St-Pierre-Jolys Development Plan
Prepared by: Richard + Wintrup Planning and Development
September 2021
By-Law No. 2021-10
St-Pierre-Jolys Development Plan By-law No. 2021-10
A by-law of the Village of St-Pierre-Jolys to regulate the use and development of land within the Planning Area
of the municipality.
WHEREAS, Section 45 of The Planning Act requires a Council adopt a development plan by by-law that
applies to the municipality.
NOW THEREFORE BE IT RESOLVED THAT the Village of St-Pierre-Jolys Council in meeting duly
assembled, enacts as follows:
1.
The Development Plan attached in Schedules A, and B is hereby adopted.
2.
The By-law shall be known as the St-Pierre-Jolys Development Plan By-law No. 2021-10.
3.
By-law No. 2009--8 for the Village of St-Pierre-Jolys: as amended, are repealed.
4.
This By-law shall come into force on D~u Mt,t r \ ?.o ;}\_
DONE AND PASSED by the Village of St-Pierre-Jolys Council duly assembled at the
i \\°"f ()\b,e. ( "7o( ) -\~ 'l
in the Province of M_anitoba, this ~
day of
! <!..- tt,'<,e..\
, ~
-
(De~ t )
M~
/
READ A FIRST TIME this fourteenth (14"') day of July, 2021.
READ A SECOND TIME this fifteenth (15()day of September, 2021 .
READ A THIRD TIME this ~
day of
i!.UM'C>e-
, ~
-
Certified copy of By-law 2021-10, given first reading on the
fourteenth (1 ") day of July, 2021.
Certified copy of By-law 2021-10, given second reading on
the
eenth 15") day of September, 2021.
certified copy of By-law 2021-10, given third reading on the
~
dayof 'i)e,e,'<'';)e<'
CAO
Table of Contents
Schedule A: Development Plan
1
Introduction ................................................................................. 1
1.1 Plan Purpose ........................................................................................................... 1
1.2 Plan Approach ......................................................................................................... 2
1.3 Plan Outline ............................................................................................................. 4
2
Planning Intent ............................................................................ 5
2.1 Vision ........................................................................................................................ 5
2.2 Guiding Principles ................................................................................................... 5
2.3 Village Goals and Objectives ................................................................................. 6
3
Planning Area .............................................................................. 8
3.1 Boundaries of the Planning Area ........................................................................... 8
3.2 Surrounding the Planning Area.............................................................................. 9
4
Planning Policies ....................................................................... 10
4.1 Progressive Policies ............................................................................................. 10
4.1.1 Urban Policy Areas ....................................................................................... 11
4.1.2 Chaboillé District ........................................................................................... 17
4.2 Transformative Policies ........................................................................................ 19
4.2.1 Future Growth Areas ..................................................................................... 19
4.3 Conservative Policies ........................................................................................... 21
4.3.1 Natural Lands Policies .................................................................................. 22
5
Planning Infrastructure ............................................................. 25
5.1 Transportation Policies ......................................................................................... 25
5.1.1 Roads ............................................................................................................ 25
5.1.2 Policies and Statutory Controls ..................................................................... 26
5.1.3 Active Transportation .................................................................................... 29
5.2 Public Service Policies ......................................................................................... 30
5.2.1 Water and Wastewater .................................................................................. 30
5.2.2 Land Drainage .............................................................................................. 31
5.2.3 Utilities .......................................................................................................... 31
5.2.4 Green and Open Spaces .............................................................................. 32
6
Planning Area Background ...................................................... 35
6.1 St-Pierre-Jolys Background Study ...................................................................... 35
6.2 Growth Scenarios .................................................................................................. 35
6.3 Growth Scenario Implications .............................................................................. 36
6.4 Planning Process .................................................................................................. 36
6.5 Project Governance ............................................................................................... 37
7
Implementation .......................................................................... 39
7.1 Implementation Strategies .................................................................................... 39
7.2 Leadership, Partnership, and Sponsorship ........................................................ 40
7.3 Capital Infrastructure Programme ....................................................................... 41
7.4 Incentive Tools ...................................................................................................... 42
7.5 Awareness Tools ................................................................................................... 42
7.6 Planning Tools ....................................................................................................... 43
7.6.1 Secondary Plans ........................................................................................... 44
7.6.2 Zoning By-laws ............................................................................................. 45
7.6.3 Variances ...................................................................................................... 45
7.6.4 Conditional Uses ........................................................................................... 45
7.6.5 Subdivision Control ....................................................................................... 46
7.6.6 Development Agreements ............................................................................. 46
7.6.7 Development Designs ................................................................................... 47
7.6.8 Development Permits .................................................................................... 47
7.6.9 Placemaking - Lighter, Quicker, Cheaper* .................................................... 49
7.6.10 Placemaking - The Power of 10 .................................................................. 50
7.7 Plan and Policy Interpretation .............................................................................. 50
Schedule B: Maps
Map 1 - Planning Area .................................................................... 51
Map 2 - Natural Lands .................................................................... 51
Map 3 - Transportation ................................................................... 51
Map 4 - Policy Areas ....................................................................... 51
St-Pierre-Jolys Development Plan
Introduction | 1
1 Introduction
1.1 Plan Purpose
St-Pierre-Jolys Development Plan [the Plan] is a progressive strategy that enables and sustains
the social, environmental and economic health and prosperity of Village of St-Pierre-Jolys [the
Village].
The objective is to smartly capitalize on the emerging new growth opportunities by continuing to
build on the existing strengths of this meaningful, walkable community rich in history of providing
a high quality of life and supporting entrepreneurs building a strong local economy. While
attracting new residents and businesses is an important factor in the Plan, the quality of life and
well-being of existing business and residents is also an essential consideration. Ongoing
improvements to infrastructure and amenities will continue to build towards a complete
community with a diversity of uses that sustains the Village with attractive and affordable
neighbourhoods for residents to live, work, and play all within easy walking distances of their
homes.
The Plan is a long-range blueprint for embracing economic growth opportunities that will
diversify and grow the Village in a proactive and accountable manner. It intends to sustain and
support the quality of life needed for retaining existing residents and attracting new residents.
The Plan demonstrates to current and potential inhabitants, investors and other levels of
government that the Village is ready and motivated to move on economic opportunities that will
improve their economic circumstances and standard of living, in a responsible and thoughtful
manner.
The Plan provides a long-term vision, guiding principles, goals, objectives, and policies needed
to generate community resiliency in the face of climate change and fluctuating fiscal markets.
The Plan attempts to strike a balance between the various population growth projection
scenarios and the amount of land required to accommodate the growth by realizing the 'Medium'
density scenario with provisions for the 'Higher density', should it be needed. All projections and
scenarios are met by optimizing the existing lands: directing growth to the priority areas of the
Chaboillé District and lands with existing infrastructure systems. This will place new growth
within walkable distances to encourage the shift in modes of transportation away from personal
gas-powered automobile to reduce greenhouse gas emissions.
Finally, the Plan has a menu of proactive implementation actions that can be selected and used
strategically by the citizens, non-profit groups, potential investors, the development community,
public servants, municipal councils, and other levels of government to promote thoughtful,
sustainable development that improves the quality of life for everyone in St-Pierre-Jolys.
St-Pierre-Jolys Development Plan
Introduction | 2
1.2 Plan Approach
The Plan's focus is on fostering socially, environmentally and economic growth while improving
the well-being of residents that make up the Village. St-Pierre-Jolys Development Plan is not just
about regulating land uses. It focuses on implementing a strategic framework for enhancing the
quality of life for all residents, strengthening the identity of the Village, and setting-the-stage for
the growth necessary to increase its competitiveness with municipalities across the Province
and within the region to capture new residents no longer anchored at their places of work but
affixed to the safe spaces of houses and neighbourhoods they call home.
St-Pierre-Jolys Development Plan is a key indicator that this community is ready, and able to
respond in a timely manner to emerging new prospects through initiatives that nurture and
encourage economic development in all areas. The emphasis of the Plan is to evolve and
diversify in:
attracting telecommuters to a community that can provide healthy social and cultural
connections, and safe spaces for friends and families;
bolstering small-scale enterprise through tools and services that encourage the
innovators, the self-employed, and the small business entrepreneurs to continue
establishing and growing;
ensuring a full range of housing options, an appropriate range and quality of
community services and facilities, a functional transportation network, and a strong
identity that will help distinguish the Village in the Province;
providing a degree of certainty for landowners, neighbours, investors, etc. of what the
community expects to happen with use of lands;
creating a culture of resiliency from an economic, social and environmental
sustainability perspective, recognizing that the future success, both fiscally and socially
depends on the careful stewardship of resources; and
fostering alternative modes of transportation to reduce greenhouse gas emissions.
The most critical deliverable of this Development Plan is the demonstration that the Village is
mindful of its obligations and understands the fiscal, social and environmental responsibilities.
As a result, St-Pierre-Jolys has created a land use framework within which the connected
components all work together to make a vibrant, prosperous community for all, now and in the
future.
St-Pierre-Jolys Development Plan
Introduction | 3
Economic Development 'Virtuous Cycle' (source: Altus Consulting Ltd.)
St-Pierre-Jolys Development Plan
Introduction | 4
1.3 Plan Outline
PART ONE sets out the planning approach and framework for the St-Pierre-Jolys Development
Plan. Key concepts are introduced - that in order to achieve growth in the Village, strategic
actions must be taken in: economic pillar areas; the role of economic development in the
Development Plan; and where growth will be physically directed within the Village.
PART TWO sets out the vision, guiding principles, and goals the Plan is striving to achieve.
These are the outcomes from the Plan engagement process. It will consider ways to advance
general goals that: maintain a progressive, sustainable economy; attract and retain residents;
connect the Village; create a sustainable, integrated Watershed and create social, economic,
and environmental resiliency in the Village.
PART THREE sets out the location and defines the boundaries of the Planning Area that is
under the jurisdiction of the Village where the policies of this Plan apply.
PART FOUR advances the concepts on how to accommodate the anticipated growth that can
create jobs and income in the Village, attract people seeking housing who expect a broad
spectrum of commercial amenities along with a high quality of life. This section addresses how
growth and change in the Planning Area will be accommodated through Progressive Policies
(policies for growth and change) and Conservative Policies (policies for minimal growth).
PART FIVE sets out the servicing policies related to infrastructure - roads, drinking water
systems, wastewater networks, solid waste management, and green and open spaces - that
play a vital role for accommodating growth and sustaining environmentally sound, economically
sufficient, and socially strong communities.
PART SIX tells the story of the Village. It provides an overview of the context and background
for the Village at the point in time the Plan was written. This section sets out the foundation for
the plan, providing the Growth Scenarios [using population projections], for 'Low Growth',
'Modest Growth', and 'High Growth' that are to be accommodated in the Policy Areas.
PART SEVEN focuses on Plan Implementation and outlines the practical, proactive strategies
for implementing the Plan, which follow under the sections of 'Leadership, Partnership and
Sponsorship'; 'Capital Infrastructure Program'; 'Incentive Tools'; 'Awareness Tools (Marketing)';
and 'Planning and Planning Tools'. Each strategy has a set of actions that can be undertaken
and outlines all the necessary planning components for implementing the St-Pierre-Jolys
Development Plan.
St-Pierre-Jolys Development Plan
Planning Intent | 5
2 Planning Intent
2.1 Vision
Based on the St-Pierre-Jolys Municipal Strategic Plan 2020, the vision for the next 10 years is as
follows:
The Village of St-Pierre-Jolys strives to grow sustainably while preserving and celebrating our
Francophone culture and heritage. We are prepared to act on new opportunities that further
establish our community as a place to live, work, and play.
2.2 Guiding Principles
Guiding Principles were adapted from the four developed early in the process to guide the
Development Plan and confirmed through community and stakeholder dialogue. They identify
both intention and expectation in guiding the vision, goals, objectives, policies and
implementation of the Plan. The principles are:
Principle 1: Plan for Business
The Plan sets out a clear direction for business, employment and entrepreneurial opportunities
across all sectors at suitable locations throughout the Village. We will engage local and regional
partners to establish transparent communication channels outlining our business needs, goals
and future incentives to achieve mutual-beneficial outcomes within the Village. There is a clear
need to find solutions to bolster the diversity of business in the Village, while creating attractive
conditions for businesses to recover and refresh. We have heard a strong sense of community
in the Village stemming from the Chaboillé Corridor, PTH 59 or the Main Street as the heart of
the Village. This place is where an all-in-one business centre is desired by the community and
potential investors from across the region.
