Perth-Andover Community GHG & Energy Action Plan
Southern Victoria, New Brunswick
This is the exact embedded text of the captured official document.
Snapshot 19db2778ced0 · verified 2026-06-07 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
Perth-Andover's Community GHG & Energy Action Plan
Climate Change and Energy Initiative
June 2018
Consulting team
Financed by
Realised with the
© 2018, Union of Municipalities of New Brunswick. All Rights Reserved.
The preparation of this plan was carried out with assistance from the Green Municipal
Fund, a Fund financed by the Government of Canada and administered by the
Federation of Canadian Municipalities. Notwithstanding this support, the views
expressed are the personal views of the authors, and the Federation of Canadian
Municipalities and the Government of Canada accept no responsibility for them.
Acknowledgements
We would like to express our deepest appreciation to all those who provided support
to our team to complete reports, annexes and all tools developed in this UMNB
initiative.
-
A special gratitude to UMNB general managers, Mrs. Margot Cragg and Mr.
Raymond Murphy (deceased).
-
We want to thank Eddie Oldfield - Spatial QUEST for its technical contribution with
the mapping, the workshops organisation and all the work provided.
-
We also want to present special thanks to all stakeholders and municipal
employees who have contributed to achieve the UMNB CCEI.
Community GHG & Energy Action Plan
Page 2
CONTENTS
I.
Introduction ........................................................................................................................................................
II.
The Plan's Strategy ............................................................................................................................................
III.
The Community's profile ..................................................................................................................................
IV.
The Plan's Summary ..........................................................................................................................................
V.
The Inventory ..................................................................................................................................................
VI.
The Plan ...............................................................................................................................................................
VII.
Appendices ........................................................................................................................................................
Community GHG & Energy Action Plan
Page 3
I. INTRODUCTION
THE PARTNERS FOR CLIMATE PROTECTION
(PCP) PROGRAM is a network of Canadian municipal
governments that have committed to reducing greenhouse gases
(GHG) and to acting on climate change. Since the program's
inception in 1994, over 300 municipalities have joined PCP,
making a public commitment to reduce emissions. PCP
membership covers all provinces and territories and accounts for
more than 65 per cent of the Canadian population. PCP is the
Canadian component of ICLEI's Cities for Climate Protection (CCP)
network, which involves more than 1,100 communities
worldwide. PCP is a partnership between the Federation of
Canadian Municipalities (FCM) and ICLEI -- Local Governments for
Sustainability.
The CLIMATE CHANGE AND ENERGY
INITIATIVE (CCEI)
Municipalities in New Brunswick are increasingly aware of
environmental challenges they face, and are particularly
concerned with actual and future impacts of climate change.
The Village of Perth-Andover joined the Climate Change and
Energy Initiative of the Union of Municipalities of New Brunswick,
to reinforce its efforts to advance in the Partners for Climate
Protection Program (PCP). The UMNB initiative fits perfectly in the
global and national context of addressing climate change,
following the Paris Agreement (COP 21).
Perth-Andover is engaged:
Climate Change and Energy Initiative (CCEI) of the Union
of Municipalities of New Brunswick, 2017
Member - Partners for Climate Protection program, FCM,
2016
Village of Perth Andover Strategic Priorities 2016-2020
Communities across Canada are facing the effects of
climate change. Some have to deal with greater droughts, others
with more violent storms.
Municipal governments have a leading role to play in climate
protection. They have direct or indirect control over nearly half of
Canada's greenhouse gas (GHG) emissions (350 million tons).
Canada's goal is to reduce its GHG emissions by 30% below 2005
levels under the Paris Agreement.
Community GHG & Energy Action Plan
Page 4
I. INTRODUCTION
What is a Community GHG & Energy Plan? The Plan is a long-term plan that identifies ways to reduce GHG emissions
and to support the Municipality's local economy by increasing its competitiveness, helping to create local or regional jobs in the energy sector,
improving energy efficiency, and improving energy security.
In 2018, planning and coordinating energy use and GHG emission reduction at the community level remains innovative especially for smaller
size communities outside metropolitan areas. However, in cities or communities where it has been done, it has resulted in some of the most
efficient, and from an energy standpoint, most cost-competitive cities in the world, with resulting reductions in associated environmental
impacts.
The communities that are leaders have taken an integrated energy systems approach looking at the potential for innovation in how energy is
sourced, generated, consumed, re-captured, conserved, stored, and delivered. The UMNB CCEI's Community GHG & Energy Plan will
be a "living document", in that the actions taken by the Municipality and community stakeholders are expected to grow and change over time.
Why a Community & GHG Energy Action Plan The Plan is great tool to face community transformation challenges
encountered in New Brunswick: Climate change impacts, population growth or decline, development growth and economic transformation.
Those challenges push municipalities and communities to examine ways to reduce its cost of services while continuing to maintain and enhance
the quality of life. And how energy is used, and the cost of that energy to residents as well as to the municipality, is an important factor. Smart
solutions also reduce environmental impacts associated with the consumption of energy. A good strategy and planning can enhance prosperity
by making the municipality more economically competitive.
Enhancing access to energy efficiency, conservation and demand-management opportunities can also have a positive effect on the local retail
and service industry. Businesses that increase the energy efficiency of their facilities and operations can improve their competitiveness in the
marketplace.
In addition to the Corporate GHG Action Plan, the Community GHG & Energy Plan is the UMNB CCEI second foundation stone.
The Plan brings a powerful and dynamic tool to help communities for smart and sustainable development allowing to reduce their carbon
footprint.
Community GHG & Energy Action Plan
Page 5
II. THE PLAN'S STRATEGY
Vision
The vision of the Plan is to achieve a low carbon and smart energy community in an economically viable way:
Reducing its carbon footprint by increasing energy conservation, using energy efficiently through new development and retrofits,
transportation planning, producing renewable or clean energy, helping to improve local energy security.
Goals
The vision is supported by a series of goals that bring focus to mitigating climate change, improving energy performance within the community
and creating economic advantage:
1. Foster a shift towards low carbon technologies.
2. Increase energy efficiency for new and existing buildings.
3. Foster a shift towards low carbon transportation that integrates EV infrastructure, promotes alternative fuel vehicles, low carbon fuel
options, as well as public transit and active transportation as mechanisms to reduce the number of vehicles on the road.
4. Create or help adaptive, sustainable, affordable, and reliable local renewable and clean energy supply.
5. Design, build, and revitalize neighbourhoods as complete communities that offer multi-modal transportation options.
6. Create new market opportunities for innovative energy solutions that are attractive for local and new businesses, and through high
quality, affordable, clean energy services foster retention and growth of existing businesses and industries.
