This is the exact embedded text of the captured official document.
Snapshot ca48b5c3061c · verified 2026-06-07 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
Page 1 of 47
POLICY
Owner Department:
Strategic Initiatives
Level of Service
Effective Date:
June 18, 2018
Last Reviewed Date:
December 22, 2021
City Council Approval Dates:
2022, 2023, 2024 and 2025 Budget
Approvals
Approving Authority:
Moncton City Council
Replaces No.: N/A
1. Preamble
The City of Moncton manages many different services throughout the year, including but not limited to
the following areas:
- Corporate Services - including Corporate Communications;
- Community and Safety Services - including Building Inspection, Moncton Fire Department,
Codiac Transpo, By-Law Enforcement, Urban Planning, and Policing Support Services;
- Engineering and Environmental Services - including Public Works, Municipal Facilities, Utilities,
Water Systems, and Environmental Planning and Management;
- Recreation, Culture and Events - including Recreation and Leisure, Parks and Leisure
Operations, Resurgo Place Culture and Heritage, Magnetic Hill Zoo and Magnetic Hill Park,
Tourism and Events, and Venues;
This policy states what Level of Service is appropriate to meet minimum requirements as agreed upon
by City administration and adopted by City Council and that will best serve the citizens of Moncton.
2. Policy Statement
City administration shall strive to meet the Levels of Service as adopted by Moncton City Council in the
Appendices attached to and forming part of this Policy, as amended as required.
3. Objectives
The objectives of this policy are:
Level of Service
Page 2 of 47
1. To provide guidelines to City administration so they can identify what is required to be done to
meet the expectations of the citizens of Moncton.
2. To ensure that the Levels of Service delivered are in the best interest of the citizens of
Moncton.
3. To emphasize and promote understanding of Levels of Service among City Council, City
administration and the citizens of Moncton.
4. To provide direction to City administration with regards to meeting the Levels of Service.
4. Definitions
Level of Service - is a measure of the ability to meet an expected deliverable determined by City
administration and Council under the guidance from the citizens of Moncton.
A level of service typically relate to:
-
Quality
-
Quantity
-
Safety
-
Capacity
-
Fitness for purpose
-
Aesthetics
-
Reliability
-
Responsiveness
-
Environmental acceptability
-
Costs
5. Council Approved Levels of Service
See Appendix "A" for the Council approved Levels of Service.
6. Administration and Contact
City Clerk's Office
655 Main St., Moncton, NB E1C 1E8
Telephone: 506.853.3550
Email: [email protected]
Level of Service
Page 3 of 47
APPENDIX A
By-Law Enforcement - People for Animal Wellbeing (PAW) Animal Control
Pillars
Department
Goals
Departmen
t
Divisio
n
Service
Name
Sub Service
Direct
Customer
Service Definition
Service
Component
Current Service Level
Target
Achieve
d 2024-
2025
Target
Achieve
d 2023-
2024
Target
Achieve
d 2022-
2023
Results / Comment
Social
To provide a
safe
environment for
citizens with
appropriate
animal controls
in locations
throughout the
City
PAW -
People for
Animal
Wellbeing
N/A
Animal
Control
Enforcement of
Animal Control By-
Law H-1322
Park users
Enforcing By-law H-202
Animal Control,
capturing and
impounding stray
animals, investigating
dog bite complaints,
providing expert
testimony in court cases,
writing incident reports,
providing humane care to
animals under their
supervision, daily patrols
of parks and trails, after
hours emergency
response, and public
education on responsible
pet ownership.
Animal control -
(PAW - People
for Animal
Wellbeing)
- Patrol parks and trails (100 hours / month)
- 90% of the time
73.69
hours
74 hours
84 hours Centennial, Irishtown, Mapleton and Victoria
Complainte
nt
- Acknowledge receipt of complaint within 2
business days
- 90% of the time
Yes
Yes
Yes
Number of Complaints received : 467/average of 40
files per month. Target of 90% achievement as per
the Executive Director of PAWS
- Provide follow up on next steps and timelines
within 4 business days
- 90% of the time
Yes
Yes
Yes
Target of 90% achievement as per Executive
Director of PAWS
Dog
owners
and
citizens
Dogs registered
(City of
Moncton)
- Register and provide dog licenses
- 85% annual renewal rate (5% of people and
their pets relocate and 10% annual mortality
rate in household pets)
266
licenses
374
licenses
462
licenses
Level of Service
Page 4 of 47
By-Law Enforcement (Levels of Service to Public) July 2024 - June 2025 Results
Community Safety
Pillar
Department Goal Department Division Service
Name
Sub Service
Direct Customer Service Definition
Service Component
Current Service Level
Target
Achiev
ed
2024-2025
Target
Achieved
2022-
2023
Target
Achieved
2022-
2023
Results / Comment
Social
Ensure that the
City of Moncton
is a safe and
respectful
community
through the
enforcement of
by-laws
By-law
Enforcemen
t
N/A
By-law
enforcemen
t
Complaint handling
-
By-
Laws
Complainant
A public service
provided to potential
by-law violators and
complainants offering
compliance with a
variety of City By-laws.
Response to Complainant.
- 48 hours to acknowledge
receipt of complaint from
complainant and have it
entered in our system for
investigation.
- Target: 95% of the time
95%
95%
95%
*5920 Service Request from July 2022 to June 2023
*6337 Service Request from July 2023 to June
2024
*52
20 Service Request from July 2024 to June 2025
- 48 hours to respond to request for
information on existing service
request or case regarding status of
service request or case.
- Target: 95% of the time
80%
80%
80%
* Waiting for new software to increase efficiency.
- 4 business days from receipt of
complaint, follow-up or next steps
including timelines will be
provided.
- Target: 95% of the time
85%
85%
85%
* Waiting for new software to increase efficiency.
On street patrols:
- Pan handling
- On Street parking
regulations
- Encampments/Social
Issues
Violators and
Citizens
A public service
provided to on-street
by-law violators and
complainants offering
compliance with a
variety of City By-laws.
Ticketing
Community Officers patrolling 24/7
Yes
Yes
Yes
*1021 Service Request from July 2022 to June 2023
* 4418 Service Request from July 2023 to June
2024
*
4250 Service Request from July 2024 to June
2025
Level of Service
Page 5 of 47
Governance
Ensure that by-
laws are
created and
abided by for
the greater
safety and
enjoyment of
the community
By-law
Enforcemen
t
N/A
Business
licensing
- Taxi Owners and
Operators
- Pawnbrokers
- Mobile Home Parks
- Transient Traders
- Portable sign permit
- Mobile Vendors
- Vehicle immobilization
service providers
- Sidewalk Café license
- Fire Pit Permit
- Resident Permits
Applicant
Providing a licensing
service for particular
businesses and
activities as allowed
under the
Municipalities Act
ensuring compliance
with applicable
regulations.
- Taxi Owners and
Operators
- Pawnbrokers
- Mobile Home Parks
- Transient Traders
- Portable sign permit
- Mobile Vendors
- Vehicle immobilization
service providers
- Sidewalk Café license
- Fire Pit Permit
- Resident Permits
- License and permit will be
issued within 5 business days
from receipt of a complete
application
- Target: 95% of the time
Yes
Yes
Yes
* 1582 Licenses issued from July 2022 to June 2023
*
1602 Licenses issued from July 2023 to June 2024
* 1701
Licenses issued from July 2024 to June 2025
Communications (Levels of Service to Public) (July 2024-June 2025 Results)
Corporate
Pillar
Description
Department
Division
Service
Name
Sub Service Direct
Customer
Service Definition
Service
Component
Current Service Level
Target
Achie
ved
2024-
2025
Target
Achieved
2023
2024
Target
Achieved
2022-
2023
Target
Achiev
ed
2021-
2022
Results / Comment
Media
relations
Media
Public relations (PR) is
the practice of
managing the
communication
between an
organization and its
publics.
Informed
citizens
- Media requests are acknowledged within 1 hour
- Target: less than 7 valid media complaints of
not meeting service level
100%
100%
100%
100%
Media
- Interviews (date and time) are agreed to by the
media outlet and the City within a 5 hour of
request for an interview
- Target: less than 10 valid media complaints of
not meeting service level
100%
100%
100%
100%
Media
- Media requests are responded to in the official
language of choice
- Target: less than 5 valid media complaints of
not meeting service level
100%
100%
100%
100%
Level of Service
Page 6 of 47
Governan
ce
Proactively inform
residents to
improve
transparency
Corporate
Communicatio
ns
Corporate
Communicatio
ns
Public
Relations
Public
knowledge Citizens
Enhance citizen
knowledge on city
services
Informed
citizens
- Educational information to citizens on various
city services
- Target: 2 per month
100%
100%
100%
100%
Social
media
Citizens
Public relations (PR) is
the practice of
managing the
communication
between an
organization and its
publics.
Informed
citizens
- Questions received on social media are
acknowledged within 5 hours
- Target: less than 10 valid complaints of not
meeting service level Note: Questions are
answered within 1 business day (Monday to
Friday from 8:30 a.m. to 4:30 p.m.)
100%
100%
100%
100%
Culture
Improve bilingual
services within
the municipality
Corporate
Communicatio
ns
Corporate
Communicatio
ns
Official
Language
Support
Official
Languages
Citizens
Ensuring that all
materials and
communication
destined for an external
audience is provided in
both French and
English.
Adherence to
Policies and
Acts.
Official Languages Policy is reviewed every 5
years
No
Yes
Yes
Yes
Citizens
- Provide external audience materials in both
official languages.
- Target: less than 5 language complaints
annually.
Yes
Yes
Yes
No
Governan
ce
Engage residents
in the decision
making process
Public
Engageme
nt
Public
Participatio
n
Citizens
Opportunities for the
public to engage
in decision making at the
neighborhood
or municipal level.
Consultation/
engagement
Public Engagement Plan to be developed.
Yes
Yes
Yes
Yes
Community Services - Culture and Heritage
Pillar
Department Goal
Department
Division
Service
Name
Sub Service Service Definition
Direct Customer
Service
Component
Current Service Level
Target
Achieved
2024-
2025
Target
Achieved
2023-
2024
Target
Achieved
2022-
2023
Results / Comment
Level of Service
Page 7 of 47
Cultur
e
To Provide a
community based
initiatives and
activities that
promote the vibrancy
of our arts and
culture sector,
including operation
of the new Resurgo
Place and our
heritage properties
(Free Meeting
House, Thomas
Williams House, and
Treitz Haus)
Culture and
Heritage
Heritage
Heritage
Resurgo
Place
Access and
Collection
Manageme
nt
A public service
provided to heritage
program participants
offering access to
collections and
heritage places as well
as engagement in
activities of heritage
and cultural
significance to
Moncton at its
different locations.
Patrons of Museum Moncton
Museum -
artifact
collection
- Access to museum collection
- Target: At least 20 new/different
artefacts annually
310%
Yes
YES
- Lobby case displays (25 artefacts)
- Loans (7 artefacts)
- Artefacts Canada Database (30 new records)
- Access to temporary exhibitions
- Target: Showcase 5 annually
160%
Yes
YES
- Bees!
- Behind Racism
- Gérald Leblanc
- Fall & Harvest Cooking
- Monarch Butterflies
- Art Atlantic
- Recovery Art
- Meet me Halfway
Patrons of Resource
Centre
Reg Ward
Resource
Centre
- Access to resources by appointment
- Target: 95% of request
accommodated
100%
Yes
YES
- 121 research request in 2024
- Research requests completed
within 10 business days
- Target: 90% of the time
100%
Yes
YES
Patrons of Resurgo
Place
Transportat
ion
Discovery
Centre
- Visitor satisfaction
- Target: Less than 5 complaints
annually
100%
Yes
YES
- 1 complaint - resolved
Patrons of Thomas
Williams House
Thomas
Williams
House
Access to the heritage house
- Target: 4 events annually
100%
Yes
YES
- Summer 2024 open
- Holiday Tea
- Valentine Tea
- Various rentals
Patrons of Treitz
Haus
Treitz Haus
- Access to permanent and temporary
exhibitions
- Target: 1 new temporary exhibition
annually
100%
Yes
YES
- Fundy Biosphere Exhibition
Offer onsite programs and
activities Target: At least 12
annually
158%
Yes
YES
- Guided tours
- School group program Sept-April (4 activities)
- School group program May-June (7 choices)
- Birthday party (4 programs)
- Book launch (4)
- Concerts (3)
- Exhibition events (3)
- Special events of note: Wings of Opportunity, Recovery
Day, Heritage Fair
Level of Service
Page 8 of 47
Heritage
and
Cultre
Heritage
and
Culture
Resurgo
Place
Program
ming and
Education
A public service
provided to heritage
and culture program
participants offering
engagement in
activities of heritage
and cultural
significance.
Patrons of Resurgo
Place
Heritage and
culture
programs as
well as
Learning
Centre
- Offer outreach programs and
activities
- Target: At least 12 annually
141%
Yes
YES
- Education Kits (3)
- Tidal Bore
- Riverfront Walk
- Resurgo on the Go! (6)
- School Outreach
- Senior Home Outreach
- Festivals presence
- Canada Day
- Heritage Week
- Doors Open
Patrons of City
Facilities
Displayed Art
- Display 65% of City of Moncton Art
Collection in City facilities
- Target: 95% of the time
100%
Yes
YES
Level of Service
Page 9 of 47
Cultur
e
To Provide a
community based
initiatives and
activities that
promote the vibrancy
of our arts and
culture sector,
including operation
of the new Resurgo
Place and our
heritage properties
(Free Meeting
House, Thomas
Williams House, and
Treitz Haus)
Culture and
Heritage
Culture
Culture
Art
Gallery
Access
and
Collectio
n
Manage
ment
A public service
provided to culture
program participants
offering engagement
in activities cultural
significance to
Moncton.
