{
 "answer": "In the Town of Flower's Cove, Newfoundland and Labrador, building permit rules are set by Town of Flowers Cove Development Regulations 2016-2026, verified 2026-10-18. Permit required for: Any development requires a permit; a separate building permit is required for each building in a subdivision. Administered by: The Authority (Council of the Town of Flowers Cove) and its inspectors.",
 "municipality_id": "gx-003306",
 "municipality": "Flower's Cove",
 "status_type": "Town",
 "jurisdiction": "Newfoundland and Labrador",
 "country": "CA",
 "topic": "building_permits",
 "label": "Building permits",
 "status": "found",
 "last_verified": "2026-10-18",
 "official_website": "https://townofflowerscove.com/",
 "documents": [
  {
   "primary": true,
   "is_official": true,
   "title": "Town of Flowers Cove Development Regulations 2016-2026",
   "category": "building_permits",
   "document_type": "bylaw",
   "status": "adopted",
   "adopted_date": "2017-05-09",
   "document_url": "https://www.gov.nl.ca/mca/files/registry-community-flowers-cove-files-flowers-cove-dr.pdf",
   "summary": "No separate building by-law found; the Development Regulations require a permit for any development (incl. erecting or altering a building) and refer to Building Regulations; recorded as building_permits primary per NL rule.",
   "discovered_by": "atl-building",
   "discovered_at": "2026-10-14",
   "capture_sha256": "a06af9214b59b5bef77d579c7836dd6f7154090364688e9f7ea70ba359e51de8",
   "captured_at": "2026-10-15T03:14:23+00:00",
   "capture_http_status": 200,
   "document_number": "2016-2026",
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/a06af9214b59b5bef77d579c7836dd6f7154090364688e9f7ea70ba359e51de8.pdf",
   "link_dead": false,
   "facts": {
    "permit_required_for": "Any development requires a permit; a separate building permit is required for each building in a subdivision.",
    "authority": "The Authority (Council of the Town of Flowers Cove) and its inspectors."
   },
   "fact_citations": {
    "permit_required_for": "Regulation 7; Regulation 74",
    "authority": "Regulation 5; Regulation 33-34"
   },
   "transcript_url": "/ca/nl/flower-s-cove/zoning/regulations-2016-2026/",
   "transcript_quality": "exact"
  }
 ],
 "source": "https://govanswers.org/ca/nl/flower-s-cove/building-permits/"
}