7. Build awareness about energy investment and create a culture of energy conservation amongst residents, business, institutions, and
industries.
8. Build knowledge, skills, and technical capacity through partnerships that deliver innovative energy solutions at the local scale.
Community GHG & Energy Action Plan
Page 6
II. THE PLAN'S STRATEGY
The principles provide direction for the development of the
projects and initiatives presented in the Plan. To build and implement
an action plan and portfolio of environmentally and economically
successful projects all proposed solutions, projects, or initiatives
should consider these principles:
1.
Advocate for urgent action to address climate change
2.
Set achievable reduction targets
3.
Maximize benefits for the municipality and the community
4.
Ensure and enhance a sustainable energy system
5.
Maximize efficient use of energy
6.
Design model and innovative projects
7.
Build on existing programs and funds: for example, FCM and GMF
programs, Environmental Trust Fund, NB Power programs, etc.
8.
Create a competitive and economic advantage for the Community
9.
Demonstrate global leadership
GHG Emission Reduction Target
17% for 2025 and 34% for 2035
For the Community Plan, GHG emission reduction target is set on a voluntary and non-binding basis. It is important that the targets are
ambitious while being realistic both in their importance (projected reductions) and in their duration (year of maturity). Before setting the
reduction targets and the action plan timeline, we took into account:
PCP and GMF recommendations is -6% over the base year, within 10 years.
The objectives of the Government of New Brunswick.*
The GHG reduction potential of the municipality and its community.
* The New Brunswick's Climate Change Action Plan "Transitioning to a Low-Carbon Economy" (2017) - The provincial
government will: 31 - Establish specific GHG emission targets for 2020, 2030 and 2050 that reflect a total output of:
a - 14.8 Mt by 2020;
b - 10.7 Mt by 2030; and
c - 5 Mt by 2050.
Community GHG & Energy Action Plan
Page 7
II. THE PLAN'S STRATEGY
Approach and developing the Plan
Background data was collected via energy distributors in New Brunswick and from various other provincial and federal sources. Electricity data
was provided by NB Power, Saint John Energy and Perth Andover Electric and Light Commission.
For all participant, a workshop was held to do a mapping exercise through a community GHG & energy planning process. The workshop
allowed the team, the municipality and its stakeholders to identify areas or sectors where GHG reduction projects, conservation and efficiency
measures could be focused, to assess the potential for local generation, particularly renewable energy, and look at the energy implications of
future growth and prosperity. Webinars were held with each participants to finalize the Corporate GHG & Energy Action Plan as well as to
prepare the final workshop to complete the Community GHG & Energy Action Plan. Each municipality CCEI manager invited to workshops and
webinars, stakeholders they considered important to assist, councillors and municipal employees.
Each Community Plan include a presentation document and more importantly is also build with a series of tool joined in annexes:
Annexe A: Project's description with implementation procedures
Annexe B: Excel Projects Sheets with GHG and energy data calculation
Annexe C: Mapping document for Workshop (Spatial Quest)
As final step, the Community and the Corporate plan are submitted to the Participant Municipality to be adopted by resolution.
YHC Environnement, an energy planning and environment consultant, was retained by UMNB to provide services to produce inventories,
action plans and the various tool needed. Spatial Quest was hired to do the GHG and energy mapping related to workshop's organisation and
as liaison agent with the concerned stakeholders in New Brunswick.
Timeline For efficiency, the choice of a pertinent timeline is essential. Because the scope of the Community Plan is important and imply
major technological and behavioral changes, we recommend a 20 years timeline. However, for reviewing and monitoring process the
Community Plan propose a 10 year step in 2025 concordance with the Corporate GHG Action Plan.
Community GHG & Energy Action Plan
Page 8
III. THE COMMUNITY'S PROFILE
The Village of Perth-Andover is located in Victoria
County, in western New Brunswick, 101 kilometers south-east of
Edmundston and 175 kilometers north-west of Fredericton.
Perth-Andover is adjacent to Andover Parish to the west and
Perth Parish to the east. Tobique First Nation Reserve is located
on the opposite shore of the river to the north.
The population of Perth Andover in 2016 was 1,590 inhabitants
spread over an area of 8.97 km2, a density of 177.3 hab./km2.
The Municipality had 769 private dwellings in 2016, of which
717 were occupied by full time residents. 74% of the dwellings
were built before 1991.
The official language spoken by the population of Perth Andover
is English at 96%, French at 3% and both official languages at
1%.
Perth-Andover owns its Electric Light Commission and purchases
power from the Tinker Dam. The resulting GHG emission
coefficient for the electricity used and consumed on the territory
is significantly low.
With the interesting environmental advantage, Perth-Andover
has decided to adopt a corporate target of 50% reductions in
GHG emissions for 2025 according to the reference year 2015
and is planning a 100% reductions in corporate GHG emissions
for 2035.
Perth-Andover aims to be "The first net zero
community" in New Brunswick
PICTURE 1: PERTH-ANDOVER'S MAP
Community GHG & Energy Action Plan
Page 9
III. THE COMMUNITY'S PROFILE
PICTURE 2: PERTH-ANDOVER'S GHG EMISSIONS MAP
Community GHG & Energy Action Plan
Page 10
III. THE COMMUNITY'S PROFILE
Challenges
The Village of Perth Andover and its community are facing important challenges related to
population's decrease: 11,5% between 2006 and 2016.
For the Village, the challenge is while its responsibilities and expenses related to energy
remain similar or increase, tax incomes are decreasing in time.
Energy needs are difficult to curb down.
Opportunities
Perth-Andover owning its Electric Light Commission purchases and generates income
selling clean energy.
The Village is aiming to maximise the use of its clean electricity in the Community for
example by:
- Promoting electric and clean equipment to remove residential oil furnace;
- Promoting EV acquisition and use;
- Negotiating deal with clean tech industries and businesses to develop green and clean
projects on its territory;
- Etc.
For Perth-Andover there is a major opportunity to be "a perfect size" living lab to learn and
test ways to become a green and prosperous "net zero community".
A Plan for Perth-Andover to be "The first net zero community" in New
Brunswick.
Community GHG & Energy Action Plan
Page 11
IV. THE PLAN'S SUMMARY
The Plan
The Plan aims to help Perth-Andover and its Community to face main challenges.
