Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | i Corporate Asset Management Plan Proposed Levels of Service May 2025 Final Report Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | ii Executive Summary The Town of Ajax (the Town) provides a wide range of services to its residents, businesses and visitors, including transportation, environmental, parks, recreation and culture, fire, and library services, supported by facilities, fleet and information technology "internal" services. This Asset Management Plan identifies the asset lifecycle actions needed to sustain the Proposed Levels of Service for the Town's core and non-core services over the next 10 years, along with their forecast costs. Risks associated with the current funding level are identified and mitigations have been recommended. This Asset Management Plan fulfils the requirements of the Ontario Regulation (O.Reg.) 588/17, Asset Management Planning for Municipal Infrastructure for July 2025. Municipal Asset Inventory The estimated replacement value of the Town's tangible capital assets is $2.697 billion (in 2024 dollars), as shown in Table ES-1. The Table includes a breakdown of the inventory by service. Table ES-1 Assets covered by this Asset Management Plan Service Area Asset Categories Replacement Value (in million $) Replacement Value (%) Transportation Roads, Bridges and Major Culverts, Traffic Assets, Roadside Assets $1,524 56.5% Environmental Stormwater Ponds, Stormwater Sewers, Stormwater Appurtenances, Small Stormwater Culverts, Woodlots, Boulevard and Park Trees $599 22.2% Facilities Administration Buildings, Recreation and Community Centres, Fire Buildings, Libraries $404 15.0% Parks, Recreation and Culture Indoor Exercise Equipment, Recreation - Other, Outdoor Recreation $99 3.7% Fleet Vehicles, Rolling Equipment, Fire Emergency Response $51 1.9% Library Library Collections, Library Furniture, Library Public Technology $13 0.5% Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | iii Service Area Asset Categories Replacement Value (in million $) Replacement Value (%) Information Technology End User Devices, Server Equipment, Networking Equipment $5 0.2% Fire Personal Protective Equipment, Respiratory Equipment, Rescue Equipment, Suppression Equipment $3 0.1% Total All Municipally Owned Infrastructure $2,697 100% *Numbers may not add due to rounding State of Infrastructure Figure ES-1 illustrates the percentage of assets that fall within each of the condition grades (very good, good, fair, poor, very poor), by each program area. The total replacement value of assets within each program area is shown at the bottom of the condition grade bar. Assets where condition has been assessed using age, as opposed to, a formal inspection or assessment have been delineated with hashed shading. Figure ES-1 Asset Condition Grade Profile Percentage, By Service Area Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | iv To adequately meet service levels and manage risk while minimizing lifecycle costs, most assets should generally be preserved in fair or better condition. The above figure show that 92% of the Town's assets are in fair or better condition based on replacement value. Subsequently, 7% or $182 million are in poor condition and 1% or $38 million are in very poor condition (of which $21 million were assessed using age-based condition). Assets in poor or very poor condition require increased attention and renewal investment (funding and staff resources) to avoid increased maintenance costs and/or unexpected failure. The assets that are currently in poor or very poor condition are typically those that are included in 10-year capital renewal programs and budget forecasts, especially if deemed critical by the Town. There are currently $2.2 million of assets that have not had their condition assessed either physically or by using an age- based method. Levels of Service The Community and Technical Levels of Service were defined for each program area in alignment with the Town's strategic priorities. One of the main drivers for renewal decision-making, common across all service areas, is for assets to be fit for service or within their service life. Assets not fit for service have been identified as assets which are at or past their service life or are in very poor condition. Table ES-2 below summarizes the assets deemed not to be fit for service for each program area. Table ES-2 Levels of Service - Fit for Service Service Area Community Levels of Service Technical Levels of Service Current Performance (in million $) Current Performance (% of Very Poor of the Service Area) Transportation Quality: Assets are not meeting expected Reliability service levels % assets in Very Poor Condition (at or past end of life) by Replacement Value $4.46 0.3% Environmental Quality: Assets are not meeting expected Reliability service levels % assets in Very Poor Condition (at or past end of life) by Replacement Value $16.68 2.8% Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | v Service Area Community Levels of Service Technical Levels of Service Current Performance (in million $) Current Performance (% of Very Poor of the Service Area) Facilities Quality: Assets are not meeting expected Reliability service levels % assets in Very Poor Condition (at or past end of life) by Replacement Value $7.0 1.7% Parks, Recreation and Culture Quality: Assets are not meeting expected Reliability service levels % assets in Very Poor Condition (at or past end of life) by Replacement Value $0.37 0.4% Fleet Quality: Assets are not meeting expected Reliability service levels % assets in Very Poor Condition (at or past end of life) by Replacement Value $4.73 9.2% Library Quality: Assets are not meeting expected Reliability service levels % assets in Very Poor Condition (at or past end of life) by Replacement Value $3.38 26.1% Information Technology Quality: Assets are not meeting expected Reliability service levels % assets in Very Poor Condition (at or past end of life) by Replacement Value $1.12 21.4% Fire Quality: Assets are not meeting expected Reliability service levels % assets in Very Poor Condition (at or past end of life) by Replacement Value $0.007 0.3% Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | vi Service Area Community Levels of Service Technical Levels of Service Current Performance (in million $) Current Performance (% of Very Poor of the Service Area) Total Quality: Assets are not meeting expected Reliability service levels % assets in Very Poor Condition (at or past end of life) by Replacement Value $37.7 1.4% of total *Numbers may not add due to rounding Risk Management Strategy Based on those assets with known conditions, Figure ES-2 shows that $50.4 million of the Town's assets are in the Very High-risk exposure category related to reliable services. This excludes approximately $2.2 million of assets with an unknown condition (probability of failure). The Town mitigates its exposure to these risks through the planned lifecycle strategies discussed in the Lifecycle Management Strategy section of this Asset Management Plan. Service area specific risk profiles are provided in Chapters 7 through 14 of this report. Figure ES-2 Risk Exposure of the Town's Assets Over the course of the life of an asset, the asset's condition decreases and its likelihood of failure increases. When the asset is rehabilitated or reconstructed its likelihood of failure decreases to very low. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | vii Lifecycle Management Strategy Renewal and Rehabilitation The renewal forecasts consider the asset's current condition or age, the Town's planned rehabilitation and replacement activities, and the recommended strategies from specific studies such as, BCAs (Building Condition Assessments). Asset renewal needs are triggered by condition, age, or other performance measures. If the installation date is missing, renewal needs were included as an average annual reinvestment rate (same investment each year) based on asset value and useful life. This Asset Management Plan for proposed levels of service explored renewal and condition forecasts for the following two scenarios: Maintaining Current Levels of Service and Proposed Levels of Service. Scenario 1: Maintaining the Current Levels of Service This scenario shows renewal activities that would be required to prevent the current renewal backlog from growing. According to Figure ES-3 below, the forecasts for the maintain current levels of service scenario: - The 10-year average annual renewal need to maintain the current level of service is $29.6 million (dashed blue line). - The current average annual renewal funding is $21.5 million (solid red line). - The average annual infrastructure renewal gap of $8.1 million for the maintain current level of service scenario over the next ten (10) years. The infrastructure gap is $35.7 million over the life of the assets. - The solid orange line represents additional funding if Council were to approve a 2% infrastructure levy increase in 2026 and a 1% infrastructure levy increase thereafter through the annual budget process. This would reduce the average annual infrastructure renewal gap to $2.5 million for the maintain current level of service scenario over the next ten (10) years. - Note that according to Figure ES-3 the whole lifecycle average annual needs (total renewal costs divided by the service life) is $57.2 million (solid green line). This is the average annual amount needed to renew the assets over their entire lives. At this time, the in perpetuity average annual need is higher than the 10-year average annual need which indicates that there are higher upcoming renewal needs beyond the 10-year period of this Asset Management Plan forecast. It is important that the Town consider the whole lifecycle costs when building reserves to ensure sufficient money is available to fund the state of good repair of these assets as they age. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | viii The whole lifecycle average annual needs below only reflect the renewal needs required for the existing assets and does not account for the renewal needs required for the growth assets being added to the Town's infrastructure portfolio. Figure ES-3 Infrastructure Renewal Needs - Maintaining Current Levels of Service Scenario Figure ES-4 below shows the forecast condition distribution associated with spending level in Figure ES-3 (Maintaining Current Levels of Service Scenario). If assets are not renewed when they reach their end-of-life, the probability of their failure increases. Depending on the asset type and failure context, an asset failure may result in various negative impacts, such as service disruptions, injuries to employees and the public, or reputational harm to the organization. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | ix Figure ES-4 Condition Forecast, Maintain Current Levels of Service (Renewal Backlog) Scenario Scenario 2: Proposed Level of Service Scenario This scenario has most service areas maintaining the current levels of service. Library has increased its levels of service to address furniture that is in very poor condition. Transportation (Roads) and Infrastructure Technology Services have decreased their respective levels of service. The proposed levels of service renewal funding scenario decreases the infrastructure gap which is more attainable. Figure ES-5 shows the forecasts for the proposed levels of service scenario, as follows: - The average annual renewal need over the next ten (10) years is $23.9 million (dashed blue line). - As with the previous scenario, the current average annual renewal funding (in dollar values of spending year) for the same period is $21.5 million (solid red line). - This reduces the existing average annual infrastructure renewal gap to $2.4 million for the proposed levels of service scenario over the next ten (10) years and $29 million over the life of the assets. - The solid orange line again assumes a 2% infrastructure levy increase in 2026 and a 1% infrastructure levy increase thereafter. If this infrastructure levy were approved by Council through the annual budget process, the infrastructure renewal gap could be eliminated and result in an estimated average annual Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | x contribution to reserves of $3.2 million for the proposed levels of service scenario over the next ten (10) years. - The whole lifecycle annual needs (total renewal costs divided by the service life) is $50.5 million dollars (solid green line). As discussed previously, this is the amount needed on average annually, in perpetuity, to renew the assets over their entire lives and should be considered when building reserves to ensure sufficient money is available to fund the state of good repair of these assets as they age. It is important to note that existing revenue sources, such as Elexicon dividends and Ajax Casino revenues, are not guaranteed and this may result in needs for future alternative funding sources and a greater dependency on the infrastructure levy. Figure ES-5 Infrastructure Renewal Needs - Proposed Levels of Service Scenario The resulting condition distribution over the next 10 years for this scenario is shown in Figure ES-6. The majority (85%) of the assets remain in fair or better condition under the proposed levels of service scenario. The maintain levels of service scenario has approximately 87% of the municipal assets in fair or better condition. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | xi Figure ES-6 Condition Forecast, Proposed Levels of Service Scenario As part of the asset renewal program, condition assessment frequencies and protocols should be formalized for critical and high-value assets, and the recurring cost conducting condition assessments should be added to the capital needs schedule. For example, building condition assessments should be conducted at least every 10 years. Operations and Maintenance Forecasted operating and maintenance costs are expected to vary in relation to the total value of the asset inventory. If additional assets are acquired, the future operating and maintenance costs will increase and if assets are disposed of the costs associated with operating and maintaining them will decrease. Figure ES-7 shows the forecasted operation and maintenance costs for the next 10 years. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | xii Figure ES-7 Operations and Maintenance Needs Forecast Figure ES-7 shows that the costs are expected to increase from $71.1 million/year in 2024 to $83.9 million/year in 2034. All figure values are shown in year 2024$. Forecasted increases in operation and maintenance needs are due to estimated growth in the asset portfolio as indicated in The Town's Long-Range Capital Forecast, as well as assets anticipated to be assumed from developers over the next ten years. Section 4.5 of this Asset Management Plan expands upon the increased operational and capital needs as a result of growth. Operating and maintenance needs in future years are assumed to increase proportionally with the increase in the replacement value of the asset portfolio by asset type (facilities, vehicles, equipment). The estimate of operating and maintenance cost increases can be refined by conducting more detailed analysis of operating costs and work order costs, for example, by asset sub-types or by maintenance activity. For the period 2025-2034, the annual operating and maintenance costs are expected to average $78.4 million/year. Financing Strategy Strategies to Close Funding Gaps The infrastructure funding gap may be reduced by one or a combination of the following strategies: - Reduce near term renewal needs by deferring capital renewal projects on lower risk assets, thereby lengthening the period in which the backlog is addressed beyond the 10 years. This may result in increased maintenance costs and risks to service delivery. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | xiii - Decreasing the levels of service for municipal assets to a level that relates to what the average resident is willing to pay while not increasing the risk to the Town beyond its risk threshold. - Increase available funds through property tax increases, such as the infrastructure levy, and leveraging third party grants. - Reduce renewal needs by divesting assets. This may reduce service levels related to capacity. - Promoting non-infrastructure solutions to decrease the demand on the existing asset base. - Short-term funding through debt and drawing from reserves. These are not sustainable long-term solutions as the debt funding needs to be paid back and reserves need to be replenished. Plan Improvement Opportunities Development of Asset Management Plans is an iterative process that includes improving processes, data, and staff skills over time. This section provides an overview of the compliance of this Asset Management Plan with Ontario Regulation 588/17 for proposed levels of service and identifies opportunities for improvements to the Town's asset management practices, including those required for municipalities to remain in compliance with Ontario Regulation 588/17. It is important that the Town recognises areas of their Asset Management Plan and planning process that require future improvements to ensure effective asset management and informed decision making. The improvement plan generated from this Asset Management Plan is shown in Table ES-3 below. Table ES-3 Plan Improvement Recommendations No. Improvement Recommendation 1 Continue improving work order management system and processes to support improved: - Tracking of refurbishment and replacement intervals of assets, and - More accurate forecasting of maintenance and operating costs. 2 Consider the internal resource needs (both operational and renewal impacts) required to successfully implement the recommended Asset Management Plan capital growth projects. Internal resource needs for municipalities include adequate staffing, training, equipment, technology, materials, logistical and administrative support, operational continuity plans, monitoring and evaluation systems to successfully implement capital growth projects. 3 Town to continue to understand growth projections and leverage master planning initiatives and studies. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | xiv No. Improvement Recommendation 4 Understand state of good repair needs for stormwater infrastructure through condition assessment program. 5 Continue to collect conditional data of Town facilities. The Building Condition Assessments are recommended to be completed every ten (10) years. 6 Continued refinement of identifying and mapping lifecycle activities (renewal, growth, upgrade) to capital projects. 7 Consider and integrate whole asset lifecycle costs during budgeting process (to assist in planning for future reserves). 8 Continue to account for the assumption of assets from development and the associated infrastructure investment impacts. 9 Regular updates to asset inventory, asset condition, and recommended needs based on inspection programs. 10 Consideration of a Decision Support System to act as a central asset register and to assist with asset management planning analytics. 11 Incorporate into future iterations of this Asset Management Plan the zero carbon and sustainability targets from the Carbon Net Zero Emissions Plan (CNZEP). Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | xv Table of Contents Corporate Asset Management Plan ................................................................................. i Proposed Levels of Service .......................................................................................... i Executive Summary......................................................................................................ii Municipal Asset Inventory .........................................................................................ii State of Infrastructure...............................................................................................iii Levels of Service......................................................................................................iv Risk Management Strategy......................................................................................vi Lifecycle Management Strategy..............................................................................vii Financing Strategy ..................................................................................................xii Plan Improvement Opportunities............................................................................ xiii Figure Index............................................................................................................. xviii Table Index................................................................................................................xix 1 Introduction........................................................................................................... 1 1.1 Background ................................................................................................... 1 1.2 Alignment with Regulatory Requirements...................................................... 1 1.3 Relationship with Other Municipal Documents .............................................. 1 1.4 Key Stakeholders .......................................................................................... 2 1.5 Purpose of the Plan....................................................................................... 3 1.6 Asset Management Plan Scope .................................................................... 4 1.7 Organization of Document............................................................................. 5 1.8 State of Infrastructure.................................................................................... 6 1.9 Asset Hierarchy and Inventory ...................................................................... 6 1.10 Asset Valuation ............................................................................................. 6 2 Levels of Service ................................................................................................ 11 2.1 Overview ..................................................................................................... 11 2.2 Legislative Requirements ............................................................................ 11 2.3 Strategic and Corporate Goals .................................................................... 13 2.4 Community and Technical Levels of Service............................................... 15 2.5 Customer Research and Expectations ........................................................ 18 2.6 Current Performance................................................................................... 18 2.7 Factors Impacting Levels of Service Performance ...................................... 21 Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | xvi 3 Risk Management Strategy ................................................................................ 22 3.1 Overview ..................................................................................................... 22 3.2 Consequence of Failure .............................................................................. 22 4 Lifecycle Management Strategy ......................................................................... 