Mattawan 2021 Asset Management Plan

Mattawan, Ontario

This is the exact embedded text of the captured official document. Snapshot bfeb19cc7bdd · verified 2026-06-09 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

i Corporate Asset Management Program Municipality of Mattawan | 2021 Asset Management Plan Municipality of Mattawan 2021 i © 2021, Corporation of the Municipality of Mattawan. All Rights Reserved. The preparation of this plan was carried out with assistance from the Government of Canada and the Federation of Canadian Municipalities. Notwithstanding this support, the views expressed are the personal views of the authors, and the Federation of Canadian Municipalities and the Government of Canada accept no responsibility for them. This Asset Management Program was prepared by: Empowering your organization through advanced asset management, budgeting & GIS solutions i Key Statistics Replacement cost of asset portfolio $5.1 million Replacement cost of infrastructure per household $49,000 (2016) Percentage of assets in fair or better condition 56% Percentage of assets with assessed condition data 84% Annual capital infrastructure deficit $123,000 Recommended timeframe for eliminating annual infrastructure deficit 20 Years Target reinvestment rate 2.4% Actual reinvestment rate 0% 1 Table of Contents Executive Summary ................................................................................................... 3 Scope ............................................................................................................................ 3 Findings ......................................................................................................................... 4 Recommendations .......................................................................................................... 5 1 Introduction & Context ........................................................................................ 6 An Overview of Asset Management ........................................................................ 7 Key Concepts in Asset Management ......................................................................10 Ontario Regulation 588/17 ....................................................................................13 2 Scope and Methodology .................................................................................... 15 Assets categories included in this AMP ...................................................................16 Deriving Replacement Costs ..................................................................................16 Estimated Useful Life and Service Life Remaining....................................................17 Reinvestment Rate ...............................................................................................17 Deriving Asset Condition .......................................................................................18 3 Portfolio Overview .......................................................................................... 19 Total Replacement Cost of Asset Portfolio ..............................................................20 Target vs. Actual Reinvestment Rate .....................................................................20 Condition of Asset Portfolio ...................................................................................21 Service Life Remaining .........................................................................................22 Forecasted Capital Requirements...........................................................................22 4 Analysis of Tax-funded Assets ............................................................................ 23 Road Network ......................................................................................................24 Bridges & Culverts ...............................................................................................33 Buildings .............................................................................................................40 Machinery & Equipment ........................................................................................44 5 Impacts of Growth .......................................................................................... 48 Description of Growth Assumptions .......................................................................49 Impact of Growth on Lifecycle Activities .................................................................50 6 Financial Strategy ............................................................................................. 51 Financial Strategy Overview ..................................................................................52 Funding Objective ................................................................................................54 2 Financial Profile: Tax Funded Assets ......................................................................55 Use of Debt .........................................................................................................58 Use of Reserves ...................................................................................................60 7 Appendices ..................................................................................................... 61 Appendix A: 10-Year Capital Requirements ......................................................................62 Appendix B: Level of Service Maps ..................................................................................64 Appendix C: Condition Assessment Guidelines ..................................................................67 3 Executive Summary Municipal infrastructure provides the foundation for the economic, social, and environmental health and growth of a community through the delivery of critical services. The goal of asset management is to deliver an adequate level of service in the most cost-effective manner. This involves the development and implementation of asset management strategies and long-term financial planning. Scope This AMP identifies the current practices and strategies that are in place to manage public infrastructure and makes recommendations where they can be further refined. Through the implementation of sound asset management strategies, the Municipality can ensure that public infrastructure is managed to support the sustainable delivery of municipal services. This AMP includes the following asset categories: Asset Category Bridges & Culverts Buildings Road Network Machinery & Equipment 4 Findings The overall replacement cost of the asset categories included in this AMP totals $5.1 million. 56% of all assets analyzed in this AMP are in fair or better condition and assessed condition data was available for 84% of assets. For the remaining 16% of assets, assessed condition data was unavailable, and asset age was used to approximate condition - a data gap that persists in most municipalities. Generally, age misstates the true condition of assets, making assessments essential to accurate asset management planning. The development of a long-term, sustainable financial plan requires an analysis of whole lifecycle costs. This AMP uses a replacement-only strategy to determine the costs required to maintain the current level of service. To meet capital replacement and rehabilitation needs for existing infrastructure, prevent infrastructure backlogs, and achieve long-term sustainability, the Municipality's average annual capital requirement totals $123,000. Based on a historical analysis of sustainable capital funding sources, the Municipality is committing $0 towards capital projects or reserves per year as all funds are used for operational activities. As a result, there is currently an annual funding gap of approximately $123,000. It is important to note that this AMP represents a snapshot in time and is based on the best available processes, data, and information at the Municipality. Strategic asset management planning is an ongoing and dynamic process that requires continuous improvement and dedicated resources. With the development of this AMP the Municipality has achieved compliance with O. Reg. 588/17 to the extent of the requirements that must be completed by July 1, 2022. There are additional requirements concerning proposed levels of service and growth that must be met by July 1, 2024 and 2025. 5 Recommendations A financial strategy was developed to address the annual capital funding gap. The following graphic shows the annual tax change required to eliminate the Municipality's infrastructure deficit based on a 20-year plan: Recommendations to guide continuous refinement of the Municipality's asset management program include: - Continue to refine and update asset information as made available - Undertake CityWide inventory training and asset management training for staff - Operationalize existing database and develop short- and long-term capital projections - Evaluate the efficacy of the Municipality's lifecycle management strategies at regular intervals to determine the impact on cost, condition, and risk. - Continue to measure current levels of service and work towards compliance for O. Reg 588/17 2024 and 2025 requirements - Consider the development of a dedicated capital budget Tax-Funded ASSETS Average Annual Rate Change 1.6% Annual Increase Per Household $1,710 6 Key Insights 1 Introduction & Context - The goal of asset management is to minimize the lifecycle costs of delivering infrastructure services, manage the associated risks while maximizing the value ratepayers receive from the asset portfolio - The Municipality's asset management policy provides clear direction to staff on their roles and responsibilities regarding asset management - An asset management plan is a living document that should be updated regularly to inform long-term planning - Ontario Regulation 588/17 outlines several key milestones and requirements