Principle 2: Plan for People
The Plan paves the way forward for a complete and connected Village where people of all ages
and abilities can work, access recreation and shop all within a short walk or bike ride. We will
work together to help our bilingual places to thrive and for buildings and open spaces to be
highly linked and compact.
A plan for people considers the senses and scale of pedestrians, their respective age, ability to
move and socio-economic status. An age-friendly community carefully considers the safety of
the environment for people age 8 and under to age 80 and over, and their ability to access
everyday activities car-free and barrier-free within 15 minutes of travel time. Emphasizing these
elements add to and create the urban conditions people and businesses often look for and are
attracted to.
St-Pierre-Jolys Development Plan
Planning Intent | 6
Principle 3: Plan for Resilience
The plan helps protect the environment for future generations, while strategically promoting our
natural assets as a unique community feature. In this plan we will identify and protect our
significant natural areas, encourage, and incentivize infill development where feasible, and
encourage the design of well-connected street-blocks, greenspaces and buildings that work with
nature and foster biodiversity. Planning for resilience involves a whole-of-community approach
to overcome challenges, sustain our wellbeing and preserve our natural resources for future
generations. It involves collaboration with experts from a wide range of industries to the public,
together with the support of local, provincial, Federal and First Nation partners to champion
"green" initiatives.
Principle 4: Plan for Sustainable Growth
The Plan builds capacity for smart and responsible growth to withstand the rise in cost of living
by offering affordable alternatives. A mix of housing types, tenure and building age are critical to
help stabilize housing costs, attract population growth and retain youth. A key strategy for
affordability in the Village is to capture all types of investment and through-traffic along and
adjacent to Sabourin Street (PTH 59) to create spin-off economic benefits for local businesses in
the Village.
2.3 Village Goals and Objectives
The Village commits to advancing the following Goals and Objectives, which are the foundation
to the plan policies and implementation strategy. Each Goal and Objective is advanced through
the framework described in this Plan.
Goal 1: Promote diverse businesses and land use.
Encourage a full range of business opportunities from small home occupations, shops
and offices to larger commercial highway and institutional uses.
Encourage a mix of land/property uses that are complementary and compatible in the
same areas.
Establish an economic development area south of Joubert Creek to accommodate a
range of larger-scale business related to warehousing and transportation industries.
Coordinate with health industries to deliver complementary health and wellness
services such as transitional care for older adults, home care, health promotion and
rehabilitation programs.
Attract new business through various incentives.
Support the construction of new buildings, while encouraging the maintenance and
rehabilitation of old ones that are more affordable for small businesses.
Goal 2: Retain residents by offering attractive and affordable neighbourhoods
respective of all ages and abilities.
Support the development of various types of housing that suit people of all income
levels, stage of life and physical ability.
Nourish our cultural and natural heritage assets to ensure that each resident is able to
engage in healthy living.
Collaborate with surrounding Municipalities and private-sector partners within the
St-Pierre-Jolys Development Plan
Planning Intent | 7
region to identify mutual community-economic needs that could be met through land
development in the Village.
Work with public and private sector partners to achieve age-friendly objectives such as
increasing the capacity for transitional/supportive living.
Facilitate a mix of residential lot sizes that create a seamless urban-rural transition and
are sensitive to surrounding agricultural and natural lands.
Build upon institutional and private-sector business presence in the Village to offer
more learning opportunities for youth and young professionals.
Goal 3: Protect and enhance our Francophone heritage by maintaining our places
of natural and historical significance.
Protect significant cultural heritage features and places such as Park Carillon, the
Museé St-Pierre-Jolys, and Joubert Creek from adverse impacts cause by adjacent
land use development.
Link mature and newly developed areas together through greenspace and multi-use
trail connections.
Champion the remediation of contaminated lands along Sabourin Street.
Excuse existing agricultural-related uses until such land is needed for contiguous
urban development.
Encourage the retention of mature trees where possible, management of land drainage
alterations and the enhancement of flood protection.
Build infrastructure to a standard that is resilient and adaptable to changes in future
climate such as extreme temperatures, flood, drought, wind and snow conditions.
Goal 4: Facilitate sustainable growth through compact and fiscally-responsible
land use development.
Create the land use conditions for active transportation and to limit the need for private
automobile parking and usage within the Village.
Encourage infill development within the Village where appropriate.
Encourage a mix of land uses, building types and age that are complementary and
compatible in the same areas.
Promote balanced growth by maximizing land use within the Village in areas currently
serviced with municipal infrastructure (e.g. redevelopment of vacant properties).
Encourage a range of housing types (duplex, triplex, fourplex, cottage-court, courtyard
and mansion-style residences) that house more than one unit and that fit under the
scale of a single-detached home.
St-Pierre-Jolys Development Plan
Planning Area | 8
3 Planning Area
The Village of St-Pierre-Jolys is a bilingual municipality located on Treaty 1 Territory, the original
lands of Anishinaabeg, Cree, Oji-Cree, Dakota, and Dene peoples, and on the homeland of the
Métis Nation with a settlement history dating back to the 1870's. This area is also known as the
Chaboillé region, named after the prominent fur trader Charles Jean-Baptiste Chaboillé who
established the first centre of commerce in 1799 at the mouth of the Rat and Red River.
3.1 Boundaries of the Planning Area
The Village of St-Pierre-Jolys Planning Area [the Planning Area] approximate boundaries are
the northern limits of River Lot 26, and the southern limits of River Lot 31. The eastern boundary
is the Government Road Allowance between River Lots 41and the eastern ends of River Lots
42, 27 - 31. The western boundary is the western limits of Pt. Lot 4 Plan 3423, Lot 1 Plan 19562;
and Parcels E Plan 59011.
St-Pierre-Jolys Development Plan
Planning Area | 9
3.2 Surrounding the Planning Area
The Village of St-Pierre-Jolys is encircled by the Rural
Municipality of De Salaberry and bisected by Provincial
Trunk Highway 59 on a north/south axis and Provincial
Road 205 on an east/west axis. The existing built areas
of the Village fall within a 900-metre radius of the PTH 59
and PR 205 intersection, located in the middle of the
village. Joubert Creek flows from the southeast to the
northwest through the Village.
The Village of St-Pierre-Jolys exists within the Red River Valley School Division, the Eastern
District of the Association of Manitoba Municipalities, the Steinbach Assessment Area, the La
Vérendrye Provincial Electoral District, the Provencher Federal Electoral District, and Tourism
Manitoba's Eastern Region.
Roseau River Anishinaabe First Nation is the closest First Nation Reserve, located 50 kilometres
south and about 20 kilometres north of the Canada/United States border.
On January 1, 2020, Manitoba transitioned Conservation Districts to Watershed Districts under
The Watershed Districts Act. Under Watershed Districts Regulation 141/2019, 18 conservation
Districts became 14 new watershed Villages with boundaries based on watersheds including the
newly formed Seine Rat Roseau Watershed District, Rat River-Joubert Creek Subdistrict the
covers the entire Village of St-Pierre-Jolys.
St-Pierre-Jolys Development Plan
Planning Policies | 10
4 Planning Policies
4.1 Progressive Policies
'Progressive Policies' target areas for growth and land development. These are the areas where
development activity is likely to take place because there exists an underlying sturdy foundation
of neighbourhoods and infrastructure that is best suited for growth. This includes new
commercial, residential and employment related land-uses.
Intent
Progressive policies are applied to most residential, commercial, mixed-use and institutional
properties in the Village, and collectively make-up a complete and connected Village.
The existing neighbourhoods, employment hubs, and commercial concentrations of land-uses
are the places where growth can be best accommodated via intensification: developing at a
higher density than currently exists, and includes redeveloping property, expanding or
converting existing buildings, reusing brownfield sites, developing under-utilized property, infill
development and mixing compatible land uses. These are the areas that will support the
densities and diversity of residential, institutional, employment and commercial land-uses
required to sustain the community's social and economic well-being.
New commercial and employment, especially the smaller entrepreneurs amplifying the
economy, are best suited on traditional main streets and the downtown central business district
within comfortable walking distances (400-800 meters) of all residential areas. Commercial and
employment requiring large plots of land are better suited along major transportation corridors
that enable the movement of goods and as logical extensions of existing land developments.
Employment lands requiring separation due to nuisances, or hazardous operations, need to be
located away from residential uses.
Objectives
Significant growth should be directed toward the
intensification of the previously developed areas of
the Village to concentrate development around
existing infrastructure, and to limit low density
scattered development.
General Policies
(1) Progressive Policies shall only be applied to Urban Policy Areas and all uses within these Areas,
as identified on Map 4.
(2) Growth and development should occur in a planned and contiguous manner that emphasizes
compact form and optimizing municipal public services.
(3) New development projects should provide for a variety of housing types, residential building forms
St-Pierre-Jolys Development Plan
Planning Policies | 11
densities and affordability levels to accommodate a range of income levels, the ability to age in
place and align to market demands.
(4) New development projects should encourage a mixture of land-uses and an appropriate inventory
of employment uses (commercial, retail, and industrial), amenities, community and cultural assets,
transportation choices, and strong place identities to better compete with other regions in attracting
and maintaining residents.
(5) Intensification of, and reinvestment in, the existing built areas should be considered and
encouraged before expansion onto underdeveloped lands.
(6) High quality open spaces should be considered a priority when planning for new development
projects, guided by Section 5.2.4.
(7) Expansion of designated Urban Policy Areas shall require an amendment to the Development Plan
and a complimentary zoning amendment.
(8) New livestock operations shall not be permitted to establish and existing livestock operations shall
not be permitted to expand within any Progressive Policy area. However, provisions may be made
in the Zoning By-law to allow as a Conditional Use, but with not more than 9 AUs: Livestock
Operations, Animal Keeping (less than 10 Animal Units in size); and Private Stables.
4.1.1 Urban Policy Areas
Intent
To continue to concentrate development within the existing
neighbourhoods in the Village to optimize existing infrastructure
and civic services to better position the community to generate
the economic activities necessary to sustain themselves into
the future. Density and diversity of uses are aligned with the
type of road they are fronting: the more significant densities and
diversity of uses are directed toward the corresponding
classification of roads considered 'major'.
Objectives
To direct projected growth from all scenarios towards the existing built areas of the
Urban Policy Areas, especially along major streets, and on vacant and underutilized
lands.
To promote all forms of development, linking property owners to economic
development opportunities via home builders, local entrepreneurs and bringing in
business from across Southern Manitoba.
To ensure public institutional lands, including educational facilities are maintained and
developed strategically to advance sustainable objectives and green innovation.
To facilitate purpose-built living options such as intergenerational living spaces, and
visitable and universally accessible homes.
To encourage density and diversity of land-uses to enable alternative modes of
transportation shifting away from single-occupant gas powered vehicles.
St-Pierre-Jolys Development Plan
Planning Policies | 12
Policies
(1) Urban Policy Areas apply to all areas identified on Map 4.
(2) Urban Policy Areas may have residential, commercial, employment (industrial) land-uses, and
public services including recreational, cultural, and institutional uses such as educational and
medical.
(3) Residential intensification means intensification of a property, building or area that results in a net
increase in residential units or accommodation.
(4) Residential intensification with additional densities shall be encouraged in the following:
a. Higher concentrations of density and diversity of uses should be directed towards
corresponding higher volume vehicle transportation routes that are long-standing and
historically significant and identified as major roads: Sabourin Street (PTH 59), Jolys
Avenue (PR 205), Joly Avenue East, Joubert Street, Prefontaine Avenue, Hebert Avenue
and Cote Avenue.
b. The reuse and intensification of brownfield sites means abandoned, vacant, derelict or
under-utilized commercial or industrial sites that may be contaminated is encouraged with
densities that are greater than the net housing densities of the adjacent neighbourhoods,
provided that potential contamination has been assessed and remediated as directed by
Provincial legislation and regulations.
c. The repurposing and intensification of grayfield sites means abandoned, vacant, derelict,
blighted or under-utilized commercial, or institutional sites, buildings or parking areas will be
encouraged with densities that are greater than the net housing densities of the adjacent
neighbourhoods.
d. The conversion or expansion of non-residential buildings (commercial, industrial or
institutional) for residential uses with densities higher than the net housing densities of the
adjacent neighbourhoods, will be encouraged.
e. Infill development on small lots and/or corner lots that are vacant or underdeveloped
fronting lower volume vehicle transportation routes as identified as local streets will be
encouraged.
f. Incremental intensification within residential neighbourhoods with the conversion or
expansion of existing residential buildings to create one additional dwelling unit will be
encouraged.
g. Residential densities shall not exceed the capacity of the required infrastructure services of
wastewater sewer, land drainage, and water.