Patrons of City Hall
Art Gallery
Year round
access to art
Present Art exhibitions at the City
Hall Gallery Target: At least 5 per
year
100%
Yes
YES
- Denise LeBlanc
- Atlantic Arts Symposium
- Jared Betts
Culture and
Heritage
Visitor
Information
Visitor
Informa
tion
Centre
Visitor
Informa
tion
A public service
provided to tourists,
visitors and citizens
offering information
about local and
regional attractions,
and activities as well
as hospitality services
with the aim to trigger
a visit to the area,
enhance visit
satisfaction, prolong a
visit or encourage a
subsequent visit to
Greater Moncton.
Visitors looking for
information on
Moncton
Year round
access to
visitor
information
by phone,
email and in-
person.
- Access to visitor information
booth (un-staffed) at Romeo
LeBlanc International airport
- Target: Restocked on a weekly basis
95% of the time
100%
Yes
Partially
- Access to face-to-face visitor
information service at Resurgo
Place
- Target: 6 days per week (with the
exception of Statutory Holidays),
except from Victoria Day to Labour
Day 7 days per week
100%
Yes
Yes
- Access to face-to-face visitor
information service at Treitz Haus
- Target: 7 days per week (June-
August)
114%
Yes
Yes
- Opened in May
- Respond to voice messages within 1
business day
- Target: 95% of the time
100%
Yes
Yes
- Respond to e-mail request within 1
business day
- Target: 95% of the time
100%
Yes
Yes
Level of Service
Page 10 of 47
Sustainable Growth and Development - Building Inspection
Pillars
Department
Goals
Departm
ent
Divisio
n
Service
Name
Sub Service
Direct Customer
Service
Definition
Service
Component
Current Service
Level
Percenta
ge % of
Target
Achieved
2024-
2025
Percentag
e % of
Target
Achieved
2023-
2024
Target
Achieved
2023-
2024
Target
Achieved
2022-
2023
Results / Comments
Builder
Residential
- Single Family
Dwelling
applications issued
within 5 business
days
- Target: 85% of the
time
N/A
35%
No
No
Current reporting methods do not properly reflect the service being
provded. The HAF project includes a new e-permiting system that
will allow us to better track turnaround time. The numbers will
better represent the service that is provided.
Builder
- Duplex Dwelling
applications issued
within 5 business
days
- Target: 85% of the
time
N/A
58.75%
No
No
See explanation above
Plumber
- Plumbing
applications
issued within 5
business days
- Target: 85% of the
time
N/A
89.91%
Yes
Yes
See explanation above
Level of Service
Page 11 of 47
Economy
Safeguard life,
property, and
public welfare by
ensuring
compliance with
National Building
Code, Building and
Zoning By-laws in
regard to the
design,
construction, and
alteration of
buildings and
structures for the
City of Moncton
Planning
and
Buildin
g
Service
s
Buildin
g
Inspecti
on
Building
and
Plumbin
g
Permitti
ng and
Inspecti
on
- Plumbing
Permits
- Building
Permits
- Demolition
Permits
- Property
Search
- Electrical
Waiver
Homeowner
To assist
citizens,
person and
corporate, in
preparing
applications
for building
and plumbing
permits that
contain all
required
information.
Permitting
throughput
time; time
from
application to
issuance
- Fence
applications issued
within 5 business
days
- Target: 85% of the
time
N/A
63%
Fence /
71%
Pools
No
Yes
See explanation above
Homeowner
- Accessory
Buildings
applications issued
withing 5
business days
- Target: 85% of the
time
N/A
64%
No
No
See explanation above
Homeowner and
Lawyer
- Property Search
completed within 5
business days
- Target: 85% of
the time
N/A
78%
No
Yes
See explanation above
Electrician
- Electrical Waiver
Search completed
within 2 business
days
- Target: 85% of
the time
N/A
N/A
N/A
N/A
See explanation above
Commercial
N/A
- Multi- Unit
Residential
Apartment /
Condo
applications
N/A
21%
No
No
See explanation above
Level of Service
Page 12 of 47
Builder
issued within 10
business days
-Target = 85% of
the time
- School/Day-
Care/Special Care
applications
issued within 10
business days
- Target = 85% of
the time
N/A
52%
No
No
See explanation above
- Office applications
issued
within 10 business
days
- Target = 85% of
the time
N/A
33%
N/A
N/A
See explanation above
- Recreation
applications
issues within 10
business days
- Target = 85% of
the time
N/A
N/A
Yes
Yes
See explanation above
- Retail applications
issued
within 10 business
days
- Target = 85% of
the time
N/A
16.60%
No
No
See explanation above
Level of Service
Page 13 of 47
Economy
Safeguard life,
property, and
public welfare by
ensuring
compliance with
National Building
Code, Building and
Zoning By-laws in
regard to the
design,
construction, and
alteration of
buildings and
structures for the
City of Moncton
Planning
and
Buildin
g
Service
s
Buildin
g
Inspecti
on
Building
and
Plumbin
g
Permitti
ng and
Inspecti
on
- Plumbing
Permits
- Building
Permits
- Demolition
Permits
- Property
Search
- Electrical
Waiver
Builder
To assist
citizens,
person and
corporate, in
preparing
applications
for building
and plumbing
permits that
contain all
required
information.
Permitting
throughput
time; time
from
application to
issuance
- Restaurant
applications
issued within 10
business days
- Target = 85% of
the time
N/A
50%
No
No
See explanation above
- Warehouse
applications
issued within 10
business days
- Target =85% of
the time
N/A
0%
No
No
See explanation above
- Manufacturing
applications
issued within 10
business days
- Target = 85% of
the time
N/A
25%
N/A
N/A
See explanation above
Economy
Safeguard life,
property, and
public welfare by
ensuring
compliance with
National Building
Code, Building and
Zoning By-laws in
regard to the
design,
construction, and
alteration of
buildings and
structures for the
City of Moncton
Planning
and
Buildin
g
Service
s
Buildin
g
Inspecti
on
Building
and
Plumbin
g
Permitti
ng and
Inspecti
on
Townhouse/Rowh
ouse
developments
Builder
To assist
citizens,
person and
corporate, in
preparing
applications
for building
and plumbing
permits that
contain all
required
information.
Permitting
throughput
time; time
from
application to
issuance
- townhouse/row
house
applications
issued within 10
business days
- Target = 85% of
the time
N/A
60%
No
No
See explanation above
Level of Service
Page 14 of 47
Sustainable Growth and Development - Economic Development
Department Goal
Division Service
Name
Sub Service
Direct
Customer
Service Definition
Service
Component
Current Service Level
Targ
et
Achi
eved
2024-
2025
Targe
t
Achie
ved
2023-
2024
Targe
t
Achie
ved
2022-
2023
Targe
t
Achie
ved
2021-
2022
Results / Comment
To attract and
retain
businesses and
investment,
promote
sustainable
development
and population
growth to
support a
thriving and
prosperous
economy.
Economic
Development
Business /
Investmen
t
Attraction
Information broker /
customer service
Businesses and
Investors
A public service provided to
prospective businesses, promoting
and raising
the awareness /
visibility
and
credibility
of
Moncton.
In-mission to Moncton
and business relocation
or opening in Moncton.
- Acknowledge client inquiry within 48 hours
- Target: 95% of the time
100%
Yes
Yes
Yes
The economic development Linkedin page has
more than 8,500 followers. For the period,
there were over 376,000 impressions and 3,200
interactions. The economic development
Instagram account has more than 3,400
followers.
- Respond to client needs within 72 hours
- Target: 95% of the time, depending on
complexity of client request.
100%
Yes
Yes
Yes
Site selection
Businesses and
Investors
A service to businesses / investors
highlighting real estate, land
holdings, property and / or lease
opportunities.
Client secures, rents,
leases, purchases
suggested site, land,
building, tenancy, space.
- Acknowledge client inquiry within 48 hours
- Target: 95% of the time
100%
Yes
Yes
Yes
Sustainable Growth and Development has a
housing pipeline of more than 50 residential and
mix-use developments (based on projects
currently approved or in planning stages).
- Respond to client needs within 72 hours
- Target: 95% of the time, depending on
complexity of client request.
100%
Yes
Yes
Yes
Downtow
n One
Stop Shop
Downtown information
broker
Downtown
Businesses
A public service provided to
prospective businesses, promoting
and raising the awareness of
downtown Moncton as a choice
location for investment.
Provided information
meets client's needs.
- Acknowledge client inquiry within 48 hours
- Target: 95% of the time
100%
Yes
Yes
Yes
Three companies have applied for the
Commercial Bilingual Signage Program.
- Respond to client needs within 72 hours
- Target: 95% of the time, depending on
complexity of client request.
100%
Yes
Yes
Yes
Administer Downtown
and Heritage Financial
Incentive Program
Downtown
Businesses
A financial incentive program
designed to bring forward more
investment in the downtown.
Eligible applications
received and approved
by Council.
- Once all required information
received, final decision on
application completed within 45 days
- Target: 95% of the time
100%
Yes
Yes
Yes
Economic Development has issued Downtown
Financial Incentive Grants for a total of $2.12
million across 12 downtown projects.
Business
Retention
and
Expansio
n (BRE)
Support
Concierge/customer
service
Existing Businesses
A service targeted at existing
Moncton businesses. We provide
customer service to address
identified issues, to connect
businesses with resources to
retain/maintain or expand their
business in Moncton.
Service touch point
- Acknowledge client inquiry within 48 hours
- Target: 95% of the time
100%
Yes
Yes
Yes
The Economic Development team responded to
over 60 unique inquiries.
- Respond to client needs within 72 hours
- Target: 95% of the time, depending on
complexity of client request.
Yes
Yes
100%
Yes
Level of Service
Page 15 of 47
Immigration Immigratio
n
Connect immigrants to
job opportunities;
connect employers to
workforce / talent
Immigrants and
Busines Owners
A service connecting immigrants
to available jobs in the
community and a service to
enable employers to access talent
Immigrants secure
employment.
- Regular job fairs scheduled throughout the
year - every 90 days
- 90% of the time
100%
Yes
Yes
Yes
The Economic Development team hosted three
job fairs, with 66 unique employers. Over 117
positions filled and over 4,700 attendees.
People attraction -
promote Moncton as a
destination of choice for
international newcomers /
immigrants.
Potential
Immigrants
A public service provided to non-
residents, offering them access to
information to better understand
the unique value proposition and
unique quality of life in Moncton
in order to attract them to the
City.
Potential immigrants
either visit Moncton for
an exploratory visit or
they make a final
decision to move or
relocate to Moncton.
- Acknowledge client inquiry within 48 hours
- Target: 95% of the time
100%
Yes
Yes
Yes
The Economic Development team hosted three
major events for international student
intergration. Provided information sessions at
post-secondary institutions.
- Respond to client needs within 72 hours
- Target: 95% of the time, depending on
complexity of client request.
100%
Yes
Yes
Yes
Municipal Emergency Measures Organization (MEMO) (Levels of Service to the Public) July 2024 - June 2025 Results
Community Safety
Pillar
Department Goal Department Division Service Name
Sub Service
Direct Customer
Service Definition
Service Component
Current Service Level
Target
Achiev
ed
2024-2025
Target
Achieved
2023-
2024
Target
Achiev
ed
2022-
2023
Target
Achiev
ed
2021-
2022
Results / Comment
Social
Ensure the
Corporation is
prepared for
any Emergency
by executing
and testing our
Emergency
Management
Plans, and
ensuring our
citizens are
properly
informed
MEMO
N/A
Municipal
Emergency
Measures
Organization
Emergency /
Disaster
Recovery
Planning
Community
An internal service provided to the
Corporation offering emergency and / or
disaster recovery planning, coordination,
temporary shelter, and monitoring.
Increase safety in
crisis or disaster
situations
- Tri-Community All Hazard Plan reviewed
annually
Yes
Yes
Yes
Yes
Revised Plan to be braught to
council in fall of 2025
- Hazard specific Plans reviewed every two years
Yes
Yes
Yes
Yes
Revised the Do Not Consume
Plan
Municipal
Emergency
Measures
Organization
Emergency
Management
Plan Testing
Community
An internal service provided to the
Corporation offering emergency and / or
disaster recovery planning, coordination,
temporary shelter, and monitoring.
Increase safety in
crisis or disaster
situations
- Participate in annual Provincial Emergency
Exercise
No
No
No
No
No longer offered
- Carry out table top exercise annually
Yes
Yes
No
No
May 2025
Municipal
Emergency
Measures
Organization
Emergency
Management
Plan Response
Monitoring
Community
An internal service provided to the
Corporation offering emergency and / or
disaster recovery planning, coordination,
temporary shelter, and monitoring.
Increase safety in
crisis or disaster
situations
- Emergency Command Centre (ECC)
operational during emergencies when
requested by the City's Director of
Emergency Measures
- Target: ECC operational within an 1 hour
of notice of activation
Yes
Yes
Yes
Yes
Activated at the Monitoring
level a few times but no full
activation required.
Level of Service
Page 16 of 47
Protective Services - Fire
Pillar
Department Goal Departmen
t
Division
Service
Name
Sub Service
Direct
Customer
Service Definition
Service
Component
Current Service Level
Target
Achieved
2024-
2025
Target
Achieve
d 2023-
2024
Target
Achieve
d 2022-
2023
Results / Comment
Social
Ensure that the
City of Moncton
is a safe
community by
protecting the life
and property of
its citizens via
the various Fire
Department
services
Fire
Fire
Preventio
n
Fire
Safety
Educati
on
Fire
Safety
Campai
gn
Public
Public
service
provided
to
students (young & old) interested
in fire prevention by offering
training and awareness session.
