Surface Drainage Policy- 1 - | P a g e
RURAL MUNICIPALITY OF PORTAGE LA PRAIRIE
REFERENCE: Public Works
POLICY NO. PW - 06
TITLE: Surface Drainage Policy
PAGES: 7
ADOPTED BY: Resolution No. 2017-452
DATE: January 10, 2017
Statement and Purpose:
The RM of Portage is the drainage authority for all lands in its jurisdiction with the exception of
natural waterways and Province of Manitoba designated drains. The purpose of this policy is
to establish guidelines and conditions for the drainage projects on land in the Municipality. Note:
Tile Drainage is under a separate policy.
Supporting Legislative Documents:
Municipal Act:
Duties re drains
294.1(3) A municipality must maintain every drain within its boundaries to a standard that is appropriate for
the use to which the municipality expects the drain to be put.
Municipality's power to clear drains
294.1(4) A municipality may require a person who without written authority from the municipality obstructs a
drain to remove the obstruction, and if the person fails to do so, the municipality may remove the obstruction
and recover any expense it incurs from the person who caused the obstruction
(a) by levying and collecting the amount of the expense as a tax; or
(b) by any other means.
This policy is used in conjunction with the Private Works By-law (3011) and the Drainage By-
law (no. 2874)
Definitions:
Drainage means a natural or artificial channel which provides a course for water flowing
continuously or intermittently.
Drainage Manager is the Assistant Public Works Manager
Municipal Drainage is the drainage work in waterways that are deemed first or second order
Surface Drainage Policy- 2 - | P a g e
(defined by provincial water rights) and municipal ditches.
Private Drainage is drainage work constructed, erected, installed or maintained by a non-
government entity
RTK - Real Time Kinematic (RTK) satellite navigation is a technique used to enhance the precision of
position data derived from satellite-based positioning systems (global navigation satellite
systems, GNSS) such as GPS, GLONASS,Galileo, and BeiDou. It uses measurements of
the phase of the signal's carrier wave, rather than the information content of the signal, and relies on
a single reference station or interpolated virtual station to provide real-time corrections, providing up
to centimetre-level accuracy. With reference to GPS in particular, the system is commonly referred
to as Carrier-Phase Enhancement, or CPGPS. It has application in land survey and in hydrographic
survey.
Policy:
Table of Jurisdiction:
Construction and
Maintenance of:
Jurisdiction:
Municipal ditches and first
and second order provincial
drains
RM of Portage and Manitoba Water Stewardship
Manitoba Infrastructure
provincial highway ditches
Manitoba Sustainable Development
Drainage and Water Control Licensing Section
However input from the RM is required.
Provincial drains and natural
waterways (third order
provincial drain)
Manitoba Water Resources and Manitoba Water
Stewardship
1. The municipality expects all private drains to be licensed in compliance with
Manitoba Government rules and regulations. The municipality may refuse drainage
requests if the landowner is not in compliance.
2. Land owner requests for improvements to municipal, provincial or Highway drains
should be made to the appropriate ward councilor or to the RM of Portage by
completing the attached Drainage Application attached as schedule "A" and
submitted a minimum of 6 months prior to the project start date. The license
application must cover no less than 1 mile in length and have a minimum of 2 miles
downstream landowner permission in writing.
3. All requests received will be reviewed by the Councilor of the Ward.
4. The Council of the RM of Portage establishes an annual municipal drainage works
plan to be funded as part of the municipal budget. Additional municipal drainage
projects may be added as time and budget allow. Private drainage works will not be
performed nor funded by the municipality.
5. Non-compliance with the terms of the work approved may result in work cease order,
revocation of permission and/or denial of future private drainage applications.
6. The Drainage Manager delegates and completes the surveying and licensing and
provincial approvals as required for municipal drainage works. For private drainage
Surface Drainage Policy- 3 - | P a g e
works, the applicant is responsible for the surveying, licensing and provincial approvals
at their own cost.
7. Surveys for private drainage works must be performed by a qualified surveyor with
drawings in the same format as provided in the example in appendix D. The plan must
include prairie, ditch and road elevations.
8. Survey work prepared by the RM staff will not be released. However, special
circumstances may exempt this restriction at the approval and direction of Council.