(5) The location and intensity of land-uses shall be regulated by the Local Planning Authority through
the Zoning By-law.
(6) Secondary Plans may be used to express the policies and objectives of the Development Plan for
guiding the development of a specific geographical area, district, or neighbourhood where more
detailed direction is needed for matters beyond the general framework provided by the
Development Plan.
(7) Growth and new residential developments should first be directed towards lands with existing piped
wastewater and/or water services.
St-Pierre-Jolys Development Plan
Planning Policies | 13
(8) Urban Policy Areas will include an adequate inventory of serviced lands, or lands easily serviced, to
accommodate the projected population growth for the Municipality.
(9) Where the expansion of an existing designated Urban Policy Area is required to accommodate new
urban-type land uses, it will require a development plan amendment and complimentary zoning by-
law amendment
Residential
(10) Urban Policy Areas will include an adequate inventory of
residential lands to accommodate a range of dwelling types,
forms, and ownership tenure to meet local needs and provide
housing opportunities, while minimizing the need for travel
beyond the community.
(11) Infill in areas designated Urban Policy Areas shall be encouraged
before expanding or re-designating more lands for expanding
Urban Policy Areas.
(12) Provision should be made for a variety of types, including single-
detached dwellings, duplexes, triplexes, fourplexes, and
apartment buildings.
(13) The Local Planning Authority may cause to prepare and endorse
development design guidelines for Urban Policy Areas that
address building designs and site planning for different land-uses
or different geographical areas.
(14) Accessory Dwelling Units may be accommodated within the
Urban Policy Areas, subject to compliance with the standards set
forth in the Zoning By-law, provided they are compatible with the
adjacent residential uses, and the residential character of the
property is maintained.
(15) Home Enterprises may be accommodated within the Urban
Policy Areas, subject to compliance with the standards set forth
in the Zoning By-law, provided they are compatible with the
adjacent residential uses, and the residential character of the
property is maintained.
(16) Proposed residential uses of more than 3 units is considered 'significant developments', and as
such should require concept plans and must be serviced with drinking water and wastewater and
have high quality landscaping and aesthetically pleasing site design.
Commercial
(17) Urban Policy Areas will include an adequate inventory of commercial lands to accommodate a
range of commercial services to meet local and regional needs and provide convenient local retail
opportunities and personal services, while minimizing the need for travel beyond the community.
(18) Regional scale public service facilities attended by the broader public should be located and
directed within designated Urban Policy Areas that are along corresponding higher volume vehicle
transportation routes that are long-standing and historically significant and identified as major
St-Pierre-Jolys Development Plan
Planning Policies | 14
roads: Sabourin Street (PTH 59), Jolys Avenue (PR 205), Jolys Avenue East, Joubert Street and
Hebert Avenue.
(19) Large format commercial and institutional uses will be directed to the appropriately zoned areas
along Sabourin Street (PTH 59), Jolys Avenue (PR 205) and Jolys Avenue East and (where
appropriate) Joubert Street. New or modified access may be limited along PTH 59 and PR 205,
and may require a traffic impact study, drainage study and possible intersection improvements.
(20) Proposed large format commercial/retail uses are considered 'significant developments', and as
such should require concept plans, be serviced with potable drinking water and wastewater and
have high quality landscaping and aesthetically pleasing site design.
(21) Large format commercial will be encouraged to co-locate with light/medium industrial (e.g. flex tech
space, small scale manufacturing), institutional uses and higher density residential uses.
Industrial
(22) Ensure industrial and commercial developments are located to not negatively affect existing
development or designated land uses.
(23) Where possible, encourage the mixing of industrial uses that are compatible with commercial uses.
(24) Small scale industrial uses should be encouraged to locate in Urban Policy Areas with available
municipal public services.
(25) Proposed industrial and manufacturing related uses will be directed south of Joubert Creek and
have access along Sabourin Street (PTH 59). Such uses will require a rezoning application to "M"
Industrial.
St-Pierre-Jolys Development Plan
Planning Policies | 15
4.1.1.1 Heritage Resources
Intent
Heritage Resources should be identified and protected to optimize
ecological, heritage, cultural, health and economic benefits to
communities and Manitobans. If adverse impacts are unavoidable, the
impacts must be minimized and mitigated by using appropriate
measures to preserve, create or restore the value of the heritage
resources. Designating these important uses allows for growing the
economic benefits of the tourism industry, creating authenticity of a
place, and reflecting on the past history of the area.
Objectives
Preserving heritage sites and objects, and any work or assembly of works of nature or
human endeavour that is of value for its archaeological, paleontological, prehistoric,
historic, cultural, natural, scientific or aesthetic features, and may be in a form of sites
or objects or combination of them.
Policies
(1) Heritage Resources are identified on Map 4 attached to this Development Plan.
(2) The Local Planning Authority shall encourage and facilitate the identification of heritage resources
in the Planning Area; and sites with heritage potential shall be considered for designation as a
municipal heritage site under Part 3 of The Heritage Resources Act.
(3) Heritage resources that have been degraded or damaged should also be identified and prioritized
for rehabilitation, if rehabilitation is practicable.
(4) The Local Planning Authority shall encourage the preservation of heritage resources and significant
structures in the Village.
(5) No development shall be permitted that will endanger heritage resources with historic, architectural,
or archaeological significance as designated by applicable Local Planning or Provincial Authority.
(6) Opportunities for the compatible, environmentally sound, sustainable development of heritage
resources and lands and habitat identified should be facilitated, including using:
a. historic structures and sites for residential and commercial uses, if appropriate;
b. heritage resources for appropriate education and tourism opportunities; and
c. lands and habitat to support eco-tourism, such as wildlife viewing and wilderness canoeing.
(7) The Local Planning Authority shall endeavor to preserve and protect municipal heritage resources
through tools such as the Zoning By-laws, Secondary Plans, subdivision procedures, development
permits, design by-laws and demolition by-laws.
St-Pierre-Jolys Development Plan
Planning Policies | 16
4.1.1.2 Hazardous Uses
Intent
The intention is to locate uses that have potentially adverse impacts on human health away from
people's homes, lands subject to flooding, drinking water systems, and critical and significant
wildlife habitat. Such hazardous uses may be located in in Urban Policy Areas without a
development plan amendment as long as siting guidelines are met.
Objectives
To mitigate the risk of hazardous uses upon settlement areas and critical public
services.
Policies
(1) New or expanding hazardous uses will not be allowed within the Chaboillé District, Green and Open
Spaces, and Natural Lands Policy Areas.
(2) Hazardous uses refer to facilities or developments, exclusive of railways and highways, which
manufacture, handle, store or distribute dangerous goods.
(3) Dangerous goods mean's a product, substance or organism that is:
a. prescribed, designated or classified as a dangerous good or hazardous waste in Provincial
regulations;
b. by its nature conforms to the classification criteria for one or more classes of dangerous
goods or hazardous wastes set out in Provincial regulations; or
c. a High Hazard, Group F, Division 1 (F1) Industrial occupancy containing sufficient quantities
of highly combustible and flammable or explosive materials to constitute a special fire
hazard because of their inherent characteristics as per the Manitoba Building Code.
(4) Mutual separation distances should be established in the Zoning By-law between hazardous uses
and areas such as drinking water systems, habitable spaces, buildings with evacuation-sensitive
occupancy, the edge of Provincial Trunk Highways, Provincial Road right-of-way as well as all
Provincial Access Road right-of-way's; and designated areas identified in this Plan.
(5) Hazardous uses should be separated from incompatible uses such as lands or buildings used
primarily for human occupation; municipal public services for drinking water systems; away from
lands prone to flooding, and directed to appropriately designated area.
(6) The proposed expansion of an existing facility shall require Municipal Council approval, as provided
in the applicable Zoning By-law.
(7) A site-specific groundwater pollution hazard appraisal may be required prior to the approval of a
proposed new development or expanded facility for a hazardous use.
(8) Where development of a potentially hazardous use is proposed, a rezoning application to "M"
Industrial is required. In addition, further analysis may be required relating to the adverse impacts
of the use such as the nature of any potential discharges, the nature of outside storage, the
compatibility of surrounding land uses, and plans for buffering such activities from adjacent uses
and human activities. Any required environmental or engineering studies may be the responsibility
of the applicant.
(9) Development or activities that could cause pollution under normal operating conditions may not be
St-Pierre-Jolys Development Plan
Planning Policies | 17
permitted in an identified groundwater pollution sensitivity area unless:
a. It can be proven by adequate engineering or hydro-geological investigation that the
proposed activity will not cause pollution of the groundwater supply; or
b. Appropriate remedial measures have been or will be taken to sufficiently mitigate the risk of
endangering the potability of the groundwater supply.
(10) Anhydrous ammonia facilities are hazardous uses and shall not locate in the Village
4.1.2 Chaboillé District
Intent
By recognizing the 'Chaboillé District' in this Plan,
we recognize the heritage of the area and the
importance of this main street to the Village. The
term 'Chaboillé District' comes from the Heritage
Corridor concept that had historically been
represented as the link between the communities of
St-Pierre-Jolys, Otterburne, St-Malo, and Dufrost. It
is a subset of the "Progressive" Policy Area in the
Village that is characterized by a greater concentration and diversity of mature businesses,
dwellings, and places unique to the Village. It consists largely of Sabourin Street (PTH 59) and
Jolys Avenue (East and West) where people primarily go for everyday for work and school,
access everyday goods and services, and spend their leisure time on a regular basis. The
Village will make the Chaboillé District a prime location for infill development to further support a
mix of new and old buildings.
Objectives
To encourage infill development to create a greater concentration of businesses and
residential dwellings.
To promote the adaptive re-use of existing buildings and activation of building
façade/street frontage.
To ensure small- to mid-scale businesses are complementary and compatible in the
same areas through appropriate lot coverage, building yard setbacks and landscaping.
To facilitate road extensions to align with pre-existing grid-block street pattern.
To encourage pedestrian- and cycling-supportive site design.
St-Pierre-Jolys Development Plan
Planning Policies | 18
Policies
(1) The Chaboillé District is identified in Schedule B:
Map 4 attached to this Development Plan.
(2) The boundaries of the Chaboillé District shown on
the maps and figures contained herein are
intended to be approximate only and should be
considered as such.
(3) Public facilities, public offices, institutional
facilities, and indoor recreational facilities that
serve the whole community should be located in
the Chaboillé District.
(4) Promoting the rehabilitation and re-use of existing
buildings in the Chaboillé District and encouraging
the
multiple use of buildings and mixing different
housing options with other compatible uses.
(5) Commercial retail, food services, personal
services and limited small-scale industrial
requiring smaller land sizes will be encouraged to
locate in the Chaboillé District.
(6) Encourage social and cultural gathering areas within the Chaboillé District. Amenities should include
public art, public spaces (i.e. open air stages), benches, chairs and tables, or other community
identity building features, to create lively and meaningful interactions to support the Chaboillé District
as unique destinations for both residents and visitors.
(7) Encourage a horizontal and vertical mixing of uses along the Chaboillé District including
retail/commercial on the ground floor, and residential and office on upper floors.
(8) Encourage mid-level buildings (4-6 stories) along the Chaboillé District.
(9) Support the revitalization of residential areas contiguous to the Chaboillé District with the
encouragement of residential intensification as per the polices under section 4.1.
St-Pierre-Jolys Development Plan
Planning Policies | 19
4.2 Transformative Policies
'Transformative Policies' provide a general idea of where the transformational growth-the
possibilities of an influx of investments and residents that can greatly change the fortunes of the
municipality-may occur by identifying lands that can capture and accommodate the potential
economic development of commercial, residential and/or industrial land-uses the community
may reasonable aspire to secure.
4.2.1 Future Growth Areas
Intent
Setting up the framework for future development with commercial, residential, and industrial
uses to capture the influx of investments and employees. These lands may include existing
agricultural uses.
Objectives
To direct future growth opportunities to the existing settlement area and transportation corridors,
unless otherwise required to fulfill the need of a specific opportunity, or to accommodate a
growing need for residential, employment, and commercial land supplies. Urban Policy Areas
will 'grow' into these areas when needed and when servicing capacity allows for bringing these
lands on-line and up to developable standards, otherwise these lands remain relatively 'as is'.
Policies
(1) Transformative Policies shall only be applied to Future Growth Areas and all uses within these
Areas, as identified on Map 4 Policy Areas.
