MUNICIPALITÉ REGIONALE DE GRAND-SAULT GRAND FALLS REGIONAL MUNICIPALITY ARRÊTÉ Z-l Arrêté concernant l'édifîcation, la réparation et la démolition de bâtiments et de constructions à Grand-SauIt BY-LAWZ-1 A By-law Respecting the Construction, Repair and Démolition of Buildings and Structures in Grand Falls En vertu des pouvoirs que lui confère la Loi sur l'administration du Code du bâtiment, le conseil municipal de Grand-Sault, dûment réuni, adopte ce qui suit : PRÉAMBULE ATTENDU QUE Grand-Sault estime souhaitable d'adopter le présent arrêté puisqu'il établit des normes régissant la construction de bâtiments et de constructions dans la municipalité; ATTENDU QUE la Loi sur l'administration du Code du bâtiment autorise le conseil d'un gouvernement local à prendre un arrêté de construction qui prévoit des normes régissant l'édification, la détermmation de remplacement, le déplacement, la démolition, la modification, la modification de la structure, la réparation ou le remplacement d'un bâtiment ou d'une construction ou toute combinaison de ces travaux; ATTENDU QUE le conseil de Grand-Sault entend respecter toutes les sections applicables de la Loi sur l'administration du Code du bâtiment et ses règlements incluant les inspections, la conformité et les pouvoirs de l'inspecteur en bâtiment; ATTENDU QU' en vertu de la Loi sur l'administration du Code du bâtiment, quiconque contrevient ou omet de se conformer à une disposition d'un arrêté de construction ou d'un règlement commet une infraction punissable à titre d'infraction de la classe B, conformément à la Loi sur la procédure applicable aux infractions provinciales; ATTENDU QU'en vertu de la Loi sur l'administration du Code du bâtiment, quiconque contrevient ou omet de se conformer à tout ordre que doime un inspecteur en bâtiment commet une infraction purdssable à titre d'infraction de la classe E en application de la Loi sur la procédure applicable aux infractions provinciales; Pursuant to the powers conferred by the Building Code Administration Act, the municipal council of Grand Falls, duly assembled, enacts as follows: RECITALS WHEREAS Grand Falls deems it advisable to pass this by-law because it will establish standards of construction for buildings and structures within the municipality; AND WHEREAS the Building Code Administration Act provides that a council of a local govemment may make a building by- law to prescribe standards for the building, locating or relocatmg, demolishing, altering, stmcturally altering, repairing or replacing, or any combination ofthe work, of a building; AND WHEREAS the council of Grand Falls intends to respect all applicable sections ofthe Building Code Administration Act and its régulations mcluding inspections, compliance and the powers ofthe Building Inspector; AND WHEREAS the Building Code Administration Act provides that a person who violâtes or fails to comply with a provision of a building by-law or a régulation commits an offence punishable as a category B offence under fhe Provincial Offences Procédure Act; AND WHEREAS the Building Code Administration Act pro vides fhat a person who violâtes or fails to comply with an order of a building inspecter commits an offence punishable as a category E offence under the Provincial Offences Procédure Act; ARRÊTÉ/BY-LAWZ-1 Page A CES CAUSES, le conseil municipal de Grand-Sault édicté : l. Titre 1(1) Le présent arrêté peut être cité sous le titre : Arrêté de construction (ci-après « l'arrêté »). 2. Définitions 2(1) Les autres parties du discours et les autres formes grammaticales d'un terme défini ont im sens correspondant. 2(2) Sauf définition contraire dans le présent arrêté, les définitions du Code s'appliquent également au présent arrêté. 2(3) Les définitions qui s'appliquent au présent arrêté : suivent « bâtiment accessoire » Bâtiment annexe et secondaire par rapport à l'usage principal, au bâtiment principal ou à la construction principale situé sur le même lot, et qui est affecté exclusivement à cet usage; (accessory building) « inspecteur en bâtiment par intérim » La personne nommée par le conseil pour exercer la charge d'inspecteur en bâtiment par intérim; (acting building inspector) « effet néfaste » A l'égard des éléments qui suivent, se dit de leur dégradation ou de dommages causés à ceux-ci, ou de la capacité d'en causer la dégradation ou d'y causer des dommages : a) un réseau d'installations pour recueillir, acheminer et contenir les eaux pluviales, qui est composé notamment de fossés, de ponceaux, de rigoles de drainage, drains d'interception, de mes, de bordures de trottoir et de caniveaux, de puisards, de trous d'homme, de conduites, d'émissaires, de bassins secs et de bassins de retenue; b) l'égout unitaire municipal ou l'égout pluvial existant; e) la santé et la sécurité des humains; d) des biens; NOW THEREFORE, the municipal council of Grand Falls enacts as follows: l. Title 1(1) This by-law may be cited as the Building By-Law (hereinafter the "By- law"). 2. Définitions 2(1 ) Where a word is defined, other parts of speech and grammatical forms of the same word shall have corresponding meaning. 2(2) Unless otherwise defined herein, the words defined in the Code, when used in this By-law, shall have the same meaning as in the Code. 2(3) The following définitions apply in this By-law: "accessory building" means a building that is incidental, subordinate, and exclusively devoted to the main use, building, or sù-ucture located on the same lot; (bâtiment accessoire) "acting building inspector" means the person appointed by Council as the acting building inspector; (inspecteur en bâtiment par intérim) "adverse effect" means impairment of or damage to, or the ability to cause impairment of or damage to: a) a System of facilities for receiving, conveying, and conù-olling stonnwater, including, ditches, culverts, swales, subsurface interceptor drains, streets, curb and gutters, catch basins, manholes, pipes, outfalls and détention and rétention ponds; b) the existing municipal combined sewer System or the storm sewer System; e) human health or safety; d) property; e) l'environnement; e) the environment; ARRÊTÉ/BY-LAWZ-1 Page |3 f) la stabilité d'une pente ou du sommet d'un talus. La présente définition vise notamment l'érosion, l'inondation et la formation de glace sur les mes; (adverse effect) «jour ouvrable » S'entend des jours du lundi au vendredi, à l'exclusion des jours suivants : a) les jours de repos prescrits selon la Loi sur les jours de repos ; b) les jours qui constituent des jours fériés pour les employés au titre de leur convention collective conclue avec Grand-Sault; (business day) « inspecteur en bâtiment » La personne nommée par le conseil pour exercer la charge d'inspecteur en bâtiment ou la personne que l'inspecteur en bâtiment charge d'agir pour son compte; (building inspector) « occupation d'un bâtiment » Les classifications d'occupation d'un bâtiment ou d'une construction, ou d'une partie de ceux-ci, définies dans le Code; (building occupancy) « permis de construction » Permis se rapportant à des travaux qui est délivré en vertu du présent arrêté; (building permit) « municipalité » Le secteur géographique se trouvant dans les limites de Grand-Sault, dans la province du Nouveau-Brunswick; (municipality) « inspecteur municipal » S'entend de Finspecteur en bâtiment, de l'inspecteur en bâtiment par intérim, de l'inspecteur adjoint des constructions; (municipal inspector) « Code » Désigne l'édition la plus récente du Code national du bâtiment du Canada, tel que défini dans la Loi sur l'administration du Code du bâtiment et adopté par la province du Nouveau-Bmnswick incluant ses modifications, révisions et errata publiés subséquemment, à l'exception des parties 5 et 8, constitue la norme adoptée à laquelle tous les travaux entrepris dans Grand-Sault doivent être conformes; (Code) « permis d'occuper conditionnel » Permis délivré en application du présent arrêté qui se rapporte à l'occupation d'un bâtiment f) the stability of a slope or top of a bank. Adverse effects include erosion, flooding and icing on streets; (effet néfaste) "business day" Friday except: means Monday through a) days of rest prescribed under the Days ofRestAct; b) days that are holidays for employées under Grand Falls' collective agreements; (jour ouvrable) "building inspecter" means the person appointed by Couacil as building inspector or any person. appointed by Council to act in the building inspector's place; (inspecteur en bâtiment) "building occupancy" means the occupancy classifications of a building or structure, or part thereof, as defined in the Code; (occupation d'un bâtiment) "building permit" means a permit pursuant to this By-law which pertains to work; Cpei'mis de construction) "municipality" means the geographical area within the boundaries of Grand Falls in the Province of New Bmnswick; (municipalité) "municipal inspector" means and includes the building inspecter, the acting building inspecter, the deputy building inspector; (inspecteur municipal) "Code" means the National Building Code of Canada in its latest édition as defined in the Building Code Administration Act and adopted by the province of New Brunswick, includmg any amendments, révisions and errata subsequently issued, with the exception of Parts 5 aad 8, is hereby adopted as the standard to which all work undertaken in Grand Falls must conform ; (Code) "conditional occupancy pennit" means a permit pursuant to this By-law which pertains to occupancy of a building for a ARRÊTÉ/BY-LAWZ-1 Page |4 pendant une période; (conditional occupancy permit) « conseil » Le conseil de Grand-Sault; (Council) « permis de démolition » Permis délivré en vertu du présent arrêté qui se rapporte à la démolition; (démolition permit) « valeur estimative » Valeur pécuniaire totale de l'ensemble de la construction et de la démolition visées par les travaux proposés, qui font partie des travaux et qui sont nécessaires à l'achèvement des travaux, y compris ce qui suit: (estimated value) a) tous les revêtements muraux; b) les constructions diverses; e) la toiture; d) le câblage; e) la plomberie; f) le matériel mécanique permanent ou fixe; g) les ascenseurs; h) les extincteurs automatiques; i) toute installation permanente; j) la main-d'œuvre, au prix de tiers; k) les matériaux et autres dispositifs; l) la préparation et la modification du chantier. « spécifications générales » S'entend de la version la plus récente du document intitulé « Standard Municipal Spécifications » de Grand-Sault; (général spécifications) « arpenteur-géomètre » Membre en règle de l'Association des arpenteurs-géomètres du Nouveau-Brunswick autorisé en vertu de la Loi de 1986 sur les arpenteurs-géomètres du Nouveau-Brunswick (L.N.B. 1986, ch. 91) à exercer l'activité d'arpentage au Nouveau-Brunswick; (land surveyor) « lot » Parcelle, ou deux ou plusieurs parcelles contiguës, appartenant au même propriétaire et servant ou destinées à servir d'emplacement à un bâtiment principal ou à une construction principale et, s'il en est, aux bâtiments accessoires et constructions accessoires, espaces d'agrément, voies d'accès, aménagements paysagers ou aires de stationnement connexes, que ce lot soit illustré ou non sur un plan de lotissement enregistré et qu'il fasse l'objet ou non d'un acte de transfert distinct ou d'une description distincte dans un acte de transfert; (lot) period of time; (permis d'occuper conditionnel) "Council" means the Council of Grand Falls; (conseil) "démolition permit" means a permit pursuant to this By-law which pertains to démolition; (permis de démolition) "estimated value" means the total monetary worth of all construction and démolition involved in the proposed work or démolition, incorporated into and necessary to the exécution of the work and démolition in its completed fomi, including: (valeur estimative) a) all wall finishes; b) miscellaneous structures; e) roofmg; d) electrical; e) plumbing; f) permanent or fixed mechaaical equipment; g) elevator equipment; h) fire sprinkler equipment; i) any permanent equipment; j) all labour, valued at that of a third party; k) materials and other devices; and l) site préparation and altération. "général spécifications" means the latest édition of the document entitled "Standard ]V[unicipal Spécifications" of Grand Falls; (spécifications générales) "land siu-veyor" means a member in good standing with the Association of New Brunswick Land Surveyors authorized under the Ne-w Bruns-wick Land Surveyors Act, SNB 1986, e 91, to practice land surveying in the Province of New Brunswick; (arpenteur-géomètre) "lot" means a parcel ofland, or two or more adjoining parcels of land held by the same owner and used or intended to be used as the site for a main building or main structure along with any associated accessory building or accessory structure, amenity space, driveway, landscaping, or parking area whether or not such lot is shown on a filed subdivision plan, or is the subject matter of a separate deed, or separate description in a deed; (lot) ARRÊTÉ/BY-LAWZ-1 Page [5 « bâtiment principal » Le ou les bâtiments destinés