for asset management plans in Ontario between July 1, 2022 and 2025 7 An Overview of Asset Management Municipalities are responsible for managing and maintaining a broad portfolio of infrastructure assets to deliver services to the community. The goal of asset management is to minimize the lifecycle costs of delivering infrastructure services, manage the associated risks while maximizing the value ratepayers receive from the asset portfolio. The acquisition of capital assets accounts for only 10-20% of their total cost of ownership. The remaining 80-90% is derived from operations and maintenance. This asset management plan (AMP) focuses its analysis on the capital costs to maintain, rehabilitate and replace existing municipal infrastructure assets. These costs can span decades, requiring planning and foresight to ensure financial responsibility is spread equitably across generations. An asset management plan is critical to this planning, and an essential element of a broader asset management program. The industry-standard approach to developing a practical asset management program begins with a Strategic Plan, followed by an Asset Management Policy and an Asset Management Strategy, concluding with an Asset Management Plan. This industry-standard, defined by the Institute of Asset Management (IAM), emphasizes the alignment between the corporate strategic plan and various asset management documents. The strategic plan has a direct, and cascading impact on asset management planning and reporting. Build 20% Operate, Maintain, and Dispose 80% Total Cost of Ownership 8 1.1.1 Asset Management Policy An asset management policy represents a statement of the principles guiding the municipality's approach to asset management activities. It aligns with the organizational strategic plan and provides clear direction to municipal staff on their roles and responsibilities as part of the asset management program. The Municipality adopted By-law No. 2019-11 which included a "Strategic Asset Management Policy" and "State of Maturity Report" on June 13th, 2019 in accordance with Ontario Regulation 588/17. The asset management plan satisfies the policy statement 4 section 4 "The Municipality will develop an asset management plan that incorporates all infrastructure categories and municipal infrastructure assets that meet the capitalization threshold outlined in the organization's Tangible Capital Asset Policy. It will be updated at least every five years following 2024 in accordance with O. Reg. 588/17 requirements, to promote, document and communicate continuous improvement of the asset management program." 1.1.2 Asset Management Strategy An asset management strategy outlines the translation of organizational objectives into asset management objectives and provides a strategic overview of the activities required to meet these objectives. It provides greater detail than the policy on how the municipality plans to achieve asset management objectives through planned activities and decision-making criteria. The Municipality's Asset Management Policy contains many of the key components of an asset management strategy and may be expanded on in future revisions or as part of a separate strategic document. 1.1.3 Asset Management Plan The asset management plan (AMP) presents the outcomes of the municipality's asset management program and identifies the resource requirements needed to achieve a defined level of service. The AMP typically includes the following content: - State of Infrastructure - Asset Management Strategies - Levels of Service - Financial Strategies 9 The AMP is a living document that should be updated regularly as additional asset and financial data becomes available. This will allow the municipality to re-evaluate the state of infrastructure and identify how the organization's asset management and financial strategies are progressing. 10 Key Concepts in Asset Management Effective asset management integrates several key components, including lifecycle management, risk management, and levels of service. These concepts are applied throughout this asset management plan and are described below in greater detail. 1.2.1 Lifecycle Management Strategies The condition or performance of most assets will deteriorate over time. This process is affected by a range of factors including an asset's characteristics, location, utilization, maintenance history and environment. Asset deterioration has a negative effect on the ability of an asset to fulfill its intended function, and may be characterized by increased cost, risk and even service disruption. To ensure that municipal assets are performing as expected and meeting the needs of customers, it is important to establish a lifecycle management strategy to proactively manage asset deterioration. There are several field intervention activities that are available to extend the life of an asset. These activities can be generally placed into one of three categories: maintenance, rehabilitation and replacement. The following table provides a description of each type of activity and the general difference in cost. Lifecycle Activity Description Example (Roads) Cost Maintenance Activities that prevent defects or deteriorations from occurring Crack Seal $ Rehabilitation/ Renewal Activities that rectify defects or deficiencies that are already present and may be affecting asset performance Mill & Re-surface $$ Replacement/ Reconstruction Asset end-of-life activities that often involve the complete replacement of assets Full Reconstruction $$$ Depending on initial lifecycle management strategies, asset performance can be sustained through a combination of maintenance and rehabilitation, but at some point, replacement is required. Understanding what effect these activities will have on the lifecycle of an asset, and their cost, will enable staff to make better recommendations. 11 The Municipality's approach to lifecycle management is described within each asset category outlined in this AMP. Developing and implementing a proactive lifecycle strategy will help staff to determine which activities to perform on an asset and when they should be performed to maximize useful life at the lowest total cost of ownership. 1.2.2 Risk Management Strategies Municipalities generally take a 'worst-first' approach to infrastructure spending. Rather than prioritizing assets based on their importance to service delivery, assets in the worst condition are fixed first, regardless of their criticality. However, not all assets are created equal. Some are more important than others, and their failure or disrepair poses more risk to the community than that of others. For example, a road with a high volume of traffic that provides access to critical services poses a higher risk than a low volume rural road. These high-value assets should receive funding before others. By identifying the various impacts of asset failure and the likelihood that it will fail, risk management strategies can identify critical assets, and determine where maintenance efforts, and spending, should be focused. Potential risks that affect the Municipality's service delivery should be captured. This AMP includes a high-level identification of the risks posed by undertaking the current lifecycle activities to achieve the current levels of service. The risks reflect the key challenges and trends that the Municipality may face when delivering the expected services. 1.2.3 Levels of Service A level of service (LOS) is a measure of what the Municipality is providing to the community and the nature and quality of that service. Within each asset category in this AMP, technical metrics and qualitative descriptions that measure both technical and community levels of service have been established and measured as data is available. These measures include a combination of those that have been outlined in O. Reg. 588/17 in addition to performance measures identified by the Municipality as worth measuring and evaluating. The Municipality measures the level of service provided at two levels: Community Levels of Service, and Technical Levels of Service. Community Levels of Service Community levels of service are a simple, plain language description or measure of the service that the community receives. For core asset categories (Roads, Bridges & Culverts, Water, Wastewater, Stormwater) the Province, through O. Reg. 588/17, has provided qualitative descriptions that are required to be included in this AMP. For non-core asset categories, the Municipality has determined the qualitative descriptions that will be used to determine the community level of service provided. These descriptions can be found in the Levels of Service subsection within each asset category. 12 Technical Levels of Service Technical levels of service are a measure of key technical attributes of the service being provided to the community. These include mostly quantitative measures and tend to reflect the impact of the municipality's asset management strategies on the physical condition of assets or the quality/capacity of the services they provide. For core asset categories (Roads, Bridges & Culverts, Water, Wastewater, Stormwater) the Province, through O. Reg. 588/17, has provided technical metrics that are required to be included in this AMP. Current and Proposed Levels of Service This AMP focuses on measuring the current level of service provided to the community. Once current levels of service have been measured, the Municipality plans to establish proposed levels of service over a 10-year period, in accordance with O. Reg. 588/17. Proposed levels of service should be realistic and achievable within the timeframe outlined by the Municipality. They should also be determined with consideration of community expectations, fiscal capacity, regulatory requirements, corporate goals, and long-term sustainability. Once proposed levels of service have been established, and before July 2025, the Municipality must identify a lifecycle management and financial strategy which allows these targets to be achieved. 