Level of Service Policy

Moncton, New Brunswick · adopted 2018-06-18

This is the exact embedded text of the captured official document. Snapshot ca48b5c3061c · verified 2026-06-07 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

Page 1 of 47 POLICY Owner Department: Strategic Initiatives Level of Service Effective Date: June 18, 2018 Last Reviewed Date: December 22, 2021 City Council Approval Dates: 2022, 2023, 2024 and 2025 Budget Approvals Approving Authority: Moncton City Council Replaces No.: N/A 1. Preamble The City of Moncton manages many different services throughout the year, including but not limited to the following areas: - Corporate Services - including Corporate Communications; - Community and Safety Services - including Building Inspection, Moncton Fire Department, Codiac Transpo, By-Law Enforcement, Urban Planning, and Policing Support Services; - Engineering and Environmental Services - including Public Works, Municipal Facilities, Utilities, Water Systems, and Environmental Planning and Management; - Recreation, Culture and Events - including Recreation and Leisure, Parks and Leisure Operations, Resurgo Place Culture and Heritage, Magnetic Hill Zoo and Magnetic Hill Park, Tourism and Events, and Venues; This policy states what Level of Service is appropriate to meet minimum requirements as agreed upon by City administration and adopted by City Council and that will best serve the citizens of Moncton. 2. Policy Statement City administration shall strive to meet the Levels of Service as adopted by Moncton City Council in the Appendices attached to and forming part of this Policy, as amended as required. 3. Objectives The objectives of this policy are: Level of Service Page 2 of 47 1. To provide guidelines to City administration so they can identify what is required to be done to meet the expectations of the citizens of Moncton. 2. To ensure that the Levels of Service delivered are in the best interest of the citizens of Moncton. 3. To emphasize and promote understanding of Levels of Service among City Council, City administration and the citizens of Moncton. 4. To provide direction to City administration with regards to meeting the Levels of Service. 4. Definitions Level of Service - is a measure of the ability to meet an expected deliverable determined by City administration and Council under the guidance from the citizens of Moncton. A level of service typically relate to: - Quality - Quantity - Safety - Capacity - Fitness for purpose - Aesthetics - Reliability - Responsiveness - Environmental acceptability - Costs 5. Council Approved Levels of Service See Appendix "A" for the Council approved Levels of Service. 6. Administration and Contact City Clerk's Office 655 Main St., Moncton, NB E1C 1E8 Telephone: 506.853.3550 Email: [email protected] Level of Service Page 3 of 47 APPENDIX A By-Law Enforcement - People for Animal Wellbeing (PAW) Animal Control Pillars Department Goals Departmen t Divisio n Service Name Sub Service Direct Customer Service Definition Service Component Current Service Level Target Achieve d 2024- 2025 Target Achieve d 2023- 2024 Target Achieve d 2022- 2023 Results / Comment Social To provide a safe environment for citizens with appropriate animal controls in locations throughout the City PAW - People for Animal Wellbeing N/A Animal Control Enforcement of Animal Control By- Law H-1322 Park users Enforcing By-law H-202 Animal Control, capturing and impounding stray animals, investigating dog bite complaints, providing expert testimony in court cases, writing incident reports, providing humane care to animals under their supervision, daily patrols of parks and trails, after hours emergency response, and public education on responsible pet ownership. Animal control - (PAW - People for Animal Wellbeing) - Patrol parks and trails (100 hours / month) - 90% of the time 73.69 hours 74 hours 84 hours Centennial, Irishtown, Mapleton and Victoria Complainte nt - Acknowledge receipt of complaint within 2 business days - 90% of the time Yes Yes Yes Number of Complaints received : 467/average of 40 files per month. Target of 90% achievement as per the Executive Director of PAWS - Provide follow up on next steps and timelines within 4 business days - 90% of the time Yes Yes Yes Target of 90% achievement as per Executive Director of PAWS Dog owners and citizens Dogs registered (City of Moncton) - Register and provide dog licenses - 85% annual renewal rate (5% of people and their pets relocate and 10% annual mortality rate in household pets) 266 licenses 374 licenses 462 licenses Level of Service Page 4 of 47 By-Law Enforcement (Levels of Service to Public) July 2024 - June 2025 Results Community Safety Pillar Department Goal Department Division Service Name Sub Service Direct Customer Service Definition Service Component Current Service Level Target Achiev ed 2024-2025 Target Achieved 2022- 2023 Target Achieved 2022- 2023 Results / Comment Social Ensure that the City of Moncton is a safe and respectful community through the enforcement of by-laws By-law Enforcemen t N/A By-law enforcemen t Complaint handling - By- Laws Complainant A public service provided to potential by-law violators and complainants offering compliance with a variety of City By-laws. Response to Complainant. - 48 hours to acknowledge receipt of complaint from complainant and have it entered in our system for investigation. - Target: 95% of the time 95% 95% 95% *5920 Service Request from July 2022 to June 2023 *6337 Service Request from July 2023 to June 2024 *52 20 Service Request from July 2024 to June 2025 - 48 hours to respond to request for information on existing service request or case regarding status of service request or case. - Target: 95% of the time 80% 80% 80% * Waiting for new software to increase efficiency. - 4 business days from receipt of complaint, follow-up or next steps including timelines will be provided. - Target: 95% of the time 85% 85% 85% * Waiting for new software to increase efficiency. On street patrols: - Pan handling - On Street parking regulations - Encampments/Social Issues Violators and Citizens A public service provided to on-street by-law violators and complainants offering compliance with a variety of City By-laws. Ticketing Community Officers patrolling 24/7 Yes Yes Yes *1021 Service Request from July 2022 to June 2023 * 4418 Service Request from July 2023 to June 2024 * 4250 Service Request from July 2024 to June 2025 Level of Service Page 5 of 47 Governance Ensure that by- laws are created and abided by for the greater safety and enjoyment of the community By-law Enforcemen t N/A Business licensing - Taxi Owners and Operators - Pawnbrokers - Mobile Home Parks - Transient Traders - Portable sign permit - Mobile Vendors - Vehicle immobilization service providers - Sidewalk Café license - Fire Pit Permit - Resident Permits Applicant Providing a licensing service for particular businesses and activities as allowed under the Municipalities Act ensuring compliance with applicable regulations. - Taxi Owners and Operators - Pawnbrokers - Mobile Home Parks - Transient Traders - Portable sign permit - Mobile Vendors - Vehicle immobilization service providers - Sidewalk Café license - Fire Pit Permit - Resident Permits - License and permit will be issued within 5 business days from receipt of a complete application - Target: 95% of the time Yes Yes Yes * 1582 Licenses issued from July 2022 to June 2023 * 1602 Licenses issued from July 2023 to June 2024 * 1701 Licenses issued from July 2024 to June 2025 Communications (Levels of Service to Public) (July 2024-June 2025 Results) Corporate Pillar Description Department Division Service Name Sub Service Direct Customer Service Definition Service Component Current Service Level Target Achie ved 2024- 2025 Target Achieved 2023 2024 Target Achieved 2022- 2023 Target Achiev ed 2021- 2022 Results / Comment Media relations Media Public relations (PR) is the practice of managing the communication between an organization and its publics. Informed citizens - Media requests are acknowledged within 1 hour - Target: less than 7 valid media complaints of not meeting service level 100% 100% 100% 100% Media - Interviews (date and time) are agreed to by the media outlet and the City within a 5 hour of request for an interview - Target: less than 10 valid media complaints of not meeting service level 100% 100% 100% 100% Media - Media requests are responded to in the official language of choice - Target: less than 5 valid media complaints of not meeting service level 100% 100% 100% 100% Level of Service Page 6 of 47 Governan ce Proactively inform residents to improve transparency Corporate Communicatio ns Corporate Communicatio ns Public Relations Public knowledge Citizens Enhance citizen knowledge on city services Informed citizens - Educational information to citizens on various city services - Target: 2 per month 100% 100% 100% 100% Social media Citizens Public relations (PR) is the practice of managing the communication between an organization and its publics. Informed citizens - Questions received on social media are acknowledged within 5 hours - Target: less than 10 valid complaints of not meeting service level Note: Questions are answered within 1 business day (Monday to Friday from 8:30 a.m. to 4:30 p.m.) 100% 100% 100% 100% Culture Improve bilingual services within the municipality Corporate Communicatio ns Corporate Communicatio ns Official Language Support Official Languages Citizens Ensuring that all materials and communication destined for an external audience is provided in both French and English. Adherence to Policies and Acts. Official Languages Policy is reviewed every 5 years No Yes Yes Yes Citizens - Provide external audience materials in both official languages. - Target: less than 5 language complaints annually. Yes Yes Yes No Governan ce Engage residents in the decision making process Public Engageme nt Public Participatio n Citizens Opportunities for the public to engage in decision making at the neighborhood or municipal level. Consultation/ engagement Public Engagement Plan to be developed. Yes Yes Yes Yes Community Services - Culture and Heritage Pillar Department Goal Department Division Service Name Sub Service Service Definition Direct Customer Service Component Current Service Level Target Achieved 2024- 2025 Target Achieved 2023- 2024 Target Achieved 2022- 2023 Results / Comment Level of Service Page 7 of 47 Cultur e To Provide a community based initiatives and activities that promote the vibrancy of our arts and culture sector, including operation of the new Resurgo Place and our heritage properties (Free Meeting House, Thomas Williams House, and Treitz Haus) Culture and Heritage Heritage Heritage Resurgo Place Access and Collection Manageme nt A public service provided to heritage program participants offering access to collections and heritage places as well as engagement in activities of heritage and cultural significance to Moncton at its different locations. Patrons of Museum Moncton Museum - artifact collection - Access to museum collection - Target: At least 20 new/different artefacts annually 310% Yes YES - Lobby case displays (25 artefacts) - Loans (7 artefacts) - Artefacts Canada Database (30 new records) - Access to temporary exhibitions - Target: Showcase 5 annually 160% Yes YES - Bees! - Behind Racism - Gérald Leblanc - Fall & Harvest Cooking - Monarch Butterflies - Art Atlantic - Recovery Art - Meet me Halfway Patrons of Resource Centre Reg Ward Resource Centre - Access to resources by appointment - Target: 95% of request accommodated 100% Yes YES - 121 research request in 2024 - Research requests completed within 10 business days - Target: 90% of the time 100% Yes YES Patrons of Resurgo Place Transportat ion Discovery Centre - Visitor satisfaction - Target: Less than 5 complaints annually 100% Yes YES - 1 complaint - resolved Patrons of Thomas Williams House Thomas Williams House Access to the heritage house - Target: 4 events annually 100% Yes YES - Summer 2024 open - Holiday Tea - Valentine Tea - Various rentals Patrons of Treitz Haus Treitz Haus - Access to permanent and temporary exhibitions - Target: 1 new temporary exhibition annually 100% Yes YES - Fundy Biosphere Exhibition Offer onsite programs and activities Target: At least 12 annually 158% Yes YES - Guided tours - School group program Sept-April (4 activities) - School group program May-June (7 choices) - Birthday party (4 programs) - Book launch (4) - Concerts (3) - Exhibition events (3) - Special events of note: Wings of Opportunity, Recovery Day, Heritage Fair Level of Service Page 8 of 47 Heritage and Cultre Heritage and Culture Resurgo Place Program ming and Education A public service provided to heritage and culture program participants offering engagement in activities of heritage and cultural significance. Patrons of Resurgo Place Heritage and culture programs as well as Learning Centre - Offer outreach programs and activities - Target: At least 12 annually 141% Yes YES - Education Kits (3) - Tidal Bore - Riverfront Walk - Resurgo on the Go! (6) - School Outreach - Senior Home Outreach - Festivals presence - Canada Day - Heritage Week - Doors Open Patrons of City Facilities Displayed Art - Display 65% of City of Moncton Art Collection in City facilities - Target: 95% of the time 100% Yes YES Level of Service Page 9 of 47 Cultur e To Provide a community based initiatives and activities that promote the vibrancy of our arts and culture sector, including operation of the new Resurgo Place and our heritage properties (Free Meeting House, Thomas Williams House, and Treitz Haus) Culture and Heritage Culture Culture Art Gallery Access and Collectio n Manage ment A public service provided to culture program participants offering engagement in activities cultural significance to Moncton. Patrons of City Hall Art Gallery Year round access to art Present Art exhibitions at the City Hall Gallery Target: At least 5 per year 100% Yes YES - Denise LeBlanc - Atlantic Arts Symposium - Jared Betts Culture and Heritage Visitor Information Visitor Informa tion Centre Visitor Informa tion A public service provided to tourists, visitors and citizens offering information about local and regional attractions, and activities as well as hospitality services with the aim to trigger a visit to the area, enhance visit satisfaction, prolong