (sign) P.ENG. SEAL Date of Substantial Completion 2.2 CITY OF WILLIAMS LAKE: All deficiencies having been corrected, the subdivision construction work is: Accepted as Complete on Director of Planning and Engineering (sign) Date after which Owner may apply for Final Acceptance: (10 months after Construction Completion Date) FINAL ACCEPTANCE CERTIFICATE CITY OF WILLIAMS LAKE SUBDIVISION CONSTRUCTION FINAL ACCEPTANCE CERTIFICATE Subdivision Name: Subdivision Owner: Engineering Firm: Contractor: Description: Construction Completion Date: 3. FINAL ACCEPTANCE 3.1 CONSULTING ENGINEERING FIRM: I, , P.Eng., of the firm of Certify that after a one year maintenance inspection by myself, that the Subdivision Construction is in accordance with the plans and specifications approved pursuant to the City of Williams Lake Subdivision & Development Servicing Bylaw No. 1730. I hereby recommend to the City of Williams Lake that this subdivision construction work receive Final Acceptance. Drawing Number(s) Professional Engineer (sign) P.ENG. SEAL Date of Substantial Completion 3.2 CITY OF WILLIAMS LAKE: Confirms acceptance by the municipality of the works and authorizes the release of the security to the Owner. Final Acceptance on Director of Planning and Engineering (sign) APPENDIX 4 Sample Subdivision Servicing Agreement SAMPLE SUBDIVISION SERVICING AGREEMENT SUBDIVISION SERVICING AGREEMENT THIS AGREEMENT made the______day of___________, 20__ BETWEEN: CITY OF WILLIAMS LAKE 450 Mart Street Williams Lake, B.C. V2G 1N3 (the "Municipality") OF THE FIRST PART AND: [Property Owner Name and Address] (the "Owner") OF THE SECOND PART WHEREAS the Owner desires to subdivide lands within the Municipality, more particularly known and described as: Parcel Identifier: [Legal Description of Property] (the "Lands") AND WHEREAS the Owner, as a condition of subdivision approval is required under Subdivision and Development Servicing Bylaw No. 1730, 2000 of the Municipality (the "Subdivision Servicing Bylaw") to construct certain works and services (the "Works") as more particularly described in Schedules "A" and "B" annexed hereto; AND WHEREAS the Owner has requested subdivision approval of the Lands prior to final construction and installation of the Works and is agreeable to entering into an agreement pursuant to Section 940 of the Local Government Act and to deposit a security herein specified; NOW THIS AGREEMENT WITNESSETH that in consideration of the premises and in consideration of the agreement by the Municipality to approve the subdivision plan prior to completion of the construction of the Works, the Municipality and the Owner herein covenant and agree as follows: 1. In this Agreement: Approving Officer means the person appointed by Council pursuant to Section 77 of the Land Title Act as the Approving Officer; Complete or Completion or any variation of these words when used with respect to the Works shall mean completion to the satisfaction of the Director of Planning and Engineering when so certified by him in writing; Director of Planning and Engineering means the person appointed by Council as the Director of Planning and Engineering of the Municipality and his duly authorized assistants and such consulting or professional engineers as may be appointed to act for the Municipality; and Owner's Engineer means the Professional Engineer whom the developer has engaged to carry out surveys, design, field inspection and preparation and certification of as- built drawings. 2. The Owner shall complete the Works to the satisfaction of the Director of Planning and Engineering by the _____ day of _________, 20___. 3. As security for the due and proper performance, during the construction period, of all of the covenants, terms and conditions in this Agreement and the subdivision contemplated, the Owner has deposited with the Municipality: cash or a certified cheque in the amount of $ as a Security within the meaning of Section 940(2) of the Local Government Act (the "Security") [or] an irrevocable Letter of Credit in the amount of $ bearing even date herewith, a copy of which is attached hereto (the "Security") to be valid for a period of twelve (12) months from the date specified in paragraph 2 hereof, PROVIDED HOWEVER, that the Municipality shall be at liberty to make demands on this Letter of Credit at any time after the date hereof with the Owner being entitled to renew this Agreement as hereinafter provided if such Letter of Credit shall not have been demanded upon in the manner hereinafter provided and provided also that the amount of such Security may be reduced as per Section 5 Fees and Charges of the Subdivision and Development Servicing Bylaw No. 1730, 2000 with approval of the Approving Officer. 4. The Construction Period shall terminate upon the issuance of an approved Construction Completion Certificate, signed by the Director of Planning and Engineering, which has no deficiencies to be completed or correct. The Maintenance Period shall terminate upon issuance of an approved Final Acceptance Certificate, signed by the Director of Planning and Engineering, which has no deficiencies to be completed or corrected. 