Rural Municipality of
Hanover
Policy, Procedures and Standards Manual
Section: Works, Operations and
Environmental Services
Policy No: WOR-004
Subject: Snow Removal
Date issued: February 27, 2013
Revision Date: April 6, 2022
PURPOSE
The purpose of this policy is to ensure that there is a set standard for level of snow removal as to
maintain an acceptable level of service and safety to residents within the Rural Municipality of
Hanover.
DEFINITIONS:
"Corporation" shall mean the Rural Municipality of Hanover.
"Municipality" shall mean the Rural Municipality of Hanover.
"Grunthal" shall mean the LUD of Grunthal.
"Mitchell" shall mean the LUD of Mitchell.
"Blumenort" shall mean the LUD of Blumenort.
"Urban Centers" shall mean the LUD of Blumenort, LUD of Grunthal, LUD of Mitchell,
Kleefeld, and New Bothwell.
"Foreman" Within "Snow Removal Policy" shall mean an individual appointed as a supervisor
of Public Works department that reports to the Manager of same department.
"Manager" Within "Snow Removal Policy" shall mean an individual appointed as a Manager of
Works and Operations of the Corporation of the Municipality of Hanover.
"MIT" shall mean Manitoba Infrastructure and Transportation.
1.0
POLICY STATEMENT:
The Municipality as a whole has approximately 500 miles of gravel roads and asphalt, along with
5 urban centers. Our equipment consists of 4 motor graders, 2 plow trucks and 1 sanding truck.
https://hanovermb.sharepoint.com/sites/FinanceAdmin/Shared Documents/Central/Policies/XX - DRAFTS AND WORKING COPIES/WOR Works
and Operations Working copies of Policies/WOR-004 Snow removal policy Revised.docx
Snow clearing operations will only begin once the snowfall has ended or is expected to shortly,
and visibility is greater than 300 meters. In cases where the snow fall ends the evening before or
during the night, snow clearing operations will begin the following morning or as according to
policy. The Municipality's goal for complete opening of all maintained roads and urban centers
shall be set at 3 days. Generally snow clearing begins in urban centers and then moves outward
into the surrounding rural areas. Employees and equipment will be dispatched or put on standby
according to the Foreman and/or Manager's discretion upon review of meteorological forecasts
and other factors such as wind velocity and direction.
2.0
RD32N (RIDGE ROAD)
Rd32N shall be treated to the likeness of an MIT PR. Clearing of snow shall
commence once snow fall has ceased and upon consideration of meteorological
forecasts. If weather event has occurred or ceased late in the day, evening or night,
operations shall commence the following morning. Sanding may require a stronger
salt/sand ratio as to ensure that the asphalt does not build up with ice or become
snow packed.
3.0
WEATHER EVENTS
3.1
DRIFTING/BLOWING:
Conditions shall be monitored by designated personnel, and clearing operations
will commence at the Foreman or Manager's discretion. Wind direction and
velocity should be considered together with an inspection of certain key areas
throughout the municipality.
3.2
FREEZING RAIN:
Intersection sanding will be done as soon as possible in order of priority. Priority for
sanding is generally as follows:
- Rd 32N between PR216 and PTH12 (Ridge Road)
- School zones
- Fire halls
- Where urban center streets meet a MIT right of way
- Remaining intersections within urban centers
- Municipality hard surface approaches to a MIT right of way
- Other areas as per Foreman's or Manager's discretion
3.3
SNOWFALL
a) Level 1: snowfall amounts of less than 5cm
This does not require a full cleanup. A few minor cleanups might be done
at the foreman and manager's discretion. Sanding might be necessary
within urban centers, depending on various factors including: Temperature,
Forecast, Traffic volumes, previous sanding, etc.
https://hanovermb.sharepoint.com/sites/FinanceAdmin/Shared Documents/Central/Policies/XX - DRAFTS AND WORKING COPIES/WOR Works
and Operations Working copies of Policies/WOR-004 Snow removal policy Revised.docx
b) Level 2: snowfall amounts of 5cm up to 15cm (accumulative)
A cleanup will be done within urban centers beginning on the first regular
work day following the snowfall. Snow removal shall be done in order of
priority within each respective urban center. Rural roads shall be cleared at
the discretion of the Foreman or Manager, upon an inspection of road
conditions in various key areas throughout the municipality.
c) Level 3: snowfall amounts of 15cm or more
A cleanup of urban centers and rural roads will be commenced shortly after
snowfall has ceased. In situations where snowfall ends late in the day or
evening, clearing operations shall commence the following morning.