Use Perth-Andover asset of its Electric Light Commission selling clean energy comparative advantage to generate income and become a
"net zero community" with:
A. A program promoting high efficient electric equipment "mini split" for heating purposes to replace oil products use
B. Promote with a program EV acquisition and use to replace oil products use
C. Help transport electrification provincial program (NB Climate Change Action Plan)
D. At the corporate level, test and show example for transport electrification
Reduce dependency on fossil energies: Eliminate all residential heating oil use
Curb down energy use, expenses and reduce GHG emissions
Promote individual and collective energy efficient habits:
a. Implement an ongoing anti-idling campaign & fuel efficient driving all across the community
b. Increase at least by 25% clothe line usage
Promote energy efficient technologies:
a.
LED lighting to replace 60% all lights in the community
b.
At least half of residential and commercial to improve their energy efficiency
Promote energy wise decision-making : smaller vehicles are in average 20% more fuel efficient
Implement low capital project & strategy to generate good return on investment overcome tax income decrease
Community GHG & Energy Action Plan
V. THE INVENTORY
COMMUNITY GHG INVENTORY
Page 12
Community GHG & Energy Action Plan
The Village of Perth-Andover has joined
the Climate Change and Energy
Initiatives Program by commissioning
UMNB and YHC Environnement to
develop an inventory of its GHG
emissions that will be used to develop
an action plan that includes a suite of
measures. to control and reduce GHG
emissions from their sources.
Page 13
V. THE INVENTORY
Perth-Andover's emissions inventory
consists of two separate components.
The first is emissions from the activities
of the municipal administration (the
Corporate) and the second covers the
entire territory of the Municipality (the
Community).
This document covers the Greenhouse
Gas Emission Inventory for the 2015
reference year of the Community
Component of the Village of Perth-
Andover. The relevant additional
elements are detailed in the
appendices.
Community GHG & Energy Action Plan
Page 14
V. THE INVENTORY
TABLE 1 :
COMMUNITY GHG EMISSIONS FOR THE BASE YEAR
GRAPH 1 :
COMMUNITY GHG EMISSIONS BREAKDOWN BY SECTOR (TECO2)
A. Summary
The community component consists of five emission sectors. For Perth-Andover, the total emissions of the community is approximately
9 252 tons of CO2 equivalent. Most of these came from transportation that is 65.2%. Commercial generated 18.2% of emissions,
residential 13.7%, industrial 1.5% and finally 1.3% of emissions are attributed to the community waste.
The Community, with its 1 590 inhabitants has a per capita emission rate of 5.8 tons of CO2 equivalent
Community GHG & Energy Action Plan
Page 15
V. THE INVENTORY
TABLE 2 :
TRANSPORTATION GHG EMISSIONS BREAKDOWN
BY VEHICLE TYPE (TECO2)
GRAPH 2 :
TRANSPORTATION GHG EMISSIONS BREAKDOWN
BY VEHICLE TYPE (TECO2)
B. Transportation
For the year 2015, the Perth-Andover community had 1 336 vehicles numbered on its territory. With 6 033 tons of eq. CO2, the
transportation sector is responsible for a large part (65.2%) of greenhouse gas emissions of the community (see Graph 1). Emissions
from the sector come from five (5) subclasses; light truck because of their large number, form the category that generates the most
emissions from GHG, with 36.7% of the total sector. Heavy truck is in second place with 31.2%, follow car 26.9%, bus 4.9%, and finally
motorcycle with 0.4%.
Community GHG & Energy Action Plan
C. Industrial, Commercial and Institutional Buildings (ICI)
In 2015, an estimated 3 097.2 tons of eq. CO2, greenhouse gas emissions come from Perth-Andover's residential and industrial,
commercial and institutional (ICI) sectors. Fuel oil gets noticed as first source of GHG emissions with 2 255.6 tons of eq. CO2. Electricity
and heavy fuel oil Assume 470.0 and 187.1 tons and propane emits 184.6 tons eq. CO2.
Page 16
V. THE INVENTORY
TABLE 3 :
COMMUNITY GHG EMISSIONS AND ENERGY CONSUMPTION BY TYPE
Volume
Unit
(teCO2)
%
(Gj)
%
Electricity
27 644 256
kWh
470,0
15,2%
99 519
72,6%
Fuel Oil
824 670
Liters
2 255,6
72,8%
31 997
23,3%
Natural Gas
0
m3
0,0
0,0%
0
0,0%
Diesel - Buildings
0
Liters
0,0
0,0%
0
0,0%
Heavy Fuel Oil
59 482
Liters
187,1
6,0%
2 528
1,8%
Propane - Buildings
119 536
Liters
184,6
6,0%
3 025
2,2%
District Energy
0
0,0
0,0%
0
0,0%
3 097,2
137 070
Energy
2015
Total
Community GHG & Energy Action Plan
Page 17
V. THE INVENTORY
GRAPH 3 :
RESIDENTIAL AND ICI GHG EMISSIONS BREAKDOWN
BY ENERGY TYPE (TECO2)
GRAPH 4 :
RESIDENTIAL AND ICI ENERGY CONSUMPTION BREAKDOWN
BY ENERGY TYPE (GJ)
C. Industrial, Commercial and Institutional Buildings (ICI) (continued)
Fuel Oil produces 72.8% of the sector's emissions and meets 23.3% of the Perth-Andover Territory's energy needs for the residential
sector and ICI. Electricity, heavy fuel oil and propane-buildings accounted for 15.2%, 6.0% and 6.0% of greenhouse gases, respectively,
and together they contributed to the satisfaction of 72.6%, 1.8% and 2.2% of their energy demand in their sectors for the Perth-
Andover community.
Community GHG & Energy Action Plan
Page 18
V. THE INVENTORY
TABLE 4 :
COMMUNITY LANDFILL WASTE BY CATEGORY
GRAPH 5 :
COMMUNITY LANDFILL WASTE GHG EMISSIONS
BY CATEGORY (TECO2)
D. Community Waste
In 2015, the 860 tons of Perth-Andover solid waste produced 121.7 tons of eq. CO2 greenhouse gas. They are responsible for 1.3% of the
total emissions of the Community (see Graph 1).
The estimated share of corporate issues is 7.0 tons of eq. CO2 (5.7% of the total) which would correspond to nearly 42 tons of waste.
Community GHG & Energy Action Plan
Page 19
V. THE INVENTORY
TABLE 5 :
COMMUNITY INFORMATION
GRAPH 6 :
COMMUNITY EMISSIONS FORECAST
E. Community Emissions Forecast
Community emissions forecast present how the inventory emissions may evolve at the end of the action plan (2025), based on a
business as usual scenario, i.e. without any direct intervention of the decision-makers. Factors such as demographic change or economic
conditions are taken into account in determining future levels of current emissions.