28 4.1 Overview ..................................................................................................... 28 4.2 Town Growth and Upgrade Needs .............................................................. 30 4.3 Town Inventory Growth and Upgrade Forecast........................................... 31 4.4 Renewal Needs, Funding and Gaps............................................................ 32 4.5 Impact of Future Growth to Asset Renewal Needs...................................... 37 4.6 Operations and Maintenance Needs ........................................................... 38 5 Financing Strategy.............................................................................................. 40 5.1 Overview ..................................................................................................... 40 5.2 Available Funding Amounts and Sources.................................................... 40 6 Transportation Services...................................................................................... 44 6.1 Overview ..................................................................................................... 44 6.2 State of Infrastructure.................................................................................. 44 6.3 Levels of Service ......................................................................................... 46 6.4 Risk Management Strategy ......................................................................... 51 6.5 Lifecycle Management Strategy .................................................................. 51 7 Environmental Services...................................................................................... 52 7.1 Overview ..................................................................................................... 53 7.2 State of Infrastructure.................................................................................. 53 7.3 Levels of Service ......................................................................................... 55 7.4 Risk Management Strategy ......................................................................... 58 7.5 Lifecycle Management Strategy .................................................................. 58 8 Parks, Recreation and Culture Services............................................................. 60 8.1 Overview ..................................................................................................... 60 8.2 State of Infrastructure.................................................................................. 60 8.3 Levels of Service ......................................................................................... 61 8.4 Risk Management Strategy ......................................................................... 64 8.5 Lifecycle Management Strategy .................................................................. 64 9 Fire Services....................................................................................................... 65 Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | xvii 9.1 Overview ..................................................................................................... 66 9.2 State of Infrastructure.................................................................................. 66 9.3 Levels of Service ......................................................................................... 67 9.4 Risk Management Strategy ......................................................................... 70 9.5 Lifecycle Management Strategy .................................................................. 70 10 Library Services .............................................................................................. 71 10.1 Overview ..................................................................................................... 72 10.2 State of Infrastructure.................................................................................. 72 10.3 Levels of Service ......................................................................................... 73 10.4 Risk Management Strategy ......................................................................... 75 10.5 Lifecycle Management Strategy .................................................................. 75 11 Information Technology Services.................................................................... 77 11.1 Overview ..................................................................................................... 77 11.2 State of Infrastructure.................................................................................. 77 11.3 Levels of Service ......................................................................................... 78 11.4 Risk Management Strategy ......................................................................... 80 11.5 Lifecycle Management Strategy .................................................................. 80 12 Fleet Services ................................................................................................. 82 12.1 Overview ..................................................................................................... 82 12.2 State of Infrastructure.................................................................................. 82 12.3 Levels of Service ......................................................................................... 83 12.4 Risk Management Strategy ......................................................................... 85 12.5 Lifecycle Management Strategy .................................................................. 85 13 Facilities Services ........................................................................................... 87 13.1 Overview ..................................................................................................... 87 13.2 State of Infrastructure.................................................................................. 87 13.3 Levels of Service ......................................................................................... 88 13.4 Risk Management Strategy ......................................................................... 90 13.5 Lifecycle Management Strategy .................................................................. 90 Asset Management Plan Improvement and Monitoring ............................................. 92 14.1 Plan Improvement Opportunities ................................................................. 92 14.2 Asset Management Plan Monitoring and Review ........................................ 93 Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | xviii 14.3 Performance Measures ............................................................................... 93 Appendix A - O.Reg. 588/17 Community Levels of Service Documentation............. 94 A-1 Stormwater Assets .......................................................................................... 94 A-2 Roads .............................................................................................................. 95 A-3 Bridges and Culverts ....................................................................................... 97 Appendix B - Consequence of Failure Scores ........................................................ 100 Appendix C - Detailed asset inventory replacement value...................................... 107 Figure Index Figure 1 Asset Condition Grade Profile, By Service Area (by Percentage)................... 10 Figure 2 Levels of Service Framework .......................................................................... 17 Figure 3 Risk Exposure of the Town's Assets ............................................................... 26 Figure 4 Risk Forecast - Do Nothing Scenario ............................................................. 27 Figure 5 Conceptual Lifecycle Cost Model .................................................................... 29 Figure 6 Year Inventory Growth and Upgrade Forecast................................................ 31 Figure 7 Infrastructure Renewal Needs - Maintaining Current Levels of Service Scenario ........................................................................................................................ 33 Figure 8 Condition Forecast, Maintain Current Levels of Service (Renewal Backlog) Scenario ........................................................................................................................ 34 Figure 9 Infrastructure Renewal Needs - Proposed Levels of Service Scenario .......... 36 Figure 10 Condition Forecast, Proposed Levels of Service Scenario ........................... 37 Figure 11 Average Annual Lifecycle Renewal Needs - Proposed Budget Scenario (Including Future Growth).............................................................................................. 38 Figure 12 Operations and Needs Forecast ................................................................... 39 Figure 13 Condition Distribution by Replacement Value, Transportation ...................... 45 Figure 14 Risk Exposure of the Town's Transportation Infrastructure........................... 51 Figure 15 Forecasted Renewal Needs - Transportation Services ................................. 52 Figure 16 Condition Distribution by Replacement Value, Environmental ...................... 55 Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | xix Figure 17 Risk Exposure of the Town's Environmental Infrastructure........................... 58 Figure 18 Forecasted Renewal Needs - Environmental Services ................................. 59 Figure 19 Condition Distribution by Replacement Value, Parks, Recreation & Culture. 61 Figure 20 Risk Exposure of the Town's Parks, Recreation & Culture Infrastructure ..... 64 Figure 21 Forecasted Renewal Needs - Parks, Recreation & Culture Services............ 65 Figure 22 Condition Distribution by Replacement Value, Fire Services ........................ 67 Figure 23 Risk Exposure of the Town's Fire Infrastructure............................................ 70 Figure 24 Forecasted Renewal Needs - Fire Services .................................................. 71 Figure 25 Condition Distribution by Replacement Value, Library Services.................... 73 Figure 26 Risk Exposure of the Town's Library Infrastructure....................................... 75 Figure 27 Forecasted Renewal Needs - Library Services ............................................. 76 Figure 28 Condition Distribution by Replacement Value, Information Technology........ 78 Figure 29 Risk Exposure of the Town's IT Infrastructure............................................... 80 Figure 30 Forecasted Renewal Needs - IT Services ..................................................... 81 Figure 31 Condition Distribution by Replacement Value, Fleet Services....................... 83 Figure 32 Risk Exposure of the Town's Fleet Infrastructure.......................................... 85 Figure 33 Forecasted Renewal Needs - Fleet Services ................................................ 86 Figure 34 Condition Distribution by Replacement Value, Facilities ............................... 88 Figure 35 Risk Exposure of the Town's Facilities Infrastructure.................................... 90 Figure 36 Forecasted Renewal Needs - Facilities Services .......................................... 91 Table Index Table 1 Key Stakeholders in the Asset Management Plan.............................................. 2 Table 2 Assets covered by this Asset Management Plan................................................ 7 Table 3 Five-Point Condition Grading System ................................................................ 8 Table 4 Conversion of Industry Condition to Five-Point Condition Grade ....................... 9 Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | xx Table 5 Legislative Requirements ................................................................................. 11 Table 6 Corporate Strategic Themes (2022-2026 Strategic Plan)................................. 14 Table 7 Levels of Service - Fit for Service .................................................................... 18 Table 8 Asset Criticality (Consequence of Failure) Ratings .......................................... 24 Table 9 Probability of Failure Ratings............................................................................ 25 Table 10 Asset Lifecycle Management Categories ....................................................... 28 Table 11 Town Population Forecasts (Envision Durham) ............................................. 30 Table 12 Proposed Road Rehabilitation Triggers.......................................................... 35 Table 13 Asset Management Funding Sources (Renewal) ........................................... 41 Table 14 Growth and Upgrade Funding Sources .......................................................... 42 Table 15 Inventory and Age Summary, Transportation Infrastructure (Total $1,523.7 million)........................................................................................................................... 44 Table 16 Technical Level of Service, Transportation Infrastructure .............................. 47 Table 17 Inventory and Age Summary, Environmental Infrastructure (Total $598.8 million)........................................................................................................................... 54 Table 18 Technical Levels of Service, Environmental Services Infrastructure .............. 56 Table 19 Inventory and Age Summary, Parks, Recreation & Culture (Total $98.6 million) ...................................................................................................................................... 60 Table 20 Technical Levels of Service, Parks, Recreation & Culture ............................. 62 Table 21 Inventory and Age Summary, Fire Services (Total $3.2 million)..................... 66 Table 22 Technical Levels of Service, Fire Services..................................................... 68 Table 23 Inventory and Age Summary, Library Services (Total $12.9 million) .............. 72 Table 24 Technical Levels of Service, Library Services ................................................ 74 Table 25 Inventory and Age Summary, Information Technology (Total $5.2 million) .... 77 Table 26 Technical Levels of Service, Information Technology .................................... 79 Table 27 Inventory and Age Summary, Fleet Services (Total $51.3 million) ................. 82 Table 28 Technical Levels of Service, Fleet Services ................................................... 84 Table 29 Inventory and Age Summary, Facilities (Total $403.9 million)........................ 87 Table 30 Technical Levels of Service, Facilities............................................................ 89 Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | xxi Table 31 Plan Improvement Recommendations ........................................................... 92 Table A-1 Road Condition Grades ................................................................................ 97 Table A-2 Bridge and Culvert Condition Grades ........................................................... 99 Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 1 1 Introduction 1.1 Background The Town of Ajax (the Town) provides a wide range of services to its residents, businesses and visitors. These services include transportation, environmental, parks, recreation and culture, fire, and library services which are supported by facilities, fleet and information technology "internal" services. This Asset Management Plan identifies the asset lifecycle actions needed to sustain the proposed Levels of Service for the Town's core and non-core services over the next 10 years, along with their forecasted cost. Risks associated with the current funding level are identified and mitigations recommended. This Asset Management Plan fulfils the requirements of the Ontario Regulation (O.Reg.) 588/17 Asset Management Planning for Municipal Infrastructure for July 2025. 1.2 Alignment with Regulatory Requirements This 2025 Proposed Levels of Service Asset Management Plan is an update to the Town's 2024 Current Levels of Service Asset Management Plan, intended to meet the requirements of O.Reg. 588/17 "Asset Management Planning for Municipal Infrastructure" under the Infrastructure for Jobs and Prosperity Act, 2015. Specifically, by July 1, 2025, O.Reg. 588/17 requires municipalities to adopt an Asset Management Plan reporting proposed levels of service for all assets, and lifecycle needs to maintain those levels of service. In accordance with the requirements of O.Reg. 588/17, this Asset Management Plan is posted on the Town's website and is emailed to the Ministry of Infrastructure. 1.3 Relationship with Other Municipal Documents Asset management planning is a medium- to long-term planning activity that relies on input from strategic planning activities and informs shorter-term decision making. The Asset Management Plan provides a framework to validate the Town's budgeting processes and assist in prioritizing work activities, including capital projects, based on risk. It also discusses levels of service that support goals in the Town's Strategic Plan and lifecycle management strategies intended to reduce the overall cost of asset ownership. The Asset Management Plan is intended to be read with other Town policies and planning documents, including the following: - Policies - Policy # 120 - Financial Sustainability Policy - Policy # 122 - Discretionary Stabilization Reserve - Policy # 123 - Discretionary Capital Reserves - Policy # 124 - Debt Management Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 2 - Policy # 127 - Capital Expenditure Control - Policy # 128 - Operating Budget Management - Policy # 135 - Corporate Asset Management Policy - 2022-2026 Strategic Plan - Action 26 - Official Plan - Tangible Capital Asset (Fixed Asset) Annual Financial Statements - Multi-year Accessibility Plan (2023-2026) - 5-Year Corporate Energy Conservation and Demand Management Plan (2019) - Operating and Capital Budgets - Fire Master Plan (2021) - Integrated Transportation Master Plan (2019) - Recreation and Parks Master Plan (2022) - Library Strategic Master Plan (2023) - 2024 Development Charge Background Study - Ajax Climate Risk and Resiliency Plan (2025) - Envision Durham, Durham Regional Official Plan (2023) 1.4 Key Stakeholders Key stakeholders in the preparation and implementation of this Asset Management Plan are shown in Table 1 below. Table 1 Key Stakeholders in the Asset Management Plan Key Stakeholder Role in Asset Management Plan Town of Ajax Elected Council Overall owners of the Town's assets. Approves asset management policies and oversee asset funding through the annual corporate budget process. An overarching expectation of a standard of care is required by Council to ensure commitment to effective asset management practices. Senior Management Team (SMT) Provides corporate oversight to the program to ensure that the goal and directions of the Corporate Asset Management program are maintained and the program remains consistent with the overall Strategic Plan. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 3 Key Stakeholder Role in Asset Management Plan Asset Management Provides leadership and strategic direction for supporting systems/processes specific to the delivery of asset/work management information for the Town of Ajax. Further, in support of the Town-wide asset management strategies, the committee provides leadership and governance to the Asset Management Policy statement through the provision of information necessary for the long-range forecasts of asset investment needs, service levels, risks, costs and other performance measures. Finance Finance provides historic Tangible Capital Asset (TCA) amounts and historic and current capital and operating budgets. Further, provides coordination on input data and development of the Asset Management Plan from each of the service and program areas. Service Area Departments Provides input data, forecasts and text for the Asset Management Plan relative to their service and program area of functional expertise. Ajax Public Libraries Provides input data, forecasts and text for the Asset Management Plan relative to their service and program area of functional expertise. 1.5 Purpose of the Plan This Asset Management Plan identifies the asset lifecycle activities needed to sustain the Proposed Levels of Service for the Town's core and non-core services. The Asset Management Plan begins by defining levels of service metrics and performance and provides an overview of the infrastructure assets used to support those levels of service. Identify asset lifecycle activities, separated by capital and operating activities and their associated costs, which are needed to sustain the proposed levels of service over the next 10 years. Risks associated with the current funding level are identified and mitigations recommended. This Asset Management Plan fulfils the requirements of the Ontario Regulation (O.Reg.) 588/17 Asset Management Planning for Municipal Infrastructure for Asset Management Plans. Specifically, this Asset Management Plan outlines the proposed levels of service performance for core and non-core assets, how the proposed levels of service differ from the current levels of service, lifecycle activity options, costs associated with sustaining that level of service, the municipality's ability to afford the proposed level of service, identify lifecycle activities that will be undertaken, and how the municipality will address the risks of not performing scheduled lifecycle activities. In accordance with the requirements of O.Reg. 588/17, this Asset Management Plan is posted on the Town's website and will be updated at least every 5 years. Starting in 2026, Town Council must conduct an annual review of its asset management progress Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 4 on or before July 1st each year which addresses progress in implementing the Town's Asset Management Plan, any factors impeding the Town's ability to implement the Asset Management Plan, and a strategy to address these factors. This Asset Management Plan is a medium to long range planning document that is used to support the Town's strategic priorities and other goals by providing a rational strategy for proactively and effectively managing the Town's assets. It provides a guide to understanding key items such as: - The size, replacement value, and condition of the Town's asset portfolio; - The proposed levels of service standards and the Town's performance against them; - The assets that will be needed in the future to support core service delivery objectives and mitigate vulnerabilities; - The planned activities to sustain current and future assets throughout their lifecycles at minimal cost, while mitigating vulnerabilities; - The funding sources for planned lifecycle activities; and - The steps to improve future iterations of the Asset Management Plan. This Asset Management Plan is intended to improve the Town's ability to achieve its corporate goals and objectives in a way that best serves its stakeholders. It provides a rational framework that enables systematic and repeatable processes to manage costs, risks, and levels of service for the Town's asset portfolio. 