Asset Management Plan - Phases One and Two (2025)

Hilton Beach, Ontario

This is the exact embedded text of the captured official document. Snapshot f35ef17c84ab · verified 2026-06-10 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

Village of Hilton Beach Asset Management Plan -- Phases One and Two April 21st, 2025 To: Myra Eddy, Clerk-Treasurer Village of Hilton Beach From: BDO Canada LLP Chartered Accountants and Advisors 747 Queen Street East Sault Ste. Marie, Ontario P6A 2A8 (705) 945-0990 THIS DOCUMENT CONTAINS PROPRIETARY AND CONFIDENTIAL INFORMATION AND IS NOT TO BE DISTRIBUTED WITHOUT PRIOR WRITTEN PERMISSION Village of Hilton Beach Asset Management Plan -- Phases One and Two P a g e |3| Table of Contents Introduction ................................................................................................. 4 Asset Management Plan Development ................................................................ 5 Asset Management Plan Structure ..................................................................... 5 1.0 Condition Assessment - State of Local Infrastructure ............................................ 9 Asset Inventory ........................................................................................... 9 Asset Inventory and Valuation (Core Assets) ......................................................... 9 Asset Inventory and Valuation (Non-Core Assets) .................................................. 11 Identify Candidate Assets (Long List) ................................................................ 14 Remaining Service Life ................................................................................. 15 Asset Condition ......................................................................................... 15 2.0 - Desired Levels of Service .......................................................................... 15 Core Assets............................................................................................... 16 Buildings Assessment ................................................................................... 16 Non-Core Assets ......................................................................................... 20 APPENDIX A -- ASSET INVENTORY ........................................................................ 27 APPENDIX B -- OCWA CONDITION ASSESSMENT ......................................................... 32 APPENDIX C -- TULLOCH CONDITION ASSESSMENT .................................................... 33 APPENDIX D -- ROADS CONDITION ASSESSMENT ....................................................... 34 Introduction Village of Hilton Beach Asset Management Plan -- Phases One and Two P a g e |4| Introduction The Village of Hilton Beach retained BDO to assist in developing this asset management plan, which serves as a tool for the Township to optimize asset management outcomes for its core and non-core assets in a cost-effective manner and brings the Township in compliance with the July 1, 2024 requirements of Ontario Regulation 588/17: Asset Management Planning for Municipal Infrastructure (O. Reg. 588/17). Core elements of the comprehensive asset management plan will include filling remaining data gaps, identifying proposed levels of service, establishing lifecycle management strategies to achieve those service levels, developing a financial strategy that incorporates financial sustainability and affordability factor specific to the Township, and assessing asset critically through a risk management lens. Asset management planning is the process of making the best possible decisions regarding the building, operating, maintaining, renewing, replacing and disposing of infrastructure assets. The objective is to maximize benefits, manage risk, and provide satisfactory levels of service to the public in a sustainable manner. Asset management requires a thorough understanding of the characteristics and condition of infrastructure assets, as well as the service levels expected from them. It also involves setting strategic priorities to optimize decision-making about when and how to proceed with investments. Finally, it requires the development of a financial plan, which is the most critical step in putting the plan into action. The province's goals for municipal infrastructure include making good asset management planning universal; moving toward optimal use of a full range of infrastructure financing tools; and addressing the structural challenges facing small communities. In developing this Asset Management Plan (AMP), reference was made to resources available from Ministry of Infrastructure's Guide for Municipal Asset Management Plans. The plan sets out a strategic framework that will guide future investments in ways that support economic growth, are fiscally responsible, and respond to changing needs. A key element of this framework is ensuring good stewardship through proper asset management. Municipalities deliver many of the services that are critical to Ontarians, and these services rely on well-planned, well-built and well-maintained infrastructure. An asset management plan is a strategic document that states how a group of assets is to be managed over a period of time. Key steps in achieving a well-informed AMP include: 1. A description of the characteristics and condition of infrastructure assets; 2. The levels of service expected from them, including risk and performance assessment and priority planning; 3. Planned actions to ensure the assets are providing the expected level of service (LOS); and 4. Financing and monitoring strategies to implement the planned actions. To achieve the above strategic items for the Township assets, the following Interim report provides step 1. Information to share with Council and administration for discussion and decision-making purposes regarding desired levels of service expected in Step 2. The final report (required by July 2025) will detail the financial strategy to meet the proposed levels of services outlined Step 2. Introduction Village of Hilton Beach Asset Management Plan -- Phases One and Two P a g e |5| Asset Management Plan Development The development of this asset management plan was guided by the principles outlined in the Municipality's Strategic Asset Management Policy. It incorporated strategies and objectives identified through discussions with the Municipality's asset managers, insights from reviews of existing long-term planning documents and studies, and further refinements through staff consultations and analysis of the Municipality's capital asset data. The key steps in the development of this asset management plan are summarized below: 1. Compile comprehensive asset inventories, detailing attributes such as size, quantity, age, expected service life, and replacement costs. Replacement costs were updated as needed, using appropriate inflation indices. 2. Assess the current condition of non-core assets through a combination of staff input and age-based condition analyses. 3. Define and document current levels of service by analyzing available data and reviewing relevant background reports. 4. Develop lifecycle management strategies to outline the activities required to maintain current levels of service. 5. Prepare a financial summary forecasting capital and significant operating expenditures associated with the identified lifecycle management activities. 6. Document the asset management plan in a formal report to guide future decision-making and communicate planning to municipal stakeholders. Asset Management Plan Structure This plan has been designed to meet July 1, 2024 O.Reg. 588/17 requirements, which is an AMP that documents the current levels of service being provided and the costs to sustain them for the City's core assets. The Village of Hilton Beach has two sections of assets that will be assessed, namely core (e.g., buildings) and non-core assets (e.g., vehicles, equipment, and roads). For each asset class, the following subsections will be applied: 1. State of Local Infrastructure 2. Levels of Service 3. Lifecycle Management Strategy 4. Asset Management Strategy/Financing Strategy The plan is concluded with the Improvement and Monitoring sections which are inclusive of both core and non-core assets. The following describes each of the subsections in detail: Introduction Village of Hilton Beach Asset Management Plan -- Phases One and Two P a g e |6| State of Local Infrastructure The State of Local Infrastructure for both service areas include the following information: - Summary of assets in the category; - The replacement cost of the assets in the category; - The average age of the assets in the category, determined by assessing the average age of the components of the assets; - The information on the condition of the assets in the category, and; - A description of the municipality's approach to assessing the condition of the assets in the category, based on recognized and general accepted good engineering practices, where applicable. The average ages of assets presented in subsequent sections of this asset management plan are weighted by the estimated current replacement cost of each asset. Similarly, the average condition is also weighted by the estimated current replacement cost of each asset. Table 1. Asset Condition Rating Condition Rating Definition Service Life Remaining (%) Very Good The asset is fit for the future. It is well maintained, in good condition, new or recently rehabilitated 75-100 Good The asset is adequate. It is acceptable and general within the mid-stage of its expected service life. 50-75 Fair The asset requires attention. The asset shows signs of deterioration, and some elements exhibit deficiencies. 25-50 Poor There is an increasing potential for its condition to affect the service it provides. The asset is approaching the end of its service life, the condition is below the standard and a large portion of the system exhibits significant deterioration. 0-25 Very Poor The asset is unfit for sustained service. It is near or beyond its expected service life and shows signs of advanced deterioration. Elements may be unusable. <0 Unknown Not enough data exists to estimate condition. In asset management planning, the quality of data is crucial. Therefore, documenting data sources and evaluating their quality is essential in creating effective asset management plans (AMPs). By ensuring that the best available data is used, municipalities can conduct high-quality analyses, forming a strong foundation for future AMPs. This practice also enhances transparency, allowing readers to understand where assumptions were made to address data gaps. Introduction Village of Hilton Beach Asset Management Plan -- Phases One and Two P a g e |7| Levels of Service Levels of service measure how effectively an asset meets functional or user requirements, emphasizing that assets serve as a means to deliver services rather than as ends in themselves. These assets play a crucial role in providing services to a municipality's residents and stakeholders. Municipalities must ensure that infrastructure assets meet service-level goals in an affordable, achievable, and sustainable manner. A well-developed levels of service framework enables a municipality to: - Communicate objectives to stakeholders and inform them of planned changes. - Track performance against objectives to identify areas needing improvement. - Make budget decisions based on outcomes, allowing for informed trade-offs. To comply with the July 1, 2024 requirements of O. Reg. 588/17, asset management plans must identify the current levels of service for each in-scope asset class. While O. Reg. 588/17 prescribes specific community and technical levels of service for core assets, it does not impose similar requirements for non-core assets. To address this, the Municipality has established its own levels of service frameworks for non- core assets, describing both qualitatively and quantitatively the objectives these assets are expected to achieve. These frameworks include performance measures that the Municipality will continue to monitor over time. The LOS tables were developed for the core service groups and comprised of the following structure: 1. Service Attributes consists of a phrase which describes an important area of focus for each service group. Example of Key Service Attributes include Cost Efficient, Safety, Reliability etc. 2. LOS Statement consists of a short sentence, which describes the outputs of the service category. Each LOS Statement corresponds to a Key Service Attribute. 3. Performance Measures identify specific areas of focus that can be measured to support each Key Service Attribute. One of more performance measures can be listed for each Key Service Attribute. The LOS tables provide two types of Performance Measures: Customer and Technical. Each Performance Measure is subdivided into four components, which are represented as addition columns in the LOS table. 4. Current Performance are values that indicate the current performance for each performance measure for the recent calendar year. Lifecycle Management Strategy The Village of Hilton Beach's lifecycle strategy described the set of planned actions undertaken to sustain levels of service, while managing risk at the lowest possible lifecycle cost, in alignment with the levels of service and risk strategies. The types of lifecycle activities are shown in Table 2. Introduction Village of Hilton Beach Asset Management Plan -- Phases One and Two P a g e |8| Table 2: Lifecycle Activities Lifecycle Activity Description Non-Infrastructure Actions or policies that can lower costs of extend asset life. Maintenance Regularly scheduled inspection and maintenance, or more significant repair and activities associated with unexpected events. Renewal/Rehabilitation Significant repairs designed to extend the life of the asset. Replacement/Construction Activities that are expected to occur once an asset has reached the end of its useful life and renewal/rehabilitation is no longer an option Disposal Activities associated with disposing of an asset once it has reached the end of its useful life or is otherwise no longer needed by the municipality Expansion/Growth/Service Improvements Planned activities required to extend services to previously unserviced areas or expand services to meet growth demands These activities form the basis of Lifecycle Management Strategy section of the Asset Management Plan. This will enable the township to establish and report on possible options for which lifecycle activities could potentially be undertaken to maintain the current levels of service as well as the associated risks and costs. Village of Hilton Beach Asset Management Plan -- Phases One and Two P a g e |9| 1.0 Condition Assessment - State of Local Infrastructure Asset Inventory The assets covered by this AMP are the tangible capital assets owned by the Village of Hilton Beach (VHB), identified during PSAB 3150 documentation by BDO Canada LLP's Audit and Assurance division (Appendix A), an AMP for Water and Wastewater Systems by OCWA (Appendix B), a Building Condition Assessment by Tulloch Engineering (Appendix C), a roads condition assessment by VHB (Appendix D), and insights from the Township of Hilton on shared fire assets. During this process, asset inventories and values were categorized within the following eight asset categories: - Buildings (core asset) - Vehicles (non-core asset) - Roads (core asset) - Docks (non-core asset) - Watermains (core asset) - Land Improvements (non-core asset) - Equipment (non-core asset) - Furnishings (non-core asset) Asset Inventory and Valuation (Core Assets) The Village of Hilton Beach (VHB) owns many building, road, and watermain assets, and is thus responsible for maintaining and replacing them when necessary. The goal is to ensure a high level of performance by both core and non-core assets, in order to improve their safety and reliability in their use by residents and visitors to the VHB. The replacement valuation for the entire asset portfolio falling under the categories of Watermains (Appendix B), Buildings (Appendix C), or Roads (Appendix D) are displayed below in Table 3. This valuation is compared to its financial accounting valuation. The financial accounting valuation differs from the replacement valuation, as it is based on the initial construction costs and the cost of the asset's depreciation over time until the current year. In contrast, replacement costs represent the current cost to replace the asset. Table 3: Snapshot of Core Asset Categories Category Financial Accounting Valuation Replacement Valuation # of Assets Average Age (Years) Average Remaining Useful Life (Years) Buildings $ 1,309,042 $ 2,241,611 24 19 22 Roads $ 142,105 $ 256,921 8 16 15 Watermains $ 2,487,481 $ 4,487,703 39 21 35 Totals $ 3,938,628 $ 6,986,235 71 18.7 24 1.0 Condition Assessment - State of Local Infrastructure Village of Hilton Beach Asset Management Plan -- Phases One and Two P a g e |10| Figure 1 below displays both the financial accounting and replacement valuations of VHB's core assets by category, as a proportion of the total. Figure 1: FAV and RV of Core Assets Categories by Proportion of Total Figure 2 below indicates the both the financial accounting and replacement valuations of VHB's core assets per household, using the 2021 Canada Census's count of 134 households in VHB. Figure 2: FAV and RV of Core Asset Categories per Household Buildings 33% Roads 4% Watermains 63% Financial Accounting Valuation of Core Assets ($3,938,628) Buildings 32% Roads 4% Watermains 64% Replacement Valuation of Core Assets ($6,986,235) $0 $2,000 $4,000 $6,000 $8,000 $10,000 $12,000 $14,000 $16,000 $18,000 $20,000 Buildings Roads Watermains Financial Accounting Valuation of Core Assets per Household $0 $5,000 $10,000 $15,000 $20,000 $25,000 $30,000 $35,000 $40,000 Buildings Roads Watermains Replacement Valuation of Core Assets per Household 1.0 Condition Assessment - State of Local Infrastructure Village of Hilton Beach Asset Management Plan -- Phases One and Two P a g e |11| Table 4 below shows the remaining service life (in years) of VHBs core asset categories. From this table, 12 of VHB's 71 core assets (~17%) have 0 years of remaining service life remaining, meaning these assets are fully depreciated as of 2024. Of these 12 assets, 7 fall under the Building category, 1 falls under the Roads category, and 4 fall under the Watermains category. Table 4: Core Asset Count, Remaining Service Life Categories Category Remaining Service Life (Years) Total 0 1-5 6-10 >10 Buildings 7 0 2 15 24 Roads 1 0 0 7 8 Watermains 4 0 0 35 39 Total 12 0 2 57 71 Asset Inventory and Valuation (Non-Core Assets) In addition to its core assets, VHB also owns many assets that are considered "non-core" assets, or inessential to the operations of the municipality. However, proper management of these assets is still an important task of the municipality, as doing so will allow VHB to maximize the utility of these assets and efficiently facilitate their replacement, when necessary. These "non-core" assets fall into five categories: - Equipment - Docks - Furnishing - Land Improvements - Vehicles 29% 13% 10% 8% 63% 88% 90% 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Buildings Roads Watermains Core Asset Count, Remaining Service Life Categories 0 1-5 6-10 >10 1.0 Condition Assessment - State of Local Infrastructure Village of Hilton Beach Asset Management Plan -- Phases One and Two P a g e |12| The replacement valuation for the assets falling under the non-core categories of equipment, furnishings, vehicles, docks, and land improvements are displayed below in Table 5. This valuation is compared to its financial accounting valuation. The financial accounting valuation differs from the replacement valuation, as it is based on the initial construction costs and the cost of the asset's depreciation over time until the current year. In contrast, replacement costs represent the current cost to replace the asset. Table 5: Snapshot of Non-Core Asset Categories Category Financial Accounting Valuation Replacement Valuation # of Assets Average Age (Years) Average Remaining Useful Life (Years) Equipment $ 261,694 $ 716,552 38 10 4 Furnishing $ 5,079 $ 54,178 4 20 1 Vehicles $ 70,385 $ 134,590 4 5 3 Docks $ 116,385 $ 861,034 16 22 3 Land Improvements $ 1,628,646 $ 2,881,820 16 24 20 Totals $ 2,082,189 $ 4,648,174 78 16.2 6 Figure 3 below displays both the financial accounting and replacement valuations of VHB's non- core assets by category, as a proportion of the total. 