Education
- One annual open house - Fire
Prevention Week
Yes
Yes
Yes
Fire
Fire
Preventio
n
Fire
Safety
Educati
on
Fire Safety
Awareness
Public and
Schools
Public
service
provided
to
students (young & old) interested
in fire prevention by offering
training and awareness session.
Education
- Provide 10 sessions annually - upon
request
Yes
Yes
Yes
Fire
Fire
Preventio
n
Fire
Safety
Inspecti
on
Inspection -
Residential
Homes
Property
Owners
Public
service
provided
to
property owners
and building
occupants offering compliance
with National Fire Codes.
Inspections
- Provide home inspection upon request
- Target: 95% of the time
Yes
Yes
Yes
Fire
Fire
Preventio
n
Fire
Safety
Inspecti
on
Inspection -
IC&I Buildings
Schools,
daycares,
special care
homes
Public
service
provided
to
property owners
and building
occupants offering compliance
with National Fire Codes.
Inspections
- Schools, colleges, universities,
daycares and special care homes are
inspected annually
- Target: 100% of the time
No
No
_
Requested to PNB for funding to hire addtional staff. The province
is looking at 2026.
Hospitals
- Hospitals are inspected every three
years
- Target: 100% of the time
No
No
_
Requested to PNB for funding to hire addtional staff. The province
is looking at 2026.
Ensure that the
City of Moncton
Fire
Operations Fire Rescue Fire
Suppression
Property
Owners
Public service provided to
incident victims and their
families, property owners, and
insurance companies offering
mitigation of a life/property
threatening incident.
Extinguish /
control fires
- Turn Out Time of 80 seconds or less
- Target: 90% of the time
Yes
Yes
Yes
- Travel time of 240 seconds (4 mins) or
less
- Target: 90% of the time
Yes
Yes
Yes
Fire
Operations Fire Rescue Haz Mat
Response
Mitigation
Everyone
Public service provided to
incident victims and their
families, property owners, and
insurance companies offering
Control
substance
or
assist
other
response
team(s)
- Turn Out Time of 80 seconds or less
- Target: 90% of the time
Yes
Yes
Yes
- Travel time of 240 seconds (4 mins) or
less
- Target: 90% of the time
Yes
Yes
Yes
Level of Service
Page 17 of 47
Social
is a safe
community by
protecting the life
and property of
its citizens via
the various Fire
Department
services
mitigation of a life/property
threatening incident.
Fire
Operations Fire Rescue Medical Fire
Responder
Care
People in
distress
Public service provided to
incident victims and their
families, property owners, and
insurance companies offering
mitigation of a life/property
threatening incident.
Basic life support
- Turn Out Time of 80 seconds or less
- Target: 90% of the time
Yes
Yes
Yes
- Travel time of 240 seconds (4 mins) or
less
- Target: 90% of the time
Yes
Yes
Yes
Fire
Operations Fire Rescue Rescue
Everyone
Public service provided to
incident victims and their
families, property owners, and
insurance companies offering
mitigation of a life/property
threatening incident.
Extraction from
vehicle
/ building
- Turn Out Time of 80 seconds or less
- Target: 90% of the time
Yes
Yes
Yes
- Travel time of 240 seconds (4 mins) or
less
- Target: 90% of the time
Yes
Yes
Yes
Community Services - Magnetic Hill Zoo and Park
Pillar
Department Goal
Department
Division
Servi
ce
Nam
e
Sub
Service
Direct
Custome
r
Service Definition
Service
Component
Current Service Level
Target
Achieved
2024
2025
Target
Achieved
2023
2024
Target
Achieved
2022
2023
Results / Comment
Economy
To build a
sustainable and
financial plan that
responsibly
balances the
nessescity of staff,
animal and visitors
Magnetic Hill
Zoo and Park
Magnetic
Hill Zoo
Magne
tic Hill
Zoo
Admissions,
Guest
Service,
Retail,
Activities
Zoo
patrons
A public service to ensure
all customer service
needs and services are
met during their visit.
Customer
Service
- Provide excellent customer service
- Target: 90% of patrons surveyed are either
"completely" or "mostly" satisfied with
the service received (July and August)
91.39
96.7%
96.44
- Visitors consistently noted the friendliness and helpfulness of
staff, which contributed positively to their overall experience
- At the same time, feedback highlighted opportunities to improve
service levels in busy areas such as the bistro and gift shop to
better meet demand
Schoo
l
childr
en
- Provide educational and fun school visits for
ages 5-16
- Target: 90% of children surveyed are
either "completely" or "mostly" satisfied
with their group visit experience.
95%
95%
NA
- Feedback from parents & teachers continues to be that they
would like more school offerings including field trips & behind
the scenes experiences
Level of Service
Page 18 of 47
Envirome
nt
To remain Atlantic
Canada leading
zoo that educates
and inspires
conservation
action
Magnetic Hill
Zoo and
Park
Magnetic
Hill
Zoo
Magnet
ic Hill
Zoo
Educati
on
Progra
ms
Experie
nce
progra
ms
A public service provided,
in both official languages,
to inspire participants
with an educational
activity that encourages
an appreciation of animals
and inspires conservation
action.
Educational
Services
- Provide educational and fun behind the
scene or exclusive experience programming
- Target: 90% of participants surveyed are
either "completely" or "mostly" satisfied
with their experience
94.5%
100%
100%
- Our behind-the-scenes programs continue to receive excellent
feedback
- These experiences offer visitors a unique opportunity to
learn more about the animals, see how we care for them,
and engage with our mission of inspiring connections to
nature
- Due to their success, we expanded the offerings in 2024 by
introducing a new
program, Pizza for the Primates, which has been a huge success
Summer
camp
patrons
- Provide educational and fun summer camps
for ages 5-16
- Target: 90% of parents surveyed are either
"completely" or "mostly" satisfied with
their children camp experience
100%
96.4%
92.8
- We received excellent feedback on our 2025 summer
camps, which reached full capacity, and we are exploring
opportunities to expand in the future
Zoo
Standards
Animals
/
Patrons
/
Employ
ees
A public service to enrich
the lives of our animals
and to provide visitor
experiences that inspires a
connection to and action
for nature.
Healthy animals
/ inspired
patrons and
employees
- Meet Province of NB and Canada's
Accredited Zoos and Aquariums (CAZA)
standards
- Target: *100% of the time
100%
- Visitors continue to share that animal care is an important
part of their overall experience
- Many commented that the animals appeared healthy, well
looked after, and that interactions such as feeding
opportunities and behind-the-scenes programs added great
value
- Some feedback pointed to opportunities for improvement,
including requests for larger or more enriched habitats for certain
species, improved ventilation in animal buildings, and clearer
signage with more animal information (e.g., names, ages, and
behaviors)
Economy
To build a
sustainable and
financial plan that
responsibly
balances the
management of
the park and the
safety of our
guest and partner
Magnetic Hill
Zoo and Park
Magnetic
Hill Park
Magne
tic Hill
Park
Admission
s, Guest
Service
Patrons
A public service to ensure
customer needs and
services are positive.
Customer
Service
- Provide excellent customer service
- Target: 90% of patrons surveyed are either
"completely" or "mostly" satisfied with
the service received
77.61
92.86
92.16
- Just over 22% of visitors to the Hill reported being less
than fully satisfied, with approximately 10% expressing
dissatisfaction
- Key factors included limited clarity around the illusion itself,
challenges with traffic flow, and confusing signage
- We are developing an improved operational plan to address
these issues for the 2026 season
Magne
tic Hill
Park
Partners of
Magnetic
Hill Park
Tenant
A public service provided
for the efficient
management ensure
tenants conformity to
contract agreement and
City of Moncton policies
and directives. Provides
services necessary for
visitor safe access to sites
Satisfied
tenants
Magic Mountain:
- Address known issues, within contract,
with tenant within 5 business days
- Target: 90% of the time
YES
Yes
Yes
- Tenants expressed their appreciation for having the Visitor
Information Centre on site this past summer and are eager to
continue future collaboration discussions
- Ongoing discussion topics include Magnetic Hill Park marketing,
traffic flow within the park, and safety and security
considerations
Tenant
Wharf Village:
- Address known issues, within contract,
with tenant within 5 business days
YES
Yes
Yes
Sustainable Growth and Development - Moncton Industrial Development
Level of Service
Page 19 of 47
Pillar
Department
Goal
Department Division
Service
Name
Sub Service Direct
Customer
Service Definition
Service
Component
Current Service Level
Target
Achieved
2024-
2025
Target
Achiev
ed
2023-
2024
Target
Achiev
ed
2022-
2023
Target
Achiev
ed
2021-
2022
Results / Comment
Econo
my
Ensure the
City of
Moncton has
a fully
diversified
economy
that is
supported by
development
and
investment in
our industrial
parks
Moncton
Industrial
Develop
ment
Limited
(MID)
N/A
MID
An Act to
Incorporat
e the
Moncton
Industrial
Developme
nt Limited
(1959)
Future
Businesses
MID's primary functions are to acquire
by purchase or otherwise lands in the
City of Moncton, New Brunswick, with
a view to the development of the same
as sites for the establishment of
industries thereon and to sell, lease
or otherwise deal in or with the same;
to provide services such as power,
water, sewerage, roads and other
amenities used or useful in connection
with such lands or in connection with
the operations of the Company or
those of the occupiers of such lands; to
acquire by purchase, lease, exchange,
concession or otherwise, any
description of real estate and real
property or any interest and rights
therein, legal or equitable or
otherwise howsoever; to take, build
upon, hold, own, maintain, work,
develop, sell, lease, mortgage,
exchange, improve or otherwise deal
with in any manner and dispose of
such lots, lands, sites, real estate and
real property or any interest therein,
to deal with any portion of the lands
and property so acquired, subdividing
the same into building lots, and
generally laying out the same into
lots, street and building sites for
industrial purposes; and, to do all such
acts, matters or things as may be
deemed desirable to encourage the
promotion, expansion and
Industrial
land
developmen
t
- To provide an adequate level of serviced land
inventory to meet current and future market demands
ensuring we have an appropriate level of inventory -
approx.
- Target: 5-7 years worth of a minimum of 190 acres
(75 hectares) of serviced land inventory
Yes
Yes
Yes
Yes
Above average sales continued throughout the
year with MID challenged to maintain adequate
inventory of serviced lands. The construction of
Harrisville Logistics Park adds an additional 120 plus
acres to our inventory and the development of MIP
West phase 2 will add another 250+ acres of
saleable lands in the coming years. A small and
final expansion of Caledonia was completed in
summer 2024 creating an additional 40+ acres for
industrial development.
- To continually assess current and future land
development opportunities within the City limits
- Target: Review available land on a quarterly basis
Yes
Yes
Yes
Yes
Harrisville Logistics Park is now completed
opening 124 acres (with 13 acres previously
sold). MIP West phase 2 is now underway with
West Main traffic circle combined sanitary and
storm sparation and sanitary upgrades and the
Millner Trunk sanitary upgrades designed and
ready to be tendered.. A future industrial park
development study was completed with a land
assembly totaling 180 acres already completed
with an additional 200 acres to be added for future
development.
City of
Moncton
Industrial land
sales and
grant revenues
- To generate an average tax base growth of
$23Million per year within the parks (based on a 5-
YR rolling average)
100%
100%
100%
100%
5-Year Rolling AVG = $32.1 Million
- To generate an average of 38 acres of land sales per
year (based on a 5-YR rolling average)
100%
100%
100%
100%
5-Year Rolling AVG = 68.28 acres
- To generate incremental tax revenues of $1.1Million
per year (based on a 5-YR rolling average)
100%
100%
100%
100%
5-Year Rolling AVG = $2.560 Million
- To generate total revenues (land sales and
incremental tax grant combined) of $2.2Million per
year (based on a 5-YR rolling average)
100%
100%
100%
100%
5-Year Rolling AVG = $5.340 Million
Level of Service
Page 20 of 47
diversification of industrial activity
within the City of Moncton.
Protective Services - Southeast Regional Service Commission Mosquito Control
Pillar
Departme
nt Goal
Commis
sion
Divisio
n
Service
Name
Sub Service
Direct
Customer
Service
Definition
Service
Component
Current Service Level Target
Achiev
ed
2025
Targe
t
Achiev
ed
2024
Targe
t
Achiev
ed
2023
Targe
t
Achiev
ed
2022
Results / Comment
Monitor larvae
densities on a
10 to 14 day
rotation
within the Tri-
Community
Number of
larvae (per
250 ml
sample)
- Monitor public
land sites (approx.
200 sites) every 7-
14 days
- Target = 100% of
the time
95%
95%
100% 100%
In alignment with the continued shift toward prioritizing Integrated Mosquito Management (IMM - a subset of the
Integrated Pest Management framework) within the SERSC Mosquito Management Program (Mosquito360), the
historical "routine" surveillance schedule (~10 days) was slightly modified in 2025 to reflect a more data-driven
approach. Surveillance parameters were adapted not only to staffing realities but also to take advantage of new
technologies, particularly the novel drone-based monitoring introduced in 2024.
As a general principle, the 10-day window remains a solid baseline, as it reflects typical larval development cycles
under moderate environmental conditions and across multiple species. In practice, however, larval development
varies significantly depending on temperature, habitat class, rainfall events, and species composition.
Accordingly, monitoring operations were, and continue, to be refined to reflect site-specific productivity. For 2025,
this meant prioritizing "site classes" identified as higher-risk or more productive, with the intent of advancing to
location-specific monitoring for 2026 and beyond. In this model, high-priority sites were sampled more frequently,
while the 10-day interval continue to serve as the general reference standard (with 7 days being a frequent during
periods where smaller, more accessible sites, were prioritized due to weather and other external factors - such as
the fire bans).