1.6 Asset Management Plan Scope This Asset Management Plan focuses on eight (8) Town services which all assist in providing municipal services to the Town's residential, commercial, industrial, and institutional customers. 1. Transportation: This includes core and non-core transportation infrastructure assets including roads, bridges and major culverts, traffic and roadside assets. The Town maintains and upgrades these assets to ensure safe and efficient transportation for residents and businesses. 2. Environmental: The core infrastructure is; drainage systems, culverts, and stormwater management ponds which are essential for managing rainfall and preventing flooding in residential and commercial areas. This service area also includes non-core infrastructure that includes; green spaces, forests, and natural areas that contribute to the Town's environmental health and biodiversity. 3. Parks, Recreation and Culture: This category includes parks, playgrounds, sportsfields, trails, as well as, program equipment and public art within recreational buildings such as community centres and arenas. These assets provide opportunities for leisure, sports, and community gatherings. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 5 4. Fire Services: This includes emergency response equipment necessary for ensuring public safety and responding to emergencies. This service area does not include the fire vehicles (Fleet) or fire halls (Facilities). 5. Library Services: The assets that support the Library's portfolio such as collections, furnishing, information technology, and other equipment within library spaces. This service area does not include the various libraries (Facilities). 6. Information Technology (IT) Infrastructure: IT infrastructure supports the Town's digital operations, including networks, servers, end user devices, and communication technologies. 7. Municipal Fleet: Vehicles and equipment owned and operated by the Town for maintenance, transportation, and emergency response. 8. Facilities: Public buildings owned and maintained by the Town which include administrative offices, libraries, fire stations, recreation and community centres, and other municipal facilities. 1.7 Organization of Document The contents of this Asset Management Plan follow the recommended elements of a detailed Asset Management Plan. - Chapter 1: Introduction: Outlines scope, background information, relationship to other municipal documents and plans, and applicable legislation. - Chapter 2: State of Infrastructure: Summarizes the inventory, valuation, condition, and remaining life of the assets in the inventory by service and asset type. - Chapter 3: Levels of Service: Defines the proposed levels of service through performance indicators and targets, and outlines current performance. - Chapter 4: Risk Management Strategy: Defines the framework for identifying critical assets and quantifies risk exposure to enable prioritization of lifecycle activities and optimization of lifecycle activities. - Chapter 5: Lifecycle Management Strategy: Summarizes the planned activities to manage the assets that will enable them to provide the proposed levels of service in a sustainable way, while managing risk at the lowest lifecycle cost. - Chapter 6: Financing Strategy: Summarizes the available funding for the asset management strategies and any forecasted funding gaps. - Chapters 7 through 13: Provide details for each of the service areas. - Chapter 14: Asset Management Plan Improvement and Monitoring: Summarizes the next steps including improving future iterations of the Asset Management Plan and monitoring of the Asset Management Plan implementation progress. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 6 1.8 State of Infrastructure This section of the Asset Management Plan describes the Town's asset inventory, and provides an overview of the valuation, age, and condition of its assets. Recommendations for the regular frequency of data collection and reporting are provided in the Asset Management Plan Improvement and Monitoring section. 1.9 Asset Hierarchy and Inventory Understanding the assets owned by the Town that are used to support each major service area is important to enable their effective and efficient management. In this Asset Management Plan, the Town's asset inventory has been organized around the major service groups and program areas shown in Table 2 in the following sub-section. Most infrastructure assets owned by the Town are included and organized into linear networks, facilities, fleet, equipment, information technology, and natural assets. Leasehold improvements in facilities not owned by the Town are not included. Land is generally not included in the current replacement costs of the asset inventory. 1.10 Asset Valuation Financial accounting valuation uses historical costs and depreciation assumptions to determine the net book value of capital assets in accordance with the Public Sector Accounting Board (PSAB). Policies and procedures relating to the development of net book values for accounting purposes have been developed by the Town to comply with PSAB 3150 Tangible Capital Assets (TCA) reporting. While financial accounting valuations are based on historical costs, managerial accounting valuations are based on replacement costs. For some asset types, the replacement values were calculated using historical costs indexed to December 31, 2024, using the Non-Residential Building Construction Price Indices (NRBCPI) or Consumer Price Index (CPI), as appropriate for the asset type. For the most part, replacement values are benchmark values calculated from current and previous year construction contracts. The replacement cost valuation represents the estimated cost to replace assets today and is presented in 2024 dollars. The replacement cost does not account for future technological improvements. The estimated current replacement value of Town assets is $2.697 billion presented in 2024 dollars, as outlined in the following table. For a detailed summary of the assets covered in this Asset Management Plan refer to Sections 7 through 14. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 7 Table 2 Assets covered by this Asset Management Plan Service Asset Categories Replacement Value (in million $) Replacement Value (%) Transportation Roads, Bridges and Major Culverts, Traffic Assets, Roadside Assets $1,524 56.5% Environmental Stormwater Ponds, Stormwater Sewers, Stormwater Appurtenances, Small Stormwater Culverts, Woodlots, Boulevard and Park Trees $599 22.2% Facilities Administration Buildings, Recreation and Community Centres, Fire Buildings, Libraries $404 15.0% Parks, Recreation and Culture Indoor Exercise Equipment, Recreation - Other, Outdoor Recreation $99 3.7% Fleet Vehicles, Rolling Equipment, Fire Emergency Response $51 1.9% Library Library Collections, Library Furniture, Library Public Technology $13 0.5% Information Technology End User Devices, Server Equipment, Networking Equipment $5 0.2% Fire Personal Protective Equipment, Respiratory Equipment, Rescue Equipment, Suppression Equipment $3 0.1% Total All Municipally Owned Infrastructure $2,697 100% *Numbers may not add due to rounding Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 8 1.11 Asset Condition In this Asset Management Plan, the term "condition" refers to the degree of physical deterioration of an asset. "Performance" is a more general term that typically describes an asset's ability to achieve levels of service through measures such as capacity, function and operational quality. Condition assessment programs evaluate current physical condition, determine rate of deterioration over time, enable forecasts of future condition, and inform the most beneficial type and timing of treatment. Condition assessment methods and rating systems have become relatively standard for some assets but vary depending on the type of asset. The Town conducts inspections more frequently on more critical assets such as roads, bridges, structural culverts and other critical transportation infrastructure. In addition, facilities at the Town undergo regular condition assessments to identify deficiencies and recommend repair and replacement of building elements. In conjunction with this initiative, the Town completed Building Condition Assessments for some of their critical facilities in 2023 to obtain a better understanding of their state of good repair needs. It is recommended that Building Condition Assessments be performed at all facilities every ten (10) years. For those assets with no condition data, age-based condition is estimated as the percentage of age to useful life. Using age data as a surrogate for condition data is common in municipal organizations, but it can be misleading as age does not always directly reflect condition or remaining life. To enable comparison of condition and condition trends over time between different asset types, a generic condition grading scale is often used to translate detailed engineering data about assets into information that can be compared across asset groups. For this purpose, the Town uses a five-point condition grading system, summarized in Table 3 below, which is consistent with the general condition grading system included in the International Infrastructure Management Manual (IIMM). Table 3 Five-Point Condition Grading System Grade Description Condition Criteria Condition Description VG Very Good Fit for the future Well maintained, good condition, new or recently rehabilitated G Good Adequate for now Acceptable, generally approaching mid- stage of expected service life F Fair Requires attention Signs of deterioration, some elements exhibit deficiencies Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 9 Grade Description Condition Criteria Condition Description P Poor Increasing potential of affecting service Approaching end of service life, below standard, significant deterioration VP Very Poor Unfit for sustained service Near or past service life, advanced deterioration, assets may be unusable Details relating to the condition of each asset are currently maintained in various databases and spreadsheets. The Town converts industry standard condition rating systems and age-based assets to the above condition grading system as provided in Table 4 below. Table 4 Conversion of Industry Condition to Five-Point Condition Grade Condition Grade Parking Lot & Retaining Wall Condition Grade Sidewalk & Guiderail Condition Grade Pavement Condition Index (PCI) Bridge Condition Index (BCI) Facility Condition Index (FCI - 3 Year Town Staff Inspection Condition Grading % Life Remaining for Age- Based Condition Very Good (New) 1-2 0 - 20 80 - 100 80 - 100 0 - 2.5% A 75 - 100% Good 3-4 20 - 40 60 - 80 70 - 80 2.5% - 5% B 50 - 75% Fair 5-6 40 - 60 40 - 60 60 - 70 5% - 10% C 25 - 50% Poor 7-8 60 - 80 20 - 40 40 - 60 10% - 20% D 0 - 25% Very Poor (End of Life) 9-10 80 - 100 0 - 20 0 - 40 20%+ E <=0% Figure 1 depicts, by colour, the value of assets that fall within each of the condition grades (very good, good, fair, poor, very poor), organized by program area. The total replacement value of assets within each service area is shown on the condition grade bars. The Facilities were assessed based upon the condition of each component of the facility. The Facility Condition Index (FCI) will be used in conjunction with visual inspection in future iterations of this Asset Management Plan as a quality assurance test. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 10 Where Very Poor conditions have been assessed using age as opposed to a formal inspection or assessment, this has been delineated with a hashing as the condition reported for these assets is potentially less accurate. For storm lines within the Environmental Services, an industry specific deterioration curve was integrated into the condition assessment where a condition of Very Good up to 60 years, Good >60 to 75 years, Fair >75 to 85 years, Poor >85 to 90 years and Very Poor greater than 90 years. The need to estimate the condition of the storm lines will decrease as the Town continues to conduct Closed Captioning Television (CCTV) assessments of this infrastructure. Figure 1 Asset Condition Grade Profile, By Service Area (by Percentage) To adequately meet service levels and manage risk while minimizing lifecycle costs, most assets should generally be preserved in fair or better condition. The above figure show that 92% of the Town's assets are in fair or better condition based on replacement value. Subsequently, 7% or $182 million are in poor condition and 1% or $38 million are in very poor condition (of which $21 million was assessed using age-based condition). Assets in poor or very poor condition require increased attention and renewal investment (funding and staff resources) to avoid increased maintenance costs and/or unexpected failure. The assets that are currently in poor or very poor condition are typically those that are included in 10-year capital renewal programs and budget forecasts, especially if deemed critical by the Town. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 11 2 Levels of Service 2.1 Overview One of the basic principles of sound asset management practice is to describe the levels of service the current and future community want and are prepared to pay for, and the associated lowest cost to deliver those levels of service. Performance management is the systematic and cyclical process of identifying objectives, collating information regarding the achievement of those objectives, reporting the information in a meaningful way, and using the information to improve delivery of services to the community. Monitoring the Town's performance against defined levels of service helps to improve the Town's service delivery by focusing program activities and assets on priorities and identifying underperformance so that it can be addressed. Good performance management also demonstrates affordability to our taxpayers, ensures the Town is accountable to the community and attracts economic development. 2.2 Legislative Requirements There are many legislative requirements relating to the management of assets. Legislative requirements that impact the delivery of Town services are outlined in Table 5. Table 5 Legislative Requirements Legislation Requirement Municipal Act, 2001 The main statute governing the creation, administration and government of municipalities in Ontario, other than the City of Toronto. Ontario Regulation 588/17: Asset Management Planning for Municipal Infrastructure. The Infrastructure for Jobs and Prosperity Act, 2015 Sets out the principles for the provincial government to regulate asset management planning for municipalities. Accessibility for Ontarians with Disabilities Act (AODA) 2005 Develops, implements, and enforces accessibility standards to achieve for Ontarians with disabilities with respect to goods, services, facilities, accommodation, employment, buildings, structures, and premises on or before January 1, 2025. Public Sector Accounting Board Standard 3150 Standard on how to account for and report on tangible capital assets in government financial statements. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 12 Legislation Requirement Ontario Regulation 104/97, Standards for Bridges Requires municipalities to undertake an inspection, under the direction of a Professional Engineer, for every bridge and major culvert at least once every two years in accordance with the Ontario Structure Inspection Manual. Minimum Maintenance Standards for Municipal Highways (MMS) Regulation 239/02 Routine Patrol Sets out the standard for the frequency of patrolling of highways to check for conditions described such as snow, ice, potholes, cracks, etc. Highway Traffic Act R.R.O. 1990 Reg. 615: Signs Sets out the standard for the erection and maintenance of signs. Highway Traffic Act R.R.O. 1990 Reg. 626: Traffic Control Signal Systems Sets out the standard for the erection and maintenance of traffic control signal systems. Highway Traffic Act R.R.O. 1990 Sets out fleet and equipment inspection requirements Reg. 174/22: Classes of Vehicles Requiring Annual and Semi-Annual Inspections Reg. 611: Safety Inspections Reg. 199/07: Commercial Motor Vehicle Inspections Reg. 587: Equipment Ontario Traffic Manual Book 18: Cycling Facilities Provides guidelines for developing municipal cycling facilities. Technical Standards and Safety Act, 2000 Sets out the technical standards and safety regulations to enhance public safety providing for the efficient and flexible administration of various industries or equipment. Fire Protection and Prevention Act, 1997 Sets out the legislative and regulatory framework for the establishment of fire protection in Ontario, which is a mandated municipal responsibility. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 13 Legislation Requirement Ontario Building Code Act, 1992 The legislative framework governing the construction, renovation and change-of-use of a building in Ontario. The Ontario Building Code, a regulation under the Act, establishes detailed technical and administrative requirements and minimum standards for building construction in public health and safety, fire protection, structural sufficiently, construction materials, plumbing and mechanical systems. Environmental Protection Act, 1990 The primary pollution control legislation in Ontario. Prohibits discharge of any contaminants to the environment that cause or are likely to cause adverse effects. Amounts of approved contaminants must not exceed limits prescribed by the regulations. Requires that spills of pollutants are reported and cleaned up promptly. Has the authority to establish liability on the party at fault. Legislated Community Levels of Service Legislated requirements define the standards according to which the Town is legally obligated to provide services to the community. The Town delivers services in adherence to applicable legislative requirements, including required compliance monitoring and reporting. Many legislated levels of services relate to service and asset safety and reliability. Information on regulatory inspections is contained within various databases and maintained by Town staff at the operational level to ensure legislative compliance. In addition, O.Reg. 588/17 requires Ontario municipalities to document specific community and technical proposed levels of service, for all tangible capital assets within the Asset Management Plan. Technical levels of service are more quantitative in nature, however community levels of services include qualitative descriptions and visuals such as maps and images. The required levels of services prescribed by O.Reg 588/17 for core assets can be found in Appendix A. 2.3 Strategic and Corporate Goals The 2022-2026 Strategic Plan outlines the vision, mission and corporate operating principles, and strategic themes. The Strategic Plan's three main pillars where strategic priorities are broken into are provided in Table 6. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 14 Table 6 Corporate Strategic Themes (2022-2026 Strategic Plan) Pillar Definition Priorities Connecting our Community Connecting our community means amplifying different voices and ensuring that Ajax is a welcoming and safe space with opportunity for all. Within this pillar, you will find a commitment to safety, diversity, community pride and a focus on arts, culture and innovation. 1. Increase and amplify creative and innovative opportunities 2. Encourage community pride 3. Improve well-being and quality of life 4. Fostering a safe and welcoming community 5. Champion inclusion, diversity, equity and accessibility (IDEA) Growing our Community Growing our community is about ensuring that we are facilitating the development of the housing, community spaces and infrastructure Ajax residents need today and in the future. It is also about support for business and a thriving local economy. 1. Embrace dynamic and sustainable growth 2. Advance innovation and investment 3. Invest in the changing recreation needs of a growing community Modernizing our Community The Town's plans for modernizing the community include looking internally to ensure we have the best team to support our community, that we are sound financial managers and that we are leading in communication. Modernizing also means preparing for a changing climate and taking meaningful action to preserve and enhance our environment. 1. Lead the green transition 2. Rethink the way we communicate 3. Equip our workforce for the future 4. Ready our organization for the future 5. Demonstrate sound financial management Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 15 2.4 Community and Technical Levels of Service Community Levels of Service measures how the customer receives the service and whether value to the customer is provided. Figure 2 shows that Corporate Priorities and the Legislated Requirements drive the definition of more specific Community Levels of Service, which can be categorized as relating to one of the following service attributes: - Capacity: Measures that reflect whether the service and supporting assets are of sufficient capacity to meet user demand. - Does the Town need more or less of these services and assets? - Functionality: Measures that reflect the suitability of the services, operations and assets for the user or other stakeholder. - Do they meet the needs of the community? - Do they meet regulatory requirements including those for health and safety, environmental protection and barrier free access? - Do they support the Town's strategic priorities? - Reliability & Quality: Measures that reflect whether services and supporting assets are reliable, available when needed, and responsive to customers. - Are assets maintained and renewed to ensure a state of good repair (condition)? - Are services continuous? - Is the community involved in planning, treated respectfully and responded to promptly? - Affordability: Measures that reflect whether services and supporting assets are adequately funded in both the short and long term. Technical Levels of Service measures support the Community Levels of Service. They relate to the allocation of resources to service activities to best achieve the desired customer outcomes and demonstrate effective performance. Community Levels of Service are translated into Technical Levels of Service, where: - Capacity Levels of Service drive assessment of expansion needs. - Function Levels of Service drive assessment of upgrade needs. - Reliability & Quality Levels of Service drive assessment of renewal, maintenance, operations, and programming needs. - Affordability Levels of Service drive assessment of financial sustainability needs. The risks of failing to achieve the defined Community and Technical Levels of Service are assessed and lifecycle activities are prioritized to address those risks. Lifecycle activities may include preventative maintenance, expansion, upgrade, renewal, maintenance or operational activities, depending on the category of levels of service to be addressed. In some cases, lifecycle activities address several Community and Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 16 Technical Levels of Service. For example, a large renovation project at a facility may simultaneously increase capacity, make upgrades to meet regulatory requirements, and renew existing equipment. The nature of the lifecycle activity determines whether it should be funded as capital or operating, as well as, identifying eligible funding sources. As shown in Figure 2, even after the lifecycle intervention, some residual risk may remain. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 17 Figure 2 Levels of Service Framework Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 18 2.5 Customer Research and Expectations Resident, business and other stakeholder input is sought during the update of the Town's Strategic Plan, Official Plan, Master Plans and annual budgets. This includes public opinion and stakeholder group surveys that collect information about user service patterns, behaviours and preferences today and potentially into the future. This customer research provides insight into citizens' and other stakeholders' needs and perceptions related to areas of improvement. 2.6 Current Performance Table 7 summarizes the current performance of each program area. Community and Technical Levels of Service and performance is provided by service and program area in Section 7 Service and Program Area Details with measures as required by O.Reg.588/17 for core assets provided in Section 8 O.Reg. 588/17 Community Levels of Service Documentation. Table 7 Levels of Service - Fit for Service Service Area Community Level of Service Technical Level of Service Current Performance (in million $) Current Performance (% of Very Poor of the Service Area) Transportation Quality: Assets are not meeting expected Reliability service levels % assets in Very Poor Condition (at or past end of life) by Replacement Value $4.46 0.3% Environmental Quality: Assets are not meeting expected Reliability service levels % assets in Very Poor Condition (at or past end of life) by Replacement Value $16.68 2.8% Facilities Quality: Assets are not meeting expected Reliability service levels % assets in Very Poor Condition (at or past end of life) by Replacement Value $7.0 1.7% Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 19 Service Area Community Level of Service Technical Level of Service Current Performance (in million $) Current Performance (% of Very Poor of the Service Area) Parks, Recreation and Culture Quality: Assets are not meeting expected Reliability service levels % assets in Very Poor Condition (at or past end of life) by Replacement Value $0.37 0.4% Fleet Quality: Assets are not meeting expected Reliability service levels % assets in Very Poor Condition (at or past end of life) by Replacement Value $4.73 9.2% Library Quality: Assets are not meeting expected Reliability service levels % assets in Very Poor Condition (at or past end of life) by Replacement Value $3.38 26.1% Information Technology Quality: Assets are not meeting expected Reliability service levels % assets in Very Poor Condition (at or past end of life) by Replacement Value $1.12 21.4% Fire Quality: Assets are not meeting expected Reliability service levels % assets in Very Poor Condition (at or past end of life) by Replacement Value $0.007 0.3% Total Quality: Assets are not meeting expected Reliability service levels % assets in Very Poor Condition (at or past end of life) by Replacement Value $37.7 1.4% of total Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 20 Other Levels of Service measures related to Capacity & Use, Function, and Reliability are explored within each individual Service Area subsection within the Asset Management Plan. Where sufficient data is not available to determine the Town's current performance, the Town will be collecting data and monitoring performance in the future. In the next iteration of the Asset Management Plan, Proposed Levels of Service will be established, which will drive asset improvement decision making. It is important to monitor the service levels regularly as circumstances change. Current performance is based on existing resource provisions and work efficiencies. Moreover, changing circumstances such as technology and customer priorities will also impact future service levels which will result in different funding models being adopted. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 21 2.7 Factors Impacting Levels of Service Performance External trends and issues affecting expected levels of services or the Town's ability to meet the defined levels of services include the following. - Population and employment changes which will impact infrastructure use. - Changes in expectations for programs or patterns of use which will impact infrastructure use and revenue for services. - Potential changes in technology and increased security requirements, which may replace obsolete equipment, provide longer asset life, and/or achieve higher quality and greater efficiencies. - Potential changes to the cost of input variables (power, fuel), which will impact costs to deliver the services. - Infrastructure failing prematurely due to environmental factors and/or construction practices requiring renewal much earlier than the expected life of the asset. - Availability of external funding (federal and provincial infrastructure programs), which may affect the infrastructure improvement activities that can be undertaken. - Unexpected downloading of services by upper tier levels of government. - Widespread implementation of sustainability initiatives and "greening" strategies targeting reduction in greenhouse gas emissions within the municipality (new zero carbon buildings, LEED certifications). - Climate change, including changing storm events and patterns (higher intensity storms occurring more regularly), which will impact the infrastructure. - Potential changes in Federal or Provincial legislation. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 22 3 Risk Management Strategy 3.1 Overview The Town's key asset management principle is to meet service levels and manage risk, while minimizing lifecycle costs. The relative importance of the assets to support service delivery, referred to as asset criticality, is a key driver in selection of the most appropriate asset management strategy for each asset. Critical assets include assets that are key contributors to performance, expensive in terms of lifecycle costs, prone to deterioration, and in need of increased spending on maintenance activities. Risk events, such as an asset's failure to have sufficient capacity, function, or reliability, are events that may compromise the delivery of the Town's strategic objectives. Lifecycle activities are used to manage the risk of failure by reducing the chance of asset failure to acceptable levels. The impact of asset failure on the Town's ability to meet its strategic objectives dictates the type and timing of lifecycle activities. The Town uses a risk framework for quantifying the risk exposure of its assets to enable prioritization of projects across asset classes and services. Risk exposure is the multiplication of the criticality or consequence of failure (CoF), which is the direct and indirect impact on the Town if an asset failure were to occur, by the probability of failure (PoF), which is the likelihood or chance that an asset failure may occur: Risk Exposure = Consequence of Failure x Probability of Failure 3.2 Consequence of Failure Asset criticality or consequence of failure reflects the importance of an asset to the Town's delivery of services. The following impacts of a potential asset failure are considered: - Financial impact considerations such as asset replacement cost, damages to Town or private property and infrastructure, loss of revenue, and fines. - Health and Safety considerations including the ability to meet health and safety related regulatory requirements, and degree and extent of injury, ranging from negligible injuries to loss of life. - Service Delivery considerations ranging from a disruption of non-essential service to widespread and long-term disruption of essential service. - Reputational considerations such as residents' reduced trust and confidence in Town government. - Environmental considerations such as length and extent of damages to the natural environment. The Town's Climate Risk and Resiliency Plan requires consideration of the consequences of extreme weather, emergency events and safety risks to the community. The risk assessment includes climate change considerations but should be reviewed over time as the impacts of climate change become more apparent. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 23 Table 8 summarizes the above listed impacts against an asset criticality rating scale from 1 to 5, with a higher score indicating a higher consequence of failure. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 24 Table 8 Asset Criticality (Consequence of Failure) Ratings Score Grade Description Social Environmental Economic Service Delivery Facilities 1 N Negligible Negligible impact on community, Town goals, life or health Negligible (very isolated) impact, reversible within 1 week Liabilities < $10,000 Restoration < $5,000 Small number of customers, non- essential service disruption (< 1 hour) Minor structures, Mothballed assets, Non-functional for core services 2 L Low Low Impact on community, Town goals, life or health Low (isolated) impact, reversible within 1 year Liabilities $10,000 to < $50,000 Restoration $5,000 to < $100,000 Localized, non- essential service disruption (< 6 hours) Supports delivery of community programs, services and recreation 3 M Moderate Moderate Impact on community, Town goals, life or health Moderate (local) impact, reversible within 1 year Liabilities $50,000 to < $250,000 Restoration < $100,000 to < $250,000 Localized, essential service disruption (<1 day) For delivery of community programs, service and recreation 4 S Significant Significant Impact on community, Town goals, life or health Significant (regional) impact, reversible within 5 years Liabilities $250,000 to < $500,000 Restoration < $250,000 to < $1.0 million Widespread, essential service disruption (> 1 day) For infrastructure and service delivery 5 C Catastrophic Catastrophic impact on community, Town goals, life or health Catastrophic (provincial) impact, irreversible or not reversible for over 5 years Liabilities > $0.5 million, Restoration > $1.0 million Widespread, essential service disruption (> 3 days) For delivery of the safety, emergency, and vital Town functions Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 25 3.2.1 Probability of Failure The Town's goal is to ensure that its assets are kept in a state of good repair to reduce the incidence of unplanned service disruptions due to assets in very poor condition. Depending on the asset, unplanned failures can have a wide range of consequences including service disruption, damage to surrounding infrastructure and property, risks to public safety, and environmental impacts. For this Asset Management Plan, Probability of Failure is estimated based on the condition of the asset, as shown in Table 9. Table 9 Probability of Failure Ratings Probability of Failure Score Grade Description Remaining Service Life Deterioration Performance Maintenance Costs Age 1 Very Good Fit for future 80 to 100% None As intended Well within normal level New / Like New 2 Good Adequate for now 60 to 79% Minimal deterioration As intended Acceptable, but increasing Within mid-range of expected service life 3 Fair Required attention 20 to 59% Signs of medium deterioration Lower than intended Exceeding normal levels and increasing Later stage of expected service life 4 Poor At risk of affecting service 20 to 39% Significant deterioration Much lower than intended Significantly above acceptable levels Nearing end of expected service life 5 Very Poor Unsatisfactory for sustained service < 20% Unsound / Failing Not performing as intended Costs unacceptable and rehabilitation not cost effective Past end of service life n/a Unknown Unknown n/a n/a n/a n/a n/a Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 26 3.2.2 Town Wide Asset Risk Profile After assessing the criticality and probability of each asset's risk, the results were plotted on Figure 3 of the risk heat map, a graphic representation of probability and consequence of failure. Colours on the heat map denote the various levels of risk and help to prioritize the Town's resources, time, and effort in Chapter 5 of the Asset Management Plan - Lifecycle Management Strategy. - Risks that appear in the orange (Very High) zone are significant to the Town and therefore need to be actively managed and monitored in a more comprehensive manner than other risks. - Risks that appear in the yellow (High) or light blue (Moderate) zones will also be actively managed depending on their nature. - Risks that appear in the light green (Low) or darker green (Very Low) zones are generally acceptable without significant mitigation strategies being implemented, although monitoring may still occur in some form. Based on those assets with known condition, Figure 3 shows that $50.4 million of the Town's assets are in the Very High-risk exposure category related to the provision of reliable services. This excludes approximately $2.2 million of assets that have an unknown condition (probability of failure). The Town mitigates its exposure to these risks through the planned lifecycle strategies discussed in the Lifecycle Management Strategy section of this Asset Management Plan. Service area specific risk profiles are provided in Chapters 7 through 14 of this report. Figure 3 Risk Exposure of the Town's Assets During the course of the life of an asset, assets will deteriorate and move up the Likelihood of Failure scale and after they are rehabilitated or reconstructed, they will return to the bottom of the Likelihood of Failure scale. Figure 4 shows the forecast risk exposure from 2024-2034 if Town did not perform any renewal activities (Do Nothing Renewal Scenario). Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 27 Figure 4 Risk Forecast - Do Nothing Scenario Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 28 4 Lifecycle Management Strategy 4.1 Overview The Town's ability to deliver the levels of service outlined in the Asset Management Plan is impacted in large part by: - aging infrastructure and the associated need for operations, maintenance, and renewal investments to sustain it; - forecast future population growth and the associated need for additional infrastructure to serve it; - changing functional, legislative and sustainability requirements and the associated need for existing assets to be upgraded to continue to be fit for purpose; and - available funds and the associated need for assets to be provided at the lowest cost for both current and future customers. To achieve its objectives, the Town with limited funding builds new infrastructure assets to meet capacity needs, upgrades assets to meet new functional needs and manages existing assets to meet reliability needs. Asset lifecycle management strategies are planned activities that enable assets to provide the defined levels of service in a sustainable way, while managing risk at the lowest lifecycle cost. Asset lifecycle management strategies are typically organized into the categories listed in Table 10 and are driven by the levels of services defined for each Service Area. Table 10 Asset Lifecycle Management Categories Lifecycle Management Category Description Examples of Associated Activities Operate Regular activities to provide services Inspect, clean, energy usage Maintain Activities to retain asset condition to enable it to provide service for its planned life Repair, replace component Renew Activities that return the original service capability of an asset Rehabilitate (minor), rehabilitate (major), replace Upgrade Activities to provide a higher level of service capability from an existing asset to achieve better fit for purpose or meet regulatory requirements Update system to be more energy efficient, improve environmental sustainability Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 29 Lifecycle Management Category Description Examples of Associated Activities Growth Activities to provide a new asset that did not exist previously or an expansion to an existing asset Acquire new asset, expand existing asset In addition to the above asset strategies, non-asset solutions are also considered which are actions or policies that can lower costs, lower demands, or extend asset life. Examples of non-asset solutions include better integrated infrastructure and land use planning, demand management, insurance, process optimization, and public education. The Town assesses the costs of potential lifecycle activities to determine the lowest lifecycle cost strategy to manage each asset type while still meeting its level of service. The total cost of ownership is the sum of lifecycle activity costs to sustain each asset type over the asset lifecycle. A conceptual lifecycle cost model is shown in Figure 5. Sufficient investment of the right type and at the right time minimizes the total cost of ownership for each asset and mitigates other potential risks such as interruption to service delivery or damage to other nearby infrastructure. Operations, maintenance, and renewal activities are timed to reduce the risk of service failure from deterioration in asset condition and are part of the total cost of ownership. Figure 5 Conceptual Lifecycle Cost Model The Town uses its understanding of the risk of not meeting service levels to inform the timing and level of investments needed in infrastructure assets. The Town aims to provide sufficient service capacity to meet demand and manages the upgrade, operations, maintenance, and renewal of assets to meet defined service levels, including legislated requirements and corporate priorities. This section of the Asset Management Plan outlines the Town's expansion and upgrade strategies to support capacity and functional service levels, and the Town's operations, maintenance, and renewal activities to support reliable service levels. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 30 4.2 Town Growth and Upgrade Needs One main factor that municipalities must consider in asset management planning is the impact of future growth on meeting goals and objectives. The Town monitors trends in its population to ensure that its impacts on service levels are understood and that strategies are developed to address additional demands due to growth and demographic changes. On May 17, 2023, Durham Regional Council adopted the new Regional Official Plan, "Envision Durham". Today, the region is home to 699,460 people. By the year 2051, the Region's population is expected to grow to 1.3 million people, with over 460,000 jobs in the region. This expected growth in the region is correlated with significant growth expected within the Town of Ajax as well. The Town's historical and forecast population and employment growth is summarized in Table 11. Forecasted growth is as reported in Envision Durham. Table 11 Town Population Forecasts (Envision Durham) Year Urban Population Rural Population Total Population Households Employment 2021 130,510 960 131,470 39,490 37,040 2026 140,000 960 140,960 44,080 40,240 2031 150,570 960 151,530 49,070 44,190 2036 161,940 960 162,900 54,420 48,280 2041 173,370 950 174,320 60,010 52,400 2046 185,590 950 186,540 65,790 57,070 2051 198,160 950 199,110 71,640 61,910 The Town anticipates that additional infrastructure will be required over the next 10 years to maintain capacity service levels. Some of this infrastructure will be acquired through capital projects while other infrastructure will be assumed from developers. The funding is addressed in Chapter 6 - Financial Strategy. In addition to adding new assets to the portfolio, the Town also upgrades existing assets. Upgrading infrastructure assets is crucial for the Town to ensure the safety, efficiency, and sustainability of the community. Compliance goals, such as meeting regulatory standards for environmental protection or ensuring accessibility for people with disabilities, are essential for legal and ethical reasons. Energy efficiency targets are important to reduce operational costs and minimize environmental impact, contributing to long-term sustainability. Additionally, technological upgrades enable the Town to keep pace with advancements, enhancing service delivery and improving the overall quality of life for its residents. Neglecting infrastructure upgrades can lead to inefficiencies, safety hazards, and increased maintenance costs over time. Therefore, investing in infrastructure upgrades is a proactive approach that not only meets current needs but also prepares the Town for future challenges and opportunities. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 31 4.3 Town Inventory Growth and Upgrade Forecast Annual growth and acquisition amounts for projects in the 2025-2034 Capital Plan are shown in Figure 6. The growth impact on the asset portfolio increased by: - $425.5 million of growth or "net-new" assets added to the Town's infrastructure portfolio. These projects have been identified through the forecasted capital plan, master plans and stakeholder discussions. Significant planned growth assets included in Figure 6 include: o Roadway Extension Projects o Ajax Community Centre (ACC) North Field and Magnum Opus Community Parks o Audley Recreation Centre (ARC) Phase III o ACC Recreation Master Plan Renovation - $69.1 million of new assets assumed from developers to be operated and maintained by the Town. Figure 6 Year Inventory Growth and Upgrade Forecast Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 32 4.4 Renewal Needs, Funding and Gaps Renewal efforts focus on rehabilitation and replacement activities to enable the Town to meet its reliability objectives. The renewal activities included in this Asset Management Plan are forecasted to be needed to address the existing backlog of assets in Poor and Very Poor condition and sustaining other assets as they deteriorate over the next 10 years. Rehabilitation activities extend the life of an asset and reduce the risk of failure. These activities and associated benefits are deemed to be more cost effective than allowing the asset to reach its end of life. The Town has identified estimated service lives for each of its assets. These replacement intervals are developed to minimize lifecycle costs while considering service levels and associated risk. The renewal forecasts consider the asset's current condition or age, the Town's planned rehabilitation and replacement activities, as well as the recommended strategies from specific studies such as the building condition assessments. Asset renewal needs are triggered by condition, age, or other performance measures. If the installation date is missing, renewal needs are included as an average annual reinvestment rate based on asset value and useful life. Figures 7 to 10 present renewal and condition forecasts for two scenarios: Maintaining Current Levels of Service and Proposed Levels of Service. Scenario 1: Maintaining the Current Levels of Service This scenario shows renewal activities that would be required to prevent the current renewal backlog from growing. According to Figure 7 below, the forecasts for the maintain current levels of service scenario: - The 10-year average annual renewal need to maintain the current levels of service is $29.6 million (dashed blue line). - The current average annual renewal funding is $21.5 million (solid red line). - The current average annual infrastructure renewal gap of $8.1 million for the maintain current level of service scenario over the next ten (10) years. The infrastructure gap is $35.7 million over the life of the assets. - If approved, the anticipated annual funding (solid orange line) which is comprised of the recommended Infrastructure Levy (2% in 2026 and 1% thereafter) and the existing average annual funding has an average annual funding of $27.1 million. Therefore, the 10-year infrastructure gap reduces to $2.5 million. - Note that according to Figure 7 the whole lifecycle average annual needs (total renewal costs divided by the service life) is $57.2 million (solid green line). This is the average annual amount needed to renew the assets over their entire lives. At this time, the in perpetuity average annual need is higher than the 10-year average annual need which indicates that there are higher upcoming renewal Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 33 needs beyond the 10-year period of this Asset Management Plan forecast. It is important that the Town consider the whole lifecycle costs when building reserves to ensure sufficient money is available to fund the state of good repair of these assets as they age. The whole lifecycle average annual needs below only reflect the renewal needs required for the existing assets and does not account for the renewal needs required for the growth assets being added to the Town's infrastructure portfolio. Figure 7 Infrastructure Renewal Needs - Maintaining Current Levels of Service Scenario Figure 8 below shows the forecast condition distribution associated with spending level in Figure 7 (Maintaining Current Levels of Service Scenario). If assets are not renewed when they reach their end-of-life, the probability of their failure increases. Depending on the asset type and failure context, an asset failure may result in various negative impacts, such as service disruptions, injuries to employees and the public, or reputational harm to the organization. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 34 Figure 8 Condition Forecast, Maintain Current Levels of Service (Renewal Backlog) Scenario Scenario 2: Proposed Level of Service Scenario This scenario has most service areas maintaining the current levels of service. Library has increased its levels of service to address furniture that is in very poor condition. Transportation (Roads) and Infrastructure Technology Services have decreased their respective levels of service. The proposed levels of service renewal funding scenario decreases the infrastructure gap which is more realistic and attainable. Table 12 outlines the changes in the proposed levels of service for roads. There is little change in arterial roads as they remain in fair condition when they are triggered to be rehabilitated. The trigger point for rehabilitation on collector roads is decreased but remains in fair condition, the savings is due to the volume of collector roads. The significant savings exists with the local roads, where the trigger point is changed from 45 (low fair condition) to 35 (high poor condition). Expected deficiencies with this change are moderate cracking, settlement around catchbasins and maintenance holes, and potholes. Treating these potential deficiencies is estimated to increase the annual roads operational budget by $11 thousand. Future budgets would have this value inflated to incorporate the Non-Residential Building Canadian Price Index (NRBCPI). Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 35 Table 12 Proposed Road Rehabilitation Triggers Functional Class (lane Km) Current Trigger Point (Current Level of Service) Current Lifecycle Costs per Lane Km Proposed Trigger Point (Proposed Levels of Service) Proposed Lifecycle Costs Per Lane Km Difference Between Current and Proposed Levels of Service Change to Capital Expenditures of the Life of the Road B Arterial (43.312) 60 $2,544,880 55 $2,325,495 -$219,385 -$9,502,003 C Arterial (92.836) 55 $2,325,495 55 $2,325,495 $0 $0 Collector (93.709) 50 $3,625,100 45 $3,320,600 -$304,500 -$28,534,390 Local (522.067) 45 $2,369,460 35 $2,230,230 -$139,230 -$72,687,388 Figure 9 shows the forecasts for the proposed levels of service scenario, as follows: - The average annual renewal need over the next ten (10) years is $23.9 million (dashed blue line). - As with the previous scenario, the current average annual renewal funding for the same period is $21.5 million (solid red line). - This reduces the existing average annual infrastructure renewal gap to $2.4 million for the proposed levels of service scenario over the next ten (10) years and $29 million over the life of the assets. - The solid orange line again assumes a 2% infrastructure levy increase in 2026 and a 1% infrastructure levy increase thereafter. If this infrastructure levy were approved by Council through the annual budget process, the infrastructure renewal gap could be eliminated and result in an estimated average annual contribution to reserves of $3.2 million for the proposed levels of service scenario over the next ten (10) years. - The whole lifecycle annual needs (total renewal costs divided by the service life) is $50.5 million dollars (solid green line). As discussed previously, this is the amount needed on average annually, in perpetuity, to renew the assets over their entire lives and should be considered when building reserves to ensure sufficient money is available to fund the state of good repair of these assets as they age. It is important to note that existing revenue sources, such as Elexicon dividends and Ajax Casino revenues, are not guaranteed and this may result in needs for future alternative funding sources and a greater dependency on the infrastructure levy. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 36 Figure 9 Infrastructure Renewal Needs - Proposed Levels of Service Scenario The resulting condition distribution over the next 10 years for this scenario is shown in Figure 10. The majority (85%) of the assets remain in fair or better condition under the proposed levels of service scenario. The maintain levels of service scenario has approximately 87% of the municipal assets in fair or better condition. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 37 Figure 10 Condition Forecast, Proposed Levels of Service Scenario 4.5 Impact of Future Growth to Asset Renewal Needs It is important to note that whole lifecycle average annual needs shown in the scenarios above only reflect the renewal needs required for the existing asset base and does not account for the renewal needs required for the growth assets being added to the Town's infrastructure portfolio. Based on the anticipated asset growth over the next 10 years, it is expected that the infrastructure whole lifecycle annual needs will increase to $57.2 million/year as shown in Figure 11 below. It is important that the Town allocates sufficient resources for the renewal needs of these growth assets prior to their deterioration. In 2034, the infrastructure gap between the yellow line that represents the anticipated annual funding (includes infrastructure levy) and the green line that represents the lifecycle average annual need is $18.2 million. When growth is factored in, the infrastructure gap between the yellow line that represents the anticipated annual funding (includes infrastructure levy) and the blue line that represents the growth lifecycle annual need is $24.9 million. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 38 Figure 11 Average Annual Lifecycle Renewal Needs - Proposed Budget Scenario (Including Future Growth) 4.6 Operations and Maintenance Needs Forecasted operations and maintenance costs are expected to vary in relation to the total value of the asset stock. If additional assets are acquired, the future operations and maintenance costs are forecasted to increase. If assets are disposed of, the forecast operation and maintenance costs are expected to decrease. Figure 12 shows the forecast operations and maintenance costs for the next 10 years. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 39 Figure 12 Operations and Needs Forecast The figure shows that the operational costs are expected to increase from $71.1 million/year in 2024 to $83.9 million/year in 2034. All figure values are shown in 2024$. Forecast increases in operations and maintenance needs are due to estimated growth in the asset portfolio as indicated in the Town's Long Range Capital Forecast, as well as assets anticipated to be assumed from developers over the next ten years. Operations and maintenance needs in future years past 2024 are assumed to increase proportionally with the increase in the replacement value of the asset portfolio by asset type. The estimate of operations and maintenance cost increases can be refined by conducting more detailed analysis of operating costs by asset sub-types or by maintenance activity. For the period 2025-2034, the annual operating and maintenance costs are expected to be an average of $78.4 million/year. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 40 5 Financing Strategy 5.1 Overview The financial strategy is informed by the following sections of the Asset Management Plan: the state of infrastructure, the levels of service, the risk management strategy, and the lifecycle management strategy. The financial strategy considers how the Town will fund the planned asset management actions to meet the proposed service levels. A global leader in asset management, the Local Government Association of Australia defines financial sustainability within the municipal government context as "... a government's ability to manage its finances so it can meet its spending commitments, both now and in the future. It ensures future generations of taxpayers do not face an unmanageable bill for government services provided to the current generation". A municipality is in a financially sustainable position if it: - Provides an accepted level of service with willingness and ability to pay; - Can adjust service levels in response to changes in economic conditions or transfer payments from other levels of government; - Can adjust its implementation plans in response to changes in the rate of growth; and - Has sufficient reserves and/or debt capacity to replace infrastructure when it needs to be replaced to keep its infrastructure in a state of good repair. The key challenges to financial sustainability are: - A discrepancy between levels of service decisions and fiscal capacity; - The future cost of infrastructure investments; and - Unforeseen impacts to revenue. As per O.Reg. 588/17, this section of the Asset Management Plan identifies the annual funding projected to be available to undertake the planned lifecycle activities and discusses strategies to address potential funding shortfalls. 5.2 Available Funding Amounts and Sources Through the Town's annual budget process, capital project and operating activity expenditure information is gathered from each of the services areas, including investment needs, trends, and priorities to enable preparation of the capital and annual operating plans. The Town currently approves one-year capital and operating plans and budgets. O.Reg. 588/17 requires that Asset Management Plans for proposed levels of service (due by July 1, 2025) provide lifecycle management and financial strategies and annual funding projected to be available for each of the next 10 years. The Town's main sources of revenue include property tax, debt, Canada Community Building Fund, third party grants, development charges, and user fees. These funding sources are further outlined in Tables 13 and 14. There are restrictions on the use of funds from various sources (grants, user fees). Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 41 Table 13 below identifies the different funding sources available at the Town to support "asset management" activities for core and non-core infrastructure. Table 13 Asset Management Funding Sources (Renewal) Reserve Name Capital Budget/LRCF Funding Revenue Sources Building Maintenance Reserve Maintenance/repair/rehabilitation of existing facilities including asset condition assessments Annual budget allocation Casino Ajax revenue Elexicon revenue Portion of tax room from the debt payments on retired long-term debt Annual Infrastructure Levy (2% until 2026 and 1% thereafter) Road Maintenance Reserve Maintenance/repair/rehabilitation of existing roads and other transportation infrastructure including asset condition assessments - Annual budget allocation - Casino Ajax revenue - Elexicon revenue - Portion of tax room from the debt payments on retired long-term debt - Annual Infrastructure Levy (2% until 2026 and 1% thereafter) General Infrastructure Reserve Maintenance/repair/rehabilitation of all other infrastructure not fundable from Building Reserve or Roads Maintenance Reserve Annual budget allocation Casino Ajax revenue Elexicon revenue Portion of tax room from the debt payments on retired long-term debt Annual Infrastructure Levy (2% until 2026 and 1% thereafter) Vehicle/Equipment Replacement Reserve Replacement of vehicles, rolling stock, fire equipment, indoor recreation, and IT assets. Annual budget allocation Casino Ajax revenue Elexicon revenue Portion of tax room from the debt payments on retired long-term debt Annual Infrastructure Levy (2% until 2026 and 1% thereafter) Stormwater Maintenance Reserve Maintenance/repair/rehabilitation of all stormwater infrastructure including asset condition assessments Stormwater user fee Developer contributions Canada Community Building Fund (CCBF) For projects identified within the Municipal Funding agreement CCBF Grant (received twice a year) Parkland Reserve Fund Utilized to fund retrofits for existing park spaces Developer contributions under the Planning Act Building Approvals Reserve Utilized for assets used in the provision of activities governed by the Building Code Act Portion of fees collected for the provision of Building Code related activities Although currently not an active funding source, the following reserves can be utilized for renewal needs in the future: - Post Growth Capital Reserve - Debt Reduction Reserve Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 42 The proposed levels of service budget scenario sees the 10-year average annual expenditures for the Town's existing asset base calculated to be $23.9 million while the average annual revenues currently allocated to these assets is only $21.5 million. Therefore, the annual capital funding deficit is $2.4 million. However, Council has endorsed in principle a 2% infrastructure levy until 2026 and then 1% thereafter. If this infrastructure levy was to be approved through the annual budget process over the next 10 years, with the current capital funding maintained, then the average annual funding available is projected at $27.1 million. However, there is uncertainty regarding the sustainability of the Casino Ajax and Elexicon revenues that currently support the Town's Capital Budget. The additional infrastructure funding would help mitigate any loss from non-tax revenues and potentially eliminate the 10-year infrastructure gap which could allow the Town to build reserve balances to fund asset management needs in future years. Table 14 below describes the different growth and upgrade funding sources utilized by the Town, relevant details pertaining to the funding source, and associated revenue sources. Table 14 Growth and Upgrade Funding Sources Reserve Name Capital Budget/LRCF Funding Revenue Sources Development Reserve Town's share (ineligible & Benefit to Existing) of Development Charge projects and new infrastructure not eligible for Development Charge funding - Annual budget allocation - Casino Ajax revenue - Elexicon revenue Strategic Initiatives Reserve Capital projects resulting from Community Action Plan, traffic calming, new IT software and acquisition and installation of art in public spaces - Annual budget allocation - Casino Ajax revenue - Elexicon revenue Development Charge Reserve Fund Utilized for capital growth projects as outlined in Development Charge Background Study - Developer Contributions under the Development Charges Act Community Benefits Reserve Utilized for capital growth projects funded from Section 37 agreement - Developer Contributions under the Planning Act Parkland Reserve Fund Utilized to fund new park space development - Developer Contributions under the Planning Act Insurance Reserve/Risk Mitigation Used for risk management initiatives intended to mitigate future insurance claims (i.e. slip and fall prevention) - Surplus payements, recoveries, or other payments received from the Durham Municipal Insurance Pool or other agency specifically related to risk mitigation or claim settlement Growth related projects receive most of their funding through development charges while replacement projects are predominantly funded through tax-based contributions. Importantly, once the new asset is acquired, although the first round of capital may be Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 43 development charge funded, the ongoing rehabilitation and replacement of the infrastructure is not growth-related and will rely on funding limited to reserves or contributions outlined in Table 13. 5.2.1 Strategies to Close Funding Gaps The infrastructure funding gap may be reduced by one or more of the following strategies: - Reduce near-term renewal needs by deferring capital renewal projects on lower risk assets, thereby lengthening the period in which the backlog is addressed beyond the 10 years. This may result in increased maintenance costs and risks to service delivery. - Decreasing the levels of service for municipal assets to a level that relates to what the average resident is willing to pay while not increasing the risk to the Town beyond its risk threshold. - Increase available funds through property tax increases and leveraging third party grants. - Reduce renewal needs by divesting assets. This may reduce service levels related to capacity. - Promoting non-infrastructure solutions to decrease the demand on the existing asset base. - Short-term funding through debt and drawing from reserves. These are not sustainable long-term solutions as the debt funding needs to eventually be paid back, and reserves need to be replenished. In addition, taking a sustainable approach to managing the growth in the asset base is important to mitigate future infrastructure renewal needs and operating expenditures. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 44 6 Transportation Services 6.1 Overview Transportation services at the Town include a mobility network of roads, bridges, sidewalks, and cycling infrastructure. These services aim to provide safe, efficient, and accessible transportation options for residents and visitors within the community. Additionally, the Town offers services such as parking management, road maintenance, traffic control, and transportation planning to ensure the smooth functioning of transportation systems and support sustainable urban development. 6.2 State of Infrastructure Assets that support transportation services include core infrastructure such as approximately 751.9 lane-km of roads, 46 major structures (i.e. roadway bridges and large culverts), and non-core infrastructure such as traffic and parking assets. Cycle Lanes are also included within the road network inventory, where the Town maintains approximately 144 lane-km of on-road bike lanes and shared facilities. Table 15 shows the estimated replacement value of $1,523.7M and includes a breakdown of the inventory by asset category. Paved road assets make up most of the portfolio. Note that transportation vehicles are covered under "Fleet Services" and facilities under "Facility Services" within this Asset Management Plan. Appendix C provides a detailed listing of the asset inventory for Transportation Services. The average age and estimated life of these assets, weighted by replacement value, are also summarized in Table 15. Assets that are past their planned service lives can be found within the respective condition profiles as being in very poor condition. Table 15 Inventory and Age Summary, Transportation Infrastructure (Total $1,523.7 million) Asset Category Asset Type 2024 Replacement Value (in million $) Average Age Average Service Life Roads Arterial Roads, Collector Roads, Local Roads $1,088.0 11 90 Bridges and Major Culverts Road and Pedestrian Bridges, Major Culverts $152.8 25 40 - 75 Traffic Assets Road Signs, Street Poles and Luminaires, Traffic Signals $57.3 3 (Traffic Signals only) 10 - 50 Roadside Assets Barrier and Poles, Guiderails, Retaining Walls, Parking Lots, Sidewalks $225.6 27 20 - 75 Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 45 The condition distribution for the Town's Transportation assets is shown in Figure 14. The figure graphically shows the relative replacement value by asset category and the proportion of assets by condition grade. The condition assessments of the Town road system are performed on a three-year cycle (one third of the road system is assessed each year), by an engineering consultant. A comprehensive road survey identifies the condition of each road asset and is uploaded into the RoadMatrix Pavement Management System where needs and rehabilitation treatment decisions are made including crack sealing, mill and overlay, resurfacing and reconstruction. The database is further updated with information from the annual rehabilitation and maintenance programs. Through RoadMatrix, the Pavement Condition Assessment provides an overview of road system condition by road section, and includes considerations of: structural adequacy, drainage and surface condition. These factors are combined to create a Pavement Quality Index (PQI) for each road segment in the Town. PQI values range from 100 (new) to 0 (end of service life). In addition, the condition of bridge and structural culverts have been determined through OSIM condition assessments. The Town's bridge maintenance program provides safe, serviceable and sustainable structures through inspections; routine maintenance; and rehabilitation and/or replacements of key components. The Public Transportation and Highway Improvement Act prescribes that the structural integrity, safety, and condition of every bridge be determined through completion of no less than one inspection every two years under the direction of a professional engineer. The Town completes frequent inspections internally where condition information is captured on many of its other transportation assets, such as sidewalks, signs, guiderails, parking lots, and barriers. Figure 13 Condition Distribution by Replacement Value, Transportation Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 46 On average, 94.4% of Transportation assets are in fair or better condition. 0.4% are in very poor condition. 6.3 Levels of Service Table 16 provides the Technical Levels of Service for the Town's transportation infrastructure. The Town is proactively looking to fill data gaps related to their current performance for future iterations of the Asset Management Plan. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 47 Table 16 Technical Level of Service, Transportation Infrastructure Community Level of Service Category Community Level of Service Measures Techinical Level of Service Measure Current Performance Proposed Level of Service Capacity and Use Convenient access to alternative routes or transport modes % of lane-kilometres of dedicated/shared bicycle lanes as a proportion of roadway lane-kilometres 19% 19% Capacity and Use Convenient access to properties at all times # of lane-kms of arterial B roads as a proportion of square kms of land area of the municipality (lane-km/km2) (O.Reg.588/17) 0.65 0.65 Capacity and Use Convenient access to properties at all times # of lane-kms of arterial C roads as a proportion of square kms of land area of the municipality (lane-km/km2) (O.Reg.588/17) 1.38 1.38 Capacity and Use Convenient access to properties at all times # of lane-kms of collector roads as a proportion of square kms of land area of the municipality (lane-km/km2) (O.Reg.588/17) 1.4 1.4 Capacity and Use Convenient access to properties at all times # of lane-kms of local roads as a proportion of square kms of land area of the municipality (lane-km/km2) (O.Reg.588/17) 7.83 7.83 Capacity and Use Convenient access to properties at all times % of parking spaces out of service during winter (made not available for public use) 24% 24% Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 48 Community Level of Service Category Community Level of Service Measures Techinical Level of Service Measure Current Performance Proposed Level of Service Functionality Roads smooth enough for different road users based on their comfort needs % of roads with ride comfort rated fair or better based on Roughness Condition Index (RCI) 98% 95% Functionality Bridges and culverts that are suitable for intended functional needs % of bridges in the municipality with loading or dimensional restrictions (O.Reg.588/17) 0% 0% Functionality Traffic management system complies with legislation and is secure % of Town owned traffic signals in compliance with AODA legislation 61% 100% Functionality Traffic management system complies with legislation and is secure % of Town owned traffic signals with battery backup 17% 100% Functionality Adequate lighting in places where lighting is required % of parking lots with lighting 65% 65% Functionality Adequate lighting in places where lighting is required % walkways with lighting 48% 48% Reliability Roadways - Paved kept in state of good repair * For paved Arterial B roads, the average pavement quality index (PQI) (O.Reg. 588/17) 68.5 70 Reliability Roadways - Paved kept in state of good repair * For paved Arterial C roads, the average pavement quality index (PQI) (O.Reg. 588/17) 64.9 70 Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 49 Community Level of Service Category Community Level of Service Measures Techinical Level of Service Measure Current Performance Proposed Level of Service Reliability Roadways - Paved kept in state of good repair * For paved Collector roads, the average pavement quality index (PQI) (O.Reg. 588/17) 65.4 60 Reliability Roadways - Paved kept in state of good repair * For paved Local roads, the average pavement quality index (PQI) (O.Reg. 588/17) 64.3 55 Reliability Roadways - Paved kept in state of good repair * For unpaved roads, the average pavement condition (O.Reg. 588/17) 63.1 50 Reliability Roadways - Paved kept in state of good repair % of Arterial B roadway pavement in fair or better condition based on Pavement Quality Index (PQI) (O.Reg. 588/17) 86.6% 100% Reliability Roadways - Paved kept in state of good repair % of Arterial C roadway pavement in fair or better condition based on Pavement Quality Index (PQI) (O.Reg. 588/17) 95.1% 100% Reliability Roadways - Paved kept in state of good repair % of Collector roadway pavement in fair or better condition based on Pavement Quality Index (PQI) (O.Reg. 588/17) 93.5% 100% Reliability Roadways - Paved kept in state of good repair % of Local roadway pavement in fair or better condition based on Pavement Quality Index (PQI) (O.Reg. 588/17) 93.1% 91% Reliability Roadways - Unpaved kept in state of good repair % of unpaved roadway surface condition in fair or better condition 100% 80% Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 50 Community Level of Service Category Community Level of Service Measures Techinical Level of Service Measure Current Performance Proposed Level of Service Reliability Roadway Bridges kept in state of good repair * For bridges, the average Bridge Condition Index (BCI) value (O.Reg. 588/17) 79.03 80 Reliability Roadway Bridges kept in state of good repair * For culverts, the average Bridge Condition Index (BCI) value (O.Reg. 588/17) 72.56 75 Reliability Roadway Bridges kept in state of good repair % of roadway bridges in fair or better condition based on Bridge Condition Index (BCI) (O.Reg. 588/17) 95% 95% Reliability Roadway Culverts kept in state of good repair % of roadway culverts (over 1.4m span) in fair or better condition based on Bridge Condition Index (BCI) (O.Reg. 588/17) 94% 95% Reliability Retaining Walls kept in state of good repair % retaining walls in fair or better condition 97% 95% Reliability Sidewalks kept in state of good repair % sidewalks in fair or better condition 100% 95% Reliability Traffic management kept in state of good repair % traffic management assets in fair or better condition (out of 5) 96% 99% Reliability Guiderail kept in state of good repair % guiderails in fair or better condition 100% 95% Reliability Parking kept in state of good repair % parking assets in fair or better condition 72% 80% Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 51 6.4 Risk Management Strategy Appendix B provides a detailed listing of the Consequence of Failure assessment scores for the Town's transportation assets. The risk map shown in Figure 15 combines the Criticality (Consequence of Failure) ratings with the Condition (Probability of Failure) ratings for all infrastructure represented within Transportation Services (excluding $1.5 million in asset value where condition is unknown). The $188.6 million shown as a High and Very High risk exposure (yellow and orange) consists of Roads (such as Arterial, Local and Collector roads with Consequence of Failure ratings of 3 or higher), Bridges and Major Culverts (such as Roadway Bridges, Pedestrian Bridges and Major Culverts with Consequence of Failure ratings of 4 or higher), Traffic Assets (such as Road Signs and Streetlight Poles with a Consequence of Failure rating of 4) and Roadside Assets (such as Sidewalks, Barriers and Parking Lots with Consequence of Failure ratings of 3 or higher). Figure 14 Risk Exposure of the Town's Transportation Infrastructure 6.5 Lifecycle Management Strategy Figure 16 shows the renewal needs over the next 10 years by the total service area. Renewal needs were determined based on a variety of forecasting methods; Bridges & Large Culverts, Retaining Walls and Acoustic Barriers were forecasted using industry standard condition assessments, while Streetlight Poles, and Parking Lots were forecasted using staff reported condition and the remaining assets were forecasted using install date and useful life. The renewal needs for the Town's paved roads have been determined through a pavement condition assessment, where the associated rehabilitation needs and forecasted condition is stored within a program called "RoadMatrix". The Town has very few gravel roads, and these roads were assessed using install date and useful life. The average renewal need (dotted black line) is estimated at $11.2 million per year for the period 2025-2034. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 52 Figure 15 Forecasted Renewal Needs - Transportation Services Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 53 7 Environmental Services 7.1 Overview Environmental services at the Town is comprised of two main groups - stormwater and forestry. Stormwater services involve the management of rainfall and runoff to prevent flooding, erosion, and water pollution. This includes the maintenance and operation of stormwater drainage systems, such as pipes, culverts, ditches, and retention ponds, which collect and convey stormwater away from developed areas. Additionally, stormwater management often involves green infrastructure solutions, such as rain gardens and permeable pavement, to reduce the volume of runoff and improve water quality. Forestry services encompass the management and conservation of urban forests and green spaces. This includes tree planting, pruning, and maintenance to enhance the safety and aesthetic appeal of streetscapes, parks, and public areas while providing numerous environmental benefits, such as air purification, shade, and habitat for wildlife. Municipal forestry programs also focus on tree preservation, disease and pest management, and urban forest planning to sustainably manage and protect the valuable natural assets within the community. 7.2 State of Infrastructure Assets that support environmental infrastructure include approximately 446 km of storm sewer systems, 50 stormwater ponds, and a network of smaller culverts. The Town also manages approximately 88 hectares of woodlots as well as a vast inventory of boulevard and park trees. Table 17 shows the estimated replacement value of $598.6M and includes a breakdown of the inventory by asset category. Stormwater sewers and appurtenances make up most of the portfolio. Note that environmental vehicles are covered under "Fleet Services" and facilities under "Facility Services" within this Asset Management Plan. Appendix C provides a detailed listing of the asset inventory for Environmental Services. The average age and estimated life of these assets, weighted by replacement value, are also summarized in Table 17. Assets that are past their planned service lives can be found within the respective condition profiles as very poor condition. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 54 Table 17 Inventory and Age Summary, Environmental Infrastructure (Total $598.8 million) Asset Category Asset Type 2024 Replacement Value (in million $) Average Age Average Service Life Stormwater Ponds Detention and Retention Ponds $38.8 21 100 Stormwater Sewers Linear Storm Pipes $396.0 30 100 Stormwater Appurtenances Outfalls, Headwalls, Oil- Grit Separators, Manholes, Catchbasins $107.0 26 100 Small Stormwater Culvers Driveway Culverts, Trail Pathway Culverts, Road Culverts $5.5 5 25 Woodlots $6.4 Perpetual Boulevard and Park Trees $45.0 50 The condition distribution for the Town's environmental assets shown in Figure 17. The figure graphically shows the relative replacement value, by asset category, and the proportion of assets by condition grade. The condition assessment rating for the storm drainage network is based on the age of the asset, as opposed to condition rating information. The condition of the Town storm drainage network is not evaluated in a cyclical manner. Storm sewer linear assets in problem areas are flushed and Closed Captioning Television (CCTV) video produced on a rotating basis for the purpose of confirmation of cleaning. The Town is currently completing condition assessments to better understand the condition and capital needs related to it's stormwater infrastructure. For stormwater ponds, the Town is currently building capacity to meet compliance standards, supported by an external consulting engineer who undertakes inspections on select ponds and assists in determining the highest priority maintenance, rehabilitation and replacement programs for those ponds. All other ponds are inspected semi- annually by Town staff and report on priority maintenance requirements. A condition- based assessment for stormwater management ponds is ongoing. The condition scoring for boulevard and park trees was based on asset age, and the condition scoring for woodlots was based on a variety of factors such as species diversity, mixed size class (Diameter at Breast Height), and any invasive plants within the surrounding area. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 55 On average, 92.1% of Environmental infrastructure assets are in fair or better condition. 2.8% are in very poor condition. Figure 16 Condition Distribution by Replacement Value, Environmental 7.3 Levels of Service Table 18 provides the technical levels of service for the Town's Environmental Services infrastructure. The Town is proactively looking to fill data gaps related to their current performance for future iterations of the Asset Management Plan. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 56 Table 18 Technical Levels of Service, Environmental Services Infrastructure Community Level of Service Measures Technical Level of Service Measure Current Performance Proposed Level of Service Adequate stormwater system capacity % of municipal stormwater management system resilient to a 5-year storm (O.Reg. 588/17) 100% 100% Adequate flood protection for properties % of properties resilient to a 100-year storm (O.Reg. 588/17) 93% 95% Complies with legislation % of Town with up-to-date stormwater quality control 58% 100% Storm sewers and appurtenances kept in a state of good repair % of storm sewers and appurtenances in fair or better condition 98% 80% Stormwater detention facilities kept in a state of good repair % of stormwater detention ponds in fair or better condition 56% 80% Forestry assets are kept in a state of good repair % of woodlots in fair or better condition 91% 95% Forestry assets are kept in a state of good repair % of boulevard and park trees in fair or better condition 86% 90% Maintenance work done as and when required % of boulevard trees pruned every 5-7 years in accordance with best industry practices 66% 100% Maintenance work done as and when required % of park trees pruned every 5-7 years in accordance with best industry practices 50% 100% Maintenance work done as and when required Average frequency in years for boulevard tree pruning 10 5-7 Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 57 Community Level of Service Measures Technical Level of Service Measure Current Performance Proposed Level of Service Maintenance work done as and when required Average frequency in years for park tree pruning 10 5-7 *Numbers are low due to contractor performance by the tree pruning contractor. These numbers are anticipated to increase with a new pruning contractor in 2025. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 58 7.4 Risk Management Strategy Appendix B provides a detailed listing of the CoF assessment scores for the Town's environmental assets. The risk map shown in Figure 18 combines the Criticality (Consequence of Failure) ratings with the Condition (Probability of Failure) ratings for all infrastructure represented within Environmental Services (excluding $0.2 million in asset value where condition is unknown). The $52.4 million shown as a High and Very High risk exposure (yellow and orange) consists predominantly of Stormwater Ponds, Small Stormwater Culverts and Stormwater Appurtenances (with Consequence of Failure ratings of 3 or higher). Figure 17 Risk Exposure of the Town's Environmental Infrastructure 7.5 Lifecycle Management Strategy Figure 19 shows the renewal needs over the next 10 years by the total service area. Renewal needs were predominantly determined using staff reported condition, however some assets were forecasted using install date and useful life. The average renewal need (dotted black line) is estimated at $2.2 million per year for the period 2025-2034. However, the renewal need in 2024 is approximately $7.2 million, representing an elevated backlog of needs. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 59 Figure 18 Forecasted Renewal Needs - Environmental Services Note: The cost for Pond rehabilitation and renewal has increased immensely over the past years. The current Capital Plan amounts are not sufficient to support industry pricing - the Town will adjust for this in future iterations of the Asset Management Plan. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 60 8 Parks, Recreation and Culture Services 8.1 Overview Parks, recreation, and cultural services in a municipality offer residents opportunities for leisure, physical activity, and cultural enrichment. Through parks, green spaces, and recreational facilities, people can engage in outdoor activities, sports, and relaxation. Additionally, cultural services provide access to arts, heritage, and entertainment, fostering community identity and creativity through events, programs, and cultural initiatives. These services contribute to the overall well-being and livability of the Town, enhancing the quality of life for its residents. 8.2 State of Infrastructure Assets that support Parks, Recreation and Culture include indoor exercise equipment, outdoor recreation assets and other recreation assets such as benches and tables. Table 19 shows the estimated replacement value of $98.6M and includes a breakdown of the inventory by asset category. Outdoor recreation assets make up most of the portfolio including 112 sports fields/courts, 101 playgrounds and an expansive trail/pathway network spanning more than 110 km. Note that parks, recreation and culture vehicles are covered under "Fleet Services" and facilities under "Facility Services" within this Asset Management Plan. Appendix C provides a detailed listing of the asset inventory for Parks, Recreation and Culture Services. The average age and estimated life of these assets, weighted by replacement value, are also summarized in Table 19. Assets that are past their planned service lives can be found within the respective condition profiles as very poor condition. Table 19 Inventory and Age Summary, Parks, Recreation & Culture (Total $98.6 million) Asset Category Asset Type 2024 Replacement Value (in million $) Average Age Average Service Life Indoor Exercise Equipment Treadmills, Elliptical Machines, Bikes, Other Gym Equipment $1.4 10 12 Recreation - Other Canoes, Game Tables, Carpet Cleaners etc. $3.7 3 12 Outdoor Recreation Fields, Courts, Access Gates, Playgrounds Outdoor Exercise Equipment, Trails $93.4 15 18 *Numbers may not add due to rounding Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 61 The condition distribution for the Town's Parks, Recreation and Culture assets shown in Figure 20. The figure graphically shows the relative replacement value, by asset category, and the proportion of assets by condition grade. The Town routinely conducts internal condition inspections on playgrounds, courts and sports fields. On average, 96.5% of Parks, Recreation and Culture assets are in fair or better condition, whereas 0.4% are in very poor condition. Figure 19 Condition Distribution by Replacement Value, Parks, Recreation & Culture 8.3 Levels of Service Table 20 provides the technical level of service for the Town's park, recreation and culture infrastructure. The Town is proactively looking to fill data gaps related to their current performance for future iterations of the Asset Management Plan. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 62 Table 20 Technical Levels of Service, Parks, Recreation & Culture Community Level of Service Category Community Level of Service Measures Techinical Level of Service Measure Current Performance Proposed Level of Service Capacity and Use Indoor Recreation and Culture assets are of sufficient numbers to support the surrounding populations # of Youth Spaces / total Youth population of Town 1/6000 (age 10-19) 1/6000 (age 10-19) Capacity and Use Indoor Recreation and Culture assets are of sufficient numbers to support the surrounding populations # of Ice Pads / registered participants 1/800 1/800 Capacity and Use Indoor Recreation and Culture assets are of sufficient numbers to support the surrounding populations # Multi-Purpose Rooms / total population 1:5,900 1:5,900 Capacity and Use Indoor Recreation and Culture assets are of sufficient numbers to support the surrounding populations # Fitness Spaces / total population 1/21,700 1/21,700 Capacity and Use Outdoor Active Recreation Trails are resilient to any disruptions caused by external hazards % of trails resilient to 100yr storm flows 85% 85% Capacity and Use Indoor Recreation and Culture assets are available to customers when desired # of customer suggestions related to equipment availability Future Measure Future Measure Capacity and Use Indoor Recreation and Culture assets are available to customers when desired # of 55+ spaces/ total 55+ population 1/6000 1/6000 Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 63 Community Level of Service Category Community Level of Service Measures Techinical Level of Service Measure Current Performance Proposed Level of Service Capacity and Use Indoor Recreation and Culture assets are available to customers when desired # Gymnasiums / total population 1/47,300 1/30,000 Capacity and Use Indoor Recreation and Culture assets are available to customers when desired # Squash Courts / total population 1/26,000 1/26,000 Capacity and Use Indoor Recreation and Culture assets are available to customers when desired # of indoor aquatic centres/ total population 1/43,300 1/40,000 Reliability Parks, Recreation & Culture assets kept in a state of good repair % of indoor recreation assets in fair or better condition 95% 95% Reliability Parks, Recreation & Culture assets kept in a state of good repair % of outdoor recreation assets in fair or better condition 97% 90% Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 64 8.4 Risk Management Strategy Appendix B provides a detailed listing of the CoF assessment scores for the Town's Parks, Recreation and Culture assets. The risk map shown in Figure 21 combines the Criticality (CoF) ratings with the Condition (PoF) ratings for all infrastructure represented within Parks, Recreation & Culture Services (excluding $0.1 million of asset value where condition is unknown).. The $2.5 million shown as a High and Very High risk exposure (yellow and orange) consists predominantly of Park and Walkway Lighting, Playgrounds and Trails (with COF ratings of 3). Figure 20 Risk Exposure of the Town's Parks, Recreation & Culture Infrastructure 8.5 Lifecycle Management Strategy Figure 22 shows the renewal needs over the next 10 years by the total service area. Renewal needs were predominantly determined based on staff reported condition. The average renewal need (dotted black line) is estimated at $1.5 million per year for the period 2025-2034. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 65 Figure 21 Forecasted Renewal Needs - Parks, Recreation & Culture Services Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 66 9 Fire Services 9.1 Overview Fire services in a municipality are responsible for fire prevention, suppression, and emergency response to protect lives, property, and the environment. Highly trained firefighters operate firefighting equipment, respond to emergencies such as fires, medical incidents, hazardous material spills, and conduct public education and safety programs. Additionally, fire services collaborate with other emergency response agencies to ensure effective coordination during crises and disasters, serving as a critical component of public safety infrastructure within the community. 