à accueillir l'usage principal ou les usages principaux permis sur un lot par l'Arrêté de zonage; (main building) « matériel mécanique » Vise notamment ce qui suit : a) les condenseurs; b) les appareils de chauffage, de ventilation et de climatisation de l'air; e) les génératrices; (mechanical equipment) « plan d'urbanisme municipal» ou « plan municipal » Le document le plus récent intitulé « Plan d'urbanisme municipal de Grmd-Sault »; (municipal plan) « logement à densité faible ou moyenne » S'entend d'une habitation umfamiliale, d'une habitation bifamiliale, d'une habitation jumelée ou d'une habitation en rangée; (minor and medium residential) « changement d'occupation » Changement de la classification d'occupation d'un bâtiment ou d'une construction, ou d'une partie de ceux-ci, au sens défini dans le Code; (occupancy, change of) « permis d'occupation » Permis délivré en application du présent arrêté qui se rapporte à l'occupation d'un bâtiment ou d'une construction, mais qui n'est pas un permis d'occuper conditionnel; (occupancy permit) « partie » Partie du Code; (Part) « permis de construction par étapes » Permis délivré en application du présent arrêté se rapportant à des travaux à effectuer sur une partie d'un bâtiment ou d'une construction; Cphased building permit) « ingénieur » Membre en règle de l'Association des ingénieurs et des géoscientifiques du Nouveau-Bmnswick qui est inscrit ou titulaire d'un permis ou d'une licence l'autorisant à exercer la profession d'ingénieur au Nouveau- Brunswick; (professional engineer) « professionnel » s'entend, selon le cas : a) d'un ingénieur professionnel agréé dans la province du Nouveau- Bmnswick; "main building" means the building or buildings intended to accommodate the main use or uses permitted by the Zoning By-law on a lot; (bâtunent principal) "mechanical equipment" includes: a) condensers; b) heating, ventilation and air conditioning equipment; and e) generators; (matériel mécanique) "municipal plan" means the most récent document entitled "Grand Falls Municipal Plan"; (plan d'urbanisme municipal) "minor and medium residential" means a l unit dwelling, 2 unit dwelling, semi- detached dwelling and towahouse dwelling; (logement à densité faible ou moyenne) "occupancy, change of means a change of occupancy classification for a building or structure, or part thereof, as defined m the Code; (changement d'occupation) "occupancy permit" meaas a permit under this By-law which pertains to occupancy of a building or structure but is not a conditional occupancy permit; (permis d'occupation) "Part" means a part in the Code; (partie) "phased building permit" means a permit under this By-law which pertains to work for a portion of a building or stmcture; (permis de consù'uction par étapes) "professional engineer" means a member in good standing with the Association of Professional Engineers and Geoscientists of New Brunswick and registered or licensed to practice engineering in the Province of New Bmnswick; (ingénieur) "qualified professional" means a person who 1S: a) a professional engineer licensed in the province of New Bnmswick; ARRÊTÉ/BY-LAWZ-1 Page [ 6 b) d'un membre en règle de l'Association des architectes du Nouveau-Bnmswick qui est titulaire d'un certificat d'exercice ou d'un permis délivré par cette association et qui est autorisé à exercer l'architecture au Nouveau- Bmnswick; ou e) d'un membre en règle de l'Association des designers d'intérieur du Nouveau-Bmaswick titulaire d'un permis l'autorisant à exercer la profession de désigner d'intérieur au Nouveau-Brunswick (qualified professional) « plan de nivellement préliminaire» Plan indiquant les renseignements suivants au sujet d'un lot : a) Pélévation aux coins du lot; b) l'élévation au sommet du mur de fondation; e) F élévation du plancher du sous-sol; d) remplacement et la pente de tous les éléments de drainage de surface; e) F élévation à l' alignement de la rue; (rough grading plan) « élément de drainage de surface» Elément destiné à contrôler l'écoulement des eaux pluviales, notamment les rigoles de drainage, les pentes et les contours de terrains pour faciliter l'écoulement des eaux pluviales ou leur retenue, les constructions ou les caniveaux en béton ou en asphalte; (surface drainage feature) « eaux pluviales » S'entend des eaux de ruissellement et des précipitations, y compris de l'eau de fonte de la neige et de la glace; (stormwater) « rue » S'entend de la largeur totale de l'emprise d'une route, d'un chemin, d'une melle, d'une allée, d'une bordure de trottoir, d'un trottoir, d'un parc ou d'une place publique, lorsqu'une partie de celle-ci est utilisée par le public pour le passage de véhicules et de piétons, et vise notamment les ponts qui s'y trouvent; (street) « travaux » L'édification, la modification, la modification de la struch-ire, la détermination de remplacement ou le déplacement, la réparation ou le remplacement, le changement d'occupation d'un bâtiment ou d'une construction, ou toute combinaison de ces travaux; (work) b) a member in good standing with the Architects' Association of New Bmnswick and has a certificate of practice or licence from such association to practice architecture in the Province of New Brunswick; or e) a member in good standing with the Association of Interior Designers of New Brunswick registered to practice interior design in New Brunswick (professionnel) "rough grading plan" means a plan indicating the following information about a lot: a) élévations at the comers ofthe lot; b) top offoundation wall élévation; e) basement floor élévation; d) location and grade of all surface drainage features; and e) élévation at centreline of sù-eet; (plan de nivellement préliminaire) "surface drainage featire" means any feature or features intended to control the drainage of stormwater including swales, the sloping and contouring ofland that facilitâtes the drainage or control of stormwater, structures, or concrète or asphalt gutters; (élément de drainage de surface) "stormwater" means surface run-offwater and précipitation, including snowmelt and ice melt; (eaux pluviales) "street" means the entire width between the boundary lanes of every highway, road, lane, alley, curb, sidewalk, park or place when any part thereof is used by the général public for the passage of vehicles and pedestrians, and includes bridges thereon; (me) "work" means the building, altering, stmcturally altering, locating or relocating, repairing or replacing, changing of occupancy, or any combination thereof, of a building or struct-ire; (travaux) AKRÊTÉ/BY-LAWZ-1 Page | 7 « travaux auxquels s'applique un permis d'occuper » S'entend d'un bâtiment ou d'une construction nouvellement édifiée ou qui ont fait l'objet d'un changement d'occupation, d'un logement nouvellement créé à l'mtérieur d'un bâtiment ou d'une construction existants, ou de toute partie de ceux-ci; (work to which an occupancy permit applies) « Arrêté de zonage » soit l'Arrêté de zonage de Grand-Sault en vigueur. (Zoning By-law) 3. Interprétation 3(1) Les règles qui suivent s'appliquent à l'interprétation du présent arrêté : a) les titres, sous-titres et intertitres et la numérotation qui figurent dans le présent arrêté ne sont donnés que par simple souci de commodité et n'ont aucune incidence sur son interprétation. b) selon le contexte, le masculin ou le féminin s'applique, le cas échéant, aux personnes physiques de l'un ou l'autre sexe et les personnes non- binaires, et le pluriel ou le smgulier s'applique, le cas échéant, à l'unité ou à la pluralité. e) Le renvoi à une loi vise également les modifications qui s'y appliquent, y compris toute législation de remplacement. Les renvois à d'autres arrêtés de Graad- Sault visent également les modifications qui s'y appliquent, y compris tout arrêté de remplacement. d) Les obligations qu'il crée s'ajoutent à celles découlant d'autres arrêtés applicables de Grand-Sault ou des lois et règlements applicables du gouvernement fédéral ou provincial. e) une déclaration d'invalidité faite, quels qu'en soient les motifs, par un tribunal judiciaire ou administratif compétent à l'égard d'une partie ou d'une disposition du présent arrêté ne porte pas atteinte à la validité de l'arrêté dans son ensemble, ni à celle de ses autres parties. "work to which an occupancy permit applies" means a newly constmcted building or structure, a building or structure that has undergone a change of occupancy or a newly created dwelling unit within an existing building or structure, or any part or parts thereof; (travaux auxquels s'applique un permis d'occuper) "Zoning By-law" means the Grand Falls Zoning By-law, m effect. (Arrêté de zonage) 3. Interprétation 3(1) Rules for interprétation of the language used m this By-law are contained in the lettered paragraphs as follows: a) The captions, article and section names and numbers appearing in this By-law are for convenience of référence only and have no effect on its interprétation. b) This By-law is to be read with all changes of gender or number required by the context. The masculine form is used in this by- law to designate women, men, and non-binary people. The plural or singular also applies to unity or plurality. e) Each référence to législation is intended to include all applicable amendments to the législation, including successor législation. Where this By-law références other Grand Falls by-laws, the term is intended to include all applicable amendments to those by-laws, iacluding successor by-laws. d) The requirements ofthis By-law are in addition to any requirements contained in any other applicable Grand Falls by-laws or applicable provincial or fédéral statutes or régulations. e) If any section, subsection, paragraph, part or parts or provision of this By-law, is for any reason déclarée by a court or tribunal of compétent j urisdiction to be invalid, the ruling shall not affect the validity of the By-law as a whole, nor any other part of it. ARRÊTÈ/BY-LAWZ-1 Page |8 4. 4(1) Le présent arrêté a pour objet : a) de fixer des normes quant à l'édification, la détermination de remplacement ou le déplacement, la démolition, la modification, la modification de la structure, la réparation, ou le remplacement d'un bâtiment ou d'une construction, ou toute combinaison de ces travaux; b) d'interdire d'entreprendre ou de poursuivre ces travaux en violation des normes prescrites par le présent arrêté; e) d'instaurer un système de permis pour ces travaux, et de déterminer les modalités et les conditions de délivrance, de suspension, de rétablissement, de révocation et de renouvellement des permis, leur forme et les droits à payer. 5. Application 5(1) C'est arrêté est applicable sur l'ensemble du territoire compris à l'intérieur des limites administrative de Grand-Sault / Grand Falls 6. Champ d'auplication 6(1) Le présent arrêté s'applique à la conception, à la détermination de remplacement à l'édification et à l'occupation de constructions et de bâtiments neufs, ainsi qu'à la modification, à la réparation ou au remplacement, à la modification de la structure, à la démolition, au déplacement et à l'occupation de tout ou partie de bâtiments et constructions existants ou d'une combinaison quelconque de ces travaux, sauf disposition contaire du présent arrêté. 6(2) Sans limiter la généralité du paragraphe 6(1), lorsque tout ou partie d'un bâtiment ou d'une construction fait l'objet de modifications ou de réparations, le présent arrêté s'applique aux parties du bâtiment ou de la construction à modifier ou à réparer, et à toutes les autres parties du bâtiment ou de la construction qui sont touchées par les modifications ou les réparations. 6(3) Sans limiter la généralité du paragraphe 6(2), le présent arrêté s'applique 4. Purpose 4(1) Thepurpose ofthisBy-lawis: a) to prescribe standards for the building, locating or relocating, demolishing, altering, structurally altering, repairmg or replacing, or any combination thereof, of a building or structure; b) to prohibit the undertaking or continuing ofsuch work in violation of standards prescribed by this By- law; and e) to prescribe a system of permits for such work, their terms and conditions, the conditions under which they may be issued, suspended, reinstated, revoked and renewed, their form and the fees to be paid. 5. Application 5(1) This by-law applies throughout the territory included within the administrative limits ofGrand-Sault / Grand Falls 6. 6(1) This By-law applies to the design, locating, consù-uction and occupancy of new buildings and structures, and the altération, repair or replacement, structurally altering, démolition, relocation and occupancy of existing buildings and structures, or any portion of existing buildings and structures, or any combination thereof, except as otherwise provided herein. 6(2) Without limiting the generality of subsection 6(1), where a building or structure or any part thereof is altered or repaired, this By-law applies to the parts of the building or structure that are to be altered or repaired, and to any other part of the building or stmcture that are affected by the altérations or repairs. 