a visit or encourage a subsequent visit to Greater Moncton. Visitors looking for information on Moncton Year round access to visitor information by phone, email and in- person. - Access to visitor information booth (un-staffed) at Romeo LeBlanc International airport - Target: Restocked on a weekly basis 95% of the time 100% Yes Partially - Access to face-to-face visitor information service at Resurgo Place - Target: 6 days per week (with the exception of Statutory Holidays), except from Victoria Day to Labour Day 7 days per week 100% Yes Yes - Access to face-to-face visitor information service at Treitz Haus - Target: 7 days per week (June- August) 114% Yes Yes - Opened in May - Respond to voice messages within 1 business day - Target: 95% of the time 100% Yes Yes - Respond to e-mail request within 1 business day - Target: 95% of the time 100% Yes Yes Level of Service Page 10 of 47 Sustainable Growth and Development - Building Inspection Pillars Department Goals Departm ent Divisio n Service Name Sub Service Direct Customer Service Definition Service Component Current Service Level Percenta ge % of Target Achieved 2024- 2025 Percentag e % of Target Achieved 2023- 2024 Target Achieved 2023- 2024 Target Achieved 2022- 2023 Results / Comments Builder Residential - Single Family Dwelling applications issued within 5 business days - Target: 85% of the time N/A 35% No No Current reporting methods do not properly reflect the service being provded. The HAF project includes a new e-permiting system that will allow us to better track turnaround time. The numbers will better represent the service that is provided. Builder - Duplex Dwelling applications issued within 5 business days - Target: 85% of the time N/A 58.75% No No See explanation above Plumber - Plumbing applications issued within 5 business days - Target: 85% of the time N/A 89.91% Yes Yes See explanation above Level of Service Page 11 of 47 Economy Safeguard life, property, and public welfare by ensuring compliance with National Building Code, Building and Zoning By-laws in regard to the design, construction, and alteration of buildings and structures for the City of Moncton Planning and Buildin g Service s Buildin g Inspecti on Building and Plumbin g Permitti ng and Inspecti on - Plumbing Permits - Building Permits - Demolition Permits - Property Search - Electrical Waiver Homeowner To assist citizens, person and corporate, in preparing applications for building and plumbing permits that contain all required information. Permitting throughput time; time from application to issuance - Fence applications issued within 5 business days - Target: 85% of the time N/A 63% Fence / 71% Pools No Yes See explanation above Homeowner - Accessory Buildings applications issued withing 5 business days - Target: 85% of the time N/A 64% No No See explanation above Homeowner and Lawyer - Property Search completed within 5 business days - Target: 85% of the time N/A 78% No Yes See explanation above Electrician - Electrical Waiver Search completed within 2 business days - Target: 85% of the time N/A N/A N/A N/A See explanation above Commercial N/A - Multi- Unit Residential Apartment / Condo applications N/A 21% No No See explanation above Level of Service Page 12 of 47 Builder issued within 10 business days -Target = 85% of the time - School/Day- Care/Special Care applications issued within 10 business days - Target = 85% of the time N/A 52% No No See explanation above - Office applications issued within 10 business days - Target = 85% of the time N/A 33% N/A N/A See explanation above - Recreation applications issues within 10 business days - Target = 85% of the time N/A N/A Yes Yes See explanation above - Retail applications issued within 10 business days - Target = 85% of the time N/A 16.60% No No See explanation above Level of Service Page 13 of 47 Economy Safeguard life, property, and public welfare by ensuring compliance with National Building Code, Building and Zoning By-laws in regard to the design, construction, and alteration of buildings and structures for the City of Moncton Planning and Buildin g Service s Buildin g Inspecti on Building and Plumbin g Permitti ng and Inspecti on - Plumbing Permits - Building Permits - Demolition Permits - Property Search - Electrical Waiver Builder To assist citizens, person and corporate, in preparing applications for building and plumbing permits that contain all required information. Permitting throughput time; time from application to issuance - Restaurant applications issued within 10 business days - Target = 85% of the time N/A 50% No No See explanation above - Warehouse applications issued within 10 business days - Target =85% of the time N/A 0% No No See explanation above - Manufacturing applications issued within 10 business days - Target = 85% of the time N/A 25% N/A N/A See explanation above Economy Safeguard life, property, and public welfare by ensuring compliance with National Building Code, Building and Zoning By-laws in regard to the design, construction, and alteration of buildings and structures for the City of Moncton Planning and Buildin g Service s Buildin g Inspecti on Building and Plumbin g Permitti ng and Inspecti on Townhouse/Rowh ouse developments Builder To assist citizens, person and corporate, in preparing applications for building and plumbing permits that contain all required information. Permitting throughput time; time from application to issuance - townhouse/row house applications issued within 10 business days - Target = 85% of the time N/A 60% No No See explanation above Level of Service Page 14 of 47 Sustainable Growth and Development - Economic Development Department Goal Division Service Name Sub Service Direct Customer Service Definition Service Component Current Service Level Targ et Achi eved 2024- 2025 Targe t Achie ved 2023- 2024 Targe t Achie ved 2022- 2023 Targe t Achie ved 2021- 2022 Results / Comment To attract and retain businesses and investment, promote sustainable development and population growth to support a thriving and prosperous economy. Economic Development Business / Investmen t Attraction Information broker / customer service Businesses and Investors A public service provided to prospective businesses, promoting and raising the awareness / visibility and credibility of Moncton. In-mission to Moncton and business relocation or opening in Moncton. - Acknowledge client inquiry within 48 hours - Target: 95% of the time 100% Yes Yes Yes The economic development Linkedin page has more than 8,500 followers. For the period, there were over 376,000 impressions and 3,200 interactions. The economic development Instagram account has more than 3,400 followers. - Respond to client needs within 72 hours - Target: 95% of the time, depending on complexity of client request. 100% Yes Yes Yes Site selection Businesses and Investors A service to businesses / investors highlighting real estate, land holdings, property and / or lease opportunities. Client secures, rents, leases, purchases suggested site, land, building, tenancy, space. - Acknowledge client inquiry within 48 hours - Target: 95% of the time 100% Yes Yes Yes Sustainable Growth and Development has a housing pipeline of more than 50 residential and mix-use developments (based on projects currently approved or in planning stages). - Respond to client needs within 72 hours - Target: 95% of the time, depending on complexity of client request. 100% Yes Yes Yes Downtow n One Stop Shop Downtown information broker Downtown Businesses A public service provided to prospective businesses, promoting and raising the awareness of downtown Moncton as a choice location for investment. Provided information meets client's needs. - Acknowledge client inquiry within 48 hours - Target: 95% of the time 100% Yes Yes Yes Three companies have applied for the Commercial Bilingual Signage Program. - Respond to client needs within 72 hours - Target: 95% of the time, depending on complexity of client request. 100% Yes Yes Yes Administer Downtown and Heritage Financial Incentive Program Downtown Businesses A financial incentive program designed to bring forward more investment in the downtown. Eligible applications received and approved by Council. - Once all required information received, final decision on application completed within 45 days - Target: 95% of the time 100% Yes Yes Yes Economic Development has issued Downtown Financial Incentive Grants for a total of $2.12 million across 12 downtown projects. Business Retention and Expansio n (BRE) Support Concierge/customer service Existing Businesses A service targeted at existing Moncton businesses. We provide customer service to address identified issues, to connect businesses with resources to retain/maintain or expand their business in Moncton. Service touch point - Acknowledge client inquiry within 48 hours - Target: 95% of the time 100% Yes Yes Yes The Economic Development team responded to over 60 unique inquiries. - Respond to client needs within 72 hours - Target: 95% of the time, depending on complexity of client request. Yes Yes 100% Yes Level of Service Page 15 of 47 Immigration Immigratio n Connect immigrants to job opportunities; connect employers to workforce / talent Immigrants and Busines Owners A service connecting immigrants to available jobs in the community and a service to enable employers to access talent Immigrants secure employment. - Regular job fairs scheduled throughout the year - every 90 days - 90% of the time 100% Yes Yes Yes The Economic Development team hosted three job fairs, with 66 unique employers. Over 117 positions filled and over 4,700 attendees. People attraction - promote Moncton as a destination of choice for international newcomers / immigrants. Potential Immigrants A public service provided to non- residents, offering them access to information to better understand the unique value proposition and unique quality of life in Moncton in order to attract them to the City. Potential immigrants either visit Moncton for an exploratory visit or they make a final decision to move or relocate to Moncton. - Acknowledge client inquiry within 48 hours - Target: 95% of the time 100% Yes Yes Yes The Economic Development team hosted three major events for international student intergration. Provided information sessions at post-secondary institutions. - Respond to client needs within 72 hours - Target: 95% of the time, depending on complexity of client request. 100% Yes Yes Yes Municipal Emergency Measures Organization (MEMO) (Levels of Service to the Public) July 2024 - June 2025 Results Community Safety Pillar Department Goal Department Division Service Name Sub Service Direct Customer Service Definition Service Component Current Service Level Target Achiev ed 2024-2025 Target Achieved 2023- 2024 Target Achiev ed 2022- 2023 Target Achiev ed 2021- 2022 Results / Comment Social Ensure the Corporation is prepared for any Emergency by executing and testing our Emergency Management Plans, and ensuring our citizens are properly informed MEMO N/A Municipal Emergency Measures Organization Emergency / Disaster Recovery Planning Community An internal service provided to the Corporation offering emergency and / or disaster recovery planning, coordination, temporary shelter, and monitoring. Increase safety in crisis or disaster situations - Tri-Community All Hazard Plan reviewed annually Yes Yes Yes Yes Revised Plan to be braught to council in fall of 2025 - Hazard specific Plans reviewed every two years Yes Yes Yes Yes Revised the Do Not Consume Plan Municipal Emergency Measures Organization Emergency Management Plan Testing Community An internal service provided to the Corporation offering emergency and / or disaster recovery planning, coordination, temporary shelter, and monitoring. Increase safety in crisis or disaster situations - Participate in annual Provincial Emergency Exercise No No No No No longer offered - Carry out table top exercise annually Yes Yes No No May 2025 Municipal Emergency Measures Organization Emergency Management Plan Response Monitoring Community An internal service provided to the Corporation offering emergency and / or disaster recovery planning, coordination, temporary shelter, and monitoring. Increase safety in crisis or disaster situations - Emergency Command Centre (ECC) operational during emergencies when requested by the City's Director of Emergency Measures - Target: ECC operational within an 1 hour of notice of activation Yes Yes Yes Yes Activated at the Monitoring level a few times but no full activation required. Level of Service Page 16 of 47 Protective Services - Fire Pillar Department Goal Departmen t Division Service Name Sub Service Direct Customer Service Definition Service Component Current Service Level Target Achieved 2024- 2025 Target Achieve d 2023- 2024 Target Achieve d 2022- 2023 Results / Comment Social Ensure that the City of Moncton is a safe community by protecting the life and property of its citizens via the various Fire Department services Fire Fire Preventio n Fire Safety Educati on Fire Safety Campai gn Public Public service provided to students (young & old) interested in fire prevention by offering training and awareness session. Education - One annual open house - Fire Prevention Week Yes Yes Yes Fire Fire Preventio n Fire Safety Educati on Fire Safety Awareness Public and Schools Public service provided to students (young & old) interested in fire prevention by offering training and awareness session. Education - Provide 10 sessions annually - upon request Yes Yes Yes Fire Fire Preventio n Fire Safety Inspecti on Inspection - Residential Homes Property Owners Public service provided to property owners and building occupants offering compliance with National Fire Codes. Inspections - Provide home inspection upon request - Target: 95% of the time Yes Yes Yes Fire Fire Preventio n Fire Safety Inspecti on Inspection - IC&I Buildings Schools, daycares, special care homes Public service provided to property owners and building occupants offering compliance with National Fire Codes. Inspections - Schools, colleges, universities, daycares and special care homes are inspected annually - Target: 100% of the time No No _ Requested to PNB for funding to hire addtional staff. The province is looking at 2026. Hospitals - Hospitals are inspected every three years - Target: 100% of the time No No _ Requested to PNB for funding to hire addtional staff. The province is looking at 2026. Ensure that the City of Moncton Fire Operations Fire Rescue Fire Suppression Property Owners Public service provided to incident victims and their families, property owners, and insurance companies offering mitigation of a life/property threatening incident. Extinguish / control fires - Turn Out Time of 80 seconds or less - Target: 90% of the time Yes Yes Yes - Travel time of 240 seconds (4 mins) or less - Target: 90% of the time Yes Yes Yes Fire Operations Fire Rescue Haz Mat Response Mitigation Everyone Public service provided to incident victims and their families, property owners, and insurance companies offering Control substance or assist other response team(s) - Turn Out Time of 80 seconds or less - Target: 90% of the time Yes Yes Yes - Travel time of 240 seconds (4 mins) or less - Target: 90% of the time Yes Yes Yes Level of Service Page 17 of 47 Social is a safe community by protecting the life and property of its citizens via the various Fire Department services mitigation of a life/property threatening incident. Fire Operations Fire Rescue Medical Fire Responder Care People in distress Public service provided to incident victims and their families, property owners, and insurance companies offering mitigation of a life/property threatening incident. Basic life support - Turn Out Time of 80 seconds or less - Target: 90% of the time Yes Yes Yes - Travel time of 240 seconds (4 mins) or less - Target: 90% of the time Yes Yes Yes Fire Operations Fire Rescue Rescue Everyone Public service provided to incident victims and their families, property owners, and insurance companies offering mitigation of a life/property threatening incident. Extraction from vehicle / building - Turn Out Time of 80 seconds or less - Target: 90% of the time Yes Yes Yes - Travel time of 240 seconds (4 mins) or less - Target: 90% of the time Yes Yes Yes Community Services - Magnetic Hill Zoo and Park Pillar Department Goal Department Division Servi ce Nam e Sub Service Direct Custome r Service Definition Service Component Current Service Level Target Achieved 2024 2025 Target Achieved 2023 2024 Target Achieved 2022 2023 Results / Comment Economy To build a sustainable and financial plan that responsibly balances the nessescity of staff, animal and visitors Magnetic Hill Zoo and Park Magnetic Hill Zoo Magne tic Hill Zoo Admissions, Guest Service, Retail, Activities Zoo patrons A public service to ensure all customer service needs and services are met during their visit. Customer Service - Provide excellent customer service - Target: 90% of patrons surveyed are either "completely" or "mostly" satisfied with the service received (July and August) 91.39 96.7% 96.44 - Visitors consistently noted the friendliness and helpfulness of staff, which contributed positively to their overall experience - At the same time, feedback highlighted opportunities to improve service levels in busy areas such as the bistro and gift shop to better meet demand Schoo l childr en - Provide educational and fun school visits for ages 5-16 - Target: 90% of children surveyed are either "completely" or "mostly" satisfied with their group visit experience. 95% 95% NA - Feedback from parents & teachers continues to be that they would like more school offerings including field trips & behind the scenes experiences Level of Service Page 18 of 47 Envirome nt To remain Atlantic Canada leading zoo that educates and inspires conservation action Magnetic Hill Zoo and Park Magnetic Hill Zoo Magnet ic Hill Zoo Educati on Progra ms Experie nce progra ms A public service provided, in both official languages, to inspire participants with an educational activity that encourages an appreciation of animals and inspires conservation action. Educational Services - Provide educational and fun behind the scene or exclusive experience programming - Target: 90% of participants surveyed are either "completely" or "mostly" satisfied with their experience 94.5% 100% 100% - Our behind-the-scenes programs continue to receive excellent feedback - These experiences offer visitors a unique opportunity to learn more about the animals, see how we care for them, and engage with our mission of inspiring connections to nature - Due to their success, we expanded the offerings in 2024 by introducing a new program, Pizza for the Primates, which has been a huge success Summer camp patrons - Provide educational and fun summer camps for ages 5-16 - Target: 90% of parents surveyed are either "completely" or "mostly" satisfied with their children camp experience 100% 96.4% 92.8 - We received excellent feedback on our 2025 summer camps, which reached full capacity, and we are exploring opportunities to expand in the future Zoo Standards Animals / Patrons / Employ ees A public service to enrich the lives of our animals and to provide visitor experiences that inspires a connection to and action for nature. Healthy animals / inspired patrons and employees - Meet Province of NB and Canada's Accredited Zoos and Aquariums (CAZA) standards - Target: *100% of the time 100% - Visitors continue to share that animal care is an important part of their overall experience - Many commented that the animals appeared healthy, well looked after, and that interactions such as feeding opportunities and behind-the-scenes programs added great value - Some feedback pointed to opportunities for improvement, including requests for larger or more enriched habitats for certain species, improved ventilation in animal buildings, and clearer signage with more animal information (e.g., names, ages, and behaviors) Economy To build a sustainable and financial plan that responsibly balances the management of the park and the safety of our guest and partner Magnetic Hill Zoo and Park Magnetic Hill Park Magne tic Hill Park Admission s, Guest Service Patrons A public service to ensure customer needs and services are positive. Customer Service - Provide excellent customer service - Target: 90% of patrons surveyed are either "completely" or "mostly" satisfied with the service received 77.61 92.86 92.16 - Just over 22% of visitors to the Hill reported being less than fully satisfied, with approximately 10% expressing dissatisfaction - Key factors included limited clarity around the illusion itself, challenges with traffic flow, and confusing signage - We are developing an improved operational plan to address these issues for the 2026 season Magne tic Hill Park Partners of Magnetic Hill Park Tenant A public service provided for the efficient management ensure tenants conformity to contract agreement and City of Moncton policies and directives. Provides services necessary for visitor safe access to sites Satisfied tenants Magic Mountain: - Address known issues, within contract, with tenant within 5 business days - Target: 90% of the time YES Yes Yes - Tenants expressed their appreciation for having the Visitor Information Centre on site this past summer and are eager to continue future collaboration discussions - Ongoing discussion topics include Magnetic Hill Park marketing, traffic flow within the park, and safety and security considerations Tenant Wharf Village: - Address known issues, within contract, with tenant within 5 business days YES Yes Yes Sustainable Growth and Development - Moncton Industrial Development Level of Service Page 19 of 47 Pillar Department Goal Department Division Service Name Sub Service Direct Customer Service Definition Service Component Current Service Level Target Achieved 2024- 2025 Target Achiev ed 2023- 2024 Target Achiev ed 2022- 2023 Target Achiev ed 2021- 2022 Results / Comment Econo my Ensure the City of Moncton has a fully diversified economy that is supported by development and investment in our industrial parks Moncton Industrial Develop ment Limited (MID) N/A MID An Act to Incorporat e the Moncton Industrial Developme nt Limited (1959) Future Businesses MID's primary functions are to acquire by purchase or otherwise lands in the City of Moncton, New Brunswick, with a view to the development of the same as sites for the establishment of industries thereon and to sell, lease or otherwise deal in or with the same; to provide services such as power, water, sewerage, roads and other amenities used or useful in connection with such lands or in connection with the operations of the Company or those of the occupiers of such lands; to acquire by purchase, lease, exchange, concession or otherwise, any description of real estate and real property or any interest and rights therein, legal or equitable or otherwise howsoever; to take, build upon, hold, own, maintain, work, develop, sell, lease, mortgage, exchange, improve or otherwise deal with in any manner and dispose of such lots, lands, sites, real estate and real property or any interest therein, to deal with any portion of the lands and property so acquired, subdividing the same into building lots, and generally laying out the same into lots, street and building sites for industrial purposes; and, to do all such acts, matters or things as may be deemed desirable to encourage the promotion, expansion and Industrial land developmen t - To provide an adequate level of serviced land inventory to meet current and future market demands ensuring we have an appropriate level of inventory - approx. - Target: 5-7 years worth of a minimum of 190 acres (75 hectares) of serviced land inventory Yes Yes Yes Yes Above average sales continued throughout the year with MID challenged to maintain adequate inventory of serviced lands. The construction of Harrisville Logistics Park adds an additional 120 plus acres to our inventory and the development of MIP West phase 2 will add another 250+ acres of saleable lands in the coming years. A small and final expansion of Caledonia was completed in summer 2024 creating an additional 40+ acres for industrial development. - To continually assess current and future land development opportunities within the City limits - Target: Review available land on a quarterly basis Yes Yes Yes Yes Harrisville Logistics Park is now completed opening 124 acres (with 13 acres previously sold). MIP West phase 2 is now underway with West Main traffic circle combined sanitary and storm sparation and sanitary upgrades and the Millner Trunk sanitary upgrades designed and ready to be tendered.. A future industrial park development study was completed with a land assembly totaling 180 acres already completed with an additional 200 acres to be added for future development. City of Moncton Industrial land sales and grant revenues - To generate an average tax base growth of $23Million per year within the parks (based on a 5- YR rolling average) 100% 100% 100% 100% 5-Year Rolling AVG = $32.1 Million - To generate an average of 38 acres of land sales per year (based on a 5-YR rolling average) 100% 100% 100% 100% 5-Year Rolling AVG = 68.28 acres - To generate incremental tax revenues of $1.1Million per year (based on a 5-YR rolling average) 100% 100% 100% 100% 5-Year Rolling AVG = $2.560 Million - To generate total revenues (land sales and incremental tax grant combined) of $2.2Million per year (based on a 5-YR rolling average) 100% 100% 100% 100% 5-Year Rolling AVG = $5.340 Million Level of Service Page 20 of 47 diversification of industrial activity within the City of Moncton. Protective Services - Southeast Regional Service Commission Mosquito Control Pillar Departme nt Goal Commis sion Divisio n Service Name Sub Service Direct Customer Service Definition Service Component Current Service Level Target Achiev ed 2025 Targe t Achiev ed 2024 Targe t Achiev ed 2023 Targe t Achiev ed 2022 Results / Comment Monitor larvae densities on a 10 to 14 day rotation within the Tri- Community Number of larvae (per 250 ml sample) - Monitor public land sites (approx. 200 sites) every 7- 14 days - Target = 100% of the time 95% 95% 100% 100% In alignment with the continued shift toward prioritizing Integrated Mosquito Management (IMM - a subset of the Integrated Pest Management framework) within the SERSC Mosquito Management Program (Mosquito360), the historical "routine" surveillance schedule (~10 days) was slightly modified in 2025 to reflect a more data-driven approach. Surveillance parameters were adapted not only to staffing realities but also to take advantage of new technologies, particularly the novel drone-based monitoring introduced in 2024. As a general principle, the 10-day window remains a solid baseline, as it reflects typical larval development cycles under moderate environmental conditions and across multiple species. In practice, however, larval development varies significantly depending on temperature, habitat class, rainfall events, and species composition. Accordingly, monitoring operations were, and continue, to be refined to reflect site-specific productivity. For 2025, this meant prioritizing "site classes" identified as higher-risk or more productive, with the intent of advancing to location-specific monitoring for 2026 and beyond. In this model, high-priority sites were sampled more frequently, while the 10-day interval continue to serve as the general reference standard (with 7 days being a frequent during periods where smaller, more accessible sites, were prioritized due to weather and other external factors - such as the fire bans). Level of Service Page 21 of 47 Environ ment Mitigate the potential spread of arbor- viruses as well as ensure that residents of the Tri- Southea st Regional Service Commis sion Mos quit o 360 Mos quit o Cont rol Citizens and Tourists A Tri- Community service provided to residents offering a mosquito control Continuing from 2024,field operations were conducted with a crew of four Field Technicians, supported by drone operations. As field dynamics can change dramatically from season-season, an additional Field Technician may be added to help support operations moving forward. In terms of site monitoring and treatment volume, a total of 1,184 site observations were conducted (plus additional drone scans and applications) - this being in line with previous coverage (a slight increase - likely due to more frequent rotation through some of the more accessible sites noted above during certain windows). Non-wetland sites such as retention ponds, parks, schools, and trails continued to be monitored per established