5. The Owner agrees that if the Works are not completed pursuant to paragraph 2 hereof, the Municipality may complete the Works, at the cost of the Owner, and for that purpose may draw down upon the Security the full amount of such Security and should there be insufficient monies contained in the Security, the Owner shall pay the balance of such insufficiency forthwith upon invoice therefore or should the Owner complete the Works or should the Works cost less than the amount of the Security the Security or such part thereof shall be returned by the Municipality to the Owner. The cost of the engineering, supervision, legal survey, and other costs in connection therewith, together with an administration fee of ten percent (10%) of such cost which shall be payable to the Municipality. It is understood that the Municipality may do such work either by itself or by contractors employed by it. 6. The Owner shall complete the Works to the standards set out in the Subdivision and Development Servicing Bylaw and to the approval of the Director of Planning and Engineering. Should such Works prove to be in any way defective or not operate, then the Owner shall, at his expense, modify and reconstruct the Works so that they shall be fully operative and function to the satisfaction of the Director of Planning and Engineering, such satisfaction is to be indicated by a Construction Completion Certificate signed by the Director of Planning and Engineering. 7. The Owner covenants and agrees to comply with the provisions of all Municipal Bylaws throughout the construction of the Works. In the event that any material or debris should be left upon any road after the construction of the Works, the Owner covenants and agrees that the Municipality may forthwith remove such material or debris at the expense of the Owner, the cost of such removal to be determined by the Director of Planning and Engineering. In the event that any invoice of the Municipality for the removal of such material or debris shall remain unpaid after thirty (30) days of receipt of the same by the Owner, the Municipality is authorized to deduct the amount of such invoice from the Security. 8. The Owner shall, at all times in connection with the Works, keep and employ a competent general superintendent with the authority to act on behalf of the Owner and capable of speaking, reading and writing the English language and any explanations, orders, instructions, directions and requests given by the Municipality to such superintendent shall be held to have been given to the Owner. 9. Where the installation of the Works will result in the temporary disruption of municipal or non-municipal services to surrounding residents (e.g., sewer, water, road access, electricity, telephone, etc.), the Owner will notify the affected residents at least 24 hours in advance so as to reduce any inconvenience. The timing of the advance notification shall be extended when the length of the disruption will be longer than 3 hours. 10. The Owner covenants and agrees to comply with any changes in subdivision requirements or standards established by bylaw prior to the substantial commencement upon the said lands of the Works contemplated by this Agreement. 11. The Owner covenants and agrees to the following conditions of maintenance and final acceptance: (a) The Owner shall, upon being satisfied that all of the requirements of the Director of Planning and Engineering are met, submit to the Director of Planning and Engineering a Construction Completion Certificate signed by the Owner's Engineer for the subdivision construction. (b) If the inspection shows to the satisfaction of the Director of Planning and Engineering that the utilities and improvements are complete, the Director of Planning and Engineering shall sign the Construction Completion Certificate and shall indicate thereon the date when the Owner may apply for Final Acceptance. If, however, defects or deficiencies are apparent to the Director of Planning and Engineering in the utilities and improvements, the Certificate will be returned to the Owner unsigned with a report of the defects. (c) After the issuance of the Construction Completion Certificate the Owner shall be responsible for any and all repairs and replacements to any utilities and improvements which may become necessary from any cause whatever, up to the end of the maintenance period. The maintenance period shall stay in force until a Final Acceptance Certificate has been signed by the Director of Planning and Engineering. (d) If during the Construction Period or Maintenance period any defects become apparent in any of the utilities or improvements installed or constructed and the Director of Planning and Engineering requires repairs or replacements to be done, the Owner shall, within a reasonable time after notice cause such repairs or replacements to be done and if the Owner defaults, or any emergency exists, the Director of Planning and Engineering may have the repairs or replacements carried out and the