1.0 Condition Assessment - State of Local Infrastructure Village of Hilton Beach Asset Management Plan -- Phases One and Two P a g e |13| Figure 3: FAV and RV of Non-Core Asset Categories by Proportion of Total Figure 4 below indicates the both the financial accounting and replacement valuations of VHB's core assets per household, using the 2021 Canada Census's count of 134 households in VHB. Figure 4: FAV and RV of Non-Core Asset Categories per Household Equipment 13% Furnishing 0% Vehicles 3% Docks 6% Land Improvements 78% Financial Accounting Valuation of Non-Core Assets ($2,082,189) Equipment 15% Furnishing 1% Vehicles 3% Docks 19% Land Improvements 62% Replacement Valuation of Non-Core Assets ($4,648,174) $0 $2,000 $4,000 $6,000 $8,000 $10,000 $12,000 $14,000 Financial Accounting Valuation of Core Assets per Household $0 $5,000 $10,000 $15,000 $20,000 $25,000 Replacment Valuation of Core Assets per Household 1.0 Condition Assessment - State of Local Infrastructure Village of Hilton Beach Asset Management Plan -- Phases One and Two P a g e |14| Table 6 below shows the remaining service life (in years) of VHBs core asset categories. From this table we can see 52 of VHB's 94 non-core assets (~55%) have 0 years of remaining service life remaining, meaning these assets are fully depreciated as of 2024. Table 6: Remaining Service Life, Non-Core Asset Categories Category Remaining Service Life (Years) Total 0 1-5 6-10 >10 Equipment 22 6 2 8 38 Furnishing 3 1 0 0 4 Vehicles 2 1 1 0 4 Docks 9 5 0 2 16 Land Improvements 16 0 2 14 32 Total 52 13 5 24 94 Identify Candidate Assets (Long List) Assets that are candidate for further assessment were identified by reviewing remaining service lives and other needs (e.g., unexpected asset failures) from the asset inventory and values. This review produced a list of candidate assets with remaining service lives less than five years in length, and assets with unexpected, emergency, or critical requirements. The remaining service life "cut-off" can be modified by VHB to develop lists that are manageable (i.e., to help manage the costs of subsequent condition review to support further assessment under the AMP). 58% 75% 50% 56% 50% 16% 25% 25% 31% 5% 25% 6% 21% 13% 44% 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Equipment Furnishing Vehicles Docks Land Improvements Non-Core Asset Count, Remaining Service Life Categories 0 1-5 6-10 >10 2.0 - Desired Levels of Service Village of Hilton Beach Asset Management Plan -- Phases One and Two P a g e |15| Remaining Service Life Remaining service life is the key indicator when completing the review to identify assets that are candidate for repair/rehabilitate/replace. Remaining service lives are determined considering the expected useful life of assets. Assets with remaining service lives less than five years in length were considered candidates for replacement. Asset Condition A key component of the AMP is the ongoing collection of information to facilitate condition assessments of aged and/or problematic assets (e.g., road/bridge/culvert inspections -- Appendix D). Regarding the relevant condition of VHB's capital condition, management has acquired third-party reports and insights (i.e., OCWA AMP for Water and Wastewater Systems -- Appendix B, Tulloch Engineering Building Condition Assessment -- Appendix C, and Township of Hilton) and provided their own evaluations as follows: - Establish asset values - Identify core and non-core candidate assets and their remaining service life - Identify unexpected, emergency, and critical needs - Finalize asset condition assessment 2.0 - Desired Levels of Service The following section will identify the Township's current and desired level of service for their asset portfolio. These metrics include technical and community service metrics that are required as part of the O. Reg. 588/17 as well as any additional performance metrics that the Township has selected for this asset management plan. Identify Candidate Assets (Short List) Candidate assets identified during the initial review of remaining service life, asset condition assessment and other stakeholder needs are assessed considering the appropriate acceptable LOS, legislative compliance, condition, and quality of service provided. Levels of Service LOS is a qualitative or quantitative measure to describe the accepted or expected performance of an asset or group of assets. The Municipality's objective should be to provide services at the established LOS's in the most cost-effective manner. For Village of Hilton Beach, LOS are based on: 2.0 - Desired Levels of Service Village of Hilton Beach Asset Management Plan -- Phases One and Two P a g e |16| What follows is a chart that outlines: - qualitative LOS description that has been adopted for each asset grouping; - observations from asset condition assessment and stakeholder consultations; - performance and risk assessment evaluation; and, - recommendations for Step 3 of AMP, which is the Financing/Capital Budgeting Strategy. Core Assets Buildings Assessment There are nine (9) buildings and infrastructure as part of the Village of Hilton Beach's inventory that are owned by the Township and maintained by the departments who provide administration, transportation, and recreational and cultural services to the community. Based on the Tulloch Engineering Building Condition Assessment in Appendix C, most of the facilities are in fair or good condition but some are in poor condition and may require replacement. Under the current standing, there is estimated capital improvements required over the next 10 years totalling $1,141,000. Assessment of the buildings are as follows: Buildings & Infrastructure Levels of Service - Provides facilities that are cost effective, safe, accessible, convenient, and provide adequate amenities (e.g., HVAC, restrooms). Structures Observation/Interviews Performance/Risk Recommendations Waterfront Centre - Building was constructed in 1950, with an addition constructed in 1990. - Site contains one (1) building and one (1) outbuilding at approximately 7,200 square feet in ground floor area. - Parking lot was a combination of gravel and surface treatment. - Building is in good condition overall - Building has Facility Condition Index (FCI) of 3.26% or is in Excellent Condition - $81,500 estimated cost of repair/replacement taking place over the next 10-years primarily consisting of roofing and stairs on the exterior Dock Infrastructure - Dock construction was noted to be on a wood platform framing on corrugated PVC floats. - Total length of floating dock infrastructure was noted to be approximately 1,000 meters. - PVC floats were noted to be in visually good condition, while wood surfaces were noted to have advanced decay and loose surfacing fasteners - $650,000 estimated to remove and replace existing wood deck, wood substructure, and wood guards for full length of breakwater walkway 2.0 - Desired Levels of Service Village of Hilton Beach Asset Management Plan -- Phases One and Two P a g e |17| Boardwalk, Breakwater Walkway, and Viewing Platform - Boardwalk extends from the south extent of the marina basin, north to the marina building (260 meters total). - Breakwater walkway extends from the south end of the boardwalk to the bridge servicing the viewing platform (110 meters total). - Viewing platform is 36 square meters. - Boardwalk, Breakwater Walkway, and Viewing Platform are in poor condition overall - $350,000 estimated to remove and replace existing wood deck and wood substructures for all docks Marina - Building included two (2) changing rooms with shower facilities. - It houses gas docks and slip rentals office. - Approximately 1,400 square feet in ground floor area. - Marina building's exterior and interior was observed and was generally in good condition overall - Marina building has a FCI of 3.6% or in excellent condition - $20,000 estimated repair for a shingle replacement in the next 5 years Municipal Garages - Site contains two (2) buildings - Original garage is of unknown age but assumed to be in excess of 30 years old and approximately 1,200 square feet in ground floor area. - New garage was constructed in 2022 and is approximately 1,000 square feet in ground floor area. - Original garage is in good condition overall with a few noted defects - Several notable items should be reviewed with the Municipal Building Official to ensure garage design and construction are compliant with the Ontario building code - Original Garage has an FCI of 6.9% or is in good condition. - $15,000 estimated repair for the removal and replacing of asphalt shingles Municipal Library - Site contains one (1) building. - Building is approximately 800 square feet in ground floor area. - Original building was assumed to be constructed more than 100 years ago, with construction of subsequent additions unknown. - Building is considered to be in good condition overall with a few defects - $24,500 estimated repair to reinforce damage/unsupported floor joists, remove and replace existing asphalt composite panel, insulate crawl space & remove concrete entrance ramp and replace with OBC compliant ramp and guards 2.0 - Desired Levels of Service Village of Hilton Beach Asset Management Plan -- Phases One and Two P a g e |18| Watermains Levels of Service - Provide a water distribution system that is cost-effective, reliable, and safe, delivering clean and potable water at adequate pressure. Watermains Observation/Interviews Performance/Risk Recommendations Water Treatment Plant (WTP) - In the 2025-2034 OCWA capital plan, a series of capital projects and major maintenance initiatives are set to occur. - Approximately 11 pieces of WTP equipment are in poor condition and require major maintenance. - 7 capital projects anticipated in the next 10 years. - Estimated capital investment in WTP and its equipment of $185,650 over the next decade. Wastewater Treatment Plant (WWTP) - In the 2025-2034 OCWA capital plan, a series of capital projects and major maintenance initiatives are set to occur. - Approximately 11 pieces of WWTP equipment are in poor condition and require major maintenance. - 5 capital projects anticipated in the next 10 years - Estimated capital investment in WWTP and its equipment of $201,200 over the next decade. Distribution and Collection - In the 2025-2034 OCWA capital plan, a series of capital projects are set to occur. - 3 capital projects anticipated in the next 10 years. - Estimated capital investment in Distribution and collection of $39,600 over the next decade. Roads - Transportation and pedestrian facilities Levels of Service - Provide facilities that are cost effective, safe, have smooth riding surfaces, clear directions (signage and line painting), no pot holes, no tripping hazards. Roads Observation/Interviews Performance/Risk Recommendations South St. (asphalt) - Initially constructed in 1999, fully amortized as of 2024. - Road was last improved in 2022, fairly new (8.5) with no known issues. - No further capital investment is anticipated over the next decade. Sixth St. (base) - Initially paved in 1987, with an estimated remaining life of 13 years. - Road was last improved in 2022, fairly new (8.5) with no known issues. - No further capital investment is anticipated over the next decade. 2.0 - Desired Levels of Service Village of Hilton Beach Asset Management Plan -- Phases One and Two P a g e |19| Bay St. (east section) - Initially paved in 2011, with an estimated remaining life of 12 years. - Bowker to Marina is moderately new (6.5), with improvements needed in foreseeable future. - Cenotaph is a fairly new (8) gravel road, with improvements planned in foreseeable future. - Bowker to Marina to be improved in 2027 for $11,993, rehabilitating the road to 10. - Cenotaph to be improved in 2030 for $2,363. Canoe Point Rd. - Initially paved in 2012, with an estimated remaining life of 13 years. - Eastern portion is moderately new (7), with improvements planned in foreseeable future. - Western portion is fairly new (8), with improvements planned in foreseeable future. - Eastern portion to be improved in 2028 for $4,758, rehabilitating the road to 10. - Western portion to be improved in 2030 for $17,705. Hilton Rd. - Initially paved in 2017, with an estimated remaining life of 18 years. - Road was last improved in 2023, fairly new (8.5) with no known issues. - No further capital investment is anticipated over the next decade. Mariners' Way (base) - Initially paved in 2005, with an estimated remaining life of 31 years. - Gravel road is in good condition, with moderate improvements planned in foreseeable future. - To be improved in 2025 for $17,000. Marks St. - HCB pavement road - In fair to poor condition (5.5), requires replacement with improvements planned in foreseeable future. - To be improved in 2026 for $50,000, rehabilitating the road to a 10. Upper Birch - Gravel road from Sixth to Plant. - In fair to poor condition (5), requires replacement with improvements planned in foreseeable future. - To be improved in 2025 for $22,700, rehabilitating the road to a 10. 2.0 - Desired Levels of Service Village of Hilton Beach Asset Management Plan -- Phases One and Two P a g e |20| Non-Core Assets Vehicles Levels of Service - Provide safe, cost effective and reliable vehicles to support the delivery of Municipal services. Vehicles Observation/Interviews Performance/Risk Recommendations Tanker Replacement - Estimated remaining life of 5 years, purchased in 2019 with a 10-year useful life. - Asset is quite dated (2001), in fair to poor condition - Management anticipates immediate replacement. - Replacement of approximately $125,500 (50% of total) in 2025. - Budget of $8,500 (50% of total) annually for ongoing maintenance and repairs. Fire Pumper - 1995 HUB 1050 GPM - Fully amortized asset, initially purchased in 2009 with a 15-year useful life. - 1995 Freightliner is dated, in fair condition - Management anticipates replacement in coming years. - Replacement of approximately $25,000 (50% of total) in 2026. - Budget of $1,500 (50% of total) annually for ongoing maintenance and repairs. Equipment Levels of Service - Provide safe, cost effective, reliable and effective equipment and machinery to support the delivery of Municipal services. Equipment Observation/Interviews Performance/Risk Recommendations Computers - Estimated remaining life of 1 year, purchased in 2020 with a 5-year useful life. - In good condition and still functional, foresee replacement in the next 2 years. - Replacement of approximately $800 for 4 PCs and $800 for 2 laptops in next 2 years. Turnout Gear - Fully amortized as of 2024, purchased in 2014 with a 10-year useful life. - In fair to poor condition, management foresees replacement in the next couple of years. - Replacement of approximately $5,500 (50% of total) in the next 2-3 years. - Budget of $500 (50% of total) annually for ongoing maintenance and repairs. Small Playground Unit - Fully amortized as of 2024, purchased in 1999 with a 25-year useful life. - In poor to fair condition, is being maintained but requires replacement. - Estimated replacement cost of $40,000. 2.0 - Desired Levels of Service Village of Hilton Beach Asset Management Plan -- Phases One and Two P a g e |21| Large Playground Unit - Fully amortized as of 2024, purchased in 1999 with a 25-year useful life. - In poor to fair condition, is being maintained but requires replacement. - Estimated replacement cost of $75,000. Mechanical (HVAC) - Fully amortized asset - Replaced in 2023 for $23,617. - Management does not foresee further replacements in the coming 10 years. Mechanical (HVAC) 10 - Estimated remaining life of 1 year, purchased in 2010 with a 15-year useful life. - Replaced in 2023 for $23,617. - Management does not foresee further replacements in the coming 10 years. Dishwasher - Estimated remaining life of 1 year, purchased in 2000 with a 25-year useful life. - Dishwasher replaced in 2024 for $6,500. - Management does not foresee further replacements in the coming 10 years. Acoustic - Estimated remaining life of 5 years, purchased in 2004 with a 25-year useful life. - Acoustic tiles on walls of community hall to reduce echo during concerts. - Sound system no longer in use. - Good condition - No known issues, damage, or repairs needed, functioning as intended. - No further capital investment is anticipated in the coming 10 years. - Sound system will not be replaced due to inactivity. On-Demand Hot Water System - Fully amortized as of 2024, purchased in 2009 with a 15-year useful life. - Good condition - No known issues, functioning as intended. - No immediate action required in next 10 years - maintenance as necessary. Hall Signage - Fully amortized as of 2024, purchased in 2014 with a 10-year useful life. - Good condition - No known issues, yet minor paint corrosion - no immediate replacement needed, but ongoing maintenance. - External sign recently repainted. - Budget for repairs of $500 annually (i.e., painting), amounting to approximately $5,000 over the next decade. - Estimated replacement cost of $1,000. Aqua Genic Pump-Out System - Fully amortized asset - Good condition - No known issues, functioning as intended. - No immediate action required in next 10 years - maintenance as necessary. 2.0 - Desired Levels of Service Village of Hilton Beach Asset Management Plan -- Phases One and Two P a g e |22| Transformer to Convert Power - Fully amortized as of 2024, purchased in 2004 with a 20-year useful life. - Fair to good condition - functioning properly with regular maintenance. - Management does not foresee replacement in the next 10 years. - Transformer to only be replaced if it breaks down. - Budget for general maintenance/repairs of $250 annually, amounting to approximately $2,500 over the next decade. Mariners' Lounge - Commercial Dryers - Fully amortized asset - One was replaced with a Maytag single-load coin slide gas dryer in 2023 for approximately $2,400. - 2 remaining dryers are in fair condition - quite old yet function adequately. - Plan for replacement of remaining commercial dryers in the next 10 years for $4,800. Mariners' Lounge - Hot Water System - Fully amortized asset - 75-gallon hot water tank replaced in 2023 at Waterfront Centre for $7,785.70. - Management does not foresee further replacements in the coming 10 years. Fuel Tanks and Pumps - Estimated remaining life of 4 years, purchased in 2008 with a 20-year useful life. - Good condition - no known issues or deficiencies. - Management does not foresee replacement in the next 10 years. - No further capital investment is anticipated in the coming 10 years. Sewage Pump-Out for Boats - Estimated remaining life of 5 years, purchased in 2009 with a 20-year useful life. - Sewage pump-out for boats replaced in 2023 for $8,136. - Management does not foresee further replacements in the coming 10 years. Marina - Solar Panels - Fully amortized as of 2024, purchased in 1999 with a 25-year useful life. - Fair condition - part of government program that initially incentivized installation. - No further capital investment is anticipated in the coming 10 years. - Solar panels will not be replaced once they reach end of useful life due to discontinuation of government programming. - To be removed from infrastructure once roofing is replaced. 2.0 - Desired Levels of Service Village of Hilton Beach Asset Management Plan -- Phases One and Two P a g e |23| Docks Levels of Service - Provide docks that are cost-effective, safe, and well-maintaining, ensuring stable and durable structures for public and commercial use. Docks Observation/Interviews Performance/Risk Recommendations Electrical and Plumbing: Docks/Building/Pumps - Fully amortized as of 2022, purchased in 1997 with a 25-year useful life. - Management notes maintenance of the systems is ongoing rather than replacing them entirely. - Management to refer to respective budgets for ongoing repairs and maintenance costs. - Budget for ongoing general maintenance and repairs of $5,000 annually, amounting to approximately $50,000 over the next decade. Dock Pedestals - First set of pedestals installed in 1989, fully amortized as of 2014 after a 25-year useful life. - Second set of pedestals installed in 2006, fully amortized as of 2021 after a 15-year useful life. - Third set of pedestals installed in 2009, fully amortized as of 2024 after a 15-year service life. - In poor condition and require immediate replacement. - It is suggested that the replacement of the docks, including pedestals, will be done in stages over the coming several years. - Estimated replacement cost of $2,500 per pedestal, amounting to $115,000 total in the next 10 years. Anchors and Mants - Estimated remaining life of 3 years, purchased in 2012 with a 15-year useful life. - Replacement in 2023 for $40,116. - Management does not foresee further replacements in the coming 10 years. 