Rural Municipality of East St. Paul, Manitoba
· adopted 2013-03-13
This is the exact embedded text of the captured official document.
Snapshot 2e1442f45a3d · verified 2026-06-10 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
THE RURAL MUNICIPALITY OF EAST ST. PAUL
POLICY & PROCEDURES MANUAL
Reference
Classification
Public Works Department
Policy
Subject
Pages
Snow Clearing
3
Authority
Effective Date
Council
March 13, 2013
Approved
Index
Resolution #100-2013
PUB-103
PURPOSE
The purpose of this policy is to provide a prompt and efficient level of snow clearing service for residents
of the R. M. of East St. Paul.
PROCEDURE
1. Following a major snowfall all Priority I streets are cleared of snow immediately. All Priority I streets
will be cleared to bare surface within a twenty-four (24) hour period.
2. Priority II streets are cleared of snow to a bare surface whenever conditions allow following the
completion of the ploughing of snow from Priority I streets. Generally windrows across private
walks and approaches are not to be removed. However, windrows will be removed after all Priority I
and II streets are cleared, if the height of the windrow is greater than four hundred and fifty (450)
mm. After removing the windrow from the driveway, the remaining windrow will be no greater
than 300mm and no less than 150mm.
3. For a gradual accumulation of snow, Priority I streets are cleared of snow after three (3) cm of snow
or as required, to bare surface.
4. Sidewalks will be cleared of snow to a compacted snow surface following a five (5) cm snowfall
accumulation. In the clearing of snow from sidewalks, windrows across private approaches and/or
walks will not be removed.
5. During the winter, sanding and salting is done on an "as required" basis to ensure a reasonable level
of service for the safety of motorists and pedestrians.
6. Snow is not to be pushed, shovelled or blown from any residential or commercial property onto
Municipal roadways.
7. Priority streets are identified as shown on attached Schedule "A".
2
8. After all Priority I and II streets are cleared, upon receiving a request in writing, the R.M. of East St.
Paul will clear any windrows left on approaches of residents who are senior citizens (65 years of age
and older) and special needs persons, provided there is no other person residing there that is able to
perform the work. Effective January 1st, 2014, the R.M. of East St. Paul will only accept additions to
the current list if written proof of incapacitation is supplied to the municipality.
OPERATIONS
Working Hours
1.
Work schedules may be developed within the following parameters. The maximum shift should be
12 hours, excepting emergencies, with a minimum of 8 hours off between shifts. (A shift is defined
at the time the employee is on duty). If more than 12 hours are required, staggered shifts should be
considered. The 12 hour limitation may be exceeded for medical emergencies and unexpected
serious changes in road conditions.
Working Conditions
2.
Under severe sight-distance restrictions no effort should be made to conduct snow removal
operations by day or night. Snow clearing operations should not be undertaken when visibility is
less than 300 metres.
Accommodating Traffic When Snowplowing
3.
Vehicles following a snowplow are a hazard. When the snowdrifts are intermittent or when the
wind is blowing from left to right, motorists can see around the plow and usually pass freely. The
greatest hazard exists when the snow fog hangs over the road or drifts from right to left across the
adjacent lane.
In this situation, motorists may want to pass the plow even if they cannot see oncoming traffic. This
puts vehicles in the immediate area into a dangerous situation. For this reason, it is important to
pull over, and allow traffic to pass.
In situations when the snow accumulation is sufficient to cause difficulty in passing and/or staying
ahead of the plow, do not pull over to the shoulder to facilitate passing. Vehicles ahead of the plow
will become obstacles/hazards to safe snow removal operation.
Stalled Vehicles
4.
Stalled/abandoned vehicles are not removed unless they present a hazard to the motoring public.
As necessary, vehicles are removed at the owner's expense using local towing services.