Base Year
Forecast Year*
2025
2035 CGHGEP
Reduction Target by Forecast Year* (%)
17,0%
34,0%
2015
Community GHG & Energy Action Plan
E. Community Emissions Forecast (continued)
Page 20
V. THE INVENTORY
TABLE 6 :
COMMUNITY EMISSIONS FORECAST BY SECTOR
Current
emissions
% Change
Expected**
Emissions in
Forecast year
Emissions in CEP
Forecast year
Residential
1 269,6
-4,0%
1 244,2
1 218,8
Commercial
1 686,0
-4,0%
1 652,3
1 618,6
Industrial
141,6
-4,0%
138,8
135,9
Transportation
6 032,8
-4,0%
5 912,1
5 791,5
Waste
121,7
-4,0%
119,3
116,9
Total Emissions (t CO2e)
9 251,7
9 066,7
8 881,6
Community GHG & Energy Action Plan
VI. THE PLAN
COMMUNITY PLAN
Page 21
Community GHG & Energy Action Plan
Page 22
VI. THE PLAN
A. STRATEGY FOR GHG REDUCTION AND PROJECT SELECTION
Community Action plan
As noted in Section II - Strategy, for PCP and GMF, the GHG emission reduction targets of participating municipalities are set on a
voluntary and non-binding basis.
Considering the context of the Municipality, and the fact that the Village owns its Electric Light Commission and purchases power
from the Tinker Dam, which produces a very low-GHG power, the community plan proposes the achievement of a target of 17%
reductions in GHG emissions for 2025 and 34% reductions in GHG emissions for 2035 according to the reference year 2015.
Objectives and year set by Perth-Andover:
Community Action plan :
-
Reduction Target : 17% and 34%
-
Base year : 2015
-
Forecast year : 2025 and 2035
TABLE 7 :
COMMUNITY INFORMATION
Community GHG & Energy Action Plan
Page 23
VI. THE PLAN
A. STRATEGY FOR GHG REDUCTION AND PROJECT SELECTION
Guiding principles
The approach behind the development of the Village of Perth-Andover's Action Plan as part of UMNB's CCEI is to develop an action plan
that includes projects which :
1)
Improve the quality of life of communities (better environment and savings)
Improve the quality of life of communities (better environment and savings) ;
Generate GHG emission reductions that meet the goals and needs of the community ;
Allow as much as possible to generate energy savings that guarantee the sustainability of the actions of the Municipality and
its community.
2)
Use community resources to develop the expertise of UMNB and New Brunswick members
Optimize the use of community resources and know-how to maximize socio-economic benefits;
Help develop local and regional expertise to increase the knowledge of communities and New Brunswick..
3)
Will become examples and models for New Brunswick and other communities in Canada
The projects must enable UMNB member municipalities to stand out/take leadership, to respond to challenges of climate
change for New Brunswick communities, to protect the environment, improve the quality of life, and become role models for
action and resilience.
Community GHG & Energy Action Plan
Page 24
VI. THE PLAN
A. STRATEGY FOR GHG REDUCTION AND PROJECT SELECTION
Global approach
«GOOD PRACTICE» PROJECTS
The action plan prioritises projects considered as "good practices".
These projects correspond to the application of, for example, measures
and technologies supported by the programs of New Brunswick Power,
the Government of New Brunswick or Canada.
These "Good Practice" projects form the basis of the Action Plan.
MODEL PROJECTS & UMNB PILOT PROJECTS
As part of UMNB's CCEI, the action plan also proposes to municipalities
two types of model projects & pilot projects :
1.
Transport electrification & EV integration in the
community
2.
EV & Carsharing - SAUVéR (Group Project)
Community GHG & Energy Action Plan
The goal of the Village of Perth-Andover's Community Action Plan is to reduce greenhouse gas emissions by 17% by 2025 and 34% by
2035 from their 2015 baseline.
For Perth-Andover, the emissions calculated for the year 2015 allow us to estimate the reductions required to reach the target set by the
Community's action plan to approximately 1 572.8 tons or 17% by 2025 and 3 145.6 tons or 34% by 2035.
Page 25
VI. THE PLAN
TABLE 8 :
BASELINE AND TARGET
Base
Forecast
Forecast EGHGEP
2015
2025
2035
1
9 252
2
Community Emissions Forecast (BAU Scenario)
9 067
8 882
3
17,0%
34,0%
4
7 679
6 106
5
1 572,8
3 145,6
6
1 387,8
2 775,5
Reduction Target
Forecast emissions (target) (line 1 - line 5)
Total reductions to be achieved (Including BAU Scenario)
Tons of CO2 equivalent
Current Emissions
Year
Total reductions to be achieved (line 1 - line 4)
17%
2025
34%
2035
B. REFERENCE LEVEL AND TARGET
Community GHG & Energy Action Plan
Achieving the objective of Perth-Andover's Action Plan would mean that the level of community GHG emissions for the year 2025 be at
7 640 tons of eq. CO2. This is a decrease of 1 612 tons from the 2015 emissions level of 9 252 tons of eq. CO2. This represents a
potential reduction of 17.4%, which is 0.4 percentage point above the target of 17% and 39.3 tons more than the targeted reduction of
1 572.8 tons (see Table 8).
VI. THE PLAN
TABLE 9 :
ANALYSIS OF THE OUTCOME OF THE ACTION PLAN
Page 26
Forecast EGHGEP
2025
eCO2(t)
%
1
9 252
100,0%
2
0,4
0,0%
3
1 612
17,4%
4
1 612
17,4%
5
7 640
82,6%
6
39,3
0,4%
7
224,4
2,0%
19,4%
Gap with the target ( Action Plan 2025)
Current Emissions (Base year)
Early action results
Expected reductions in the Action Plan
Considering BAU Scenario (2025)
Total reductions
Total Reductions (line 2 + line 3)
Level of anticipated emissions (forecast year) (line 1 - line 4)
C. ANALYSIS OF THE PROJECTED RESULTS OF THE ACTION PLAN
Community GHG & Energy Action Plan
Some projects have been completed or initiated by the Village of Perth-Andover between the reference year of the inventory (2015) and
the year of adoption of the action plan presented (2018). These early actions have contributed to the municipality's effort to reduce
community GHG emissions.
The action plan identified the completion of one (1) project whose estimated reductions were estimated at 0.4 ton of CO2 equivalent.