Municipality may recover the cost from the Owner or from the Security. (e) The Owner will, from the date of the Construction Completion Certificate, flush and clean out the sanitary sewers as required. The cost of removing obstructions caused by gravel, rocks, or silt other than that deposited from sewage, shall be borne by the Owner. All blocked sewers attributable to faulty construction shall be corrected at the expense of the Owner. Prior to the issuance of the Final Acceptance Certificate, the Director of Planning and Engineering may carry out, at the cost of the Municipality, an additional video inspection of all sanitary and storm sewer lines. Should the video inspection show any defects these are to be remedied by the Owner and the Owner shall carry out, at his cost, any further video inspections necessary to show proof that defects are corrected. The Director of Planning and Engineering will not issue a Final Acceptance Certificate until he is satisfied that defects are remedied. (f) The Owner shall be responsible for adjusting all hydrants, valve boxes and service valve boxes to established grades as they are developed, and maintaining valves and appurtenances in operating condition until such time as the Director of Planning and Engineering issues a Final Acceptance Certificate for the Works. (g) Maintenance, without limiting the generality of the term, for which the Owner shall be responsible, includes: (i) failure of, or damage to, underground utilities resulting from defective materials or improper installation; (ii) settlement of culverts or ditches; (iii) grading, graveling, repairs and/or replacement of road and lane surfaces including access roads; (iv) adjustments and repairs to water mains, hydrants, service lines and valves and valve operating mechanisms including the casings enclosing these mechanisms; (v) repairs, replacements and adjustments to sewer mains, services, manholes, manhole frames and covers; (vi) repairs, replacements and adjustments to street lighting fixtures and appurtenances. (h) The Owner agrees that maintenance is a continuous operation which shall be carried on until the date of issuance of the Final Acceptance Certificate for each and every utility, and no releases from liability of any kind will be given until all repairs or replacements required by the Director of Planning and Engineering have been made. (i) The Owner shall maintain each of the utilities for a minimum period of one year from the date shown in the Construction Completion Certificate. The above period may be extended by the Director of Planning and Engineering when compaction test results or other documented observations indicate substandard construction. (j) Two months before expiration of the period specified in the paragraph above for the utilities and improvements, or earlier if weather conditions dictate, the Owner, following a complete inspection of the utilities and improvement accompanied by the Owner's Engineer and the Owner's Contractor, shall correct all defects to the satisfaction of the Director of Planning and Engineering. Application may be made for Final Acceptance following the above inspection by submitting a Final Acceptance Certificate, duly signed by the Owner's Engineer, to the Director of Planning and Engineering. The Owner is responsible for applying for Final Acceptance. (k) After receipt of the Final Acceptance Certificate, the Director of Planning and Engineering shall make an inspection within one month of the receipt thereof, if weather conditions permit a proper inspection. If the inspection shows to the satisfaction of the Director of Planning and Engineering that the utilities and improvements are acceptable, the Director of Planning and Engineering shall approve the Final Acceptance Certificate. If, however, defects or deficiencies are apparent to the Director of Planning and Engineering in the utilities or improvements the Final Inspection Certificate will be returned to the Owner unsigned with a report of the defects and deficiencies listed and with a statement of the length of time in which the defects and deficiencies shall be corrected by the Owner at his own expense. (l) Should the Owner fail to correct deficiencies or defects listed or pay for any damage resulting therefrom, the Municipality may deduct the cost of completing the works, correcting deficiencies or defects, or paying the damage from the Security referred to in paragraph 3 hereof. 12. The Owner shall submit to the Municipality final record drawings of the Works as constructed and as approved by the Director of Planning and Engineering, as specified in Schedules B through J of the Subdivision and Development Servicing Bylaw No. 1730. As well: (a) The Owner agrees to pay all arrears or taxes outstanding against the property herein described before approval of any subdivision plans. (b) The Owner further undertakes to pay all current taxes levied on the said lands on the basis and in accordance with assessment and collector's roll entries. (c) In addition to the Security referred to in paragraph 3 hereof, the Owner agrees to pay to the Municipality all inspection fees, administration fees, engineering fees, non-refundable levies and charges and legal cost of connecting all utilies to service the subdivision of the Lands contemplated by this Agreement. 