{
 "answer": "In the Township of Front of Yonge, Ontario, building permit rules are set by Township of Front of Yonge By-law #30-26, Consolidated Fee By-law, verified 2026-10-26. Permit fees: $125 + $12/$1000 construction value; minimum fee $125.00; valued at $120/sq.ft. or contractor’s price. Fines: double the cost of building permit.",
 "municipality_id": "gx-001517",
 "municipality": "Front of Yonge",
 "status_type": "Township",
 "jurisdiction": "Ontario",
 "country": "CA",
 "topic": "building_permits",
 "label": "Building permits",
 "status": "found",
 "last_verified": "2026-10-26",
 "official_website": "https://mallorytown.ca/",
 "documents": [
  {
   "primary": true,
   "is_official": true,
   "title": "Township of Front of Yonge By-law #30-26, Consolidated Fee By-law",
   "category": "building_permits",
   "document_type": "bylaw",
   "status": "adopted",
   "adopted_date": "2026-08-17",
   "document_url": "http://mallorytown.ca/wp-content/uploads/2026/09/30-26-Consolidated-Fees-By-law.pdf",
   "summary": "The Building fee table generally charges $125 plus $12 per $1,000 construction value. Demolition, early occupancy, special inspections and changes of use cost $125 each; annual permit renewal costs $100. Building without a permit doubles the permit fee.",
   "document_number": "30-26",
   "notes": "Refile candidate recovered from existing fees_rates capture; category addition only, original classification retained. Reused official capture 02ba6bca81d6a7a3c485146ab5cf9dfd3d5e04bc3d4cf5b33442483f81c099f2",
   "capture_sha256": "02ba6bca81d6a7a3c485146ab5cf9dfd3d5e04bc3d4cf5b33442483f81c099f2",
   "captured_at": "2026-10-15T15:18:04+00:00",
   "capture_http_status": 200,
   "discovered_by": "on-building-astra",
   "discovered_at": "2026-10-26",
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/02ba6bca81d6a7a3c485146ab5cf9dfd3d5e04bc3d4cf5b33442483f81c099f2.pdf",
   "link_dead": false,
   "facts": {
    "permit_required_for": "To repair, alter, construct/install pool, install fuel fired appliance and/or chimney, agricultural building; construct a building or an addition; install solar panels; decking; demolition.",
    "fee_basis": "$125 + $12/$1000 construction value; minimum fee $125.00; valued at $120/sq.ft. or contractor’s price",
    "fine_range": "double the cost of building permit"
   },
   "fact_citations": {
    "permit_required_for": "Schedule “A” — Building",
    "fee_basis": "Schedule “A” — Building",
    "fine_range": "Schedule “A” — Building"
   },
   "transcript_url": "/ca/on/front-of-yonge/fees/bylaw-30-26/",
   "transcript_quality": "ocr"
  }
 ],
 "source": "https://govanswers.org/ca/on/front-of-yonge/building-permits/"
}