(2) The Local Planning Authority shall only allow the re-designation of some or all of the lands in
Future Growth Areas when there is a demonstrated need for additional lands to satisfy an
immediate demand; and where any associated needs for municipal public services can be provided
in an environmentally-sound, economically, and timely manner.
(3) The timing of when these lands will be re-designated in the Development Plan to allow new
developments shall be dependent on the economic conditions within the municipality and
Manitoba, and market conditions with regards to the supply of, and demand for, the land-uses; as
well as the completion of infrastructure improvements to support and enable specific land-use
developments.
(4) The location and intensity of land uses will be guided by the Village through an amendment to the
Development Plan, a Secondary Plan or a Concept Plan, and an amendment to the Zoning By-law.
(5) The identification of Future Growth Areas shall not compel the Local Planning Authority to
undertake: re-designating the lands to allow intensification with development; or re-designating all
the lands identified within the Transformative Area.
(6) Future Growth Areas shall be located adjacent to compatible and existing developments with the
proposed new growth areas being contiguous to existing urban areas and development abutting
transportation corridors.
(7) Future Growth Areas shall be located adjacent to existing road networks to minimize new road
construction, and should be located with existing piped services for water to optimize public
investments in infrastructure.
St-Pierre-Jolys Development Plan
Planning Policies | 20
(8) Redesignation of Future Growth Areas must be planned for, including provision of all technical
studies deemed appropriate by the Village.
(9) Proposed subdivisions on lands designated Future Growth Area will require an amendment to the
development plan and shall be redesignated to Urban Policy Area.
(10) Redesignation of Future Growth Areas in the southwest part of the Village shall consider the needs
for additional public reserve and institutional lands to accommodate a third school.
(11) Proposed industrial uses on Future Growth lands may be deemed by the Village as appropriate,
granted the lands have an existing or proposed access to a major road such as Sabourin Street
(PTH 59) and Jolys Avenue West (PR 205).
(12) Existing and underlying uses in Future Growth Areas shall remain in effect until lands are re-
designated through a development plan amendment.
(13) The issuance of a building or development permit for permitted land-uses on rightfully zoned lands
that existed prior to the adoption of this Plan shall be allowed.
(14) New livestock operations shall not be permitted to establish and existing livestock operations shall
not be permitted to expand within Future Growth Areas. However, provisions may be made in the
Zoning By-law to allow as a Conditional Use, but with not more than 9 AUs: Livestock
Operations, Animal Keeping (less than 10 Animal Units in size); and Private Stables.
(15) Any proposed development on lands designated Future Growth Policy Area shall require a
Development Plan Amendment to Urban Policy Area, in addition to a subdivision and rezoning
application to the appropriate zoning category.
St-Pierre-Jolys Development Plan
Planning Policies | 21
4.3 Conservative Policies
'Conservative Policies' are important for maintaining
and preserving the health, and identity of the Village as
defined in our Municipal Strategic Plan. These areas
are identified as being protected due to being
inappropriate for development. Such lands are
characterized as a flood risk, wildlife and riparian
habitat, play and open space.
Intent
Conservative Policies are associated with undeveloped or protected parts of the Planning Area
where no new growth is anticipated.
Objectives
To preserve the natural and rural character of the Village.
To protect existing natural lands, critical and significant wildlife habitats.
To protect public investments in transportation by ensuring land use planning and
decisions preserve the efficiency and safety of the transportation system.
To protect development of lands subject to flooding.
General Policies
(1) Conservative Policies shall only be applied to Natural Lands Policy Areas as identified on Map 4
Policy Areas.
(2) Current land-uses shall continue, as they may exist today, for as long as the landowner wishes until
such time as discontinuance conditions are met based on The Planning Act.
(3) The issuance of a building or development permit for permitted land-uses on right-fully zoned lands
that existed prior to the adoption of this Plan may be allowed.
(4) The removal of topsoil, or other organic surface material shall not be permitted unless approval has
been granted by the Local Planning Authority. This is not intended to restrict excavation for the
purposes of drainage ditches, dikes, road construction, building sites or similar work.
(5) Local Planning Authorities shall support the protection of soil from wind and water erosion by
encouraging the retention of existing woodlots and shelterbelts, and the development of new
shelterbelts and other conservation measures.
St-Pierre-Jolys Development Plan
Planning Policies | 22
4.3.1 Natural Lands Policies
Natural Lands should be identified and protected to optimize ecological, heritage, cultural, health
and economic benefits to the communities. Natural Lands also provide local citizens with
employment opportunities in the tourisms sectors. The Local Planning Authority may also
designate some areas within the Planning Area for retention as passive, publicly or privately
owned spaces that retain existing features and topography valued by the local community.
Intent
Lands under the Crown [Provincial or Federal] fall
outside of the jurisdiction of local municipal authorities
though should be identified in Development Plans to
ensure the importance of these areas' natural
significance and impacts in the tourism economy.
Lands owned by the municipality, conservation groups
and private landowners may also be designated for
their natural significance and importance to the
community. Designating these areas allows for the
use of the minimum distances for siting livestock
operations.
Protecting water bodies, groundwater supply and
aquatic ecosystems within the Planning Area is
important for ensuring clean drinking water,
supporting tourism, encouraging recreation, protecting
culture and heritage resources, and reducing the risk
of damages to property due to flooding.
Objectives
To protect existing natural areas, including water bodies, groundwater supply and
associated riparian areas within the Planning Area.
Policies
(1) Natural Lands Policy Areas are identified on Maps 2 and 4 attached to this Development Plan.
(2) Natural Lands shall be protected from incompatible or potentially conflicting land use developments
where:
a. Lands that have received provincial designation and protection under the Wildlife Act;
Manitoba Endangered Species and Ecosystem Protection Act (2015); or the Species at Risk
Act (2002);
b. Lands have been designated as 'Permanent Protected' under the Province of Manitoba's
Protected Areas Initiative;
c. Sensitive wildlife or aquatic habitat has been identified by a senior level of government;
d. Municipally owned lands identified by the Local Planning Authority for preserving existing
features and topography; and
e. Private lands that have been voluntarily protected by landowners under The Conservation
Agreements Act.
St-Pierre-Jolys Development Plan
Planning Policies | 23
(3) Proposed developments located near water bodies that have the potential to alter, disrupt or
destroy aquatic habitat, including the riparian area, will be referred to the Province of Manitoba for
review.
(4) Buffer Areas should be established around designated protected areas, and developments and the
use of land within the buffer areas should be referred to the Province of Manitoba for
review/comment to ensure that future development or changes in land use will not adversely affect
the sustainability of the Natural Lands.
(5) Remaining wooded lands may be developed in a manner consistent with their wildlife potential,
particularly in the areas adjacent to wildlife management areas, provincial parks, ecological
reserves or any other sensitive /important ecological areas.
(6) The Local Planning Authority may designate municipally owned lands as 'Natural Lands' in order to
maintain the passive character of these lands and retain these publicly owned lands in their current
state.
Water Bodies and Hazards
(7) Development shall adhere to the regulations under The Water Protection Act and the Provincial
Planning Regulation and will be encouraged to develop in a manner that ensures that water bodies
and the limited groundwater resources are sustained.
(8) Land subject to flooding, erosion or bank instability shall be left in its natural state or only
developed for low intensity uses such as open space recreation, grazing, cropping, forestry, and
wildlife habitat.
(9) Intensive and high-pollution risk developments (including chemical and fertilizer storage facilities,
septic fields and tanks, fuel tanks, waste disposal grounds and sewage treatment facilities) should
be restricted in source water protection areas for all public drinking water sources. Where
restriction is not possible, development must be limited and may be subject to:
a. Demonstration by the proponent that no significant negative effect on water is likely to
occur;
b. Implementation of mitigation measures and alternative approaches that protect, improve or
restore these areas; and
c. Preparation of a strategy for mitigation in the event that negative impacts do occur. This
may include:
i) Ensuring an emergency response plan is developed for each public drinking water
system to address spills, accidents, and other emergencies that may affect public
drinking water sources; and
ii) Sealing all known abandoned wells in public water system source water protection
areas.
(10) Lands subject to flooding means land that:
a. is inundated by floods up to and including the 200-year flood, or the flood of record,
whichever is greater;
b. has a known history of flooding; or
c. experiences flooding during a flood event of a magnitude specified by the Province in areas
protected by flood control works.
St-Pierre-Jolys Development Plan
Planning Policies | 24
(11) Lands subject to erosion refers to all lands which would, within a 50-year period, be eroded or
become unstable due to the action of water contained in an adjacent water body.
(12) Lands subject to bank instability refer to those lands where actual effects of such hazards have
occurred, are occurring, or have been predicted by engineers to occur.
(13) In areas where the specific flood, erosion and bank instability hazards have not been determined,
new buildings shall be set back from all water bodies at a distance an engineering investigation
shows that these limits should be established, and at the discretion of the Local Planning Authority,
and/or the applicable Provincial authority.
(14) To ensure the protection, retention and rehabilitation of riparian areas, a 30-meter (100 foot)
setback is established. the applicable provincial authority:
a. The natural vegetative cover must be retained or rehabilitated within the setbacks to water
bodies; and
b. Developments that create minor disturbances to the natural vegetative cover in riparian
areas, such as docks, pathways and boathouses, may be permitted in those areas,
provided that not more than 25% of the length of the lot's shoreline is affected.
(15) The riparian setback limiting development adjacent to Joubert Creek may be reduced subject to
geotechnical, engineering or environmental assessment by a professional engineer, and at the
discretion of the Village and the applicable Provincial Authority.
(16) Where possible, and at the discretion of the Local Planning Authority, an area adjacent a water
body may be registered as a public reserve on title for public purposes as part of a subdivision
process.
(17) Where lands containing shoreland are to be subdivided, the following may be required:
a. Public shoreland reserve suitable to accommodate erosion hazards or to include the
provision of acceptable shoreline protection as determined through an appropriate and
professional geotechnical and/or environmental assessment.
b. Provision for access to the shoreline at suitable locations in the proposed development.
c. The establishment and maintenance of a public reserve with undisturbed native vegetation
adjacent to water bodies. A purpose of the public reserve is to establish a functioning
riparian area of undisturbed native vegetation which:
i) Helps stabilize the banks;
ii) Provides aquatic and wildlife habitat; and
iii) Protects water quality.
d. In areas where the specific flood, erosion and bank instability hazards have not been
determined, buildings shall be set back from all water bodies at a distance an engineering
investigation shows that these limits should be established, and at the discretion of the
Local Planning Authority, and/or the applicable Provincial authority.
St-Pierre-Jolys Development Plan
Planning Infrastructure | 25
5 Planning Infrastructure
5.1 Transportation Policies
5.1.1 Roads
Intent
A comprehensive road network that is able to move
people, goods and services safely and efficiently relies
on the effective integration of transportation and land
use planning. Existing and proposed land uses
influence the nature and extent of the road system. In
turn, a convenient road system encourages economic
development. Access to the road system should be in a
manner compatible with the function of these roads.
Therefore, land uses and development should be
compatible and correspond to the municipal road system so that access to the provincial
highway system is minimized. The operation of the provincial highway system must be protected
from incompatible land uses that would jeopardize its function to move people and goods safely
and efficiently.
Objectives
To provide and maintain safe and efficient vehicular transportation routes in the
Planning Area.
To establish a road hierarchy within the Planning Area that determines the functions
and significance of those roads and their place within the regional and provincial
transportation system.
To protect public investments in transportation by ensuring land use planning and
decisions to preserve the efficiency and safety of the transportation system.
General Policies
(1) The Transportation system is identified on Map 3 attached to this Development Plan.
(2) Consideration should be given to the establishment of guidelines for the placement of facilities for
hazardous uses, as defined by Policy 4.1.1.2 (4).
(3) Consideration should be given to the preparation of overall concept plans, or secondary plans if
more appropriate, for areas where 'significant development' is proposed.
(4) Preference should be given to internal road systems (as opposed to frontage roads) in the
preparation of overall plans. All new frontage roads serving developments will be the responsibility
of the local jurisdiction.
St-Pierre-Jolys Development Plan
Planning Infrastructure | 26
Road Hierarchy
The road system within the Village includes municipal roads, and provincial roads and highways.
These roads are illustrated in attached maps and policies specific to provincial roads are
contained below. The following road classifications have been assigned:
PTH 59 - Primary Arterial
PR 205 - Collector "A"
Rural Arterial: These are generally two-lane or, in some cases, multi-lane highways that carry
large traffic volumes at high speed. In conjunction with Expressways, they connect major
economic regions and centres of the province such as cities and towns, industrial centres,
agricultural areas and major recreation facilities. To maintain the flow and safety of through
traffic, direct access to abutting land may be restricted or eliminated. This applies particularly in
undeveloped areas where lack of another road service may encourage strip development. There
are two classes of Rural Arterial highways:
Primary Arterials provide intra/inter-provincial and international connections and direct
service to important and larger population centres.