9. The applicant is responsible for culverts that need to be relocated, replaced or removed
at the applicant's expense and in compliance with the culvert policy and the drainage
license issued by the Province. Cost share or culvert work done by the municipality
may occur as an exception in special circumstances and only at the approval of the
Drainage Committee and Councilor for the applicable Ward.
10. The Drainage Manager in consultation with Council determines the timing and
scope of municipal drainage work.
11. Council shall receive a monthly progress report on municipal drainage works.
12. The excess material excavated during construction shall be stored directly adjacent
to the field side of the maintained drain. The Municipality will undertake to spread
the material in the same calendar year as the work is completed or as soon as
practically possible.
13. The landowner may request use of the material for works done on private land.
The landowner will be required to sign an excess stockpiled material agreement
complying with conditions as per municipal policy, attached as Schedule "B".
14. The municipality attempts to mitigate erosion which may occur as a result of new
drainage works.
15. Erosion control methods of field drain outlets into municipal drains are an important
component of erosion mitigation. The Municipality and, where applicable, the
Conservation District are available to provide expertise and assistance in this
matter.
16. Requests for additional culverts or modified field approaches are addressed as per
the Culverts and Crossings Policy.
17. Proof of completed private drainage work must be provided to the RM and will be
deemed officially completed at the RM's review and satisfaction of submitted
documents. Surveys for private drainage works completed will be performed by
the RM.
18. No other private drainage works will be approved until prior applications are deemed
completed in satisfactory manner by the RM.
19. The applicant is responsible to maintain the licensed municipal ditch at the
applicants cost for a period of 5 years and may be extended at Council's discretion.
Surface Drainage Policy- 4 - | P a g e
R.M. of Portage la Prairie
DRAINAGE WORKS REQUEST FORM
Date
Name
Ph
Land Description
Drainage Work Requested (minimum of 1 mile is required)
NORTH
Sec ________________
Sec ________________
Committee Comments
Applicant Signature
Council
Submit your completed application to the Councilor for your Ward
Wood/River Lot #
Schedule A
Schedule A
Surface Drainage Policy- 5 - | P a g e
RURAL MUNICIPALITY OF PORTAGE LA PRAIRIE
Application for Excess Stockpiled Material Agreement
The Rural Municipality of Portage la Prairie will permit the excess stockpiled material to be used by the
landowner and/or the applicant that has made their formal request in writing and has been reviewed and
approved by council.
The excess material excavated during construction shall be stored directly adjacent to the maintained drain.
If the Municipality has approved the excess stockpiled material use by the landowner and/or the applicant,
they must undertake to use/spread the material within the calendar year, no later than October 31st. If
the landowner and/or the applicant does not use/spread the excess stockpiled material by the deadline,
the Municipality will undertake to spread the material as soon as practically possible at the applicant's
expense. The Municipality reserves the right to deny any future requests of this nature if the requirements
are not complied by.
The landowner and/or the applicant is not allowed to receive any remuneration for the excess stockpiled
material that they have been granted the use of.
Thank you for your cooperation in this matter. Use of the excess stockpiled material must not commence
until the applicant and/or the landowner has received a signed copy back from the Rural Municipality of
Portage.
ACKNOWLEDGEMENT:
I,
of
Agree to comply with the conditions and recommendations outlined in this letter.
IN WITNESS WHEREOF the parties hereto agree to the above conditions.
Signatures:
Date:
_
Landowner(required signature)
Witness
Applicant( only if different from the landowner)
APPROVAL:
Nettie Neudorf, Chief Administrative Officer
Schedule B
Schedule B
Surface Drainage Policy- 6 - | P a g e
RURAL MUNICIPALITY OF Portage la Prairie
Application for Private Drainage Works
The Rural Municipality of Portage will permit the work once the landowner and/or the applicant
has reviewed this agreement letter and returned a signed copy to our office, confirming the
acceptance of the following conditions:
LOCATION:
Planned Start date:
CONDITIONS
1. The Rural Municipality of Portage will acquire the necessary drainage license from
Manitoba
Water Stewardship. A copy of this license shall be forwarded to you when you provide our
office with a signed copy of this agreement, and before any works commence.