Page 27
TABLE 10 :
PROJECT PROJECTS COMPLETED PRIOR TO THE ADOPTION OF THE ACTION PLAN (EARLY ACTIONS)
D. PROJECT PORTFOLIO - EARLY ACTION
VI. THE PLAN
Projects (MAT)
Residential
0,4
1
EA
Mini-Split Rental Program (Early Action)
Number of units 93
0,4
ICI
-
Transportation
-
Community Waste
-
TOTAL
0,4
Total GHG
reductions (tons)
Community GHG & Energy Action Plan
Mini-Split Rental Program (Early Action)
Perth-Andover has set up a heat pump rental program. Units are available for customers inside and outside of the Village. Customers,
depending on their heating and cooling needs can chose between different models. A free home assessment is performed in order to:
Review of the current electrical panel and service for install ; Review the layout and square footage of the home ; Evaluate heating and
cooling needs ; Educate on the basics of how Mini Split Ductless Heat Pumps cut your home heating costs.
Because they do not produce heat but only moving it, mini-splits are more efficient than other convectional home heating technologies.
The same reason explains why their performance varies according to the temperature.
Page 28
Base year : 2015
Mini-Split Rental Program (Early Action)
1 Number of Mini-splits installed (as of 2017)
93
2 Total residential electricity consumption
14 889 484
kWh
3 Number of households
719
4 Electricity Intensity (kWh/household)
20 709
kWh/household
5 Total electricity needs (estimated)
1 925 900
kWh
6 Energy use for heating purposes
65,94
%
7 Energy use for cooling purposes
0,38
%
8 Electric Consumption - heating
1 269 938
kWh
9 Electric Consumption - cooling
n/a
kWh
10 Electricity consumption GHG emissions
21,6
eCO2 (t)
11 Average heating savings (estimated)
1,6
%
12 Average cooling savings (estimated)
n/a
13 Electricity reduction per year (kWh)
20 935
kWh
14 GHG emissions reduction (tons)
0,36
eCO2 (t)
D. PROJECT PORTFOLIO - EARLY ACTION
VI. THE PLAN
Community GHG & Energy Action Plan
The most recent measures, technologies and programs have been analyzed and evaluated. They form the basis of the action plans
produced by YHC Environnement. Then, based on the 2015 inventory data, as well as the characteristics and needs of the Community of
Perth-Andover, the development of the Project Portfolio was completed.
The action plan contains twelve (12) projects whose potential reductions are estimated at 1 611.8 tons of CO2 equivalent (see Table 11).
VI. THE PLAN
Page 29
D. PROJECT PORTFOLIO
Community GHG & Energy Action Plan
Project Portfolio Summary
VI. THE PLAN
TABLE 11 : COMMUNITY PROJECT PORTFOLIO
Page 30
Projects (MAT)
Residential
974,7
1
R 1
LED lighting
3,9
2
R 2
Energy efficiency (Residential buildings)
8,8
3
R 3
Clean Energy Conversion (Oil to Electricity)
Conversion rate : 100%
959,7
4
R 4
Mini-Split Rental Program
Number of units 160
0,6
5
R 5
Energy efficiency - Residential - Clothes Line Program
1,7
ICI
84,0
6
ICI 1
LED lighting
See Action R 1
11,0
7
ICI 2
Energy efficiency (commercial buildings)
73,0
Transportation
553,1
8
T 1
Idle-free Policy
376,8
9
T 2
Fuel-efficient driving
114,9
10
T 3
Electric Vehicle Community Program
EV Units
21
23,3
11
T 4
Compact vehicles
38,1
Community Waste
-
12
W1
Domestic composting
-
TOTAL
1 611,8
Total GHG
reductions (tons)
D. PROJECT PORTFOLIO
Community GHG & Energy Action Plan
1. Infrastructure (lighting) - LED lighting
LED technology is more reliable with a much longer life span compared to incandescent or fluorescent bulbs. LED technology is more
reliable with a much longer life span compared to other types of lighting. According to Hydro-Quebec : "Most LED bulbs last about
25,000 hours, while incandescent lightbulbs last only 1,000." So if they're on 8 hours a day, 365 days a year, LED bulbs could last more
than 8 years".
In the community, voluntary conversions and those made through information, awareness and incentive campaigns
reduce electricity consumption. It is assumed that 60% of the incandescent bulbs will be replaced by LED bulbs at the end of this action
plan.
VI. THE PLAN
Page 31
Base year : 2015
LED lighting
GJ
kWh
Ratio
1 Total residential energy consumption
68 042
18 900 653
2 Estimated residential lighting power consumption
2 477
687 984
3,64%
3 Total CI sector energy consumption
64 264
17 851 065
4 Estimated commercial lighting power consumption
6 889
1 913 634
10,72%
5 Total industrial energy consumption
4 764
1 323 275
6 Estimated industrial lighting power consumption
173
48 167
3,64%
7 Efficiency gains due to conversion
55%
8 Conversion rate for 2025
60%
9 Annual energy conversion reduction (residential)
227 035
kWh
10 Annual Energy Conversion Reduction (CI)
631 499
kWh
11 Annual Energy Reduction in Conversion (Industries)
15 895
kWh
12 Reduction of GHG emissions from conversion (residential)
4
t eCO2
13 Conversion GHG emission reduction (CI)
11
t eCO2
14 Reduction in Conversion GHG Emissions (Industries)
0
t eCO2
15 Reduction of GHG emissions from conversion (all sectors)
15
t eCO2
D. PROJECT PORTFOLIO
Community GHG & Energy Action Plan
2. Infrastructure (heating, cooling & envelope) - Energy efficiency (Residential buildings)
According to the community inventory, more than 13,7% of the community's GHG emissions come from the commercial and
institutional sector. Improving energy efficiency is therefore a key means of reducing overall community emissions. NB Power has
developed a series of financial incentive programs such as waterproofing, insulation or replacement of home heating systems. The
average implementation rate of these measures is set at 50%. The average efficiency of all these measures is set at 10%.