Level of Service
Page 21 of 47
Environ
ment
Mitigate
the
potential
spread of
arbor-
viruses as
well as
ensure
that
residents
of the Tri-
Southea
st
Regional
Service
Commis
sion
Mos
quit
o
360
Mos
quit
o
Cont
rol
Citizens and
Tourists
A Tri-
Community
service
provided to
residents
offering a
mosquito
control
Continuing from 2024,field operations were conducted with a crew of four Field Technicians, supported by drone
operations. As field dynamics can change dramatically from season-season, an additional Field Technician may be
added to help support operations moving forward.
In terms of site monitoring and treatment volume, a total of 1,184 site observations were conducted (plus additional
drone scans and applications) - this being in line with previous coverage (a slight increase - likely due to more
frequent rotation through some of the more accessible sites noted above during certain windows). Non-wetland
sites such as retention ponds, parks, schools, and trails continued to be monitored per established protocols.
Wetland sites were assessed through a hybrid model that combined drone surveying with direct, on-foot sampling.
In both cases, monitoring parameters were expanded to include higher-resolution data, with increased dip counts,
vegetation surveys, predator observations, and baseline soil assessments, in addition to existing water-quality
sampling. These enhancements reflect a gradual integration of wetland-specific assessment protocols. In support of
this, the program supervisor completed both Wetland Delineation and WESP-AC (Wetland Ecosystem Services
Protocol - Atlantic Canada) certifications in 2025, which will further strengthen monitoring practices moving
forward.
As referred to above, it is also important to note that widespread August wildfires and the associated restrictions,
restricted access to many wooded and wetland sites, preventing their inclusion in routine surveillance and treatment
rotations. As a result, the program achieved ~95% of its monitoring coverage target for the season.
Apply
biological
insecticide
(Bti)
Larvicide(Bti)
Insecticidal
applied
- Apply biological
insecticide when
potential active
breeding sites are
identified or when
larvae are present
within a water
sample.
- Target = 100% of
the time
100%
100% 100% 100%
Larvicide was applied at all sites where larvae were positively identified.
As noted in last year's results, the Mosquito360 program has now effectively fully transitioned away from using
Argos for wetland access and treatment (two Argo's are maintained for potential use for specific use-cases but are
not part of standard practices). This decision was based on multiple factors, including operating and capital costs,
ecological impacts, and the recognition that Argo track depressions themselves created non-trivial amounts of
stagnant water that contributed to mosquito breeding. These functions have now been replaced with a drone-based
wetland management approach. Because 2025 was the first spring in which drone technology was deployed, some
challenges were encountered during the early part of the season. Chief among these were regulatory restrictions
tied to the Special Flight Operations Certificate (SFOC), particularly weather-related limits such as maximum wind
tolerances. As a result, supplementary foot treatments were occasionally required (with Argos still excluded from
regular wetland use), however adult trap counts remained extremely low during this window - with total adult
capture for May being >200, indicating supplementary treatment was effective in regards to subsequent adult
activity). Fortunately, in response to accumulating data from drone programs such as ours, Transport Canada made
significant regulatory changes of which will came into effect in November 2025. Under the new rules, drones
carrying payloads under 150 kg can operate without an SFOC (up from the previous, much more restrictive, 25 kg
threshold). This adjustment is expected to greatly expand operational flexibility, reduce time constraints, and create
opportunities for efficient scaling of larvicide operations, if required, and generally mitigate the challenges posed in
2025.
Turning to site treatment conditions, precipitation in 2025 was approximately 16% lower than in 2024 (which itself
had seen a 40% decline from 2023). These reductions resulted in widespread desiccation of wetlands, particularly in
Level of Service
Page 22 of 47
Communi
ty
(Rivervie
w,
Moncton,
Dieppe)
experienc
e reduced
nuissance
levels
from
mosquito
es
program to
reduce the
local
mosquito
populations
(from late-
April to
early-
September).
June, most of July, and throughout August and September. The 2025 season marked both the driest summer in the
past decade and the longest continuous drought period on record for the program's target area. These dry
conditions extended to both wetland and non-wetland sites. As a result, general surveillance - including a significant
increase in species identification and habitat mapping - became a more dominant focus of operations than direct
larvicide treatment. Combined with the program's continued emphasis on targeted rather than high-intensity
larviciding, this shift led to a further proportional reduction in larvicide use during 2025. Whether this decline
represents a sustained trend remains uncertain. The program's revised treatment approach suggests larvicide
volumes should remain lower than historical norms; however, increasingly extreme seasonal weather patterns could
also bring very wet years that would once again drive usage upward.
Monitor larval
densities post
biological
insecticide
application
Number of
larvae (per
250 ml
sample)
- Monitor results
within 48 hours of
application
- Target = 100% of
the time
100%
100% 100% 100%
Post-treatment monitoring in 2025 followed the same approach as in 2024. Pre-treatment larval densities averaged
3.69 larvae per 250 mL, while post-treatment counts dropped to 0.09 larvae per 250 mL - a reduction of
approximately 97.6%. As in previous years, these results are consistent with the established efficacy of Bacillus
thuringiensis israelensis (Bti), as documented in external studies and reference literature. It should be noted,
however, that- as in 2024 - the prolonged lack of standing water across most site classes may have influenced the
averages, as larvae were concentrated into smaller pockets of water at higher densities.
A potentially important consideration moving forward is the relative dominance of Coquillettidia perturbans , as
noted below under trapping. According to the literature, Cq. perturbans larvae differ from most species by avoiding
the surface water channel. Instead, using a specialized siphon structure to tap into the root systems of aquatic
vegetation to access oxygen. As a result, these larvae are difficult to sample with standard dipping techniques,
making adult trap counts a more reliable metric of their activity. Furthermore, because Bti is most active in this
same upper water column, its efficacy against Cq. perturbans is limited, as supported by scientific studies on this
species, and may require modified approaches for effective management.
Level of Service
Page 23 of 47
and other
(aquatic-
larvae)
biting flies.
Adult mosquito
trapping
Number of
mosquitoes
per trap
- Monitor results
weekly, identify
the flying adults
- Target: Maintain
adult-count trends
from prior
season(s), taking
into account
seasonal
temperatures and
precipitation.
Yes
Yes
Yes
Yes
Trapping and associated identification saw some of the most significant improvements in 2025 compared to prior
years. The addition of a dedicated Surveillance Technician, with previous experience in both mosquito identification
and trapping, enhanced both the trapping process and specimen identification within the program. Field-trapping
data collection was also expanded to include additional environmental parameters such as wind speed, humidity,
and air temperature, recorded at deployment, midnight, and pickup. Additionally, when suitable larval habitat was
present within range of deployed traps, larval sampling was incorporated into the trapping framework.
Otherwise, trapping frequency (twice weekly) was maintained, and the overall number of sites remained consistent
with 2024 (~22 sites). Although additional trap locations were added early in the season, the total was eventually
reduced back to 2024 levels due to the significant time commitment required to maintain a statistically meaningful
volume of specimens identified, via microscopic speciation (based on current program goals and cost-factors,
microscopsic identificaiton will continue to be the preferred methodology; as opposed to more resource intensive
approaches like molecular analysis).
Looking at trap counts, which remain one of the best indicators of adult abundance and nuisance activity, the
comparison of sites consistent between 2024 and 2025 showed a total of 6,610 adults trapped in 2025 - the
program's lowest recorded seasonal count. This represented a 43% decrease from 2024, which had itself shown a
63% decline from 2023. Across all trapping sites (including new locations), a total of 9,810 adults were trapped in
2025, a 14% decrease compared with 2024's total trapping count (all sites included). Continuing the trajectory from
2024, the 2025 season again reflected relatively low adult activity. This reduction was very likely the combined result
of targeted larval control and extreme climatic conditions that limited larval habitat availability.
Looking at speciation efforts in 2025, over 2,000 individual specimens were speciated (genus and species confirmed)
by Mosquito360; with additional species data from over 6,000 specimens also being compiled from Acadia University
- including data from 2023 and 2024. It should be noted that these data sets cover the broader Maritime region,
with a subset being specific to the Tri-community area (including Centennial Park). In keeping with IMM principles,
building a foundation of high-resolution species data is critical for treatment and surveillance planning. Mosquito
populations vary widely in habitat preference, dispersal range, nuisance level, and treatment susceptibility, so
management strategies should account for these factors, including the timing and frequency of larvicide
applications.
Of those 2,000+ individuals identified in 2025 within our region, 33 unique species were identified, including
aggressive human biters such as Cq. perturbans, which were largely dominant in terms of their numbers (< 80% of
the catch - and while this could be a result of some degree of sampling bias, individuals are selected at random for
identification so dominance is well supported). This species is noted for the challenges they pose in terms of
treatment, including resilience to Bti-based treatments approaches highlighting the potential need for further
research and consideration of alternative management strategies if if their numbers continue to trend as seen in
2025.
Level of Service
Page 24 of 47
Educate general
population
Educated
population
- Community visit,
Web site,
GeoPortal,
Handouts
Implem
ented
(Ongo
ing)
Parti
ally
(Ongoi
ng)
In-
Progre
ss
Partial
ly
2025 saw some significant advancements on the education and outreach front. A dedicated Mosquito360
webpage, developed with support from HAWK Marketing, was launched to provide a clear landing point for
residents seeking information about the program. The webpage is currently live and undergoing a final review
before the addition of supplemental resources on mosquito breeding, treatment approaches, prevention strategies,
and related educational materials are amended as additional webpage tabs. These updates are scheduled for
release in October, and the site will continue to be built-upon to ensure residents have access to relevant
information.
In addition, the SERSC's GeoPortal now includes a live Mosquito GeoPortal. To date, this tool has primarily served as
an internal resource, providing valuable datasets such as delineated wetland boundaries, watercourses, flood zones,
and other geographic features that support site identification and management. However, as this GeoPortal
continues to be developed for the public user, it will function as a more comprehensive landing area for more data-
driven program information (as opposed to the website, which is more broadly informational). This will allow us to
tie in data, such as documented species composition, and the associated mosquito behaviours, such as most active
peak biting activity, preferred host and habitat, etc., to be tied into a with a visual-spatial tool (interactive map),
which may include other information such as adult counts, etc.
Public outreach was also carried out at SERSC-participated events during summer 2025. In parallel, a broader
wetland education program was developed in collaboration with curriculum specialists and Department of
Environment wetland biologists, designed for delivery to school and community groups (targeting grades 4-12).
Furthermore, to increase general awareness of Mosquito360's role, a mail-out program was launched, which
delivered pamphlets to every household in Moncton. These materials focused on the question: "What can I do on
my own property?" with practical guidance for reducing breeding habitat. As in 2024, digital communication was also
maintained, with an active social media campaign in circulation to keep residents informed about mosquito-control
operations, including drone applications. The SERSC's communication department also rolled out a 'Mosquito
Monday' program, which included various posts that provided all sorts of insights into Mosquito360 operations
(where, why, when, how, etc.), this included a World Mosquito Day video, which was also shared by the AMCA's
social media (American Mosquito Control Association) team.
Communication remains a core pillar of the IMM approach and will continue to be prioritized. These efforts not only
provide transparency around program operations but also empower residents to play a role in reducing local
breeding sources - particularly stagnant water on private property, which falls outside direct program control.
Operations Services - Parks
Pillars
Department Goals
Department
Division
Service Name
Sub Service
Direct Customer
Service Definition
Service Component
Current Service Level
Target
Achieved
2024-2025
Target
Achieved
2023-2024
Target
Achieved
2022-2023
Results/Comments
Lawn
Maintenance
- All areas should be serviced weekly from May until Thanksgiving
No
No
Achieved target 76% of the time when fully
staffed with students from May until
September. From September 1 to Thanksgiving,
Level of Service
Page 25 of 47
To contributes at
improving the
quality of life for
the citizens of
Park and Open Space
Maintenance
- Trails
- Horticultural
- Turf
- Playground
Equipment
- Garbage Collection
- Boulevards
- Facility Grounds
- Environmental
Corridors
Parks Users
Citizens and
Residents
Class A Parks
(High
traffic parks:
Regional Parks,
Riverfront,
Municipal Facilities
etc)
we are staffed at 25% of our summer
compliment
Horticultur
e
Maintenan
ce
- Service weekly as required (ex: Weeding, Edging, and Mulching) May
until Thanksgiving
No
No
Target is met 62% when fully staffed with
students from May until September. From
September 1 to Thanksgiving, we are staffed at
25% of our summer compliment
Waste
Collection
- Waste collection shall be twice weekly during the summer season or
more as required - Target:
95% of the time
No
No
Achieved target 93% of the time
Class B Parks
(Neighbourhood
parks: Lewis Park,
Gagnon Park,
Knox Park etc)
Lawn
Maintenance
- All areas should be serviced weekly from May until September
and then bi-weekly until Thanksgiving
No
No
Target is met 68% when fully staffed with
students from May until September. From
September 1 to Thanksgiving, we are staffed at
25% of our summer compliment.
Horticultur
e
Maintenan
ce
- Service bi-weekly as required (ex: Weeding, Edging, and Mulching)
May until Thanksgiving
No
No
Target is met 42% when fully staffed with
students from May until September. From
September 1 to Thanksgiving, we are staffed at
25% of our summer compliment.
Waste
Collection
- Waste collection will be a minimum of once weekly or more as
required
- Target:
95% of the time
No
Yes
Achieved target 91% of the time
Class C Parks
(Boulevards, and
city owned land
with limited
fixtures)
Lawn
Maintenance
- All areas should be serviced bi-weekly from May until September
and then on demand until Thanksgiving
No
No
Target is met 70% when fully staffed with
students from May until September. From
September 1 to Thanksgiving, we are staffed at
25% of our summer compliment.