Secondary Arterials connect other population centres.
Rural Collectors: Rural Collector routes provide a traffic link between Arterial highways and
local roads. They also provide direct service for developments such as tourist attractions,
recreational areas, mines, small towns and villages. Collector routes equally serve the function
of movement and land access.
Municipal Roads: Major municipal roads accommodate local traffic and are meant to service
traffic generated by new development. Some of these roads will then connect to the system of
provincial roads (i.e. collectors and arterials) at strategic locations to ensure safe operations on
these higher volume routes.
5.1.2 Policies and Statutory Controls
Limited Access Highways
Sabourin Street (PTH 59) from Joubert Creek south to the Village boundary and from
Prefontaine Avenue north to the Village boundary is considered a Limited-Access Highway.
Limited Access Highways have a 'controlled area' or a controlled right-of-way to ensure safe
operations of provincial traffic, which includes the roadway as well as the ditches, drainage
facilities and highway related signage.
The 'controlled area' extends 38.1 m (125 ft) from the edge of the right-of-way for the protection
of future highway expansions and improvements, and future operations. The 'controlled area'
adjacent to Sabourin Street (PTH 59) and Jolys Avenue West (PR 205) are identified under
Schedule B: Map 3. A Highway Permit from Manitoba Infrastructure (MI) is required for any of
the following purposes within the controlled area as illustrated in Map 3:
New or modified municipal roads and/or trails accessing a provincial highway; and
New or modified private accesses on provincial highways.
Under Provincial Legislation, a permit issued by Manitoba Infrastructure (MI) is required for any
new, modified or relocated access and to intensify the use of an existing access to the entirety of
St-Pierre-Jolys Development Plan
Planning Infrastructure | 27
Sabourin Street (PTH 59) and Jolys Avenue West (PR 205) within the Village. However, the
Village is the approving authority for development (including new or modified structures, utility
upgrades, signage and trails) adjacent to PTH 59 and PR 205 within the Planning Area--which
includes establishing building setbacks as prescribed in the Zoning By-law 2021-11.
Provincial Highway System
In order to preserve the integrity of the provincial highway system:
(1) Areas of potential or future highway upgrading/widening, system enhancement and intersection
improvements should be kept free of development;
(2) Developments shall be planned to restrict direct access to a provincial highway facility and
whenever possible, use internal access roads; internal road systems; or municipal road system to
limit direct access to the Provincial Highway System.
(3) Development that would have a detrimental impact to the function and safety of the highway or
where the highway (or any future system expansion) may have a detrimental impact on the
development, should not be allowed to locate near a provincial highway;
(4) Development that contributes to the evolution of a row of lots (strip development) each relying on
direct access should not be permitted adjacent to a provincial highway.
(5) Developments that generate vehicle movements with heavier than normal loads that exceed weight
restrictions on provincial highway and local roads shall not be permitted unless provisions are
made to ensure that appropriate load improvements for the road networks are incorporated into
any plans for development.
(6) Developments that generate excessive noise or dust; or are hazardous in nature that are
incompatible with the safe use, operation and maintenance of nearby transportation facilities as
indicated in Policy 5.1.2.(3) must not be allowed, unless mitigative measures can be met by the
developer.
Highway Developments
(7) Compatible land uses, such as agricultural operations and "highway commercial", may be
permitted adjacent to a provincial highway under certain circumstances. Highway commercial uses
are land uses with a dependency on vehicle traffic, large parking areas, a dominance of vehicle
use, and need large land areas for development, especially to accommodate the travelling public
and transportation of goods.
(8) Allowable areas for highway commercial uses (i.e. lands that are zoned Highway Commercial in
the Zoning By-law) should be areas that will ensure that the efficiency and safety of the adjoining
highway are not jeopardized and the area is designed to minimize direct access to the highway
system.
(9) Whenever possible, internal access roads, internal road systems, or municipal road systems will be
utilized to limit direct access to the Provincial Highway System.
St-Pierre-Jolys Development Plan
Planning Infrastructure | 28
Road Drainage
(10) Permission is required from Manitoba Infrastructure to drain any water into the highway drainage
system. The Department prefers to see no increase in storm flows in the highway ditch system. If
there is an increase in flow or an adverse impact, the cost of any revisions required to the existing
highway drainage system, which are directly associated with the development, will be the
responsibility of the developer.
Limit Direct Access
(11) Internal access roads; internal road systems; or municipal road system shall be utilized to limit
direct access to the Provincial Highway System from all land developments.
(12) It is however, recognized that there are some developments in the highway commercial category
for which a frontage road could be beneficial, some exceptions could be made in these instances.
Frontage roads should access the highway system via the local road system. Frontage roads that
may be required to serve development will be a municipal responsibility.
Municipal Roads
(13) New development shall have access to an existing all-weather road of sufficient standard and
capacity, unless the proponent makes an agreement with the municipality to upgrade an existing
road or develop new road access to a standard agreed upon by the Municipality. The proponent
may be responsible for part or all of the costs of this roadway construction and maintenance.
(14) A setback distance for all buildings, structures, hedges, or similar obstructions adjacent to roads,
shall be specified in the zoning by-laws for the purpose of protecting the safety and efficiency of the
road system. This setback shall apply to all municipal roads in the Planning Area.
(15) Where there are existing or anticipated high volumes of truck traffic, the Municipality may designate
certain municipal roads as truck routes, in order to limit deterioration of the municipal road system
and to minimize safety problems and nuisance factors within urban and rural residential areas. The
designated truck routes will be identified as truck routes on a map and adopted as a transportation
by-law for the Municipality. These truck routes are intended to complement the provincial highway
system as major traffic carriers and as such will be subject to the following considerations:
a. Truck routes shall receive priority consideration for maintenance and snow removal; and
b. Truck routes shall be designed to carry heavy farm traffic although restrictions may be
placed on these roads at certain times of the year.
St-Pierre-Jolys Development Plan
Planning Infrastructure | 29
5.1.3 Active Transportation
Intent
Providing greater access and options for walking,
cycling and physically active modes of
transportation is widely considered to be the most
practical investment that will lead to improved
health, increased personal mobility, and more
livable and socially active communities.
One of the fundamental strengths the Village has
to offer is its connection to the Crow Wing Trail
and to other partner Municipalities, including
Richot, Niverville, DeSalaberry, and Emerson-Franklin. The Crow Wing Trail represents nearly
60 kilometers of the Trans Canada Trail, attracting trail users from around the world, in addition
to many local users. Expanding the quality and range of active transportation options to
residents, workers and visitors of the Village will not only help to ensure people are not
dependent on one mode of travel, but also facilitate an active lifestyle.
Objectives
To plan for, and implement active transportation network improvements, and establish
connections within existing neighbourhoods via active transportation routes.
To facilitate the Village as an integral destination along the Crow Wing Trail through
continued investment into active transportation infrastructure.
To provide residents with active recreational opportunities and alternative
transportation choices (including designated snowmobile trails) to reduce reliance on
private passenger vehicles.
Policies
(1) Active Transportation (AT) Trails are identified in Map 3 attached to this Development Plan.
(2) AT Trails should be protected from developments that may potentially interrupt, interfere or limit
activities occurring on the AT Trails.
(3) The development of AT Trails linking settlement areas, and linking Natural Lands with settlement
areas, should be encouraged.
(4) Utility corridors and underground pipes may provide opportunities to co-locate AT trails.
(5) Should any transportation or utility corridor become redundant, consideration shall be given to
converting such lands to public uses that may include or support an extension of AT Trails.
(6) New developments in the Planning Area shall be encouraged to make provisions for active
transportation options such as physical connections to existing or anticipated AT trails.
(7) The development of land in and around Active Transportation Trails may require a concept plan to
determine whether it complies with the overall intent of this Development Plan to connect new
developments to AT Trails.
(8) Employment intensive land-uses located within Urban Policy Areas should be connected to new AT
trail network.
St-Pierre-Jolys Development Plan
Planning Infrastructure | 30
(9) AT facilities should be physically separated from PTH 59. Operation and maintenance of these
facilities are the responsibility of the Municipality.
5.2 Public Service Policies
5.2.1 Water and Wastewater
Intent
The drinking water and wastewater distribution systems of a community are critical components
for sustaining residents. Community drinking water systems comprised of shared well systems
exist in the Village, as does wastewater treatment facilities with lagoons that accept trucked in
deliveries from septic tanks for treatment prior to release back into the watershed. These
systems and networks for potable water and wastewater distribution are maintained by local
decision makers but are constructed with funds from senior levels of government who set the
regulations for the operations and treatment of water and wastewater. Overcapacity, under
capacity, or interference of the network systems and works may cause human health concerns
for residents and financial hardships for local decision makers.
Objectives
To ensure the protection of existing drinking water systems and wastewater treatment
works in the Planning Area with non-compatible land-uses.
To optimize the public investment in drinking water systems, wastewater treatment
works by optimizing new developments with the necessary densities that use this
public infrastructure.
Policies
(1) No new or expanded development shall be permitted in areas where essential services such as
potable water supply, wastewater collection and disposal, storm water and drainage systems,
public roadway access and communications cannot be provided or extended in a sustainable
manner.
(2) Where municipally operated water or wastewater services are provided within any developed area,
new developments shall be required to connect to these services.
(3) Where piped water or piped sewer services are not available in the Planning Village, development
should be planned to be able to accommodate efficient and economical piped municipal services in
the future.
(4) The extension of piped water and piped wastewater services to new developments should be
implemented in environmentally-sound, economically, and timely manner
(5) New developments should be approved in a manner that supports Village and regional services for
water and wastewater.
(6) New developments that will optimize the provision of existing municipal water and wastewater
infrastructure shall be encouraged.
(7) It is recommended that new residential developments are setback 300 meters from a wastewater
treatment lagoon.
(8) Drinking water systems and wastewater management systems, where provided, shall be developed
and operated in accordance with applicable provincial standards, including: The Environment Act,
St-Pierre-Jolys Development Plan
Planning Infrastructure | 31
and The Public Health Act and The Drinking Water Safety Act.
5.2.2 Land Drainage
Intent
An integrated network and system across a wide geographical area comprising both natural and
human made elements are essential to making sure water drainage is managed to safeguard
human security.
Open ditches, culverts, dams and other engineered water control works are used to manage
surface waters into the Souris River Watershed. There are a number of Provincial and Federal
agencies that establish and have input into drainage standards and requirements as a result of
their individual mandates and control over natural and engineered drainage structures.
Objectives
To ensure local drainage issues are addressed in a coordinated manner with
government departments and agencies, and adjacent municipalities.
Policies
(1) Local Planning Authorities should adhere to provincial drainage guidelines and work cooperatively
with the applicable Provincial authorities and adjacent municipalities to address any regional
drainage issues.
(2) Overall storm drainage plans for undeveloped areas may be required prior to development. Where
development may increase storm flows into the provincial highway system, permission from the
applicable provincial authority will be needed, and the cost of any improvements required to the
existing highway drainage system directly associated with the development will be the
responsibility of the developer.
(3) Authorization is required from Manitoba Infrastructure to undertake any activity or construction on a
provincial waterway as designated under the Water Resource Administration Act. The cost of any
revisions required to the existing provincial waterway system, which are directly associated with the
development, will be the responsibility of the developer.
5.2.3 Utilities
Intent
Future growth will be based on the ability to provide a full spectrum of utilities, including fiber
optic cables, hydro connections, television and satellite providers, and other telecom services.
Objectives
To ensure utilities are planned for in a coordinated manner, whereby aligning to future
growth opportunities in the Village.
Policies
(1) Coordinate the provision of a number of shallow utilities, including electrical power, telephone,
cable, and/or digital infrastructure, to enhance existing utility services, and plan for new
development.
(2) Encourage the installation of underground utilities to reduce the visual impact, physical
deterioration and environmental obstructions it may produce.
St-Pierre-Jolys Development Plan
Planning Infrastructure | 32
5.2.4 Green and Open Spaces
Intent
The Green and Open Spaces provide lively public areas in a
safe context that complement urban living: play areas for
children, off-leash dog runs for pet owners, sitting areas for
seniors, walking networks for neighbourhood connectivity,
temporary events to celebrate the seasons, and outdoor al
sports such as baseball. Vibrant Green and Open Spaces are
places where people want to be, be seen, and/or meet others.
