Capital Development Fees By-Law No. 2233, Schedule A (2024-2027)

Steinbach, Manitoba

This is the exact embedded text of the captured official document. Snapshot 6ede5151ae6c · verified 2026-08-23 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

6 SCHEDULE "A" to By-Law 2233 NON-RESIDENTIAL CAPITAL DEVELOPMENT FEES A.1 General Non-Residential Capital Development fees General Non-Residential Capital Development fees are charged based on square footage of the structure or expansion being developed according to the chart below: Gross floor area of the applicable building or structure. 2024 Per sq ft. 2025 Per sq ft. 2026 Per sq ft. 2027 Per sq ft. Up to 2,000 sq ft. $1.45 $1.52 $1.60 $1.68 2,000 sq ft. - 10,000 sq ft. $1.80 $1.89 $1.98 $2.08 10,000 sq ft. - 30,000 sq ft. $2.14 $2.25 $2.36 $2.48 30,000 sq ft. - 50,000 sq ft. $2.53 $2.66 $2.79 $2.93 Over 50,000 sq ft. $2.89 $3.03 $3.18 $3.34 A.1.1 Method to calculate floor area: The calculated gross floor area of a building shall be the sum of the area that is contained within the external walls of a building, measured for each floor level, excluding space used for elevator or under- ground parking areas. A.2 Water and Sewer Impact fees Water and Sewer Impact fees are non-residential development fees that are charged based on the size of water and sewer utility services installed according to the charts below: METER SIZE (in.) Water Service Impact Fees by Year 2024 2025 2026 2027 5/8" $ 1,050 $ 1,103 $ 1,158 $ 1,216 3/4" $ 1,490 $ 1,564 $ 1,643 $ 1,725 1" $ 2,675 $ 2,809 $ 2,950 $ 3,097 1.5" $ 5,996 $ 6,295 $ 6,610 $ 6,941 2" $ 10,635 $ 11,167 $ 11,726 $ 12,312 4" $ 42,677 $ 44,811 $ 47,052 $ 49,404 6" $ 95,855 $ 100,647 $ 105,680 $110,964 8" $ 170,371 $ 178,889 $ 187,834 $197,226 10" $ 212,964 $ 223,612 $ 234,792 $246,532 SEWER SIZE (in.) Sewer Service Impact Fees by Year 2024 2025 2026 2027 6" $ 3,675 $ 3,859 $ 4,052 $ 4,254 8" $ 6,532 $ 6,859 $ 7,202 $ 7,562 10" $10,193 $10,703 $11,238 $11,800 12" $14,674 $15,407 $16,178 $16,987 7 SCHEDULE "B" to By-Law 2233 RESIDENTIAL CAPITAL DEVELOPMENT FEES All Residential Capital Development fees are charged based on the number and type of dwelling units being developed according to the chart below: Capital Development Fees charged per Residential Dwelling Unit (DU): 2024 Single Family per DU Two Family per DU Multi Family per DU General $1,620 $1,620 $1,620 Sidewalk $1,776 $1,219 $656 Transportation $688 $688 $688 Total: $4,083 $3,527 $2,964 2025 Single Family per DU Two Family per DU Multi Family per DU General $1,701 $1,701 $1,701 Sidewalk $1,864 $1,280 $689 Transportation $722 $722 $722 Total: $4,288 $3,703 $3,112 2026 Single Family per DU Two Family per DU Multi Family per DU General $1,786 $1,786 $1,786 Sidewalk $1,958 $1,344 $724 Transportation $758 $758 $758 Total: $4,502 $3,888 $3,268 2027 Single Family per DU Two Family per DU Multi Family per DU General $1,876 $1,876 $1,876 Sidewalk $2,055 $1,411 $760 Transportation $796 $796 $796 Total: $4,727 $4,083 $3,431