VI. THE PLAN
Page 32
Base year : 2015
Energy efficiency (Residential buildings)
1
10,0%
2
Participating households (number and %) *
360
50,0%
3
Energy saved per year (Gj)
1 775
4
8,82
5,0%
* Rough estimation
Estimation details
5
53 602
Gj
6
65,94%
7
35 345
Gj
8
0
Gj
see below
9
157
Gj
10
167
eCO2 (t)
11
0
eCO2 (t)
12
10
eCO2 (t)
13
176
1,9%
14
50%
To set
15
9 252
eCO2 (t)
16
10,0%
To set
17
720
18
360
Rough estimation
See Oil removal project : Community aims to eliminate all heating oil use at the end of the current Action Plan
Propane GHG emissions
GHG emissions targeted
Projects' rate of implementation
Total community emissions
Average energy efficiency gain
Number of Dwellings in the community
Participating households
Electric Consumption - heating
Fuel consumption - heating
Propane consumption - heating
Electricity consumption GHG emissions
Fuel consumption GHG emissions (See Oil Removal Program)
Energy saving (estimated)
Reduction of GHG emissions (tons and %)
Total electricity Consumption
Energy use for heating purposes
D. PROJECT PORTFOLIO
Community GHG & Energy Action Plan
3. Infrastructure (heating, cooling) - Clean Energy Conversion (Oil to Electricity)
Perth-Andover wishes to become a net zero community. To reach the net zero target for its corporate GHG emissions, the Action Plan
proposes offset programs included in the community GHG and energy planning. Perth-Andover targets a complete removal of heating oil
consumption in the community in favor of electricity. In the case of Perth-Andover, this project is particularly interesting since the
community has access to hydroelectric power. The Village owns its Electric Light Commission and purchases power from the Tinker Dam.
As a result, both
power rates and GHG emissions of Perth-Andover are the lowest in the province. According to the community
inventory, more than 13.7% of the community's GHG emissions come from the residential sector.
A survey of oil residential consumer will be realized in the next 2 years to target an efficient clean energy switch.
VI. THE PLAN
Page 33
Base year : 2015
Clean Energy Conversion (Oil to Electricity)
1
100,0%
2
Participating households (number and %) *
720
100,0%
3
Energy saved per (Gj)
4 285
4
959,7
95,3%
* Rough estimation
Estimation details
5
Heating oil consumption
14 283
Gj
6
Heating oil GHG emissions
1 007
eCO2 (t)
7
Projects' rate of implementation
100%
Target
8
720
9
720
Rough estimation
10
9 998
Gj
11 Electricity GHG Emissions (result of conversion)
47
eCO2 (t)
12 Residual Heating Oil consumption
0
Gj
13 Residual Heating GHG Emissions
0
eCO2 (t)
14
959,7
eCO2 (t)
GHG reduction
Energy conversion
Reduction of GHG emissions (tons and %)
Electricity needs (result of conversion)
Number of Dwellings in the community
Participating households
D. PROJECT PORTFOLIO
Community GHG & Energy Action Plan
4. Infrastructure (heating & cooling) - Mini-Split Rental Program
The program, as described in the Early Actions section, will be continued. During the current action plan, in addition of the 93 units
already installed, The Village's target is to install 20 more mini-splits each year.
The outcome of this project will be better evaluated if the power consumption of the homes are monitored. The efficiencies achieved
and the customers feedback could bring valuable data to the project.
VI. THE PLAN
Page 34
D. PROJECT PORTFOLIO
Base year : 2015
Mini-Split Rental Program
1
Number of Mini-splits installed
160
2
Total residential electricity consumption
14 889 484
kWh
3
Number of households
720
4
Electricity Intensity (kWh/household)
20 680
kWh/household
5
Total electricity needs (estimated)
3 308 774
kWh
6
Energy use for heating purposes
65,94
%
7
Energy use for cooling purposes
0,38
%
8
Electric Consumption - heating
2 181 806
kWh
9
Electric Consumption - cooling
n/a
kWh
10
Electricity consumption GHG emissions
37,1
eCO2 (t)
11
Average heating savings (estimated)
1,6
%
12
Average cooling savings (estimated)
n/a
13
Electricity reduction per year (kWh)
35 967
kWh
14 GHG emissions reduction (tons)
0,61
eCO2 (t)
Community GHG & Energy Action Plan
5. Infrastructure (heating, cooling & envelope) - Energy efficiency - Residential - Clothes Line Program
Perth-Andover wishes to promote simple yet efficient measures that will reduce energy costs and carbon footprint of its citizens.
According to the community inventory, more than 13,7% of the community's GHG emissions come from the residential sector. Clothe
lines have multiple advantages : Low installation/repair cost, saves money, zero GHG emission, etc. The average implementation rate of
these measures is set at 25%.
VI. THE PLAN
Page 35
Base year : 2015
Infrastructure (heating, cooling & envelope)
1
12,5%
2
Participating households (number and %)
165
22,9%
3
Energy saved per year (kWh)
98 763
4
1,7
0,0%
Estimation details
5
100
kWh / month
6
1 200
kWh / year
7
720
8
Ratio of households with an electric clothes dryer
91,4%
9
790 103
kWh / year
10
13
eCO2 (t)
11
Clothes lines efficiency
100%
12
50%
6 months / year
13
25%
To set
14
165
15
98 763
kWh
16
GHG reduction
2
17
10 459
$
18
9 252
eCO2 (t)
Energy reduction
Energy savings
Total community emissions
Number of Dwellings in the community
Annual estimated power used by laundry dryers
Total estimated GHG emissions of laundry drying
Clothes lines use rate
Projects' rate of penetration
Participating households
Total power use for clothes drying
Energy saving (estimated)
Reduction of GHG emissions (tons and %)
Average electric clothes Dryer consumption per household
D. PROJECT PORTFOLIO
Community GHG & Energy Action Plan
6. Infrastructure (heating, cooling & envelope) - Energy efficiency (Commercial buildings)
According to the community inventory, more than 18.2% of the community's GHG emissions come from the commercial and
institutional sector. Improving energy efficiency is therefore a key means of reducing overall community emissions. NB Power has put in
place a program called " Energy Smart Commercial Buildings Retrofit Program" for Commercial Buildings. The average implementation
rate of these measures is set at 50%. The average efficiency of all these measures is set at 10%.
VI. THE PLAN
Page 36
Base year : 2015
Energy efficiency (commercial buildings)
1
Energy saving (estimated)
0
2
Energy saved per year (Gj)
2 023
3
73,00
5,0%
Estimation details
4
42 929
Gj
5
48,35%
6
20 756
Gj
7
16 909
Gj
8
2 786
Gj
9
98
eCO2 (t)
10
1 192
eCO2 (t)
11
170
eCO2 (t)
12
1 460
15,8%
13
50%
To set
14
9 252
eCO2 (t)
15
10,0%
To set
Energy use for heating purposes
Fuel consumption GHG emissions
Propane GHG emissions
GHG emissions targeted
Projects' rate of implementation
Total community emissions
Electric Consumption - heating
Fuel consumption - heating
Propane consumption - heating
Electricity consumption GHG emissions
Reduction of GHG emissions (tons and %)
Total electricity Consumption
Average energy efficiency gain
D. PROJECT PORTFOLIO
Community GHG & Energy Action Plan
7. Transportation - Idle-free Policy
Idling refers to running a vehicle's engine when the vehicle is not in motion. Idling occurs when car owner is warming up or cooling
down a vehicle, drivers are stopped at a red light, waiting while parked outside a business or residence, or otherwise stationary with the
engine running. For the average vehicle with a 3-litre engine, every 10 minutes of idling costs 300 milliliters (over 1 cup) in wasted fuel -
and one half of a liter (over 2 cups) if your vehicle has a 5-liters engine.