Objectives
They can include well landscaped parks, playing fields, urban plazas, public squares,
or similar built-up areas that are gathering places for people, which can become the
centre of community life. Green and Opens Spaces can also have pop up events and
temporary infrastructure, food kiosks, cafés and restaurant land-uses, especially
outdoor dining areas, to animate public spaces with transportation connections that
strongly integrate these 'outdoor rooms' into the surrounding community.
Policies
(1) Green and Open Spaces should be centrally located to ensure inclusivity and optimize use for local
residents.
(2) Green and Open Spaces should be located within, adjacent or abutting residential land-uses to
enable residents a comfortable walk to and through their community.
(3) Collaboration with School Divisions to co-locate municipally owned Green and Open Spaces next
to schools to allow for joint-use opportunities should be considered.
(4) Green and Open Spaces in urban areas should be a unifying public realm, part of the open space,
and street network that creates one overall community for the residential area.
(5) Green and Open Spaces should have strong sight lines to encourage 'eyes on the street', critical to
community safety.
(6) Green and Open Spaces should be constructed in accordance with Crime Prevention Through
Environmental Design (CPTED) and Universal Design principles.
(7) There should be a diversity of Green and Open Spaces in the Planning Area with different
functions and facilities to accommodate an assortment of activities from passive to active.
St-Pierre-Jolys Development Plan
Planning Infrastructure | 33
(8) Each Green and Open Space should have a clear function, character and shape with well-defined
boundaries through the positioning of adjacent buildings, walls, fences, trees and plantings.
(9) Green and Open Spaces should have lighting, directional signage and focal points, and connect to
the cycling and pedestrian networks of the Planning Area.
(10) Green and Open Spaces may have a variety of vegetation plantings such as flowers, trees and/ or
shrubs along with boxes and plots for community gardening.
(11) Green and Open Spaces should provide seating areas that allow people to rest and observe
surrounding activities.
(12) Amenities such as water features, clock towers, public art and/or architectural features may be
considered as landmarks in Green and Open Spaces that provide identity to the neighbourhood.
(13) Café, restaurants, food trucks, food kiosks, eating and drinking land-uses and outdoor dining and
drinking areas should be land-uses encouraged to set up temporarily or permanently to attract
people.
(14) Children play areas, playgrounds, community gardening, pop up activities, off-leash dog runs,
organized recreational games, leisure events, outdoor art and music events, seasonal and
temporary events should be land-uses encouraged to set up temporarily or permanently to attract
people.
(15) Accessory motor vehicle surface parking and bicycle parking [short and long term] may be enabled
as an acceptable land-use within Green and Open Spaces Policy Areas.
(16) Collaboration with Manitoba Hydro to identify opportunities to accommodate passive leisure and
recreational uses in the Hydro Corridors as appropriate should be encouraged.
(17) Collaboration with the private sector to identify opportunities to accommodate in Green and Open
Spaces, cafés, restaurants, food trucks, food kiosks, eating and drinking land-uses, and outdoor
dining and drinking areas should be encouraged.
(18) Green and Open Spaces shall be connected to existing pathways or sidewalks to facilitate easy
pedestrian and cycling movements.
(19) Regional pathways may connect to and through Green and Open Spaces.
(20) Green and Open Spaces should provide at least one universally accessible path that connects to
one or more existing adjacent path or sidewalks.
(21) The Local Planning Authority may require a Public Land Dedication from subdivision applications
for up to 10% of the proposed land (or up to 8% of the land value), designated for Green and Open
Spaces.
(22) When new Green and Open Spaces are being proposed by a land developer as part of land
dedication, the Local Planning Authority may request a traffic impact study, active transportation
network plan, building design information, or any other information deemed necessary to ensure a
high-quality development.
(23) The Local Planning Authority may require the preparation and submission of designs for the
development of park and open space areas as part of any new development. Pursuant to The
Planning Act, a public open space reserve dedication may be required as a condition of approval of
any subdivision in order to:
St-Pierre-Jolys Development Plan
Planning Infrastructure | 34
a. Preserve the natural environment and protect wildlife and high-quality fisheries habitat;
b. Provide space for recreational opportunities such as playgrounds, tennis courts, sports
fields, etc.;
c. Support a network of open spaces, trails, and natural corridors that enhance the
environmental character and well-being of the Village;
d. Provide suitable buffer zones between intensive recreational development and neighbouring
land-uses, roadways, etc; and
e. Maintains and support public access to the shores of the adjacent water body.
St-Pierre-Jolys Development Plan
Planning Area Background | 35
6 Planning Area Background
6.1 St-Pierre-Jolys Background Study
The companion document completed with the Development Plan, the St-Pierre-Jolys
Background Study [the Study] contains a comprehensive compilation of both qualitative and
quantitative data analysis for the Planning Area in the following areas: Citizens; Community;
Environment; and Commerce.
The Study also takes a thorough look at the current ability of the Village to accommodate growth
and change, including residential, commercial, and industrial. The Study looks at the current
supply of designated land and future demand, using population projections for three (3) different
scenarios explored in the Citizens Section of the Study.
6.2 Growth Scenarios
Scenario 1 - Anticipated Growth (1.29%): Manitoba from 2013 to 2038 is expected
to grow anywhere between 1.2% and 1.5% annually. The anticipated growth scenario
for St-Pierre-Jolys, also the low-end projection across the province of Manitoba, is an
annual increase of about 1.29%. The anticipated growth projection is the baseline
population projection for the Village, which represents the previous 15-year average for
the Village and a conservative growth assumption among the Southeast region of
Manitoba.
Scenario 2 - Moderate Growth (1.90%): The Province of Manitoba predicts South
Central and Southeast regions to experience higher and stronger rates of population
growth. Urban areas in the region, including the towns of Saint Malo, Grunthal,
Niverville and Ile des Chênes have seen a strong growth rate and also tend to be
located closer to Winnipeg. If these trends are to continue, it is likely the Village will
experience a more moderate growth rate of 1.9%.
Scenario 3 - Rapid Growth (2.50%): An influx of jobs, people and residential
development would be more likely to create the conditions for a rapid growth scenario.
If the Village is able to secure private sector investment into the Village, it would help
support a steady labour force, increase in population, and livelihood of a strong
community base. This rapid annual population increase is similar to the previous five-
year growth rate of Niverville, the fastest growing community in Manitoba in terms of
population data, which is about 2.5% annually.
St-Pierre-Jolys Development Plan
Planning Area Background | 36
Residential Area Demand Projections
6.3 Growth Scenario Implications
As of 2016, the population of the Village was about 1170. Our projection estimates that by 2031,
an additional 100 to 210 new dwelling units will need to be built to accommodate anticipated,
moderate or rapid growth. When we look to the year 2046, we estimate around 220 to 514 new
dwelling units will be needed. Different types of housing will accommodate different numbers of
people, which is why the next major component in this growth projection analysis are to define
the assumptions between single-detached and multi-family housing.
The Development Plan is structured in a manner [the vision, the principles and the tools] to
provide the foundation and framework to allow the Planning Village to respond to all three (3)
growth scenarios by ensuring there is an adequate supply of land designated to accommodate
the projected growth.
6.4 Planning Process
This development plan review takes a different approach. It is not linear. Rather it is 'iterative',
meaning that it approaches the plan process as follows:
Community Dialogue
This process began with the creation of a Municipal Strategic Plan that incorporated the
community's vision for Village in the next ten to twenty years. Community dialogue is an
important and open-ended process (as opposed to a linear approach that presents 'facts' for
St-Pierre-Jolys Development Plan
Planning Area Background | 37
community verification), these initial public conversations were further supported by direct one-
on-one dialogue with many community stakeholders.
Framing
Quantitative (hard facts, stats and data) and Qualitative (community dialogue: what you told us)
are assessed together - an iterative process assumes both 'streams' of information are equal
and valuable. During this stage, the 'hard facts' are weighed against the community dialogue.
Do community ideas, issues and opportunities 'fit' with the hard data? The completed
Background Study helps to present this information.
Vision and Guiding Principles
The Vision and Guiding Principles were drafted in response to the community dialogue and used
as the basis of all community dialogue. Citizens, stakeholders, organizations and elected
officials were invited to provide input on the draft vision and guiding principles.
This development plan review takes a different approach. It is not linear. Rather it is 'iterative',
meaning that it approaches the plan process as follows:
Draft Vision and Guiding Principles - a unique aspect of the planning process was
the drafting of a Vision and Guiding Principles at the start of the process.
Framing - Quantitative (hard facts, stats and data) and Qualitative (community
dialogue: what you told us) are assessed together - an iterative process assumes both
'streams' of information are equal and valuable. During this stage, the 'hard facts' are
weighed against the community dialogue. Do community ideas, issues and
opportunities 'fit' with the hard data? This background study is the outcome of the
'framing' component.
Drafting and Looping Back - The next step in the process is to draft the plan and
loop back with the community to present the outcomes of the process. The looping
back is an opportunity to set out the refined vision and guiding principles and
associated plan policies.
6.5 Project Governance
A comprehensive governance structure was developed to ensure complete oversight throughout
the process. This consisted of 4 governance groups:
Village of St-Pierre-Jolys
This group includes all community members of the Village, with key community stakeholders
being contact directly for their input. Through public engagement events, all members of the
public have the opportunity to have their voices heard in the planning process.
Project Steering Committee
The Project Steering Committee consists of the Village of St-Pierre-Jolys Council and
Administration. Members of the Council at this time include: Mayor Raymond Maynard,
Councillor Paule Péloquin, Councillor/Deputy Mayor Justin Kehler, and former Councillor
Raymond Gagné. Monthly meetings with the Consultant Team, Project Steering Committee, and
Project Management Team are held to provide regular updates and guide the process through
each deliverable.
St-Pierre-Jolys Development Plan
Planning Area Background | 38
Project Management Team
The Project Management Team consists of Chief Administrative Officer Tina Bubenzer and
Assistant Administrative Officer Nicole Bratzke. They are the primary contacts for both the
Consultant Team and Project Steering Committee, and ensure detailed components of the
process are consistent with the Village's Vision.
Consultant Team
Richard+Wintrup Planning and Development is the planning group drafting the Development
Plan and subsequent Zoning By-law for the Village.
Project Governance Diagram
St-Pierre-Jolys Development Plan
Implementation | 39
7 Implementation
St-Pierre-Jolys Development Plan provides direction on the long-term development of the
communities that comprise the Village of St-Pierre-Jolys.
The Plan does this by outlining a clear vision with planning principals & goals that can realize the
inherent opportunities presented in the Planning Area as well as mitigate constraints by following
a series of objectives & policies. This will evolve the communities within the Village in a proactive
manner that improves the quality of life for the residents through economic development: by
strengthening, nurturing, and encouraging economic activities that diversify and drive the
Villages' economy.
The Plan has policies to guide decision makers, the
community, and landowners towards the vision for the
Village. The policies are rooted in the comprehensive
analysis of both qualitative and quantitative data
analysis for the Planning Area to provide the foundation
and framework on how best to respond to three (3)
possible growth scenarios.
The vision, goals, principles, and policies have all been formulated in an iterative planning
process to provide certainty amongst the stakeholders and the public at-large who have been
engaged in the planning process, that the over-arching future direction of the Village reflects
their needs and requirements.
The Plan is a blueprint with specific actions that can be undertaken for proactively implementing
the vision & goals of the Development Plan, as well as outlining the possible planning tools
available for responding nimbly when changing market & engineering conditions may afford the
Village with new economic opportunities. The following are the actions for implementing the
Plan.
7.1 Implementation Strategies
In accordance with the Planning Act, all future intensifications of lands with new development
applications, development permits, and municipal decisions and actions within the planning
area, must be consistent with the policies of this Plan.
This provides one mechanism for implementing the Plan but is a passive reaction completely
dependent on waiting for development to occur, and only allows the private developer and the
planning authorities to implement the Plan. The Act does not necessary outline all the proactive
strategies and actions for guiding various stakeholders to implement the Plan by attracting
economic development and enhancing the quality of life for residents.
And there are a number of practical, proactive strategies for implementing of the Plan, which
follow under the sections of 'Leadership, Partnership and Sponsorship'; 'Capital Infrastructure
St-Pierre-Jolys Development Plan
Implementation | 40
Programme'; 'Incentive Tools'; 'Awareness Tools (Marketing)'; and 'Planning and Planning
Tools'. Each strategy has a number of actions that can be considered for undertaking to
implement the Plan, including: planning strategies, funding strategies, incentives/innovative
techniques, leadership, partnership and sponsorship steps. These actions include low risk frugal
activities, and actions that associations, groups, and Non-Governmental Organizations outside
of the Village can also implement to drive growth and change in the Village.