13 Ontario Regulation 588/17 As part of the Infrastructure for Jobs and Prosperity Act, 2015, the Ontario government introduced Regulation 588/17 - Asset Management Planning for Municipal Infrastructure (O. Reg 588/17). Along with creating better performing organizations, more liveable and sustainable communities, the regulation is a key, mandated driver of asset management planning and reporting. It places substantial emphasis on current and proposed levels of service and the lifecycle costs incurred in delivering them. The diagram below outlines key reporting requirements under O. Reg 588/17 and the associated timelines. 2019 2022 2024 2025 Strategic Asset Management Policy Asset Management Plan for Core Assets with the following components: 1. Current levels of service 2. Inventory analysis 3. Lifecycle activities to sustain LOS 4. Cost of lifecycle activities 5. Population and employment forecasts 6. Discussion of growth impacts Asset Management Policy Update and an Asset Management Plan for All Assets with the following additional components: 1. Proposed levels of service for next 10 years 2. Updated inventory analysis 3. Lifecycle management strategy 4. Financial strategy and addressing shortfalls 5. Discussion of how growth assumptions impacted lifecycle and financial Asset Management Plan for Core and Non-Core Assets (same components as 2022) 14 1.3.1 O. Reg. 588/17 Compliance Review The following table identifies the requirements outlined in Ontario Regulation 588/17 for municipalities to meet by July 1, 2022. Next to each requirement, a page or section reference is included in addition to any necessary commentary. Requirement O. Reg. Section AMP Section Reference Status Summary of assets in each category S.5(2), 3(i) 4.1.1 - 4.4.1 Complete Replacement cost of assets in each category S.5(2), 3(ii) 4.1.1 - 4.4.1 Complete Average age of assets in each category S.5(2), 3(iii) 4.1.3 - 4.4.3 Complete Condition of core assets in each category S.5(2), 3(iv) 4.1.2 - 4.4.2 Complete Description of municipality's approach to assessing the condition of assets in each category S.5(2), 3(v) 4.1.2 - 4.2.2 Complete for Core Assets Only Current levels of service in each category S.5(2), 1(i-ii) 4.1.6 - 4.2.6 Complete for Core Assets Only Current performance measures in each category S.5(2), 2 4.1.6 - 4.2.6 Complete for Core Assets Only Lifecycle activities needed to maintain current levels of service for 10 years S.5(2), 4 4.1.4 - 4.2.4 Complete for Core Assets Only Costs of providing lifecycle activities for 10 years S.5(2), 4 Appendix A Complete Growth assumptions S.5(2), 5(i-ii) S.5(2), 6(i-vi) 5.1 - 5.2 Complete 15 Key Insights 2 Scope and Methodology - This asset management plan includes 4 asset categories and consists of tax-funded categories - The source and recency of replacement costs impact the accuracy and reliability of asset portfolio valuation - Accurate and reliable condition data helps to prevent premature and costly rehabilitation or replacement and ensures that lifecycle activities occur at the right time to maximize asset value and useful life 16 Assets categories included in this AMP This asset management plan for the Municipality of Mattawan is produced in compliance with Ontario Regulation 588/17. The July 2022 deadline under the regulation--the first of three AMPs--requires analysis of only core assets (roads, bridges & culverts, water, wastewater, and stormwater). The AMP summarizes the state of the infrastructure for the Municipality's asset portfolio, establishes current levels of service and the associated technical and customer-oriented key performance indicators (KPIs), outlines lifecycle strategies for optimal asset management and performance, and provides financial strategies to reach sustainability for the asset categories listed below. Asset Category Source of Funding Road Network Tax Levy Bridges & Culverts Buildings Machinery & Equipment Deriving Replacement Costs There is a range of methods to determine the replacement cost of an asset, and some are more accurate and reliable than others. This AMP relies on two methodologies: - User-Defined Cost and Cost/Unit: Based on costs provided by municipal staff which could include average costs from recent contracts; data from engineering reports and assessments; staff estimates based on knowledge and experience - Cost Inflation/CPI Tables: Historical cost of the asset is inflated based on Consumer Price Index or Non-Residential Building Construction Price Index User-defined costs based on reliable sources are a reasonably accurate and reliable way to determine asset replacement costs. Cost inflation is typically used in the absence of reliable replacement cost data. It is a reliable method for recently purchased and/or constructed assets where the total cost is reflective of the actual costs that the Municipality incurred. As assets age and new products and technologies become available, cost inflation becomes a less reliable method. 17 Estimated Useful Life and Service Life Remaining The estimated useful life (EUL) of an asset is the period over which the Municipality expects the asset to be available for use and remain in service before requiring replacement or disposal. The EUL for each asset in this AMP was assigned according to the knowledge and expertise of municipal staff and supplemented by existing industry standards when necessary. By using an asset's in-service data and its EUL, the Municipality can determine the service life remaining (SLR) for each asset. Using condition data and the asset's SLR, the Municipality can more accurately forecast when it will require replacement. The SLR is calculated as follows: 𝑆𝑒𝑟𝑣𝑖𝑐𝑒 𝐿𝑖𝑓𝑒 𝑅𝑒𝑚𝑎𝑖𝑛𝑖𝑛𝑔 (𝑆𝐿𝑅) = 𝐼𝑛 𝑆𝑒𝑟𝑣𝑖𝑐𝑒 𝐷𝑎𝑡𝑒+ 𝐸𝑠𝑡𝑖𝑚𝑎𝑡𝑒𝑑 𝑈𝑠𝑒𝑓𝑢𝑙 𝐿𝑖𝑓𝑒(𝐸𝑈𝐿) −𝐶𝑢𝑟𝑟𝑒𝑛𝑡 𝑌𝑒𝑎𝑟 Reinvestment Rate As assets age and deteriorate they require additional investment to maintain a state of good repair. The reinvestment of capital funds, through asset renewal or replacement, is necessary to sustain an adequate level of service. The reinvestment rate is a measurement of available or required funding relative to the total replacement cost. By comparing the actual vs. target reinvestment rate the Municipality can determine the extent of any existing funding gap. The reinvestment rate is calculated as follows: 𝑇𝑎𝑟𝑔𝑒𝑡 𝑅𝑒𝑖𝑛𝑣𝑒𝑠𝑡𝑚𝑒𝑛𝑡 𝑅𝑎𝑡𝑒= 𝐴𝑛𝑛𝑢𝑎𝑙 𝐶𝑎𝑝𝑖𝑡𝑎𝑙 𝑅𝑒𝑞𝑢𝑖𝑟𝑒𝑚𝑒𝑛𝑡 𝑇𝑜𝑡𝑎𝑙 𝑅𝑒𝑝𝑙𝑎𝑐𝑒𝑚𝑒𝑛𝑡 𝐶𝑜𝑠𝑡 𝐴𝑐𝑡𝑢𝑎𝑙 𝑅𝑒𝑖𝑛𝑣𝑒𝑠𝑡𝑚𝑒𝑛𝑡 𝑅𝑎𝑡𝑒= 𝐴𝑛𝑛𝑢𝑎𝑙 𝐶𝑎𝑝𝑖𝑡𝑎𝑙 𝐹𝑢𝑛𝑑𝑖𝑛𝑔 𝑇𝑜𝑡𝑎𝑙 𝑅𝑒𝑝𝑙𝑎𝑐𝑒𝑚𝑒𝑛𝑡 𝐶𝑜𝑠𝑡 18 Deriving Asset Condition An incomplete or limited understanding of asset conditions can mislead long-term planning and decision-making. Accurate and reliable condition data helps to prevent premature and costly rehabilitation or replacement and ensures that lifecycle activities occur at the right time to maximize asset value and useful life. A condition assessment rating system provides a standardized descriptive framework that allows comparative benchmarking across the Municipality's asset portfolio. The table below outlines the condition rating system used in this AMP to determine asset conditions. This rating system is aligned with the Canadian Core Public Infrastructure Survey which is used to develop the Canadian Infrastructure Report Card. When assessed condition data is not available, the service life remaining is used to approximate asset condition. Condition Description Criteria Service Life Remaining (%) Very Good Fit for the future Well maintained, good condition, new or recently rehabilitated 80-100 Good Adequate for now Acceptable, generally approaching mid- stage of expected service life 60-80 Fair Requires attention Signs of deterioration, some elements exhibit significant deficiencies 40-60 Poor Increasing potential of affecting service Approaching the end of service life, condition below standard, a large portion of the system exhibits significant deterioration 20-40 Very Poor Unfit for sustained service Near or beyond expected service life, widespread signs of advanced deterioration, some assets may be unusable 0-20 The analysis in this AMP is based on assessed condition data only as available. In the absence of assessed condition data, asset age is used as a proxy to determine asset condition. Appendix C includes additional information on the role of asset condition data and provides basic guidelines for the development of a condition assessment program. 19 Key Insights 3 Portfolio Overview - The total replacement cost of the Municipality's asset portfolio is $5.1 million - The Municipality's target re-investment rate is 2.4%, and the actual reinvestment rate is 0%, contributing to an expanding infrastructure deficit - 56% of all assets are in fair or better condition - 22% of assets are projected to require replacement in the next 10 years - Average annual capital requirements total approximately $123,000 per year across all assets 20 Total Replacement Cost of Asset Portfolio The asset categories analyzed in this AMP have a total replacement cost of $5.1 million based on inventory data from 2020. This total was determined based on a combination of user-defined costs and historical cost inflation. This estimate reflects the replacement of historical assets with similar, not necessarily identical, assets available for procurement today. Target vs. Actual Reinvestment Rate The graph below depicts funding gaps or surpluses by comparing target vs actual reinvestment rates. To meet the long-term replacement needs, the Municipality should be allocating approximately $123,000 annually, for a target reinvestment rate of 2.41%. Actual annual capital spending on infrastructure totals approximately $0, for an actual reinvestment rate of 0%1. 1 The Municipality currently funds its assets through an operating budget. 