{
 "answer": "In the Township of Ignace, Ontario, building permit rules are set by By-law No. 87/2013 – The Building By-law, verified 2026-09-25. Permit required for: Construction, demolition and change of use of buildings; moving a building within the Township. Fees set in: Schedule \"A\" to this By-Law. Administered by: Chief Building Official; Inspectors; Registered Code Agency.",
 "municipality_id": "gx-001567",
 "municipality": "Ignace",
 "status_type": "Township",
 "jurisdiction": "Ontario",
 "country": "CA",
 "topic": "building_permits",
 "label": "Building permits",
 "status": "found",
 "last_verified": "2026-09-25",
 "official_website": "https://www.ignace.ca/",
 "documents": [
  {
   "primary": true,
   "is_official": true,
   "title": "By-law No. 87/2013 – The Building By-law",
   "category": "building_permits",
   "document_type": "bylaw",
   "status": "adopted",
   "adopted_date": null,
   "document_url": "https://ignace.civicweb.net/filepro/document/3556/87.13.pdf",
   "summary": "Township's Building By-law under Building Code Act s.7: classes of permits and fees (Schedule A), application requirements, conditional/partial permits, inspections; scanned document, OCR'd and confirmed as Township of Ignace's own enactment.",
   "discovered_by": "on-building",
   "discovered_at": "2026-09-25",
   "capture_sha256": "942b1164a6fdf01910c904d9af28f9634709ed1ef8cafd28099ff30077be171c",
   "captured_at": "2026-09-25T07:16:54+00:00",
   "capture_http_status": 200,
   "document_number": "87/2013",
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/942b1164a6fdf01910c904d9af28f9634709ed1ef8cafd28099ff30077be171c.pdf",
   "link_dead": false,
   "facts": {
    "permit_required_for": "Construction, demolition and change of use of buildings; moving a building within the Township.",
    "exemptions": "Painting/decorating; replacement millwork/cabinets without plumbing; hot water heaters; appliances; shingling; same-size doors/windows; small decks; residential fences; structures under 108 sq ft without plumbing; construction sheds/trailers.",
    "fee_basis": "$5.25 per $1,000 of construction/demolition value; $100 per unit for change of use/moving; minimum $50; conditional permit extra 50%; 200% surcharge for starting before permit.",
    "fees_location": "Schedule \"A\" to this By-Law",
    "authority": "Chief Building Official; Inspectors; Registered Code Agency."
   },
   "fact_citations": {
    "permit_required_for": "s. 3.1; s. 4.4",
    "exemptions": "Schedule \"A\", s. 3.1.1-3.1.10",
    "fee_basis": "Schedule \"A\", ss. 1.1, 2.1, 5.1-5.8",
    "fees_location": "s. 7",
    "authority": "s. 4.2; s. 9.1.1; s. 12.2"
   },
   "transcript_url": "/ca/on/ignace/building-permits/bylaw-87-2013/",
   "transcript_quality": "ocr"
  }
 ],
 "source": "https://govanswers.org/ca/on/ignace/building-permits/"
}