 "answer": "In the Town of Caraquet, New Brunswick, building permit rules are set by Arrêté No. 306 — Construction (Building By-law), verified 2026-10-23. Exemptions: Peinture; isolation; changement des portes ou fenêtres sans modifier les dimensions. Administered by: L'inspecteur des constructions (délivrance, inspections, application); la Commission de services régionaux de la Péninsule acadienne (CSRPA) émet les permis.",
 "municipality_id": "gx-003057",
 "municipality": "Caraquet",
 "status_type": "Town",
 "jurisdiction": "New Brunswick",
 "country": "CA",
 "topic": "building_permits",
 "label": "Building permits",
 "status": "found",
 "last_verified": "2026-10-23",
 "official_website": "https://www.caraquet.ca/",
 "documents": [
  {
   "primary": true,
   "is_official": true,
   "title": "Arrêté No. 306 — Construction (Building By-law)",
   "category": "building_permits",
   "document_type": "bylaw",
   "status": "adopted",
   "adopted_date": null,
   "document_url": "https://www.caraquet.ca/sites/default/files/arretes/306construction.pdf",
   "summary": "Caveat: enacted before New Brunswick's Building Code Administration Act regime; building by-laws that do not conform ceased to have effect on 2023-01-01, when the provincial General Regulation began to apply, so this by-law may no longer be fully in force. Caraquet building/construction bylaw (Arrêté 306) governing building permits, construction standards, and inspections within town limits.",
   "capture_sha256": "4f98dd3132f96ed4cc73ae1ae22ee8fb7b23f3ec31cd62ff5e101a80838180cd",
   "captured_at": "2026-06-07T16:30:53+00:00",
   "capture_http_status": 200,
   "relabel_note": "Relabelled from zoning_land_use 2026-10-14 (Atlantic building pass)",
   "nb_bcaa_caveat": "2026-10-14",
   "document_number": "306",
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/4f98dd3132f96ed4cc73ae1ae22ee8fb7b23f3ec31cd62ff5e101a80838180cd.pdf",
   "link_dead": false,
   "facts": {
    "permit_required_for": "Tous travaux d'édification, implantation/réimplantation, démolition, modification, modification structurelle, réparation ou remplacement d'un bâtiment, construction ou structure, sauf exemptions.",
    "exemptions": "Peinture; isolation; changement des portes ou fenêtres sans modifier les dimensions.",
    "fee_basis": "5,00 $ par tranche de 1 000 $ du coût estimatif total (matériaux et main-d'œuvre); démolition 50,00 $; droits doublent après début des travaux (sauf remplacement accessoire existant).",
    "authority": "L'inspecteur des constructions (délivrance, inspections, application); la Commission de services régionaux de la Péninsule acadienne (CSRPA) émet les permis."
   },
   "fact_citations": {
    "permit_required_for": "s. 10(4); définition « travaux »",
    "exemptions": "s. 11(1)-(3)",
    "fee_basis": "s. 22(1)-(2); s. 24",
    "authority": "s. 14; s. 21; définition « permis de construction »"
   },
   "transcript_url": "/ca/nb/caraquet/building-permits/arrete-306/",
   "transcript_quality": "ocr"
  }
 ],
 "source": "https://govanswers.org/ca/nb/caraquet/building-permits/"
}