21 Condition of Asset Portfolio The current condition of the assets is central to all asset management planning. Collectively, 56% of assets in Mattawan are in fair or better condition. This estimate relies on both age- based and field condition data. This AMP relies on assessed condition data for 84% of assets; for the remaining portfolio, age is used as an approximation of condition. Assessed condition data is invaluable in asset management planning as it reflects the true condition of the asset and its ability to perform its functions. The table below identifies the source of condition data used throughout this AMP. Asset Category Asset Segment % of Assets with Assessed Condition Source of Condition Data Road Network All 38% Staff Assessments Bridges & Culverts Bridges 100% 2019 OSIM Report Buildings All 97% Staff Assessments Machinery & Equipment All 25% Staff Assessments 22 Service Life Remaining Based on asset age, available assessed condition data, and estimated useful life, 22% of the Municipality's assets will require replacement within the next 10 years. Capital requirements over the next 10 years are identified in Appendix A. Forecasted Capital Requirements The development of a long-term capital forecast should include both asset rehabilitation and replacement requirements. With the development of asset-specific lifecycle strategies that include the timing and cost of future capital events, the Municipality can produce an accurate long-term capital forecast. The following graph identifies capital requirements over the next 50 years. 23 Key Insights 4 Analysis of Tax-funded Assets - Tax-funded assets are valued at $5.1 million - 56% of tax-funded assets are in fair or better condition - The average annual capital requirement to sustain the current level of service for tax-funded assets is approximately $123 thousand 24 Road Network The Road Network is a critical component of the provision of safe and efficient transportation services and represents a significant value asset category in the Municipality's asset portfolio. It includes all municipally owned and maintained roadways in addition to supporting roadside infrastructure, such as culverts with a span of under 3 meters. The Municipality's roads are maintained by the Contracted Road Staff. 4.1.1 Asset Inventory & Replacement Cost The table below includes the quantity, replacement cost method, and total replacement cost of each asset segment in the Municipality's Road Network inventory. Asset Segment Quantity Replacement Cost Method Total Replacement Cost Culverts < 3 meter span 129 49% CPI Tables, 51% Cost/Unit $723,278 Unpaved Roads 25.4 km Cost/Unit $469,900 $1,193,178 25 4.1.2 Asset Condition The table below identifies the current average condition and source of available condition data for each asset segment. The Average Condition (%) is a weighted value based on replacement cost. Asset Segment Average Condition (%) Average Condition Rating Condition Source Culverts < 3 meter span 56% Fair 100% Age-Based Unpaved Roads 60% Good 96% Assessed 58% Fair 38% Assessed Current Approach to Condition Assessment Accurate and reliable condition data allows staff to more confidently determine the remaining service life of assets and identify the most cost-effective approach to managing assets. The following describes the municipality's current approach: - Road patrols are completed weekly for all roads by Road Supervisor - Older roadside culvert (under 3m span) pipes are inspected on an annual basis - While roadside culverts are checked less often, they are expected to be part of an inspection program 26 4.1.3 Estimated Useful Life & Average Age The Estimated Useful Life for Road Network assets has been assigned according to a combination of established industry standards and staff knowledge. The Average Age of each asset is based on the number of years each asset has been in service. Finally, the Average Service Life Remaining represents the difference between the Estimated Useful Life and the Average Age, except when an asset has been assigned an assessed condition rating. The assessed condition may increase or decrease the average service life remaining. Asset Segment Estimated Useful Life (Years) Average Age (Years) Average Service Life Remaining (Years) Culverts < 3 meter span 20 - 50 Years 14.1 15.5 Unpaved Roads 45 Years 63.8 27.5 18.7 16.5 Each asset's Estimated Useful Life should be reviewed periodically to determine whether adjustments need to be made to better align with the observed length of service life for each asset type. 27 4.1.4 Lifecycle Management Strategy The condition or performance of most assets will deteriorate over time. This process is affected by a range of factors including an asset's characteristics, location, utilization, maintenance history, and environment. The following lifecycle strategies have been developed as a proactive approach to managing the lifecycle of gravel roads. Activity Type Description of Current Strategy Maintenance, Rehabilitation, and Replacement Grading is completed throughout the year to maintain the roads Dust suppressant is applied on an annual basis Gravel is reapplied to the roads on an as-needed basis according to Road Supervisor recommendations based on field observations Ditching is completed periodically A backhoe and sod are utilized to level and remedy roadside culverts that have lost cover due to erosion; staff prioritize based on criticality and condition of culverts Gravel roads are perpetually maintained and are generally not replaced unless there is an underlying structural issue 28 Forecasted Capital Requirements Based on the lifecycle strategies identified previously, and assuming the end-of-life replacement of all other assets in this category, the following graph forecasts capital requirements for the Road Network. The annual capital requirement represents the average amount per year that the Municipality should allocate towards funding rehabilitation and replacement needs to meet future capital needs. The projected cost of lifecycle activities that will need to be undertaken over the next 10 years to maintain the current level of service can be found in Appendix A. 29 4.1.5 Risks to Current Asset Management Strategies The following section summarizes key trends, challenges, and risks to service delivery that the Municipality is currently facing: Climate Change & Extreme Weather Events An increase in freeze/thaw cycles causes roads to heave and settle. This can cause accelerated deterioration. When the ditches are filled with water, freeze/thaw makes the terrain conditions more difficult to maintain. Additional sanding is required. The uncertainty surrounding the impact of extreme weather events can make changing conditions difficult to plan for. Capital Funding There is some uncertainty on the ability to adequately fund lifecycle requirements from available revenues. Given the small tax base of the municipality, additional tax revenue can mean a larger tax increase for a single household compared to that of larger municipalities. 30 4.1.6 Levels of Service The following tables identify the Municipality's current level of service for the Road Network. These metrics include the technical and community level of service metrics that are required as part of O. Reg. 588/17 as well as any additional performance measures that the Municipality has selected for this AMP. Community Levels of Service The following table outlines the qualitative descriptions that determine the community levels of service provided by the Road Network. Service Attribute Qualitative Description Current LOS (2020) Scope Description, which may include maps, of the road network in the municipality and its level of connectivity See Appendix B Quality Description or images that illustrate the different levels of road class pavement condition Routine road patrols identify 8 different types of deficiencies including potholes, soft shoulders, debris on the road, drainage, warning/hazard on road, regulatory issue for signs, road on bridge issue, and information signs. Roads that do not exhibit any of these deficiencies are considered to be in Very Good condition. Depending on the severity and extent of the 8 deficiency types, roads will receive a Good, Fair, Poor, or Very Poor rating. 31 Technical Levels of Service The following table outlines the quantitative metrics that determine the technical level of service provided by the Road Network. Service Attribute Technical Metric Current LOS (2020) Scope Lane-km of arterial roads (MMS classes 1 and 2) per land area (km/km2) 0/201 Lane-km of collector roads (MMS classes 3 and 4) per land area (km/km2) 0/201 Lane-km of local roads (MMS classes 5 and 6) per land area (km/km2) 50.8/2012 Quality Average pavement condition index for paved roads in the municipality N/A3 Average surface condition for unpaved roads in the municipality (e.g. excellent, good, fair, poor) Good 2 Where the number of lanes was not specified, it was assumed that the road had 2 lanes. 3 The Municipality of Mattawan does not currently own any paved roads. 32 4.1.7 Recommendations Asset Inventory - Review roadside culvert inventory and update attribute information (e.g. quantity and unit of measure) to ensure standardization of all asset segments. - Staff should undertake CityWide inventory training to gain knowledge on uploading and updating assets and utilize tools available to run capital projections. - Collect and track inventory of roadside ditches, capturing important attribute information so that it can be included in the asset management program. Condition Assessment Strategies - Develop an internal condition assessment for road and culvert assets to capture consistent and reliable information. - Capture internal condition ratings on assets and input this information into the inventory on a regular basis (e.g. yearly). Lifecycle Management Strategies - Evaluate the efficacy of the Municipality's lifecycle management strategies at regular intervals to determine the impact on cost, condition, and risk. Risk Management Strategies - Consider procuring extra supplies (e.g. sand) when there are deals for emergency preparedness, subject to budgetary and space constraints. Levels of Service - Re-evaluate the value of each culvert and consider whether to dispose or replace them based on performance, budgetary constraints, and levels of service expected. - Work towards identifying proposed levels of service as per O. Reg. 588/17 and identify the strategies that are required to close any gaps between current and proposed levels of service. 