2.0 - Desired Levels of Service Village of Hilton Beach Asset Management Plan -- Phases One and Two P a g e |24| Land Improvements Levels of Service - Provide well-maintained, cost-effective, and safe public spaces that ensure accessibility for all users while minimizing hazards and environmental impacts. Land Improvements Observation/Interviews Performance/Risk Recommendations Boardwalk Bollards - Fully amortized as of 2022, purchased in 2007 with a 15-year useful life. - In poor condition - while still functioning, bollards appear to be at end of life and in rough condition. - Replacement of approximately $500 per unit, totaling $14,500 in the next 10 years. - Budget for ongoing repairs of $300 annually, amounting to approximately $3,000 over the next decade. Boardwalk Signage - Fully amortized as of 2022, purchased in 2012 with a 10-year useful life. - Map of village and other large signage along boardwalk in good condition. - Signs encased in a wooden frame that appears to be maintaining its integrity. - Signage will only require minor upgrades (i.e., coat of paint and/or wood frame replacement), within the next 10 years. - Budget for repairs of $500 annually, amounting to approximately $5,000 over the next decade. - Estimated replacement cost (if necessary) of $1,000 for signage. Boardwalk Landscaping - Landscaping occurred in 1990, becoming fully amortized in 2015 after a 25-year useful life. - Ongoing maintenance that does not involve any major capital investments in the foreseeable future. - Includes seasonal decorations and general upkeep. - Budget for general upkeep of $2,000 annually, amounting to $20,000 over the next 10 years. Landfill - Fire Break - Fully amortized as of 2024, purchased in 2014 with a 10-year useful life. - Fair condition - Management notes no major issues, functioning as intended. - No immediate action required in next 10 years - maintenance as necessary. 2.0 - Desired Levels of Service Village of Hilton Beach Asset Management Plan -- Phases One and Two P a g e |25| New Trench System - Fully amortized as of 2024, purchased in 2019 with a 5-year useful life. - Management notes no further repairs/maintenance required. - Management does not foresee further replacements in the coming 10 years. Landfill Improvements - Landfill improvements occurred in 2018 for roughly $12,346. - $1,650 spent for landfill program development in 2024. - Management notes no further repairs/maintenance required. - Management noted that approximately $52,500 to be spent in 2025 to meet regulatory requirements. - Includes program development, well installations, Fall sampling, and laboratory analysis. All Season Surface - Fully amortized as of 2024, installed in 1999 with a 25-year useful life. - In poor condition - concrete pad is weathered, requires resurfacing and recoating. - Estimated resurfacing cost of $20,000 - $40,000. Permanent Structures Landscaping - Fully amortized as of 2014, occurred in 1989 with a 25-year useful life. - Ongoing maintenance that does not involve any major capital investments in the foreseeable future. - Budget for general upkeep of $2,000 annually, amounting to $20,000 over the next 10 years. Furnishings Levels of Service - Provide durable, safe, and cost-effective furnishings that enhance public spaces and meet community needs. Furnishings Observation/Interviews Performance/Risk Recommendations General Government Furnishings - Estimated remaining life of 5 years, purchased in 2009 with a 20-year useful life. - Fair condition - some issues have been noted with regards to flooring in offices. - Select chairs are in poor condition and require replacement. - Other furnishings are in fair to good condition, with no known issues. - Budget of $500 - $1,000 annually for replacement, amounting to approximately $5,000 - $10,000 over the next decade. 2.0 - Desired Levels of Service Village of Hilton Beach Asset Management Plan -- Phases One and Two P a g e |26| Event Tables - Fully amortized as of 2023, purchased in 2013 with a 10-year useful life. - In fair to good condition - will not be replaced. - Tables are wooden structures used for farmers' markets. - No further capital investment is anticipated in the coming 10 years. Hall Furnishings - Fully amortized as of 2023, purchased in 1998 with a 25-year useful life. - Existing tables replaced with plastic ones over 5 years ago. - Hall chairs in good condition and do not require immediate replacement. - Management does not foresee further replacements in the coming 10 years. APPENDIX A -- ASSET INVENTORY Village of Hilton Beach Asset Management Plan -- Phases One and Two P a g e |27| APPENDIX A -- ASSET INVENTORY APPENDIX A -- ASSET INVENTORY Village of Hilton Beach Asset Management Plan -- Phases One and Two P a g e |28| APPENDIX A -- ASSET INVENTORY Village of Hilton Beach Asset Management Plan -- Phases One and Two P a g e |29| APPENDIX A -- ASSET INVENTORY Village of Hilton Beach Asset Management Plan -- Phases One and Two P a g e |30| APPENDIX A -- ASSET INVENTORY Village of Hilton Beach Asset Management Plan -- Phases One and Two P a g e |31| APPENDIX B -- OCWA CONDITION ASSESSMENT Village of Hilton Beach Asset Management Plan -- Phases One and Two P a g e |32| APPENDIX B -- OCWA CONDITION ASSESSMENT [THIS PAGE INTENTIONALLY LEFT BLANK] Village of Hilton Beach Asset Management Plan for Water and Wastewater Systems SUBMITTED BY Ontario Clean Water Agency 2085 Hurontario Street, 5th Floor Mississauga, ON L5A 4G1 Date: January 10, 2025 Rev: 1 VILLAGE OF HILTON BEACH AMP FOR WATER AND WASTEWATER SYSTEMS Revision History REV. NO. DATE PREPARED BY: APPROVED BY: DESCRIPTION 1 January 10, 2025 Milos Posavljak, Nick Larson Nick Larson Draft OCWA consents to have the Client use this document and related information (collectively the "Document") only in connection with the agreement between OCWA and the Client subject to the following permitted use: (1) the Client may use any of the Document internal to its organization only, unless the disclosure or the external use is required by law and (2) the Client may use the Document externally provided that the external party is bound by confidentiality agreement(s) with terms and conditions at least as strict as this one, (collectively and individually the "Permitted Use"). Other than any Client data, any information in this Document and all related intellectual property and rights in the foregoing are confidential and proprietary to OCWA. The Client or any other party shall not directly or indirectly infringe the intellectual property and rights of OCWA in any of the foregoing. The Document is intended to assist the Client in relation to the project in the Document as at the date in the Document based on information available and facts stated by the Client as at such date. OCWA is not responsible for any conclusions drawn by the Client based on prior inconsistencies or any additional information made available after such date. The Document or any opinion arising out of the Document cannot be relied on by third parties or in connection with any transaction or documents. Any use of the Document outside of its intended purpose or in relation to any other project is the responsibility of the Client VILLAGE OF HILTON BEACH AMP FOR WATER AND WASTEWATER SYSTEMS EXECUTIVE SUMMARY Executive Summary Water and Wastewater Facility Asset Portfolio The scope of this Asset Management Plan (AMP) includes all water and wastewater assets. The infrastructure portfolio has an estimated replacement value of approximately $9.6 million. Figure ES1: Asset Portfolio Summary Note: Actual costing values are subject to market forces at the time of infrastructure construction/improvement activity, the above values are based on historical averages and industry standards. Current Asset Performance The best available asset information combines with the judgement of subject matter experts to establish the current performance of each of the individual asset records represented in the asset portfolio. The performance of individual assets aggregates to present the performance distribution of each asset group. Table ES1 and Figure ES2 presents the current asset performance results. VILLAGE OF HILTON BEACH AMP FOR WATER AND WASTEWATER SYSTEMS EXECUTIVE SUMMARY Figure ES2 - Current Performance Summary The total replacement cost of the assets in the poor performance category is approximately $1 million, which represents approximately 10% of the total asset portfolio. The spending required to restore these assets to the good performance category is not necessarily equal to the replacement costs, since some assets only require rehabilitation while others require replacement with a more expensive asset. Table ES1: Current Performance by Replacement Value Asset Good Fair Poor Total (No (Has (Requires Deficiencies) Deficiencies Treatment/ Spending) 5033 Hilton Beach WTP 365,913 $ 38,213 $ 181,625 $ 585,752 $ 5034 Hilton Beach WWTP 546,787 $ 590,750 $ 744,489 $ 1,882,026 $ Hilton Beach Distribution 1,118,700 $ 2,170,000 $ - $ 3,288,700 $ Hilton Beach Collection 2,197,800 $ 1,699,500 $ - $ 3,897,300 $ Total 4,229,200 $ 4,498,464 $ 926,114 $ 9,653,777 $ VILLAGE OF HILTON BEACH AMP FOR WATER AND WASTEWATER SYSTEMS EXECUTIVE SUMMARY Spending Forecast Figure ES3 summarizes the spending forecast results. An average of $ 61,000 is required in the 5-year term, and $ 72,000 per year over the long term to achieve asset performance requirements. Figure ES3: Spending Forecast Summary Funding Gap The funding gap is the difference between the Village's current capital and maintenance spending levels and the ones proposed in this AMP. Its value will be determined in future collaboration with the Village. Financial Strategy The objective of the Village's financing strategy should be to maximize new assessment growth at the lowest real cost impact to ratepayers (i.e. maximize real revenue growth through expanded customer base and minimize rate increases). This would prioritize the following options: 1. Provincial/Federal Government Grants 2. Internal Financing using Reserves 3. Debt 4. Rate Increases Future budgets will present the optimal balance of the available financing options to fund the Village's infrastructure program. VILLAGE OF HILTON BEACH AMP FOR WATER AND WASTEWATER SYSTEMS EXECUTIVE SUMMARY Table of Contents 1 INTRODUCTION ................................................................................................................... 1 1.1 Overview .......................................................................................................................................... 1 1.2 Defining Asset Performance ............................................................................................................ 1 1.3 Provincial Asset Management Planning Requirements ................................................................... 1 1.4 AMP Development Approach .......................................................................................................... 1 1.5 Updating the Asset Management Plan ............................................................................................ 2 1.6 Asset Management Plan Scope ....................................................................................................... 2 1.7 Growth Planning .............................................................................................................................. 2 2 OVERVIEW OF ASSET PORTFOLIO ........................................................................................ 3 3 ASSET PERFORMANCE ASSESSMENT ................................................................................... 4 3.1 Measuring Asset Performance ......................................................................................................... 4 3.2 Current Asset Performance ............................................................................................................. 4 4 ASSET LIFECYCLE MANAGEMENT ......................................................................................... 6 4.1 Asset Lifecycle Activities Overview .................................................................................................. 6 4.2 Spending Forecast ............................................................................................................................ 6 4.3 Funding Gap Summary ................................................................................................................... 13 4.4 Risk Management .......................................................................................................................... 13 4.5 Managing Climate Change ............................................................................................................. 14 5 FINANCING STRATEGY ....................................................................................................... 15 6 DISCUSSION AND NEXT STEPS ........................................................................................... 16 6.1 Monitoring Asset Performance ...................................................................................................... 16 6.2 Roadmap for Enhancing Asset Management Processes ................................................................ 16 Appendix A - Performance Indicator Tracking Appendix B - Short Term Capital (Major Maintenance) Plan Appendix C - Detailed Asset Inventory Appendix D - Planned Program VILLAGE OF HILTON BEACH AMP FOR WATER AND WASTEWATER SYSTEMS PAGE 1 1 INTRODUCTION 1.1 Overview This Asset Management Plan (AMP) builds a structured relationship between infrastructure spending and asset performance. Periodic (annual) updates ensure it reflects changing circumstances and actively supports infrastructure decision-making processes. 1.2 Defining Asset Performance The definition of Asset Performance is "the ability of an asset to fulfill the organization's objectives or requirements". The performance of an asset directly relates to the level of service it provides:  An asset in the good performance category is one which is meeting the expectations of the community (i.e. providing an appropriate level of service); and  An asset in the poor performance category is one which is not meeting expectations (i.e. not providing an appropriate level of service), and requires spending to have it meet expectations. The community's asset performance expectations balance costs and affordability and are therefore unique to each community based on its infrastructure inventory, financial status and community/corporate priorities. 1.3 Provincial Asset Management Planning Requirements The Province of Ontario developed Regulation 588/17 under the Infrastructure for Jobs and Prosperity Act (2015). The following points summarize the requirements of O.Reg. 588/17:  An AM policy is required to articulate specific principles and commitments that will guide decisions around when, why and how to spend money on the Village's infrastructure assets. The Policy is required by July 1, 2019.  By July 1, 2022 the AMP will be required to establish the spending that is required to maintain current asset performance expectations for water, wastewater, stormwater, roads and bridges.  By July 1, 2024 the AMP will be required to establish the spending that is required to maintain current asset performance expectations for all asset groups.  By July 1, 2025 the AMP will be required to establish the spending that is required to achieve desired asset performance expectations, and the financial strategy to fund the required spending. 1.4 AMP Development Approach OCWA's Asset Stewardship Quality Management System (ASQMS) guides the approach to develop this AMP. The ASQMS Framework shows how technical asset lifecycle strategies connect to community VILLAGE OF HILTON BEACH AMP FOR WATER AND WASTEWATER SYSTEMS PAGE 2 priorities to develop optimized spending plans that balance service levels and costs. An AMP is a tactical output of the ASQMS. The ASQMS aligns with Ontario Regulation 588/17 Asset Management Planning for Municipal Infrastructure and the international standard for infrastructure asset management (ISO 55000). The development of this AMP leverages the Village's best available asset and financial information to OCWA , staff input, subject matter expert professional judgement, and AM best practices, to complete the following steps: 1. Develop a complete listing of infrastructure assets to be included in the AMP. 2. Assess current performance (level of service) of the assets based on existing information. 3. Prepare an asset lifecycle management strategy (i.e. spending plan) that maintains the current performance of the Village's infrastructure assets. 4. Determine the gap between required spending levels to achieve asset performance objectives versus historic spending. This is a future step. 1.5 Updating the Asset Management Plan A periodic update to the AMP ensures it reflects the latest information and responds to evolving asset performance expectations in the community. Ideally, this update occurs annually in conjunction with the Village's budget processes, or more frequently if required to support funding applications. 1.6 Asset Management Plan Scope This AMP includes all water and wastewater assets owned by the Village. Section 2 summarizes the infrastructure portfolio. 1.7 Growth Planning This section will examine the Village's projected population growth to assess potential impacts on its water and wastewater system. VILLAGE OF HILTON BEACH AMP FOR WATER AND WASTEWATER SYSTEMS PAGE 3 2 OVERVIEW OF ASSET PORTFOLIO The infrastructure portfolio has an estimated replacement value of approximately $9.6 million (Figure 2-1). A detailed asset inventory is available in Appendix C. Figure 2-1: Water and Wastewater Infrastructure Portfolio Note: Actual costing values are subject to market forces at the time of infrastructure construction/improvement activity, the above values are based on historical averages and industry standards. VILLAGE OF HILTON BEACH AMP FOR WATER AND WASTEWATER SYSTEMS PAGE 4 3 ASSET PERFORMANCE ASSESSMENT As described in Section 1, the new landscape of AM that aligns with ISO 55000 defines asset performance as the ability for an asset to fulfill its objectives or requirements. This means that the performance of an asset is directly proportional to the level of service it provides. Levels of service are also at the core of O.Reg. 588/17, which requires municipalities to understand the cost to achieve higher or lower levels of service. 3.1 Measuring Asset Performance The Village's asset inventory contains performance information for all infrastructure assets. This includes information related to both asset condition and asset function. The performance information is collected from a variety of sources, ranging from sophisticated technologies to investigate the assets to visual observations from qualified professionals. All asset performance data combines with the professional judgment of subject matter experts to establish the current performance of each asset as defined in Table 3-1 below. Table 3-1: Asset Performance Rating Descriptions PERFORMANCE CATEGORY DESCRIPTION STATE OF ASSET Good Asset performance meets or exceeds its objectives/requirements. No Deficiencies Fair Asset performance is nearing the point where it will not meet its objectives/requirements. Has Deficiencies Poor Asset performance is not meeting its objectives/requirements. Requires Treatment (Spending) 3.2 Current Asset Performance Figure 3-1 and Table 3-2 provide the current performance distribution of each asset group. The total replacement cost of the assets in the poor performance category is of approximately $1 million, which represents approximately 10% of the total asset portfolio. Note that the spending required to restore these assets to the good performance category is not equal to the replacement costs, since some assets only require rehabilitation while others require replacement with a more expensive asset. The performance category of each asset updates on a continual basis to reflect actual spending on assets, new asset data, and changing asset performance objectives or requirements. Detailed performance metrics are provided in Appendix A. VILLAGE OF HILTON BEACH AMP FOR WATER AND WASTEWATER SYSTEMS PAGE 5 Figure 3-1: Current Performance Distribution Table 3-2: Current Performance by Replacement Value Asset Good Fair Poor Total (No (Has (Requires Deficiencies) Deficiencies Treatment/ Spending) 5033 Hilton Beach WTP 365,913 $ 38,213 $ 181,625 $ 585,752 $ 5034 Hilton Beach WWTP 546,787 $ 590,750 $ 744,489 $ 1,882,026 $ Hilton Beach Distribution 1,118,700 $ 2,170,000 $ - $ 3,288,700 $ Hilton Beach Collection 2,197,800 $ 1,699,500 $ - $ 3,897,300 $ Total 4,229,200 $ 4,498,464 $ 926,114 $ 9,653,777 $ VILLAGE OF HILTON BEACH AMP FOR WATER AND WASTEWATER SYSTEMS PAGE 6 4 ASSET LIFECYCLE MANAGEMENT 4.1 Asset Lifecycle Activities Overview Table 4-1 provides an overview of typical asset lifecycle activities applied to public infrastructure. The spending forecasts in this section represent a combination of major maintenance, rehabilitation and replacement treatments. Appendix D contains the detailed spending plan. Table 4-1: Typical Asset Lifecycle Activities LIFECYCLE ACTIVITY DESCRIPTION Operational Operational activities, routine preventative maintenance, studies on asset performance (Major) Maintenance Repairs and component replacement to maintain asset performance, typically costing between 5-10% of asset replacement value. Rehabilitation Project to extend asset service life, typically costing between 15% - 40% of asset replacement value. Replacement A project resulting in a replacement of an asset with one asset that meets top industry and community expectations. New Asset Construction or purchase of new assets that results in net growth of the asset inventory and an enhancement in service levels provided to the community. 