{
 "answer": "In the Town of Millertown, Newfoundland and Labrador, building permit rules are set by Town of Millertown (2024-2034) Development Regulations, verified 2026-10-18. Permit required for: A separate building permit shall be obtained for each building proposed for construction in the subdivision. Fees set in: a schedule of fees adopted by Council. Administered by: Council or its designated staff/agent; inspections by authorized official.",
 "municipality_id": "gx-003383",
 "municipality": "Millertown",
 "status_type": "Town",
 "jurisdiction": "Newfoundland and Labrador",
 "country": "CA",
 "topic": "building_permits",
 "label": "Building permits",
 "status": "found",
 "last_verified": "2026-10-18",
 "official_website": "https://www.townofmillertown.com/",
 "documents": [
  {
   "primary": true,
   "is_official": true,
   "title": "Town of Millertown (2024-2034) Development Regulations",
   "category": "building_permits",
   "document_type": "bylaw",
   "status": "adopted",
   "adopted_date": "2024-12-13",
   "document_url": "https://www.gov.nl.ca/mca/files/REGISTERED-DEVELOPMENT-REGULATIONS-MILLER_TOWN-2024-2034.pdf",
   "summary": "No separate building by-law found; the Development Regulations require a council permit before any development (including erecting or altering a building) and require a separate building permit per building in approved subdivisions.",
   "discovered_by": "atl-building",
   "discovered_at": "2026-10-14",
   "capture_sha256": "5600c3e1aa223512974711fd06fa79a839f8557dbad812535567a4152232a78b",
   "captured_at": "2026-10-15T03:14:23+00:00",
   "capture_http_status": 200,
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/5600c3e1aa223512974711fd06fa79a839f8557dbad812535567a4152232a78b.pdf",
   "link_dead": false,
   "facts": {
    "permit_required_for": "A separate building permit shall be obtained for each building proposed for construction in the subdivision.",
    "fees_location": "a schedule of fees adopted by Council",
    "authority": "Council or its designated staff/agent; inspections by authorized official"
   },
   "fact_citations": {
    "permit_required_for": "s. 6.7",
    "fees_location": "s. 3.18",
    "authority": "s. 3.16(1); s. 3.24"
   },
   "transcript_url": "/ca/nl/millertown/zoning/regulations-2024-2034/",
   "transcript_quality": "exact"
  }
 ],
 "source": "https://govanswers.org/ca/nl/millertown/building-permits/"
}