33 Bridges & Culverts Bridges & Culverts represent a critical portion of the transportation services provided to the community. Public Works staff is responsible for the maintenance of all bridges located across municipal roads to keep structures in an adequate state of repair and minimize service disruptions. There are two bridges at the Municipality of Mattawan - Murphy Bridge and Burke Bridge. The Municipality does not own any structural (greater than 3-meter span) culverts. 4.2.1 Asset Inventory & Replacement Cost The table below includes the quantity, replacement cost method, and total replacement cost of each asset segment in the Municipality's Bridges & Culverts inventory. Asset Segment Quantity Replacement Cost Method Total Replacement Cost Bridges 2 User-Defined Cost $3,000,000 $3,000,000 34 4.2.2 Asset Condition The table below identifies the current average condition and source of available condition data for each asset segment. The Average Condition (%) is a weighted value based on replacement cost. Asset Segment Average Condition (%) Average Condition Rating Condition Source Bridges 42% Fair 100% Assessed 42% Fair 100% Assessed To ensure that the Municipality's Bridges & Culverts continue to provide an acceptable level of service, the Municipality should monitor the average condition of all assets. If the average condition declines, staff should re-evaluate their lifecycle management strategy to determine what combination of maintenance, rehabilitation, and replacement activities is required to increase the overall condition of the Bridges & Culverts. Currently, Murphy's Bridge is closed as it is structurally unsafe. The bridge is expected to be replaced and reopened by the end of 2021. Current Approach to Condition Assessment Accurate and reliable condition data allows staff to more confidently determine the remaining service life of assets and identify the most cost-effective approach to managing assets. The following describes the municipality's current approach: - Condition assessments of all bridges are completed every 2 years per the Ontario Structure Inspection Manual (OSIM). The most recent inspection report was completed in 2019 by K. Smart Associates Ltd. - These findings are verified by Public Works Staff through visual inspections, such as looking at the bridges' underside for cracking or any other indicators of issues 35 4.2.3 Estimated Useful Life & Average Age The Estimated Useful Life for Bridges & Culverts assets has been assigned according to a combination of established industry standards and staff knowledge. The Average Age of each asset is based on the number of years each asset has been in service. Finally, the Average Service Life Remaining represents the difference between the Estimated Useful Life and the Average Age, except when an asset has been assigned an assessed condition rating. The assessed condition may increase or decrease the average service life remaining. Asset Segment Estimated Useful Life (Years) Average Age (Years) Average Service Life Remaining (Years) Bridges 50 Years 48.7 23.9 48.7 23.9 Each asset's Estimated Useful Life should be reviewed periodically to determine whether adjustments need to be made to better align with the observed length of service life for each asset type. 36 4.2.4 Lifecycle Management Strategy The condition or performance of most assets will deteriorate over time. To ensure that municipal assets are performing as expected and meeting the needs of customers, it is important to establish a lifecycle management strategy to proactively manage asset deterioration. The following table outlines the Municipality's current lifecycle management strategy. Activity Type Description of Current Strategy Maintenance, Rehabilitation, and Replacement All lifecycle activities are driven by the results of mandated structural inspections completed according to the Ontario Structure Inspection Manual In-house maintenance activities are completed periodically such as regular cleaning, maintaining guide rails, applying sealant, etc. Forecasted Capital Requirements The following graph forecasts long-term capital requirements. The annual capital requirement represents the average amount per year that the Municipality should allocate towards funding rehabilitation and replacement needs. The projected cost of lifecycle activities that will need to be undertaken over the next 10 years to maintain the current level of service can be found in Appendix A. 37 4.2.5 Risks to Current Asset Management Strategies The following section summarizes key trends, challenges, and risks to service delivery that the Municipality is currently facing: Capital Funding The rehabilitation and/or replacement of bridges is heavily dependent on the availability of grant funding for capital projects. Capital costs for bridges can be substantial, and when grant funding is unavailable it can be challenging to fund necessary capital works through sustainable revenue sources. Necessary repairs can be deferred, but this affects the Levels of Service provided. Climate Change & Extreme Weather Events The changing climate can lead to more rain and freezing temperature events, increasing freeze/thaw cycles. Moisture seeps into the depths of the foundation and freezing temperatures have heaved parts of the structure e.g. guide rails. This can cause accelerated deterioration and increase the level of maintenance required. 38 4.2.6 Levels of Service The following tables identify the Municipality's current level of service for Bridges & Culverts. These metrics include the technical and community level of service metrics that are required as part of O. Reg. 588/17 as well as any additional performance measures that the Municipality has selected for this AMP. Community Levels of Service The following table outlines the qualitative descriptions that determine the community levels of service provided by Bridges & Culverts. Service Attribute Qualitative Description Current LOS (2020) Scope Description of the traffic that is supported by municipal bridges (e.g. heavy transport vehicles, motor vehicles, emergency vehicles, pedestrians, cyclists) The bridges support regular vehicular and truck traffic. Snowplows traverse over them during snowfall. With the logging operations in the area, transport trucks are common and may carry excavators. Quality Description or images of the condition of bridges & culverts and how this would affect use of the bridges & culverts See Appendix B Technical Levels of Service The following table outlines the quantitative metrics that determine the technical level of service provided by Bridges & Culverts. Service Attribute Technical Metric Current LOS (2020) Scope % of bridges in the Municipality with loading or dimensional restrictions 0 Quality Average bridge condition index value for bridges in the Municipality 42 Average bridge condition index value for structural culverts in the Municipality N/A4 4 The Municipality of Mattawan does not currently own any structural (greater than 3 meters) culverts. 39 4.2.7 Recommendations Data Review/Validation - Continue to review and validate inventory data, assessed condition data, and replacement costs for all bridges and structural culverts upon the completion of OSIM inspections every 2 years. - Staff should undertake CityWide inventory training to gain knowledge on uploading and updating assets and utilize tools available to run capital projections. Lifecycle Management Strategies - This AMP only includes capital costs associated with the reconstruction of bridges and culverts. The Municipality should work towards identifying projected capital rehabilitation and renewal costs for bridges and culverts and integrating these costs into long-term planning. Levels of Service - Continue to measure current levels of service in accordance with the metrics identified in O. Reg. 588/17. - Work towards identifying proposed levels of service as per O. Reg. 588/17 and identify the strategies that are required to close any gaps between current and proposed levels of service. 40 Buildings This AMP primarily focuses on core asset categories as defined in O. Reg. 588/17. Buildings are not considered a core municipal infrastructure. The Municipality of Mattawan owns and maintains an office and a garage. A high-level analysis of this category is provided. The Municipality will work towards improving data quality and meeting all requirements required prior to July 1, 2024. 