{
 "answer": "In the City of Clarence-Rockland, Ontario, building permit rules are set by By-law 2026-74 - Being a by-Law under the Building Code Act, 1992 respecting construction, demolition, change of use permits and inspections (Building By-law), verified 2026-09-27. Permit required for: construction, demolition, and change of use. Permit fees: gross floor area, class of construction, type of work, or valuation model in Schedule \"G\"; or a minimum fee. Fees set in: Schedule \"G\" of user fee by-law.",
 "municipality_id": "gx-001468",
 "municipality": "Clarence-Rockland",
 "status_type": "City",
 "jurisdiction": "Ontario",
 "country": "CA",
 "topic": "building_permits",
 "label": "Building permits",
 "status": "found",
 "last_verified": "2026-09-27",
 "official_website": "http://www.clarence-rockland.com/",
 "documents": [
  {
   "primary": true,
   "is_official": true,
   "title": "By-law 2026-74 - Being a by-Law under the Building Code Act, 1992 respecting construction, demolition, change of use permits and inspections (Building By-law)",
   "category": "building_permits",
   "document_type": "bylaw",
   "status": "adopted",
   "adopted_date": "2026-08-12",
   "document_url": "https://www.clarence-rockland.com/en/media/file/2026-74-building-lawpdf",
   "summary": "City of Clarence-Rockland's current Building By-law (short title 'Building By-law'): permits, exemptions, inspections under the Building Code Act, 1992. Read, passed and adopted in open council 2026-08-12, in force 2026-09-01; Section 21.1 repeals the prior By-law 2015-172 ('the Building By-law', now superseded). Section 20 amends Schedule G (Construction) of the User Fee By-law 2025-105 for building permit fees -- the fee schedule lives in that separate fees by-law, not this one. 17-page text PDF, not truncated.",
   "capture_sha256": "9b482448a2b2c4061ba04c4b9106acc513692f314eccf54dbc128aa5079cb55a",
   "captured_at": "2026-09-27T23:01:27+00:00",
   "capture_http_status": 200,
   "discovered_by": "building-gaps",
   "discovered_at": "2026-09-27",
   "document_number": "2026-74",
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/9b482448a2b2c4061ba04c4b9106acc513692f314eccf54dbc128aa5079cb55a.pdf",
   "link_dead": false,
   "facts": {
    "permit_required_for": "construction, demolition, and change of use",
    "fee_basis": "gross floor area, class of construction, type of work, or valuation model in Schedule \"G\"; or a minimum fee",
    "fees_location": "Schedule \"G\" of user fee by-law",
    "authority": "Chief Building Official and any Inspectors appointed in accordance with the Building Code Act"
   },
   "fact_citations": {
    "permit_required_for": "s. 3.1",
    "fee_basis": "s. 6.3",
    "fees_location": "s. 6.1",
    "authority": "s. 16.1"
   },
   "transcript_url": "/ca/on/clarence-rockland/building-permits/bylaw-2026-74/",
   "transcript_quality": "exact"
  }
 ],
 "source": "https://govanswers.org/ca/on/clarence-rockland/building-permits/"
}