4.2 Spending Forecast 4.2.1 Approach The analysis approach involves connecting real planned projects against specific assets where feasible and iteratively adjusting annual spending levels until the forecasted performance distribution will be relatively stable (i.e. the proportion of the asset network in the poor performance category is consistent). For example, Figure 4-1 shows a scenario where there is not sufficient spending, resulting in the proportion of assets in the poor performance category increase from 5% in 2021 to 90% in 2040, and a declining trend in the Network Average performance index. This indicates that additional spending is required. Analysis updates continue to achieve a suitable performance forecast. VILLAGE OF HILTON BEACH AMP FOR WATER AND WASTEWATER SYSTEMS PAGE 7 Figure 4-1: Sample Performance Forecast 4.2.2 Results Figure 4-2 to Figure 4-5 provide the performance and spending forecasts for each asset group. Figure 4-6 provides the summary of spending needs. Appendix D provides the detailed planned program. VILLAGE OF HILTON BEACH AMP FOR WATER AND WASTEWATER SYSTEMS PAGE 8 Desired Performance Forecast Spending Plan to Achieve Desired Performance Forecast  5-year OCWA Capital Plan forecast = $23,000 per year  6-25 year Capital/Maintenance forecast = $ 10,000 per year long-term average spending Figure 4-2: 5033 Hilton Beach WTP Performance and Expenditure Forecast VILLAGE OF HILTON BEACH AMP FOR WATER AND WASTEWATER SYSTEMS PAGE 9 Desired Performance Forecast Spending Plan to Achieve Desired Performance Forecast  5-year OCWA Capital Plan forecast = $31,000 per year  6-25 year Capital/Maintenance forecast = $ 25,000 per year long-term average spending Figure 4-3: 5034 Hilton Beach WWTP Performance and Expenditure Forecast VILLAGE OF HILTON BEACH AMP FOR WATER AND WASTEWATER SYSTEMS PAGE 10 Desired Performance Forecast Spending Plan to Achieve Desired Performance Forecast  5-year OCWA Capital Plan forecast = $800 per year  6-25 year Capital/Maintenance forecast = $ 18,000 per year long-term average spending Figure 4-4: Hilton Beach Distribution Assets Performance and Expenditure Forecast VILLAGE OF HILTON BEACH AMP FOR WATER AND WASTEWATER SYSTEMS PAGE 11 Desired Performance Forecast Spending Plan to Achieve Desired Performance Forecast  5-year OCWA Capital Plan forecast = $5,000 per year  6-25 year Capital/Maintenance forecast = $ 19,000 per year long-term average spending Figure 4-5: Hilton Beach Collection Assets Performance and Expenditure Forecast VILLAGE OF HILTON BEACH AMP FOR WATER AND WASTEWATER SYSTEMS PAGE 12 Desired Performance Forecast Spending Plan to Achieve Desired Performance Forecast  5-year OCWA Capital Plan forecast = $61,000 per year  6-25 year Capital/Maintenance forecast = $ 72,000 per year long-term average spending Figure 4-4: All Assets Performance and Expenditure Forecast Figure 4-6 summarizes the combined spending forecast. An average of $ 61,000 per year over the short term of 5-years, and $ 72,000 over the long term of 6-25 years is required to achieve the Village's desired asset performance expectations. The detailed planned program is provided in Appendix D. VILLAGE OF HILTON BEACH AMP FOR WATER AND WASTEWATER SYSTEMS PAGE 13 4.3 Funding Gap Summary The funding gap is the difference between the Village's current capital and maintenance spending levels and the ones proposed in this AMP. Its value will be determined in future collaboration with the Village. 4.4 Risk Management The approach to managing risk in this AMP is to consider the overall criticality of each asset related to the role it plays in providing services to the community (by understanding the required performance of each asset based on its location, function, size, etc.). This understanding establishes when an asset is not meeting its objectives or requirements based on the available technical performance indicators and subject matter expert judgement. Assets that are more critical have higher performance expectations, while less critical assets have lower performance expectations. VILLAGE OF HILTON BEACH AMP FOR WATER AND WASTEWATER SYSTEMS PAGE 14 4.5 Managing Climate Change The expected impacts of climate change have been considered and included throughout the analysis used to inform this AMP. This includes consideration of climate change when establishing the current performance category of an asset, forecasting the deterioration rate of an asset, or establishing the lifecycle activities completed on an asset. The most prominent climate factors affecting the Village's water and wastewater infrastructure are severe wet weather events, prolonged periods of cold weather, and prolonged periods of heat or drought. The climate factors discussed are referenced to the Climate Atlas of Canada1, an online tool to learn about the impacts of climate change in the area for different scenarios.  Climate Factor 1 - Severe Wet Weather Events Severe wet weather events put added strain on the wastewater collection and treatment systems. This strain can lead to additional overflows or a reduction in treatment effectiveness. At this point, this climate factor is not causing any specific performance deficiencies as the heavy rain days are projected to increase from 5.1 to 6.0 days per year in the next 20 years. The Village should continue to monitor the impacts of severe wet weather events on the wastewater collection and treatment system.  Climate Factor 2 - Periods of Prolonged Heat or Drought This climate factor can lead to more days of high peak water demand and reductions to the quantity and/or quality of source water. Based on the climate model of Climate Atlas of Canada, the number of heat waves increases from 0.2 days to 1.1 days in the next 20 years. However, due to the stable supply of fresh water, this climate factor is not causing any specific performance deficiencies. The Village should continue to monitor the impacts of periods of prolonged heat or drought on the water supply and storage system. 1 Climate Atlas of Canada VILLAGE OF HILTON BEACH AMP FOR WATER AND WASTEWATER SYSTEMS PAGE 15 5 FINANCING STRATEGY A number of financing strategies are available to fund infrastructure expenditures. The objective of the Village's financing strategy should be to maximize new assessment growth at the lowest real cost impact to ratepayers (i.e. maximize real revenue growth through expanded customer base and minimize rate increases). This would prioritize the following options: 1. Provincial/Federal Government Grants 2. Internal Financing using Reserves 3. Debt 4. Rate Increases Future budgets will present the optimal balance of the available financing options to fund the Village's infrastructure program. VILLAGE OF HILTON BEACH AMP FOR WATER AND WASTEWATER SYSTEMS PAGE 16 6 DISCUSSION AND NEXT STEPS This AMP represents the tactical output of a corporate management system. The corporate management system is the series of interconnected processes that work together to realize value from assets. This AMP uses the best available asset and financial information. The AMP is a living document that requires periodic updates to reflect new information and changing community priorities. 6.1 Monitoring Asset Performance Moving forward, Provincial Regulation requires the Village to provide an annual update on the progress of the AMP. The practical steps to complete these activities are as follows: 1. Each year, update the asset inventory with the best available asset data. This adds/removes assets as appropriate. 2. Each year, update current asset performance based on the best available information. 3. Each year, update the spending analysis to record completed spending, and to connect planned spending to assets or asset networks. These three steps enable updates to the forecast performance versus spending analysis. Over time, the Village will be able to see connections between the changing performance distribution and annual spending levels. This will increase the confidence of the Village's AMPs each year. 6.2 Roadmap for Enhancing Asset Management Processes The following points provide a roadmap to enhance asset management planning processes in the Village: 1. Continue to maintain the inventory of all assets owned. Asset inventories should be comprehensive of all assets in an asset network. 2. Continue to strengthen the connection between actual or planned spending and specific assets (or asset networks). This will provide greater line of sight from the current or planned spending and the resulting performance improvement in an asset or asset network. 3. Continue to strengthen the quality of asset-centric performance indicator data that is available to measure the current performance of assets and asset networks. 4. Engage the community to understand their current perspective on the performance of assets and asset networks. This understanding calibrates the current performance of the asset networks and prioritizes the allocation of funding to improve the performance of asset networks relative to community expectations. VILLAGE OF HILTON BEACH AMP FOR WATER AND WASTEWATER SYSTEMS PAGE 17 Appendix A - Performance Indicator Tracking Name System Type Indicator 2019 2020 2021 2022 2023 Treatment Capacity (max flow/rated capacity) 72% 69% 75% 60% 41% Boil Water Advisory 0 0 0 0 0 Adverse Water Quality Incident (AWQI) 0 1 1 1 1 Non-Compliance 1 0 0 2 0 Watermain Breaks 0 0 0 0 0 Capacity (average flow/rated capacity) 26% 28% 23% 23% 22% Effluent (or other) Non-Compliance 0 0 1 4 6 Bypass/Spill/Overflow events 0 0 0 0 0 Sewer Blockages 0 0 0 0 0 Community Complaint 0 0 0 0 0 5033 Hilton Beach WTP Water Treatment 5034 Hilton Beach WWTP Wastewater VILLAGE OF HILTON BEACH AMP FOR WATER AND WASTEWATER SYSTEMS PAGE 18 O. Reg. 588/17 Mandatory Metrics Asset Group Metric Result Comment Water User groups or areas that are connected to the municipal water system Most properties within Hilton Beach are connected to the municipal water system? Water User groups or areas that have fire flow All properties connected to the municipal water system have some fire flow coverage. Water Percentage of properties connected to the municipal water system TBD Water Percentage of properties where fire flow is available TBD Water Description of boil water advisories and service interruptions TBD Water Number of connection-days per year where a boil water advisory notice is in place compared to the total number of properties connected to the municipal water system TBD Note: Metric resutls in units of 'days' which is a meaningless statistic. Province needs to better define this metric. Water Number of connection-days per year due to water main breaks compared to the total number of properties connected to the municipal water system TBD Assume Oreg metric is missing "disrupted", i.e. text should read "Number of disrupted connection-days per year due to water main breaks compared to the total number of properties connected to the municipal water system. Assume 1 break = 20 customers impacted for 1 day Water Average Age of Water Treatment Assets 18 Years Water Average Age of Water Distribution Assets TBD Wastewater User groups or areas that are connected to the municipal wastewater system Most properties within Hilton Beach are connected to the municipal wastewater system? Wastewater Percentage of properties connected to the municipal wastewater system TBD TBD Total Parcels, TBD connected to municipal system Wastewater Description of how combined sewers in the municipal wastewater system are designed with overflow structures in place (to prevent backups into homes by allowing overflow during storm events) N/A - no combined sewers? Wastewater Description of the frequency and volume of overflows in combined sewers in the municipal wastewater system that occur in habitable areas or beaches N/A - no combined sewers? Wastewater Description of how stormwater can get into sanitary sewers in the municipal wastewater system, causing sewage to overflow into streets or backup into homes Infiltration inflow into sanitary sewers in both groundwater and stormwater which are not intended to be in sanitary system. Infiltration can enter through a variety of sources (cracks in pipes, weeping tile connections, cross connection, catch basins, etc.). Wastewater Description of how sanitary sewers in the municipal wastewater system are designed to be resilient to avoid sewage overflow into streets or backup into homes Sanitary sewer systems are designed with appropriate overflows to reduce likelihood of sewer backup events. Overflows are typically found in the collection system or at pumping stations. Wastewater Description of the effluent that is discharged from sewage treatment plants in the municipal wastewater system Effluent can be defined as water pollution, such as the outflow from a sewage treatment facility. The effluent from the treatment facilities have documented compliance limits, objectives, and actual performance. The effluent criteria include effluent flow rates, and parameters for suspended solids, Biochemical Oxygen Demand (BOD), phosphorous, ammonia, and E. coli. Wastewater The number of connection-days per year due to wastewater backups compared to the total number of properties connected to the municipal wastewater system. TBD Note: Metric resutls in units of 'days' which is a meaningless statistic. Province needs to better define this metric. Wastewater Annual number of events where combined sewer flow in the municipal wastewater system exceeds system capacity compared to the total number of properties connected to the municipal wastewater system. N/A - no combined sewers? Wastewater The number of effluent violations per year due to wastewater discharge compared to the total number of properties connected to the municipal wastewater system. 4 violations,TBD wastewater connections Wastewater Average Age of Wastewater Treatment and Pumping Assets 31 Years Wastewater Average Age of Wastewater Collection Assets TBD VILLAGE OF HILTON BEACH AMP FOR WATER AND WASTEWATER SYSTEMS PAGE 19 Appendix B - 5 Year Capital Plan i 5033-Hilton Beach WT (10-Year Recommended Capital/Major Maintenance Out of Scope from 2025 to 2034) The Ontario Clean Water Agency has identified the following Out of Scope capital projects/major maintenance for your review and approval. Project No. Facility/System Name Project Type (drop down list) Project Name 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 1 5033-Hilton Beach WT Capital Project Turbidity Analyzer Upgrade/Replacement $10,500 x x Lifecycle Replacement 2 5033-Hilton Beach WT Capital Project Well #2 Singer Valve Replacement $12,000 x Life Cycle Replacement 3 5033-Hilton Beach WT Capital Project Clearwell Inspection $3,000 x x Predictive Maintenance 4 5033-Hilton Beach WT Capital Project Well inspection Below Grade $10,000 x Predictive Maintenance 5 5033-Hilton Beach WT Capital Project Distribution Pipework Revisions $3,000 x Predictive Maintenance 6 5033-Hilton Beach WT Capital Project Well Building Pipe Replacement Staged $3,000 $3,000 $3,000 x Predictive Maintenance 7 5033-Hilton Beach WT Capital Project Valve replacements Staged $2,500 $2,500 $2,500 $2,500 $5,000 $5,000 x 8 5033-Hilton Beach WT Major Maintenance Chlorine Probes Refurbishing and Maintenance Kit/standards $2,500 $2,500 $2,500 $2,800 $2,500 $2,800 $3,000 $3,200 $3,200 $3,200 x Critical Process component 9 5033-Hilton Beach WT Major Maintenance pH probe $1,000 $1,200 $1,200 $1,200 $1,200 x x Critical Process component 10 5033-Hilton Beach WT Major Maintenance Chemical Systems Parts, eg. valves, sensors, PRVs/daytank $2,500 $2,200 $2,500 $2,000 $2,200 $2,500 $2,600 $2,600 $2,600 $2,600 x x Predictive Maintenance 11 5033-Hilton Beach WT Major Maintenance generator batteries/repairs $900 $900 $900 $900 $900 $950 $950 $950 $950 $950 x As Required 12 5033-Hilton Beach WT Major Maintenance UPS batteries $900 $800 $800 $800 $800 $800 $800 $800 $800 $800 x Back Up Power 13 5033-Hilton Beach WT Major Maintenance Pipe/Fittings/Connectors $1,000 $1,000 $1,000 $1,000 $1,000 $1,200 $1,200 $1,200 $1,200 $1,200 x As Required 14 5033-Hilton Beach WT Major Maintenance alarm upgrades $1,200 $1,200 x as required 15 5033-Hilton Beach WT Major Maintenance DWQMS, onsite audit $4,200 $4,200 $4,200 x Mandatory 3 year cycle 16 5033-Hilton Beach WT Major Maintenance DWQMS off site audit $1,500 $1,500 $1,500 $1,500 $1,500 $1,500 $1,500 $1,500 $1,500 $1,500 x Mandatory every two years between on site audits 17 5033-Hilton Beach WT Major Maintenance PTTW renewal $1,000 x every 10 years 18 5033-Hilton Beach WT Major Maintenance MDWL, MDWP renewal $500 x Every 5 years Total $54,300 $19,800 $15,900 $12,000 $14,300 $9,750 $17,450 $15,450 $16,450 $10,250 Notes The recommendations constitute the projects that Qualified Professionals deem necessary to ensure regulatory compliance or achieve client community objectives. The recommendations are informed by data from OCWA's Work Management System (Maximo), data from OCWA's Process Data Management System (WISKI), commissioned engineering or consultant reports, OCWA's review of industry including energy saving opportunities, innovative technologies, optimization opportunities, system capacity, emerging environmental trends, changing climatic conditions, system resiliency and discussions with a range of subject matter experts as necessary to identify appropriate spending needs that are not within the scope of activities included in OCWA's Operating and Maintenance Agreement. Relevant Asset ID(s) or Functional Location(s) from WMS *The above noted Cost Estimates have been developed to aid the client to understand the order of magnitude cost and will be further refined based on Client acceptance in principle of the proposed work. OCWA uses the AACE cost estimating framework to identify our cost estimate classification. Estimates are considered to be Class 5 cost estimates (+/- 50%), with increasing accuracy in shorter term projects as quotations are solicited from contractors. Cost Estimate* Scope Summary Comment/Additional Rationale/Supporting Information Approved by Client to Develop into an Expenditure Request Package Compliance Impact Health & Safety Repair / Maintenance Lifecycle Replacement DWQMS RA Outcome** Improvement Spare Parts/Materials Inventory CLI/ECA WMS Workorder Number Innovation/Energy/Optimizati on/Bio Solids Growth/Development Infrastructure Planning and Permitting Resiliency/Emerging Trends/Climatic Changes Page 1 of 1 10/24/24 i i 5034-Hilton Beach WWTP (10-Year Recommended Capital/Major Maintenance Out of Scope from 2025 to 2034) The Ontario Clean Water Agency has identified the following Out of Scope capital projects/major maintenance for your review and approval. Project No. Facility/System Name Project Type (drop down list) Project Name 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 1 5034-Hilton Beach WWTP Capital Project STP Equalization Pump $12,000 $12,000 $1,200 x x Predictive Maintenance 2 5034-Hilton Beach WWTP Capital Project Lift stations - clean outs $6,000 $6,000 $6,000 $6,000 $6,000 x Predictive Maintenance 3 5034-Hilton Beach WWTP Capital Project Sludge Tank Cleaning $7,500 $7,500 $7,500 $10,000 $10,000 x Predictive