{
 "answer": "In the Rural Municipality of Dauphin, Manitoba, building permit rules are set by By-Law No. 3054 (Fees and Charges) and 1 other bylaw, verified 2026-09-24. Fees set in: MLA Planning Region / current MLA Fee Schedule. Administered by: Authority Having Jurisdiction (Rural Municipality of Dauphin; building inspector/designated officer).",
 "municipality_id": "gx-001323",
 "municipality": "Rural Municipality of Dauphin",
 "status_type": "Rural Municipality",
 "jurisdiction": "Manitoba",
 "country": "CA",
 "topic": "building_permits",
 "label": "Building permits",
 "status": "found",
 "last_verified": "2026-09-24",
 "official_website": "https://www.rmofdauphin.ca/",
 "documents": [
  {
   "primary": true,
   "is_official": true,
   "title": "By-Law No. 3054 (Fees and Charges)",
   "category": "building_permits",
   "document_type": "bylaw",
   "status": "adopted",
   "adopted_date": "2026-02-24",
   "document_url": "https://dauphin.municipalwebsites.ca/ckfinder/connector?command=Proxy&lang=en&type=Files&currentFolder=%2F&hash=c245c263ce0eced480effe66bbede6b4d46c15ae&fileName=BY-LAW%20NO_%203054%20(Fees%20and%20Charges%20By-Law)%20.pdf",
   "summary": "Sets current building permit fee amounts (including a rush permit fee) that apply alongside the fee schedule already embedded in Minimum Standards Building By-Law 3039.",
   "discovered_by": "mb-building",
   "discovered_at": "2026-09-24",
   "capture_sha256": "bcf68c6f85f8c4c00aef7505aea798158dd9f12ab55dfcccbd299adc01c38bd9",
   "captured_at": "2026-09-25T02:40:41+00:00",
   "capture_http_status": 200,
   "document_number": "3054",
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/bcf68c6f85f8c4c00aef7505aea798158dd9f12ab55dfcccbd299adc01c38bd9.pdf",
   "link_dead": false,
   "facts": {
    "fee_basis": "Part 9: 1.25% on first $100.000 of value, 0.75% on remainder; Part 3/9 commercial: $36.00/sqft, 1.0% on first 1.000,000, 0.6% on remainder, $200 minimum; other permits have flat fees.",
    "fine_range": "Emergency line fine: $100.00 (1st), $250.00 (2nd), $200.00 (3rd+); missed inspection: $100.00 + re-inspection fees; permit after work: double fees, $200.00 minimum."
   },
   "fact_citations": {
    "fee_basis": "Schedule \"A\", Development & Zoning",
    "fine_range": "Schedule \"A\": EMERGENCY LINE FINE; Penalty for Missed Inspection; Penalty for Permit After Work Has Commenced"
   },
   "transcript_url": "/ca/mb/rural-municipality-of-dauphin/building-permits/bylaw-3054/",
   "transcript_quality": "exact"
  },
  {
   "primary": true,
   "is_official": true,
   "title": "Minimum Standards Building By-Law No. 3039",
   "category": "building_permits",
   "document_type": "bylaw",
   "status": "adopted",
   "adopted_date": "2022-08-23",
   "document_url": "https://dauphin.municipalwebsites.ca/UploadFiles/Docs/BYLAWNO3039BuildingBylaw_klJ5Ra.pdf",
   "summary": "Sets minimum construction standards, building/plumbing/occupancy/demolition permit requirements and exemptions, inspection authority duties, appeal process and offences; Schedule A lists classes of permits and permit fees; repeals By-Law 2881.",
   "discovered_by": "mb-building",
   "discovered_at": "2026-09-24",
   "capture_sha256": "b6f6b4ea5669434f767630a9ffc4c02e704e4cb0b15aa3b5c138f9245c9f2cf8",
   "captured_at": "2026-09-25T02:40:41+00:00",
   "capture_http_status": 200,
   "document_number": "3039",
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/b6f6b4ea5669434f767630a9ffc4c02e704e4cb0b15aa3b5c138f9245c9f2cf8.pdf",
   "link_dead": false,
   "facts": {
    "permit_required_for": "Building permit required for: location, placement, erection or construction, addition, extension, improvement, alteration or conversion, underpinning, relocation or removal, mechanical system, special process, plumbing connection, excavation.",
    "exemptions": "Building permit not required for patching, painting, decorating; replacement of stucco/siding/shingles, doors/windows, open landing/stairs; fences; cabinets/shelves; accessory storage buildings <=13.9 m2; non-structural work <$15,000.",
    "fee_basis": "Building permit fees based on valuation: 1.25% first $100,000, 0.75% remainder; commercial 1.0% first $1,000,000, 0.6% remainder, $200 minimum.",
    "fees_location": "MLA Planning Region / current MLA Fee Schedule",
    "authority": "Authority Having Jurisdiction (Rural Municipality of Dauphin; building inspector/designated officer)",
    "fine_range": "Penalty for applying for development permit after commencement of work: $100.00; other fines/penalties as set out in General Enforcement By-law."
   },
   "fact_citations": {
    "permit_required_for": "s. 4.2.1.1",
    "exemptions": "s. 4.2.1.2",
    "fee_basis": "Schedule \"A\"",
    "fees_location": "s. 4.1.1(c); Schedule \"A\"",
    "authority": "s. 2.2.3",
    "fine_range": "Schedule \"A\"; s. 7.3"
   },
   "transcript_url": "/ca/mb/rural-municipality-of-dauphin/building-permits/bylaw-3039/",
   "transcript_quality": "exact"
  }
 ],
 "source": "https://govanswers.org/ca/mb/rural-municipality-of-dauphin/building-permits/"
}