6(3) Without limiting the generality of subsection 6(2), this By-law applies to any ARRÊTÉ/BY-LAWZ-1 Page [9 aux bâtiments et constructions qui ont fait l'objet de quelque manière que ce soit, en tout ou en partie, d'un changement d'occupation. 7. Adoption de codes 7(1) Le Code, comme défini dans le présent arrêté, est par les présentes adopté en ce qui concerne les bâtiments et les constructions auxquels s'appliquent les normes qui y sont présentes. 7(2) Le Code national de l'énergie pour les bâtiments - Canada 2020, adopté par le Règlement du Nouveau-Brunswick 2021-2 pris en vertu de la Loi sur l'administration du Code du bâtiment, est par les présentes adopté en ce qui concerne les bâtiments et les constructions auxquels s'appliquent les normes qui y sont présentes. 7(3) Les bâtiments agricoles sont conformes aux exigences du Code canadien de construction des bâtiments agricoles du CACNB dans sa version la plus récente. 7(4) L'édition la plus récente du Code national du bâtiment du Canada, adopté par la province du Nouveau-Brunswick, incluant ses modifications, révisions et errata publiées subséquemment, à l'exception des parties 5 et 8, constitue la norme adoptée à laquelle tous les travaux entrepris dans Grand-Sault doivent être conformes. 7(5) Le Code national du bâtiment s'applique aux bâtiments construits in situ et aux bâtiments préfabriqués en usine. 7(6) Les bâtiments agricoles sont conformes aux exigences du Code national de construction des bâtiments agricoles - Canada (CNCBA) 1995. 8. Nommation de l'inspecteur 8(1) Le conseil doit nommer par voie de résolution, au moins un inspecteur qui exerce les pouvoirs et fonctions prévus par le présent arrêté. 9. Interdiction building or strucùu-e or any part thereofthat has been affected in any manner in whole or in part by a change of occupancy. 7. AdQption.of Codes 7(1) The Code as defined in this By-law is hereby adopted m relation to all buildings and stmct.ires for which standards are therein prescribed. 7(2) The National Energy Code of Canada for Buildings 2020 adopted by New Bmnswick Régulation 2021-2 under the Building Code Administration Act, is hereby adopted in relation to all buildings and structures for which standards are therein prescribed. 7(3) Farm buildings shall conform to the requirements in the ACNBC Canadian Farm Building Code m its most récent version. 7(4) The most récent édition of the National Building Code of Canada, adopted by fhe Province of New Brunswick, including its amendments, révisions, and subsequently published errata, with the exception of Parts 5 and 8, constitutes the adopted standard to which all work imdertaken in Grand Falls must comply. 7(5) The National Building Code applies to buildings constructed on-site and factory- fabricated buildings. 7(6) Agricultural buildings comply with the requirements ofthe National Farm Building Code of Canada (NFBC) 1995. 8. Auuointment of an msDector 8(1) By way of résolution the council must appoint at least one inspector who exercises the powers and fonctions by this By-law. 9. Prohibition 9(1) II est interdit d'entreprendre ou de poursuivre des travaux à moins que les conditions suivantes ne soient réunies : a) les travaux sont conformes au Code, au Code national de l'énergie pour 9(1) A person shall not undertake or continue any work unless: a) the work conforms with the Code, the National Energy Code of ARRÊTÈ/BY-LAWZ-1 Page | 10 les bâtiments - Canada 2020 et au Code canadien de construction des bâtiments agricoles du CACNB; b) les travaux sont conformes au présent arrêté; e) un permis de construction ou un permis de construction par étapes concernant les travaux a été délivré en vertu du présent arrêté. 9(2) II est interdit de démolir ou de faire démolir un bâtiment ou une construction dans Grand-Sault sans avoir d'abord obtenu un permis de démolition délivré en vertu du présent arrêté. 9(3) II est interdit d'entreprendre ou de poursuivre des travaux ou une démolition en violation des conditions énoncées dans le présent arrêté ou dans un permis de construction, im permis de consù-uction par étapes ou un permis de démolition délivré pour ces travaux ou cette démolition. 9(4) II est interdit à quiconque ayant la charge de travaux ou de la démolition d'un bâtiment ou d'une construction de causer des conditions dangereuses pour le public ou de permettre que telles conditions soient causées relativement à ces travaux ou à cette démolition. 10. Travaux ne nécessitant pas de permis 10(l)Nonobstant le paragraphe 9, une personne n'est pas tenue de demander un permis pour les travaux ou démolitions énumérés à l'annexe D. 10(2) L'annexe D n'a pas pour effet de soustraire à l'obligation d'obtenir un permis pour le déplacement ou la modification de cloisons, la réparation, la modification ou la modification de la structure de séparations coupe-feu ou d'éléments de sù-ucture d'un bâtiment ou d'une construction. 11. Demandes de permis de construction 11 (l) La demande de permis de construction est présentée à l'inspecteur en bâtiment en la forme que prescrit ce dernier. 11 (2) Le titulaire d'un permis de construction, le propriétaire enregistré du bien ou le preneur à bail enregistré du bien peut demander la modification d'un permis Canada for Buildings 2020 and the ACNBC Canadian Farm Building Code; b) the work conforms with this By- law; and e) a valid building permit or phased building permit for such work has been issued pursuant to this By-law. 9(2) No person shall demolish or cause the démolition of a building or structure within Grand Falls without a démolition permit issued pursuant to this By-law. 9(3) No person shall undertake or continue any work or démolition contrary to any of the terms and conditions that are stated in this By-law or are stated in a building permit, phased building permit or démolition permit that has been issued with respect to such work or démolition. 9(4) No person having authority with respect to work or démolition of any building or structure shall cause or permit any condition unsafe to the public to exist with respect to such work or démolition. 10. Work Not Reguiring Permits 10(l)Notwithstanding section 9 a person shall be exempted from requiring a permit for the work or démolition listed in Schedule "D". 10(2)Nothing in Schedule "D" exempts moving or changing partitions, repairs or altérations or structural altérations to fire séparations or structural components in a building or structure from requiring a permit. 11. Building Permit Applications 11 (l) A person shall apply to the building inspector for the issuaûce of a building permit in the fomi prescribed by the building inspector. 11 (2) A building pemiit holder, a registered property owner, or a person with a registered lease in the property, may apply to the building inspector to modify a valid ARRÊTÉ/BY-LAWZ-1 Page ] 11 de construction valide à l'inspecteur en bâtiment en la forme que prescrit ce dernier. 11 (3) Le requérant d'une demande de permis de construction, le propriétaire enregistré du bien ou le preneur à bail enregistré du bien peut demander la modification d'une demande de permis de construction à l'inspecteur en bâtiment en la forme que prescrit ce dernier. 11(4) Toute demande de permis de constmction ou de modification d'un permis de construction doit: a) identifier et décrire en détail les travaux proposés et l'occupation proposée du bâtiment; b) indiquer remplacement du lot sur lequel les travaux proposés seront effectués, y compris: (i) le numéro de voirie, (il) le nom de la me, (iii) le numéro d'identification de la parcelle; e) être accompagnées de séries de plans dimensiomiels lisibles de tous les plans et un devis descriptif du lot et du bâtiment ou de la construction visée par les travaux proposés, y compris, s'il y a lieu : (i) F occupation du bâtiment de toutes les parties du bâtiment ou de la construction proposé et de tout autre bâtiment ou construction sur le lot, (il) un plan de situation indiquant ce qui suit : (A) remplacement de tous les bâtiments existants et proposés sur le terrain, ainsi que la distance qui les sépare les uns des autres et des limites de la propriété, (B) remplacement et les dimensions des voies d'accès ou de tout autre accès, building permit in the form prescribed by the building inspector. 11 (3) An applicant for a building permit, a registered property owner, or a person with a registered lease m the property, may apply to the building inspector to modify an application for building permit in the form prescribed by the building inspector. l l(4)Every application for a building permit or modification of a building permit must: a) identify and describe in détail all proposed work and building occupancy; b) state the location of the lot upon which the proposed work is to be performed including: (i) civic number; (ii) street name; and (iii) parcel identifier number; e) include complète, dimensioned and legible sets of all plans and spécifications of the lot and building or structure wifh respect to the proposed work including, where applicable: (i) the building occupancy of all parts of the proposed building or structure and any other building or structure on the lot; (ii) a site plan indicating: (A) the location of all existing and proposed buildings on the property and their distance fi-om each other and property lines; (B) the location and dimensions of driveways or other access locations; ARRÊTÈ/BY-LAWZ-1 Page | 12 (C) remplacement et les dimensions des ponceaux situés sous les voies d'accès, (D) le sens de l'écoulement des eaux pluviales et remplacement et la pente des éléments de drainage de surface, (iii) un plan de viabilisation du terrain d'implantation, y compris l'alimentation en eau et les égouts sanitaires et pluviaux, (iv) les coupes transversales des bâtiments, (v) les élévations des bâtiments, (vi) les plans d'étages des bâtiments; d) s'agissant de travaux proposés auxquels s'applique la partie 3, être accompagnées des plans mentionnés à l'alinéa ll(4)(c), datés et sur lesquels sont apposés le cachet et la signature d'un professionnel, sauf si les conditions suivantes sont réunies : (i) lorsque le requérant ne fournit pas d'estimé et / ou que l'inspecteur municipal juge que l'estimé n'est pas valide, l'inspecteur appliquera les taux prévus à l'annexe A. (il) les travaux proposés ne se rapportent pas à des modifications structurelles, aux sorties, aux séparations coupe- feu ou à la sécurité de personnes; e) s'agissant de travaux proposés auxquels s'applique la partie 4, y compris les fermes, les poutres de plancher triangulées, les linteaux, les poutres et tout autre élément de structure, inclure les plans datés sur lesquels sont apposés le cachet et la signat.ire d'un ingénieur; f) inclure une confirmation d'engagement et une confirmation de la surveillance générale des travaux pour tous les (C) the location and dimensions of driveway culverts; (D) direction of stormwater flow and location and grade of surface drainage features. (iii) a site servicing plan including water, sanitary and storm services; (iv) all building cross sections; (v) all building élévations; (vi) all building floor layouts. d) for proposed work to which Part 3 applies, include the plans referred to in paragraph ll(4)(c) stamped, signed and dated by a qualified professional except when: (l) the applicant does not provide an estimate and / or the municipal inspecter j udges that the estimate is not valid, the Inspector will apply the rates provided in Schedule A; (ii) the proposed work does not relate to structural modifications, exiting, fire séparation or life safety; e) for proposed work to which Part 4 applies, including rooftrusses, floor trusses, lintels and beams, and any other structural components, include plans stamped, signed and dated by a professional engineer; f) include confirmation of commitment and confirmation of field review for all qualified professionals in the form prescribed ARRËTÈ/BY-LAWZ-1 Page | 13 professionnels, en la forme que prescrit l'inspecteur en bâtiment si l'alinéa ll(4)d) ou ll(4)e) s'applique. g) inclure tous les détails se rapportant à la division B, article 9.36 du Code pour les ù-avaux proposés, s'il y a lieu; h) lorsqu'il existe, pour le lot où doivent être effectués les travaux proposés, un plan de nivellement approuvé, inclure un plan de nivellement préliminaire; i) indiquez la valeur estimative des travaux proposés; j) énoncez les noms, adresses postales, numéros de téléphone et adresses de courrier électronique de l'auteur de la demande, du propriétaire enregistré, de Parchitecte, de Fmgénieur et des autres concepteurs et entrepreneurs, s'il en est; k) lorsque l'inspecteur en bâtiment ou l'auteur de la demande a connaissance d'indicateurs selon lesquels les sols du lot sont impropres aux travaux proposés, inclure mi rapport géoteclmique daté et sur lequel sont apposés le cachet et la signature d'un ingénieur, qui indique que les conditions du sol du lot sont propices aux travaux proposés ou qui précise les mesures supplémentaires devant être prises pour rendre les conditions du sol propices aux travaux proposés. 