Maintenance 4 5034-Hilton Beach WWTP Capital Project Generator Batteries/Repairs $800 $1,000 $1,000 $1,000 $1,200 x Predictive Maintenance as required 5 5034-Hilton Beach WWTP Capital Project Sodium Hypo Chlorite Chemical Feed Panel $10,000 x Lifecycle Improvements 6 5034-Hilton Beach WWTP Major Maintenance Emergency Pump Repairs $3,000 $3,000 $3,000 $3,000 $3,000 $3,000 $3,000 $3,000 $3,000 $3,000 x as required 7 5034-Hilton Beach WWTP Major Maintenance Collection System Flushing (1/3 For 3 years) $6,000 $6,000 $6,000 $6,000 $6,000 $6,000 x as required 8 5034-Hilton Beach WWTP Major Maintenance Alarm and Telecomunications Upgrades $2,500 $2,500 $2,500 $2,500 $2,500 x Predictive Maintenance 9 5034-Hilton Beach WWTP Major Maintenance Sodiuym Hypo Panel Replacement $10,000 x Total $57,000 $9,800 $25,000 $4,000 $31,000 $4,000 $21,500 $10,000 $28,700 $10,200 Notes The recommendations constitute the projects that Qualified Professionals deem necessary to ensure regulatory compliance or achieve client community objectives. The recommendations are informed by data from OCWA's Work Management System (Maximo), data from OCWA's Process Data Management System (WISKI), commissioned engineering or consultant reports, OCWA's review of industry including energy saving opportunities, innovative technologies, optimization opportunities, system capacity, emerging environmental trends, changing climatic conditions, system resiliency and discussions with a range of subject matter experts as necessary to identify appropriate spending needs that are not within the scope of activities included in OCWA's Operating and Maintenance Agreement. Relevant Asset ID(s) or Functional Location(s) from WMS Cost Estimate* Compliance Impact DWQMS RA Outcome** Scope Summary Comment/Additional Rationale/Supporting Information *The above noted Cost Estimates have been developed to aid the client to understand the order of magnitude cost and will be further refined based on Client acceptance in principle of the proposed work. OCWA uses the AACE cost estimating framework to identify our cost estimate classification. Estimates are considered to be Class 5 cost estimates (+/- 50%), with increasing accuracy in shorter term projects as quotations are solicited from contractors. Repair / Maintenance Lifecycle Replacement Improvement Spare Parts/Materials Inventory CLI/ECA Innovation/Energy/Optimizati on/Bio Solids Health & Safety Growth/Development Infrastructure Planning and Permitting Resiliency/Emerging Trends/Climatic Changes Approved by Client to Develop into an Expenditure Request Package WMS Workorder Number Page 1 of 1 10/24/24 i i Hilton Beach Distribution & Collection (10-Year Recommended Capital/Major Maintenance Out of Scope from 2025 to 2034) The Ontario Clean Water Agency has identified the following Out of Scope capital projects/major maintenance for your review and approval. Project No. Facility/System Name Project Type (drop down list) Project Name 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 1 Hilton Beach Distribution & Collection Capital Project Resevoir Cleaning $20,000 x as required 2 Hilton Beach Distribution & Collection Capital Project Distribution Vavle Maintenance $2,000 $1,000 $1,000 $1,000 $1,000 $1,000 x as required 3 Hilton Beach Distribution & Collection Capital Project Electrical Maintenance $1,000 $1,200 $1,200 $1,200 $1,400 $1,400 $1,000 $1,400 $1,400 $1,400 x as required Total $23,000 $1,200 $2,200 $1,200 $2,400 $1,400 $2,000 $1,400 $2,400 $2,400 Notes The recommendations constitute the projects that Qualified Professionals deem necessary to ensure regulatory compliance or achieve client community objectives. The recommendations are informed by data from OCWA's Work Management System (Maximo), data from OCWA's Process Data Management System (WISKI), commissioned engineering or consultant reports, OCWA's review of industry including energy saving opportunities, innovative technologies, optimization opportunities, system capacity, emerging environmental trends, changing climatic conditions, system resiliency and discussions with a range of subject matter experts as necessary to identify appropriate spending needs that are not within the scope of activities included in OCWA's Operating and Maintenance Agreement. Relevant Asset ID(s) or Functional Location(s) from WMS Cost Estimate* Compliance Impact DWQMS RA Outcome** Scope Summary Comment/Additional Rationale/Supporting Information *The above noted Cost Estimates have been developed to aid the client to understand the order of magnitude cost and will be further refined based on Client acceptance in principle of the proposed work. OCWA uses the AACE cost estimating framework to identify our cost estimate classification. Estimates are considered to be Class 5 cost estimates (+/- 50%), with increasing accuracy in shorter term projects as quotations are solicited from contractors. Repair / Maintenance Lifecycle Replacement Improvement Spare Parts/Materials Inventory CLI/ECA Innovation/Energy/Optimizati on/Bio Solids Health & Safety Growth/Development Infrastructure Planning and Permitting Resiliency/Emerging Trends/Climatic Changes Approved by Client to Develop into an Expenditure Request Package WMS Workorder Number Page 1 of 1 10/24/24 i VILLAGE OF HILTON BEACH AMP FOR WATER AND WASTEWATER SYSTEMS PAGE 22 Appendix C - Detailed Asset Inventory Reconstruction 2025 2025 Asset ID Asset Location Value ($) 2025 Performance Qualitative Performance 0000114652 PANEL COMMUNICATION Outpost 5033 6,303 0.03 Fair, has deficiencies. 00000115558 GENERATOR 5033-WTHB-F-PD 113,000 -1.00 Poor, requires treatment. 0000126584 VALVE GATE Main Stop Valve 5033 2,720 -1.00 Poor, requires treatment. 0000126585 LIGHTING EMERGENCY Chlorination Room 5033 813 0.05 Fair, has deficiencies. 0000126586 SAFETY EYE WASH/SHOWER Entrance 5033 3,000 0.06 Fair, has deficiencies. 0000126588 VALVE GATE Well #1 Above Singer valve 5033 2,720 0.07 Fair, has deficiencies. 0000126589 SAFETY SPILL KIT 5033 1,113 0.08 Fair, has deficiencies. 0000126590 VALVE GLOBE Well #2 West Header 5033 2,720 0.10 Fair, has deficiencies. 0000126591 VALVE GATE Well #1 West Header 5033 2,720 -1.00 Poor, requires treatment. 0000126592 VALVE GATE Well #1 East Header 5033 2,720 -1.00 Poor, requires treatment. 0000126593 VALVE GATE Below CL2 injection 5033 2,720 -1.00 Poor, requires treatment. 0000126594 VALVE GATE Well #2 East Header 5033 2,720 0.18 Fair, has deficiencies. 0000126597 VALVE RELIEF Well #1 5033 2,720 0.20 Fair, has deficiencies. 0000126598 VALVE RELIEF Well #2 East Header 5033 2,720 0.22 Fair, has deficiencies. 0000126599 UPS Chlorination Room 5033 1,723 0.25 Fair, has deficiencies. 0000126602 FIRE EXTINGUISHER 5033 300 0.28 Fair, has deficiencies. 0000126603 FIRE EXTINGUISHER 5033 300 0.31 Fair, has deficiencies. 0000126604 RECORDER DATA LOGGER FLOW, Turb, Cl2 5033 5,087 0.34 Fair, has deficiencies. 0000126605 LIGHTING EMERGENCY MCC Room 5033 813 0.38 Fair, has deficiencies. 0000126607 HEATER Chlorination Room 5033 2,581 0.41 Fair, has deficiencies. 0000126608 HEATER MCC Room 5033 2,581 0.45 Fair, has deficiencies. 0000126610 UPS MCC Room 5033 1,723 -1.00 Poor, requires treatment. 0000127446 VALVE BACKFLOW EYE WASH 5033-WTHB-P-PI 5,000 0.52 Good, no deficiencies. 0000127449 METER FLOW WELL #1 5033-WTHB-P-PC 10,500 0.55 Good, no deficiencies. 0000127526 MCC 5033-WTHB-F-PD 60,032 0.59 Good, no deficiencies. 0000127527 TRANSFORMER AIR PHASE CONVERTER 5033-WTHB-F-PD 8,288 0.62 Good, no deficiencies. 0000127528 PANEL CONTROL WATER PLANT 5033-WTHB-F-PD 11,250 0.66 Good, no deficiencies. 0000127530 PANEL ALARM/DIALER 5033-WTHB-P-PC 6,303 -1.00 Poor, requires treatment. 0000127535 PUMP SUBMERSIBLE 01 HL 5033-WTHB-P-HL 8,377 0.72 Good, no deficiencies. 0000127536 PUMP SUBMERSIBLE 02 HL 5033-WTHB-P-HL 8,377 0.75 Good, no deficiencies. 0000127537 VALVE GATE Well #2 5033-WTHB-P-PI 2,720 -1.00 Poor, requires treatment. 0000127541 ANALYZER CHLORINE 1 RESIDUAL - SPARE 5033-WTHB-P-PC 7,000 0.80 Good, no deficiencies. 0000127661 PUMP 1 CHLORINE 5033-WTHB-P-DI 1,500 0.82 Good, no deficiencies. 0000127662 PUMP 2 CHLORINE 5033-WTHB-P-DI 1,500 0.85 Good, no deficiencies. 0000127663 METER FLOW WELL #2 5033 10,500 0.87 Good, no deficiencies. 0000142972 METER PRESSURE Well #2 5033-WTHB-P-PI 7,795 0.88 Good, no deficiencies. 0000142974 METER PRESSURE Well #1 5033-WTHB-P-PI 7,795 0.90 Good, no deficiencies. 0000258649 ANALYZER CHLORINE Treated Water Free 5033 7,000 -1.00 Poor, requires treatment. 0000258650 ANALYZER TURBIDITY Raw Water 5033 8,000 -1.00 Poor, requires treatment. 0000313200 ANALYZER CHLORINE Injection 5033 7,000 -1.00 Poor, requires treatment. 0000313201 VALVE REGULATING 1 Singer Pressure Control 5033 5,000 0.95 Good, no deficiencies. 0000313237 GENERATOR 5033-WTHB-F-PD 113,000 1.00 Good, no deficiencies. TBD_53 building 50,000 1.00 Good, no deficiencies. TBD_54 pipes 25,000 -1.00 Poor, requires treatment. TBD_55 site 50,000 1.00 Good, no deficiencies. 23 Reconstruction 2025 2025 Asset ID Asset Location Value ($) 2025 Performance Qualitative Performance 0000127434 TANK PROCESS 01 MIXING RBC 5034-WWHB-P-ST 150,000 0.03 Fair, has deficiencies. 0000127435 MOTOR AC 01 GEAR DRIVE RBC 5034-WWHB-P-ST 8,125 0.03 Fair, has deficiencies. 0000127438 TANK STORAGE ALUM 5034-SPHB-P-SH-ALUM 25,000 0.04 Fair, has deficiencies. 0000127439 PUMP DIAPHRAGM CHEMICAL 5034-SPHB-P-TT 4,836 0.04 Fair, has deficiencies. 0000127440 PUMP DIAPHRAGM 01 CHEMICAL 5034-SPHB-P-TT 4,836 0.05 Fair, has deficiencies. 0000127441 PUMP DIAPHRAGM 02 CHEMICAL 5034-SPHB-P-TT 4,836 0.06 Fair, has deficiencies. 0000127442 PUMP DIAPHRAGM 03 CHEMICAL 5034-SPHB-P-TT 4,836 0.06 Fair, has deficiencies. 0000127443 PUMP DIAPHRAGM CHEMICAL 5034-SPHB-P-TT 4,836 0.07 Fair, has deficiencies. 0000127484 MCC 5034-WWHB-F-PD 60,032 0.08 Fair, has deficiencies. 0000127485 SWITCH TRANSFER GENSET HILTON WWTP 5034-WWHB-F-PG 8,000 0.10 Fair, has deficiencies. 0000127486 PANEL CONTROL GENERATOR HILTON BEACH WW 5034-WWHB-F-PG 6,303 0.11 Fair, has deficiencies. 0000127487 GENERATOR DIESEL HILTON WWTP 5034-WWHB-F-PG 120,000 -1.00 Poor, requires treatment. 0000127488 PANEL CONTROL GENERATOR HILTON BEACH WW 5034-WWHB-F-PG 6,303 0.13 Fair, has deficiencies. 0000127489 RECORDER CHART 5034-SPHB-P-PC 5,087 0.15 Fair, has deficiencies. 0000127490 PANEL CONTROL PROCESS 5034-SPHB-P-PC 6,303 -1.00 Poor, requires treatment. 0000127491 PANEL ALARM/DIALER 5034-SPHB-P-PC 6,303 -1.00 Poor, requires treatment. 0000127492 FAN EXHAUST BLOWER RM 5034-SPHB-F-HV 1,500 0.20 Fair, has deficiencies. 0000127493 FAN EXHAUST MAIN RM 5034-SPHB-F-HV 1,500 0.22 Fair, has deficiencies. 0000127494 BLOWER POSITIVE DISPLACEMENT 01 5034-WWHB-P-ST 30,000 0.25 Fair, has deficiencies. 0000127495 MOTOR AC 01 BLOWER 5034-WWHB-P-ST 8,125 0.27 Fair, has deficiencies. 0000127496 BLOWER POSITIVE DISPLACEMENT 02 5034-WWHB-P-ST 30,000 0.29 Fair, has deficiencies. 0000127497 MOTOR AC 02 BLOWER 5034-WWHB-P-ST 8,125 0.31 Fair, has deficiencies. 0000127498 BLOWER POSITIVE DISPLACEMENT 03 5034-WWHB-P-ST 30,000 0.34 Fair, has deficiencies. 0000127499 MOTOR AC 03 BLOWER 5034-WWHB-P-ST 8,125 0.37 Fair, has deficiencies. 0000127500 VALVE BUTTERFLY BLOWER RM 5034-WWHB-P-ST 2,720 0.39 Fair, has deficiencies. 0000127501 GEAR DRIVE 01 RBC 5034-WWHB-P-ST 9,750 0.42 Fair, has deficiencies. 0000127502 TANK PROCESS 02 MIXING RBC 5034-WWHB-P-ST 150,000 0.45 Fair, has deficiencies. 0000127503 MOTOR AC 02 GEAR DRIVE RBC 5034-WWHB-P-ST 8,125 0.47 Fair, has deficiencies. 0000127504 GEAR DRIVE 02 RBC 5034-WWHB-P-ST 9,750 0.50 Good, no deficiencies. 0000127505 TANK PROCESS 03 MIXING RBC 5034-WWHB-P-ST 150,000 0.53 Good, no deficiencies. 0000127506 MOTOR AC 03 GEAR DRIVE RBC 5034-WWHB-P-ST 8,125 0.55 Good, no deficiencies. 0000127507 GEAR DRIVE 02 RBC 5034-WWHB-P-ST 9,750 0.58 Good, no deficiencies. 0000127508 PUMP SUBMERSIBLE 03 RBC 5034-WWHB-P-ST 8,377 -1.00 Poor, requires treatment. 0000127509 PUMP SUBMERSIBLE 02 RBC 5034-WWHB-P-ST 8,377 -1.00 Poor, requires treatment. 0000127510 PUMP SUBMERSIBLE 01 RBC 5034-WWHB-P-ST 8,377 -1.00 Poor, requires treatment. 0000127511 TANK PROCESS CLARIFIER SECONDARY 5034-WWHB-P-ST 150,000 -1.00 Poor, requires treatment. 0000127512 TANK PROCESS CLARIFIER SECONDARY 5034-WWHB-P-ST 150,000 -1.00 Poor, requires treatment. 0000127513 TANK PROCESS CLARIFIER SECONDARY 5034-WWHB-P-ST 150,000 -1.00 Poor, requires treatment. 0000127514 SAMPLER FINAL EFFLUENT 5034-SPHB-P-PC 6,630 0.75 Good, no deficiencies. 0000127515 PUMP SUBMERSIBLE 01 LIFT STN 5034-SPHB-P-HW-PUMP 8,377 -1.00 Poor, requires treatment. 0000127516 PUMP SUBMERSIBLE 02 LIFT STN 5034-SPHB-P-HW-PUMP 8,377 -1.00 Poor, requires treatment. 0000127517 PANEL CONTROL GENERATOR HILTON BEACH PS 5034-WWHB-F-PG 6,303 0.82 Good, no deficiencies. 0000127518 GENERATOR DIESEL HILTON MAIN PS 5034-WWHB-F-PG 120,000 -1.00 Poor, requires treatment. 0000127519 PANEL CONTROL GENERATOR HILTON BEACH PS 5034-WWHB-F-PG 6,303 0.85 Good, no deficiencies. 0000127520 VALVE BUTTERFLY BLOWER AREA 5034-WWHB-P-ST 2,720 0.87 Good, no deficiencies. 0000127521 VALVE BUTTERFLY BLOWER AREA 5034-WWHB-P-ST 2,720 0.88 Good, no deficiencies. 0000127522 VALVE BUTTERFLY BLOWER AREA 5034-WWHB-P-ST 2,720 0.89 Good, no deficiencies. 0000127523 VALVE BUTTERFLY BLOWER AREA 5034-WWHB-P-ST 2,720 0.90 Good, no deficiencies. 0000127524 VALVE BUTTERFLY BLOWER AREA 5034-WWHB-P-ST 2,720 0.92 Good, no deficiencies. 0000127525 VALVE BUTTERFLY BLOWER AREA 5034-WWHB-P-ST 2,720 0.93 Good, no deficiencies. 0000127531 MCC HILTON BEACH PS 5034-WWHB-F-PD 60,032 0.94 Good, no deficiencies. 0000127532 SWITCH TRANSFER GENSET HILTON MAIN PS 5034-WWHB-F-PG 8,000 0.94 Good, no deficiencies. 0000127533 TRANSFORMER 01 DRY HILTON BEACH PS 5034-WWHB-F-PD 8,288 0.95 Good, no deficiencies. 0000127534 TRANSFORMER 02 DRY HILTON BEACH PS 5034-WWHB-F-PD 8,288 0.96 Good, no deficiencies. 0000313221 ANALYZER CHLORINE 5034-WWHB 8,750 0.96 Good, no deficiencies. TBD_66 building 100,000 0.97 Good, no deficiencies. TBD_67 site 100,000 0.97 Good, no deficiencies. TBD_68 pipes 50,000 0.98 Good, no deficiencies. 24 Reconstruction 2025 2025 Asset ID Asset Location Value ($) 2025 Performance Qualitative Performance 1 Ringham St East St to Canoe Point Rd 270,000 0.25 Fair, has deficiencies. 2 East St Ringham St to Canoe Point Rd 147,600 0.3 Fair, has deficiencies. 3 Ringham St Hilton Rd to East St 207,000 0.35 Fair, has deficiencies. 4 Park St North St to Bowker St 83,700 0.4 Fair, has deficiencies. 5 Canoe Point Rd East St to Park St 49,500 0.45 Fair, has deficiencies. 6 Bowker St Park St to Marks St 111,600 0.5 Good, no deficiencies. 7 Bowker St Marks St to Hilton Rd 84,600 0.65 Good, no deficiencies. 8 Hilton Rd Ringham St to Marks St 163,800 0.6 Good, no deficiencies. 9 Marks St Hilton Rd to North St 126,000 0.75 Good, no deficiencies. 10 Marks St North St to Bowker St 90,900 0.25 Fair, has deficiencies. 11 Marks St Bowker St to Bay St 55,800 0.3 Fair, has deficiencies. 12 Bay St to Mark St 64,800 0.35 Fair, has deficiencies. 13 Bay St Marks St to Hilton Rd 135,000 0.4 Fair, has deficiencies. 14 Hilton Rd Maple St to Marks St 117,000 0.45 Fair, has deficiencies. 15 Hilton Rd Maple St to 3rd St 279,000 0.5 Good, no deficiencies. 16 Maple St Hilton Rd to 1st St 54,000 0.65 Good, no deficiencies. 17 Maple St 1st St to 2nd St 113,400 0.85 Good, no deficiencies. 18 3rd St 2nd St to Hilton Rd 135,000 0.6 Good, no deficiencies. 19 South St Hilton Rd to 1st St 51,300 0.75 Good, no deficiencies. 20 South St 1st St to 2nd St 112,500 0.25 Fair, has deficiencies. 21 South St 2nd St to 6th St 337,500 0.3 Fair, has deficiencies. 22 1st St South St to Maple St 198,000 0.35 Fair, has deficiencies. 23 2nd St South St to Maple St 200,700 0.4 Fair, has deficiencies. 24 Well House 100,000 0.45 Fair, has deficiencies. 25 Reconstruction 2025 2025 Asset ID Asset Location Value ($) 2025 Performance Qualitative Performance 1 Ringham St East St to Canoe Point Rd 330,000 0.03 Fair, has deficiencies. 2 East St Ringham St to Canoe Point Rd 180,400 0.05 Fair, has deficiencies. 3 Ringham St Hilton Rd to East St 253,000 0.07 Fair, has deficiencies. 4 Park St North St to Bowker St 102,300 0.10 Fair, has deficiencies. 5 Canoe Point Rd East St to Park St 60,500 0.13 Fair, has deficiencies. 6 Bowker St Park St to Marks St 136,400 0.17 Fair, has deficiencies. 7 Bowker St Marks St to Hilton Rd 103,400 0.22 Fair, has deficiencies. 8 Hilton Rd Ringham St to Marks St 200,200 0.27 Fair, has deficiencies. 9 Marks St Hilton Rd to North St 154,000 0.33 Fair, has deficiencies. 10 Marks St North St to Bowker St 111,100 0.40 Fair, has deficiencies. 11 Marks St Bowker St to Bay St 68,200 0.47 Fair, has deficiencies. 12 Bay St to Mark St 79,200 0.53 Good, no deficiencies. 13 Bay St Marks St to Hilton Rd 165,000 0.60 Good, no deficiencies. 14 Hilton Rd Maple St to Marks St 143,000 0.67 Good, no deficiencies. 15 Hilton Rd Maple St to 3rd St 341,000 0.73 Good, no deficiencies. 16 Maple St Hilton Rd to 1st St 66,000 0.78 Good, no deficiencies. 17 Maple St 1st St to 2nd St 138,600 0.83 Good, no deficiencies. 18 3rd St 2nd St to Hilton Rd 165,000 0.87 Good, no deficiencies. 19 South St Hilton Rd to 1st St 62,700 0.90 Good, no deficiencies. 20 South St 1st St to 2nd St 137,500 0.93 Good, no deficiencies. 21 South St 2nd St to 6th St 412,500 0.95 Good, no deficiencies. 22 1st St South St to Maple St 242,000 0.97 Good, no deficiencies. 23 2nd St South St to Maple St 245,300 0.98 Good, no deficiencies. 26 VILLAGE OF HILTON BEACH AMP FOR WATER AND WASTEWATER SYSTEMS PAGE 28 Appendix D - Planned Program note: actual costs are subject to respective tendering/bidding processes, system averages are shown below note II: actual Asset IDs to be treated are subject to latest in-year available performance information and subject matter expert judgement note III: totals may not add up to Capital Program totals (Appendix B) due to asset inventory cross-referencing limitations Treatment Forecast Forecast Line # Location Asset ID Asset Description Cost ($) Year 1 5033 115558 GENERATOR Maintenance 900.00 2025 2 5033 126593 VALVE GATE Below CL2 injection Reconstruction 2,500.00 2025 3 5033 126610 UPS MCC Room Rehabilitation 900.00 2025 4 5033 127537 VALVE GATE Well #2 Reconstruction 12,000.00 2025 5 5033 258650 ANALYZER TURBIDITY Raw Water Reconstruction 10,500.00 2025 6 5033 313200 ANALYZER CHLORINE Injection Maintenance 2,500.00 2025 7 5033 TBD_54 pipes Maintenance 4,000.00 2025 8 5033 9 5033 10 5033 115558 GENERATOR Maintenance 900.00 2026 11 5033 126584 VALVE GATE Main Stop Valve Reconstruction 2,500.00 2026 12 5033 126610 UPS MCC Room Rehabilitation 800.00 2026 13 5033 127530 PANEL ALARM/DIALER Maintenance 1,200.00 2026 14 5033 258649 ANALYZER CHLORINE Treated Water Free Maintenance 2,500.00 2026 15 5033 TBD_54 pipes Maintenance 4,000.00 2026 16 5033 17 5033 18 5033 115558 GENERATOR Maintenance 900.00 2027 19 5033 126592 VALVE GATE Well #1 East Header Reconstruction 2,500.00 2027 20 5033 126610 UPS MCC Room Rehabilitation 800.00 2027 21 5033 313200 ANALYZER CHLORINE Injection Maintenance 2,500.00 2027 22 5033 TBD_54 pipes Maintenance 4,000.00 2027 23 5033 24 5033 25 5033 115558 GENERATOR Maintenance 900.00 2028 26 5033 126591 VALVE GATE Well #1 West Header Reconstruction 2,500.00 2028 27 5033 126610 UPS MCC Room Rehabilitation 800.00 2028 28 5033 258649 ANALYZER CHLORINE Treated Water Free Rehabilitation 2,800.00 2028 29 5033 TBD_54 pipes Maintenance 1,000.00 2028 30 5033 31 5033 32 5033 115558 GENERATOR Maintenance 900.00 2029 33 5033 126610 UPS MCC Room Rehabilitation 800.00 2029 34 5033 313200 ANALYZER CHLORINE Injection Maintenance 2,500.00 2029 35 5033 TBD_54 pipes Maintenance 1,000.00 2029 36 5033 37 5033 38 5033 114652 PANEL COMMUNICATION Outpost Reconstruction 5,609.38 2030 39 5033 126585 LIGHTING EMERGENCY Chlorination Room Reconstruction 756.44 2030 40 5033 126586 SAFETY EYE WASH/SHOWER Entrance Reconstruction 2,730.00 2030 41 5033 126588 VALVE GATE Well #1 Above Singer valve Reconstruction 2,393.60 2030 42 5033 126589 SAFETY SPILL KIT Reconstruction 1,013.14 2030 43 5033 126590 VALVE GLOBE Well #2 West Header Reconstruction 2,393.37 2030 44 5033 126594 VALVE GATE Well #2 East Header Reconstruction 2,393.60 2030 45 5033 126597 VALVE RELIEF Well #1 Reconstruction 2,393.37 2030 46 5033 126599 UPS Chlorination Room Reconstruction 1,636.67 2030 47 5033 126602 FIRE EXTINGUISHER Reconstruction 300.00 2030 48 5033 126603 FIRE EXTINGUISHER Reconstruction 300.00 2030 49 5033 50 5033 51 5033 126598 VALVE RELIEF Well #2 East Header Reconstruction 2,393.37 2031 52 5033 126605 LIGHTING EMERGENCY MCC Room Reconstruction 756.44 2031 53 5033 54 5033 55 5033 126604 RECORDER DATA LOGGER FLOW, Turb, Cl2 