VI. THE PLAN
Page 37
For a successful anti-idling campaign includes
- the adoption of a speed reduction regulation
- carrying out an awareness-raising campaign
- the acquisition and installation of permanent signs
Base year : 2015
Idle-free Policy
1 Number of units
1 237
87
2 Fuel consumption
1 614 428
litres
767 049
litres
3 GHG emissions
3 938
eCO2 (t)
2 058
eCO2 (t)
4 Average fuel wasted idling
133 002
litres
19 488
litres
5 Average fuel economy
8,2%
2,5%
6 GHG emissions reduction
324,5
eCO2 (t)
52,3
eCO2 (t)
7 Total GHG Emissions reduction
376,76
eCO2 (t)
Diesel
Gasoline
D. PROJECT PORTFOLIO
Community GHG & Energy Action Plan
8. Transportation - Fuel-efficient driving
Driving can significantly influence fuel consumption. We assume in this project that community drivers, through incentives, promotional
campaigns and economic reasons, will gradually integrate these principles of effective behaviour.
According to Natural resources Canada, Adopting these five fuel-efficient driving techniques can reduce fuel consumption and carbon
dioxide emissions by as much as 20 percent (20%):
VI. THE PLAN
Page 38
1. Accelerate gently
2. Maintain a steady speed
3. Anticipate traffic
4. Avoid high speeds
5. Coast to decelerate
Base year : 2015
Fuel-efficient driving
1 Community transportation emissions
6 033
eCO2 (t)
2 Total community emissions
9 252
eCO2 (t)
3
128
4
115
1,24%
Number of targeted units
Reduction of GHG emissions (tons and %)
D. PROJECT PORTFOLIO
Community GHG & Energy Action Plan
9. Transportation - Electric Vehicle Community Program
The EV Community Program is proposed for the Community GHG and Energy Planning timeline. The program is related to the NB
Climate Action Plan and will help the community to integrate EV and gradually replace conventional vehicle use.
Perth-Andover Offset Program : The municipality aims to be a "Net Zero" equivalent for corporate GHG emission. To reach the "Net
Zero" equivalent objective, Perth-Andover will support community efforts to integrate EV use on its territory. The Village owns its
Electric Light Commission and provide a low carbon energy.
Pert-Andover wish to become a EV "pilot & model" village to test EV equipment, technologies and green transport transformation.
Information : EV use electrical energy to power an electric motor, they also reduce society's dependence on environmentally damaging
fossil fuels while lowering greenhouse gas emissions and air pollution.
Electric cars are cost effective, good for the environment and deliver great performance. There are two kinds of electric car:
VI. THE PLAN
Page 39
Fully Electric Cars are powered 100% by electricity and have
zero tailpipe emissions. Fully electric cars can travel 200-400
km on a single charge.
Plug-in Hybrid Electric Cars have small battery packs for
short all-electric driving distances (20-80 km) before a
gasoline engine or generator turns on for longer trips.
Base year :
2015
Target year :
2025
1 Perth- Andover - GHG Offset Target - eCO2 (t)
23
2 Target number of EV units for 2025
Minimum & maximum
8
21
3 NB CCAP Target for EV units for 2025 (estimated)
Total & annually
21
3
4 GHG emissions reduction (tons and %)
Minimum
23
0,3%
5
Maximum
64
0,7%
6 Transport GHG emissions reduction (%)
Minimum & Maximum
0,4%
1,1%
7 Savings per year (Minimum & maximum)
Minimum & Maximum
2 776 $
25 331 $
8 Number of car & light Truck
1 208
9
Minimum & maximum
0,6%
1,7%
D. PROJECT PORTFOLIO
Community GHG & Energy Action Plan
9. Transportation - Electric Vehicle Community Program (continued)
VI. THE PLAN
Page 40
EV-Charging Station (Installed & planned)
Location
Comment
Number
Total
5
Perth Johnson Pharmacy 16 NB-109, NBPower N3 NBPower - FLO
1
Near the Tim Hortons, Subway, Gas Stations, Highway 2
Proposed W1
1
Near light industrial area
Proposed W1
1
Near Town Hall and SNB
Proposed W1
1
Civic Centre, 2 Schools:
Proposed W1
1
(A) Credit for electricity consumed for
private EV Charging. Perth-Andover will offer
a credit for the electricity used for private
electric recharge.
i- Perth EV owners will have to register their
EV with the Village and the Commission to
receive a credit.
(Amount and Duration of credit must be
confirmed)
(B) Charging Station: EV owners & users will need an access to sufficient charging
stations (CS) reliability for public locations and private charging.
i- In 2018, Perth-Andover counts 2 public CS on its territory including one (1) level 3
(fast charging) CS. With the EV program the Village is planning to increase public CS
in 4 other location (see location).
ii- EV owners will also need a reliable private CS installed at home. (Better
electricity price and PA EV credit)
iii- Perth-Andover will work to negotiate interesting price with retailer for private
charger. (See Addenergie)
D. PROJECT PORTFOLIO
Community GHG & Energy Action Plan
10. Transportation - Compact vehicles
The community vehicle fleet is becoming more fuel-efficient and fuel-efficient, consuming about 20% less fuel. Change is achieved
through targeted incentives, public awareness, a gradual change in transportation patterns, or the availability of more attractive
business models.
VI. THE PLAN
Page 41
Base year : 2015
Compact vehicles
1
Community transportation emissions
6 033
eCO2 (t)
2
Total community emissions
9 252
eCO2 (t)
3
Number of targeted units
60
4
Reduction of GHG emissions (tons and %)
38
0,41%
D. PROJECT PORTFOLIO
Community GHG & Energy Action Plan
11. Solid Waste - Domestic composting
The Village of Perth-Andover intends to promote and establish a "domestic composting culture" with the population through actions
such as training, composting, etc. This project involves the distribution of 70 domestic composters as soon as possible.
