Planning & Development Policy Framework

Rural Municipality of West St. Paul, Manitoba

This is the exact embedded text of the captured official document. Snapshot 6f57b78c04a5 · verified 2026-06-09 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

Home # Planning & Development The RM of West St. Paul is part of the Red River Planning District whose office provides planning and building development services to West St. Paul and other member Municipalities. This includes the adoption, administration, and enforcement of the development plan, secondary plans and zoning by-law. All land use planning and building permit matters are provided to the Municipality by the Red River Planning District. All current Public Hearing Notices are posted at the Municipal office located at 3550 Main Street. Development in the Municipality is guided and regulated by the following documents: **Red River Planning District Development Plan** The Development Plan is the Planning District's vision for future development and provides general policies that guide development in the district as a whole. **West St. Paul Secondary Plans** The West St. Paul Secondary Plans offer more detailed land use and infrastructure policies that apply to specific areas in the Municipality. **Rural Municipality of West St. Paul Zoning By-Law** The zoning by-law regulates the use and placement of structures, size of lots, and all other necessary requirements for development in each zone. For more information regarding planning and development in the Municipality, please contact: **Red River Planning District Main Office:** 2978 Birds Hill Road East St. Paul, R2E 1J5 Phone: 204-669-8880 General Inquiries: **[email protected]** **Office Hours:** Monday to Friday 8:30am to 4:15pm Closed ALL Statutory Holidays **Inspections**: 204-669-8980 or [email protected] Please visit their website **www.redriverplanning.com**for additional information. ## I want to put an access/driveway on to my property, what do I need to do? An approach permit must be obtained from the RM Office. The culvert must be purchased by the homeowner/builder and also installed by same, but before the culvert is back filled, the homeowner/builder must contact the RM Office so that our Public Works Manager can go out and verify that the culvert is at the correct elevation and placement. Once it has been inspected, the homeowner/builder will be advised that everything is ok and that the culvert can be back filled. Decorative Additions to approaches are not permitted unless permission is obtained under Section 8.0 of the Private Approach By-Law 2026-08. That any alteration or maintenance of a Decorative Addition permitted by section 8.1 is strictly the responsibility of the Owner whose property gains access from the approach, and the Municipality will not be held responsible for any damage sustained to any such alternation or Decorative Addition, whether such damage is caused by the Municipality's grader or any other cause whatsoever. ## Where do I find out information on zoning and building permits? Red River Planning District 2978 Birds Hill Road, East St. Paul, MB Phone: 1- 800-876-5831 **www.redriverplanning.com** Pam Elias Director of Planning & Economic Development 3550 Main St., West St. Paul, MB, R1A 2C9 **[email protected]** Phone: 204-338-0306