Waste
Collection
- Waste collection will be a minimum of once every 2 weeks or more as
required
- Target:
95% of the time
No
Yes
Achieved 91% of the time
A public service
provided to
ensure safety in our
parks
Grounds &
Playground
Maintenance
- Play equipment
- Meet CSA standard CAN/CSA Z614:20 A Standard for Children's
Playround Equipment and Surfacing for annual, monthly and
weekly inspections
No
Yes
Annual 99% / Monthly 83%
Athletic Fields
Services
Athletic Field
Users
Athletic Fields
Athletic Field
Maintenance
- Maintain safe playing fields. Report on conditions daily during
operating season.
Yes
Yes
Conditions reported for Baseball, Softball and
Multi-Use Fields reported daily.
Winter
Operations
- All level 1 areas are to be cleared within a 24 hour period
- Target: 90% of the time
Yes
Yes
Snow removal operations completed within
target for 17 major snowfall events during the
period.
Level of Service
Page 26 of 47
Culture
Moncton with
recreational and
athletic facilities
that foster wellness
and healthy living,
and invest in parks,
trails and green
spaces
planting and
preservation.
Operatio
ns
Parks
Park and
Open
Space
Access
Winter Park
Services
Trail Users
Winter
Services
A public service
provided to ensure
safety and
enjoyment of our
trails
- Snow
removal
Winter
Operations
- Snow
removal
- All level 2 priorities will be cleared within 48 hours
- Target: 90% of the time
Yes
Yes
Snow removal operations completed within
target for 17 major snowfall events during the
period.
Winter
Operations
- Snow
removal
- All level 3 priorities will be cleared within 72 hours
- Target: 90% of the time
Yes
Yes
Snow removal operations completed within
target for 17 major snowfall events during the
period.
Winter
Operations
- Sanding and
Salting
- Following snow event: All level 1 priority areas are to be
sanded/salted within a 24 hour period
- Target: 95% of the time
Yes
Yes
Snow removal operations completed within
target for 17 major snowfall events during the
period.
Winter
Operations
- Sanding and
Salting
- Following snow event: All 2 priority areas will be sanded/salted within
48 hours
- Target: 95% of the time
Yes
Yes
Snow removal operations completed within
target for 17 major snowfall events during the
period.
Winter
Operations
- Sanding and
Salting
- Following snow event: All level 3 priority areas will be sanded/salted
within 72 hours
- Target: 95% of the time
Yes
Yes
Snow removal operations completed within
target for 17 major snowfall events during the
period.
Trail
Maintenance
- All Surfaced Trails /Footpaths inspected annually with repairs and
pruning done as required
- Target: 95% of the time
Yes
Yes
61 of 62 trails, 98% compliance.
Rink Users
A public service
provided to ensure
safety and
enjoyment of our
rinks
Winter
Operations
- Outdoor
Rinks
Report ice conditions daily during operating season
Yes
Yes
Conditions for Kaboom Rink, Ian Fowler Oval,
Mapleton Park Outdoor Rink, Muskrat Skating
Trail and Victoria Park Outdoor Rink reported
daily for the season.
Level of Service
Page 27 of 47
Ski Users
A public service
provided to ensure
safety and
enjoyment of our
ski trails
Ski Trail
Operations
Report trail conditions daily during operating season
Yes
Yes
Conditions for Ski Trails reported daily for the
season.
Arboriculture
Services
Residents and
Citzens
A public service
provided to
citizens and
residents, for
planting,
establishment and
maintenance of
trees.
Tree Planting
- All trees planted during optimal planting season with a mortality
rate of less than 6% during warranty period
- Target: 90% of the time
No
No
357 trees planted in 2023, 32 warranty
replacements (16 due to nursery stock failure)
with 9.1 % mortality overall, if excluding
nursery stock failure 4.5 % mortality.
Street clearance
- Maintain street canopy at 14 feet of clearence
- Target: To be determined based on demand - see comment
Yes
Yes
175 requests, 174 resolved - 99% target
achieved.
Sidewalk
clearance
- Maintain sidewalk canopy at 8 feet of clearence
- Target: To be determined based on demand - see comment
Yes
Yes
56 requests for Canopy clearing, 51 resolved -
91% target achieved
Stump removal
- Stump removed within growing season
- Target: 90% of the time
Yes
No
Total of 157 removals completed
Sustainable Growth and Development - Planning and Development
Pillar
Department
Goal
Departm
ent
Division
Service
Name
Sub Service Direct Customer
Service
Definition
Service Component
Current Service
Level
Target
Achieved
2024-
2025
Target
Achieved
2023-
2024
Target
Achieved
2022-
2023
Target
Achieved
2021
2022
Results / Comment
Cultur
e
Implement
Heritage
Conservation
Strategic Plan
Heritage
Conservati
on
Heritage
Conservati
on
Heritage
Permit
Applicatio
ns
Homeowner
To administer the
City's Heritage
Conservation By-
law and process
Heritage Permit
applications and
conduct
inspections.
Heritage Permit
Applications Turnaround
Time
- Heritage Permit
Applications
processed within 4 to 6
weeks
- Target: 80% of the time
82.76%
100%
Yes
Yes
- Further adjustments required in the tracking system to
more precisely track only
the time within the
department's control and avoid adding the time spent
waiting
for information beyond the department's
control.
- 82.76% (28 out of 29) of applications were processed in
accordance with desired
Service Levels.
Heritage
Grant
Administr
ation
Applicant
To administer the
City's Heritage
Grant Policy and
process Heritage
Grant applications.
Grant Applications
Turnaround Time
- Grant Applications
processed
within 4 to 6 weeks
- Target: 80% of the time
90%
93%
Yes
Yes
90% of applications were processed in accordance with
desired Service Levels. The average processing time for
applications was 2-3 weeks. Variations in processing
times are largely due to when an application is filed
relative to the next Heritage Commitee Board meeting,
which occur monthly.
Level of Service
Page 28 of 47
Econo
my
Guiding the
city's growth
and
development in
a sustainable
matter that
takes into
consideration
the city's
environmental,
social, cultural
and economic
goals and
objectives.
Planning
and
Buildin
g
Service
s
Land Use
Planning
Municipal
Plan
Municipal
Plan
Develop
ment
Community
Prepare and
administer the
City's Municipal
Plan, Secondary
Municipal Plans,
Zoning By-law,
Subdivision By law,
Controlled Access
By-law.
Land Use Plans and
Regulations Reviewed
and Established
Municipal Plan is
reviewed and updated
every 10 years.
Yes
Yes
Yes
Yes
The last Municipal Plan review was completed in 2014.
The Municipal Plan and Zoning By-Law review has been
initiated and the RFP awarded to WSP in 2024. Review
is on-going.
Zoning By-
Law
Ensuring
Zoning By-
law
Compliance
Community
To Ensure that
Properties and
Land use is in
accordance with
Zoning By-laws.
Process Service Requests
for Zoning
By-law Complaints and
Violations.
- Process Service
Request Violations
within 4 to 6 weeks and
achieve approved
compliance plan
- Target: 80% of the time
80%
75.0%
No
No
- 80% achieved compliance within the 4-6 week
turnaround time.
Zoning
Certificat
es
Issuing
Zoning
Certificat
es
Applicant
Process Zoning
Compliance and
Zoning
Confirmation
letters required for
legal / real estate
transactions
confirming details
on property,
including whether
or not they are in
compliance with
City of Moncton by-
laws.
Zoning Certificates
Turnaround Time.
- Zoning Certificates
Applications
processed within 2
business days
- Target: 80% of the time
75.68%
83.3%
Yes
Yes
- Further adjustments required in the tracking system to
more precisely track only
the time within the
department's control and avoid adding the time spent
waiting
for information beyond the department's
control.
- 75.68% (196 out of 259) Zoning Certificates were
processed in accordance with approved Service Levels.
The average processing time is 1.75 days.
- Zoning Certificates did not meet expected Service Levels.
Applicant
Zoning Agreement
Inspected for Compliance
- Conditional Zoning
Agreements inspected
for compliance within
12 months of
development permit
approval
- Target: 90% of the time
85%
42%
Yes
Yes
Further adjustments required in the tracking system to
more precisely track only the time within the
department's control and avoid adding the time spent
waiting for information beyond the department's
control. Staff have been monitoring rezoning agreements
and resolutions within the 12 month period. The
department has shifted towards having Rezonings
undertaken by resolution of Council, which has reduced
Level of Service
Page 29 of 47
the amount of Condtional Zoning Agreements moving
forward.
Level of Service
Page 30 of 47
Developme
nt
Approval
Rezoning
Rezoning
Application
Administrati
on
Applicant
Process Municipal
Plan and
Zoning
By-
law
amendments
(Rezoning
applications).
Application-to-Approval
Turnaround Time
- Rezoning Applications
processed
within 6 months
- Target: 80% of the time
57.14%
39.3%
Yes
Yes
- Further adjustments required in the tracking system to
more precisely track only
the time within the
department's control and avoid adding the time spent
waiting
for information beyond the department's
control.
- avergae turn around time was 198.90 days. 6 out of 28
were over 6 months.
- Infor system reporting improvements are being
explored to better reflect the rezoning process (i.e.
application type, timelines, milestones.
- Transition from Conditional Zoning Agreements to
resolution of Council (where possible) has assisted in
streamlining this process.
Econo
my
Guiding the
city's growth
and
development in
a sustainable
matter that
takes into
consideration
the city's
environmental,
social, cultural
and economic
goals and
objectives.
Planning
and
Buildin
g
Service
s
Developme
nt
Approval
Subdivisio
ns
Subdivision
Applicatio
n Approval
Applicant
Subdivision Plan
Approval
Type 1 Tentative
Subdivision
Application Approval
Turnaround Time.
- Type 1 Tentative
Subdivision
Applications
processed within 2
weeks
- Target: 80% of the time
64.06%
43.6%
No
No
- Further adjustments required in the tracking system to
more precisely track only
the time within the
department's control and avoid adding the time spent
waiting
for information beyond the department's
control.
- 64.06% (41 of 55)Type 1 Subdivision Applications were
processed in accordance
with approved Service Levels.
- The average number of days to process Tentative
Subdivision Approval was 218.63 days). Type 1
Subdivisions require Council approval, which can extend
beyond the 10 work day turnaround. Staff vacation also
affects turnaround timelines for a handful of Type 1
Subdivision applications
Applicant
Type 2 Tentative
Subdivision
Application Approval
Turnaround Time.
- Type 2 Tentative
Subdivision
Applications
processed within 6
weeks
- Target: 80% of the time
56.25%
46.2%
No
No
- Further adjustments required in the tracking system to
more precisely track only
the time within the
department's control and avoid adding the time spent
waiting
for information beyond the department's
control.
- 56.25% (9 out of 16 applications)Type 2 Subdivision
Applications were processed
in accordance with approved Service Levels.
- The average number of days to process Tentative
Subdivision Approval was 654.78 days).
Applicant
Development Approval
Inspected for Compliance
- Planning
Advisory
Committee
(PAC)
applications
inspected
for
compliance within 12
100%
86%
Yes
Yes
100% of all PAC applications were monitored for
compliance. Many files can take multiple years to
achieve full compliance (i.e. apartment buildings,
Level of Service
Page 31 of 47
PAC
Application
PAC
Applicatio
n
Administra
tion
Planning Advisory
Committee (PAC)
Application
Approval
months
of
development permit
approval.
- Target: 90% of the time
multiple buildings etc.) and are reviewed monthly to see
what progress has been made.
Applicant
Application-to-Approval
Turnaround time
- PAC Application-to-
Approval
processed within 4 to 6
weeks
- Target: 80% of the time
N/A
86%
Yes
No
- Further adjustments required in the tracking system to
more precisely track only
the time within the
department's control and avoid adding the time spent
waiting
for information beyond the department's
control.
- Planning Advisory Committee (PAC) Applications were
processed in accordance with approved service levels.
The average application is processed in 9.17 days. A
further review is proposed to accurately reflect the time
taken from initial site plan review to the decision of
PAC.
Developm
ent
Permit
Development
Permit
Administrati
on
Applicant
Development
Permit
Approval
Development Approval
Turnaround Time.
- Development Permit
issued within
2 business days
- Target: 90% of the time
N/A
No
Yes
- There were 24 of 28 development permit
applications of which the zoning approval issued
within expected service level as part of building
permit turn-around times
- The number of development permits (i.e.
accessory buildings) issued has been reduced due
to changes in provincial legislation
Sustainable Growth and Development - Public Transit
Pillar
Department
Goal
Department Division Service
Name
Sub Service
Direct
Customer
Service Definition
Service
Component
Current Service Level
Target
Achieve
d
2024-2025
Target
Achieve
d
2023-2024
Target
Achieve
d 2022-
2023
Target
Achieve
d 2021-
2022
Results / Comment
Social
Codiac
Transpo is
committed
to providing Codia Transpo N/A
Fixed
Route
Transit
schedule -
Tri-
Community
Transit
passengers
To support ridership growth
goal and provide better
customer service.
Customer service
- Arrive at destination within 3 minutes of
scheduled arrival time
- Target: 85% of the time
86%
91%
Yes
Yes
Timing increased on multiple bus routes due to
increased passengers and traffic.
Customer
Ridership -
Transit
passengers
To support ridership growth goal New transit
passengers
- Increase ridership by 2% annually
18%
43%
Yes
No
18% ridership increase (July 2024 - June 2025)
(Farebox data)
Level of Service
Page 32 of 47
a safe,
reliable and
professional
transit
service to
everyone in
the tri-
community
Transi
t
Servic
e
Tri -
Community
Bus Pass Sales -
Tri
Community
Transit
passengers
To support ridership growth
goal, encourage migration from
cash payments to acquiring
multi-ride passes.