VI. THE PLAN
Page 42
Base year : 2015
Solid Waste
1
Compostable materials diverted from landfill
17
2
GHG emissions reduction (tons & %)
-
0,0%
3
Duration of the project
7
Estimation details
4
Community Waste sector emissions
122
eCO2 (t)
5
Total community emissions
9 252
eCO2 (t)
6
Residential solid waste
409
Tons
7
Number of Dwellings in the community
720
8
Number of composters to be distributed
70
Units
9
Number of users per composter
2,24
10 Average organic material per person / year
0,184
Tons
11 Proportion of organic matter actually composted
60%
12 Compostable materials diverted from landfill
17,31
Tons
13 Avoided Emissions
2
eCO2 (t)
14 Emissions from composting
7
eCO2 (t)
15 Net Short-term Reductions
0
eCO2 (t)
D. PROJECT PORTFOLIO
Community GHG & Energy Action Plan
Page 43
VI. APPENDICES
Appendice: Perth-Andover Electric Light Commission
Partners for Climate Protection program (PCP) - Method
Community GHG & Energy Action Plan
Page 44
APPENDICE: PERTH-ANDOVER ELECTRIC LIGHT COMMISSION
Electric Light Commission Mission Statement
The provision of reliable and affordable power services for the
residential and commercial customers in the Municipality, with
safety being first priority!
Facilities:
Sub Station- 10 MVA with related equipment
1200 Pole Structures
45 km wire distribution system at 1240/7200 V
Hot Line Equipment
Street Lights (350)
Public Works Building
1000 electrical meters - residential and commercial
200 secondary transformers and related hardware
Services:
- Consultation on entrance location
- Provision of temporary power
- Permanent Service
- Trouble Shooting and Calls
- Hanging Christmas Decorations
-
Insure safety of public from our system
- Upgrade services to customers when required
- Provide emergency back up with Boom truck
- Disconnects and Reconnects
- Construction and Maintenance of Lines
- Coordinate jobs with NBTel and NB Power
- Meter Reading
- Street Light Maintenance
- Underground location wires
- Tree Trimming
One attraction to Perth-Andover that no other town or village can
claim, is that the we have the lowest power rates in the Province.
The Village owns its Electric Light Commission.
Under an agreement with Maine & New Brunswick Electrical Power
Co. Ltd., the Village purchases power from the Tinker Dam and
resells it to the residents and businesses of the Village over its own
distribution system. This arrangement has resulted in a power rate
below that paid elsewhere in the province.
Community GHG & Energy Action Plan
Page 45
APPENDICE: PERTH-ANDOVER ELECTRIC LIGHT COMMISSION
Perth-Andover
NB Power
Residential Service
Service Charge
$16.49
$23.21
Energy Charge:
First 1300 kWh
$0.0986
$0.1059
Balance kWh
$0.0960
$0.1059
General Service
Service Charge
$16.49
$22.52
Energy Charge:
First 5000 kWh
$0.1208
$0.1297
Balance kWh
$0.0856
$0.0920
Demand Charge:
First 20 kW
no charge
no charge
Balance KW
$9.42
$10.37
Other Charges
Dusk to Dawn 100 W
$13.43
$14.14
Dusk to Dawn 200 W
$21.12
$22.23
Wood Pole
$4.14
$4.36
Community GHG & Energy Action Plan
Page 46
APPENDICE: PERTH-ANDOVER ELECTRIC LIGHT COMMISSION
Maine & New Brunswick Electrical Power Co. Ltd.
The Tinker Dam is a hydroelectric dam built on the Aroostook River in the Canadian province of New Brunswick and operated jointly by
WPS Energy and NB Power. Its power house has a capacity of 34 megawatts. The dam and power house are collectively known as the
Tinker Generating Station. The dam is located in Aroostook Junction, New Brunswick, immediately downstream of Fort Fairfield, Maine,
and less than 1 km east of the Canada-United States border. The reservoir floods the Aroostook River valley into a portion of
northeastern Maine. The dam was built in 1923 and the power house contains 5 hydroelectric units (1-5) which were placed in service
between 1923-1965.
The Tinker Generating Station benefits from flow regulation upstream in Maine on Millinocket Lake and on the Aroostook River in Squa
Pan. There are also control facilities and a power house canal located on the Maine side of the border.
The Tinker Generating Station was constructed as a joint project of the New Brunswick Electric Power Commission and the Maine Public
Service. In 1999, the Maine Public Service sold its share of the plant to WPS Power Development, LLC of De Pere, Wisconsin. WPS Power
Development operates in Canada under its subsidiary WPS Canada Generation, Inc.
The dam spans the river between Andover Parish on the south side, and Grand Falls Parish on the north side, both in Victoria County.
The Tinker Dam is a hydroelectric dam not classified as a "run of the river" type. For the inventory we used the CO2 coefficient for a
regular dam. The coefficient is close to 0.
Reference:
http://globalenergyobservatory.org/geoid/5730
https://en.wikipedia.org/wiki/List_of_generating_stations_in_New_Brunswick
https://en.wikipedia.org/wiki/Tinker_Dam
https://en.wikipedia.org/wiki/Category:Lists_of_power_stations
https://en.wikipedia.org/wiki/Run-of-the-river_hydroelectricity
https://en.wikipedia.org/wiki/List_of_run-of-the-river_hydroelectric_power_stations
Community GHG & Energy Action Plan
UMNB CCEI allows participating municipalities to complete the first 3 steps of the Partners for Climate Protection
(PCP) program. Steps 4 and 5 consist of the implementation of action plans and the monitoring and reporting of
results.
Page 47
PARTNERS FOR CLIMATE PROTECTION PROGRAM (PCP) - METHOD
MILESTONE 1 CREATING A GREENHOUSE GAS EMISSIONS INVENTORY AND FORECAST
A greenhouse gas inventory brings together data on community and municipal energy use and solid waste generation
in order to estimate greenhouse gas (GHG) emissions in a given year. The forecast projects future emissions based on
assumptions about population, economic growth and fuel mix.
MILESTONE 2 SETTING AN EMISSIONS REDUCTIONS TARGET
An emissions reduction target can be established at any time. The target is normally set, however, following the
development of an emissions inventory and forecast or after the quantification of existing emissions reduction
measures.
MILESTONE 3 DEVELOPING A LOCAL ACTION PLAN
A Local Action Plan (LAP) is a strategic document that outlines how your municipality will achieve its greenhouse gas
(GHG) emissions reduction target. The LAP covers municipal operations and the community.