Operations shall be done in order of priority.
4.0
URBAN CENTERS
The Municipality shall ensure that snow deposited on a residential or commercial
access within an urban center, be removed as to not block access. The manager
shall have authority to arrange services of a private contractor registered with the
municipality's hourly bid process. Manager and or Foreman shall also work closely
with LUD committees/councillor within each respective urban center regarding
snow removal practices. LUD of Grunthal shall revisit agreement with MIT in
regards to snow removal of Main St. once annually. Manager shall have the
authority as to arrange private contractors to remove windrowed snow when
necessary.
5.0
PRIORITIES
The order of priorities is as follows with consideration to snowfall amounts listed in section
3.3
1st Priority: Urban centers (detailed in sections 5.1 - 5.5)
2nd Priority: Rural grid roads (refer to section 5.6)
3rd Priority: Rural developments (refer to section 5.6)
4th Priority: Recreational centers (refer to section 5.7)
5th Priority: Snow removal/snow windrowing (refer to section 5.8)
5.1 BLUMENORT(streets to be cleared first)
- Park St.
- Penner Dr N
- Penner Dr S
- OakDale Dr
- Lilac St.
- Barkman St.
- Rockridge Dr.
- Remaining streets
https://hanovermb.sharepoint.com/sites/FinanceAdmin/Shared Documents/Central/Policies/XX - DRAFTS AND WORKING COPIES/WOR Works
and Operations Working copies of Policies/WOR-004 Snow removal policy Revised.docx
5.2 MITCHELL (streets to be cleared first)
- Center St. South
- Ash St.
- Morley Ave.
- Willow St.
- Stanway Ave N
- Stanway Ave S.
- Walnut St. (Willow St. to Center St. North)
- Center St. North
- Remaining streets
5.3 GRUNTHAL (streets to be cleared first)
- Oak Ave.
- Park St.
- Southwood Ave.
- Maple Ave.
- Remaining streets
5.4 KLEEFELD (streets to be cleared first)
- Friesen Ave.
- Fourth St.
- Remaining streets
5.5 NEW BOTHWELL (streets to be cleared first)
- Crown Valley Rd East
- Crown Valley Rd West
- Remainder of streets
5.6
RURAL ROADS
Rural grid roads and developments shall be cleared only after all urban
centers have been completed.
a) Rural Grid Roads
Grid roads shall be cleared as per attached map (schedule "A"). Class A
roads shall be cleared first. Class B roads shall be cleared immediately
following the completion of Class A roads.
b) Rural Developments
Rural developments shall be cleared once rural grid roads have been
completed.
https://hanovermb.sharepoint.com/sites/FinanceAdmin/Shared Documents/Central/Policies/XX - DRAFTS AND WORKING COPIES/WOR Works
and Operations Working copies of Policies/WOR-004 Snow removal policy Revised.docx
5.7
RECREATIONAL CENTERS
Recreation center's which have not entered into an agreement with a
contractor for parking lot maintenance, may hire municipal equipment to
perform works such as sanding of a parking lot, snow clearing and/or snow
removal. If such works are required by the municipality, it will be
completed in accordance with our set priorities outlined in section 5.0.
5.8
SNOW REMOVAL
Some urban centers may require removal of snow from storage areas, as to
maintain safety and access to fire hydrants. Snow windrowing in problem
areas using motor graders may be necessary. Manager shall have the
authority as when to commence such works.
6.0
DIRT ROADS
Dirt roads shall only be cleared as to provide access for local landowner to retrieve
product once per winter season at the municipality's expense. Additional works
done to maintain access may be considered at the rate payers' expense. Requests
for maintaining continuous access will be decided by council.
7.0
SPECIAL SITUATIONS
CAO or Manager shall have the authority to dispatch equipment for special
situations that arise outside of day to day operations such as medical emergencies.
https://hanovermb.sharepoint.com/sites/FinanceAdmin/Shared Documents/Central/Policies/XX - DRAFTS AND WORKING COPIES/WOR Works
and Operations Working copies of Policies/WOR-004 Snow removal policy Revised.docx
Schedule "A"