4.3.1 Asset Inventory & Replacement Cost The table below includes the quantity, replacement cost method, and total replacement cost of each asset segment in the Municipality's Buildings inventory. Asset Segment Quantity (components) Replacement Cost Method Total Replacement Cost Garage 1 User-Defined Cost $25,000 Office 1 (2) User-Defined Cost $815,912 $840,912 41 4.3.2 Asset Condition The table below identifies the current average condition and source of available condition data for each asset segment. The Average Condition (%) is a weighted value based on replacement cost. Asset Segment Average Condition (%) Average Condition Rating Condition Source Garage 60% Good Age-based Office 58% Fair 99.6% Assessed 59% Fair 96.5% Assessed To ensure that the Municipality's Buildings continues to provide an acceptable level of service, the Municipality should monitor the average condition of all assets. If the average condition declines, staff should re-evaluate their lifecycle management strategy to determine what combination of maintenance, rehabilitation, and replacement activities is required to increase the overall condition of the Buildings. A potential renovation plan is being considered for the office building. Should it be completed, the Estimated Useful Life is expected to increase, and the condition rating would improve. Consideration is also being given to replacing the garage roof. 42 4.3.3 Estimated Useful Life & Average Age The Estimated Useful Life for Buildings assets has been assigned according to a combination of established industry standards and staff knowledge. The Average Age of each asset is based on the number of years each asset has been in service. Finally, the Average Service Life Remaining represents the difference between the Estimated Useful Life and the Average Age, except when an asset has been assigned an assessed condition rating. The assessed condition may increase or decrease the average service life remaining. Asset Segment Estimated Useful Life (Years) Average Age (Years) Average Service Life Remaining (Years) Garage 50 Years 20.0 30.0 Office 25 - 60 Years 32.0 10.5 28.0 17.0 Each asset's Estimated Useful Life should be reviewed periodically to determine whether adjustments need to be made to better align with the observed length of service life for each asset type. 43 4.3.4 Forecasted Capital Requirements The following graph forecasts long-term capital requirements. The annual capital requirement represents the average amount per year that the Municipality should allocate towards funding rehabilitation and replacement needs. The projected cost of lifecycle activities that will need to be undertaken over the next 10 years to maintain the current level of service can be found in Appendix A. 44 Machinery & Equipment This AMP primarily focuses on core asset categories as defined in O. Reg. 588/17. Machinery & Equipment are not considered a core municipal infrastructure. The Municipality of Mattawan owns and uses equipment that provides key services to the community. These include: - Office equipment - IT equipment - Chainsaws, brush saw - Fire pump with hoses, generator - Signs and safety equipment A high-level analysis of this category is provided. For most of these assets, the Municipality does not currently have assessed condition data. The Municipality will work towards improving data quality and meeting all requirements required prior to July 1, 2024. 4.4.1 Asset Inventory & Replacement Cost The table below includes the quantity, replacement cost method and total replacement cost of each asset segment in the Municipality's Machinery & Equipment inventory. Asset Segment Quantity Replacement Cost Method Total Replacement Cost Office Equipment 2 21% CPI Tables, 79% User-Defined $18,949 Machinery 6 62% CPI Tables, 38% User-Defined $23,130 IT Equipment 4 100% User-Defined $8,000 Signage 1 100% User-Defined $1,500 $51,579 45 4.4.2 Asset Condition The table below identifies the current average condition and source of available condition data for each asset segment. The Average Condition (%) is a weighted value based on replacement cost. Asset Segment Average Condition (%) Average Condition Rating Condition Source IT Equipment 80% Very Good Age-Based Machinery 71% Good 57% Assessed Office Equipment 48% Fair Age-Based Signage 87% Very Good Age-Based 64% Good 25% Assessed To ensure that the Municipality's Machinery & Equipment continues to provide an acceptable level of service, the Municipality should monitor the average condition of all assets. If the average condition declines, staff should re-evaluate their lifecycle management strategy to determine what combination of maintenance, rehabilitation, and replacement activities is required to increase the overall condition of the Machinery & Equipment. 46 4.4.3 Estimated Useful Life & Average Age The Estimated Useful Life for Machinery & Equipment assets has been assigned according to a combination of established industry standards and staff knowledge. The Average Age of each asset is based on the number of years each asset has been in service. Finally, the Average Service Life Remaining represents the difference between the Estimated Useful Life and the Average Age, except when an asset has been assigned an assessed condition rating. The assessed condition may increase or decrease the average service life remaining. Asset Segment Estimated Useful Life (Years) Average Age (Years) Average Service Life Remaining (Years) IT Equipment 5 Years 1.0 4.0 Machinery 10 - 25 Years 11.4 8.9 Office Equipment 10 - 15 Years 10.0 2.5 Signage 15 Years 2.0 13.0 8.1 7.1 Each asset's Estimated Useful Life should be reviewed periodically to determine whether adjustments need to be made to better align with the observed length of service life for each asset type. 47 4.4.4 Forecasted Capital Requirements The following graph forecasts long-term capital requirements. The annual capital requirement represents the average amount per year that the Municipality should allocate towards funding rehabilitation and replacement needs. The projected cost of lifecycle activities that will need to be undertaken over the next 10 years to maintain the current level of service can be found in Appendix A. 48 Key Insights 5 Impacts of Growth - Understanding the key drivers of growth and demand will allow the Municipality to more effectively plan for new infrastructure, and the upgrade or disposal of existing infrastructure - Minimal changes to population and employment are expected - The costs of growth should be considered in long-term funding strategies that are designed to maintain the current level of service 49 Description of Growth Assumptions The demand for infrastructure and services will change over time based on a combination of internal and external factors. Understanding the key drivers of growth and demand will allow the Municipality to more effectively plan for new infrastructure, and the upgrade or disposal of existing infrastructure. Increases or decreases in demand can affect what assets are needed and what level of service meets the needs of the community. 5.1.1 East Nipissing Official Plan (January 2021) The East Nipissing Planning Board covers the areas of Mattawan, Calvin, and Papineau- Cameron. The Official Plan has been enacted and passed by the Corporation of the Municipality of Mattawan as of February 11th, 2021. The Official Plan spans a 25-year time horizon (2021-2046) and will be revised no less frequently than 10 years after it has come into effect and every five years thereafter. The Official Plan has been prepared based on four key components including community development, environmental stewardship, community health and safety, and resource management. The overall goal is to attain a healthy economic base that supports sustainable and orderly community development while conserving the attributes and resources of the rural area. Mattawan makes up two-thirds of the Rural Lands endowed with natural resources whose extraction or development, including value-added land-use activities, support the economic base of East Nipissing. Resource-based uses include mineral aggregate extraction, forestry, and agriculture. Servicing of development will be principally through individual on-site water and sewage systems. No new municipal water or sewer services are anticipated over the life of the Official Plan (2021-2046). The following table summarizes the historical population, employment, and household statistics for the Municipality of Mattawan from the StatsCan Census. There may be changes in the distribution of full-time and part-time labour. Overall, minimal changes to population and employment are expected in the short term. Year 2006 2011 2016 Population 147 162 161 Employment 95 Not Available 55 Households 65 75 75 50 Impact of Growth on Lifecycle Activities By July 1, 2025, the Municipality's asset management plan must include a discussion of how the assumptions regarding future changes in population and economic activity informed the preparation of the lifecycle management and financial strategy. Planning for forecasted population growth may require the expansion of existing infrastructure and services. As growth-related assets are constructed or acquired, they should be integrated into the Municipality's AMP. While the addition of residential units may add to the existing assessment base and offset some of the costs associated with growth, the Municipality will need to review the lifecycle costs of growth-related infrastructure. These costs should be considered in long-term funding strategies that are designed to, at a minimum, maintain the current level of service. 51 Key Insights 6 Financial Strategy - The Municipality is committing $0 towards capital projects per year from sustainable revenue sources - Given the annual capital requirement of $123,000, there is currently a funding gap of $123,000 annually - For tax-funded assets, we recommend increasing tax revenues by 1.6% each year for the next 20 years to achieve a sustainable level of funding 52 Financial Strategy Overview For an asset management plan to be effective and meaningful, it must be integrated with a long-term financial plan (LTFP). The development of a comprehensive financial plan will allow the Municipality of Mattawan to identify the financial resources required for sustainable asset management based on existing asset inventories, desired levels of service, and projected growth requirements. This report develops such a financial plan by presenting several scenarios for consideration and culminating with final recommendations. As outlined below, the scenarios presented model different combinations of the following components: 1. The financial requirements for: a. Existing assets b. Existing service levels c. Requirements of contemplated changes in service levels (none identified for this plan) d. Requirements of anticipated growth (none identified for this plan) 2. Use of traditional sources of municipal funds: a. Tax levies b. User fees c. Reserves d. Debt 3. Use of non-traditional sources of municipal funds: a. Reallocated budgets b. Partnerships c. Procurement methods 4. Use of Senior Government Funds: a. Gas tax b. Annual grants Note: Periodic grants are normally not included due to Provincial requirements for firm commitments. However, if moving a specific project forward is wholly dependent on receiving a one-time grant, the replacement cost included in the financial strategy is the net of such grant being received. If the financial plan component results in a funding shortfall, the Province requires the inclusion of a specific plan as to how the impact of the shortfall will be managed. In determining the legitimacy of a funding shortfall, the Province may evaluate a Municipality's approach to the following: 1. In order to reduce financial requirements, consideration has been given to revising service levels downward. 