Reconstruction 4,527.58 2032 56 5033 57 5033 58 5033 127449 METER FLOW WELL #1 Reconstruction 9,345.00 2035 59 5033 60 5033 61 5033 126607 HEATER Chlorination Room Reconstruction 2,245.15 2036 62 5033 127541 ANALYZER CHLORINE 1 RESIDUAL - SPARE Reconstruction 6,020.00 2036 63 5033 64 5033 65 5033 126608 HEATER MCC Room Reconstruction 2,245.15 2037 66 5033 67 5033 68 5033 126610 UPS MCC Room Reconstruction 1,636.67 2038 69 5033 127446 VALVE BACKFLOW EYE WASH Reconstruction 4,400.00 2038 70 5033 71 5033 72 5033 126599 UPS Chlorination Room Reconstruction 1,636.67 2039 73 5033 258650 ANALYZER TURBIDITY Raw Water Reconstruction 6,880.00 2039 74 5033 75 5033 76 5033 127526 MCC Reconstruction 46,825.25 2040 77 5033 127535 PUMP SUBMERSIBLE 01 HL Reconstruction 7,120.16 2040 78 5033 127536 PUMP SUBMERSIBLE 02 HL Reconstruction 7,120.16 2040 79 5033 127663 METER FLOW WELL #2 Reconstruction 9,345.00 2040 80 5033 142972 METER PRESSURE Well #2 Reconstruction 6,937.50 2040 81 5033 82 5033 83 5033 142974 METER PRESSURE Well #1 Reconstruction 6,937.50 2041 84 5033 85 5033 86 5033 127528 PANEL CONTROL WATER PLANT Reconstruction 10,012.50 2042 87 5033 127661 PUMP 1 CHLORINE Reconstruction 1,275.00 2042 88 5033 127662 PUMP 2 CHLORINE Reconstruction 1,275.00 2042 89 5033 258649 ANALYZER CHLORINE Treated Water Free Reconstruction 6,020.00 2042 90 5033 91 5033 92 5033 313200 ANALYZER CHLORINE Injection Reconstruction 6,020.00 2043 93 5033 94 5033 95 5033 126602 FIRE EXTINGUISHER Reconstruction 300.00 2044 96 5033 126603 FIRE EXTINGUISHER Reconstruction 300.00 2044 97 5033 29 98 5033 99 5033 126585 LIGHTING EMERGENCY Chlorination Room Reconstruction 756.44 2046 100 5033 126586 SAFETY EYE WASH/SHOWER Entrance Reconstruction 2,730.00 2046 101 5033 126589 SAFETY SPILL KIT Reconstruction 1,013.14 2046 102 5033 127527 TRANSFORMER AIR PHASE CONVERTER Reconstruction 7,210.21 2046 103 5033 104 5033 105 5033 126605 LIGHTING EMERGENCY MCC Room Reconstruction 756.44 2047 106 5033 126610 UPS MCC Room Reconstruction 1,636.67 2047 107 5033 TBD_54 pipes Maintenance 1,385.04 2047 108 5033 109 5033 110 5033 126599 UPS Chlorination Room Reconstruction 1,636.67 2048 111 5033 112 5033 113 5033 313201 VALVE REGULATING 1 Singer Pressure Control Reconstruction 4,400.00 2049 114 5033 115 5033 116 5033 115558 GENERATOR Reconstruction 96,050.00 2050 117 5033 127541 ANALYZER CHLORINE 1 RESIDUAL - SPARE Reconstruction 6,020.00 2050 118 5033 313237 GENERATOR Rehabilitation 62,150.00 2050 119 5033 TBD_55 site Maintenance 2,770.08 2050 30 note: actual costs are subject to respective tendering/bidding processes, system averages are shown below note II: actual Asset IDs to be treated are subject to latest in-year available performance information and subject matter expert judgement note III: totals may not add up to Capital Program totals (Appendix B) due to asset inventory cross-referencing limitations Treatment Forecast Forecast Line # Asset Class Asset ID Asset Description Cost ($) Year 1 5034 127490 PANEL CONTROL PROCESS Reconstruction 10,000.00 2025 2 5034 127491 PANEL ALARM/DIALER Rehabilitation 2,500.00 2025 3 5034 127511 TANK PROCESS CLARIFIER SECONDARY Maintenance 7,500.00 2025 4 5034 127515 PUMP SUBMERSIBLE 01 LIFT STN Maintenance 3,000.00 2025 5 5034 6 5034 7 5034 127510 PUMP SUBMERSIBLE 01 RBC Maintenance 3,000.00 2026 8 5034 127518 GENERATOR DIESEL HILTON MAIN PS Maintenance 800.00 2026 9 5034 10 5034 11 5034 127512 TANK PROCESS CLARIFIER SECONDARY Maintenance 7,500.00 2027 12 5034 127516 PUMP SUBMERSIBLE 02 LIFT STN Maintenance 3,000.00 2027 13 5034 14 5034 15 5034 127487 GENERATOR DIESEL HILTON WWTP Maintenance 1,000.00 2028 16 5034 127509 PUMP SUBMERSIBLE 02 RBC Maintenance 3,000.00 2028 17 5034 18 5034 19 5034 127508 PUMP SUBMERSIBLE 03 RBC Maintenance 3,000.00 2029 20 5034 127513 TANK PROCESS CLARIFIER SECONDARY Maintenance 7,500.00 2029 21 5034 22 5034 23 5034 127434 TANK PROCESS 01 MIXING RBC Maintenance 45,000.00 2030 24 5034 127435 MOTOR AC 01 GEAR DRIVE RBC Reconstruction 7,312.50 2030 25 5034 127438 TANK STORAGE ALUM Maintenance 7,500.00 2030 26 5034 127439 PUMP DIAPHRAGM CHEMICAL Reconstruction 4,110.72 2030 27 5034 127440 PUMP DIAPHRAGM 01 CHEMICAL Reconstruction 4,110.72 2030 28 5034 127441 PUMP DIAPHRAGM 02 CHEMICAL Reconstruction 4,110.72 2030 29 5034 127442 PUMP DIAPHRAGM 03 CHEMICAL Reconstruction 4,110.72 2030 30 5034 127443 PUMP DIAPHRAGM CHEMICAL Reconstruction 4,110.72 2030 31 5034 127484 MCC Reconstruction 46,825.25 2030 32 5034 33 5034 34 5034 127485 SWITCH TRANSFER GENSET HILTON WWTP Reconstruction 7,120.00 2031 35 5034 127486 PANEL CONTROL GENERATOR HILTON BEACH WWTP Reconstruction 5,609.38 2031 36 5034 127488 PANEL CONTROL GENERATOR HILTON BEACH WWTP Reconstruction 5,609.38 2031 37 5034 127489 RECORDER CHART Reconstruction 4,527.58 2031 38 5034 127492 FAN EXHAUST BLOWER RM Reconstruction 1,350.00 2031 39 5034 127493 FAN EXHAUST MAIN RM Reconstruction 1,350.00 2031 40 5034 41 5034 42 5034 127495 MOTOR AC 01 BLOWER Reconstruction 7,312.50 2032 43 5034 127497 MOTOR AC 02 BLOWER Reconstruction 7,312.50 2032 44 5034 45 5034 46 5034 127494 BLOWER POSITIVE DISPLACEMENT 01 Reconstruction 26,400.00 2033 47 5034 127499 MOTOR AC 03 BLOWER Reconstruction 7,312.50 2033 48 5034 49 5034 50 5034 127496 BLOWER POSITIVE DISPLACEMENT 02 Reconstruction 26,400.00 2034 51 5034 52 5034 53 5034 127498 BLOWER POSITIVE DISPLACEMENT 03 Reconstruction 26,400.00 2035 54 5034 127500 VALVE BUTTERFLY BLOWER RM Reconstruction 2,393.37 2035 55 5034 127503 MOTOR AC 02 GEAR DRIVE RBC Reconstruction 7,312.50 2035 56 5034 57 5034 58 5034 127501 GEAR DRIVE 01 RBC Reconstruction 8,385.00 2036 59 5034 60 5034 61 5034 127506 MOTOR AC 03 GEAR DRIVE RBC Reconstruction 7,312.50 2037 62 5034 63 5034 64 5034 127504 GEAR DRIVE 02 RBC Reconstruction 8,385.00 2038 65 5034 127514 SAMPLER FINAL EFFLUENT Reconstruction 6,298.71 2038 66 5034 313221 ANALYZER CHLORINE Reconstruction 7,525.00 2038 67 5034 68 5034 69 5034 127502 TANK PROCESS 02 MIXING RBC Maintenance 45,000.00 2039 70 5034 71 5034 72 5034 127507 GEAR DRIVE 02 RBC Reconstruction 8,385.00 2040 73 5034 74 5034 75 5034 127505 TANK PROCESS 03 MIXING RBC Maintenance 45,000.00 2041 76 5034 77 5034 78 5034 127515 PUMP SUBMERSIBLE 01 LIFT STN Reconstruction 7,120.16 2046 79 5034 127517 PANEL CONTROL GENERATOR HILTON BEACH PS Reconstruction 5,609.38 2046 80 5034 81 5034 82 5034 127510 PUMP SUBMERSIBLE 01 RBC Reconstruction 7,120.16 2047 83 5034 127519 PANEL CONTROL GENERATOR HILTON BEACH PS Reconstruction 5,609.38 2047 84 5034 127520 VALVE BUTTERFLY BLOWER AREA Reconstruction 2,393.37 2047 85 5034 127521 VALVE BUTTERFLY BLOWER AREA Reconstruction 2,393.37 2047 86 5034 87 5034 88 5034 127516 PUMP SUBMERSIBLE 02 LIFT STN Reconstruction 7,120.16 2048 89 5034 127522 VALVE BUTTERFLY BLOWER AREA Reconstruction 2,393.37 2048 90 5034 127523 VALVE BUTTERFLY BLOWER AREA Reconstruction 2,393.37 2048 91 5034 127524 VALVE BUTTERFLY BLOWER AREA Reconstruction 2,393.37 2048 92 5034 93 5034 94 5034 127509 PUMP SUBMERSIBLE 02 RBC Reconstruction 7,120.16 2049 95 5034 127525 VALVE BUTTERFLY BLOWER AREA Reconstruction 2,393.37 2049 96 5034 127531 MCC HILTON BEACH PS Reconstruction 46,825.25 2049 97 5034 127532 SWITCH TRANSFER GENSET HILTON MAIN PS Reconstruction 7,120.00 2049 31 98 5034 99 5034 100 5034 127508 PUMP SUBMERSIBLE 03 RBC Reconstruction 7,120.16 2050 32 note: actual costs are subject to respective tendering/bidding processes, system averages are shown below note II: actual Asset IDs to be treated are subject to latest in-year available performance information and subject matter expert judgement note III: totals may not add up to Capital Program totals (Appendix B) due to asset inventory cross-referencing limitations Asset Treatment Forecast Forecast Line # Class Asset ID Facility Type Description Cost ($) Year 1 Distribution 10 Marks St Watermains Maintenance 6,111.03 2030 2 Distribution 3 Distribution 4 Distribution 1 Ringham St Watermains Maintenance 37,325.04 2031 5 Distribution 20 South St Watermains Maintenance 3,567.99 2031 6 Distribution 7 Distribution 8 Distribution 12 Bay St Watermains Maintenance 2,456.50 2033 9 Distribution 21 South St Watermains Maintenance 32,432.43 2033 10 Distribution 11 Distribution 12 Distribution 5 Canoe Point Rd Watermains Maintenance 6,925.86 2034 13 Distribution 13 Bay St Watermains Maintenance 6,093.54 2034 14 Distribution 15 Distribution 16 Distribution 8 Hilton Rd Watermains Maintenance 13,087.64 2035 17 Distribution 18 3rd St Watermains Maintenance 19,071.84 2035 18 Distribution 22 1st St Watermains Maintenance 25,757.35 2035 19 Distribution 20 Distribution 21 Distribution 2 East St Watermains Maintenance 10,269.25 2037 22 Distribution 16 Maple St Watermains Maintenance 3,316.52 2037 23 Distribution 23 2nd St Watermains Maintenance 14,120.63 2037 24 Distribution 25 Distribution 26 Distribution 7 Bowker St Watermains Maintenance 5,935.75 2039 27 Distribution 28 Distribution 29 Distribution 19 Maintenance 2,763.64 2042 33 note: actual costs are subject to respective tendering/bidding processes, system averages are shown below note II: actual Asset IDs to be treated are subject to latest in-year available performance information and subject matter expert judgement note III: totals may not add up to Capital Program totals (Appendix B) due to asset inventory cross-referencing limitations Asset Treatment Forecast Forecast Line # Class Asset ID Facility Type Description Cost ($) Year 1 Collection 1 Ringham St Sanitary Maintenance 6,000.00 2025 2 Collection 3 Collection 4 Collection 2 East St Sanitary Maintenance 6,000.00 2026 5 Collection 6 Collection 7 Collection 3 Ringham St Sanitary Maintenance 6,000.00 2027 8 Collection 9 Collection 10 Collection 5 Canoe Point Rd Sanitary Maintenance 8,464.94 2028 11 Collection 12 Collection 13 Collection 4 Park St Sanitary Maintenance 1,415.75 2030 14 Collection 7 Bowker St Sanitary Maintenance 7,254.80 2030 15 Collection 8 Hilton Rd Sanitary Maintenance 15,996.00 2030 16 Collection 17 Collection 18 Collection 6 Bowker St Sanitary Maintenance 13,626.03 2032 19 Collection 10 Marks St Sanitary Maintenance 7,469.03 2032 20 Collection 21 Collection 22 Collection 9 Marks St Sanitary Maintenance 15,415.42 2036 23 Collection 24 Collection 25 Collection 12 Bay St Sanitary Maintenance 3,002.39 2037 26 Collection 27 Collection 28 Collection 13 Bay St Sanitary Maintenance 7,447.65 2038 29 Collection 30 Collection 31 Collection 16 Maple St Sanitary Maintenance 4,053.52 2039 32 Collection 18 3rd St Sanitary Maintenance 23,310.02 2039 34 APPENDIX C -- TULLOCH CONDITION ASSESSMENT Village of Hilton Beach Asset Management Plan -- Phases One and Two P a g e |33| APPENDIX C -- TULLOCH CONDITION ASSESSMENT [THIS PAGE INTENTIONALLY LEFT BLANK] Village of Hilton Beach Building Condition Assessment - Municipal Office Project No. 241139 i VISUAL BUILDING CONDITION ASSESSMENT 3100 Bowker Street, Municipal Office, Village of Hilton Beach, Ontario FINAL REPORT January 2025 TULLOCH Project 241139 1. INTRODUCTION The scope of work undertaken by TULLOCH Engineering (TULLOCH) was the visual building condition assessment of the interior and exterior elements of the building, including but not limited to the roof, foundation, interior and exterior walls, interior finishes (ceilings, walls, floors etc.), mechanical/electrical systems and overall site condition. The intent of the assessment was to inform the client of the condition of the building for their asset management program. The site contained one (1) building, and one (1) outbuilding (small shed). The parking lot was a combination of gravel and surface treatment, accessible from Bowker Street. The building was a two-storey, multi-use structure that houses the Municipal Office, as well as several tenant units, on both the main and lower levels. Tenants included, residential suites, Canada Post, Mariner's Lounge (serving the Marina patrons), a dental hygienist's office, various spas / salons, and vacant spaces. The building was approximately 7,200 square feet in ground floor area. The original building was assumed to be constructed around 1950, with an addition constructed in 1990. There were two separate patios serving the upper-level tenants and a walkout precast concrete paving stone patio at grade for the lower-level tenants. (Refer to photos 1&2 below for general building overview). The building was serviced by Municipal sanitary and water infrastructure. The following items are expressly excluded from TULLOCH's scope of work for this assignment:  Structural load evaluation for current or potential future uses  Review of the Ontario Building Code or other applicable code/standard/regulation  Review of building materials for the presence of hazardous materials  Intrusive or destructive investigation of concealed structural elements Photo 1: Building Elevation (Looking Northeast) Photo 2: Building Elevation (Looking Southwest) 2. METHODOLOGY 2.1 Visual Assessment An on-site visual assessment of the building's exposed elements was carried out by Dan Moody, A.Sc.T. and Meagan Figures, C.E.T., rcsi on July 29th, 2024. During the assessment, the building's accessible components were visually reviewed to identify construction, and overall condition. This assessment does not wholly eliminate uncertainty regarding the potential for existing or future costs, hazards, or losses in connection with a property. Inaccessible units and areas that were covered with finishes or were obstructed by stored materials, permanent furnishings or coverings were not assessed. No drawings were made available to TULLOCH prior to commencing with the visual assessment. 3. OBSERVATIONS During the visual assessment of the building's exterior and interior construction, only a few defects were observed and noted, as the building was generally in good condition overall. The building can be broken down into three (3) distinct areas: upper level, lower level, and building exterior. 3.1 Upper Level The upper level included an entrance vestibule, reception area, office spaces, meeting spaces, washrooms, a hair salon, a spa, and residential units. The upper-level construction was largely unavailable for observation due to the presence of ceiling, wall, and floor finishes; however, it is assumed to be of conventional wood frame construction. There were two (2) patios on the upper level. The upper level included the following features of construction:  The building had two unique roofing systems. The original building (rental units / Canada Post) was noted to have a prefinished, low-profile corrugated metal roofing, while the addition had asphalt shingles.  Entrance stairs - concrete stair construction serving the addition (Municipal Office), with wood stairs and ramps serving the original building (Canada Post).  There were two (2) rear patios. The patio serving the original building was of wood construction. The patio serving the addition was of wood construction with a membrane topping, and a PVC/glass guard.  Suspended Acoustic Ceiling Tile (ACT) throughout.  Painted drywall wall finishes throughout.  Heat welded vinyl and laminated flooring throughout.  There were smoke detectors located throughout; however some had been removed, and minimal emergency lighting present.  There were cameras and detection devices throughout.  The building had a 400amp, single phase electrical service. Areas within the building were serviced by a variety of distribution panels, or varying age and manufacture.  There was a roof mounted solar generating system present on the building. The main floor overall was in good condition with only localized defects noted. A summary of the observations and defects are listed below:  The asphalt shingles were heavily stained by moss and organics.  The wooden stairs and ramps servicing Canada Post were assumed to be 20 years old and were in very poor condition.  The "Duradek" membrane topping on the elevated patio appeared weathered, but no perforations were noted. Photo 3: Weathered and Decayed Wood Ramp at Entrance to Canada Post Photo 4: Membrane on Patio Photo 5: Heavy Organic Staining on Asphalt Shingles 3.2 Lower Level The lower level included the Mariner's Lounge (housing a kitchenette, dining area, laundry services, showers and washroom facilities, as well as storage areas, and a mechanical/electrical room), a spa, and other rental units. Only the Mariner's Lounge was available for observation during the time of the assessment. Foundation walls were accessible for observation at the building's exterior only and were noted to be constructed as such:  The addition to the building was constructed on a cast in place concrete foundation.  The original building was constructed on masonry block foundation. The lower level included the following features of construction:  Parged foundation walls (building exterior).  Cast in place concrete floor slab (where accessible). The concrete floor slab was visible in limited locations, while the remainder was concealed with floor tile. There were no signs of significant cracking observed within the lower level.  Ceramic floor tile finishes.  Painted drywall wall finishes.  ACT or painted panel ceiling.  The heating and cooling for the building was provided by two (2) propane fired, forced air furnaces located in the lower-level mechanical room: 1. Unit #1 - 2013 Carrier Infinity 2. Unit #2 - 2020 Payne  There was a combination of electric convection heaters and baseboard heaters installed throughout the building.  There was one (1) electric water heater located in the mechanical room. It was a 2023 vintage, 75-gallon Bradford White unit. The lower level was in good condition overall with only localized defects. A summary of the observations and defects are listed below: 3.3 Building Exterior The building exterior included the following features of construction:  The building was clad with a mixture of vertical and scalloped vinyl siding, with prefinished metal soffit and fascia.  The original building's windows were noted to be 20 + years old.  The addition's windows were noted to be newer (less than 10 years old) PVC units.  Personnel doors were noted to be prefinished insulated metal doors.  There were solar panels located on the roof. The building exterior was in good condition overall. During the visual assessment of the building components, several defects were observed and noted. A summary of these observations and defects are listed below:  The block foundation without stucco was noted to have mortar joints that have separated from the block in the majority of locations.  The building's exterior was noted to be heavily stained, covered with insect debris. 4. CONCLUSIONS & RECOMMENDATIONS The assessment consisted of a visual observation of the building and the site at the subject property to assess the current condition of the individual building components. Components with an observed material physical deficiency of more than $2,000.00 per item have been identified if repair is required over the next 10 years. Items requiring repair or replacement for which the anticipated cost is less than $2,000.00 are considered to be part of the regular facility maintenance and have not been included in this report. A detailed list of recommended repairs to restore/maintain the building's optimal level of performance is included in the table below. The building elements received a condition rating based on the following criteria: 1 - Recommended immediate repair or replacement 2 - Poor condition 3 - Fair condition 4 - Good condition Table 1: Building Element Condition Rating and Cost Estimates Building System System Condition Recommendation Estimated Cost Timeline for Repair/Replacement Foundations 4 Repointing of failed mortar joints. $5,000.00 2027 Superstructure 4 N/A $0.00 N/A Exterior Enclosure 4 Repair damaged stucco over masonry block at northwest corner of the original building. Prepare and paint wood cladding at main entrance. Prepare, paint, and repair masonry cap stones on rear balcony columns. $2,500.00 $1,500.00 $2,500.00 2026 2027 2027 Roofing 2 Remove and replace existing asphalt shingles on the addition. $30,000.00 2027 Interior Construction 4 N/A $0.00 N/A Stairs - Exterior (Original Bldg) 2 Remove and replace existing wood stair and ramp servicing the original building. Remove and replace existing wood stairs servicing rear rental units. $20,000.00 $20,000.00 2027 2027 Stairs - Exterior (Addition) 4 N/A $0.00 N/A Interior Finishes 4 N/A $0.00 N/A Plumbing 4 N/A $0.00 N/A HVAC 4 N/A $0.00 N/A Electrical 4 N/A $0.00 N/A Site Development 4 N/A $0.00 N/A TOTAL $81,500.00 Notes: Prior to proceeding with the removal of any finishes, TULLOCH recommends that a Designated Substance and Hazardous Materials Assessment be completed in accordance with The Designated Substance Regulation (Reg. 490). All remedial repairs should be designed by a Professional Engineer, licensed in the Province of Ontario. 