{
 "answer": "In the Town of Clarenville, Newfoundland and Labrador, building permit rules are set by Town of Clarenville Permit Regulations (Section 414 Municipalities Act, 1999), verified 2026-10-18. Permit required for: Any construction. Permit fees: Permit fees calculated in accordance with the Permit Rates Policy as set by Council. Fees set in: Permit Rates Policy as set by Council.",
 "municipality_id": "gx-003276",
 "municipality": "Clarenville",
 "status_type": "Town",
 "jurisdiction": "Newfoundland and Labrador",
 "country": "CA",
 "topic": "building_permits",
 "label": "Building permits",
 "status": "found",
 "last_verified": "2026-10-18",
 "official_website": "http://www.clarenville.net/",
 "documents": [
  {
   "primary": true,
   "is_official": true,
   "title": "Town of Clarenville Permit Regulations (Section 414 Municipalities Act, 1999)",
   "category": "building_permits",
   "document_type": "bylaw",
   "status": "adopted",
   "adopted_date": "1997-08-18",
   "document_url": "https://clarenville.ca/wp-content/uploads/2019/03/Permit_Regulations.pdf",
   "summary": "Permit must be obtained from the Town Office before any construction; building plans and survey required; minimum residential lot size; permit fees per Council's Permit Rates Policy; permits void if not picked up in 90 days. Scanned; adopted 1997-08-18, revised 2017-03-14.",
   "discovered_by": "atl-building",
   "discovered_at": "2026-10-14",
   "capture_sha256": "a496549e172942718dc29c5ad257559fe12c98d0903168e51c4f95d14487c40e",
   "captured_at": "2026-10-15T03:14:23+00:00",
   "capture_http_status": 200,
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/a496549e172942718dc29c5ad257559fe12c98d0903168e51c4f95d14487c40e.pdf",
   "link_dead": false,
   "facts": {
    "permit_required_for": "Any construction.",
    "fee_basis": "Permit fees calculated in accordance with the Permit Rates Policy as set by Council.",
    "fees_location": "Permit Rates Policy as set by Council",
    "authority": "Town Office"
   },
   "fact_citations": {
    "permit_required_for": "Prior to the start of any construction",
    "fee_basis": "Permit fees calculated in accordance with the Permit Rates Policy",
    "fees_location": "Permit Rates Policy as set by Council",
    "authority": "permit must be obtained from the Town Office"
   },
   "transcript_url": "/ca/nl/clarenville/building-permits/town-of-clarenville-permit-regulations/",
   "transcript_quality": "ocr"
  }
 ],
 "source": "https://govanswers.org/ca/nl/clarenville/building-permits/"
}