We are recommending that the first steps for implementing the plan be the low-cost actions such
as fostering relationships, promoting temporary events/infrastructure, and changing the zoning
by-law land-use regulations to align with the Development Plan. Once these changes take root,
the community can explore the necessary steps to firmly establish the vision with an
intensification of spending and/or proactive actions. Some of the actions listed have already
been taken or are part of the Municipal Strategic Plan but serve as a reminder of the ongoing
work necessary to achieve the vision for the Village.
7.2 Leadership, Partnership, and Sponsorship
Leadership/Partnership refers to the need for leadership and collaboration within the Village as
well as within other levels of government, citizens, and other stakeholders to bring about the
vision for the Planning Area.
Actions:
Municipal Partnerships:
Identify and implement innovative approaches to municipal service delivery options
to provide quality services at an affordable cost.
Manage municipal facilities to achieve strategic fit, flexibility, and affordability in
support of the consolidation of the management of services.
Evaluate the needs of citizens in the delivery of services and monitor performance
against those needs including comparisons with other municipalities and the
private sector.
Identify and collaborate with potential partners from Non-Government Organizations
(NGOs) in sport, recreation, cultural, business and education from within and external
to the community for establishing temporary events and pop-up activities in the
communities within the Planning Area.
Monitor and respond to demographic, social, economic and environmental trends both
locally and globally.
Work cooperatively with other levels of government and Non-Government
Organizations whose services are desired and required by residents and are delivered
in a coordinated manner to maximize convenience to the public and minimize
duplication.
Develop strong partnerships with existing businesses within the Village to encourage
new business and outside investors to set up within the planning area.
Encourage the implementation of a support system that acknowledges the special
needs of new & existing, small businesses to help them grow and expand.
Support retention and recruitment programs including the creation of entrepreneur
St-Pierre-Jolys Development Plan
Implementation | 41
incubators, locations that provide resources and assistance to new businesses in their
early developmental stages.
Assist business in meeting government requirements associated with new
development and expansion, including streamlining procedures and regulations within
the municipal administration.
Support the expansion of information technology infrastructure:
Consider appropriate locations for high technology facilities, information corridors
and areas of technological concentration.
Identify and collaborate with other groups to advocate with other level of
governments and service providers to expand information technology infrastructure
in the planning area.
Foster closer relationships with local school divisions, community colleges, and the
not-for-profit sector to identify the work force training needed to support the needs of
the local business community.
Identify the personal services and commercial amenities needed in community areas
for attracting and retaining new and existing residents.
7.3 Capital Infrastructure Programme
Government resources can be key investments to leverage growth that need to be consistent
with specific plan objectives: scarce government dollars can act as an incentive for private
investors spurring economic growth of the community. By establishing priority areas for growth
sends positive signals and greater certainty about the value of private and government
investment decisions over the long-term.
Actions:
Long Term expenditures on infrastructure for the planning area, and the vision for the
planning area, need to be intertwined to ensure both are successful by focusing on
placemaking improvements to the public realm for people, and amenities needed to
support an expansion of land-uses.
Consider strategizing to generate an infrastructure programme with a schedule for the
multi-year investment being targeted for enhancing the planning area with
infrastructure that matches the demands of land-uses and land-users.
Consider generating and endorsing a Conceptual Plan that illustrates the design
possibilities for the creation and/or improvements to public spaces and public
infrastructures such as links (sidewalks, pathways), and landmarks (focal points &
main streets) to strengthen the place making design of the planning area and
reinforces the identity of the communities that make up the Village.
Consider implementing an active walking trail that mirror the Boundary Trail to
connect the municipalities together, and with their past.
Consider implementing new directional signage and gateway feature signage at
entry points into each of the communities to strengthen identity and direct tourists.
Consider implementing a program of assessment and timely replacement of
infrastructure in order to maintain the capacity of existing water supply system, and
St-Pierre-Jolys Development Plan
Implementation | 42
wastewater collection and treatment system.
Minimizing deferred maintenance and taking into account the impact on the
infrastructure life expectancy and life cycle when making deferred maintenance
decisions.
Explore innovative ways to develop new Village public amenities such as Private
Public Partnerships or Social Action Bonds.
7.4 Incentive Tools
Innovative incentive tools will be explored on an ongoing basis to facilitate projects that
contribute significantly to development objectives. The incentive toolbox includes primarily non-
fiscal related incentives, such as a streamlined approval process, but may also include limited
fiscal related incentives, such as tax increment financing.
Actions:
Consider developing a by-law to establish tax increment financing programs in
designated areas of the municipality for the purpose of encouraging investment or
development in those areas through a designated fund.
Consider streamlining the approval process by revising the existing Zoning By-law to
eliminate the regulations preventing the mix of land-uses envisioned for the area.
Waive licensing and permitting fees for pop-up (temporary) shops and events to
encourage and support small-scale entrepreneurs.
Consider investing in spaces to be provided to small-scale entrepreneurs, enabling
them to set up temporary pop-up shops.
7.5 Awareness Tools
These tools would be used for promoting the objectives of the Plan, creating interest from the
broader community, and encouraging other parties to implement the plan.
Actions:
Seasonal/One Off Events - consider having a kick start/launching event such as music
event or wine tasting event within communities of the planning area to raise awareness
of the vision outlined in the plan.
Consider meeting with potential partners from Non-Government Organizations (NGOs)
to inform them of the vision and goals of the Development Plan.
Consider engaging the community through social media, community groups,
neighbourhood forms, etc. to collect their ideals on possible pop-up events to occur in
the communities within the planning area.
Consider actively promoting the communities within the Village and outside the Village
as venues for establishing new and expanding businesses, and places for living.
Coordinate the marketing of the Village with a focus on capitalizing on the assets of the
area including its agricultural capacity.
Expand efforts to attract newcomers including new Canadians, recognizing that there
will need to be efforts to help people settle.
Support community-based initiatives to draw visitors into all the Village's communities
St-Pierre-Jolys Development Plan
Implementation | 43
through continued urban design, community theming and place making (creating
community places that people want to be in) along the appropriate transportation
routes.
Consider meeting with livestock producers and associations for increasing livestock
operations in the Village.
Create communication material to inform livestock produces on the pertinent regulatory
information including: where operations may be allowed; size of operations; where
operations will not be permitted; separation distances which would be applied in
various areas of the Village.
7.6 Planning Tools
The successful implementation of this Plan largely depends on whether its policies can
effectively guide the actions of the community towards the vision for the area. 'Planning' can
provide a diversity of important tools for implementing the vision of the Development Plan.
However, using only one tool 'planning for more planning' for addressing all issues and
scenarios, or the incorrect planning tool on an issue can cause more problems than resolve.
This is largely avoided by outlining a selection of planning tools along with directives for aligning
the appropriate planning tool with the right issue.
Actions:
Consider using Development Plan Amendments for converting lands surrounding
existing settlement areas to a Progressive Policy (Urban Policy Area, Tourism Policy
Area, Rural Residential Policy Area) designation when needed and when infrastructure
servicing capacity allows bringing these lands on-line for development with the
intended use.
Consider using Development Plan Amendments and Secondary Plans with specific
policies, strategies and goals precisely tailored for implementing land redesignation,
which the general polices of the Development Plan cannot address, for:
Large redevelopment projects in currently vacant land.
Consider changing the current Land-Use Zoning By-law Regulations to align zoning to
the Development Plan to address small-scale land-use issues.
Consider the changes to the current Land-Use Zoning By-law Regulations with the
following possibilities:
Allow for mixed uses, both horizontally on one property and vertically within one
building.
Make temporary uses such as 'outdoor markets', 'farmer markets', and 'Fair and
Exhibition Grounds' 'P' (with a number of performance standards regulating size,
intensity, and hours of operation) to draw in people to communities.
Make residential uses 'P' along commercial main streets when not on the ground
floor to encourage people to live in settlement areas on existing municipal services.
Allow 'soft densification' of secondary suites, small lot subdivisions, infill multiple
housing projects within existing residential sectors of settlement areas.
Allow multiple family housing and different residential building types.
St-Pierre-Jolys Development Plan
Implementation | 44
Allow intensive life stock operations.
Parking - consider eliminating or significantly reducing the parking stall
requirements for all land uses to discourage the consumption of land for parking
areas, and encourage the establishment of an intense diversity of land-uses along
commercial main streets of settlement areas.
Plan for Regional Services within the Village.
Streamline any permitting process for seasonal events and activities in the planning
area.
Consider establishing and using Development Design Guidelines for new
developments to clearly articulate in a transparent manner the expectations new
residential, commercial, and industrial developments are to meet for their exterior
building and site plans designs in order to fit contextually with the surrounding area.
Recommend that the planning for commercial growth be adjacent to existing
development and served by an internal road system and not along provincial highways.
Development Plan Amendments
The Planning Act allows a board or council, and a landowner to initiate an amendment to
change the Development Plan policies effecting specific lands to respond to a specific
development proposal. Development Plan amendments should be judiciously used to avoid
planning through ongoing incremental development plan amendments. Regular development
plan reviews and updating planning policies and land use designations should capture changing
circumstances in the planning area. However, the High Growth Scenario that is a possibility for
the planning area, positively impacting the local and Provincial economies, may trigger the need
to amend the Plan to bring on the additional Progressive Policy land related directly to facilitating
an intense jobs growth industry, and in-directly with expanding residential and services to
support the needs of new employees.
The Development Plan Amendment provides the vehicle for the Local Planning Authority to
collaborate with proponents of new developments to ensure local interests are considered, and
ensures the Provincial interests are also considered. The Development Plan Amendment also
provides the opportunity for the Local Planning Authority to confirm that there is sufficient
capacity in the relevant services to accommodate the new development. The vision, principles,
and goals of the Development Plan should guide the Development Plan Amendments.
7.6.1 Secondary Plans
The Planning Act allows a board or council to adopt secondary plans to deal with objectives and
issues in a specific part of the planning area or the municipality. The issues a secondary plan
might address include:
(1) any matter dealt with in the development plan by-law;
(2) subdivision, design, road patterns, building standards or other land use and development matters;
or
(3) economic development or the enhancement or special protection of heritage resources or sensitive
lands.
St-Pierre-Jolys Development Plan
Implementation | 45
A secondary plan might be useful in setting out the overall pattern of future development in an
area, or to set out more detailed policies respecting development issues in a specific part of the
municipality or planning area.
7.6.2 Zoning By-laws
The purpose of a Zoning By-law enables a board or council to adopt specific regulations for the
use and development of land across the entire Village. Where the development plan is a
statement of the board or council's intent respecting future development, the zoning by-law
provides an essential mechanism for implementing the policies set out in the development plan.
The Act requires that every municipal council must adopt a zoning by-law unless the municipality
is part of a Village that has a Village-wide zoning by-law [subsection 68].
This planning tool can be used to address quantities or numerical dimensions and standards
that are to be established as regulations for lots, land-uses, buildings, yards, parking, densities,
and setbacks from transportation infrastructure and water courses.
This planning tool can be used to address issues related to conflicting land-uses.
Action:
This planning tool can be implemented once the Development Plan has been given all
three (3) readings in order to align the new zoning by-law with the approved policies of
the Development Plan.
7.6.3 Variances
A zoning by-law is a by-law of general application to the entire municipality or Village. As a
general by-law it may not be able to adequately deal with the unusual or unique conditions of
specific properties. Strict application of the by-law could result in hardship in specific instances.
The variance process allows a board or council to vary the application of the zoning by-law as it
affects the person's property in order to mitigate the adverse effects of the Zoning by-law.
In making a variance order a board, council or planning commission may impose any conditions
on the applicant or the owner of the affected property that it considers necessary to meet the
requirements of subsection 97(1)(b). For example, in order to ensure the variance will not
negatively affect other properties or potential development in the surrounding area, a board,
council or planning commission might impose conditions to limit the intensity of the use, the
hours of operation, or external signage or storage of materials.
The owner of the affected property can also be required to enter into a Development Agreement
with the municipality or Village.
Action:
Variances shall be considered against the policies of the Development Plan, and any
variances granted shall generally be consistent with the applicable provisions of the
development plan by-law.
Variances shall not be used to 'vary' the policy intentions of the Development Plan.
7.6.4 Conditional Uses
A "conditional use" is a use of land or buildings that may be allowed under a zoning by-law.