11 (5) L'inspecteur en bâtiment accepte la demande de permis de construction lorsque les conditions suivantes sont réunies: a) les renseignements fournis semblent suffisants pour déterminer si les dispositions du présent arrêté sont respectées; b) les renseignements présentés sont exacts; e) les ù-avaux proposés semblent conformes aux normes prescrites par le Code; by the building inspector if paragraph ll(4)(d) or ll(4)(e) applies. g) include all détails relating to Division B Section 9.36 ofthe Code for the proposed work, where applicable; h) when the lot on which the proposed work is to take place has an approved grading plan, include a proposed rough grading plan; i) state the estimate of the proposed work; j) state the names, postal addresses, téléphone numbers and email addresses of the applicant, registered property owner and any architect, engineer or other désigner and contractor, as applicable; k) when the building inspector or the applicant is aware ofindicators that soils ofthe lot may be unsuitable for the proposed work, a soils report stamped, signed and dated by a professional engineer, indicating that the soil conditions ofthe lot are suitable for the proposed work or what additional measures need to be taken to make the soil conditions suitable for the proposed work. ll(5)The building inspecter shall accept application for a building permit when: an a) the information submitted appears to be adéquate to détermine compliance with the provisions of this By-law; b) the infomiation submitted is correct; e) the proposed work appears to meet the standards ofthe Code; ARRÊTÈ/BY-LAW Z-l Page | 14 d) l'inspecteur en bâtiment a reçu le plein droit de demande; e) soit les travaux proposés semblent respecter les normes prescrites par l'Arrêté de zonage, soit la demande appropriée a été présentée à Grand- Sault afin de rendre les û-avaux conformes à cet arrêté. 11(6) Sur demande, l'inspecteur en bâtiment peut répondre aux questions pertinentes qu'il estime raisonnables relativement aux dispositions du présent arrêté, mais, sauf en ce qui a trait à l'application des normes de conception, il doit s'abstenir de participer à la planification des travaux et d'agir en qualité de consultant en conception, d'ingénieur conseil ou d'architecte conseil. 11 (7) Lorsque les travaux proposés ne respectent pas les normes prescrites par le présent arrêté, l'inspecteur en bâtiment peut demander à l'auteur de la demande de lui remettre des documents révisés qui décrivent plus en détail les travaux proposés, ou de rendre les travaux proposés conformes aux normes prescrites par le présent arrêté. 12. Approbation du permis de construction 12(l)La personne ainsi habilitée par le conseil délivre un permis de construction ou un permis de construction modifié à l'auteur de la demande visé aux paragraphes 11(1), 11(2) et 11(3) lorsque les conditions suivantes sont réunies : d) the full application fee has been received by the building inspector; e) the proposed work appears to meet the standards ofthe Zoning By-law, or the appropriate application has been submitted to Grand Falls within compliance with said by- law. ll(6)The building inspector may answer such relevant questions as may be reasonable with respect to the provisions of this By-law when requested to do so but, except for standard design aids, shall refrain fi-om assisting in the laying out ofany work and from acting in the capacity of a design, engineering or architectural consultant. l l(7)When the proposed work is not to the standards of this By-law, the building inspecter may request revised submissions fi-om the applicant to fùrther describe the proposed work or to bring the proposed work within the standards ofthis By-law. 12. Building Permit Approval 12(1) A person so authorized by Council shall issue a building permit or modifiée! building permit to the applicant under subsections 11(1), 11(2) and 11(3) when: a) l'inspecteur en bâtiment a reçu une demande de permis de construction accompagnée de tous les documents requis; b) l'inspecteur en bâtiment a reçu tous les droits de demande additionnels prescrits par le paragraphe 14(2); e) les travaux proposés sont conformes aux normes prescrites par le présent arrêté; d) les travaux proposés sont conformes à l'Arrêté de zonage et au plan municipal; e) les travaux proposés ne sont pas incompatibles avec les servitudes de services municipaux ou de services publics; a) the building inspector has received a complète application for building permit; b) the building inspector has received all additional application fees pursuantto subsection 14(2); e) the proposed work meets the standards ofthis By-law; d) the proposed work meets the Zoning By-law and the municipal plan; e) the proposed work does not conflict with any municipal services easements or public utility easements; ARIŒTÉ/BY-LAWZ-1 Page | 15 f) le plan de viabilisation du terrain d'implantation convient à F occupation du bâtiment proposée; g) si le lot sur lequel doivent être effectués les travaux proposés contient un bâtiment principal qui est une habitation unifamiliale, une habitation bifamiliale ou une habitation jumelée, les travaux proposés doivent notamment viser le nivellement en pente du sol en direction opposée au bâtiment ou à la construction proposée et ne créer aucun effet néfaste; h) lorsqu'il existe, pour le lot où doivent être effectués les travaux proposés, un plan de nivellement approuvé, les travaux proposés sont conformes au plan de nivellement approuvé; i) si im rapport géotechnique a été remis à l'inspecteur en bâtiment, celui-ci indique que les conditions du sol sont propices aux travaux proposés ou les travaux prévoient des mesures pour rendre les conditions du sol propices, conformément aux recommandations du rapport géotechnique; 12(2) L'inspecteur en bâtiment peut refuser une demande de permis de construction lorsque les travaux proposés ne respectent pas les exigences décrites au paragraphe 12(1). 12(3) Sur demande, l'inspecteur en bâtiment communique les motifs du refus à l'auteur de la demande ou au propriétaire enregistré du bien. 12(4) Le permis de construction est valide pour un (l) an à partir de la date de sa délivrance. 12(5)L'inspecteur en bâtiment renouvelle un permis de construction pour une période maximale d'un an à compter de sa date d'expiration initiale sur demande du titulaire du permis de construction présentée de la manière qu'il a prescrite et lorsque les conditions suivantes sont rêumes : a) les conditions afférentes au permis de construction sont respectées; f) g) the site sendcing plan is satisfactory for the proposed building occupancy; ifthe proposed work will be on a lot that contains a main building that is a one-unit dwelling, two-unit dwelling, or a semi-detached dwelling, the proposed work includes grading land away from the proposed building or structure and will not cause an adverse effect; h) i) if the lot on which the proposed work is to take place has an approved grading plan, the proposed work is in accordance with the approved grading plan; if a soil report was provided to the building inspector, that the soil report indicates that the soil is suitable, or the work includes measures to make the soil suitable pursuant to the recommendations of the soil report; and 12(2) The building inspecter may deny an application for a building permit when the proposed work does not meet the requirements described in subsection 12(1)10(1). 12(3) The building inspector shall provide to the applicant or registered property owner, when requested to do so, reasons for denying an application for building permit. 12(4) A building permit is valid for a period ofone (l) year fi-om the date ofits issuance. 12(5) The building inspector shall renew a building permit for a period ofup to one (l) year from the original date of expiry upon request ofthe building permit holder in the marner prescribed by the building inspector when: a) the conditions of the building permit are being met; and ARRÊTÉ/BY-LAWZ-1 Page | 16 b) aucun permis d'occuper conditionnel n'a été délivré relativement aux travaux décrits dans le permis de constmction. 12(6) Un permis de construction ne peut êû-e renouvelé qu'une seule fois. 12 (7) L'inspecteur en bâtiment avise par écrit le titulaire du permis de construction du renouvellement de son permis. 12(8) Nonobstant les autres dispositions du présent arrêté, est réputé valide le permis de construction qui expire pendant la période de validité d'un permis d'occuper conditionnel se rapportant aux mêmes travaux. 12(9) Le permis de construction qui est expiré est réputé révoqué. 12(10) Lorsque le pemiis de construction est délivré, l'inspecteur en bâtiment avise par écrit son titulaire des inspections requises. 13. Révocation et annulation de permis 13(l)L'inspecteur en bâtiment refuse une demande de permis de construction si l'auteur de la demande n'est pas devenu admissible à la délivrance de ce permis dans les six mois suivant la réception de la demande par l'inspecteur en bâtiment. 13 (2) Un permis est révoqué dans les cas suivants : a) l'une des conditions énoncées sur le permis ou dans le présent arrêté a fait l'objet d'une violation à laquelle il n'a pas été remédié dans les 90 jours suivant la remise au titulaire du permis d'un avis de la violation; b) le permis a été délivré par erreur; ou e) le permis a été délivré sur le fondement de renseignements incorrects. 13 (3) L'auteur de la demande peut en demander l'annulation à l'inspecteur en bâtiment en tout temps avant la délivrance du permis en lui présentant un avis de la manière prescrite par l'inspecteur en bâtiment. b) no conditional occupancy pennit has been issued in regards to the work described in the building permit. 12(6) A building permit may be renewed no more than once. 12(7) The building inspector shall notify, in writing, the building permit holder that the building permit has been renewed. 12(8)Notwithstanding any other section of this By-law, when a building permit expires during the term that a conditional occupancy permit for the same work is valid, the building permit for such work shall be deemed valid. 12(9) A building permit that has expired shall be deemed revoked. 12(10) When the building permit is issued the building inspecter shall notify, in writing, the building permit holder which inspections are required. 13. Permit Révocation and Cancellation 13(l)The building inspector shall refuse an application for a building permit if the applicant has not within six (6) months of the building inspector receiving the application become entitled to have the building pennit issued. 13 (2) A permit shall be revoked when: a) there is a violation of any condition set out on the permit or set out in tMs By-law that has not been remedied within ninety (90) days of the permit holder being notified of such violation; b) where the permit was issued in error; or e) the permit was issued based on incorrect information. 13(3)The applicant may request that the building inspecter cancel an application at any time before issuance by providing notice, in the mamier prescribed by the building inspector, to the building mspector. ARRÊTÉ/BY-LAWZ-1 Page [ 17 13(4) L'inspecteur en bâtiment annule la demande de permis de construction si l'auteur de la demande le lui demande avant la délivrance du permis de construction. 13 (5) Sauf dans les cas décrits aux paragraphes 13(6) et 13(7), le droit de demande de permis est non-remboursable. 13(6)Dès l'annulation d'une demande de permis de construction, ou de permis de démolition, l'inspecteur en bâtiment rembourse à l'auteur de la demande 80 % du droit de demande qui lui a été remis avec la demande. 13 (7) Dès l'annulation d'un permis de constmction, ou d'un permis de démolition, l'inspecteur en bâtiment rembourse à l'auteur de la demande 60 % du droit de demande qui lui a été remis avec la demande si les travaux ou la démolition décrits dans le permis n'ont pas été entamés. 13(8)Le titulaire d'un permis de constmction peut en demander l'aimulation en présentant un avis écrit à l'inspecteur en bâtiment de la manière prescrite par celui- Cl. 13 (9) L'inspecteur en bâtiment annule un permis de constmction, un permis de démolition ou un permis de constmction par étapes à la demande du titulaire du permis si les travaux ou la démolition décrits dans le permis n'ont pas été entamés. 13(10) Un permis est réputé invalide dès son annulation, sa révocation ou son expiration. 14. Droits 14(1) Les droits de demande prescrits par le présent arrêté sont énumérés à l'annexe B. 14(2)L'estimé des coûts de construction seront basés sur les taux fixés à Fannexe A. 14(3) Aucune partie d'un bâtiment ou d'une construction pour laquelle un permis de construction ou im permis de démolition est exigé, y compris les travaux mécaniques, électriques et de plomberie, n'est exclue de la valeur estimative en vue de la délivrance d'un permis en raison de la nécessité d'obtenir d'autres permis requis par un autre arrêté applicable ou par un organisme de réglementation. 13(4)The building inspector shall cajticel an application for building permit ifrequested to do so by the applicant for a building permit before issuance of the building permit. 