53 2. All asset management and financial strategies have been considered. For example: a. If a zero-debt policy is in place, is it warranted? If not, the use of debt should be considered. b. Do user fees reflect the cost of the applicable service? If not, increased user fees should be considered. 6.1.1 Annual Requirements & Capital Funding Annual Requirements The annual requirements represent the amount the Municipality should allocate annually to each asset category to meet replacement needs as they arise, prevent infrastructure backlogs, and achieve long-term sustainability. In total, the Municipality must allocate approximately $123k annually to address capital requirements for the assets included in this AMP. For all asset categories, the annual requirement has been calculated based on a "replacement only" scenario, in which capital costs are only incurred at the construction and replacement of each asset. Although the Municipality relies on a replacement-only scenario, a lifecycle strategy scenario is also described below should the Municipality incorporate measures that yield benefits through preventative maintenance or rehabilitation activities in the future. 1. Replacement Only Scenario: Based on the assumption that assets deteriorate and - without regularly scheduled maintenance and rehabilitation - are replaced at the end of their service life. 2. Lifecycle Strategy Scenario: Based on the assumption that lifecycle activities are performed at strategic intervals to extend the service life of assets until a replacement is required. The implementation of a proactive lifecycle strategy for assets can lead to potential annual cost avoidance. As the Replacement scenario represents the most cost-effective option available to the Municipality, we have used these annual requirements in the development of the financial strategy. 54 Annual Funding Available Based on a historical analysis of sustainable capital funding sources, the Municipality is committing $0 towards capital projects per year. Given the annual capital requirement of $123,000, there is currently a funding gap of $123,000 annually. Funding Objective We have developed a scenario that would enable Mattawan to achieve full funding within 1 to 20 years for the following assets: 1. Tax Funded Assets: Road Network, Bridges & Culverts, Buildings, Machinery & Equipment For each scenario developed we have included strategies, where applicable, regarding the use of cost containment and funding opportunities. 55 Financial Profile: Tax Funded Assets 6.3.1 Current Funding Position The following tables show, by asset category, Mattawan's average annual capital expenditure (CapEx) requirements, current funding positions, and funding increases required to achieve full funding on assets funded by taxes. Asset Category Avg. Annual Requirement Annual Funding Available Annual Deficit Taxes Gas Tax OCIF Total Available Road Network 44,000 Bridges & Culverts 60,000 Buildings 14,000 Machinery & Equipment 5,000 123,000 0 05 05 0 123,000 The average annual CapEx requirement for the above categories is $123k. Annual revenue currently allocated to these asset categories for CapEx is $0 leaving an annual deficit of $123k. Put differently, these asset categories are currently funded at 0% of their long-term requirements. 6.3.2 Full Funding Requirements In 2020, the Municipality of Mattawan had annual tax revenues of $364k. As illustrated in the following table, without consideration of any other sources of revenue or cost containment strategies, full funding would require the following tax change over time: Asset Category Tax Change Required for Full Funding Road Network 12.1% Bridges & Culverts 16.5% Buildings 3.8% Machinery & Equipment 1.4% 33.8% 5 Currently, all sustainable grants and transfers are being allocated towards Operating expenditures 56 The following changes in costs and/or revenues over the next number of years should also be considered in the financial strategy: a) Mattawan's formula-based OCIF grant is scheduled to remain at $50k in 2020 for their operating expenditure (OPEX). b) Mattawan's debt payments for these asset categories will be decreasing by $8k over the next 5 years. Our recommendations include capturing the above changes and allocating them to the infrastructure deficit outlined above. The table below outlines this concept and presents several options6: Without Capturing Changes With Capturing Changes 5 Years 10 Years 15 Years 20 Years 5 Years 10 Years 15 Years 20 Years Infrastructure Deficit 123,000 123,000 123,000 123,000 123,000 123,000 123,000 123,000 Change in Debt Costs N/A N/A N/A N/A -8,000 -8,000 -8,000 -8,000 Change in OCIF Grants N/A N/A N/A N/A 0 0 0 0 Resulting Infrastructu re Deficit 123,000 123,000 123,000 123,000 115,000 115,000 115,000 115,000 Tax Increase Required 33.8% 33.8% 33.8% 33.8% 31.6% 31.6% 31.6% 31.6% Annually 6.8% 3.4% 2.3% 1.7% 6.3% 3.2% 2.1% 1.6% 6 The capturing changes options assume no new debt is issued to allow for changes in debt costs to offset a portion of the tax increases required. 57 6.3.3 Financial Strategy Recommendations At present time, Mattawan's CapEx funding strategy has been as capital project needs arise, to look to grants, debt, and/or cash on hand. Considering this and all the above information, we are recommending that Mattawan consider the 20-year option. This involves full funding being achieved over 20 years by: a) creating a capital budget to direct funds towards CapEx projects. b) when realized, reallocating the debt cost reductions of $8k to the infrastructure deficit as outlined above. c) increasing tax revenues by 1.6% each year for the next 20 years solely to phase in full funding to the asset categories covered in this section of the AMP. d) allocating the current gas tax and OCIF revenue as outlined previously. e) allocating the scheduled OCIF grant increases to the infrastructure deficit as they occur. f) reallocating appropriate revenue from categories in a surplus position to those in a deficit position. g) increasing existing and future infrastructure budgets by the applicable inflation index on an annual basis in addition to the deficit phase-in. Notes: 1. As in the past, periodic senior government infrastructure funding will most likely be available during the phase-in period. By Provincial AMP rules, this periodic funding cannot be incorporated into an AMP unless there are firm commitments in place. We have included OCIF formula-based funding, if applicable, since this funding is a multi- year commitment7. 2. We realize that raising tax revenues by the amounts recommended above for infrastructure purposes will be very difficult to do. However, considering a longer phase- in window may have even greater consequences in terms of infrastructure failure. Although this option achieves full CapEx funding on an annual basis in 20 years and provides financial sustainability over the period modeled, the recommendations do require prioritizing capital projects to fit the resulting annual funding available. Current data shows a pent-up investment demand of $45k for the Road Network, & $4k for Machinery & Equipment. Prioritizing future projects will require the current data to be replaced by condition-based data. Although our recommendations include no further use of debt, the results of the condition- based analysis may require otherwise. 7 The Municipality should take advantage of all available grant funding programs and transfers from other levels of government. While OCIF has historically been considered a sustainable source of funding, the program is currently undergoing review by the provincial government. This review may result in changes that impact its availability. 58 Use of Debt For reference purposes, the following table outlines the premium paid on a project if financed by debt. For example, a $100k project financed at 3.0%8 over 15 years would result in a 26% premium or $26k of increased costs due to interest payments. For simplicity, the table does not consider the time value of money or the effect of inflation on delayed projects. Interest Rate Number of Years Financed 5 10 15 20 25 30 7.0% 22% 42% 65% 89% 115% 142% 6.5% 20% 39% 60% 82% 105% 130% 6.0% 19% 36% 54% 74% 96% 118% 5.5% 17% 33% 49% 67% 86% 106% 5.0% 15% 30% 45% 60% 77% 95% 4.5% 14% 26% 40% 54% 69% 84% 4.0% 12% 23% 35% 47% 60% 73% 3.5% 11% 20% 30% 41% 52% 63% 3.0% 9% 17% 26% 34% 44% 53% 2.5% 8% 14% 21% 28% 36% 43% 2.0% 6% 11% 17% 22% 28% 34% 1.5% 5% 8% 12% 16% 21% 25% 1.0% 3% 6% 8% 11% 14% 16% 0.5% 2% 3% 4% 5% 7% 8% 0.0% 0% 0% 0% 0% 0% 0% It should be noted that current interest rates are near all-time lows. Sustainable funding models that include debt need to incorporate the risk of rising interest rates. The following graph shows where historical lending rates have been: 8 Current municipal Infrastructure Ontario rates for 15-year money is 3.2%. 