9.2 State of Infrastructure Assets that support Fire Services infrastructure include personal protective equipment, respiratory equipment, rescue equipment and suppression equipment. Table 21 shows the estimated replacement value of $3.2M and includes a breakdown of the inventory by asset category. Fire vehicles are covered under "Fleet Services" and fire facilities under "Facility Services" within this Asset Management Plan. Appendix C provides a detailed listing of the asset inventory for Fire Services. The average age and estimated life of these assets, weighted by replacement value, are also summarized in Table 21. Assets that are past their planned service lives can be found within the respective condition profiles as very poor condition. Table 21 Inventory and Age Summary, Fire Services (Total $3.2 million) Asset Category Asset Type 2024 Replacement Value (in million $) Average Age Average Service Life Personal Protective Equipment Firefighting Boots, Gloves, Helmets etc $1.0 3 10 Respiratory Equipment SCBA Cylinders, Face Piece and Regulators $0.7 8 15 Rescue Equipment Power Units, Cutters, Spreaders, Ropes, Ladders, Thermal Imaging Camera $0.6 6 10 Suppression Equipment Fire Hoses $0.8 3 15 *Numbers may not add due to rounding. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 67 The condition distribution for the Town's Fire Services assets is shown in Figure 23. The figure graphically shows the relative replacement value, by asset category, and the proportion of assets by condition grade. On average, 98.8% of Fire Services assets are in fair or better condition. 0.3% are in very poor condition. Figure 22 Condition Distribution by Replacement Value, Fire Services 9.3 Levels of Service Table 22 provides the technical levels of service for the Town's Fire Services. The Town is proactively looking to fill data gaps related to their current performance for future iterations of the Asset Management Plan. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 68 Table 22 Technical Levels of Service, Fire Services Community Level of Service Category Community Level of Service Measures Techinical Level of Service Measure Current Performance Proposed Level of Service Functionality To provide safe, functional and accessible fire services for the community % fire facilities which meet all gender requirements 33% 67% Functionality To provide safe, functional and accessible fire services for the community % fire facilities which meet cancer preventiuon checklist requirements 33% 67% Capacity and Use Providing efficient fire services to ensure protection of people and property Communications Equipment assets need to be upgraded to meet future needs. (Portable Radios 80, mobile radios 17, repeaters 3 - Oshawa is taking over dispatch com equipment) 100% 100% Reliability Personal Protective Equipment kept in a state of good repair % Personal Protective Equipment in good or better condition 95% 100% Reliability Fire Licensed Vehicles are kept in a state of good repair % Apparatus/vehicles being serviced for repairs at any given time Future Measure Future Measure Reliability Fire Service suppression equipment kept in a state of good repair % Suppression Equipment in good or better condition 89% 100% Reliability Fire Service respiratory equipment kept in a state of good repair % Respiratory Equipment in good or better condition 89% 100% Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 69 Community Level of Service Category Community Level of Service Measures Techinical Level of Service Measure Current Performance Proposed Level of Service Reliability Fire Service rescue equipment kept in a state of good repair % Rescue Equipment in good or better condition 89% 100% Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 70 9.4 Risk Management Strategy Appendix B provides a detailed listing of the CoF assessment scores for the Town's Fire assets. The risk map shown in Figure 24 combines the Criticality (CoF) ratings with the Condition (PoF) ratings for all infrastructure represented within Fire Services (excluding $0.5 million in asset value where condition is unknown). Note that fire emergency response vehicles are captured in the Fleet section of this Asset Management Plan. There is currently $77 thousand of Fire Services assets in the High and Very High risk exposure. Figure 23 Risk Exposure of the Town's Fire Infrastructure 9.5 Lifecycle Management Strategy Figure 25 shows the renewal needs over the next 10 years by the total service area. Renewal needs were predominantly determined based on observed condition scores by Town staff. The average renewal need (dotted black line) is estimated at $0.2 million per year for the period 2025-2034. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 71 Figure 24 Forecasted Renewal Needs - Fire Services Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 72 10 Library Services 10.1 Overview Library services provide access to a wide range of services, resources, and programs to support literacy, learning, and community engagement. These services include lending materials (books, eBooks, audiobooks, technology), offering public access to technology and Wi-Fi, hosting educational and cultural programs, providing reference assistance and research support, and providing a welcoming space for the community to gather. Ajax Public Library designs experiences and connections where community, discovery, and innovation intersect. 10.2 State of Infrastructure Assets that support Library Services include collections, furniture and public technology. Table 23 shows the estimated replacement value of $12.9M and includes a breakdown of the inventory by asset category. Library collection assets make up most of the portfolio. Note that library vehicles are covered under "Fleet Services" and facilities under "Facility Services" within this Asset Management Plan. Appendix C provides a detailed listing of the asset inventory for Library Services. The average age and estimated life of these assets, weighted by replacement value, are also summarized in Table 23. Assets that are past their planned service lives can be found within the respective condition profiles as very poor condition. Table 23 Inventory and Age Summary, Library Services (Total $12.9 million) Asset Category Asset Type 2024 Replacement Value (in million $) Average Age Average Service Life Library Collections Audiobooks, eBooks, Video Games, DVDs, Print, Special Collections $11.2 6 7 Library Furniture Shelving, Desks, Chairs $1.3 17 10 Library Public Technology Self checks, Public computers $0.4 4 6 The condition distribution for the Town's Library Services assets shown in Figure 26. The figure graphically shows the relative replacement value, by asset category, and the proportion of assets by condition grade. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 73 Many of the Town's library assets had their condition assessed based on age, with the exclusion of electronic content within collections, where these assets were assumed to be in "good" condition. On average, 62.4% of Library Services assets are in fair or better condition. 26.1% are in very poor condition. Figure 25 Condition Distribution by Replacement Value, Library Services 10.3 Levels of Service Table 24 provides the technical levels of service for the Town's Library Services. The Town is proactively looking to fill data gaps related to their current performance for future iterations of the Asset Management Plan. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 74 Table 24 Technical Levels of Service, Library Services Community Level of Service Category Community Level of Service Measures Technical Level of Service Measure Current Performance Proposed Level of Service Quality Library assets are kept in a state of good repair % of library collection assets in fair or better condition (age- based) 65% 50% Quality Library assets are kept in a state of good repair % of library technology assets in fair or better condition (age- based) 85% 75% Quality Library assets are kept in a state of good repair % of library furnishings assets in fair or better condition (age- based) 33% 66% Capacity and Use Library collections meet customer needs and expectations Collection holdings per capita 1.8 2.3 Capacity and Use Library space meets the needs of the community Library facility space square feet per capita 0.43 0.6 Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 75 10.4 Risk Management Strategy Appendix B provides a detailed listing of the CoF assessment scores for the Town's Library assets. The risk map shown in Figure 27 combines the Criticality (CoF) ratings with the Condition (PoF) ratings for all infrastructure represented within Library Services. The Town does not currently have any Library Services assets with a High or Very High risk exposure (yellow and orange). Figure 26 Risk Exposure of the Town's Library Infrastructure 10.5 Lifecycle Management Strategy Figure 28 shows the renewal needs over the next 10 years by the total service area. Renewal needs were predominantly determined based on installation years and age, however certain assets such as the collections are funded through the operating budget and have been excluded from the renewal forecast. The average renewal need (dotted black line) is estimated at approximately $0.2 million per year for the period 2025-2034. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 76 Figure 27 Forecasted Renewal Needs - Library Services Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 77 11 Information Technology Services 11.1 Overview IT services in a municipality encompass the management and support of information technology infrastructure and systems to facilitate efficient and effective municipal operations. This includes maintaining networks, servers, and software applications; providing technical support to municipal staff; managing cybersecurity measures to protect data and systems; and implementing innovative technologies to enhance service delivery and citizen engagement. IT services play a critical role in enabling digital transformation, streamlining processes, and ensuring the security and reliability of municipal IT resources, ultimately contributing to the overall effectiveness and responsiveness of the municipality. 11.2 State of Infrastructure Assets that support IT infrastructure include end user devices, server equipment and networking equipment. Table 25 shows the estimated replacement value of $5.2M and includes a breakdown of the inventory by asset category. Appendix C provides a detailed listing of the asset inventory for Information Technology Services. The average age and estimated life of these assets, weighted by replacement value, are also summarized in Table 25. Assets that are past their planned service lives can be found within the respective condition profiles as very poor condition. Table 25 Inventory and Age Summary, Information Technology (Total $5.2 million) Asset Category Asset Type 2024 Replacement Value (in million $) Average Age Average Service Life End User Devices Computers, Laptops, Tablets, Phones, Printers $2.2 2 5 Server Equipment VMWare, Firewalls, UPS $0.9 3 6 Networking Equipment Network Access Control, Wireless Access Points, Switches and Routers $2.2 2 5 The condition distribution for the Town's IT assets shown in Figure 29. The figure graphically shows the relative replacement value, by asset category, and the proportion of assets by condition grade. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 78 On average, 66.9% of IT assets are in fair or better condition. 21.4% are in very poor condition. Figure 28 Condition Distribution by Replacement Value, Information Technology 11.3 Levels of Service Table 26 provides the technical levels of service for the Town's IT assets. The Town is proactively looking to fill data gaps related to their current performance for future iterations of the Asset Management Plan. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 79 Table 26 Technical Levels of Service, Information Technology Community Level of Service Category Community Level of Service Measures Techinical Level of Service Measure Current Performance Proposed Level of Service Capacity and Use Information Technology equipment assets adequate to meet user needs # of laptops & desktops in reserve / total of staff in need 5% 2% Capacity and Use Information Technology equipment assets adequate to meet user needs # of access points in reserve / total number of access points 1% 4% Capacity and Use Information Technology equipment assets adequate to meet user needs # of switches in reserve / total number of switches 5% 8% Reliability Information Technology assets kept in a state of good repair % of end user devices in fair or better condition, based on age as a proportion of estimated life 66% 75% Reliability Information Technology assets kept in a state of good repair % of server equipment in fair or better condition, based on age as a proportion of estimated life 46% 60% Reliability Information Technology assets kept in a state of good repair % of networking equipment in fair or better condition, based on age as a proportion of estimated life 76% 60% Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 80 11.4 Risk Management Strategy Appendix B provides a detailed listing of the CoF assessment scores for the Town's Information Technology (IT) assets. The risk map shown in Figure 30 combines the Criticality (CoF) ratings with the Condition (PoF) ratings for all infrastructure represented within IT Services. The $2 million shown as a High and Very High risk exposure (yellow and orange) consists predominantly of Server Equipment and Networking Equipment (with COF ratings of 3 or higher). Figure 29 Risk Exposure of the Town's IT Infrastructure 11.5 Lifecycle Management Strategy Figure 31 shows the renewal needs over the next 10 years by the total service area. Renewal needs were predominantly determined based on installation years and age, however certain assets such as software and end user devices are funded through the operating budget and have been excluded from the renewal forecast. The average renewal need (dotted black line) is estimated at $0.4 million per year for the period 2025-2034. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 81 Figure 30 Forecasted Renewal Needs - IT Services Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 82 12 Fleet Services 12.1 Overview Fleet services in a municipality are responsible for managing and maintaining the Town's vehicles and equipment. This includes a diverse range of vehicles such as fire apparatus, snowplows, construction and turf maintenance equipment, and administrative vehicles. Fleet services ensure that these vehicles are properly maintained, serviced, and repaired to meet safety standards and operational requirements, enabling various municipal departments to carry out their duties effectively and efficiently. Additionally, fleet services oversees fuel management, vehicle procurement, lifecycle planning, and fleet optimization efforts to maximize resource utilization and minimize costs. 12.2 State of Infrastructure Assets that support Fleet Services include vehicles, rolling equipment and fire emergency response assets. Table 27 shows the estimated replacement value of $51.3M and includes a breakdown of the inventory by asset category. Road related vehicle assets make up most of this portfolio. Note that fleet facilities are covered under "Facility Services" within this Asset Management Plan. Appendix C provides a detailed listing of the asset inventory for Fleet Services. The average age and estimated life of these assets, weighted by replacement value, are also summarized in Table 27. Assets that are past their planned service lives can be found within the respective condition profiles as very poor condition. Table 27 Inventory and Age Summary, Fleet Services (Total $51.3 million) Asset Category Asset Type 2024 Replacement Value (in million $) Average Age Average Service Life Vehicles Light-duty, Medium- duty and heavy-duty vehicles $15.1 8 10 Rolling Equipment Grass cutting, sweepers, trailers, ice conditioners $13.6 9 13 Fire Emergency Response Pumper, aerials, squads, heavy rescue $22.6 12 15 Figure 32 shows the condition distribution for the Town's Fleet Services assets. The figure graphically shows the relative replacement value, by asset category, and the proportion of assets by condition grade. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 83 The Town completes frequent inspections internally on many of its fleet assets, however information such as physical observations, mileage or deferred maintenance is not formalized to determine the condition of vehicles. On average, 62.0% of fleet assets are in fair or better condition. 9.2% are in very poor condition. Figure 31 Condition Distribution by Replacement Value, Fleet Services 12.3 Levels of Service Table 28 provides the technical levels of service for the Town's fleet assets. Staff are currently reviewing the Green Fleet Strategy to determine the Proposed Levels of Service for this service area. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 84 Table 28 Technical Levels of Service, Fleet Services Community Level of Service Category Community Level of Service Measures Current Performance Capacity and Use # of bays available / # of bays required 5 / 7 Capacity and Use Fleet storage capacity (volume of indoor stacked storage available / need) Future Measure Capacity and Use Fleet storage capacity (area of indoor storage available / need) Future Measure Capacity and Use % of light-duty vehicles (Cars and Light-duty Trucks) used <= 5,000 km annually Future Measure Capacity and Use # of licensed mechanics to total # of fleet 0.13 Capacity and Use Small engine mechanic staff complement to support total # of rolling equipment (# mechanic staff / # fleet) Future Measure Functionality # of tonnes of GHG emissions for fleet Future Measure Reliability % of Cars in fair or better condition 88% Reliability % of Light-duty and Medium-duty in fair or better condition 63% Reliability % of Heavy-duty in fair or better condition 59% Reliability % of Fire and Emergency Response in fair or better condition 67% Reliability % of Heavy-duty Construction Equipment in fair or better condition 48% Reliability % of Heavy-duty Tractors in fair or better condition 95% Reliability % of mechanics with training in new technology (FMIS, CityWorks 50% Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 85 12.4 Risk Management Strategy Appendix B provides a detailed listing of the CoF assessment scores for the Town's Fleet assets. The risk map shown in Figure 33 combines the Criticality (CoF) ratings with the Condition (PoF) ratings for all infrastructure represented within Fleet Services. The $18.7 million shown as a High and Very High risk exposure (yellow and orange) consists predominantly of Fire Emergency Response Vehicles (such as Cars and Pumper Trucks with COF ratings of 5) and Heavy Trucks (such as Snowplows and Bucket Trucks with COF ratings of 4). Figure 32 Risk Exposure of the Town's Fleet Infrastructure 12.5 Lifecycle Management Strategy Figure 34 shows the renewal needs over the next 10 years by the total service area. Renewal needs were predominantly determined based on installation years and age. The average renewal need (dotted black line) is estimated at $2.7 million per year for the period 2025-2034. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 86 Figure 33 Forecasted Renewal Needs - Fleet Services Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 87 13 Facilities Services 13.1 Overview Facilities services at the Town involve the management and maintenance of municipal buildings and infrastructure. This includes administrative offices, community centers, libraries, fire stations, and other public facilities. Facilities services ensure that these buildings are safe, functional, and well-maintained by overseeing tasks such as repairs, renovations, cleaning, security, and energy management. Additionally, facilities services may coordinate space planning, facility upgrades, and compliance with building codes and regulations to support the delivery of municipal services and enhance the overall quality of life for residents. 13.2 State of Infrastructure Assets that support Facility Services at the Town include administration buildings, community centres, fire buildings, libraries and recreation facilities. Table 29 shows the estimated replacement value of $403.9M and includes a breakdown of the inventory by asset category. Note that facilities vehicles are covered under "Fleet Services" within this Asset Management Plan. Appendix C provides a detailed listing of the asset inventory for Facilities Services. The average age and estimated life of these assets, weighted by replacement value, are also summarized in Table 29. Assets that are past their planned service lives can be found within the respective condition profiles as very poor condition. Table 29 Inventory and Age Summary, Facilities (Total $403.9 million) Asset Category 2024 Replacement Value (in million $) Average Age Average Service Life Administrative Buildings $66.4 45 75 Recreation and Community Centres $287.8 32 75 Fire Buildings $32.5 31 50 Libraries $17.2 41 75 The condition distribution for the Town's facility assets is shown in Figure 35. The figure graphically shows the relative replacement value, by asset category, and the proportion of assets by condition grade. The Town recently completed a Building Condition Assessment (BCA) on many of their vital facilities in 2023. As part of the BCAs, condition scores and replacement costs were captured at the asset component level for each facility. Overall condition was calculated based on a 3-year Facility Condition Index (FCI), which is a calculation of the Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 88 deferred work on the facility divided by the overall facility replacement cost. The Town does not have a formal condition assessment cycle, however it is recommended that the facilities be assessed once every ten (10) years. On average, 85.9% of facility assets are in fair or better condition while 1.7% are in very poor condition. Figure 34 Condition Distribution by Replacement Value, Facilities 13.3 Levels of Service Table 30 provides the technical levels of service for the Town's facilities. The Town is proactively looking to fill data gaps related to their current performance for future iterations of the Asset Management Plan. Staff will incorporate the findings relating to the zero carbon and sustainability targets from the Corporate Net Zero Emissions Plan (CNZEP). This CNZEP is expected to be completed in Q3 of 2025 and will help to inform the proposed levels of service. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 89 Table 30 Technical Levels of Service, Facilities Community Level of Service Category Community Level of Service Measures Technical Level of Service Measure Current Performance Proposed Level of Service Capacity and Use Facility assets are adequate to support its operations Facility assets need to be added to meet future needs (master plans, accomodation plan) Future Measure Future Measure Functionality Facility assets are compliant with regulatory requirements and standards % of facility assets which meet Town security upgrade requirements Future Measure 35% Functionality Facility assets are compliant with regulatory requirements and standards Total Greenhouse Gas emissions for facilities (natural gas consumption only) Future Measure Future Measure Reliability Facilities kept in a state of good repair % of facilities in fair or better condition based on FCI (BCA assessed) 86% 85% Quality Building Maintenance work done as and when required % of completed to total building maintenance service requests work orders 85% 85% Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 90 13.4 Risk Management Strategy Appendix B provides a detailed listing of the CoF assessment scores for the Town's Facilities assets. The risk map shown in Figure 36 combines the Criticality (CoF) ratings with the Condition (PoF) ratings for all infrastructure represented within Facilities Services. The $110.2million shown as a High and Very High risk exposure (yellow and orange) consists predominantly of critical building components such as Foundations, Floors and Superstructure (with COF ratings of 3 or higher) for facilities including Ajax Community Centre, Ajax Main Library, and Fire Headquarters. Figure 35 Risk Exposure of the Town's Facilities Infrastructure 13.5 Lifecycle Management Strategy Figure 37 shows the renewal needs over the next 10 years by asset category. Renewal needs were predominantly determined based on industry standard building condition assessments, however other facilities were forecasted using an average annual renewal amount. The average renewal need (dotted black line) is estimated at $5.3 million per year for the period 2025-2034. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 91 Figure 36 Forecasted Renewal Needs - Facilities Services Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 92 Asset Management Plan Improvement and Monitoring 14.1 Plan Improvement Opportunities Development of Asset Management Plans is an iterative process that includes improving processes, data, and staff skills over time. This section provides an overview of the compliance of this Asset Management Plan with Ontario Regulation 588/17 for proposed levels of service (2025 requirements) and identifies opportunities for improvements to the Town's asset management practices, including those required to meet Ontario Regulation 588/17 for future iterations of the Asset Management plan. It is important that the Town recognises areas of their Asset Management Plan and planning process that require future improvements to ensure effective asset management and informed decision making. The improvement plan generated from this Asset Management Plan is shown in Table 31 below. Table 31 Plan Improvement Recommendations No. Improvement Recommendation 1 Continue improving work order management system and processes to support improved - Tracking of refurbishment and replacement intervals of assets - More accurate forecasting of maintenance and operating costs 2 Consider the internal resource needs (both operational and renewal impacts) required to successfully implement the recommended Asset Management Plan (Asset Management Plan) capital growth projects. Internal resource needs for municipalities include adequate staffing, training, equipment, technology, materials, logistical and administrative support, operational continuity plans,m and monitoring and evaluation systems to successfully implement capital growth projects. 3 Town to continue to understand growth projections and leverage master planning initiatives and studies. 4 Understand state of good repair needs for stormwater infrastructure through condition assessment program. 5 Continue to collect conditional data of Town facilities. The Building Condition Assessments (BCAs) are recommended to be completed every ten (10) years. 6 Continued refinement of identifying and mapping lifecycle activities (renewal, growth, upgrade) to capital projects. 7 Consider and integrate whole asset lifecycle costs during budgeting process (to assist in planning for future reserves). Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 93 No. Improvement Recommendation 8 Continue to account for the assumption of assets from developmentand the associated infrastructure investment impacts. 9 Regular updates to asset inventory, asset condition, and recommended needs based on inspection programs. 10 Consideration of a Decision Support System to act as a central asset register and to assist with Asset Management Planning analytics. 11 Incorporate into future iterations of this Asset Management Plan the zero carbon and sustainability targets from the Carbon Net Zero Emissions Plan (CNZEP). 14.2 Asset Management Plan Monitoring and Review The Asset Management Plan is to be updated at least every five years, reporting on the Town's updated asset portfolio, associated value, age, and condition. The update will also provide the 10-year forecast on service levels, costs of the associated lifecycle strategies and an assessment of any funding shortfalls. As per O.Reg. 588/17, the Town will conduct an annual review of its asset management progress in implementing this Asset Management Plan and will discuss strategies to address any factors impeding its implementation. 14.3 Performance Measures The effectiveness of this Asset Management Plan can be measured in the following ways: - The degree to which the required forecast costs identified in this Asset Management Plan are incorporated into the long-term financial plan; - The degree to which the Town's 1-5 year detailed capital programs, budgets, business plans and corporate structures consider the information provided within the Asset Management Plan; - The degree to which the existing and proposed service levels and service consequences, risks and residual risks are incorporated into the Strategic Planning documents and associated plans; or - The Asset Renewal Funding Ratio achieving the Organisational target once determined (this target is often 90% to 100%). Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 94 Appendix A - O.Reg. 588/17 Community Levels of Service Documentation A-1 Stormwater Assets Figure A-1 Areas Protected from Flooding Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 95 A-2 Roads Road Network Description and its Connectivity Ajax's road network is made up of highways, arterial roads, collector roads and local roads, each serving an integral function in the road network. Higher order roads such as arterials are primarily intended to serve a mobility function, while lower order roads provide access to adjacent properties. These roads provide connections to and within neighbourhoods, urban areas, the Town Centre, commercial sites, and industrial lands. The Town's Transportation Master Plan states that the Town's road network is expected to provide safe, equitable, and sustainable transportation system. A map of the Town's is shown in Figure A-2. Figure A-2 Road Network Different Levels of Road Class Pavement Condition Pavement condition data is collected on the entire road network every three years through a Roads Needs Study. Data collected includes the type, extent and severity of distresses (cracks and rutting) and smoothness or ride comfort of the road. An overall PQI is calculated from all collected data and is used as input into the annual road resurfacing and reconstruction program. The index is scaled from zero to 100 and has been divided into ranges to assess condition. Examples of roads in each of the PQI rating categories are provided in Table A 1. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 96 Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 97 Table A-32 Road Condition Grades A-3 Bridges and Culverts Levels of Bridge and Structural Culvert Condition The need for mobility requires that the Town's roadway system be kept in a state of good repair. Structures are a vital part of this system. An effective structure management system involving the systematic inspection of the structures on the roadway network is required to maintain structures in a state of good repair. In Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 98 accordance with O. Reg. 104/97 Standards for Bridges, the Town conducts detailed inspections of all of its bridges every two years. All inspections are supervised by a trained Professional Engineer following the guidelines in Ontario's Structure Inspection Manual (OSIM) which sets standards for the visual inspection and condition rating of bridges and their elements. The inspector assesses each bridge element and records the amount of the element in each of four condition states: Excellent, Good, Fair, and Poor. The inspector also records suspected performance deficiencies and recommends maintenance and renewal activities, with costs. The typical follow-up action for a suspected load carrying capacity deficiency would be to carry out a strength evaluation of the structure (or element) to determine the load carrying capacity in accordance with the requirements of the Canadian Highway Bridge Design Code. An overall Bridge Condition Index (BCI) or Culvert Condition Index (CCI) is calculated from all collected data and informs the annual bridge and structural culvert rehabilitation and reconstruction program. The index is scaled from zero to 100 and has been divided into ranges to assess condition. The BCI is not used to rate or indicate the safety of a bridge or structural culvert. Any safety issues are immediately reported by the inspector to supervising engineers and maintenance crews. Condition grade examples are provided in Table A 2. Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 99 Table A-33 Bridge and Culvert Condition Grades Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 100 Appendix B - Consequence of Failure Scores Table B-1 Consequence of Failure Ratings for Transportation Services Asset Category Asset Consequence of Failure Rating Roads Arterial B 5 Roads Arterial C 5 Roads Collector 4 Roads Local 3 Roads Local Industrial 3 Roads Gravel 1 Bridges and Major Culverts Roadway Bridges 5 Bridges and Major Culverts Pedestrian Bridges 4 Bridges and Major Culverts Major Culverts 5 Traffic Assets Regulatory Road Signs 4 Traffic Assets Warning Road Signs 4 Traffic Assets Other Road Signs 2 Traffic Assets Streetlight Luminaires 4 Traffic Assets Streetlight Poles 4 Traffic Assets Traffic Signals 4 Roadside Assets Sidewalks 4 Roadside Assets Retaining Walls 4 Roadside Assets Acoustic Barriers 4 Roadside Assets Entry Poles 1 Roadside Assets Guardrails 4 Roadside Assets Parking Lots 3 Table B-2 Consequence of Failure Ratings for Environmental Services Asset Category Asset Consequence of Failure Rating Stormwater Management Stormwater Ponds 4 Stormwater Management Driveway Culverts 2 Stormwater Management Road Culverts 4 Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 101 Asset Category Asset Consequence of Failure Rating Stormwater Management Trail Pathway Culverts 2 Stormwater Management Stormwater Sewers < 450 2 Stormwater Management Stormwater Sewers 450 to 900 3 Stormwater Management Stormwater Sewers > 900 4 Stormwater Management Catchbasin 3 Stormwater Management Manhole 3 Stormwater Management Outfall 3 Stormwater Management Headwall 4 Stormwater Management OGS 4 Forestry and Horticulture Woodlots 3 Forestry and Horticulture Boulevard and Park Trees 3 Table B-3 Consequence of Failure Ratings for Parks, Recreation & Culture Services Asset Category Asset Consequence of Failure Rating Indoor Exercise Equipment Balls, Mats, Bars & Cables 1 Indoor Exercise Equipment Stationary Bikes, Ellipticals & AMTs 2 Indoor Exercise Equipment Weightlifting Equipment & Spin Bikes 2 Indoor Exercise Equipment Pilates Reformer 2 Recreation - Other Activity Tables & Consoles 1 Recreation - Other Maintenance Equipment 3 Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 102 Asset Category Asset Consequence of Failure Rating Recreation - Other Ping Pong & Foos Ball Tables 2 Recreation - Other Special Events Equip. 3 Recreation - Other Special Events Equip. & Public Art 2 Outdoor Recreation Access Gates 2 Outdoor Recreation Baseball Fields 2 Outdoor Recreation Basketball Courts 2 Outdoor Recreation Benches & Tables 1 Outdoor Recreation Cricket Fields 3 Outdoor Recreation Garbage Cans & Recycling Stations 1 Outdoor Recreation Outdoor Exercise Equipment 2 Outdoor Recreation Park and Walkway Lighting 3 Outdoor Recreation Park Structures 1 Outdoor Recreation Playgrounds 3 Outdoor Recreation Skateparks 2 Outdoor Recreation Soccer Fields 2 Outdoor Recreation Splash Pads 2 Outdoor Recreation Tennis Courts 2 Outdoor Recreation Trails 3 Outdoor Recreation Baseball Fields (Lit) 3 Outdoor Recreation Soccer Fields (Lit) 3 Outdoor Recreation Pickleball Court 2 Table B-4 Consequence of Failure Ratings for Fire Services Asset Category Asset Consequence of Failure Rating Personal Protective Equipment PPE - Fire Fighting Boots and Gloves 3 Personal Protective Equipment PPE - Other 5 Respiratory Equipment SCBA - Cylinders 5 Respiratory Equipment SCBA - Face Piece and Regulator 5 Rescue Equipment Combi Tool 5 Rescue Equipment Combination Unit 5 Rescue Equipment Cutter 5 Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 103 Asset Category Asset Consequence of Failure Rating Rescue Equipment Hose/Hose Reel/Accessories 5 Rescue Equipment Immersion Suit 5 Rescue Equipment Ladder 5 Rescue Equipment Life Jacket 5 Rescue Equipment Power Unit 5 Rescue Equipment Ram 5 Rescue Equipment Rescue Rope 5 Rescue Equipment Spreader 5 Suppression Equipment Fire Hose 5 Rescue Equipment Defibs & Batteries 5 Respiratory Equipment Portacount 15 5 Respiratory Equipment Portacount 20 5 Rescue Equipment Thermal Imaging Cameras 5 Rescue Equipment Radios & Batteries 5 Table B-5 Consequence of Failure Ratings for Library Services Asset Category Asset Consequence of Failure Rating Library Collections Physical Books, eBooks, Audiobooks 2 Library Furniture Desks & Chairs 1 Library Public Technology Public Use Computers & Tablets 2 Table B-6 Consequence of Failure Ratings for IT Services Asset Category Asset Consequence of Failure Rating End User Devices Desktop Computers 2 End User Devices Laptop Computers 2 End User Devices Monitors 1 End User Devices iPads 2 End User Devices Cell Phones 2 End User Devices Desk Phones 1 End User Devices Printers 1 End User Devices TVs 1 Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 104 Asset Category Asset Consequence of Failure Rating Server Equipment Server Equipment - Other 4 Server Equipment Server Equipment - VMWare 5 Server Equipment Firewalls 5 Server Equipment UPS 3 Server Equipment Network Access Control 4 Networking Equipment Wireless Access Points 3 Networking Equipment Switches and Routers 4 Table B-7 Consequence of Failure Ratings for Fleet Services Asset Category Asset Consequence of Failure Rating Vehicles Cars (Non- Emergency Response) 2 Fire Emergency Response Cars (Emergency Response) 4 Rolling Equipment Construction Equipment - Heavy 4 Fire Emergency Response Fire Emergency Response 5 Rolling Equipment Grass Cutting 2 Rolling Equipment Ice Conditioners 3 Vehicles L&M Trucks 3 Rolling Equipment Misc Equipment 2 Rolling Equipment Sweeper 3 Rolling Equipment Tractors - Heavy 2 Rolling Equipment Tractors - L&M 4 Rolling Equipment Trailers 2 Vehicles Trucks - Heavy 4 Table B-8 Consequence of Failure Ratings for Facilities Asset Category Asset Consequence of Failure Rating Administration Building Municipal Offices 4 Administration Building Operation Center 5 Rec & Community Centres Monarch Maintenance Facility 3 Rec & Community Centres Ajax Memorial Pool 4 Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 105 Asset Category Asset Consequence of Failure Rating Rec & Community Centres Audley Rec. Centre 4 Rec & Community Centres Carruthers Pavilion 3 Rec & Community Centres Greenwood Discovery Pavilion 3 Rec & Community Centres Rotary Park Pavilion 3 Rec & Community Centres Sundial Pavilion 3 Rec & Community Centres St. Andrew's Gym 3 Rec & Community Centres Ajax Cricket Clubhouse 2 Rec & Community Centres Ajax Rod & Gun Club 2 Rec & Community Centres Ajax Soccer Club House 2 Rec & Community Centres Sportsplex Maintenance Building 3 Rec & Community Centres Hornung Storage Shed 2 Rec & Community Centres Mill Street Building 3 Rec & Community Centres Paulynn Park Pavilion 2 Rec & Community Centres Sportsplex Snack Bar/ washroom 2 Rec & Community Centres Paulynn Park Washroom 1 Rec & Community Centres Cedar Park Washrooms 1 Rec & Community Centres Hermitage Park Washrooms 1 Rec & Community Centres Millers Creek Washrooms 1 Rec & Community Centres Veterans Point Washrooms 1 Fire Stations Fire Station 1 (Headquarters) 5 Fire Stations Fire Headquarters - Training Tower 3 Fire Stations Fire Station 2 5 Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 106 Asset Category Asset Consequence of Failure Rating Fire Stations Fire Station 3 5 Library Ajax Main Library 4 Library McLean Community Centre Library 3 Library Audley Recreation Centre Library 3 Rec & Community Centres Village Library 1 Rec & Community Centres Ajax Community Centre 5 Rec & Community Centres McLean Community Centre 4 Rec & Community Centres Hartrick House 3 Rec & Community Centres Quaker Meeting House 3 Rec & Community Centres Pat Bayly Square 2 Rec & Community Centres St. Francis Center (Cultural) 3 Rec & Community Centres Greenwood Main Washroom 1 Rec & Community Centres Greenwood Shop 2 Rec & Community Centres St. Andrews Senior Centre 4 Rec & Community Centres Village Arena & Seniors Centre 2 Rec & Community Centres Village Community Centre 2 Rec & Community Centres Lanine Sales Office 2 Rec & Community Centres Ajax GO Station Stair Enclosure 2 Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 107 Appendix C - Detailed asset inventory replacement value Table C-1 Detailed Asset Inventory - Transportation Services (Total $1,523.7 million) Asset Category Asset Inventory/Unit 2024 Replacement Value (in million $) Roads Arterial B 43.3 lane-km $57.7 Roads Arterial C 92.8 lane-km $129.4 Roads Collector 93.7 lane-km $137.7 Roads Local 522.1 lane-km $759.0 Roads Gravel 5.9 lane-km $4.2 Bridges and Major Culverts Roadway Bridges 13 each $69.8 Bridges and Major Culverts Pedestrian Bridges 31 each $18.0 Bridges and Major Culverts Major Culverts 33 each $64.9 Traffic Assets Road Signs 14,652 each $0.5 Traffic Assets Streetlight Luminaires 9,991 each $18.8 Traffic Assets Streetlight Poles 8,396 each $28.8 Traffic Assets Traffic Signals 41 each $9.2 Roadside Assets Sidewalks 629,991m2 $136.8 Roadside Assets Retaining Walls 36 each $3.7 Roadside Assets Acoustic Barriers 86 each $24.2 Roadside Assets Entry Poles 156 each $5.0 Roadside Assets Guardrails 4,833 metres $1.9 Roadside Assets Parking Lots 204,680 m2 $53.6 Roadside Assets Emergency Access Routes 1,803 m $0.5 Table C-2 Detailed Asset Inventory - Environmental Services (Total $598.6 million) Asset Category Asset Inventory/Unit 2024 Replacement Value (in million $) Stormwater Management Stormwater Ponds 50 each $38.8 Stormwater Management Driveway Culverts 469 each $3.4 Stormwater Management Road Culverts 68 each $1.4 Stormwater Management Trail Pathway Culverts 133 each $0.7 Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 108 Stormwater Management Stormwater Sewers 446 km $396.0 Stormwater Management Catchbasins 9930 each $49.7 Stormwater Management Manholes 5,680 each $51.1 Stormwater Management Outfalls 124 each $1.9 Stormwater Management OGS 24 each $4.5 Forestry and Horticulture Woodlots 88 hectares $6.4 Forestry and Horticulture Boulevard and Park Trees 52,987 each $45.0 Table C-3 Detailed Asset Inventory - Parks, Recreation & Culture Services (Total $98.6 million) Asset Category Asset Inventory/Unit 2024 Replacement Value (in million $) Indoor Exercise Equipment Balls, Mats, Bars & Cables Pooled $0.1 Indoor Exercise Equipment Cardio Equipment 112 each $0.8 Indoor Exercise Equipment Weightlifting Equipment 73 each $0.5 Recreation - Other Activity Tables & Game Consoles 36 each $0.0 Recreation - Other Facility Maintenance Equipment 20 each $0.3 Recreation - Other Playground Sheds and Water Craft 23 each $0.1 Recreation - Other Special Events & St Francis Centre Equipment Pooled $0.6 Recreation - Other Public Art 25 each $2.7 Outdoor Recreation Access Gates 320 each $0.9 Outdoor Recreation Baseball Fields 24 each $7.3 Outdoor Recreation Basketball Courts 24 each $0.9 Outdoor Recreation Benches & Tables 881 each $1.3 Outdoor Recreation Cricket Fields 1 each $0.4 Outdoor Recreation Garbage Cans & Recycling Stations 249 each $0.3 Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 109 Asset Category Asset Inventory/Unit 2024 Replacement Value (in million $) Outdoor Recreation Outdoor Exercise Equipment 11 each $0.4 Outdoor Recreation Park & Walkway Lighting - Poles 1,057 each $9.3 Outdoor Recreation Park & Walkway Lighting - Luminaires 1,166 each $2.3 Outdoor Recreation Park Shade/Shelter Structures 55 each $3.2 Outdoor Recreation Playgrounds 101 each $15.2 Outdoor Recreation Skateparks 3 each $1.6 Outdoor Recreation Soccer Fields 45 each $7.6 Outdoor Recreation Splash Pads 5 each $2.2 Outdoor Recreation Tennis and Pickleball Courts 18 each $2.0 Outdoor Recreation Trails 110 km $38.5 Table C-4 Detailed Asset Inventory - Fire Services (Total $3.2 million) Asset Category Asset Inventory/Unit 2024 Replacement Value (in million $) Personal Protective Equipment PPE - Boots, Coats, Gloves, etc. 1,458 each $1.0 Respiratory Equipment SCBA - Cylinders, Face Piece, etc. 545 each $0.7 Rescue Equipment Power Tools, Rope, etc. 217each $0.6 Suppression Equipment Fire Hoses, Ladders, etc. 651each $0.8 Table C-5 Detailed Asset Inventory - Library Services (Total $13.0 million) Asset Category Asset Inventory/Unit 2024 Replacement Value (in million $) Library Collections Physical Books, eBooks, Audiobooks 226,254 each $11.3 Library Furniture Shelving, Desks & Chairs 1,214 each $1.3 Library Public Technology Public Use Computers & Tablets 133 each $0.4 Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 110 Table C-6 Detailed Asset Inventory - IT Services (Total $5.2 million) Asset Category Asset Inventory/Unit 2024 Replacement Value (in million $) End User Devices Computers, Printers, iPads, TVs, Phones, Monitors 1,877 each $2.2 Server Equipment Firewalls, UPS, Servers, Storage Arrays 23 each $0.9 Networking Equipment Wireless Access Points, Switches & Routers 218 each $2.2 Table C-7 Detailed Asset Inventory - Fleet Services (Total $51.3 million) Asset Category Asset Inventory/Unit 2024 Replacement Value (in million $) Vehicles Cars (Non- Emergency Response) 25 each $1.4 Vehicles Trucks - Light & Medium 83 each $7.5 Vehicles Trucks - Heavy 16 each $6.2 Fire Emergency Response Fire Emergency Response 15 each $22.6 Rolling Equipment Construction Equipment - Heavy 5 each $1.5 Rolling Equipment Grass Cutting 54 each $3.7 Rolling Equipment Ice Conditioners 5 each $0.9 Rolling Equipment Sweeper 4 each $1.7 Rolling Equipment Tractors - Heavy 10 each $1.1 Rolling Equipment Tractors - Light & Medium 19 each $2.4 Rolling Equipment Trailers 32 each $1.0 Rolling Equipment Misc Equipment 36 each $1.3 Table C-8 Detailed Asset Inventory - Facilities (Total $403.9 million) Asset Category Inventory/Unit 2024 Replacement Value (in million $) Administration Building 2 Facilities $66.4 Rec & Community Centres 36 Facilities $287.8 Fire Stations 4 Facilities $32.5 Town of Ajax | 2025 Asset Management Plan - Proposed Levels of Service | Final | 111 Asset Category Inventory/Unit 2024 Replacement Value (in million $) Library* 1 Facility $17.2 *Replacement values for library branches at McLean Community Centre and Audley Recreation Complex are included under Recreation & Community Centres asset category.