5. FACILITY CONDITION INDEX (FCI) Facility Condition Index (FCI) is a scale used to assist in building management to assess the general condition of the building. The FCI is calculated by taking the total cost of the existing deficiencies (over the next 10 years) divided by the current replacement value of the building. The Village of Hilton Beach Municipal Office has an FCI value of (3.26%) or is in (excellent) condition. Figure 2 - Facility Condition Index 6. CLOSURE We trust this report is sufficient for your purposes at this time, should you require any further assistance or would like clarification on the above, please do not hesitate to contact the undersigned. Respectfully submitted, TULLOCH Engineering Inc. Dan Moody, A.Sc.T. Meagan Figures, C.E.T., rcsi Project Manager Associate Project Manager [email protected] Village of Hilton Beach Building Condition Assessment - Municipal Office Project No. 241139 i VISUAL BUILDING CONDITION ASSESSMENT 3085 Marks Street, Municipal Library, Village of Hilton Beach, Ontario FINAL REPORT January 2025 TULLOCH Project 241139 1. INTRODUCTION The scope of work undertaken by TULLOCH Engineering (TULLOCH) was the visual building condition assessment of the interior and exterior elements of the building, including but not limited to the roof, foundation, interior and exterior walls, interior finishes (ceilings, walls, floors etc.), mechanical/electrical systems and overall site condition. The intent of the assessment was to inform the client of the condition of the building for their asset management program. The site contains one (1) building. Access to the building was provided by a concrete ramp off the Municipal sidewalk, and parking is available on the side of Mark's Street at the main entrance to the building. There was rear access to the building by way of wooden stairs. The building was one-storey and houses the Municipal Library. The building was approximately 800 square feet in ground floor area. The original building was assumed to be constructed more than 100 years ago, with the construction of subsequent additions unknown. The unheated wood framed lean-to was assumed to have been constructed in approximately 20 years. The building is serviced by the Municipality sanitary and water infrastructure. The following items are expressly excluded from TULLOCH's scope of work for this assignment:  Structural load evaluation for current or potential future uses  Review of the Ontario Building Code or other applicable code/standard/regulation  Review of building materials for the presence of hazardous materials  Intrusive or destructive investigation of concealed structural elements Photo 1: Building Elevation (Looking East) Photo 2: Building Elevation (Looking South) Photo 3: Building Elevation (Looking North) Photo 4: Main Entrance Concrete Ramp with Step and Large Crack 2. METHODOLOGY 2.1 Visual Assessment An on-site visual assessment of the building's exposed elements was carried out by Dan Moody, A.Sc.T. and Meagan Figures, C.E.T., rcsi on July 29th, 2024. During the assessment, the building's accessible components were visually reviewed to identify construction, and overall condition. This assessment does not wholly eliminate uncertainty regarding the potential for existing or future costs, hazards, or losses in connection with a property. Inaccessible units and areas that were covered with finishes or were obstructed by stored materials, permanent furnishings or coverings were not assessed. No drawings were made available to TULLOCH prior to commencing with the visual assessment. 3. OBSERVATIONS During the visual assessment of the building's exterior and interior construction, only a few defects were observed and noted, as the building was generally in good condition overall. The building can be broken down into two (2) distinct areas: the original building and the addition with a lean- to. 3.1 Original Building The original building included an open concept reception area and open storage shelves. The original building construction was noted to be clay brick on concrete foundations, with uninsulated wood floor joists on timbers, on cast in place concrete piers. The original building included the following features of construction:  There was a mix of painted drywall / lath and plaster and paneling throughout.  There was hardwood flooring throughout. The original building overall is generally in good condition. However, as noted in a previous report (Tulloch Building 240670 rpt ja Hilton Union Public Library - Building Review 240215) there were cracked floor joists present within the crawl space. 3.2 Addition The addition included an open space, a small computer area, washroom, and mechanical space. The addition included the following features of construction:  Typical finishes of the original building.  The addition had a crawlspace.  There was one (1) electric water heater located in the mechanical room. It was noted to be 10-20 years in age.  The building had a window unit air conditioner located within the addition of the building.  The building had uninsulated plumbing, running within the heated and partially insulated crawlspace.  The building was heated by a gas fired forced air furnace (Lennox), with the duct work located in the crawlspace.  The building had a 200amp, single phase electrical service. The addition was noted to be in good condition overall. 3.3 Building Exterior The building exterior included the following features of construction:  The building was clad with a mix of clay brick, vinyl siding, asphalt brick siding panels, and pressure treated plywood, with unvented pressure treated wood soffit and fascia.  There were PVC windows present throughout the building.  Personnel doors were noted to be prefinished insulated metal doors.  The building had architectural tab asphalt shingles.  The rear entrance was serviced by a set of wood stairs.  The main entrance was serviced by a concrete ramp, there was a large step onto the ramp from the municipal sidewalk and significant cracking noted.  There was a single storey "lean-to" constructed on the west face of the addition, that was assumed to be for cold storage at the time of the assessment. The building exterior was in good condition overall. Photo 5: Asphalt Brick Siding Panels 4. CONCLUSIONS & RECOMMENDATIONS The study consisted of a visual observation of the building and site at the subject property to assess the current condition of the individual building components. Components with an observed material physical deficiency of more than $2,000.00 per item have been identified if repair is required over the next 10 years. Items requiring repair or replacement for which the anticipated cost is less than $2,000.00 are considered to be part of the regular facility maintenance and have not been included in this report. A detailed list of recommended repairs to restore/maintain the building's optimal level of performance is included in the table below. The building elements received a condition rating based on the following criteria: 1 - Recommended immediate repair or replacement 2 - Poor condition 3 - Fair condition 4 - Good condition There was an odor noted in the building that may be indicative of mold growth, it is recommended that an assessment be completed by a professional. Although an accessibility audit is outside the scope of this assignment, visual review of the entrance ramp suggests that it is not constructed within the requirements of the Ontario Building Code, and it is recommended that a review is completed to ensure compliance with provincial and municipal accessibility requirements. Table 1: Building Element Condition Rating and Cost Estimates Building System System Condition Recommendation Estimated Cost Timeline for Repair/Replacement Foundations 4 N/A N/A N/A Superstructure 1 Reinforce damaged/unsupported floor joists. $2,000.00 N/A Exterior Enclosure 2 Remove and replace existing asphalt composite panel with new vinyl siding. $2,500.00 2026 Roofing 4 N/A N/A N/A Interior Construction 4 N/A N/A N/A Stairs N/A N/A N/A N/A Interior Finishes 4 N/A N/A N/A Plumbing 2 Insulate crawlspace. $5,000.00 2026 HVAC 4 N/A N/A N/A Electrical 4 N/A N/A N/A Site Development 1 Remove concrete entrance ramp. Replace with new OBC compliant ramp and guards. $15,000.00 2025 TOTAL $24,500.00 In preparation for the Building Condition Assessment we consulted TULLOCH report "Tulloch Building 240670 rpt ja Hilton Union Public Library - Building Review 240215." Notes: Prior to proceeding with the removal of any finishes, TULLOCH recommends that a Designated Substance and Hazardous Materials Assessment be completed in accordance with The Designated Substance Regulation (Reg. 490). All remedial repairs should be designed by a Professional Engineer, licensed in the Province of Ontario. 5. FACILITY CONDITION INDEX (FCI) Facility Condition Index (FCI) is a scale used to assist in building management to assess the general condition of the building. The FCI is calculated by taking the total cost of the existing deficiencies (over the next 10 years) divided by the current replacement value of the building. The Village of Hilton Beach Municipal Library has an FCI value of (12.25%) or is in (fair) condition. Figure 2 - Facility Condition Index 6. CLOSURE We trust this report is sufficient for your purposes at this time, should you require any further assistance or would like clarification on the above, please do not hesitate to contact the undersigned. Respectfully submitted, TULLOCH Engineering Inc. Dan Moody, A.Sc.T. Meagan Figures, C.E.T., rcsi Project Manager Associate Project Manager [email protected] STATEMENT OF QUALIFICATIONS AND LIMITATIONS The attached Report (the "Report") has been prepared by TULLOCH Engineering Inc. ("Consultant") for the benefit of the client ("Client") in accordance with the agreement between Consultant and Client, including the scope of work detailed therein (the "Agreement"). The information and data contained in the Report:  are subject to the scope, schedule, and other constraints and limitations in the Agreement and the qualifications contained in the Report (the "Limitations")  represent Consultant's professional judgement in light of the Limitations and industry standards for the preparation of similar reports  may be based on information provided to Consultant, which has not been independently verified  have not been updated since the date of issuance of the Report and their accuracy is limited to the time period and circumstances in which they were collected, processed, made or issued  must be read as a whole and sections thereof should not be read out of such context  were prepared for the specific purposes described in the Report and the Agreement  in the case of subsurface, environmental or geotechnical conditions, may be based on limited testing and on the assumption that such conditions are uniform and not variable either geographically or over time Unless expressly stated to the contrary in the Report or the Agreement, Consultant:  shall not be responsible for any events or circumstances that may have occurred since the date on which the Report was prepared or for any inaccuracies contained in information that was provided to Consultant  agrees that the Report represents its professional judgement as described above for the specific purpose described in the Report and the Agreement, but Consultant makes no other representations with respect to the Report or any part thereof  in the case of subsurface, environmental or geotechnical conditions, is not responsible for variability in such conditions geographically or over time The Report is to be treated as confidential and may not be used or relied upon by third parties, except:  as agreed by Consultant and Client  as required by law  for use by governmental reviewing agencies Any use of this Report is subject to this Statement of Qualifications and Limitations. Any damages arising from improper use of the Report or parts thereof shall be borne by the party making such use. This Statement of Qualifications and Limitations is attached to and forms part of the Report. STATEMENT OF QUALIFICATIONS AND LIMITATIONS The attached Report (the "Report") has been prepared by TULLOCH Engineering Inc. ("Consultant") for the benefit of the client ("Client") in accordance with the agreement between Consultant and Client, including the scope of work detailed therein (the "Agreement"). The information and data contained in the Report:  are subject to the scope, schedule, and other constraints and limitations in the Agreement and the qualifications contained in the Report (the "Limitations")  represent Consultant's professional judgement in light of the Limitations and industry standards for the preparation of similar reports  may be based on information provided to Consultant, which has not been independently verified  have not been updated since the date of issuance of the Report and their accuracy is limited to the time period and circumstances in which they were collected, processed, made or issued  must be read as a whole and sections thereof should not be read out of such context  were prepared for the specific purposes described in the Report and the Agreement  in the case of subsurface, environmental or geotechnical conditions, may be based on limited testing and on the assumption that such conditions are uniform and not variable either geographically or over time Unless expressly stated to the contrary in the Report or the Agreement, Consultant:  shall not be responsible for any events or circumstances that may have occurred since the date on which the Report was prepared or for any inaccuracies contained in information that was provided to Consultant  agrees that the Report represents its professional judgement as described above for the specific purpose described in the Report and the Agreement, but Consultant makes no other representations with respect to the Report or any part thereof  in the case of subsurface, environmental or geotechnical conditions, is not responsible for variability in such conditions geographically or over time The Report is to be treated as confidential and may not be used or relied upon by third parties, except:  as agreed by Consultant and Client  as required by law  for use by governmental reviewing agencies Any use of this Report is subject to this Statement of Qualifications and Limitations. Any damages arising from improper use of the Report or parts thereof shall be borne by the party making such use. This Statement of Qualifications and Limitations is attached to and forms part of the Report. Village of Hilton Beach Building Condition Assessment - Municipal Garage Project No. 241139 i VISUAL BUILDING CONDITION ASSESSMENT Ringham Street, Municipal Garages, Village of Hilton Beach, Ontario FINAL REPORT January 2025 TULLOCH Project 241139 1. INTRODUCTION The scope of work undertaken by TULLOCH Engineering (TULLOCH) was the visual building condition assessment of the interior and exterior elements of the building, including but not limited to the roof, foundation, interior and exterior walls, interior finishes (ceilings, walls, floors etc.), mechanical/electrical systems and overall site condition. The intent of the assessment was to inform the client of the condition of the building for their asset management program. The site contains two (2) buildings. Access to the buildings was provided by a gravel driveway off Ringham Street. The buildings are both one-storey and house the Municipal Public Works equipment. The original garage is of unknown age but assumed to be in excess of 30 years old and approximately 1,200 square feet in ground floor area. The newly constructed garage was built in 2022 and is approximately 1,000 square feet in ground floor area. The original building was serviced by the Municipal sanitary and water infrastructure. The new garage was not connected to Municipal water and sanitary services. There was an overhead electrical service on site. The following items are expressly excluded from TULLOCH's scope of work for this assignment:  Structural load evaluation for current or potential future uses  Review of the Ontario Building Code or other applicable code/standard/regulation  Review of building materials for the presence of hazardous materials  Intrusive or destructive investigation of concealed structural elements Photo 1: Original Building Elevation (Looking Northeast) Photo 2: Original Building Elevation (Looking Southwest) Photo 3: New Building Elevation (Looking Southwest) Photo 4: New Building Elevation (Looking Southwest) 2. METHODOLOGY 2.1 Visual Assessment An on-site visual assessment of the building's exposed elements was carried out by Dan Moody, A.Sc.T. and Meagan Figures, C.E.T., rcsi on July 29th, 2024. During the assessment, the building's accessible components were visually reviewed to identify construction, and overall condition. This assessment does not wholly eliminate uncertainty regarding the potential for existing or future costs, hazards, or losses in connection with a property. Inaccessible units and areas that were covered with finishes or were obstructed by stored materials, permanent furnishings or coverings were not assessed. No drawings were made available to TULLOCH prior to commencing with the visual assessment. 3. OBSERVATIONS During the visual assessment of the original building's exterior and interior construction, only a few defects were observed and noted, as the building was generally in an overall good condition. 3.1 Original Garage The original garage includes an open space for vehicular repairs, storage area, and washroom. The building was assumed to be of wood frame construction on a cast in place concrete floor slab. The original garage includes the following features of construction:  There were PVC windows throughout, approximately 20 years old.  The wall and ceiling finishes were a combination of painted drywall and plywood throughout.  The building was clad with vinyl siding, with prefinished metal soffit and fascia.  The roofing system is comprised of three-tab asphalt shingles.  There was one (1) washroom, with a sink and toilet.  There was a 40-gallon electric hot water heater (2002 vintage).  The building was heated by a combination of electric baseboard heaters and three (3) electric forced air unit heaters.  There was a combination of hollow metal and exterior residential steel doors.  The overhead door was an insulated 7'x9' sectional door.  There was a cold storage lean-to on the side of the building. It was constructed with wood flooring, plywood walls, and repurposed 2x6 joists at 24" centers, with metal roofing.  There was a 200amp, 40-circuit Square D panel. The original garage is in good condition overall. During the visual assessment of the building components, few defects were observed and noted. A summary of these observations and defects are listed below:  The floor slab was noted to be extensively cracked with heavy spalling throughout.  The asphalt shingles were noted to be in very poor condition. Photo 5: Extensively Cracked and Spalled Concrete Floor Slab Photo 6: Interior of Lean-to on Original Garage 3.2 New Garage The new garage included unfinished open space. The new garage includes the following features of construction:  Constructed on a concrete slab on grade.  The building was of wood frame construction on a cast in place concrete floor slab with a central trench drain.  The building was clad with vinyl siding, and prefinished vented metal soffit and fascia.  The building had a 16'x18' insulated sectional overhead door.  The building's roofing system included screw down, corrugated metal.  Access was provided by a residential steel door. A preliminary drawing package, used in the tendering process for construction of the new Municipal garage was provided to TULLOCH for reference. A review of these drawings for code compliance was outside of the scope of work for this assignment. However, several items were noted that should potentially be reviewed with the Municipal Building Official to ensure that the garage design and construction are compliant with the requirements of the Ontario Building Code: 1. The drawings indicate that a trench drain was included as part of the design, yet no oil interceptor is specified. As the building is reportedly used for tractor storage as well as refueling and oil changes, an oil interceptor may be required. 