{
 "answer": "In the Rural Municipality of Morris, Manitoba, building permit rules are set by By-Law No. 1775/2023 — Fines, Penalties, Fees & Charges (Schedule D, Planning & Zoning / Building Inspection), verified 2026-09-24. Exemptions: Other Signs Permit not required; Under $5000 Value No Permit unless Structural. Permit fees: $4.724 per $1,000 of construction cost, $125 minimum; commercial $7.227 per $1,000 over $10,000. Fees set in: current Fees and Charges By-law and amendments thereto.",
 "municipality_id": "gx-001342",
 "municipality": "Rural Municipality of Morris",
 "status_type": "Rural Municipality",
 "jurisdiction": "Manitoba",
 "country": "CA",
 "topic": "building_permits",
 "label": "Building permits",
 "status": "found",
 "last_verified": "2026-09-24",
 "official_website": "https://rmofmorris.ca/",
 "documents": [
  {
   "primary": true,
   "is_official": true,
   "title": "By-Law No. 1775/2023 — Fines, Penalties, Fees & Charges (Schedule D, Planning & Zoning / Building Inspection)",
   "category": "building_permits",
   "document_type": "bylaw",
   "status": "adopted",
   "adopted_date": "2023-04-12",
   "document_url": "https://rmofmorris.ca/wp-content/uploads/2025/04/fees-and-charges.pdf",
   "summary": "Same fees by-law recorded again under building_permits: Schedule D sets the RM's building permit fee schedule (residential/commercial construction-cost rates, pools, signs, agricultural buildings, mobile homes, occupancy permits).",
   "discovered_by": "mb-building",
   "discovered_at": "2026-09-24",
   "capture_sha256": "dcbb8ec2c20494f8cabda248c07dff31146389e2717ef719ae2ce5277c8ad603",
   "captured_at": "2026-09-25T02:40:41+00:00",
   "capture_http_status": 200,
   "document_number": "1775/2023",
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/dcbb8ec2c20494f8cabda248c07dff31146389e2717ef719ae2ce5277c8ad603.pdf",
   "link_dead": false,
   "facts": {
    "permit_required_for": "Building Permit (residential and commercial); plumbing permit; demolition; outdoor inground pool; agricultural buildings; mobile homes; solid fuel appliances; occupancy permit.",
    "exemptions": "Other Signs Permit not required; Under $5000 Value No Permit unless Structural.",
    "fee_basis": "$4.724 per $1,000 of construction cost, $125 minimum; commercial $7.227 per $1,000 over $10,000.",
    "fees_location": "current Fees and Charges By-law and amendments thereto",
    "authority": "The authority having jurisdiction; Inspector",
    "fine_range": "General: $50 first, $100 second, $150 third, additional $50 up to $500 max per incident; building inspection: $500 per missed inspection, $2,500 occupancy before final inspection, double permit fee if no permit."
   },
   "fact_citations": {
    "permit_required_for": "Schedule \"D\", Building Inspection, 1, 2, 3",
    "exemptions": "Schedule \"D\", Building Inspection, 2.D, 2.F",
    "fee_basis": "Schedule \"D\", Building Inspection, 1.A-B, 1.C.10",
    "fees_location": "s. 7",
    "authority": "s. 8 (5.5.10); Schedule \"D\", 7",
    "fine_range": "s. 1; Schedule \"D\", 8"
   },
   "transcript_url": "/ca/mb/rural-municipality-of-morris/building-permits/schedule-1775-2023/",
   "transcript_quality": "exact"
  }
 ],
 "source": "https://govanswers.org/ca/mb/rural-municipality-of-morris/building-permits/"
}