Revenue
- Increase bus pass purchases by 2%
annually (through 19 retail outlets
and mobile app)
6%
46%
Yes
No
6% sales increase compared to same period prior
year. (Farebox Data)
Customer
Inquiries -
Tri
Community
Transit
passengers
/ Citizens
Respond to citizen inquiries
Customer service
- Respond to citizen inquiries within 36
hours of receipt
- Target: 90% of the time
96%
93%
Yes
Yes
Of 580 requests 96% were closed within 36 hours or
less.
Operations Services - Public Works
Pillars
Goals
Departmen
t
Division
Service
Name
Sub Service
Direct
Client
Service
Definition
Service Component
Current Service Level
Target
Achieved
2024
2025
Target
Achieved
2023-
2024
Target
Achieved
2022
2023
Results / Comment
Econom
y
To provide
the public
with safe
access to
roads for
the
transport
of people,
goods and
services.
Public
Works
Public
Works
Road /
Sidewalk
Access and
Maintenanc
e
Winter
Maintenance
- Roadways
Vehicle
Operat
ors
A public service
provided to
roadway users
offering safe
access to roads
for the
transport of
people, goods
and services.
Snow Removal
Class II- Arterials (e.g. Mountain Rd.)
- Plowing commences after 5cm accumulation;
- One complete pass of road to be completed within 6-8 hours of snow event
starting;
- Final plowing to be completed within 6-8 hours after the cessation snow
event;
- Upon plowing being completed, after the snow event, road surface will be
mostly bare and dry or wet
Yes
NA
Yes
Plowing activities along arterials began within 2
hours and continued until complete.
Class III- Collectors (e.g. Evergreen Dr.)
- Plowing commences after 5-8cm accumulation;
- One complete pass of road to be completed within 8 hours of snow event
starting;
- Final plowing to be completed within 8 hours after the cessation snow
event;
- Upon plowing being completed after the snow event road will be
partially covered with two wheels of a vehicle on a bare surface and
other wheels likely on snow pack, loose snow or ice
Yes
Yes
Yes
First pass of snow clearing activities complete
within 6 hours of event start and continued
through event until complete.
Class IV- Local Streets (e.g. Douglas Ave.)
- Plowing commences after 10cm accumulation;
- One complete pass of road to be completed within 8 hours of starting;
- Final plowing to be completed within 8 hours after the cessation snow
event;
- Upon plowing being completed after the snow event road is safe and
passable
Yes
Yes
Yes
Contractors activated 18 times during the season.
Level of Service
Page 33 of 47
Econom
y
To provide
the public
with safe
access to
roads for
the
transport
of people,
goods and
services.
Public
Works
Public
Works
Road /
Sidewalk
Access and
Maintenanc
e
Winter
Maintenance
- Roadways
Vehicle
Operat
ors
A public service
provided to
roadway users
offering safe
access to roads
for the
transport of
people, goods
and services
Salting and Sanding
Class II- Arterials (e.g. Mountain Rd.)
- Salting and/or sanding shall commence when snow or ice starts to
accumulate on the traveled portion of the roadway, causing slippery
driving conditions.
- Method shall be used to maintain roads to a bare pavement
condition, until such actions become ineffective due to
temperature, severity of the storm, or other conditions.
- One complete pass of road salting / sanding should be completed
within 2-3 hours of starting salting / sanding operations.
Yes
Yes
Yes
Class II Roadways completed within 2 hours.
Subsequent passes may be required depending
on weather conditions and rate of salt
application.
Class III- Collectors (e.g. Evergreen Dr.)
- Salting and/or sanding shall commence once Class II roads have been
maintained.
- One complete pass of road salting should be completed within 2-3
hrs. of starting salting / sanding operations.
- Methods shall be used to maintain a service level that road is partly
covered with two wheels of a vehicle on a bare surface and other wheels
likely on snow pack, loose snow or ice.
Yes
Yes*
Yes
First pass Class III completed withing 3 hours of
salting operations. Subsequent passes may be
required depending on weather conditions and
rate of salt application. * Based on weather
events requiring only Salt/Sand, independent of
Plowing activities.
Class IV- Local Streets (e.g. Douglas Ave.)
- Service level is safe and passable with one complete pass of road salting /
sanding to be completed within 10-14 hrs. after cessation of snow event;
Yes
Yes
Yes
First pass of Class IV completed within 8 hours of
salting operations. Subsequent passes may be
required on weather conditions and rate of salt
application,
*Based on weather events requiring only
salt/sand, independent of plowing activities.
Conditions for applying DLA not met during the
season.
Social
To provide
the public
with safe
access to
sidewalks.
Public
Works
Public
Works
Road /
Sidewalk
Access and
Maintenanc
e
Winter
Maintenance
- Sidewalk
Pedestrians
A public service
provided to
sidewalk users
offering safe
access.
Snow Removal, Salting, and
Sanding:
Sidewalk Snow Plow Plan follows
a three-tier priority structure
without fixed timeframes. As
each priority level (1-3) is
completed, public updates on
the sidewalk clearing status will
be provided. If a storm event
occurs prior to completing all
three priority levels, the program
would reset to the first priority
service level. This approach
prioritizes sidewalk plowing in a
logical fashion that is easier to
understand and allows for a
better structure of providing a
consistent order of works
throughout the City.
Priority 1
- Identified on the City Sidewalk Snow Removal Program.
- Initial plowing round takes up to 24hr. to complete. Depending on level of
accumulation, subsequent cycles
may be required.
- Salt/Sand mixture appropriate to conditions.
Yes
Yes
Yes
Process change during 2024-2025 season resulted
in data loss for completion statistics. No
anomalies reported through the season for the
sidewalk program. Deficiencies to be addressed
for 2025-2026 season.
Priority 2
- Indentified on the City Sidewalk Snow Removal Program.
- Initial plowing round takes up to 48 hrs. to complete. Depending on level of
accumulation, subsequent
cycles may be required.
- Salt/Sand mixture appropriate to conditions.
Yes
Yes
Yes
Priority 3
- Identified on the City Sidewalk Snow Removal Program.
- Initial plowing round takes up to 5 days to complete. Depending on level of
accumulation, subsequent
cycles maybe required.
- Salt/Sand mixture appropriate to conditions.
Yes
Yes
Yes
Priority 1 - Crosswalks (annual application)
Yes
Yes
No
No
Level of Service
Page 34 of 47
Econom
y
To provide
the public
with safe
access to
roads for
the
transport
Public
Works
Public
Works
Road /
Sidewalk
Access and
Maintenanc
e
Summer
Maintenance -
Road
Pedestrian
s and
Vehicle
Operators
A public service
provided to
roadway users
offering safe
access to roads
for the
Traffic Markings:
The work plan is developed based
upon a level of risk priority.
Weather and road temperatures
are
Crosswalks around schools, Hospitals and Arterial and Collectors Streets
Yellow & broken -white longitudial lane markings ( non-residential),
directional arrow markings and AT delineated bike lanes
Yes
No
No
Traffic Symbols 88.2%
complete. Crosswalks 96.5%
complete.
Directional Arrows 94.4% complete.
White & Yellow long lines 97.4% complete.
No
No
Pedestrians
and
Vehicle
Operators
Priority 2 - Residential Areas (
annual application) Crosswalks -
residential areas.
Lane markings on secondary streets (both yellow centre line & white
broken)
Bike lane lines, edge lines & push lines
Yes
No
No
Level of Service
Page 35 of 47
and services.
Vehcile
Operat
ors
goods and
services.
Priority 2 - Parking ( bi-annual application)
- Metered parking within the downtown core.
- Metered parking around the hospitals.
- On street parking stalls
Yes
No
Yes
Econom
y
To provide
the public
with safe
access to
roads
for the
transport
Engineeri
ng &
Environm
ent
Public
Works
Road /
Sidewalk
Access and
Maintenanc
e
Summer
Maintenance -
Road
Trail Users
and
Vehcile
Operat
ors
A public service
provided to
roadway users
offering safe
access to roads
for the
Traffic Markings:
The work plan is developed based
upon a level of
risk priority.
Weather and road temperatures
are
factors
affecting
target
completion dates.
Priority 3 - other symbols ( bi-annaul application)
- Bike symbols, sharrows, & diamonds.
Yes
No
No
Cyclists
No
No
Econom
y
To provide
the public
with safe
access to
roads for
the
transport
of people,
goods and
services.
Engineeri
ng &
Environm
ent
Public
Works
Road /
Sidewalk
Access and
Maintenanc
e
Summer
Maintenance -
Road
Vehcile
Operators
and
Cyclists
A public service
provided to
roadway users
offering safe
access to roads
for the
transport of
people, goods
and services.
Street Sweeping:
Steet Sweeping Priorities:
Phase 1: Comprehensive Spring Debris Removal on Arterials, Collectors,
Industrial and Active Transportation within Street right of way ( Spring)
Phase 2: Comprehensive Street Sweep for remaining Local residential streets
(Spring and Summer)
Phase 3:Housekeeping and regular maintenance on Arterials, Collectors,
Industrial and Active Transportation within Street right of way and Local
residential streets . (Summer)
Phase 4:Comprehensive Street Cleaning for Drainage Improvement (Fall)
Yes
No
Yes
Yes
Yes
Econom
y
To provide
the public
with safe
access to
roads for
the
transport
of people,
goods and
services.
Engineeri
ng &
Environm
ent
Public
Works
Road /
Sidewalk
Access and
Maintenanc
e
Summer/Wint
er
Maintenance -
Road
Vehcile
Operators
and
Cyclists
A public service
provided to
roadway users
offering safe
access to roads
for the
transport of
people, goods
and services.
Asphalt Patching:
There are two principal
methods of repairing asphalt
roadways:
1. Remove and replace the
defective pavement and
surfacing and/or base material -
replacing it with new, base and
surface material*.
2. Cover the defective area with an
overlay of material*, sealing the
defective area and stabilize the
affected area.
*Material is defined as:
- Winter - Cold Patch or
recycled material dependent
upon air temperature.
- Summer - Includes a plant
manufactured two layer asphalt
of base and seal grades asphalt.
*Pothole is defined as:
Pavement deterioration resulting
in a pothole depth of 75mm and
Priority
Cycle
Winter:
- Class II- Arterials (e.g. Mountain Rd.)C
- Class III - Collectors (e.g. Evergreen Dr.)
- Class IV- Local Streets (e.g. Douglas Ave.)
- Repaired as required with cold patch asphalt or recycled material
Summer:
- Class II- Arterials (e.g. Mountain Rd.)
- Class III - Collectors (e.g. Evergreen Dr.) - Work to begin once asphalt
manufacturing plants have opened. All repair work completed by July.
- Class IV- Local Streets (e.g. Douglas Ave.) - Work to begin once asphalt
manufacturing plants have opened and all Class II and III roadway repairs
are completed. All repair work completed August.
Yes
Yes
Yes
Winter pothole and utility cut maintenance ongoing
through season. Summer Patching completed in
Zone A on July 26, 2024 and Zone B completed on
August 16, 2024.
Level of Service
Page 36 of 47
surface width of 300mm to be
considered as a candidate for
repair as conditions and
resources allow.
Community Services - Recreation
Pillars
Department
Goals
Departme
nt
Division
Service
Name
Sub Service
Direct
Customer
Service Definition
Service
Component
Current Service Level
Target
Achiev
ed
2024-
2025
Target
Achiev
ed
2023-
2024
Target
Achiev
ed
2022-
2023
Target
Achiev
ed
2021-
2022
Results/Comments
To facilitate the
delivery of
Recreation N/A
Recreational
activities
Recreational
activities
offered by third
party providers
Recreational
activity
participants
A facilitative service to
offer recreational
activities to citizens
with a community
development approach
through contracts with
third parties.
Recreational
activities
- Acknowledge client inquiry within 24 hours
- Target: 95% of the time
N/A
yes
yes
Yes
Not applicable this year, as we currently have no way
of measuring these outcomes. Instead, we decided to
focus on the initiatives outlined in the Strategic Plan.
Next year, we will be in a better position to reflect on
and align with the Department goals.
- Respond to issues within 48 hours
- Target: 95% of the time
N/A
yes
yes
Yes
Not applicable this year, as we currently have no way
of measuring these outcomes. Instead, we decided to
focus on the initiatives outlined in the Strategic Plan.
Next year, we will be in a better position to reflect on
and align with the Department goals.
Recreational
activities
- Acknowledge provider inquiry within 24
hours
- Target: 95% of the time
N/A
yes
yes
Yes
Not applicable this year, as we currently have no way
of measuring these outcomes. Instead, we decided to
focus on the initiatives outlined in the Strategic Plan.
Next year, we will be in a better position to reflect on
and align with the Department goals.
- Respond to issues within 72 hours
- Target: 95% of the time
N/A
yes
yes
Yes
Not applicable this year, as we currently have no way
of measuring these outcomes. Instead, we decided to
focus on the initiatives outlined in the Strategic Plan.
Level of Service
Page 37 of 47
Cultur
e
community-
based recreation
programs to
ensure that
citizens and the
public have full
access to a wide
range of
recreational,
parks and
leisure
experiences and
opportunities.
Next year, we will be in a better position to reflect on
and align with the Department goals.
- Bi-weekly site visits during peak season (July
- September)
- Target: 95% of the time
95%
yes
yes
Yes
Staff conducted site visits at our outdoor pools to
ensure operations were running smoothly and visits
were also made at our Regional Parks.
Recreation N/A
Recreational
Program
Advisory and
Support
Programming of
activities
Targeted
programming
participants
A service provided to
users of recreation
programs offering
access to supervised /
unsupervised
recreational activities.