13(5)There shall be no refùnds of application fees for a permit, except for those situations as described by subsections 13(6) and 13(7). 13(6)Upon cancelling an application for a building permit or démolition permit, fhe building inspecter shall refund 80% of the application fee given to the building inspecter at the time of application to the applicant. 13(7)Upon cancelling a building permit, or démolition permit, the building inspector shall refund 60% of the application fee given to the building inspector at the time of application to the applicaat if no work or démolition described in the permit has been undertaken. 13 (8) A building permit holder may request that a building permit be cancelled by providing written notice to the building inspector, in the manner prescribed by the building inspector. 13(9)The building inspector shall cancel a building permit or démolition permit or phased building permit upon request by the permit holder, when no work or démolition described in the permit has been undertaken. 13(10) A permit shall be deemed not valid immediately upon cancellation, révocation, or expiration. 14. Fees 14(1) The application fees required under this By-law are listed in Schedule "B". 14(2) The estimate of construction will be based on the rates set out in Schedule A. 14(3)No portion ofany building or structure for which a building permit or démolition permit is required, mcluding mechanical, electrical and plumbing work, shall be excluded fi-om the estimate for a building permit because of any other pennits required by any other goveming by-law or agency. ARRËTÉ/BY-LAWZ-1 Page | 18 14(4) Si l'auteur de la demande n'est pas en mesure d'indiquer une valeur estimative raisonnable des travaux au moment de présenter sa demande, la valeur estimative est attribuée conformément à l'annexe A ou, s'agissant de travaux non décrits à l'aruaexe A, Pinspecteur en bâtiments constructions attribue une valeur estimative raisonnable avant d'accepter la demande. 14(5)Pour l'application du paragraphe 14(1), lorsque la valeur estimative des travaux proposés qu'indique l'auteur de la demande à l'égard d'un logement est inférieure au montant prévu à l'annexe A, l'inspecteur en bâtiments attribue une valeur estimative conformément à l'amexe A. 14(4)When the applicant is unable to pro vide a reasonable estimate ofthe work at the time of application, the estimate shall be assigned according to Schedule "A" or where the work is not described in Schedule "A", the building inspector shall assign a reasonable value to the estimate before accepting the application. 14(5)For the purposes of subsection 14(1) where the estimate provided by the applicant of the proposed work is less than the amount set out in Schedule "A", the building inspector shall assign a value to the estimate according to Schedule "A". 14(6)Pour l'application du paragraphe 14(1), lorsque la valeur estimative des travaux proposés fournie par l'auteur de la demande qui ne se rapportent pas à un logement à densité faible ou moyeime est, de Pavis de l'inspecteur en bâtiments, d'une valeur déraisonnable, une valeur estimative raisonnable est attribuée. 14(7) Lorsqu'il attribue une valeur estimative en application du paragraphe 14(6), F inspecteur en bâtiments tient compte de tous les renseignements pertinents et de toute la preuve dont il dispose, y compris tous les documents et devis que lui a remis l'auteur de la demande et qui proviennent des personnes suivantes : a) b) e) d) e) des des des des des entrepreneurs; gens de métier; experts-conseils; fournisseurs; professionnels. 15. Conditions. afférentes au permis de construction 15(l)Tout permis de construction impose à son titulaire les conditions suivantes : a) veiller à ce que les plans et devis sur le fondement desquels le permis de construction a été délivré soient accessibles en tout temps pendant les heures de travail sur le chantier de construction ou sur le lot où sont effectués les travaux, pour inspection par les inspecteurs municipaux, et à ce que le permis de 14(6) For the purposes of subsection 14(1), where the estimate provided by the applicant ofthe proposed work that does not pertain to a minor and medium residential is unreasonable in the opinion ofthe building inspector, the estimate shall be assigned a reasonable value. 14(7) The building inspector, when providing an estimate pursuant to subsection 14(6), shall consider all relevant information ajcid évidence available, including any documentation and quotes of: a) contractors; b) tradespeople; e) consultants; d) suppliers; and e) qualified professionals; provided to the building inspector by the applicant. 15. Building Permit Conditions 15 (l) As a condition of a building permit, every building permit holder shall: a) ensure that the plans and spécifications on which the issue of the building permit was based are available continuously at the building site or lot of the work for inspection during working hours by municipal inspectors, and that the building permit, or tme copy thereof, is posted conspicuously on ARRËTÉ/BY-LAWZ-1 Page | 19 construction, ou une copie certifiée conforme de celui-ci, soit affiché bien en vue sur le chantier pendant toute la période d'exécution des travaux; b) au besoin pour lui permettre d'évaluer si les travaux sont conformes aux normes prescrites par le présent arrêté, fournir à un inspecteur municipal des copies de tous les rapports concernant le bâtiment ou la construction et le lot sur lequel ils se trouvent, y compris ce qm suit : (i) les documents mentionnés dans le Code, (ii) les résultats de tests d'alarme incendie, (iii) les résultats des tests des systèmes d'extincteurs automatiques a eau, (iv) les indices de propagation des flammes, (v) les caractéristiques des produits, (vi) les listes de matériaux, (vii)les caractéristiques des produits structuraux pour le bâtùnent, (viii) les résultats des analyses du sol, (ix) les résultats des analyses de compactage, (x) les registres d'isolation du gremer, (xi) les registres des travaux mécaniques; (xii)un rapport de la surveillance générale des travaux; (xiii) un rapport des tests d'intégration des systèmes. e) si l'inspecteur ou le titulaire du permis de construction prend connaissance de problèmes concernant le sol, de sols impropres, de pentes instables ou de toute autre indication que le sol du lot pourrait the site during the entire performance ofthe work; b) when necessary to evaluate whether the work meets the standards ofthis By law, provide to a municipal inspector copies of all applicable reports relating to the building or structure and the lot on which it is located including: (i) documents référencée! in the Code; (ii) fire alami testing; (iii) sprinkler System testing; (iv) flame spread ratings; (v) product spécifications; (vi) material listmgs; (vii)stmctural spécifications; product (viii) soil testing; (ix) compaction testing; (x) attic insulation record; (xi) mechanical record; (xii)fîeld review report; (xiïi) Systems intégration testmg report. e) when an inspecter or the building permit holder becomes aware ofsoil concems, unsuitable soils, unstable slopes, or any other indication that soils ofthe lot may be unsuitable for the work, provide the building ARRÊTÉ/BY-LAWZ-1 Page | 20 ne pas convenir aux travaux, remettre à l'inspecteur en bâtiments, dans les 30 jours qui suivent cette prise de connaissance, un rapport géotechnique daté et sur lequel sont apposés le cachet et la signature d'un ingénieur, qui indique que les conditions du sol du lot sont propices aux travaux; d) lorsqu'un rapport géotechrdque visé à l'alinéa e) indique que le sol est impropre aux travaux, présenter à l'inspecteur en bâtiments, dans les 30 jours suivant la date à laquelle il lui a présenté le rapport géotechnique, une demande de modification du permis de construction afin d'y inclure les mesures supplémentaires requises pour rendre les conditions du sol propres aux travaux; e) lorsque remplacement d'un bâtiment ou d'une construction est à l'intérieur de la marge de retrait prescrite par le permis de construction, remettre à l'inspecteur en bâtiments un rapport d'arpentage confirmant remplacement du bâtiment, ce rapport étant revêtu du cachet et de la signature d'un arpenteur-géomètre; f) lorsqu'un inspecteur prend connaissance du fait que des travaux ont été couverts en violation de l'alinéa 16(3) et 16(4), découvrir les travaux dans les cinq jours qui suivent cette découverte; g) prendre toutes les autres mesures ou achever les b-avaux nécessaires pour assurer le respect des normes prescrites par le présent arrêté; h) prendre toutes les autres mesures ou achever les travaux nécessaires pour prévenir toutes conditions dangereuses pour le public relativement aux travaux ou à la démolition; i) enlever tous les débris et déchets de construction du lot dans les plus brefs délais; j) éliminer les débris et déchets à un lieu d'élimination approuvé à cette fin par la Province du Nouveau- Brunswick. d) e) f) g) h) i) j) inspector, within thirty (30) days of the permit holder or inspector becoming aware, a soils report stamped, signed and dated by a professional engineer, indicating that the soil conditions ofthe lot are suitable for the work; where a soil report pursuant to paragraph e) identifies that the soil is not suitable for the work, apply within thirty (30) days ofproviding the soil report to the building inspector, to modify the building permit to include the additional measures needed to make the soil conditions suitable for the work; when a building or structure is located within the setback required by the building permit, provide the building inspector with a survey report that confirms the location of the building, signed and sealed by a land surveyor; when an inspecter becomes aware of work that has been covered over in violation ofparagraph 16(3) and 16(4), uncover work within five (5) days of such discovery; complète any other action or work necessary to comply with the standards ofthis By-law; complète any other action or work necessary to prevent any condition unsafe to the public to exist with respect to such work or démolition; promptly remove all construction debris and mbbish from the lot; and dispose of all debris and rubbish at a disposai site approved by the Province of New Brunswick for disposai of said debris aad mbbish. ARRËTÉ/BY-LAW Z-l Page |21 16. Obi et des inspections 16(1) Les inspecteurs municipaux inspectent les travaux ou les démolitions qui sont visibles et raisonnablement accessibles au cours de toutes les inspections applicables. 16(2) Nonobstant le paragraphe 16(1), les inspecteurs municipaux n'inspectent pas les travaux auxquels s'appliquent les parties 4, 5 et 8 du Code ou du Code national de l'énergie pour les bâtiments - Canada 2020. 16(3) A donner l'inspecteur à bâtiments un préavis de deux jours ouvrables, de la manière que prescrit celui-ci, et prendre des mesures pour permettre à un inspecteur municipal d'effectuer les inspections visées au paragraphe 12(10). 16(4) Ne pas couvrir les travaux pour lesquels des normes sont prescrites par le présent arrêté tant qu'ils n'ont pas été inspectés et approuvés par un mspecteur municipal. 17. Approbation de l'insuection 17(l)L'inspecteur municipal approuve, au cours d'une inspection visée au paragraphe 16(1), tous les travaux visibles et raisonnablement accessibles qui sont conformes aux normes prescrites par le présent arrêté. 18. Approbation de l'occupation 18(l)Une lettre d'attestation d'occupation des lieux pourra être émise par l'inspecteur des bâtiments lorsque toutes les conditions reliées au permis de construction sont rencontrées. 18(2)La lettre d'attestation d'occupation sera délivrée dans un délai de 4 jour ouvrable. 19. Demande de déplacement 19 (l) Quiconque peut demander la délivrance d'un permis de démolition et d'un permis de construction visant le déplacement de tout ou partie d'un bâtiment ou d'une construction en présentant une demande de déplacement à l'inspecteur en bâtiments en la forme prescrite par celui-ci. 19 (2) La demande de déplacement doit comprendre tous les renseignements requis 16. Inspectable Items 16(1) Municipal inspectors shall inspect work or démolition that is visible and reasonably accessible durmg all applicable inspections. 16(2)Notwithstanding subsection 16(1), municipal inspectors shall not inspect work covered under Part 4, 5 and 8 ofthe Code or the National Energy Code of Canada for Buildings 2020. 16(3)Give the building inspector frwo (2) business days' notice in the maimer prescribed by the building inspector and make all arrangements top allow for a municipal inspector to carry out all applicable inspections pursuant to subsection 12(10). 16(4) Not co ver over work for which standards are provided in this By-law before said work bas been inspected and approved by a municipal inspector. 