0.00% 5.00% 10.00% 15.00% Historical Prime Business Interest Rate 59 A change in 15-year rates from 3% to 6% would change the premium from 26% to 54%. Such a change would have a significant impact on a financial plan. The following tables outline how Mattawan has historically used debt for investing in the asset categories as listed. There is currently $8,000 of debt outstanding for the assets covered by this AMP with corresponding principal and interest payments of $8,000. well within its provincially prescribed maximum of $5,366,000. Asset Category Current Debt Outstanding Use of Debt in the Last Five Years 2016 2017 2018 2019 2020 Road Network 8,000 35,000 Bridges & Culverts Buildings Machinery & Equipment Total Tax Funded: 8,000 35,000 0 0 0 0 Asset Category Principal & Interest Payments in the Next Ten Years 2020 2021 2022 2023 2024 2025 2030 Road Network 8,000 8,000 Bridges & Culverts Buildings Machinery & Equipment Total Tax Funded: 8,000 8,000 0 0 0 0 0 The revenue options outlined in this plan allow Mattawan to fully fund its long-term infrastructure requirements without further use of debt. 60 Use of Reserves 6.5.1 Available Reserves Reserves play a critical role in long-term financial planning. The benefits of having reserves available for infrastructure planning include: a) the ability to stabilize tax rates when dealing with variable and sometimes uncontrollable factors b) financing one-time or short-term investments c) accumulating the funding for significant future infrastructure investments d) managing the use of debt e) normalizing infrastructure funding requirement At present time, the Municipality of Mattawan does not have formally defined reserves. The Municipality had net financial assets totalling $227k as of December 31, 2020. Put differently, this means this is how much cash the Municipality would theoretically have if all financial assets were liquidated to cash, and all liabilities were settled. There is considerable debate in the municipal sector as to the appropriate level of reserves that a Municipality should have on hand. There is no clear guideline that has gained wide acceptance. Factors that municipalities should consider when determining their capital reserve requirements include: a) breadth of services provided b) age and condition of infrastructure c) use and level of debt d) economic conditions and outlook e) internal reserve and debt policies. These reserves are available for use by applicable asset categories during the phase-in period to full funding. This coupled with Mattawan's judicious use of debt in the past, allows the scenarios to assume that, if required, available reserves and debt capacity can be used for high priority and emergency infrastructure investments in the short- to medium-term. 6.5.2 Recommendation In 2025, Ontario Regulation 588/17 will require Mattawan to integrate proposed levels of service for all asset categories in its asset management plan update. We recommend that future planning should reflect adjustments to service levels and their impacts on reserve balances. 61 Key Insights 7 Appendices - Appendix A identifies projected 10-year capital requirements for each asset category - Appendix B includes several maps that have been used to visualize the current level of service - Appendix C provides additional guidance on the development of a condition assessment program 62 Appendix A: 10-Year Capital Requirements The following tables identify the capital cost requirements for each of the next 10 years in order to meet projected capital requirements and maintain the current level of service. Road Network Asset Segment Backlog 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Culverts - <3 meter span $45,412 $38,526 $31,992 $44,513 $9,107 $7,896 $37,527 $10,447 $0 $0 $13,134 Unpaved Roads $75,850 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $121,262 $38,526 $31,992 $44,513 $9,107 $7,896 $37,527 $10,447 $0 $0 $13,134 Bridges & Culverts Asset Segment Backlog 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Bridges $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Buildings Asset Segment Backlog 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Garage $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Office $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 63 Machinery & Equipment Asset Segment Backlog 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Machinery $0 $0 $0 $0 $0 $0 $13,130 $0 $0 $0 $0 Office Equipment $3,949 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Signage $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 IT Equipment $0 $0 $0 $0 $0 $0 $8,000 $0 $0 $0 $0 $3,949 $0 $0 $0 $0 $0 $21,130 $0 $0 $0 $0 All Asset Categories Asset Segment Backlog 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Road Network $121,262 $38,526 $31,992 $44,513 $9,107 $7,896 $37,527 $10,447 $0 $0 $13,134 Bridges & Culverts $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Buildings $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Machinery & Equipment $3,949 $0 $0 $0 $0 $0 $21,130 $0 $0 $0 $0 $125,211 $38,526 $31,992 $44,513 $9,107 $7,896 $58,657 $10,447 $0 $0 $13,134 64 Appendix B: Level of Service Maps Road Network Map 1 65 Road Network Map 2 66 Images of Bridge in Good Condition Burke Drive Bridge Inspected: October 4th, 2019 Images of Bridge in Poor Condition Murphy Road Bridge Inspected: October 4th, 2019 South Approach Looking North Deck Looking Northeast South Abutment Wall, East Elv East Elevation Looking NW Post to Beam Connection Soffit of East Space South Approach Looking North West Fascia South End Cracks North Abutment with Crack South Pier - Looking SE South Span Connection - cracks South Pier - Top Portion 67 Appendix C: Condition Assessment Guidelines The foundation of good asset management practice is accurate and reliable data on the current condition of infrastructure. Assessing the condition of an asset at a single point in time allows staff to have a better understanding of the probability of asset failure due to deteriorating conditions. Condition data is vital to the development of data-driven asset management strategies. Without accurate and reliable asset data, there may be little confidence in asset management decision- making which can lead to premature asset failure, service disruption, and suboptimal investment strategies. To prevent these outcomes, the Municipality's condition assessment strategy should outline several key considerations, including: - The role of asset condition data in decision-making - Guidelines for the collection of asset condition data - A schedule for how regularly asset condition data should be collected Role of Asset Condition Data The goal of collecting asset condition data is to ensure that data is available to inform maintenance and renewal programs required to meet the desired level of service. Accurate and reliable condition data allows municipal staff to determine the remaining service life of assets, and identify the most cost-effective approach to deterioration, whether it involves extending the life of the asset through remedial efforts or determining that replacement is required to avoid asset failure. In addition to the optimization of lifecycle management strategies, asset condition data also impacts the Municipality's risk management and financial strategies. Assessed condition is a key variable in the determination of an asset's probability of failure. With a strong understanding of the probability of failure across the entire asset portfolio, the Municipality can develop strategies to mitigate both the probability and consequences of asset failure and service disruption. Furthermore, with condition-based determinations of future capital expenditures, the Municipality can develop long-term financial strategies with higher accuracy and reliability. Guidelines for Condition Assessment Whether completed by external consultants or internal staff, condition assessments should be completed in a structured and repeatable fashion, according to consistent and objective assessment criteria. Without proper guidelines for the completion of condition assessments there can be little confidence in the validity of condition data and asset management strategies based on this data. 68 Condition assessments must include a quantitative or qualitative assessment of the current condition of the asset, collected according to specified condition rating criteria, in a format that can be used for asset management decision-making. As a result, it is important that staff adequately define the condition rating criteria that should be used and the assets that require a discrete condition rating. When engaging with external consultants to complete condition assessments, it is critical that these details are communicated as part of the contractual terms of the project. There are many options available to the Municipality to complete condition assessments. In some cases, external consultants may need to be engaged to complete detailed technical assessments of infrastructure. In other cases, internal staff may have sufficient expertise or training to complete condition assessments. Developing a Condition Assessment Schedule Condition assessments and general data collection can be both time-consuming and resource- intensive. It is not necessarily an effective strategy to collect assessed condition data across the entire asset inventory. Instead, the Municipality should prioritize the collection of assessed condition data based on the anticipated value of this data in decision-making. The International Infrastructure Management Manual (IIMM) identifies four key criteria to consider when making this determination: 1. Relevance: every data item must have a direct influence on the output that is required 2. Appropriateness: the volume of data and the frequency of updating should align with the stage in the assets life and the service being provided 3. Reliability: the data should be sufficiently accurate, have sufficient spatial coverage, and be appropriately complete and current 4. Affordability: the data should be affordable to collect and maintain