2. The work shall be constructed as per the conditions outlined in the approved Drainage
License from Manitoba Water Stewardship;
a. The applicant and/or the landowner shall submit the proposed drainage project in
a timely fashion. The proposal should include an initial survey including proposed
slopes and grades with cut/fill.
b. The applicant shall comply with all requirements provided in the scope of work.
c. The applicant and or the landowner will ensure that proper erosion control methods
are followed, including the use of erosion control blankets, rip-rap material and
temporary biodegradable erosion control blanket;
d. The proposed drainage work cannot be lower than the downstream outlet and
should not accommodate the drainage of low lying areas of private land.
3. The Municipality will request all utility locates but the applicant and/or the landowner shall
be responsible for all utility re-location and protection, including MTS, Manitoba Hydro and
Portage Waterline Distribution System, and shall be liable for damage caused to utilities
located at this site;
4. When requested, all disturbed areas (i.e. grade slopes, ditches, field drains) shall be
trimmed, re-seeded and restored to an acceptable condition within 60 days of completion.
5. The applicant is responsible for the surveying, licensing and provincial approvals at their
own cost.
6. Surveys for private drainage works must be performed by a qualified surveyor with
drawings in the same format as provided in the example in appendix D. The plan must
include prairie, ditch and road elevations.
7. The applicant is responsible for culverts that need to be relocated, replaced or removed at the
applicant's expense and in compliance with the culvert policy and the drainage license issued
by the Province. The applicant and/or landowner must purchase culverts from the RM of
Portage. Installation and replacements must comply with the RM of Portage by-laws and
policies.
8. Work must be carried out with the use of laser or RTK.
9. The applicant and/or the landowner shall be responsible for the restoration of any erosion,
slope failure, or road settlements, for a period extended to December 31of the year
following the date on which work has completed the construction or modification.
10. Any excess excavated material shall be disposed of or leveled to an acceptable condition;
Schedule C
Schedule C
Surface Drainage Policy- 7 - | P a g e
11. The construction, installation, and maintenance operations of the permitted drainage
works, shall be accomplished with minimal interference of the use, operation and
maintenance of the Province's right-of-way, and shall in no way, endanger the general
public in its authorized/legal use of the right-of-way.
12. The applicant and/or the landowner, shall contact the RM of Portage a minimum of 48
hours in advance of the work being undertaken;
13. The applicant and/or the landowner shall be held liable for any damage, injury, or
destruction resulting from the negligence of their staff and/or agents and maintain ongoing
$5 million liability insurance coverage for the duration of the work, and if requested shall
provide evidence;
14. The Rural Municipality of Portage requires that all downstream landowners of a minimum
of 2 miles and any other landowners that may be affected by the drainage works must be
contacted and in agreement with the permitted work.
15. Proof of completed private drainage work must be provided to the RM and will be deemed
officially completed at the RM's review and satisfaction of submitted documents. Surveys
for private drainage works completed will be performed by the RM.
16. No other private drainage works will be approved until prior applications are deemed
completed in satisfactory manner by the RM.
17. The applicant is responsible to maintain the licensed municipal ditch at the applicants cost
for a period of 5 years and may be extended at Council's discretion. This agreement is subject
to any restrictions and/or regulations imposed by any other Government body (i.e. Manitoba
Environment, DFO) and does not relieve the landowner and/or applicant from having to
comply with the requirements.
18. If remedial works are required to be done by the RM of Portage to rectify a drain that does
not comply with the Manitoba Water Stewardship License and the Drainage Plan of the RM
of Portage as approved, the costs of such works will be the responsibility of the landowner.
19. The Municipality must receive written agreement of the proposed work from the following
landowners downstream (by a minimum of 2 miles) upon completion of the signing
of the application;
NAME
LEGAL DESCRIPTION
1.
2.
3.
4.
5.
Thank you for your cooperation in this matter. Construction must not commence until the
applicant and/or the landowner has received a signed copy back from the Rural Municipality of
Portage.
ACKNOWLEDGEMENT:
I,
of
Agree to comply with the conditions and recommendations outlined in this letter.
Surface Drainage Policy- 8 - | P a g e
IN WITNESS WHEREOF the parties hereto agree to the above conditions.
Signatures:
Date:
Landowner(required signature)
Witness
Applicant( only if different from the landowner Witness
APPROVAL - Approved by Council Resolution No. ________________________
____________________________
Nettie Neudorf, CPA, CGA, CMMA
CAO
Appendix D
Surface Drainage Policy- 9 - | P a g e