17. Inspection ApDroval 17(1) An inspector shall approve all work that is visible and reasonably accessible in regards to an inspection listed in subsection 16(1) which meets the standards prescribed by this By-law. 18. Occupancy Approval 18(1)A letter of attestation ofoccupancy of the premises may be issued by the building inspecter when all ofthe conditions related to the building permit are met. 18(2) The letter of attestation of occupation will be issued within 4 business days. 19. Relocation Application 19(1)A person may apply for the issuance of a démolition permit and a building permit for the relocation of a building or structure or part thereof by providing the building inspector an application for relocation, in the form prescribed by the building mspector 19(2)Every application for relocation must include all information necessary for a ARRÊTÉ/BY-LAWZ-1 Page | 22 dans le cas d'une demande de permis de démolition conformément au paragraphe 20(2) et de permis de construction conformément au paragraphe 9(4). 19 (3) L'inspecteur en bâtiments n'accepte que les demandes de déplacement qui satisfont aux conditions prévues aux paragraphes 21(3) et 11(5). 20. Demande de permis de démolition 20(1) Quiconque peut demander la délivrance d'un permis de démolition visant tout ou partie d'un bâtiment ou d'une construction en présentant une demande de démolition à l'inspecteur en bâtiments en la forme prescrite par celui-ci. 20(2) La demande de permis de démolition réunit les conditions suivantes : a) désigner et décrire en détail la démolition visée par le permis de démolition; b) indiquer remplacement du terrain sur lequel la démolition sera effectuée, y compris : (i) le numéro de voirie, (il) le nom de la rue, (iii) le numéro d'identification de la parcelle; e) indiquer la valeur estimative de la démolition proposée; d) énoncer les nom, adresse postale, numéro de téléphone et adresse de courrier électronique de l'auteur de la demande, du propriétaire enregistré du bien, de l'architecte, de l'ingénieur et des autres concepteurs et entrepreneurs, le cas échéant; e) indiquer les semées municipaux qui seront abandonnés et enlevés. 20(3)L'inspecteur en bâtiments accepte une demande de permis de démolition lorsque les conditions suivantes sont réunies : démolition permit pursuant to subsection 21(2) and a building permit pursuant to subsection 9(4). 19(3)The building inspector shall not accept an application for relocation unless all conditions of subsections 21(3) and 11(5) are met. 20. Démolition Application 20(1) A person may apply for the issuance of a démolition permit for a building or sù-ucture or part thereof by providing the building inspector an application for a démolition permit, in the form prescribed by the building inspector. 20(2)Every application for a démolition permit must: a) identify and describe in détail the démolition to be covered by the démolition permit; b) state the location of the property upon which the démolition is to be performed including: (l) civic number; (ii) street name; and (iii) parcel identifier number; e) state the estimate of the proposed démolition; d) state the names, postal addresses, téléphone numbers and email address of the applicant, registered property owner, architect, engineer or other désigner and contractor, as applicable; and e) identify the municipal services to be abandoned and removed. 20(3) The building inspector shall accept an application for a démolition permit when: a) les renseignements fournis semblent suffisants pour déterminer si les dispositions du présent arrêté sont respectées; b) les renseignements présentés sont corrects; a) the information submitted appears to be adéquate to détermine compliance with the provisions of this By-law; b) correct information is submitted; ARRÊTÉ/BY-LAWZ-1 Page | 23 e) l'inspecteur en bâtiments a reçu le plein droit de demande; d) l'inspecteur en bâtiments a reçu le plein dépôt remboursable; e) soit la démolition proposée est conforme aux normes prescrites par l'Arrêté de zonage, soit la demande appropriée a été présentée à Grand- Sault en vue de rendre la démolition conforme à cet arrêté; f) lorsque la valeur estimative est supérieure à l 000 $, la preuve selon laquelle la personne qui effectue la démolition est titulaire d'une police d'assurance responsabilité civile nommant Grand-Sault comme assurée additionnelle, établie sur la base des événements et qui permet les recours entre coassurés, d'im des montants suivants : (i) au moins l 000 000 $, lorsque la valeur estimative de la démolition proposée est de 1000$à50000$, (iï) d'au moins 20 000 $ par tranche de l 000 $ de la valeur estimative de la démolition proposée, jusqu'à concurrence de 5 000 000 $, lorsque la valeur estimative de la démolition proposée est supérieure à 50 000 $. 21. Approbation d'une démolition. 21 (l) Quiconque est habilité par le conseil délivre un permis de démolition à l'auteur de la demande lorsque les conditions suivantes sont réumes : a) l ' inspecteur en bâtiments a reçu une demande de permis de démolition complète; b) l'inspecteur en bâtiments a reçu tous les droits de demande additionnels prescrits par le paragraphe 14(2); e) l'inspecteur en bâtiments a reçu le plein dépôt remboursable; d) la démolition proposée pour laquelle le permis de démolition est e) d) e) f) the fall application fee bas been received by the building inspector; the fall refùndable deposit has been received by the building inspector; the proposed démolition meets the standards of the Zoning By-law, or the appropriate application has been submitted to the Grand Faits to bring the démolition within compliance with said by-law; aad if the estimate is over $1,000.00, proofthat the person performing the démolition carries a général liability insurance policy, naming Grand Falls as an additional insured, issued on an occurrence basis, which allows for cross liability, in the following amounts: (i) when the proposed between $50,000.00, estimate of the démolition is $1,000.00 and at least (ii) $1,000,000.00; when the estimate of the proposed démolition is more than $50,000.00, at least $20,000.00 per $1,000.00 of estimate of fhe proposed démolition to a maximum of $5,000,000.00. 21. Démolition Approval 21 (l) A person so authorized by Council shall issue a démolition permit to an applicant when: a) the building inspector has received a complète application for a démolition permit; b) the building inspector has received all additional application fees pursuantto subsection 14(2); e) the building inspector has received the complète refùndable deposit; d) the proposed démolition for the démolition permit describes a démolition that will meet the ARRÊTÉ/BY-LAWZ-1 Page | 24 sollicité sera conforme à l'Arrêté de zonage et au plan municipal; et e) un inspecteur municipal a inspecté les routes, les ù-ottoirs et les autres biens publics situés autour du chantier de démolition ou de déplacement. 21(2)L'inspecteur en bâtiments peut refuser une demande de permis de démolition lorsque les travaux proposés ne respectent pas les exigences prescrites par le paragraphe 20(1). 21 (3) L'inspecteur en bâtiments est tenu de communiquer, sur demande, les motifs de son refus de délivrer un permis de démolition. 21(4) Le permis de démolition est valide pour 90 jours à partir de la date de sa délivrance, sauf si, de l'avis de l'inspecteur en bâtiments, le niveau de complexité de la démolition fait en sorte qu'une période de 90 jours n'est pas suffisante pour achever la démolition. 21 (5) Lorsqu'il détermine si une démolition est d'un niveau de complexité telle qu'une période de 90 jours n'est pas suffisante pour achever la démolition, l'inspecteur en bâtiments tient compte de tous les renseignements pertinents, y compris les suivants : a) les dimensions du bâtiment ou de la construction; b) le nombre d'étages du bâtiment; e) les conditions du site. 21 (6) Nonobstant le paragraphe 21(4), si le terrain doit faire l'objet d'un aménagement paysager en application de l'alinéa 22(l)f) : a) s'il est délivré après le 1er août d'une année donnée, le permis de démolition sera valide jusqu'au 31 mai de l'année suivante; b) s'il est délivré avant le dernier jour de février d'une année donnée, le permis de démolition sera valide jusqu'au 31 mai de la même année; Zomng By-law and the municipal plan; and e) a municipal inspector has inspected roads, sidewalks and other public property around the démolition or relocation site. 21(2)The building inspector may deny an application for a démolition permit when the proposed work does not meet the requirements described in subsection 21(1). 21(3)The building inspecter shall pro vide, when requested to do so, reasons for denying an application for démolition permit. 21(4) A démolition permit is valid for a period ofninety (90) days from the date of its issuance unless in the building inspecter's opinion the démolition is of such complexity that ninety (90) days is not a reasonable amount oftime to complète the démolition. 21(5)When deciding if a démolition is of such complexity that is unreasonable to complète in ninety (90) days, the building inspecter shall consider all relevant information which may include: a) size ofthe building or structure; b) number of stories of the building; and e) site conditions. 21 (6) Notwithstanding subsection 21(4), where a property is required to have landscaping pursuant to paragraph 22(l)f): a) when a démolition permit is issued after the first day of August of a given year the démolition permit shall be valid until the last day of May ofthe following year; b) when a démolition permit is issued before the last day of Febmary of a given year the démolition pemiit shall be valid until the last day of May ofthe same year; or ARRÊTÉ/BY-LAWZ-1 Page | 25 e) s'il est délivré à un moment autre que ceux visés par les alinéas a) et b), le permis de démolition sera valide pendant 90 jours à partir de la date de sa délivrance. 21 (7) Le permis de démolition n'est pas renouvelable. e) when a démolition permit is issued at any other time than those described by paragraphs (a) or (b), the démolition permit shall be valid for aperiod ofninety (90) days from the date ofissuance. 21 (7) A démolition permit shall not be renewed. 22. Conditions afférentes au permis de démolition 22(1) Tout permis de démolition impose à son titulaire les conditions suivantes : a) le cas échéant, faire débrancher et abandonner de manière appropriée la conduite d'eau principale, d'égout sanitaire principale et d'égout pluvial principale à la limite du terrain de manière à éviter les fuites; b) ne pas remblayer les services municipaux abandonnés avant qu'ils ne soient inspectés par un fonctionnaire municipal; e) rendre au service des opérations, à son successeur ou à son équivalent, dès l'achèvement de la démolition, tous les compteurs d'eau appartenant à Grand-Sault; d) lorsqu'une situation dangereuse est susceptible de se produire pendant ou après la démolition, bamcader le chantier de démolition afin d'empêcher le public d'y accéder; e) remblayer le chantier de démolition avec du matériau de remblayage propre de sorte qu'il soit convenablement nivelé ou, si les conditions du site font qu'il serait déraisonnable de le remblayer, le remettre en état d'une manière suffisante pour qu'il ne soit plus dangereux pour le public ou qu'il ne cause aucun effet néfaste; f) effectuer un aménagement paysager sur toutes les parties du terrain qui ont été dérangées par la démolition, avec au moins 100 mm de terre végétale ensemencée par projection hydraulique ou engazonnée, si les conditions suivantes sont réunies : 22. Démolition Permit Conditions 22(1) As a condition of a démolition permit, every démolition permit holder shall: a) where applicable, cause all services from the water main, sanitary sewer main and storm sewer main to the property line to be disconnected and properly abandoned so as to prevent leakage; b) not backfill abandoned municipal services before they are inspected by a municipal officiai; e) retum all water meters owned by Grand Falls to the Opérations Départaient, or its successor or équivalent, upon completion of the démolition; d) when a dangerous condition is likely to occnr during or after the démolition, bamcade the démolition site to prevent access by the public; e) back&ll with clean fill such that the site is properly graded or where site conditions are such that backfilling is unreasonable, remediate, the démolition site in such a way that it is not dangerous to the public or cause an adverse effect; landscape all areas on the property that have been disturbed by the démolition with at least one hundred (100) mm of topsoil and hydro seeded or sodded where: ARRÊTÉ/BY-LAWZ-1 Page | 26 (i) le bâtiment principal a été démoli, (ii) aucun permis de construction valide n'a été délivré à l'égard du terrain; g) lorsqu'un permis de démolition est valide pendant plus de 90 jours par application du paragraphe 21(6), dans les 90 jours suivant la délivrance du permis, réunir les conditions suivantes : (i) tous les travaux de construction devant être effectués dans le cadre de la démolition doivent être achevés, (il) les conditions afférentes au permis de démolition prévues aux alinéas 22(l)a), b), e), d), e), h), i), j), k) et l) et aux