{
 "answer": "In the Rural Municipality of Cartier, Manitoba, building permit rules are set by Building By-Law No. 1621-11 and 1 other bylaw, verified 2026-09-24. Permit required for: Construct, erect, place, enlarge, structurally alter, renovate, demolish, relocate, remove or change occupancy of a building. Exemptions: Utility shed up to 120 square feet in area and 8 feet in height (application still required). Permit fees: Based on building inspector's opinion of estimated value of work proposed; adjusted/refund if actual lower.",
 "municipality_id": "gx-001320",
 "municipality": "Rural Municipality of Cartier",
 "status_type": "Rural Municipality",
 "jurisdiction": "Manitoba",
 "country": "CA",
 "topic": "building_permits",
 "label": "Building permits",
 "status": "found",
 "last_verified": "2026-09-24",
 "official_website": "https://www.rmofcartier.ca/",
 "documents": [
  {
   "primary": true,
   "is_official": true,
   "title": "Building By-Law No. 1621-11",
   "category": "building_permits",
   "document_type": "bylaw",
   "status": "adopted",
   "adopted_date": "2011-11-28",
   "document_url": "https://www.rmofcartier.ca/Home/DownloadDocument?docId=db5ac995-e2a3-4c3a-878c-30a53b5d03c4",
   "summary": "Adopts the Manitoba Building, Fire and Plumbing Codes; requires a building permit for construction, alteration, renovation, demolition or occupancy change; exempts utility sheds under 120 sq ft; sets inspector duties and permit fee tied to Fees and Charges By-Law.",
   "discovered_by": "mb-building",
   "discovered_at": "2026-09-24",
   "capture_sha256": "d7dc90b5ae6a50215dd790cfb5aa73a75d8444192311ecb0a539e24da7ae8ba4",
   "captured_at": "2026-09-25T02:40:41+00:00",
   "capture_http_status": 200,
   "document_number": "1621-11",
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/d7dc90b5ae6a50215dd790cfb5aa73a75d8444192311ecb0a539e24da7ae8ba4.pdf",
   "link_dead": false,
   "facts": {
    "permit_required_for": "Construct, erect, place, enlarge, structurally alter, renovate, demolish, relocate, remove or change occupancy of a building.",
    "exemptions": "Utility shed up to 120 square feet in area and 8 feet in height (application still required).",
    "fee_basis": "Based on building inspector's opinion of estimated value of work proposed; adjusted/refund if actual lower.",
    "fees_location": "By-Law 1615-11 Fees and Charges By-Law",
    "authority": "Building inspector",
    "fine_range": "Fine of not more than $1000; penalty equal to cost of enforcement, maximum $2500; s. 8 contravention penalty equal to building permit fee."
   },
   "fact_citations": {
    "permit_required_for": "s. 7",
    "exemptions": "s. 8",
    "fee_basis": "s. 13",
    "fees_location": "s. 12(f)",
    "authority": "s. 23; s. 25(a); s. 25(d)",
    "fine_range": "s. 36"
   },
   "transcript_url": "/ca/mb/rural-municipality-of-cartier/building-permits/bylaw-1621-11/",
   "transcript_quality": "exact"
  },
  {
   "primary": true,
   "is_official": true,
   "title": "Fees and Charges By-Law No. 1715-24",
   "category": "building_permits",
   "document_type": "bylaw",
   "status": "adopted",
   "adopted_date": "2024-10-21",
   "document_url": "https://www.rmofcartier.ca/Home/DownloadDocument?docId=175b011e-45e3-4004-b585-81ebb868e20f",
   "summary": "Schedule C of the consolidated fees by-law sets the Building and Development Permit fee schedule that applies under Building By-Law 1621-11.",
   "discovered_by": "mb-building",
   "discovered_at": "2026-09-24",
   "capture_sha256": "8d8af8469d61360bd7e6a91dcfcc08e93001d9c387ff6e1a43d33beb10f73052",
   "captured_at": "2026-09-25T02:40:41+00:00",
   "capture_http_status": 200,
   "document_number": "1715-24",
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/8d8af8469d61360bd7e6a91dcfcc08e93001d9c387ff6e1a43d33beb10f73052.pdf",
   "link_dead": false,
   "facts": {
    "permit_required_for": "Construction, erection, placement, alteration, repair or renovation of a building or structure; new buildings including accessory buildings.",
    "fee_basis": "Residential/Part 9: $100 minimum; 0.75% of value up to $200,000, 0.50% over. Part 3: $250 minimum; 1.0% up to $1,000,000, 0.75% over. Agricultural: $250 minimum; 1.0% up to $1,000,000, 0.50% over.",
    "fees_location": "White Horse Plains Planning District Secretary-Treasurer",
    "authority": "Authority Having Jurisdiction (AHJ)",
    "fine_range": "Permit not obtained: fee doubled; Stop Work Order continued: $150/day; missed inspection: $100 per incident."
   },
   "fact_citations": {
    "permit_required_for": "Schedule \"C\", s. 3; Schedule \"C\", s. 1",
    "fee_basis": "Schedule \"C\", s. 3 (Residential and Part 9); Schedule \"C\", s. 3 (Part 3); Schedule \"C\", s. 4",
    "fees_location": "Schedule \"B\", s. 1",
    "authority": "Schedule \"C\", s. 1",
    "fine_range": "Schedule \"C\", s. 11"
   },
   "transcript_url": "/ca/mb/rural-municipality-of-cartier/building-permits/bylaw-1715-24/",
   "transcript_quality": "ocr"
  }
 ],
 "source": "https://govanswers.org/ca/mb/rural-municipality-of-cartier/building-permits/"
}