St-Pierre-Jolys Development Plan
Implementation | 46
Conditional uses will be those specific uses, which may or may not be acceptable in a zone
depending on the particular circumstances of the proposed development. A board or council
may consider it appropriate to impose conditions on the proposed use in order to ensure that it
will be acceptable at the proposed location in the zone.
Action:
Conditional Use shall be considered against the policies of the Development Plan, and
any conditional use granted shall generally be consistent with the applicable provisions
of the development plan by-law.
7.6.5 Subdivision Control
Control over the subdivision of land is a key tool for regulating the development of land. A
"subdivision" is defined in the Act as "the division of land by an instrument, including:
(1) a plan of subdivision, conveyance, deed, mortgage or grant; or
(2) an agreement granting or extending a use of or right in land, directly or indirectly or by an
entitlement to renewal, for a period of 21 years or more;
but not including a lease respecting only floor space in a building.
A registrar may not accept for registration any instrument that has the effect, or may have the
effect, of subdividing a parcel of land unless the subdivision has been approved by the
approving authority [Subsection 121(1)].
The "approving authority" for subdivision is the minister or a board authorized by the minister
under Subsection 120. Staff of Manitoba Municipal Relations has been delegated authority to
approve subdivisions. The regional managers of the Community Planning Branch have been
delegated approving authority for subdivisions in most parts of Manitoba including the Village.
Subsection 123 of the Act requires that a subdivision of land must not be approved unless:
(1) the land that is proposed to be subdivided is suitable for the purpose for which the subdivision
is intended; and
(2) the proposed subdivision conforms with
a. the development plan by-law and zoning by-law,
b. any secondary plan by-law, and
c. the regulations under section 146 (the Subdivision Regulation).
The Subdivision Regulation 137/2006 registered June 29, 2006 places specific restrictions on
the approval of a subdivision and allows the approving authority to place conditions on the
approval of the subdivision application.
Action:
Ensure the 'approving authority' for subdivisions in the Village is aware of the policies
of the Development Plan.
7.6.6 Development Agreements
Subsection 150 of the Act allows a board or council to require the owner of an affected property
to enter into a development agreement, as a condition of amending the zoning by-law, making a
St-Pierre-Jolys Development Plan
Implementation | 47
variance order or approving a conditional use.
This authority to allow a development agreement a requirement in connection with a local
approval helps ensure that the costs associated with a specific development proposal do not fall
disproportionately on the municipality and other ratepayers.
Action:
Development Agreements shall be considered against the policies of the Development
Plan, and any conditions required shall generally be consistent with the applicable
provisions of the development plan by-law.
7.6.7 Development Designs
The intention of development designs guidelines and standards are to realize the vision for the
Planning Area with animated main streets, attractive settlement areas, appealing highway
commercial areas, and safe public spaces.
Part of creating attractive and walkable communities within settlement areas is linked to street
and building designs that encourages pedestrian activities, ensures multi modal transportation
choices, and integrates main street/village centres with the surrounding neighbourhood areas.
Actions:
The specific detailed designs of new site and buildings shall be determined through the
Development Application and Development Permit process and should be
implemented through the use of a variety of methods including design standards as
conditions of development agreements, and development permits.
The specific detailed design standards of sites and building plans in settlement areas
may be guided by Development Urban Design Guidelines which shall consider the
following:
Guidelines should be unifying the public realm and the street network that creates
one overall community for the settlement area.
Guidelines for main streets and village centres should encourage building exteriors
and site designs that facilitate pedestrian movements and sustain multi modal
transportation choices.
Guidelines should include the principles of Crime Prevention Through
Environmental Design (CPTED) and Universal Design.
Guidelines should be 'general' that avoid detailed design specifics to ensure
building professionals have flexibility in designing each building and site, and avoid
repetitious building designs.
Guidelines shall only address the exterior of buildings and above grade site plans,
and the public realm areas of rights-of-ways and public spaces.
Support community groups that bring forward Development and Design Guidelines for
Main Street revitalization projects.
7.6.8 Development Permits
Part 9 of the Act prohibits development unless a development permit has been issued and the
development complies with the permit. Procedures for issuing development permits are outlined
St-Pierre-Jolys Development Plan
Implementation | 48
in the St-Pierre-Jolys Zoning By-law 2021-11.
The requirement to obtain a development permit prior to undertaking a development is in effect
as of January 1, 2006. The requirement for a development permit applies even if the municipality
or Village does not yet have a development plan or zoning by-law in effect. An application for a
development permit must be made to the board of the Village in which the proposed
development is located [subsection 147 (2)].
Actions:
The board or council may issue the development permit if it is satisfied that the
proposed development generally conforms with the applicable provisions of the
development plan by-law, the zoning by-law and any secondary plan by-law
[Subsection 148(1)].
Until such time as the Zoning By-law regulations are changed in a Development
Application, nothing in this Plan shall preclude current uses in the Planning Area from
continuing as they existed prior to the Plan, with all the zoning land-use rights inherent
in the lands, and for as long as the landowner wishes.
Should a landowner wish to change (i.e. intensify) their land-use rights via a rezoning,
a subdivision, or a conditional use development application, the intensification shall
require the appropriate Development Application, and shall follow the Plan policies to
direct the changes towards the vision outlined for the Planning Area.
Site Plans and/or Plans of Subdivision that refine and determine exact detailed designs
& locations of land-uses, building lots, buildings, parking, densities, railway setbacks,
transportation routes & networks including public right-of-way's, and underground
services shall be submitted as part of Development Application processes when and
where appropriate as determined by the municipality.
Developers of land shall enter into agreements with the municipalities as conditions of
development applications, when and where appropriate as determined by municipal
councils, which shall direct the Developer to intensify uses on the land in the Planning
Area in a manner that is consistent with the policies of the Plan.
St-Pierre-Jolys Development Plan
Implementation | 49
7.6.9 Placemaking - Lighter, Quicker, Cheaper*
Capital-intensive initiatives are not the only, or even the most effective, ways to bring energy and
life into a community's public space. "Lighter, Quicker, Cheaper" (LQC) describes the simple,
short-term, and low-cost solutions that can energize the places we live in. These LQC actions
are incremental but when compounded together, can bring about the changes envision for the
Planning Area of making it 'people orientated'. Using LQC as a first step towards long-term
change is a great strategy for communities that recognize the need for improvements but lack
immediate resources, and/or for those who wish to take direct, incremental steps towards
executing a long-term community vision.
Actions:
Signage - consider using public art, landmarks, and signage to create a sense of place
of each community within the Village to establish a strong identity for the areas for the
residents and visitors.
Seasonal/One Off Events - temporary transform public spaces in communities within
the Planning Area by having a series of one night events during spring/summer/fall
such as block party, outdoor movie events, musical acts, poetry slams, beer gardens,
wine tasting, art shows, food trucks, farmers markets, artisan markets, star gazing, etc.
POP-UP Infrastructure - provide temporary infrastructure in public spaces within the
communities of the planning area for people to use such as lawn chairs/picnic tables,
converted shipping containers decorated by local artists for temporary shops/food
kiosks/ sitting areas;/bicycle repair station.
POP-UP activities - provide temporary activities lasting an afternoon or weekend in
public spaces within the communities of the planning area such as ping pong tables,
yoga, mini-library, art installations, art classes, chess boards, board game night,
musical acts, and retail. The specific activity may not be the same though having a
pop-up activity occurring routinely should be a goal.
POP-UP Food - encourage food and drink suppliers to set up temporarily for either a
short duration (one weekend morning) or for the entire summer to attract people to the
communities within the Planning Area. A demonstration of this may be to have a well-
known food truck set up for a weekend and/or a kitchen barge to be used by a variety
of restaurants to offer different dishes throughout the summer.
Allow for community gardens to be established in public spaces within the communities
of the planning area with boxes or plots for gardening, and provide the soil and water
supply along with sitting/shade areas to encourage gardeners to congregate.
Establish an off-leashed, fenced in Dog Park with infrastructure such as a running
obstacle course and drinking water for dogs to encourage dog owners to meet each
other over coffee and use public open spaces.
St-Pierre-Jolys Development Plan
Implementation | 50
7.6.10 Placemaking - The Power of 10
The idea behind this concept is that places thrive when users have a range of reasons (10+
reasons) to be there. These might include a place to sit, playgrounds to enjoy, art to touch,
music to hear, food to eat, history to experience, and people to meet. Ideally, some of these
activities will be unique to that particular place, reflecting the culture and history of the
surrounding community. Local residents who use this space most regularly will be the best
source of ideas for which uses will work best. The idea is to layer these uses into the area to
ensure a diversity of attractions (drawing in a variety of people) and that no single user/use
dominates the space.
Action:
Implement ten (10) LCQ things in public spaces and along mains streets within the
communities of the planning area that will draw in local residents during each of the
seasons for a short duration or lasting the entire season.
7.7 Plan and Policy Interpretation
Individual policies of the Development Plan should be interpreted within the overall spirit and
intent of all other objectives and policies of the Development Plan. The land use designation
boundaries shown on the Development Plan Policy Maps and any lot size, distance and area
requirements mentioned are meant to serve as guidelines only. Situations may arise that will
necessitate a degree of flexibility in the application of these standards, provided the intent of
the Development Plan is not compromised. These standards provide general guidelines for
the preparation of the more specific performance standards and requirements of the
applicable zoning by-laws.
Schedule B: Maps
Map 1 - Planning Area
Map 2 - Natural Lands
Map 3 - Transportation
Map 4 - Policy Areas
205
59
\
0
300
600
150
M
For General Reference Only
Source: Manitoba Geo Portal
Scale: 1:15,000
Name: NAD 1983 UTM Zone 14N
Revised: 9/9/2021
Prepared by Richard+Wintrup Planning & Development
Prepared for Village de St-Pierre-Jolys
Village Boundary
Property Assessment
Highway
Collector
Municipal Road
Creek
Ditch
Walking Radii
200m
400m
800m
Map 1
Planning Area
Joubert Creek
205
59
\
0
400
200
M
For General Reference Only
Source: Manitoba Geo Portal
Scale: 1:10,000
Name: NAD 1983 UTM Zone 14N
Revised: 9/9/2021
Prepared by Richard+Wintrup Planning & Development
Prepared for Village de St-Pierre-Jolys
Village Boundary
Property Assessment
Natural Lands
Creek
Ditch
Highway
Collector
Municipal Road
Map 2
Natural Lands
Rue
Beaudette
Ave St.
Marie
Rue M
u
laire
Rue Turenne
R
ue
C
ar
r
iere
Carey
Street
Ave
Garand
Ave
Gelinas
Rue
Gagne
Rue Tessier
Rue
Dandenault
Rue Martel
Ave Lavoie
Ave Bélanger
Rue L
a
v
ergne
Ave Hébert
Lamber Bay
Rue Croteau
Ave St. Jose
ph
Rue Sabourin
Ave Préfontaine
Ave Côté
Ave Jolys West
Rue Joubert
Ave Jolys East
205
59
\
0
400
200
M
For General Reference Only
Source: Manitoba Geo Portal
Scale: 1:10,000
Projection: NAD 1983 UTM Zone 14N
Revised: 9/9/2021
Prepared by Richard+Wintrup Planning & Development
Prepared for Village de St-Pierre-Jolys
Highway
Collector
Municipal Road
Collector "A"
Primary Arterial
Crow Wing Trail
Loop Trail
Creek
Ditch
MI Control Area
Map 3
Transportation
Ave St.
Marie
R
u
e
Mulaire
Rue
Turenne
Rue
C
a
rriere
Carey Street
Ave Garand
Ave
Gelinas
Rue Gagne
Rue
Tessier
Rue
Dandenault
Rue Martel
Ave Lavoie
Ave Bélanger
Ru
e
Lavergne
Ave Hébert
Lamber Bay
Rue Croteau
Ave St. Jos
eph
Ave Pr
éfo
ntaine
R
ue Sabourin
Ave Côté
Ave Jolys West
Rue Joubert
Ave Jolys East
205
59
59
59
RL42
RL32
RL31
RL27
RL43
RL41
RL44
RL26
RL25
\
0
400
200
M
For General Reference Only
Source: Manitoba Geo Portal
Scale: 1:10,000
Name: NAD 1983 UTM Zone 14N
Revised: 9/9/2021
Prepared by Richard+Wintrup Planning & Development
Prepared for Village de St-Pierre-Jolys
Urban
Chaboillé District
Natural
Green and Open
Spaces
Future Growth
Village Boundary
Property Assessment
Heritage Resource Use
Highway
Collector
Municipal Road
Map 4 Policy Areas
Village of St-Pierre-Jolys
Development Plan
By-law 2021-10