sous- alinéas m) (i) et (ii) doivent être respectées à l'intérieur de 90 jours de l'émission du permis de démolition; h) enlever sans délai tous les décembres du terrain; i) éliminer les décembres à un lieu d'élimination approuvé à cette fin par la Province du Nouveau- Brunswick.; j) réparer tous les dommages causés aux mes et aux autres biens publics par la démolition conformément aux normes prescrites par les spécifications générales; k) démolir les marches et les autres constructions situées dans l'emprise de Grand-Sault, le cas échéant, et reconstruire cette emprise conformément aux spécifications générales; l) lorsque la construction principale sur un lot a été ou est démolie ou déplacée, déplacer ou démolir tous les bâtiments accessoires situés sur le lot; m) donner à l'inspecteur en bâtiments un préavis de deux jours ouvrables de la manière prescrite par celui-ci et prendre toutes les mesures pour (i) the main building has been demolished; and (ii) there is no valid building permit issued for the property; g) when a démolition permit is valid for a period of more than ninety (90) days pursuant to subsection 21(6), within 90 days after the permit is issued, meet the followmg conditions: (i) all construction involved in the démolition must be completed; and (il) conditions of démolition permit described in paragraphs 22(l)(a), (b), (e), (d), (e), (h), (i), (j), (k), (l), sub paragraph m)(i) and (ii) must be met within ninety (90) days of the issuance of the démolition permit; h) promptly remove all démolition debris and mbbish from the property; i) dispose of all debris and mbbish at a disposai site approved by the Province of New Bnmswick for disposai ofsaid debris and mbbish; j) repair all damage caused by the démolition to streets and other public property to the standards of the général spécifications; k) where a building benefits from steps or other structure in Grand Falls' right-of-way, demolish all such structures in the Grand Falls' right- of-way and rebuild Grand Falls' right-of-way as per the général spécifications; l) when the main structure on a lot has been or is being demolished or relocated, relocate or demolish all accessory buildings on the lot; m) give the building inspector two (2) business days' notice in the manner prescribed by the building inspector and make all arrangements to allow ARRÊTÉ/BY-LAWZ-1 Page | 27 permettre à un inspecteur municipal d'inspecter la démolition ou le déplacement lorsqu'applicable, selon le cas : (i) avant le remblayage des services municipaux abandonnés ou obturés, (ii) après l'achèvement de la démolition ou du déplacement, (iii) après l'achèvement de l ' aménagement paysager prescrit par l'alinéa 22g), le cas échéant. 23. Dommages causés aux biens publics 23 (l) Lorsque la démolition ou le déplacement est entrepris ou commencé avant la délivrance du permis de démolition, l'inspecteur en bâtiments estime que tous les dommages causés à la me ou aux autres biens publics situés dans le voisinage général du chantier de démolition ou de déplacement sont des dommages causés par la démolition ou le déplacement. 24. Généralités 24(l)Pour l'application du présent arrêté, les permis de construction et les permis de démolition sont classés dans une catégorie conformément à l'annexe B. 24(2) Le coût des travaux, de la démolition et des mesures nécessaires au respect des conditions dont sont assortis les permis, ainsi que le coût de l'exécution des travaux ou de la démolition qui en font l'objet sont à la seule charge du titulaire du permis ou du propriétaire enregistré du bien, selon le cas. 24(3) Le conseil peut nommer un inspecteur adjoint des constructions qui relève de l'inspecteur en bâtiments. 24(4) L'inspecteur adjoint des constructions est F inspecteur en bâtiments par intérim et, en cas d'absence ou d'incapacité de l'inspecteur en bâtiments, ou quand personne n'occupe cette charge, il exerce toutes les attributions et fonctions de l'inspecteur en bâtiments. 24(5) Le conseil peut à l'occasion nommer un inspecteur en bâtiments par intérim qui, en cas d'absence ou d'incapacité de for a municipal inspector to carry out inspection of the démolition or relocation, where applicable, as follows: (i) prior to backfilling abandoned or capped municipal services; (ii) after completion of démolition or relocation; the (iii) where landscaping is required under paragraph 22(g), after the landscaping has been completed. 23. Public Propertv Damage 23(1) When démolition or relocation. is undertaken or commences prior to the issuance of a démolition permit, the building inspector shall deem any damage to the street or other public property in the général vicinity of a démolition or relocation site to be damage caused by the démolition or relocation. 24. Général 24(1) For the purposes of administering this By-law, building pemiits and démolition permits are assigned to a Tier as per Schedule "B". 24(2) AU work or démolition or actions necessary to conform with the conditions of permits or the performance of work or démolition thereunder are at the soie cost of the permit holder or registered property owner, as applicable. 24(3) Council may appoint a deputy building inspector who 'shall be subject to the direction ofthe building inspector. 24(4) The deputy building inspector shall be the acting building inspector and shall have all the powers and duties of the building inspector in the event of the absence of or the disability of the building inspector or when there is no building inspecter. 24(5) Council may from time to time appoint an acting building inspector who shall have the powers and duties of the building ARRÊTÉ/BY-LAWZ-1 Page | 28 l'inspecteur en bâtiments et de l'inspecteur adjoint des constructions, exerce toutes les attributions et fonctions de l'inspecteur en bâtiments. 24(6) L'inspecteur en bâtiments est chargé de l'application et de l'exécution du présent arrêté. 24(7) Sauf directive contraire, l'inspecteur en bâtiments prend toutes les décisions relatives aux dispositions du présent arrêté. 25. Ordonnances 25(l)L'inspecteur en bâtiments ou toute autre personne autorisée par le conseil peut donner tout avis écrit nécessaire pour informer le propriétaire enregistré du bien que des travaux ou une démolition ont été entrepris en violation du présent arrêté, de la Loi sur l'administration du Code du bâtiment ou de ses règlements. 25 (2) Si des travaux ou une démolition ont été entrepris en violation du présent arrêté, de la Loi sur l'administration du Code du bâtiment ou de ses règlements, l'inspecteur en bâtiments ou toute autre personne autorisée par le conseil peut rendre, par écrit, un ou plusieurs des ordres suivants : a) l'arrêt des travaux ou de la démolition; b) la modification des travaux ou de la démolition de sorte à remédier à cette violation; e) la prise des mesures nécessaires pour rendre le bâtiment ou le bien immobilier sécuritaire. inspecter in the absence of or the disability of both the building inspector and the deputy building inspector. 24(6) The building inspector is responsible for the administration and enforcement of this By law. 24(7) The building inspector unless otherwise indicated shall make all déterminations with respect to the provisions ofthis By-law. 25. Orders 25(l)The building inspector or any other person so authorized by Council may issue in -writing such notice as may be necessary to inform the registered property owner where work or démolition was undertaken in contravention of this By-law, the Building Code Administration Act or its régulations. 25(2)Ifwork or démolition is undertaken in contravention of this By-law, the Building Code Administration Act or its régulations, the building inspector or any other person so authorized by Council may make, in writing, one or more of the following orders: a) cessation of the construction or démolition work; b) altération of the construction or démolition work to remove the contravention; and e) taking any other action required to make the building or real property safe. 26. Droit de pénétrer dans des. lieux 26(l)Afin de s'assurer du respect du présent arrêté, de la Loi sur l'administration du Code du bâtiment et de règlements pris en vertu de cette loi, l'inspecteur en bâtiments ou l'agent d'application des arrêtés peut, à toute heure raisonnable : a) pénétrer dans les bâtiments ou sur les biens immobiliers sit-iés sur son territoire de compétence; b) se faire accompagner et aider par quiconque possède des 26. RishttoEnter 26(l)For the purpose of ensiu-ing compliance with this By-law, the Building Code Administration Act or a régulation under said Act, a building inspector or the by-law enforcement officer may, at any reasonable time: a) enter any building or real property in the area for which the inspector has the responsibility ofconducting inspections, b) be accompanied and assistée by a person who has spécial or expert knowledge, ARRÊTÉ/BY-LAWZ-1 Page | 29 connaissances particulières ou spécialisées; e) effectuer les analyses, prélever les échantillons, demander les renseignements et prendre les mesures, les photos ou les enregistrements vidéo qu'il estime nécessaires; d) exercer toute autre attribution prescrite soit par le présent arrêté, soit par règlement pris en vertu de la Loi sur l'administration du Code du bâtiment. 26(2)Par dérogation à l'alinéa 26(l)a), l'inspecteur en bâtiments ou l'inspecteur municipal ne peut pénétrer dans la partie occupée d'un logement privé que dans l'un quelconque des cas suivants : a) il obtient le consentement de l'occupant; b) il a obtenu un mandat d'entrée en vertu de la Loi sur les mandats d'entrée; e) des motifs raisonnables et probables lui donnent lieu de croire que le bâtiment crée une menace à la sécurité publique. 26(3) La délivrance d'un permis, l'examen des dessins et devis ou les inspections effectuées par un inspecteur en bâtiments ou inspecteur municipal pendant l'exécution des travaux ou la démolition ne dégagent pas le titulaire du permis de l'entière responsabilité qui lui incombe d'effectuer les travaux ou la démolition conformément aux exigences du présent arrêté, de la Loi sur l'administration du Code du bâtiment ou de ses règlements. 27. Abrogation 27(l)L'adoption du présent arrêté abroge les arrêtés suivants : a) Arrêté 38 de la ville de Grand-Sault et ses modifications; b) Arrêté 2011-1 de la communauté rurale de Saint-André et ses modifications; e) Arrêté 84 de la municipalité de Drummond et ses modifications. e) conduct tests, make inquiries and take samples, measurements, photographs or vidéo recordings that the building inspector or municipal inspector considers necessary, and d) exercise any other prescribed powers either by this By-law or by régulation made under the Building Code Administration Act. 26(2)Despite paragraph 26(l)(a), a building inspector or municipal inspector shall not enter an occupied part of a private dwelling except in the following circumstances: a) the building inspector or municipal inspecter bas the consent of the occupier; b) the building inspector or municipal inspector bas obtained an enùy warrant under the Entry Warrants Act; or e) the building inspecter or municipal inspector has reasonable and probable grounds to believe that the building poses a threat to public safety. 26(3 )The issuance of a permit, the review of the drawings and spécifications, or inspections made by a building inspector or municipal inspector during construction of the work or démolition shall not relieve the pemiit holder fi-om full responsibility for carrying out the work or démolition in accordance with the requirements of this By-law, the Building Code Administration Act or its régulations. 27(1) The adoption ofthis by-law repeals the following by-laws: a) By-law 38 of the town of Grand Falls and its amendments; b) By-law 2011-1 of the rural community of Saint-André and its amendments; e) By-law 84 of the municipality of Dmmmond and its amendments. ARRËTÈ/BY-LAWZ-1 Page | 30 27(2) Aucune lettre d'attestation d'occupation des lieux ne sera délivrée à l'égard d'un bâtiment ou d'une construction pour lequel aucun tel permis n'était nécessaire en application d'un arrêté de construction antérieur, sauf si une demande de permis de construction ou de déplacement a été acceptée après l'enù-ée en vigueur du présent arrêté. 28. Date d'entrée en vigueur 28(1) Le présent arrêté entre en vigueur le jour de son adoption. 29. Transition - Permis 2 9 (l) Les permis de construction et les permis de démolition délivrés sous le régime de PArrêté concernant les travaux de construction dans la ville de Grand- Sault (Arrêté 38), Arrêté de construction de la Communauté Rurale de Saint- André (Arrêté 2011-1) et Arrêté concernant les travaux de construction de Drummond (Arrêté 84), et l'ensemble de leurs modifications, après le 1er janvier 2023 sont réputés êb-e les permis correspondants prévus par le présent arrêté, et ils sont assortis des mêmes conditions que celles auxquelles sont assujettis les permis de construction et les permis de démolition délivrés sous le régime du présent arrêté. 