13. The Owner covenants to save harmless and effectually indemnify the Municipality against: (a) all actions and proceeding cots, damages, expenses, claims and demands whatsoever and by whomsoever brought by reason of the subdivision and the construction and installation of the Works. (b) all expenses and costs which may be incurred by reason of this Agreement resulting in damage to any property owned in whole or in part by the Municipality or which the Municipality by duty or custom is obliged, directly or indirectly, in any way or to any degree, to construct, repair or maintain; and (c) all expenses and costs which may be incurred by reason of liens or non-payment of labour or materials, Workers' Compensation Board assessments, unemployment insurance, or Federal or Provincial Tax. 14. The Municipality covenants and agrees with the Owner to permit the Owner to perform the Works upon terms and conditions herein contained. 15. The Municipality covenants and agrees that upon satisfactory completion by the Owner of all of covenants and conditions in this Agreement, and without limiting the generality of the foregoing, including maintenance of the Works constructed pursuant to this Agreement and keeping the same in complete repair for a period of time as specified in paragraph 11 hereof, to provide the Owner with a Final Acceptance Certificate for the Works, signed by the Director of Planning and Engineering. 16. The Owner covenants and agrees that the Municipality may withhold the granting of an occupancy permit for the occupancy or use of any building or part thereof constructed upon the Lands until all works herein have been completed to the satisfaction of the Director of Planning and Engineering, as evidenced by the Construction Completion Certificate provided to the Owner by the Director of Planning and Engineering. 17. It is understood and agreed that the Municipality has made no representations, covenants, warranties, guarantees, promises or agreements with the Owner other than those in this Agreement. 18. Wherever the singular or the masculine are used in this Indenture, the same shall be construed as meaning the plural or the feminine or body corporate or politic where the context or the parties hereto so require. 19. If any section, or lesser portion of this Agreement is held invalid by a court of competent jurisdiction, the invalid portion shall be severed and the invalidity of such section or portion shall not affect the validity of the remainder. 20. Time is of the essence of this Agreement. 21. This Agreement shall enure to the benefit of and be binding upon the parties hereto, their respective heirs, executors, administrators and assigns. 22. The Works required to be constructed pursuant to provisions of this Agreement shall, upon issuance of the Final Acceptance Certificate, become the property of the Municipality free and clear of any claim by the Owner or any person claiming through the Owner. IN WITNESS WHEREOF the parties have set their hands and seals and caused their corporate seals to be affixed in the presence of their duly authorized officers as of the day and year first above written. The corporate seal of the City of ) Williams Lake was hereunto affixed ) in the presence of: ) ) ) ______________________________ ) c/s Mayor ) ) ) ______________________________ ) Clerk ) The corporate seal of [ name of ) owner] was hereunto affixed ) in the presence of: ) ) ) ______________________________ ) c/s Authorized Signatory ) ) ) ______________________________ ) Authorized Signatory ) SUBDIVISION SERVICING AGREEMENT SCHEDULE "A" Works and Services Checklist The Owner undertakes to provide, construct and install the following works and services, at the locations shown and in accordance with the approved design and specifications shown in engineering drawings no. (Attached to and forming part of this Agreement in Schedule "B") and in compliance with the design criteria and specifications of the Subdivision Servicing Bylaw: Waterworks: _____ lin. metres Sanitary sewerage: _____ lin. metres Storm sewerage: _____ lin. metres Roads: _____ lin. metres Lanes _____ lin. metres Curbs, gutters and boulevards: _____ lin. metres Sidewalks: _____ lin. metres Underground electrical and telephone: _____ lin. metres Street lighting: _____ light standards etc. Wherever in this Agreement the approved design and specifications are in conflict with the standards and requirements set out in the Subdivision Servicing Bylaw, the Subdivision Servicing Bylaw shall govern; provided that, where the approved design and specifications exceed the Subdivision Servicing Bylaw standards they shall not be deemed to be in conflict, and the approved design and specifications shall govern. SUBDIVISION SERVICING AGREEMENT SCHEDULE "B" [design and specifications in the form of engineering drawings]