protocols. Wetland sites were assessed through a hybrid model that combined drone surveying with direct, on-foot sampling. In both cases, monitoring parameters were expanded to include higher-resolution data, with increased dip counts, vegetation surveys, predator observations, and baseline soil assessments, in addition to existing water-quality sampling. These enhancements reflect a gradual integration of wetland-specific assessment protocols. In support of this, the program supervisor completed both Wetland Delineation and WESP-AC (Wetland Ecosystem Services Protocol - Atlantic Canada) certifications in 2025, which will further strengthen monitoring practices moving forward. As referred to above, it is also important to note that widespread August wildfires and the associated restrictions, restricted access to many wooded and wetland sites, preventing their inclusion in routine surveillance and treatment rotations. As a result, the program achieved ~95% of its monitoring coverage target for the season. Apply biological insecticide (Bti) Larvicide(Bti) Insecticidal applied - Apply biological insecticide when potential active breeding sites are identified or when larvae are present within a water sample. - Target = 100% of the time 100% 100% 100% 100% Larvicide was applied at all sites where larvae were positively identified. As noted in last year's results, the Mosquito360 program has now effectively fully transitioned away from using Argos for wetland access and treatment (two Argo's are maintained for potential use for specific use-cases but are not part of standard practices). This decision was based on multiple factors, including operating and capital costs, ecological impacts, and the recognition that Argo track depressions themselves created non-trivial amounts of stagnant water that contributed to mosquito breeding. These functions have now been replaced with a drone-based wetland management approach. Because 2025 was the first spring in which drone technology was deployed, some challenges were encountered during the early part of the season. Chief among these were regulatory restrictions tied to the Special Flight Operations Certificate (SFOC), particularly weather-related limits such as maximum wind tolerances. As a result, supplementary foot treatments were occasionally required (with Argos still excluded from regular wetland use), however adult trap counts remained extremely low during this window - with total adult capture for May being >200, indicating supplementary treatment was effective in regards to subsequent adult activity). Fortunately, in response to accumulating data from drone programs such as ours, Transport Canada made significant regulatory changes of which will came into effect in November 2025. Under the new rules, drones carrying payloads under 150 kg can operate without an SFOC (up from the previous, much more restrictive, 25 kg threshold). This adjustment is expected to greatly expand operational flexibility, reduce time constraints, and create opportunities for efficient scaling of larvicide operations, if required, and generally mitigate the challenges posed in 2025. Turning to site treatment conditions, precipitation in 2025 was approximately 16% lower than in 2024 (which itself had seen a 40% decline from 2023). These reductions resulted in widespread desiccation of wetlands, particularly in Level of Service Page 22 of 47 Communi ty (Rivervie w, Moncton, Dieppe) experienc e reduced nuissance levels from mosquito es program to reduce the local mosquito populations (from late- April to early- September). June, most of July, and throughout August and September. The 2025 season marked both the driest summer in the past decade and the longest continuous drought period on record for the program's target area. These dry conditions extended to both wetland and non-wetland sites. As a result, general surveillance - including a significant increase in species identification and habitat mapping - became a more dominant focus of operations than direct larvicide treatment. Combined with the program's continued emphasis on targeted rather than high-intensity larviciding, this shift led to a further proportional reduction in larvicide use during 2025. Whether this decline represents a sustained trend remains uncertain. The program's revised treatment approach suggests larvicide volumes should remain lower than historical norms; however, increasingly extreme seasonal weather patterns could also bring very wet years that would once again drive usage upward. Monitor larval densities post biological insecticide application Number of larvae (per 250 ml sample) - Monitor results within 48 hours of application - Target = 100% of the time 100% 100% 100% 100% Post-treatment monitoring in 2025 followed the same approach as in 2024. Pre-treatment larval densities averaged 3.69 larvae per 250 mL, while post-treatment counts dropped to 0.09 larvae per 250 mL - a reduction of approximately 97.6%. As in previous years, these results are consistent with the established efficacy of Bacillus thuringiensis israelensis (Bti), as documented in external studies and reference literature. It should be noted, however, that- as in 2024 - the prolonged lack of standing water across most site classes may have influenced the averages, as larvae were concentrated into smaller pockets of water at higher densities. A potentially important consideration moving forward is the relative dominance of Coquillettidia perturbans , as noted below under trapping. According to the literature, Cq. perturbans larvae differ from most species by avoiding the surface water channel. Instead, using a specialized siphon structure to tap into the root systems of aquatic vegetation to access oxygen. As a result, these larvae are difficult to sample with standard dipping techniques, making adult trap counts a more reliable metric of their activity. Furthermore, because Bti is most active in this same upper water column, its efficacy against Cq. perturbans is limited, as supported by scientific studies on this species, and may require modified approaches for effective management. Level of Service Page 23 of 47 and other (aquatic- larvae) biting flies. Adult mosquito trapping Number of mosquitoes per trap - Monitor results weekly, identify the flying adults - Target: Maintain adult-count trends from prior season(s), taking into account seasonal temperatures and precipitation. Yes Yes Yes Yes Trapping and associated identification saw some of the most significant improvements in 2025 compared to prior years. The addition of a dedicated Surveillance Technician, with previous experience in both mosquito identification and trapping, enhanced both the trapping process and specimen identification within the program. Field-trapping data collection was also expanded to include additional environmental parameters such as wind speed, humidity, and air temperature, recorded at deployment, midnight, and pickup. Additionally, when suitable larval habitat was present within range of deployed traps, larval sampling was incorporated into the trapping framework. Otherwise, trapping frequency (twice weekly) was maintained, and the overall number of sites remained consistent with 2024 (~22 sites). Although additional trap locations were added early in the season, the total was eventually reduced back to 2024 levels due to the significant time commitment required to maintain a statistically meaningful volume of specimens identified, via microscopic speciation (based on current program goals and cost-factors, microscopsic identificaiton will continue to be the preferred methodology; as opposed to more resource intensive approaches like molecular analysis). Looking at trap counts, which remain one of the best indicators of adult abundance and nuisance activity, the comparison of sites consistent between 2024 and 2025 showed a total of 6,610 adults trapped in 2025 - the program's lowest recorded seasonal count. This represented a 43% decrease from 2024, which had itself shown a 63% decline from 2023. Across all trapping sites (including new locations), a total of 9,810 adults were trapped in 2025, a 14% decrease compared with 2024's total trapping count (all sites included). Continuing the trajectory from 2024, the 2025 season again reflected relatively low adult activity. This reduction was very likely the combined result of targeted larval control and extreme climatic conditions that limited larval habitat availability. Looking at speciation efforts in 2025, over 2,000 individual specimens were speciated (genus and species confirmed) by Mosquito360; with additional species data from over 6,000 specimens also being compiled from Acadia University - including data from 2023 and 2024. It should be noted that these data sets cover the broader Maritime region, with a subset being specific to the Tri-community area (including Centennial Park). In keeping with IMM principles, building a foundation of high-resolution species data is critical for treatment and surveillance planning. Mosquito populations vary widely in habitat preference, dispersal range, nuisance level, and treatment susceptibility, so management strategies should account for these factors, including the timing and frequency of larvicide applications. Of those 2,000+ individuals identified in 2025 within our region, 33 unique species were identified, including aggressive human biters such as Cq. perturbans, which were largely dominant in terms of their numbers (< 80% of the catch - and while this could be a result of some degree of sampling bias, individuals are selected at random for identification so dominance is well supported). This species is noted for the challenges they pose in terms of treatment, including resilience to Bti-based treatments approaches highlighting the potential need for further research and consideration of alternative management strategies if if their numbers continue to trend as seen in 2025. Level of Service Page 24 of 47 Educate general population Educated population - Community visit, Web site, GeoPortal, Handouts Implem ented (Ongo ing) Parti ally (Ongoi ng) In- Progre ss Partial ly 2025 saw some significant advancements on the education and outreach front. A dedicated Mosquito360 webpage, developed with support from HAWK Marketing, was launched to provide a clear landing point for residents seeking information about the program. The webpage is currently live and undergoing a final review before the addition of supplemental resources on mosquito breeding, treatment approaches, prevention strategies, and related educational materials are amended as additional webpage tabs. These updates are scheduled for release in October, and the site will continue to be built-upon to ensure residents have access to relevant information. In addition, the SERSC's GeoPortal now includes a live Mosquito GeoPortal. To date, this tool has primarily served as an internal resource, providing valuable datasets such as delineated wetland boundaries, watercourses, flood zones, and other geographic features that support site identification and management. However, as this GeoPortal continues to be developed for the public user, it will function as a more comprehensive landing area for more data- driven program information (as opposed to the website, which is more broadly informational). This will allow us to tie in data, such as documented species composition, and the associated mosquito behaviours, such as most active peak biting activity, preferred host and habitat, etc., to be tied into a with a visual-spatial tool (interactive map), which may include other information such as adult counts, etc. Public outreach was also carried out at SERSC-participated events during summer 2025. In parallel, a broader wetland education program was developed in collaboration with curriculum specialists and Department of Environment wetland biologists, designed for delivery to school and community groups (targeting grades 4-12). Furthermore, to increase general awareness of Mosquito360's role, a mail-out program was launched, which delivered pamphlets to every household in Moncton. These materials focused on the question: "What can I do on my own property?" with practical guidance for reducing breeding habitat. As in 2024, digital communication was also maintained, with an active social media campaign in circulation to keep residents informed about mosquito-control operations, including drone applications. The SERSC's communication department also rolled out a 'Mosquito Monday' program, which included various posts that provided all sorts of insights into Mosquito360 operations (where, why, when, how, etc.), this included a World Mosquito Day video, which was also shared by the AMCA's social media (American Mosquito Control Association) team. Communication remains a core pillar of the IMM approach and will continue to be prioritized. These efforts not only provide transparency around program operations but also empower residents to play a role in reducing local breeding sources - particularly stagnant water on private property, which falls outside direct program control. Operations Services - Parks Pillars Department Goals Department Division Service Name Sub Service Direct Customer Service Definition Service Component Current Service Level Target Achieved 2024-2025 Target Achieved 2023-2024 Target Achieved 2022-2023 Results/Comments Lawn Maintenance - All areas should be serviced weekly from May until Thanksgiving No No Achieved target 76% of the time when fully staffed with students from May until September. From September 1 to Thanksgiving, Level of Service Page 25 of 47 To contributes at improving the quality of life for the citizens of Park and Open Space Maintenance - Trails - Horticultural - Turf - Playground Equipment - Garbage Collection - Boulevards - Facility Grounds - Environmental Corridors Parks Users Citizens and Residents Class A Parks (High traffic parks: Regional Parks, Riverfront, Municipal Facilities etc) we are staffed at 25% of our summer compliment Horticultur e Maintenan ce - Service weekly as required (ex: Weeding, Edging, and Mulching) May until Thanksgiving No No Target is met 62% when fully staffed with students from May until September. From September 1 to Thanksgiving, we are staffed at 25% of our summer compliment Waste Collection - Waste collection shall be twice