29(2) S'agissant des permis mentionnés au paragraphe 28(1) : a) la date de délivrance du permis réputé est la date de délivrance du permis original. 30. Transition - Demandes 30(l)Les demandes qu'accepte l'inspecteur en bâtiments sous le régime de l'Arrêté concernant les travaux de construction dans la ville de Grand-SauIt (Arrêté 38), Arrêté de construction de la Communauté Rurale de Saint-André (Arrêté 2011-1) et Arrêté concernant les travaux de construction de Drummond (Arrêté 84), et l'ensemble de leurs modifications, sont réputées des demandes présentées sous le régime du présent arrêté, sous réserve des conditions suivantes : a) les renseignements et documents devant être présentés au moment de la présentation de la demande de 27(2) No letter of attestation ofoccupancy of the premises shall be issued for buildings or structures where an occupancy permit was not required by a previous building by-law unless application for a building permit or relocation was accepted after the coming into force ofthis By-law. 28. Effective date 28(1) This By-law shall come into force on the date ofits adoption. 29. Transitional - Permits 29(1) AU building permits and démolition permits issued uader A By-Law entitled the town of Grand FaIIs Building By-Iaw (By-Law 38), Arrêté de construction de la Communauté Rurale de Saint-André (By-Law 20011-1) and Arrêté concernant les travaux de construction de Drummond (By-Law 84) and all amendments thereto, after January lst, 2023 are deemed to be their corresponding permits under this By-law subject to all terms and conditions of a building permit and démolition permit as ifissued under this By-law. 29(2) For the permits mentioned in subsection 28(1): a) the date of issuance of the deemed permit shall be the date of issuance ofthe original permit. 3 0. Transitional - Applications 30(1)A11 applications accepted by the building inspector under A By-Law entitled the town of Grand Falls Building By-law (By-Law 38), Arrêté de construction de la Communauté Rurale de Saint-André (By-Law 2011-1) and Arrêté concernant les travaux de construction de Drummond (By-Law 84) and all amendments thereto, are deemed to be applications under this By-law subject to the following tenus and conditions: a) all information and submission requirements required at the time of application are required for a ARJŒTÉ/BY-LAWZ-1 Page [31 permis sont requis pour l'approbation d'un permis de construction ou d'un permis de démolition; et b) les renseignements et documents qui ne sont pas requis au moment de la présentation de la demande de permis ne sont pas requis non plus pour l'approbation d'un permis de construction ou d'un permis de démolition. 11 est par conséquent édicté tel qu'adopté par le conseil municipal de Grand-Sault au Nouveau-Brunswick. building permit or démolition permit to be approved; and b) all information or submission requirements not required at the time of application are not required for a building permit or démolition permit to be approved. Therefore, be it enacted as adopted by tihe Council of the municipality of Grand Falls, New Bmnswick. Première lecture (par titre): First reading (by title): Deuxième lecture: Second reading: Le 27 mai 2025 / May 27th, 2025 Le 18 juin 2025 / June 18th, 2025 Lecture dans son intégralité : Selon le paragraphe 15(3) de la Loi sur la gowernance locale. Reading in full: Per subsection 15(3) ofthe Local Governance Act. Troisième lecture et adoption: Third reading and enactment: s srta&id Beaulieu Maire / Mayor Le 18 juin 2025 / June 18ft, 2025 'Y< %^ '- »^ s -H^i- ^......-^ ^s:y eg^nFIEOTRU ARRÊTÈ/BY-LAWZ-1 Page | 32 ANNEXE A / SCHEDULE A BARÈME DES COUTS DE CONSTRUCTION BUILDING FEE SCHEDULE Type de travaux Bâtiment accessoire sans dalle de béton Bâtiment accessoire avec dalle de béton Bâtiment accessoire avec fondation Patio attaché Patio détaché Patio avec toit Garage annexé Garage annexé avec dalle suspendue Résidence unifamiliale (sous-sol non fini) Résidence unifamiliale l /' étage Résidence unifamiliale plusieurs étages Aménagement du sous-sol Chalet Chalet avec fondation Maison mobile Mmi maison , : Semi détaché (duplex) 3 et plus unités résidentielles Addition Aufres travaux non mentionnés Type ofwork Accessory building without concrète slab Accessory building with concrète slab Accessory building with frosfrwall Attached patio Detached patio Patio with roof Attached garage Attached garage with suspended floor Smgle family résidence with unfînished basement Single family résidence l y2 story Single family résidence multi-story Finishiag basement Cottage Cottage with foundation , Mobile home Mini home .Semi-detached (duplex) Residential 3+units Addition Other work not mentioned Taux/pied2 Amount/square ft. 34$ 38$ 42$ 27$ 23$ 49$ 42$. 50$ 182$ 182$+63$ (pour le % étage/for fhe ',2 floor) 182$+91$ (pour les étages successifs/for additional floors) 28$ 126$+63$ (pour les étages successifs/for additional floors) 182$+63$ (Pour les étages successifs/for additional floors) 114$+14$ (pour la fondation/for foundation) 140$ +14$ (pour la fondation/for foundation) 168$+63$ (pour les étages successifs/for additional floors) 154$+63$ (pour les étages successifs/for additional floors) 75% du barème approprié/building fee schedule Estimé du contracteur (incluant la main d'œuvre) Estimate from the contractor (including labor) ARRÊTÉ/BY-LAWZ-1 Page | 33 AXNEXE B / SCHEDULE B BAREME DES FRAIS DE PERMIS DE CONSTRUCTION CONSTRUCTION PERMIT FEE SCHEDULE Catégorie / Category Frais d'administration / Adminisù-ative Fees Résidentielle / Residential Commerciale / Commercial Institutiomielle / Institutional Industrielle / Industrial Agricole / Agricultural Démolition / Démolition Tarifs / Rates 35$ 25$ 100$ 100$ 200$ 100$ 20$ Veuillez noter que les frais d'administration s'ajoutent au tarif applicable selon la catégorie de permis. Le paiement du frais d'administration et du permis est requis pour que la demande soit traitée. /Please note that the administrative fee is in addition to the applicable permit categoryfee. Both the administrative and permît fees rnust bepaidfor the application to beprocessed. ARRÊTÈ/BY-LAWZ-1 Page | 34 ANNEXE C / SCHEDULE C INSPECTIONS PRÉVUES - PERMIS DE CONSTRUCTION PLANNED INSPECTIONS - BUILDING PERMITS Retrait Semelle Mur de fondation Charpente Pare-air Isolation Séparation coupe-feu Inspection finale Installation de toute st-ucture Mise en place de tous les coffi-ages de semelle avant le coulage du béton. Une vérification géotechnique peut être exigée pour confirmer la convenaace du sol. Construction du mur de fondation, incluant tous les éléments extérieurs et le système de dramage périphérique. (Avant le remblaiement) Construction de toute la charpente structurelle et des escaliers. (La plomberie brute et le système de chauffage doivent êb-e inspectés et confomies, et les portes, fenêùres et la toiture installées.) Des plans d'ingénierie doivent être fournis pour les fermes de toit. Installation d'un pare-air continu. Il existe plusieurs options pour fournir un pare- air efficace. Une confirmation peut nécessiter une iaspection à plusieurs étapes du projet. Installation du matériau isolant et du pare-vapeur. L'isolation soufflée peut être installée après la pose des plaques de plâtre au plafond et sera confirmée lors de l'inspection d'occupation. Installation de toutes les séparations coupe-feu requises, y compris les composants de calfeutrage coupe-feu. Les fiches techniques des composants de calfeutrage doivent être fournies. Achèvement de TOUS les éléments liés à la santé et à la sécurité. Aucun ordre en suspens relatif au Code du bâtiment ne doit être en vigueur. (La délivrance d'un permis d'occupation peut être requise) Setback Footing Foundation wall Framing Airban-ier Insulation Pire séparation Final inspection installation ofany stmcture Placement of all footing fomis prior to pouring concrète. Geotechnical review may be required to confirm soil suitability. Construction of foundation wall including all extemal éléments and perimeter drainage system. (Prior to Backfill) Construction ofall strucb.u-al framing and stairs. (Rough Plumbing and Heating passed and doors, Windows & roofing installed.) Engineered drawings must be provided for rooftrusses. Installation of a continuous air barrier. There are several options for providing an effective Air Barrier. Confirmation may require an inspection during several inspection stages. Installation of the insulating material and vapour barrier. Blown-in insulation can be installed after the ceiling drywall is applied and confirmed at the Occupancy inspection. Installation of all required fire séparation mcluding fire stopping components. Data sheets for the fire stopping components must be provided. Completion of ALL health and safety component. There must be no outstanding Building Code Orders. (Issuance of an Occupancy permit may be required) ARRÊTÉ/BY-LAWZ-1 Page |35 ANNEXE D / SCHEDULE D TRAVAUX NE NÉCESSITANT PAS DE PERMIS WORK NOT REQUIRING A PERMIT Les travaux, à effectuer dans un. bâtunent ne renfermant qu'un maximum de deux logements et dans des bâtiments accessoires complémentaires, se limitent : À une réparation non sù-ucturelle évaluée à l 000 $ maximum, Au remplacement du revêtement de plancher extérieur par un revêtement de même type et configuration, Au remplacement de la toiture, A la pose de gouttières ou de descentes d'eaux pluviales, à la pose de contreportes, contrefenêtres et de contrevents, Au remplacement de portes intérieures et de portes sectionnelles de même type et dimensions, au même endroit, A la peinture, à la réparation de plâtre et des panneaux de plâtre, Au remplacement de revêtement de plancher et de murs intérieurs, A l'installation de moulures décoratives intérieures, Au remplacement d'armoires de cuisine ou de salle de bain ou de leurs portes panneaux, A la réparation d'une cheminée existante. The proposed work is in a building containing only a maximum of two dwellmg units and complimentary accessory buildings, and the work consists of: Non-structural repairs valued at a maximum of $1,000; Replacing exterior floor decking where such repairs are the same type and configuration as that bemg repaired; Re-roofing; Installation of gutters, downspouts, stomi doors, storm Windows, shutters; Replacement ofinterior doors and overhead doors provided they are of the same type, location and size; Painting, plaster and drywall repairs; Replacement ofinterior floor and wall covering; Installation of cosmetic trim work; Refacmg or replacing kitchen or bathroom cabmets; Repair to an existing chimney. DÉCLARATION SOLENNELLE SOLEMN DECLARATION Province du Nouveau-Brunswick Comté de Victoria Je, soussigné, Michelle Daigle, de Grand-Sault, dans le comté de Victoria et la province du Nouveau-Brunswick, DÉCLARE sous SERMENT: Province of New Brunswick Victoria County l, Michelle Daigle, of Grand Falls, in the CountyofVictoria and Province of New Brunswick, DO SOLEMNLY DECLARE: l. QUE, je suis greffière adjointe pour Grand-Sault, une corporation municipale, et quej'ai une connaissance personnelle des faits énoncés dans la présente déclaration. l. THAT, l am Deputy Clerk for Grand Falls, a municipal corporation, and have Personal knowledge of the facts herein declared. 2. QUE, les exigences de ['article 5(4) de la Loi sur ['administration du Code du bâtiment, en lien avec l'articlell2(l)b) de la Loi sur l'urbanisme, ont été rencontrées par ['arrêté municipal Z-l, Arrêté concernant l'édification, la réparation et la démolition de bâtiments et de constructions à Grand-Sault, adopté par le conseil municipal de Grand-Sault le 18 juin 2025. 2. THAT the requirements of section 5(4) of the Building Code Administration Act, in conjunction with section 112(l)(b) of the Community Planning Act, were met by municipal by-law Z-l, A By-law respecting the construction, repair and démolition of buildings and structures in Grand Falls, adopted by the Grand Falls municipal council on June 18, 2025. ET, je fais cette déclaration solennelle la croyant vraie en toute conscience, et sachant qu'elle a la même valeur et les mêmes effets que si elle était faite sous serment et aux termes de la Loi sur la preuve. DÉCLARATION FAITE DEVANT MOI à Grand-Sault, dans le comté de Victoria et la province du Nouveau-Brunswick, le 'Z.^ t-\-<^ 2025. AND, l make this solemn déclaration conscientiously believing it to be true and knowing that it is of the same force and effect as if made under oath and by virtue ofthe Evidence Act. DECLARED BEFORE ME at Grand Falls, in the CountyofVictoria and the Province of New Brunswick, this Z^> day of_^o25_A.D., 2025. Of\4^~^^\^^ Michèle Daigle Greffière^adjointe/ Deputy Clerk prestation des serments / joner^fOaths ACo Eric Gagnon Commissaire aux serments Commissioner of oaths ma commission expire my commission, expires le/on iU^tSi&^tteftO S-3 t cîrtify thatthisinsirumenî is registgred orfilsd inthe Ï^s^- CouirtyRegistry Office, EtewBrunswick .{'atteste qus cet instrument wt enregistré ou déposé au buraau l't \ /,~cjh>^e*- _ Nouveau-Bmnswiclt oPo^-û^-oa- itp'.o3:<57 </^3^7^2 'mamiserfnumèr! Registrar-Conservatsur -"-" -~ -<. '. < -;'->-.