2. Further to the above, there is no mention on the drawings of a gas detection or motorized exhaust system, as required by OBC Section 6.2.2.3. Ventilation of Storage and Repair Garages. 3. No emergency lighting or illuminated exit lighting was noted. 4. There is a note present on drawing 2/5 referencing construction of a garage serving a house. Both garages are functioning as part of the Municipality's public works department. This is a use that would be considered to be commercial in nature, not residential. As such, construction of a new building would be expected to conform to the requirements for an industrial facility (general F2 - medium hazard industrial vehicle storage or vehicle repair garage). 4. CONCLUSIONS & RECOMMENDATIONS The assessment consisted of a visual observation of the building and site at the subject property to assess the current condition of the individual building components. Components with an observed material physical deficiency of more than $2,000.00 per item has been identified if repair is required over the next 10 years. Items requiring repair or replacement for which the anticipated cost is less than $2,000.00 are considered to be part of the regular facility maintenance and have not been included in this report. A detailed list of recommended repairs to restore/maintain the building's optimal level of performance is included in the table below. The building elements received a condition rating based on the following criteria: 1 - Recommended immediate repair or replacement 2 - Poor condition 3 - Fair condition 4 - Good condition Table 1: Building Element Condition Rating and Cost Estimates (Original Garage) Building System System Condition Recommendation Estimated Cost Timeline for Repair/Replacement Foundations 3 Although defects were noted within the surface of the garage, we have not included costs for potential repairs. The concrete floor slab appears to be functioning adequately in its present condition. Cosmetic repairs and potential surface sealing would improve the performance of the concrete slab but are not considered to be required at this time. Superstructure 4 N/A N/A N/A Exterior Enclosure 4 N/A N/A N/A Roofing 1 - Original Garage 4 - New Garage Remove and replace asphalt shingles. N/A $15,000.00 N/A 2025 N/A Interior Construction 4 N/A N/A N/A Stairs - Exterior N/A N/A N/A N/A Interior Finishes N/A N/A N/A N/A Plumbing 3 - Original Garage N/A - New Garage Review washroom in original garage for compliance with provincial workplace standards. N/A $0.00 N/A 2024 N/A HVAC N/A N/A N/A N/A Electrical N/A N/A N/A N/A Site Development N/A N/A N/A N/A TOTAL $15,000.00 Notes: Prior to proceeding with the removal of any finishes, TULLOCH recommends that a Designated Substance and Hazardous Materials Assessment be completed in accordance with The Designated Substance Regulation (Reg. 490). All remedial repairs should be designed by a Professional Engineer, licensed in the Province of Ontario. 5. FACILITY CONDITION INDEX (FCI) Facility Condition Index (FCI) is a scale used to assist in building management to assess the general condition of the building. The FCI is calculated by taking the total cost of the existing deficiencies (over the next 10 years) divided by the current replacement value of the building. The Village of Hilton Beach Municipal Garage (original garage) has an FCI value of (6.9%) or is in (good) condition. The new garage has not been given an FCI rating due to it being constructed within the last five years. Figure 2 - Facility Condition Index 6. CLOSURE We trust this report is sufficient for your purposes at this time, should you require any further assistance or would like clarification on the above, please do not hesitate to contact the undersigned. Respectfully submitted, TULLOCH Engineering Inc. Dan Moody, A.Sc.T. Meagan Figures, C.E.T., rcsi Project Manager Associate Project Manager [email protected] STATEMENT OF QUALIFICATIONS AND LIMITATIONS The attached Report (the "Report") has been prepared by TULLOCH Engineering Inc. ("Consultant") for the benefit of the client ("Client") in accordance with the agreement between Consultant and Client, including the scope of work detailed therein (the "Agreement"). The information and data contained in the Report:  are subject to the scope, schedule, and other constraints and limitations in the Agreement and the qualifications contained in the Report (the "Limitations")  represent Consultant's professional judgement in light of the Limitations and industry standards for the preparation of similar reports  may be based on information provided to Consultant, which has not been independently verified  have not been updated since the date of issuance of the Report and their accuracy is limited to the time period and circumstances in which they were collected, processed, made or issued  must be read as a whole and sections thereof should not be read out of such context  were prepared for the specific purposes described in the Report and the Agreement  in the case of subsurface, environmental or geotechnical conditions, may be based on limited testing and on the assumption that such conditions are uniform and not variable either geographically or over time Unless expressly stated to the contrary in the Report or the Agreement, Consultant:  shall not be responsible for any events or circumstances that may have occurred since the date on which the Report was prepared or for any inaccuracies contained in information that was provided to Consultant  agrees that the Report represents its professional judgement as described above for the specific purpose described in the Report and the Agreement, but Consultant makes no other representations with respect to the Report or any part thereof  in the case of subsurface, environmental or geotechnical conditions, is not responsible for variability in such conditions geographically or over time The Report is to be treated as confidential and may not be used or relied upon by third parties, except:  as agreed by Consultant and Client  as required by law  for use by governmental reviewing agencies Any use of this Report is subject to this Statement of Qualifications and Limitations. Any damages arising from improper use of the Report or parts thereof shall be borne by the party making such use. This Statement of Qualifications and Limitations is attached to and forms part of the Report. Village of Hilton Beach Building Condition Assessment - Marina Building and Dock Infrastructure Project No. 241139 i VISUAL BUILDING CONDITION ASSESSMENT 3130 Marks Street, Marina Building and Dock Infrastructure, Village of Hilton Beach, Ontario FINAL REPORT January 2025 TULLOCH Project 241139 1. INTRODUCTION The scope of work undertaken by TULLOCH Engineering (TULLOCH) was the visual building condition assessment of the interior and exterior elements of the building, including but not limited to the roof, foundation, interior and exterior walls, interior finishes (ceilings, walls, floors etc.), mechanical/electrical systems and overall site condition. The intent of the assessment was to inform the client of the condition of the building for their asset management program. The site contained one (1) building, and five (5) finger docks. The parking lot was a combination of gravel and surface treatment, accessible from Bowker Street. The building was serviced by Municipal sanitary and water infrastructure. The following items are expressly excluded from TULLOCH's scope of work for this assignment:  Structural load evaluation for current or potential future uses  Review of the Ontario Building Code or other applicable code/standard/regulation  Review of building materials for the presence of hazardous materials  Intrusive or destructive investigation of concealed structural elements Photo 1: Building Elevation (Looking South) Photo 2: Building Elevation (Northeast) Figure 1: Dock Infrastructure (Aerial Imagery from Google Earth) 2. METHODOLOGY 2.1 Visual Assessment An on-site visual assessment of the marina building's exposed elements was carried out by Dan Moody, A.Sc.T. and Meagan Figures, C.E.T., rcsi on July 29th, 2024. During the assessment, the building's accessible components were visually reviewed to identify construction, and overall condition. This assessment does not wholly eliminate uncertainty regarding the potential for existing or future costs, hazards, or losses in connection with a property. Inaccessible units and areas that were covered with finishes or were obstructed by stored materials, permanent furnishings or coverings were not assessed. No drawings were made available to TULLOCH prior to commencing with the visual assessment. 3. OBSERVATIONS During the visual assessment of the marina building's exterior and interior construction, only a few defects were observed and noted, as the building was generally in good condition overall. The assessment can be broken down into the following distinct sections:  Marina Building  Dock Infrastructure  Boardwalk, Viewing Platform and Breakwater Walkway 3.1 Marina Building The marina building included two (2) changing rooms with shower facilities, toilets, and sinks. It also houses the gas docks and slip rentals office. The building was approximately 1,400 square feet in ground floor area. The fuel dispensing system was located at the rear of the building and was not included in this assessment. There were precast concrete paving stones, concrete and wooden walkways located along the building's perimeter. The building was assumed to be of conventional wood frame construction, on cast in place concrete foundations. There were two (2) principle floating docks, as well as four (4) finger docks. The total length of floating dock infrastructure servicing the marina building was noted to be approximately 140 meters.  The building was serviced by Municipal sanitary and water infrastructure.  The marina building was heated by a combination of electric baseboard heaters and a mini split.  The marina building had solar panels on the roof.  There was an overhang canopy on the east side of the marina building.  The marina building had a precast paving concrete brick patio around its perimeter. There was a concrete sidewalk accessing wood ramps to the docks and slips.  The marina building had architectural tab shingles.  The marina building was clad with vertical prefinished vinyl siding, and prefinished metal soffit and fascia.  The marina windows were PVC and appeared to be less than 20 years in age.  There was brick wainscotting on the perimeter of the marina building, with a limestone sill.  The interior finishes of the marina building included a combination of painted concrete epoxy floors and ceramic tile. The doors were noted to be wood framed. There was painted drywall throughout the building's interior.  There was a concrete boat launch with a concrete approach slab and ramp at the marina building.  There was fuel equipment at the marina building that was positioned on a sheet piled dock.  There were wood ramps and slips at the marina building. The gas docks are on PVC dock floats with wood perimeter guards.  There was electrical and water services for each slip. The marina building is in good condition overall with only localized defects noted. A summary of the observations and defects are listed below:  All perimeter wood guards on the gas docks were noted to be in poor condition.  The wood walkway at grade was noted to be in poor condition.  The concrete ramp accessing the boat launch was noted to be in fair condition. 3.2 Dock Infrastructure The dock construction was noted to be wood platform framing on corrugated PVC floats. The PVC floats were noted to be in visually good condition, all observed dock surfaces appeared to be level with no significant deviation in freeboard, while the wood surfaces were noted to have advanced decay and loose surfacing fasteners, resulting in an uneven walking surface. The total length of floating dock infrastructure functioning as boat slips was noted to be approximately 1,000 meters. This assessment was not intended to be intrusive or exhaustive, and as such below water infrastructure was not reviewed.  The remaining lifespan of the wood on the dock surfaces is less than five years. Photo 4: Dock Infrastructure Photo 5: Deteriorated Wood Construction on Boardwalk Photo 6: Wood Shim Support on Underside of Dock Structure 3.3 Boardwalk, Breakwater Walkway, and Viewing Platform The boardwalk generally extends from the south extent of the marina basin, north to the marina building. The breakwater walkway extends from the south end of the boardwalk to the bridge servicing the viewing platform (refer to figure 1 for general arrangement of marina infrastructure). The total length of the boardwalk is 260 meters. The total length of the breakwater boardwalk is 110 meters. The total area of the viewing platform is 36 squared meters. It is recommended that the bridge on the breakwater walkway be added to the Municipal bridge appraisal program, and as such, it has not been included in this assessment. The boardwalk, breakwater walkway, and viewing platform are in poor condition overall. During the visual assessment of the building components, several defects were observed and noted. A summary of these observations and defects are listed below:  The lifespan remaining on the wood boardwalk is less than five years.  The wood boardwalk and guard at the top of the breakwater was in very poor condition and closing it immediately to public access is recommended.  There was lighting along the boardwalk.  The pedestrian bridge from the breakwater to a viewing platform was a combination of steel and wood construction.  The wood surface of the viewing platform and wood guard were noted to be in very poor condition. Photo 7: Boardwalk Access Photo 8: Breakwater Walkway Photo 9: Decayed Wood on Boardwalk Photo 10: Bridge over Breakwater to Viewing Platform Photo 11: Loose Guard at Viewing Platform Photo 12: Bridge over Breakwater 4. CONCLUSIONS & RECOMMENDATIONS The assessment consisted of a visual observation of the building and the site at the subject property to assess the current condition of the individual building components. Components with an observed material physical deficiency of more than $2,000.00 per item have been identified if repair is required over the next 10 years. Items requiring repair or replacement for which the anticipated cost is less than $2,000.00 are considered to be part of the regular facility maintenance and have not been included in this report. A detailed list of recommended repairs to restore/maintain the building's optimal level of performance is included in the table below. The building elements received a condition rating based on the following criteria: 1 - Recommended immediate repair or replacement 2 - Poor condition 3 - Fair condition 4 - Good condition Table 1: Building Element Condition Rating and Cost Estimates Building System System Condition Recommendation Estimated Cost Timeline for Repair/Replacement Foundations (Marina Building) 4 N/A $0.00 N/A Superstructure (Marina Building) 4 N/A $0.00 N/A Exterior Enclosure (Marina Building) 4 N/A $0.00 N/A Roofing (Marina Building) 3 Replace shingles in the next 5 years. $20,000.00 2030 Interior Construction (Marina Building) 4 N/A $0.00 N/A Boardwalk 1 Remove and replace the existing wood deck and wood sub- structure for full length of boardwalk. $170,000.00 2030 Dock Infrastructure 1 Remove and replace existing wood deck and wood sub- structure for all docks. $650,000.00 2030 Breakwater Walkway 1 Remove and replace the existing wood deck, wood sub- structure, and wood guards for full length of breakwater walkway. $75,000.00 2025 Viewing Platform 1 Remove and replace the existing wood deck, wood sub- structure, and wood guards for all of the viewing platform. $25,000.00 2025 Marina Building Dock Infrastructure 1 Remove and replace existing wood deck and wood sub- structure for all docks. $80,000.00 2030 Electrical 4 N/A $0.00 N/A Site Development 4 N/A $0.00 N/A TOTAL $1,020,000.00 The total replacement cost for the dock infrastructure is estimated to be $1,000,000.00 (+/-). The above cost estimate is generally reflective of required labour and materials, requirements for removal and reconstruction of the wood components of the marina docks, boardwalks, walkways, etc. This is based on removal and replacement to generally match the materials and existing configuration of construction. We recommend that a detailed review of all available options be undertaken as more cost-effective options may be available. It is assumed that no in-water work will be required. It is assumed that no repairs or replacement of steel, floats, or interconnection hardware will be required. Notes: Prior to proceeding with the removal of any finishes, TULLOCH recommends that a Designated Substance and Hazardous Materials Assessment be completed in accordance with The Designated Substance Regulation (Reg. 490). All remedial repairs should be designed by a Professional Engineer, licensed in the Province of Ontario. 5. FACILITY CONDITION INDEX (FCI) Facility Condition Index (FCI) is a scale used to assist in building management to assess the general condition of the building. The FCI is calculated by taking the total cost of the existing deficiencies (over the next 10 years) divided by the current replacement value of the building. The Village of Hilton Beach Marina Building has an FCI value of (3.6%) or is in (excellent) condition. The value is applicable to the building proper only. The dock infrastructure has not been included. Figure 2 - Facility Condition Index 6. CLOSURE We trust this report is sufficient for your purposes at this time, should you require any further assistance or would like clarification on the above, please do not hesitate to contact the undersigned. Respectfully submitted, TULLOCH Engineering Inc. Dan Moody, A.Sc.T. Meagan Figures, C.E.T., rcsi Project Manager Associate Project Manager [email protected] STATEMENT OF QUALIFICATIONS AND LIMITATIONS The attached Report (the "Report") has been prepared by TULLOCH Engineering Inc. ("Consultant") for the benefit of the client ("Client") in accordance with the agreement between Consultant and Client, including the scope of work detailed therein (the "Agreement"). The information and data contained in the Report:  are subject to the scope, schedule, and other constraints and limitations in the Agreement and the qualifications contained in the Report (the "Limitations")  represent Consultant's professional judgement in light of the Limitations and industry standards for the preparation of similar reports  may be based on information provided to Consultant, which has not been independently verified  have not been updated since the date of issuance of the Report and their accuracy is limited to the time period and circumstances in which they were collected, processed, made or issued  must be read as a whole and sections thereof should not be read out of such context  were prepared for the specific purposes described in the Report and the Agreement  in the case of subsurface, environmental or geotechnical conditions, may be based on limited testing and on the assumption that such conditions are uniform and not variable either geographically or over time Unless expressly stated to the contrary in the Report or the Agreement, Consultant:  shall not be responsible for any events or circumstances that may have occurred since the date on which the Report was prepared or for any inaccuracies contained in information that was provided to Consultant  agrees that the Report represents its professional judgement as described above for the specific purpose described in the Report and the Agreement, but Consultant makes no other representations with respect to the Report or any part thereof  in the case of subsurface, environmental or geotechnical conditions, is not responsible for variability in such conditions geographically or over time The Report is to be treated as confidential and may not be used or relied upon by third parties, except:  as agreed by Consultant and Client  as required by law  for use by governmental reviewing agencies Any use of this Report is subject to this Statement of Qualifications and Limitations. Any damages arising from improper use of the Report or parts thereof shall be borne by the party making such use. This Statement of Qualifications and Limitations is attached to and forms part of the Report. Village of Hilton Beach Asset Management Plan -- Phases One and Two Phase 1 - State of Local Infrastructure APPENDIX D -- ROADS CONDITION ASSESSMENT