weekly during the summer season or more as required - Target: 95% of the time No No Achieved target 93% of the time Class B Parks (Neighbourhood parks: Lewis Park, Gagnon Park, Knox Park etc) Lawn Maintenance - All areas should be serviced weekly from May until September and then bi-weekly until Thanksgiving No No Target is met 68% when fully staffed with students from May until September. From September 1 to Thanksgiving, we are staffed at 25% of our summer compliment. Horticultur e Maintenan ce - Service bi-weekly as required (ex: Weeding, Edging, and Mulching) May until Thanksgiving No No Target is met 42% when fully staffed with students from May until September. From September 1 to Thanksgiving, we are staffed at 25% of our summer compliment. Waste Collection - Waste collection will be a minimum of once weekly or more as required - Target: 95% of the time No Yes Achieved target 91% of the time Class C Parks (Boulevards, and city owned land with limited fixtures) Lawn Maintenance - All areas should be serviced bi-weekly from May until September and then on demand until Thanksgiving No No Target is met 70% when fully staffed with students from May until September. From September 1 to Thanksgiving, we are staffed at 25% of our summer compliment. Waste Collection - Waste collection will be a minimum of once every 2 weeks or more as required - Target: 95% of the time No Yes Achieved 91% of the time A public service provided to ensure safety in our parks Grounds & Playground Maintenance - Play equipment - Meet CSA standard CAN/CSA Z614:20 A Standard for Children's Playround Equipment and Surfacing for annual, monthly and weekly inspections No Yes Annual 99% / Monthly 83% Athletic Fields Services Athletic Field Users Athletic Fields Athletic Field Maintenance - Maintain safe playing fields. Report on conditions daily during operating season. Yes Yes Conditions reported for Baseball, Softball and Multi-Use Fields reported daily. Winter Operations - All level 1 areas are to be cleared within a 24 hour period - Target: 90% of the time Yes Yes Snow removal operations completed within target for 17 major snowfall events during the period. Level of Service Page 26 of 47 Culture Moncton with recreational and athletic facilities that foster wellness and healthy living, and invest in parks, trails and green spaces planting and preservation. Operatio ns Parks Park and Open Space Access Winter Park Services Trail Users Winter Services A public service provided to ensure safety and enjoyment of our trails - Snow removal Winter Operations - Snow removal - All level 2 priorities will be cleared within 48 hours - Target: 90% of the time Yes Yes Snow removal operations completed within target for 17 major snowfall events during the period. Winter Operations - Snow removal - All level 3 priorities will be cleared within 72 hours - Target: 90% of the time Yes Yes Snow removal operations completed within target for 17 major snowfall events during the period. Winter Operations - Sanding and Salting - Following snow event: All level 1 priority areas are to be sanded/salted within a 24 hour period - Target: 95% of the time Yes Yes Snow removal operations completed within target for 17 major snowfall events during the period. Winter Operations - Sanding and Salting - Following snow event: All 2 priority areas will be sanded/salted within 48 hours - Target: 95% of the time Yes Yes Snow removal operations completed within target for 17 major snowfall events during the period. Winter Operations - Sanding and Salting - Following snow event: All level 3 priority areas will be sanded/salted within 72 hours - Target: 95% of the time Yes Yes Snow removal operations completed within target for 17 major snowfall events during the period. Trail Maintenance - All Surfaced Trails /Footpaths inspected annually with repairs and pruning done as required - Target: 95% of the time Yes Yes 61 of 62 trails, 98% compliance. Rink Users A public service provided to ensure safety and enjoyment of our rinks Winter Operations - Outdoor Rinks Report ice conditions daily during operating season Yes Yes Conditions for Kaboom Rink, Ian Fowler Oval, Mapleton Park Outdoor Rink, Muskrat Skating Trail and Victoria Park Outdoor Rink reported daily for the season. Level of Service Page 27 of 47 Ski Users A public service provided to ensure safety and enjoyment of our ski trails Ski Trail Operations Report trail conditions daily during operating season Yes Yes Conditions for Ski Trails reported daily for the season. Arboriculture Services Residents and Citzens A public service provided to citizens and residents, for planting, establishment and maintenance of trees. Tree Planting - All trees planted during optimal planting season with a mortality rate of less than 6% during warranty period - Target: 90% of the time No No 357 trees planted in 2023, 32 warranty replacements (16 due to nursery stock failure) with 9.1 % mortality overall, if excluding nursery stock failure 4.5 % mortality. Street clearance - Maintain street canopy at 14 feet of clearence - Target: To be determined based on demand - see comment Yes Yes 175 requests, 174 resolved - 99% target achieved. Sidewalk clearance - Maintain sidewalk canopy at 8 feet of clearence - Target: To be determined based on demand - see comment Yes Yes 56 requests for Canopy clearing, 51 resolved - 91% target achieved Stump removal - Stump removed within growing season - Target: 90% of the time Yes No Total of 157 removals completed Sustainable Growth and Development - Planning and Development Pillar Department Goal Departm ent Division Service Name Sub Service Direct Customer Service Definition Service Component Current Service Level Target Achieved 2024- 2025 Target Achieved 2023- 2024 Target Achieved 2022- 2023 Target Achieved 2021 2022 Results / Comment Cultur e Implement Heritage Conservation Strategic Plan Heritage Conservati on Heritage Conservati on Heritage Permit Applicatio ns Homeowner To administer the City's Heritage Conservation By- law and process Heritage Permit applications and conduct inspections. Heritage Permit Applications Turnaround Time - Heritage Permit Applications processed within 4 to 6 weeks - Target: 80% of the time 82.76% 100% Yes Yes - Further adjustments required in the tracking system to more precisely track only the time within the department's control and avoid adding the time spent waiting for information beyond the department's control. - 82.76% (28 out of 29) of applications were processed in accordance with desired Service Levels. Heritage Grant Administr ation Applicant To administer the City's Heritage Grant Policy and process Heritage Grant applications. Grant Applications Turnaround Time - Grant Applications processed within 4 to 6 weeks - Target: 80% of the time 90% 93% Yes Yes 90% of applications were processed in accordance with desired Service Levels. The average processing time for applications was 2-3 weeks. Variations in processing times are largely due to when an application is filed relative to the next Heritage Commitee Board meeting, which occur monthly. Level of Service Page 28 of 47 Econo my Guiding the city's growth and development in a sustainable matter that takes into consideration the city's environmental, social, cultural and economic goals and objectives. Planning and Buildin g Service s Land Use Planning Municipal Plan Municipal Plan Develop ment Community Prepare and administer the City's Municipal Plan, Secondary Municipal Plans, Zoning By-law, Subdivision By law, Controlled Access By-law. Land Use Plans and Regulations Reviewed and Established Municipal Plan is reviewed and updated every 10 years. Yes Yes Yes Yes The last Municipal Plan review was completed in 2014. The Municipal Plan and Zoning By-Law review has been initiated and the RFP awarded to WSP in 2024. Review is on-going. Zoning By- Law Ensuring Zoning By- law Compliance Community To Ensure that Properties and Land use is in accordance with Zoning By-laws. Process Service Requests for Zoning By-law Complaints and Violations. - Process Service Request Violations within 4 to 6 weeks and achieve approved compliance plan - Target: 80% of the time 80% 75.0% No No - 80% achieved compliance within the 4-6 week turnaround time. Zoning Certificat es Issuing Zoning Certificat es Applicant Process Zoning Compliance and Zoning Confirmation letters required for legal / real estate transactions confirming details on property, including whether or not they are in compliance with City of Moncton by- laws. Zoning Certificates Turnaround Time. - Zoning Certificates Applications processed within 2 business days - Target: 80% of the time 75.68% 83.3% Yes Yes - Further adjustments required in the tracking system to more precisely track only the time within the department's control and avoid adding the time spent waiting for information beyond the department's control. - 75.68% (196 out of 259) Zoning Certificates were processed in accordance with approved Service Levels. The average processing time is 1.75 days. - Zoning Certificates did not meet expected Service Levels. Applicant Zoning Agreement Inspected for Compliance - Conditional Zoning Agreements inspected for compliance within 12 months of development permit approval - Target: 90% of the time 85% 42% Yes Yes Further adjustments required in the tracking system to more precisely track only the time within the department's control and avoid adding the time spent waiting for information beyond the department's control. Staff have been monitoring rezoning agreements and resolutions within the 12 month period. The department has shifted towards having Rezonings undertaken by resolution of Council, which has reduced Level of Service Page 29 of 47 the amount of Condtional Zoning Agreements moving forward. Level of Service Page 30 of 47 Developme nt Approval Rezoning Rezoning Application Administrati on Applicant Process Municipal Plan and Zoning By- law amendments (Rezoning applications). Application-to-Approval Turnaround Time - Rezoning Applications processed within 6 months - Target: 80% of the time 57.14% 39.3% Yes Yes - Further adjustments required in the tracking system to more precisely track only the time within the department's control and avoid adding the time spent waiting for information beyond the department's control. - avergae turn around time was 198.90 days. 6 out of 28 were over 6 months. - Infor system reporting improvements are being explored to better reflect the rezoning process (i.e. application type, timelines, milestones. - Transition from Conditional Zoning Agreements to resolution of Council (where possible) has assisted in streamlining this process. Econo my Guiding the city's growth and development in a sustainable matter that takes into consideration the city's environmental, social, cultural and economic goals and objectives. Planning and Buildin g Service s Developme nt Approval Subdivisio ns Subdivision Applicatio n Approval Applicant Subdivision Plan Approval Type 1 Tentative Subdivision Application Approval Turnaround Time. - Type 1 Tentative Subdivision Applications processed within 2 weeks - Target: 80% of the time 64.06% 43.6% No No - Further adjustments required in the tracking system to more precisely track only the time within the department's control and avoid adding the time spent waiting for information beyond the department's control. - 64.06% (41 of 55)Type 1 Subdivision Applications were processed in accordance with approved Service Levels. - The average number of days to process Tentative Subdivision Approval was 218.63 days). Type 1 Subdivisions require Council approval, which can extend beyond the 10 work day turnaround. Staff vacation also affects turnaround timelines for a handful of Type 1 Subdivision applications Applicant Type 2 Tentative Subdivision Application Approval Turnaround Time. - Type 2 Tentative Subdivision Applications processed within 6 weeks - Target: 80% of the time 56.25% 46.2% No No - Further adjustments required in the tracking system to more precisely track only the time within the department's control and avoid adding the time spent waiting for information beyond the department's control. - 56.25% (9 out of 16 applications)Type 2 Subdivision Applications were processed in accordance with approved Service Levels. - The average number of days to process Tentative Subdivision Approval was 654.78 days). Applicant Development Approval Inspected for Compliance - Planning Advisory Committee (PAC) applications inspected for compliance within 12 100% 86% Yes Yes 100% of all PAC applications were monitored for compliance. Many files can take multiple years to achieve full compliance (i.e. apartment buildings, Level of Service Page 31 of 47 PAC Application PAC Applicatio n Administra tion Planning Advisory Committee (PAC) Application Approval months of development permit approval. - Target: 90% of the time multiple buildings etc.) and are reviewed monthly to see what progress has been made. Applicant Application-to-Approval Turnaround time - PAC Application-to- Approval processed within 4 to 6 weeks - Target: 80% of the time N/A 86% Yes No - Further adjustments required in the tracking system to more precisely track only the time within the department's control and avoid adding the time spent waiting for information beyond the department's control. - Planning Advisory Committee (PAC) Applications were processed in accordance with approved service levels. The average application is processed in 9.17 days. A further review is proposed to accurately reflect the time taken from initial site plan review to the decision of PAC. Developm ent Permit Development Permit Administrati on Applicant Development Permit Approval Development Approval Turnaround Time. - Development Permit issued within 2 business days - Target: 90% of the time N/A No Yes - There were 24 of 28 development permit applications of which the zoning approval issued within expected service level as part of building permit turn-around times - The number of development permits (i.e. accessory buildings) issued has been reduced due to changes in provincial legislation Sustainable Growth and Development - Public Transit Pillar Department Goal Department Division Service Name Sub Service Direct Customer Service Definition Service Component Current Service Level Target Achieve d 2024-2025 Target Achieve d 2023-2024 Target