Neighbourhood
Programming
- Notify applicant of decision of request for
programming within 5 business days
- 95% of the time
N/A
yes
yes
Yes
Not applicable this year, as we have partnered with the
YMCA to deliver neighbourhood programming. The
City now directly offers block party services, so a
separate application is no longer required.
Youth
Programming
- Notify applicant of decision of request for
programming within 5 business days
- 95% of the time
N/A
yes
yes
Yes
Not applicable this year, as we have recently hired a
Community Development Officer for Seniors and
Youth. This position will be responsible for offering
programming for seniors and youth, either through
direct delivery or in partnership with community
groups.
Seniors
Programming
- Notify applicant of decision of request for
programming within 5 business days
- 95% of the time
N/A
yes
yes
Yes
Not applicable this year, as we have recently hired a
Community Development Officer for Seniors and
Youth. This position will be responsible for offering
programming for seniors and youth, either through
direct delivery or in partnership with community
groups.
Sports
Programming
- Notify applicant of decision within 5
business days
- 95% of the time
95%
yes
yes
Yes
All sports field bookings are managed through the
third-party provider, Nustadia. The City continues to
work in partnership with them to ensure quality
service delivery to sports groups.
Event Planning Events
Event
participants
A service offering free
events to the public with
various interests
Event
Programming
- Support third party events and provide City
events
- Target: Maintain 90% (third party) / 10%
(City) ratio
100%
yes
yes
Yes
Various community events were held in partnership
with the support of the Recreation Department. In
addition, the Department delivered direct
programming, including initiatives such as Skate with
Santa, fitness classes, and the New Year's Day event.
Level of Service
Page 38 of 47
Social
To improve the
quality of life
for the most
vulnerable
citizen
Recreation N/A
Social Inclusion
Clients
Clients
A service to work
strategically with
community and
government partners to
improve the quality of
life of its most vulnerable
citizens
Assisting Clients
- Acknowledge client inquiry within 24 hours
- Target: 95% of the time
N/A
yes
yes
Yes
Not applicable this year, as we currently have no way
of measuring these outcomes. Instead, we decided to
focus on the initiatives outlined in the Strategic Plan.
Next year, we will be in a better position to reflect on
and align with the Department goals.
- Respond to issues within 48 hours
- Target: 95% of the time
N/A
yes
yes
Yes
Not applicable this year, as we currently have no way
of measuring these outcomes. Instead, we decided to
focus on the initiatives outlined in the Strategic Plan.
Next year, we will be in a better position to reflect on
and align with the Department goals.
Agencies
Agencies
Assisting Agencies
- Acknowledge agency inquiry within 24 hours
- Target: 95% of the time
N/A
yes
yes
Yes
Not applicable this year, as we currently have no way
of measuring these outcomes. Instead, we decided to
focus on the initiatives outlined in the Strategic Plan.
Next year, we will be in a better position to reflect on
and align with the Department goals.
- Respond to issues within 72 hours
- Target: 95% of the time
N/A
yes
yes
Yes
Not applicable this year, as we currently have no way
of measuring these outcomes. Instead, we decided to
focus on the initiatives outlined in the Strategic Plan.
Next year, we will be in a better position to reflect on
and align with the Department goals.
Cultur
e
To provide
citizen
participation at
the
neighborhood
level
Recreation N/A
New Capital
Works
Project
Development
Public
Consultation
Citizens
A service to provide
citizens with input into
new capital projects
Consultation
- A minimum of one consultation session per
new project
- Target: 95% of the time
100%
yes
yes
Yes
All Recreation Master Plan projects had consultation
efforts.
Operations Services - Greenfoot Energy Centre (GEC) & Crossman Community Centre / Kay Arena
Leisure and Culture Program
Pillars
Department
Goals
Departme
nt
Division
Service
Name
Sub Service
Service Definition
Service Component
Current Service Level
Target
Achieved
2024-
2025
Target
Achieve
d
2023-
2024
Target
Achieve
d
2022-
2023
Results / Comment
Event Cleaning
An operational service provided to paying clients of the
Arenas. Event cleaning includes, but is not limited to:
cleaning washrooms, garbage collection, scrubbing floors,
and vacuuming (where applicable).
The facility is clean and ready for event
- Clean washrooms, collect waste, scrub floors, and vacuum, where applicable, at
least 5 hours prior to event on event day.
- Target: 90% of the time
Yes
Yes
Yes
Slapshots is clean and ready for
event participants
- Clean washrooms, collect waste, scrub floors, and
vacuum, where applicable,at least 5 hours prior
to event on event day.
- Target: 90% of the time
Yes
Yes
Yes
- Clean meeting rooms, collect waste, scrub
Level of Service
Page 39 of 47
Social
To contribute at
improving the quality
of life for citizens of
Moncton with
recrational and athletic
facilities that foster
wellness and healthy
living.
Parks
Venues - Greenfoot
Energy Centre /
Crossman Community
Centre / Kay Arena
Events
Meetings rooms are clean and
ready for function
floors, and vacuum, where applicable,at least
5 hours prior to event on event day.
- Target: 90% of the time
Yes
Yes
Yes
Event Set-Up
An operational service provided to
paying clients of the Arenas. Event
set-up includes, but is not limited
to: providing the client with their
list of rented items (staging, tables,
chairs, etc.) and setting the items up
as requested by the client.
Arenas are set-up and ready for
event
- Set-up Arenas as requested at least 5 hours prior
to event on event day.
- Target: 90% of the time
Yes
Yes
Yes
Slapshots is set-up and ready for
function
- Set-up Slapshots as requested (with list of
rented items and set-up) at least 3 hours prior to
functon.
- Target: 90% of the time
Yes
Yes
Yes
Meeting room is set-up and
ready for function
- Set-up meeting rooms as requested (with list of
rented items and set-up) at least
1.5 hours prior to event onr event day.
- Target: 90% of the time
Yes
Yes
Yes
Ice
Rentals
Ice Maintenance
(Prior to Start of Day)
An operational service for groups
renting ice at the Arenas
Ice is available for users
- Ice maintenance completed with proper
measurements logged and ice prepared for
first rental of the day.
- Target: 95% of the time
Yes
Yes
Yes
Ice Maintenance
(During Rentals)
An operational service for groups
renting ice at the Arenas
Ice is available for users
- Ice flooded prior to rental period within a max. 15
minutes per flood
- Target: 95% of the time
Yes
Yes
Yes
Dressing Room
Preparation
An operational service for groups
renting ice at the Arenas
Dressing Rooms ready for use by
users
- Clean and ensure room is empty in-between
rentals within a target of 15 minutes per
cleaning.
- Target: 90% of the time
Yes
Yes
Yes
Installati
on of Ice Installation of Ice
Process of installing ice per required
schedule
Installation of ice
- Ice installed within a max. 280 hours. Per ice
service
- Target: 95% of the time
Yes
Yes
Yes
Events
Rented Facility
Greenfoot Energy Centre is a
premium facility sporting events
with major capacity of 4 sheets of
ice. Crossman Community Centre /
Kay Arena has one ice sheet,
gymnasium, walking track, and
three community rooms.
Arenas ready for event
- Rented area(s) ready for use by client as per rental
agreement.
- Target: 90% of the time
Yes
Slapshots Restaurant &
Intermissions Café ready for
event
- Restaurant ready for use by clients of events.
- Target: 90% of the time
Yes
Ice Surface Condition Skaters / Players
Ice surface ready for use
- Ice flooded prior to rental period and after each
game
-Target: 95% of the time
Yes
Level of Service
Page 40 of 47
Venues -
Greenfoot
Energy Centre
& Crossman
Community
Centre / Kay
Arena
Ice
Rental
Dressing Rooms (16)
Condition
Users
Dressing rooms ready for use
- Dressing room cleaned prior to rental period,
Target: 90% of the time
- Dressing room cleaned after each booking, Target:
80% of the time
Yes
Lobby Condition
Users
Lobby cleaned and ready for use
- Lobby cleaned prior to rental period, Target:
90% of the time - Lobby cleaned after last
rental period, Target: 90% of the time
Yes
Public Washrooms (5)
Condition
Users
Public Washrooms cleaned and
ready for use.
- Public Washrooms cleaned prior to rental period,
Target: 90% of the time
- Public Washrooms cleaned a minimum of 3
times per renting period, Target: 90% of the time
Yes
Crossman
Community
Centre / Kay
Arena
Gym
Rentals
Gym Maintenance
(Prior to Start of Day)
An operational service for groups
renting the gym at the Crossman
Center
Gym is available for users
- Floor maintenance completed for first rental of
the day.
- Target: 95% of the time
Yes
Yes
Yes
Gym Maintenance
(During Rentals)
An operational service for groups
renting the gym at the
Crossman Center
Gym is available for users
- Floor cleaned prior to rental period
- Target: 95% of the time
Yes
Yes
Yes
Dressing Room
Preparation
An operational service for groups
renting the gym at the Crossman
Center
Dressing Rooms ready for use by
users
- Clean and ensure room is empty in-between
rentals within a target of 15 minutes per
cleaning.
- Target: 90% of the time
Yes
Yes
Yes
Walking
Track
Track Maintenance
(Prior to Start of Day)
An operational service for groups
rusing the walking track at the
Crossman Center
Walking track is available for
users
- Track maintenance and cleaned prior to opening
for the day.
- Target: 95% of the time
Yes
Yes
Yes
Community Services - Tourism and Events
Pillar
Department
Goals
Departme
nt
Division
Service
Name
Sub Service
Direct
Customer
Service Definition
Service Component
Current Service Level
Target
Achiev
ed
2024-
2025
Target
Achiev
ed
2023-
2024
Target
Achiev
ed
2022-
2023
Results / Comment
Level of Service
Page 41 of 47
Cultur
e
To increase the
number of
leisure travellers
to Moncton
and the
Southeast
region
Recreati
on,
Culture
and
Events
Tourism
and
Events
Visitor
Informatio
n: Visitor
focused
Social
media
engagem
ent /
interation
Tourists
A public service provided to
tourists and visitors
offering information about
local and regional
attractions, and activities
as well as hospitality
services with the aim to
trigger a visit to the area,
enhance visit satisfaction,
prolong a visit or
encourage a subsequent
visit to Greater Moncton.
An informed visitor
- Social media campaign with
municipal, partner and regional posts
(Facebook, Instagram, Twitter) no less
than 3 times per week
Yes
Yes
Yes
- In November 2022, Destination Moncton-Dieppe (DMD) took over
tourism promotion, including managing the City's former tourism
Facebook account
- Since then, the City's paid social media campaigns have been run
through the City's Corporate Facebook account
- After this change, the City of Moncton's Events Team shifted its
focus to promoting major Moncton events only--no longer combining
event promotion with general tourism marketing
- These key events are now promoted both locally and in nearby
provinces (NB, NS, PEI, QC) to raise awareness and attract visitors,
helping position Moncton as a fun and vibrant place to attend events
- The period from July 2024 to June 2025 marks the second full year
under this new approach. The following statistics will help set a
benchmark for future planning
RESULTS - Paid Social Media Campaign (July 2024-June 2025):
TOTAL REACH: 12 281 200
TOTAL IMPRESSIONS: 21 615 507
# of EVENTS FEATURED: 43
AVERAGE COST PER RESULT: $2,31
MARKETS: NB, NS, PEI, QC (in regions near NB)
Tourists
An informed visitor
- Response to social media inquiries
within 48 hours
100%
100%
90%
- In November 2022, the City's former tourism Facebook account
was transferred to Destination Moncton-Dieppe
- Since then, the City's paid social media campaigns have been
managed through the City's Corporate Facebook account. As a result,
all social media inquiries are now handled by the Corporate
Communications Department
- The Events Team is kept in the loop and often consulted to help craft
responses
Face-to-
Face /
Telephon
e
Tourists
An informed visitor
- Provide face-to-face and telephone
Visitor Information all year round
Yes
Yes
Yes
This is managed by Resurgo Place at these two Visitor Information
Centres:
- Resurgo Place Visitor Information Centre open 12 months/year
- Treitz House Visitor Information Center open during tourism season
On-line
advertising
Tourists
An informed visitor that
selects Moncton
(and/or Greater
Moncton, SouthEast
New Brunswick) as
their destination of
choice.
- Online advertising campaigns
targeting four priority segments
- Target: New Brunswick,
Atlantic Canada,
Quebec/Ontario, New
England
Yes
Yes
See
Comme
nts
- Destination Moncton-Dieppe is now responsible for this service.
- That said, in order to attract out-of-town visitors to Moncton, the
City's Events Team coordinates an outdoor advertising campaign to
promote key Moncton events in the following markets: Greater
Moncton, Fredericton, Saint John, Miramichi, and occasionally in
Halifax/Dartmouth
- This outdoor advertising campaign includes digital billboards and street
level ads
Level of Service
Page 42 of 47
Econo
my
To make
Moncton the
destination of
choice for
meetings, travel
trade and trade
and exhibition
opportunities
Recreati
on,
Culture
and
Events
Tourism
and
Events
Destinatio
n
Promotion
: Industry
Focused
Partnership
agreement
s with
industry
Industry
A public service provided
to industry partners
highlighting the value
proposition of Moncton
as tourist destination of
choice. Applies to
consumer, meetings and
convention, travel trade
and sport sectors.
Tourism as an economic
generator by
increasing number of
visitors, visitor
expenditures and
visitor length of stay,
year-over-year.
Delivered through all
sectors including
meetings and
conventions, travel
trade, sport tourism,
leisure, fully
independent traveller.