Achieve d 2022- 2023 Target Achieve d 2021- 2022 Results / Comment Social Codiac Transpo is committed to providing Codia Transpo N/A Fixed Route Transit schedule - Tri- Community Transit passengers To support ridership growth goal and provide better customer service. Customer service - Arrive at destination within 3 minutes of scheduled arrival time - Target: 85% of the time 86% 91% Yes Yes Timing increased on multiple bus routes due to increased passengers and traffic. Customer Ridership - Transit passengers To support ridership growth goal New transit passengers - Increase ridership by 2% annually 18% 43% Yes No 18% ridership increase (July 2024 - June 2025) (Farebox data) Level of Service Page 32 of 47 a safe, reliable and professional transit service to everyone in the tri- community Transi t Servic e Tri - Community Bus Pass Sales - Tri Community Transit passengers To support ridership growth goal, encourage migration from cash payments to acquiring multi-ride passes. Revenue - Increase bus pass purchases by 2% annually (through 19 retail outlets and mobile app) 6% 46% Yes No 6% sales increase compared to same period prior year. (Farebox Data) Customer Inquiries - Tri Community Transit passengers / Citizens Respond to citizen inquiries Customer service - Respond to citizen inquiries within 36 hours of receipt - Target: 90% of the time 96% 93% Yes Yes Of 580 requests 96% were closed within 36 hours or less. Operations Services - Public Works Pillars Goals Departmen t Division Service Name Sub Service Direct Client Service Definition Service Component Current Service Level Target Achieved 2024 2025 Target Achieved 2023- 2024 Target Achieved 2022 2023 Results / Comment Econom y To provide the public with safe access to roads for the transport of people, goods and services. Public Works Public Works Road / Sidewalk Access and Maintenanc e Winter Maintenance - Roadways Vehicle Operat ors A public service provided to roadway users offering safe access to roads for the transport of people, goods and services. Snow Removal Class II- Arterials (e.g. Mountain Rd.) - Plowing commences after 5cm accumulation; - One complete pass of road to be completed within 6-8 hours of snow event starting; - Final plowing to be completed within 6-8 hours after the cessation snow event; - Upon plowing being completed, after the snow event, road surface will be mostly bare and dry or wet Yes NA Yes Plowing activities along arterials began within 2 hours and continued until complete. Class III- Collectors (e.g. Evergreen Dr.) - Plowing commences after 5-8cm accumulation; - One complete pass of road to be completed within 8 hours of snow event starting; - Final plowing to be completed within 8 hours after the cessation snow event; - Upon plowing being completed after the snow event road will be partially covered with two wheels of a vehicle on a bare surface and other wheels likely on snow pack, loose snow or ice Yes Yes Yes First pass of snow clearing activities complete within 6 hours of event start and continued through event until complete. Class IV- Local Streets (e.g. Douglas Ave.) - Plowing commences after 10cm accumulation; - One complete pass of road to be completed within 8 hours of starting; - Final plowing to be completed within 8 hours after the cessation snow event; - Upon plowing being completed after the snow event road is safe and passable Yes Yes Yes Contractors activated 18 times during the season. Level of Service Page 33 of 47 Econom y To provide the public with safe access to roads for the transport of people, goods and services. Public Works Public Works Road / Sidewalk Access and Maintenanc e Winter Maintenance - Roadways Vehicle Operat ors A public service provided to roadway users offering safe access to roads for the transport of people, goods and services Salting and Sanding Class II- Arterials (e.g. Mountain Rd.) - Salting and/or sanding shall commence when snow or ice starts to accumulate on the traveled portion of the roadway, causing slippery driving conditions. - Method shall be used to maintain roads to a bare pavement condition, until such actions become ineffective due to temperature, severity of the storm, or other conditions. - One complete pass of road salting / sanding should be completed within 2-3 hours of starting salting / sanding operations. Yes Yes Yes Class II Roadways completed within 2 hours. Subsequent passes may be required depending on weather conditions and rate of salt application. Class III- Collectors (e.g. Evergreen Dr.) - Salting and/or sanding shall commence once Class II roads have been maintained. - One complete pass of road salting should be completed within 2-3 hrs. of starting salting / sanding operations. - Methods shall be used to maintain a service level that road is partly covered with two wheels of a vehicle on a bare surface and other wheels likely on snow pack, loose snow or ice. Yes Yes* Yes First pass Class III completed withing 3 hours of salting operations. Subsequent passes may be required depending on weather conditions and rate of salt application. * Based on weather events requiring only Salt/Sand, independent of Plowing activities. Class IV- Local Streets (e.g. Douglas Ave.) - Service level is safe and passable with one complete pass of road salting / sanding to be completed within 10-14 hrs. after cessation of snow event; Yes Yes Yes First pass of Class IV completed within 8 hours of salting operations. Subsequent passes may be required on weather conditions and rate of salt application, *Based on weather events requiring only salt/sand, independent of plowing activities. Conditions for applying DLA not met during the season. Social To provide the public with safe access to sidewalks. Public Works Public Works Road / Sidewalk Access and Maintenanc e Winter Maintenance - Sidewalk Pedestrians A public service provided to sidewalk users offering safe access. Snow Removal, Salting, and Sanding: Sidewalk Snow Plow Plan follows a three-tier priority structure without fixed timeframes. As each priority level (1-3) is completed, public updates on the sidewalk clearing status will be provided. If a storm event occurs prior to completing all three priority levels, the program would reset to the first priority service level. This approach prioritizes sidewalk plowing in a logical fashion that is easier to understand and allows for a better structure of providing a consistent order of works throughout the City. Priority 1 - Identified on the City Sidewalk Snow Removal Program. - Initial plowing round takes up to 24hr. to complete. Depending on level of accumulation, subsequent cycles may be required. - Salt/Sand mixture appropriate to conditions. Yes Yes Yes Process change during 2024-2025 season resulted in data loss for completion statistics. No anomalies reported through the season for the sidewalk program. Deficiencies to be addressed for 2025-2026 season. Priority 2 - Indentified on the City Sidewalk Snow Removal Program. - Initial plowing round takes up to 48 hrs. to complete. Depending on level of accumulation, subsequent cycles may be required. - Salt/Sand mixture appropriate to conditions. Yes Yes Yes Priority 3 - Identified on the City Sidewalk Snow Removal Program. - Initial plowing round takes up to 5 days to complete. Depending on level of accumulation, subsequent cycles maybe required. - Salt/Sand mixture appropriate to conditions. Yes Yes Yes Priority 1 - Crosswalks (annual application) Yes Yes No No Level of Service Page 34 of 47 Econom y To provide the public with safe access to roads for the transport Public Works Public Works Road / Sidewalk Access and Maintenanc e Summer Maintenance - Road Pedestrian s and Vehicle Operators A public service provided to roadway users offering safe access to roads for the Traffic Markings: The work plan is developed based upon a level of risk priority. Weather and road temperatures are Crosswalks around schools, Hospitals and Arterial and Collectors Streets Yellow & broken -white longitudial lane markings ( non-residential), directional arrow markings and AT delineated bike lanes Yes No No Traffic Symbols 88.2% complete. Crosswalks 96.5% complete. Directional Arrows 94.4% complete. White & Yellow long lines 97.4% complete. No No Pedestrians and Vehicle Operators Priority 2 - Residential Areas ( annual application) Crosswalks - residential areas. Lane markings on secondary streets (both yellow centre line & white broken) Bike lane lines, edge lines & push lines Yes No No Level of Service Page 35 of 47 and services. Vehcile Operat ors goods and services. Priority 2 - Parking ( bi-annual application) - Metered parking within the downtown core. - Metered parking around the hospitals. - On street parking stalls Yes No Yes Econom y To provide the public with safe access to roads for the transport Engineeri ng & Environm ent Public Works Road / Sidewalk Access and Maintenanc e Summer Maintenance - Road Trail Users and Vehcile Operat ors A public service provided to roadway users offering safe access to roads for the Traffic Markings: The work plan is developed based upon a level of risk priority. Weather and road temperatures are factors affecting target completion dates. Priority 3 - other symbols ( bi-annaul application) - Bike symbols, sharrows, & diamonds. Yes No No Cyclists No No Econom y To provide the public with safe access to roads for the transport of people, goods and services. Engineeri ng & Environm ent Public Works Road / Sidewalk Access and Maintenanc e Summer Maintenance - Road Vehcile Operators and Cyclists A public service provided to roadway users offering safe access to roads for the transport of people, goods and services. Street Sweeping: Steet Sweeping Priorities: Phase 1: Comprehensive Spring Debris Removal on Arterials, Collectors, Industrial and Active Transportation within Street right of way ( Spring) Phase 2: Comprehensive Street Sweep for remaining Local residential streets (Spring and Summer) Phase 3:Housekeeping and regular maintenance on Arterials, Collectors, Industrial and Active Transportation within Street right of way and Local residential streets . (Summer) Phase 4:Comprehensive Street Cleaning for Drainage Improvement (Fall) Yes No Yes Yes Yes Econom y To provide the public with safe access to roads for the transport of people, goods and services. Engineeri ng & Environm ent Public Works Road / Sidewalk Access and Maintenanc e Summer/Wint er Maintenance - Road Vehcile Operators and Cyclists A public service provided to roadway users offering safe access to roads for the transport of people, goods and services. Asphalt Patching: There are two principal methods of repairing asphalt roadways: 1. Remove and replace the defective pavement and surfacing and/or base material - replacing it with new, base and surface material*. 2. Cover the defective area with an overlay of material*, sealing the defective area and stabilize the affected area. *Material is defined as: - Winter - Cold Patch or recycled material dependent upon air temperature. - Summer - Includes a plant manufactured two layer asphalt of base and seal grades asphalt. *Pothole is defined as: Pavement deterioration resulting in a pothole depth of 75mm and Priority Cycle Winter: - Class II- Arterials (e.g. Mountain Rd.)C - Class III - Collectors (e.g. Evergreen Dr.) - Class IV- Local Streets (e.g. Douglas Ave.) - Repaired as required with cold patch asphalt or recycled material Summer: - Class II- Arterials (e.g. Mountain Rd.) - Class III - Collectors (e.g. Evergreen Dr.) - Work to begin once asphalt manufacturing plants have opened. All repair work completed by July. - Class IV- Local Streets (e.g. Douglas Ave.) - Work to begin once asphalt manufacturing plants have opened and all Class II and III roadway repairs are completed. All repair work completed August. Yes Yes Yes Winter pothole and utility cut maintenance ongoing through season. Summer Patching completed in Zone A on July 26, 2024 and Zone B completed on August 16, 2024. Level of Service Page 36 of 47 surface width of 300mm to be considered as a candidate for repair as conditions and resources allow. Community Services - Recreation Pillars Department Goals Departme nt Division Service Name Sub Service Direct Customer Service Definition Service Component Current Service Level Target Achiev ed 2024- 2025 Target Achiev ed 2023- 2024 Target Achiev ed 2022- 2023 Target Achiev ed 2021- 2022 Results/Comments To facilitate the delivery of Recreation N/A Recreational activities Recreational activities offered by third party providers Recreational activity participants A facilitative service to offer recreational activities to citizens with a community development approach through contracts with third parties. Recreational activities - Acknowledge client inquiry within 24 hours - Target: 95% of the time N/A yes yes Yes Not applicable this year, as we currently have no way of measuring these outcomes. Instead, we decided to focus on the initiatives outlined in the Strategic Plan. Next year, we will be in a better position to reflect on and align with the Department goals. - Respond to issues within 48 hours - Target: 95% of the time N/A yes yes Yes Not applicable this year, as we currently have no way of measuring these outcomes. Instead, we decided to focus on the initiatives outlined in the Strategic Plan. Next year, we will be in a better position to reflect on and align with the Department goals. Recreational activities - Acknowledge provider inquiry within 24 hours - Target: 95% of the time N/A yes yes Yes Not applicable this year, as we currently have no way of measuring these outcomes. Instead, we decided to focus on the initiatives outlined in the Strategic Plan. Next year, we will be in a better position to reflect on and align with the Department goals. - Respond to issues within 72 hours - Target: 95% of the time N/A yes yes Yes Not applicable this year, as we currently have no way of measuring these outcomes. Instead, we decided to focus on the initiatives outlined in the Strategic Plan. Level of Service Page 37 of 47 Cultur e community- based recreation programs to ensure that citizens and the public have full access to a wide range of recreational, parks and leisure experiences and opportunities. Next year, we will be in a better position to reflect on and align with the Department goals. - Bi-weekly site visits during peak season (July - September) - Target: 95% of the time 95% yes yes Yes Staff conducted site visits at our outdoor pools to ensure operations were running smoothly and visits were also made at our Regional Parks. Recreation N/A Recreational Program Advisory and Support Programming of activities Targeted programming participants A service provided to users of recreation programs offering access to supervised / unsupervised recreational activities. Neighbourhood Programming - Notify applicant of decision of request for programming within 5 business days - 95% of the time N/A yes yes Yes Not applicable this year, as we have partnered with the YMCA to deliver neighbourhood programming. The City now directly offers block party services, so a separate application is no longer required. Youth Programming - Notify applicant of decision of request for programming within 5 business days - 95% of the time N/A yes yes Yes Not applicable this year, as we have recently hired a Community Development Officer for Seniors and Youth. This position will be responsible for offering programming for seniors and youth, either through direct delivery or in partnership with community groups. Seniors Programming - Notify applicant of decision of request for programming within 5 business days - 95% of the time N/A yes yes Yes Not applicable this year, as we have recently hired a Community Development Officer for Seniors and Youth. This position will be responsible for offering programming for seniors and youth, either through direct delivery or in partnership with community groups. Sports Programming - Notify applicant of decision within 5 business days - 95% of the time 95% yes yes Yes All sports field bookings are managed through the third-party provider, Nustadia. The City continues to work in partnership with them to ensure quality service delivery to sports groups. Event Planning Events Event participants A service offering free events to the public with various interests Event Programming - Support third party events and provide City events - Target: Maintain 90% (third party) / 10% (City) ratio 100% yes yes Yes Various community events were held in partnership with the support of the Recreation Department. In addition, the Department delivered direct programming, including initiatives such as Skate with Santa, fitness classes, and the New Year's Day event. Level of Service Page 38 of 47 Social To improve the quality of life for the most vulnerable citizen Recreation N/A Social Inclusion Clients Clients A service to work strategically with community and government partners to improve the quality of life of its most vulnerable citizens Assisting Clients - Acknowledge client inquiry within 24 hours - Target: 95% of the time N/A yes yes Yes Not applicable this year, as we currently have no way of measuring these outcomes. Instead, we decided to focus on the initiatives outlined in the Strategic Plan. Next year, we will be in a better position to reflect on and align with the Department goals. - Respond to issues within 48 hours - Target: 95% of the time N/A yes yes Yes Not applicable this year, as we currently have no way of measuring these outcomes. Instead, we decided to focus on the initiatives outlined in the Strategic Plan. Next year, we will be in a better position to reflect on and align with the Department goals. Agencies Agencies Assisting Agencies - Acknowledge agency inquiry within 24 hours - Target: 95% of the time N/A yes yes Yes Not applicable this year, as we currently have no way of measuring these outcomes. Instead, we decided to focus on the initiatives outlined in the Strategic Plan. Next year, we will be in a better position to reflect on and align with the Department goals. - Respond to issues within 72 hours - Target: 95% of the time N/A yes yes Yes Not applicable this year, as we currently have no way of measuring these outcomes. Instead, we decided to focus on the initiatives outlined in the Strategic Plan. Next year, we will be in a better position to reflect on and align with the Department goals. Cultur e To provide citizen participation at the neighborhood level Recreation N/A New Capital Works Project Development Public Consultation Citizens A service to provide citizens with input into new capital projects Consultation - A minimum of one consultation session per new project - Target: 95% of the time 100% yes yes Yes All Recreation Master Plan projects had consultation efforts. Operations Services - Greenfoot Energy Centre (GEC) & Crossman Community Centre / Kay Arena Leisure and Culture Program Pillars Department Goals Departme nt Division Service Name Sub Service Service Definition Service Component Current Service Level Target Achieved 2024- 2025 Target Achieve d 2023- 2024 Target Achieve d 2022- 2023 Results / Comment Event Cleaning An operational service provided to paying clients of the Arenas. Event cleaning includes, but is not limited to: cleaning washrooms, garbage collection, scrubbing floors, and vacuuming (where applicable). The facility is clean and ready for event - Clean washrooms, collect waste, scrub floors, and vacuum, where applicable, at least 5 hours prior to event on event day. - Target: 90% of the time Yes Yes Yes Slapshots is clean and ready for event participants - Clean washrooms, collect waste, scrub floors, and vacuum, where applicable,at least 5 hours prior to event on event day. - Target: 90% of the time Yes Yes Yes - Clean meeting rooms, collect waste, scrub Level of Service Page 39 of 47 Social To contribute at improving the quality of life for citizens of Moncton with recrational and athletic facilities that foster wellness and healthy living. Parks Venues - Greenfoot Energy Centre / Crossman Community Centre / Kay Arena Events Meetings rooms are clean and ready for function floors, and vacuum, where applicable,at least 5 hours prior to event on event day. - Target: 90% of the time Yes Yes Yes Event Set-Up An operational service provided to paying clients of the Arenas. Event set-up includes, but is not limited to: providing the client with their list of rented items (staging, tables, chairs, etc.) and setting the items up as requested by the client. Arenas are set-up and ready for event - Set-up Arenas as requested at least 5 hours prior to event on event day. - Target: 90% of the time Yes Yes Yes Slapshots is set-up and ready for function - Set-up Slapshots as requested (with list of rented items and set-up) at least 3 hours prior to functon. - Target: 90% of the time Yes Yes Yes Meeting room is set-up and ready for function - Set-up meeting rooms as requested (with list of rented items and set-up) at least 1.5 hours prior to event onr event day. - Target: 90% of the time Yes Yes Yes Ice Rentals Ice Maintenance (Prior to Start of Day) An operational service for groups renting ice at the Arenas Ice is available for users - Ice maintenance completed with proper measurements logged and ice prepared for first rental of the day. - Target: 95% of the time Yes Yes Yes Ice Maintenance (During Rentals) An operational service for groups renting ice at the Arenas Ice is available for users - Ice flooded prior to rental period within a max. 15 minutes per flood - Target: 95% of the time Yes Yes Yes Dressing Room Preparation An operational service for groups renting ice at the Arenas Dressing Rooms ready for use by users - Clean and ensure room is empty in-between rentals within a target of 15 minutes per cleaning. - Target: 90% of the time Yes Yes Yes Installati on of Ice Installation of Ice Process of installing ice per required schedule Installation of ice - Ice installed within a max. 280 hours. Per ice service - Target: 95% of the time Yes Yes Yes Events Rented Facility Greenfoot Energy Centre is a premium facility sporting events with major capacity of 4 sheets of ice. Crossman Community Centre / Kay Arena has one ice sheet, gymnasium, walking track, and three community rooms. Arenas ready for event - Rented area(s) ready for use by client as per rental agreement. - Target: 90% of the time Yes Slapshots Restaurant & Intermissions Café ready for event - Restaurant ready for use by clients of events. - Target: 90% of the time Yes Ice Surface Condition Skaters / Players Ice surface ready for use - Ice flooded prior to rental period and after each game -Target: 95% of the time Yes Level of Service Page 40 of 47 Venues - Greenfoot Energy Centre & Crossman Community Centre / Kay Arena Ice Rental Dressing Rooms (16) Condition Users Dressing rooms ready for use - Dressing room cleaned prior to rental period, Target: 90% of the time - Dressing room cleaned after each booking, Target: 80% of the time Yes Lobby Condition Users Lobby cleaned and ready for use - Lobby cleaned prior to rental period, Target: 90% of the time - Lobby cleaned after last rental period, Target: 90% of the time Yes Public Washrooms (5) Condition Users Public Washrooms cleaned and ready for use. - Public Washrooms cleaned prior to rental period, Target: 90% of the time - Public Washrooms cleaned a minimum of 3 times per renting period, Target: 90% of the time Yes Crossman Community Centre / Kay Arena Gym Rentals Gym Maintenance (Prior to Start of Day) An operational service for groups renting the gym at the Crossman Center Gym is available for users - Floor maintenance completed for first rental of the day. - Target: 95% of the time Yes Yes Yes Gym Maintenance (During Rentals) An operational service for groups renting the gym at the Crossman Center Gym is available for users - Floor cleaned prior to rental period - Target: 95% of the time Yes Yes Yes Dressing Room Preparation An operational service for groups renting the gym at the Crossman Center Dressing Rooms ready for use by users - Clean and ensure room is empty in-between rentals within a target of 15 minutes per cleaning. - Target: 90% of the time Yes Yes Yes Walking Track Track Maintenance (Prior to Start of Day) An operational service for groups rusing the walking track at the Crossman Center Walking track is available for users - Track maintenance and cleaned prior to opening for the day. - Target: 95% of the time Yes Yes Yes Community Services - Tourism and Events Pillar Department Goals Departme nt Division Service Name Sub Service Direct Customer Service Definition Service Component Current Service Level Target Achiev ed 2024- 2025 Target Achiev ed 2023- 2024 Target Achiev ed 2022- 2023 Results / Comment Level of Service Page 41 of 47 Cultur e To increase the number of leisure travellers to Moncton and the Southeast region Recreati on, Culture and Events Tourism and Events Visitor Informatio n: Visitor focused Social media engagem ent / interation Tourists A public service provided to tourists and visitors offering information about local and regional attractions, and activities as well as hospitality services with the aim to trigger a visit to the area, enhance visit satisfaction, prolong a visit or encourage a subsequent visit to Greater Moncton. An informed visitor - Social media campaign with municipal, partner and regional posts (Facebook, Instagram, Twitter) no less than 3 times per week Yes Yes Yes - In November 2022, Destination Moncton-Dieppe (DMD) took over tourism promotion, including managing the City's former tourism Facebook account - Since then, the City's paid social media campaigns have been run through the City's Corporate Facebook account - After this change, the City of Moncton's Events Team shifted its focus to promoting major Moncton events only--no longer combining event promotion with general tourism marketing - These key events are now promoted both locally and in nearby provinces (NB, NS, PEI, QC) to raise awareness and attract visitors, helping position Moncton as a fun and vibrant place to attend events - The period from July 2024 to June 2025 marks the second full year under this new approach. The following statistics will help set a benchmark for future planning RESULTS - Paid Social Media Campaign (July 2024-June 2025): TOTAL REACH: 12 281 200 TOTAL IMPRESSIONS: 21 615 507 # of EVENTS FEATURED: 43 AVERAGE COST PER RESULT: $2,31 MARKETS: NB, NS, PEI, QC (in regions near NB) Tourists An informed visitor - Response to social media inquiries within 48 hours 100% 100% 90% - In November 2022, the City's former tourism Facebook account was transferred to Destination Moncton-Dieppe - Since then, the City's paid social media campaigns have been managed through the City's Corporate Facebook account. As a result, all social media inquiries are now handled by the Corporate Communications Department - The Events Team is kept in the loop and often consulted to help craft responses Face-to- Face / Telephon e Tourists An informed visitor - Provide face-to-face and telephone Visitor Information all year round Yes Yes Yes This is managed by Resurgo Place at these two Visitor Information Centres: - Resurgo Place Visitor Information Centre open 12 months/year - Treitz House Visitor Information Center open during tourism season On-line advertising Tourists An informed visitor that selects Moncton (and/or Greater Moncton, SouthEast New Brunswick) as their destination of choice. - Online advertising campaigns targeting four priority segments - Target: New Brunswick, Atlantic Canada, Quebec/Ontario, New England Yes Yes See Comme nts - Destination Moncton-Dieppe is now responsible for this service. - That said, in order to attract out-of-town visitors to Moncton, the City's Events Team coordinates an outdoor advertising campaign to promote key Moncton events in the following markets: Greater Moncton, Fredericton, Saint John, Miramichi, and occasionally in Halifax/Dartmouth - This outdoor advertising campaign includes digital billboards and street level ads Level of Service Page 42 of 47 Econo my To make Moncton the destination of choice for meetings, travel trade and trade and exhibition opportunities Recreati on, Culture and Events Tourism and Events Destinatio n Promotion : Industry Focused Partnership agreement s with industry Industry A public service provided to industry partners highlighting the value proposition of Moncton as tourist destination of choice. Applies to consumer, meetings and convention, travel trade and sport sectors. Tourism as an economic generator by increasing number of visitors, visitor expenditures and visitor length of stay, year-over-year. Delivered through all sectors including meetings and