- Tourism Moncton partnership
agreements in place with a minimum 20
tourism partners (attractions and
accommodations)
- Target: 100% of the time
No
longer
applicab
le
No
longer
applica
ble
No
longer
applica
ble
- In light of the transition of the tourism responsibility from the City of
Moncton to Destination Moncton-Dieppe, this Service Level is no
longer applicable to this department
Trade shows,
industry
events, sales
missions
Industry
- Attend 10-12 marketplaces and
travel trade shows to promote and
market the region
No
longer
applica
ble
No
longer
applica
ble
No
longer
applica
ble
- Destination Moncton-Dieppe is now responsible for this service
- That said, the Events Team continues to attend sport tourism
and cultural development, trade shows/conferences with the goal
of attracting events to Moncton
- The target number of shows attended should be revised for the 2024-
25 Levels of Service
Industry
coordinati
on,
participati
ng in
Industry
- Mininum of 3 inbound
familiarization tours for major sport,
conference of meeting planning
bodies
No
longer
applicab
le
No
longer
applica
ble
No
longer
applica
ble
- In light of the transition of the tourism responsibility from the City of
Moncton to Destination Moncton-Dieppe, this Service Level is no
longer applicable to this department
To transition
Municipal
tourism
services to
industry led
third party
destination
marketing
organisation
Destination
Marketing
Organization
- Third Party
Tourists and
Industry
- Develop Service Level Agreements
between the City of Moncton and
future Destination MarKeting
Organization
- Target: Agreements in place by June
2020
Yes
Yes
Yes
- The Service Level Agreement was approved by Council
- The board of Destination Moncton-Dieppe is in place. Tourism
services have been transferred over to DMD
- This is 100% complete
- This Level of Service should be revised or updated
Level of Service
Page 43 of 47
Cultur
e
To produce and
present
community and
events
celebrations
that are free,
open and
accesible to the
public
Recreati
on,
Culture
and
Events
Tourism
and
Events
Events and
Festivals
Municipally
Initiated
Events
Tourists and
Citizens
A public service offering
municipally planned and
funded community events,
festivals, and signature
events.
Free, open and
accessible event
offerings for the public
- Produce annual Canada Day
festivities in both official languages
- Target: Within an open space able to
accommodate a minimum of 5,000
people
Yes
Yes
Yes
- The 2024 Canada Day celebrations were held in the Riverfront
parking lot and hosted over 15,000 people. Program details
included:
- 11 a.m. - 8 p.m. Kids' Play Zone featuring inflatable games, glitter
tattoos, activities from Resurgo Place Touch a Truck, and more
(Riverfront Park)
- 12 p.m. - 5 p.m. Traditional Teachings by an indigenous knowledge
keeper
- 12 p.m. - 8 p.m. Artisan Village on Downing Street
- 12 p.m. - 10 p.m. Vendors offering a variety of foods and other
products (Riverfront Park)
- 5 p.m. - 10 p.m. Whoa Canada! Main Stage (Riverfront Parking Lot)
- 10 p.m. Tri-Community Canada Day Fireworks (Riverfront Park)
- The program featured a balance of event elements offered in both
official languages
Tourists and
Citizens
- Produce three 3 weekly Acoustica
concerts
- Target: 3 different event zones in July
and August
Yes
Yes
Yes
- In 2024, Acoustica concerts were held weekly at Victoria Park on
Tuesdays, Centennial Park on Wednesdays, at various patios on
Thursdays (PatioFest) and the Moncton Market on Saturdays
To provide
programs that
support the
development of
event activity in
the City of
Moncton
Recreati
on,
Culture
and
Events
Tourism
and
Events
Events and
Festivals
Support
community
event and
festival
organizers
Organizers
A public service offering
community event and
festival organizers support
for effective event
execution.
Accomplished through
guidelines as outlined by
Event Guidelines.
- Assistance and
support to hundreds
of community events
and festivals, 12-
months/year
- Support
established through
Event Guidelines for
Support: facility
access, organization
support, equipment
provision, financial
support
- Confirmation of receipt of an event
application
- Target: within 48 hours
Yes
Yes
Yes
- Achieved through automated response
- Achieved by being proactive with annual groups on bookings for the
following year
Organizers
- Response from Coordinator to
review event requirements
within 72 hours
- Target: 95% of the time
95%
95%
95%
- Most event inquiries processed within the 72 hour window
Organizers
- Review and respond to requests for
street closures and or noise by-law
exemptions
through
Events
Management Committee
- Target: within 48 hours
95%
95%
100%
- Street Closure and Noise By Law Requests sent to EMC a minimum of
two weeks prior to City Council Meeting approval
Organizers
- Signed letter of offer confirming
areas of support (financial, Value
In Kind, infrastructure)
- Target: no later than 2 weeks prior to
event
90%
90%
90%
- Achieved 90% of the time - inability to achieve attributed to lack of
information from organizers, and changing requirements and content
of letter of offer
Organizers
- Delivery of required materials,
provided by the City
- Target: no later than 2 hours prior to
event execution
95%
95%
95%
- Achieved target 95% of time - inability to achieve attributed to capacity
- Additionally, some groups request equipment be delivered closer to
event time when they arrive on site, while some set up the day prior.
Some equipment, like electrical and water connections, must be
supervised
Organizers
- On site visist during event, where
applicable
- Target: minimum of one visit per event
100%
100%
100%
- When required, event staff visited the event site
Level of Service
Page 44 of 47
Organizers
- Post event debrief and
recommendations for next year's event
- Target : prior to year end
Yes
Yes
Yes
- Follow up emails sent to organizers after every event to seek feedback
from that year's event
To attract and
host large scale
events that
generate
ecomonic
activity for the
Moncton and
Southeast region
Recreati
on,
Culture
and
Events
Tourism
and
Events
Events and
Festivals
Support
community
event and
festival
organizers
Organizers
A public service offered to
event partners, Provincial
organizations, community
groups, etc. to assist with
the development of bid
packages for Regional,
National and International
Event Hosting.
Attract and host major,
regional, national and
international
events
to Moncton and the
surrounding region.
- Attend industry events with
one-on-one sales opportunities
for event development
- Target: minimum of 1 annually
2
(target
exceede
d)
2
(target
exceede
d)
No
Industry events attended:
- SpoHoX Conference, October 2024 (Colette McLaughlin)
- Sport Events Congress, March 2025 (Chad Gautreau)
Events
Attraction
Bid
Development
Organizers
- Evaluation of event hosting grant
application with response and
confirmation/decline of funding
- Target: within 30 days of application
75%
90%
85%
- Achieved 75% of the time
Event Attraction:
- Complete bid evaluations
- Target: 30 annually
Yes
Yes
Yes
- Actual result: 36
Event Attraction:
- Complete formal expressions of interest
- Target: 3 annually
Yes
Yes
Yes
3 formal expressions of interest were submitted during the period:
- 2027 Baseball Canada 16U Girls Championship
- 2028 Baseball Canada Cup
- 2027&2028 Track and Field Championships
Organizers
Event Attraction:
- Complete bid submissions
- Target: 2 annually
6
4
5
- Includes bids completed by the City of Moncton, and bids from local
sporting organizations the City assisted with in a significant way
Bids submitted/supported:
- 2029 Canada Games Bid - Comprehensive Review (successful)
- 2026 NORCECA's Men's Continental Championships (successful)
- 2027&2028 Track and Field Championships (unsuccessful)
- 2026 Canadian Arm Wrestling Championship (in evaluation)
- 2026 Canadian Mixed Curling Championship (unsuccessful)
- 2025 Canadian Badminton Junior (U13+U15+U17+U19) and
Senior/Para Championships (successful)
Organizers
Event Attraction:
- Successful bid
- Target: 1 (large-scope event - national,
international)
3
5
5
Successful bids:
- 2029 Canada Games Bid (successful)
- 2026 NORCECA's Men's Continental Championships (successful)
- 2025 Canadian Badminton Junior (U13+U15+U17+U19) and
Senior/Para Championships (successful)
Level of Service
Page 45 of 47
Venues (Levels of Service to the Public) July 2024 - June 2025 Results
Recreation, Culture, and Events
Pillars
Department Goals
Department
Division
Service
Name
Sub
Service
Direct
Custome
r
Service Definition
Service
Component
Current Service Level
Target
Achieve
d 2024-
2025
Target
Achieve
d 2023-
2024
Target
Achieve
d 2022-
2023
Target
Achieve
d 2021-
2022
Comment
Economy
To ensure that the
Coliseum are
developed as key
economic generators
for the City
Recreation, Culture,
and Events
Venues -
Coliseum
Complex
Events
Rented
Facility
Event
Organizer
(renter)
Coliseum Complex is a
premium facility for
trade and consumer
shows, general rentals,
and meetings.
Coliseum Complex
ready for event
- Rented area(s) ready for use by client
as per rental agreement. Target of 90%
100%
100%
99%
100%
Legends Restaurant
ready for event
- Restaurant ready for use by client
as per rental agreement.
- Target of 90%
99%
99%
100%
100%
Ice Rental
Ice Surface
Condition
Skaters
Service provided to
groups
renting ice.
Ice surface ready
for use
- Ice flooded prior to rental period.
- Target 95%
100%
100%
100%
100%
Dressing
Room
Condition
Users
Service provided to
groups renting ice.
Dressing rooms
ready for use
- Dressing room cleaned prior to rental
period. - Target 95%
100%
100%
100%
100%
Social
To improve the quality
of life experience for
resident
Recreation, Culture,
and Events
Venues -
Coliseum
Complex
Community
Walking
Indoor
walking
area
Walkers
Service offered to
individuals seeking a
warm, indoor walking
venue.
Coliseum available
for walkers
- Available from October to April
(weekdays from 9 a.m. to 4 p.m.)
during non-event days.
- Target 95%
99%
100%
100%
100%
Level of Service
Page 46 of 47
Operations - Water and Wastewater
Pillars
Description
Departmen
t
Division
Service
Name
Sub Service Service Definition
Direct
Customer
Service Component
Current Service Level
Target
Achieved
2024-
2025
Target
Achieved
2023-
2024
Target
Achieved
2022-
2023
Results/ Comments
Environmen
tal
To provide
clean
and
safe potable
water
to
citizens.
Operations
Water &
Wastewate
r
Potable
Water
Water
A public service
provided to water
account holders and
water consumers
offering access to
safe, clean potable
water, meeting or
exceeding the
Canadian drinking
water guidelines.
Homeowners
and
Businesses
Watermain and water
services operation and
maintenance
- Repair of water main breaks (begin digging) to start
within 24 hours
- Target: 80% of the time
Yes
Yes
Yes
39 water main breaks ocurred during the period. 92%
completed within 24 hours.
Homeowners
and
Businesses
- Repair of major service leaks (begin digging) to start
within 24 hours
- Target: 80% of the time
Yes
Yes
100%
There were 6 major service leaks during the review period.
All were completed within 24 hours.
Homeowners
and
Businesses
- Repair of minor service leaks (begin digging) to
start within 168 hours (1 week)
- Target: 80% of the time
No
No
No
There were 39 minor service leaks during the period. 59%
were completed within 7 days. Average time to complete
was 9.5 days.
- Some impacts to timely resolution can be attributed to
information delays related to underground infrastructure
provided by third parties (locates) as well as to scheduled
accommodations, as requested by the ratepayer.
Homeowners
and
Businesses
- Thawing of frozen services (begin digging) to start
within 24 hours
- 80% of the time
_
_
_
No frozen services reported during the period.
Homeowners
and
Businesses
Metering - high water
consumption
- Monthly notification to users consuming more than
300% of their historical volumes
- Target: 100% of the time
Yes
Yes
Yes
Fire
Department
Fire hydrants
- Snow removal at fire hydrants in the downtown area
within 48 hours after the end of a storm
- Target: 90% of the time
Yes
Yes
Yes
Crews dispatched 9 times during the season. December(3)
January(1) and February(5).
- Contractor activation for snow removal at fire
hydrants outside of the downtown area within 24
hours of request
- Target: 90% of the time
Yes
Yes
Yes
Contractors dispatched twice for hydrant clearing during
the season.
Water
Consumers
Potable water compliance
monitoring and reporting
- Meet the Maximim Acceptable Concentrations in
Health Canada's
"Guidelines for Canadian Drinking Water Quality"
- Target: 100% of the time
100%
100%
100%
- Annual Report submitted to Regulator
- Target: 100% of the time
Yes
Yes
Yes
Environmen
tal
To provide
safe removal
of
wastewater to
residents
Operatio
ns
Water &
Wastewat
er
Wastewat
er
Wastewat
er
A public service
provided to
wastewater account
holders and
wastewater
producers offering
safe removal of
wastewater from
their premises
Homeowners
and
Businesses
Sewer main and lateral
operation and maintenance
- Response to flooded basements within 1 hour of a
call
- Target: 90% of the time
No
No
No
- Results (excluding Storm Response flooding): Met target
31.3% of the time.
- Average time to respond was 4
hours 43 minutes. Results
(excluding Storm Response
Flooding)
Homeowners
and
Businesses
Wastewater compliance
monitoring and reporting
- Annual Report submitted to Regulator
- Target: 100% of the time
Yes
Yes
Yes
Level of Service
Page 47 of 47
(effluents, cross-
connections)
Environmen
tal
General
activities
related to
water and
wastewater
Operatio
ns
Water &
Wastewat
er
Water &
Wastewat
er
Water &
Wastewat
er
Water and
Wastewater
Homeowners
and
Businesses
Water and sewer locates for
Utilities infrastructure
- Utility locates completed within 2 working days
- Target: 90% of the time
No
No
Yes
83.1% completed within 2 working days.
* Issues with external party performaing locates resulted a
drop below the expected target level of service. Overall
average time to resolve requests remain below the 2
working day target.
Homeowners
and
Businesses
New service initiation -
water and sewer account
creation and maintenance
- Utility account creation set up within 90 days from
date of application
- Target: 90% of the time
Yes
No
100%
195 applications completed in 18.2 days.