conventions, travel trade, sport tourism, leisure, fully independent traveller. - Tourism Moncton partnership agreements in place with a minimum 20 tourism partners (attractions and accommodations) - Target: 100% of the time No longer applicab le No longer applica ble No longer applica ble - In light of the transition of the tourism responsibility from the City of Moncton to Destination Moncton-Dieppe, this Service Level is no longer applicable to this department Trade shows, industry events, sales missions Industry - Attend 10-12 marketplaces and travel trade shows to promote and market the region No longer applica ble No longer applica ble No longer applica ble - Destination Moncton-Dieppe is now responsible for this service - That said, the Events Team continues to attend sport tourism and cultural development, trade shows/conferences with the goal of attracting events to Moncton - The target number of shows attended should be revised for the 2024- 25 Levels of Service Industry coordinati on, participati ng in Industry - Mininum of 3 inbound familiarization tours for major sport, conference of meeting planning bodies No longer applicab le No longer applica ble No longer applica ble - In light of the transition of the tourism responsibility from the City of Moncton to Destination Moncton-Dieppe, this Service Level is no longer applicable to this department To transition Municipal tourism services to industry led third party destination marketing organisation Destination Marketing Organization - Third Party Tourists and Industry - Develop Service Level Agreements between the City of Moncton and future Destination MarKeting Organization - Target: Agreements in place by June 2020 Yes Yes Yes - The Service Level Agreement was approved by Council - The board of Destination Moncton-Dieppe is in place. Tourism services have been transferred over to DMD - This is 100% complete - This Level of Service should be revised or updated Level of Service Page 43 of 47 Cultur e To produce and present community and events celebrations that are free, open and accesible to the public Recreati on, Culture and Events Tourism and Events Events and Festivals Municipally Initiated Events Tourists and Citizens A public service offering municipally planned and funded community events, festivals, and signature events. Free, open and accessible event offerings for the public - Produce annual Canada Day festivities in both official languages - Target: Within an open space able to accommodate a minimum of 5,000 people Yes Yes Yes - The 2024 Canada Day celebrations were held in the Riverfront parking lot and hosted over 15,000 people. Program details included: - 11 a.m. - 8 p.m. Kids' Play Zone featuring inflatable games, glitter tattoos, activities from Resurgo Place Touch a Truck, and more (Riverfront Park) - 12 p.m. - 5 p.m. Traditional Teachings by an indigenous knowledge keeper - 12 p.m. - 8 p.m. Artisan Village on Downing Street - 12 p.m. - 10 p.m. Vendors offering a variety of foods and other products (Riverfront Park) - 5 p.m. - 10 p.m. Whoa Canada! Main Stage (Riverfront Parking Lot) - 10 p.m. Tri-Community Canada Day Fireworks (Riverfront Park) - The program featured a balance of event elements offered in both official languages Tourists and Citizens - Produce three 3 weekly Acoustica concerts - Target: 3 different event zones in July and August Yes Yes Yes - In 2024, Acoustica concerts were held weekly at Victoria Park on Tuesdays, Centennial Park on Wednesdays, at various patios on Thursdays (PatioFest) and the Moncton Market on Saturdays To provide programs that support the development of event activity in the City of Moncton Recreati on, Culture and Events Tourism and Events Events and Festivals Support community event and festival organizers Organizers A public service offering community event and festival organizers support for effective event execution. Accomplished through guidelines as outlined by Event Guidelines. - Assistance and support to hundreds of community events and festivals, 12- months/year - Support established through Event Guidelines for Support: facility access, organization support, equipment provision, financial support - Confirmation of receipt of an event application - Target: within 48 hours Yes Yes Yes - Achieved through automated response - Achieved by being proactive with annual groups on bookings for the following year Organizers - Response from Coordinator to review event requirements within 72 hours - Target: 95% of the time 95% 95% 95% - Most event inquiries processed within the 72 hour window Organizers - Review and respond to requests for street closures and or noise by-law exemptions through Events Management Committee - Target: within 48 hours 95% 95% 100% - Street Closure and Noise By Law Requests sent to EMC a minimum of two weeks prior to City Council Meeting approval Organizers - Signed letter of offer confirming areas of support (financial, Value In Kind, infrastructure) - Target: no later than 2 weeks prior to event 90% 90% 90% - Achieved 90% of the time - inability to achieve attributed to lack of information from organizers, and changing requirements and content of letter of offer Organizers - Delivery of required materials, provided by the City - Target: no later than 2 hours prior to event execution 95% 95% 95% - Achieved target 95% of time - inability to achieve attributed to capacity - Additionally, some groups request equipment be delivered closer to event time when they arrive on site, while some set up the day prior. Some equipment, like electrical and water connections, must be supervised Organizers - On site visist during event, where applicable - Target: minimum of one visit per event 100% 100% 100% - When required, event staff visited the event site Level of Service Page 44 of 47 Organizers - Post event debrief and recommendations for next year's event - Target : prior to year end Yes Yes Yes - Follow up emails sent to organizers after every event to seek feedback from that year's event To attract and host large scale events that generate ecomonic activity for the Moncton and Southeast region Recreati on, Culture and Events Tourism and Events Events and Festivals Support community event and festival organizers Organizers A public service offered to event partners, Provincial organizations, community groups, etc. to assist with the development of bid packages for Regional, National and International Event Hosting. Attract and host major, regional, national and international events to Moncton and the surrounding region. - Attend industry events with one-on-one sales opportunities for event development - Target: minimum of 1 annually 2 (target exceede d) 2 (target exceede d) No Industry events attended: - SpoHoX Conference, October 2024 (Colette McLaughlin) - Sport Events Congress, March 2025 (Chad Gautreau) Events Attraction Bid Development Organizers - Evaluation of event hosting grant application with response and confirmation/decline of funding - Target: within 30 days of application 75% 90% 85% - Achieved 75% of the time Event Attraction: - Complete bid evaluations - Target: 30 annually Yes Yes Yes - Actual result: 36 Event Attraction: - Complete formal expressions of interest - Target: 3 annually Yes Yes Yes 3 formal expressions of interest were submitted during the period: - 2027 Baseball Canada 16U Girls Championship - 2028 Baseball Canada Cup - 2027&2028 Track and Field Championships Organizers Event Attraction: - Complete bid submissions - Target: 2 annually 6 4 5 - Includes bids completed by the City of Moncton, and bids from local sporting organizations the City assisted with in a significant way Bids submitted/supported: - 2029 Canada Games Bid - Comprehensive Review (successful) - 2026 NORCECA's Men's Continental Championships (successful) - 2027&2028 Track and Field Championships (unsuccessful) - 2026 Canadian Arm Wrestling Championship (in evaluation) - 2026 Canadian Mixed Curling Championship (unsuccessful) - 2025 Canadian Badminton Junior (U13+U15+U17+U19) and Senior/Para Championships (successful) Organizers Event Attraction: - Successful bid - Target: 1 (large-scope event - national, international) 3 5 5 Successful bids: - 2029 Canada Games Bid (successful) - 2026 NORCECA's Men's Continental Championships (successful) - 2025 Canadian Badminton Junior (U13+U15+U17+U19) and Senior/Para Championships (successful) Level of Service Page 45 of 47 Venues (Levels of Service to the Public) July 2024 - June 2025 Results Recreation, Culture, and Events Pillars Department Goals Department Division Service Name Sub Service Direct Custome r Service Definition Service Component Current Service Level Target Achieve d 2024- 2025 Target Achieve d 2023- 2024 Target Achieve d 2022- 2023 Target Achieve d 2021- 2022 Comment Economy To ensure that the Coliseum are developed as key economic generators for the City Recreation, Culture, and Events Venues - Coliseum Complex Events Rented Facility Event Organizer (renter) Coliseum Complex is a premium facility for trade and consumer shows, general rentals, and meetings. Coliseum Complex ready for event - Rented area(s) ready for use by client as per rental agreement. Target of 90% 100% 100% 99% 100% Legends Restaurant ready for event - Restaurant ready for use by client as per rental agreement. - Target of 90% 99% 99% 100% 100% Ice Rental Ice Surface Condition Skaters Service provided to groups renting ice. Ice surface ready for use - Ice flooded prior to rental period. - Target 95% 100% 100% 100% 100% Dressing Room Condition Users Service provided to groups renting ice. Dressing rooms ready for use - Dressing room cleaned prior to rental period. - Target 95% 100% 100% 100% 100% Social To improve the quality of life experience for resident Recreation, Culture, and Events Venues - Coliseum Complex Community Walking Indoor walking area Walkers Service offered to individuals seeking a warm, indoor walking venue. Coliseum available for walkers - Available from October to April (weekdays from 9 a.m. to 4 p.m.) during non-event days. - Target 95% 99% 100% 100% 100% Level of Service Page 46 of 47 Operations - Water and Wastewater Pillars Description Departmen t Division Service Name Sub Service Service Definition Direct Customer Service Component Current Service Level Target Achieved 2024- 2025 Target Achieved 2023- 2024 Target Achieved 2022- 2023 Results/ Comments Environmen tal To provide clean and safe potable water to citizens. Operations Water & Wastewate r Potable Water Water A public service provided to water account holders and water consumers offering access to safe, clean potable water, meeting or exceeding the Canadian drinking water guidelines. Homeowners and Businesses Watermain and water services operation and maintenance - Repair of water main breaks (begin digging) to start within 24 hours - Target: 80% of the time Yes Yes Yes 39 water main breaks ocurred during the period. 92% completed within 24 hours. Homeowners and Businesses - Repair of major service leaks (begin digging) to start within 24 hours - Target: 80% of the time Yes Yes 100% There were 6 major service leaks during the review period. All were completed within 24 hours. Homeowners and Businesses - Repair of minor service leaks (begin digging) to start within 168 hours (1 week) - Target: 80% of the time No No No There were 39 minor service leaks during the period. 59% were completed within 7 days. Average time to complete was 9.5 days. - Some impacts to timely resolution can be attributed to information delays related to underground infrastructure provided by third parties (locates) as well as to scheduled accommodations, as requested by the ratepayer. Homeowners and Businesses - Thawing of frozen services (begin digging) to start within 24 hours - 80% of the time _ _ _ No frozen services reported during the period. Homeowners and Businesses Metering - high water consumption - Monthly notification to users consuming more than 300% of their historical volumes - Target: 100% of the time Yes Yes Yes Fire Department Fire hydrants - Snow removal at fire hydrants in the downtown area within 48 hours after the end of a storm - Target: 90% of the time Yes Yes Yes Crews dispatched 9 times during the season. December(3) January(1) and February(5). - Contractor activation for snow removal at fire hydrants outside of the downtown area within 24 hours of request - Target: 90% of the time Yes Yes Yes Contractors dispatched twice for hydrant clearing during the season. Water Consumers Potable water compliance monitoring and reporting - Meet the Maximim Acceptable Concentrations in Health Canada's "Guidelines for Canadian Drinking Water Quality" - Target: 100% of the time 100% 100% 100% - Annual Report submitted to Regulator - Target: 100% of the time Yes Yes Yes Environmen tal To provide safe removal of wastewater to residents Operatio ns Water & Wastewat er Wastewat er Wastewat er A public service provided to wastewater account holders and wastewater producers offering safe removal of wastewater from their premises Homeowners and Businesses Sewer main and lateral operation and maintenance - Response to flooded basements within 1 hour of a call - Target: 90% of the time No No No - Results (excluding Storm Response flooding): Met target 31.3% of the time. - Average time to respond was 4 hours 43 minutes. Results (excluding Storm Response Flooding) Homeowners and Businesses Wastewater compliance monitoring and reporting - Annual Report submitted to Regulator - Target: 100% of the time Yes Yes Yes Level of Service Page 47 of 47 (effluents, cross- connections) Environmen tal General activities related to water and wastewater Operatio ns Water & Wastewat er Water & Wastewat er Water & Wastewat er Water and Wastewater Homeowners and Businesses Water and sewer locates for Utilities infrastructure - Utility locates completed within 2 working days - Target: 90% of the time No No Yes 83.1% completed within 2 working days. * Issues with external party performaing locates resulted a drop below the expected target level of service. Overall average time to resolve requests remain below the 2 working day target. Homeowners and Businesses New service initiation - water and sewer account creation and maintenance - Utility account creation set up within 90 days from date of application - Target: 90% of the time Yes No 100% 195 applications completed in 18.2 days.