2022 Corporate Asset Management Plan

Perry, Ontario

This is the exact embedded text of the captured official document. Snapshot 6bf24b1c8769 · verified 2026-06-10 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

2022 CORPORATE ASSET MANAGEMENT PLAN PERRY TOWNSHIP © 2022, Corporation of the Township of Perry. All Rights Reserved. The preparation of this project was carried out with assistance from the Government of Canada and the Federation of Canadian Municipalities. Notwithstanding this support, the views expressed are the personal views of the authors, and the Federation of Canadian Municipalities and the Government of Canada accept no responsibility for them. Township of Perry | 2022 Asset Management Plan | Rev. 5 | i Executive Summary Introduction The Township of Perry provides a range of services to its residents, businesses, and visitors, including transportation services on local roads; parks and recreation; fire protection; solid waste management and municipal administration services, such as by-law enforcement and development planning. To deliver these services, the Township relies on $126.0 million of infrastructure assets, including 144 km of roadways, 9 bridges and structural culverts, 17 buildings, 21 vehicles, as well as public parks, beaches, and boat launches. This Asset Management (AM) Plan describes the actions required to manage this portfolio of assets in a way that meets service level targets, while managing risks and costs. The 2022 AM Plan focuses on the 10-year period from 2022 to 2031. This document fulfils the AM Plan requirements defined by Ontario Regulation (O.Reg.) 588/17 Asset Management Planning for Municipal Infrastructure for years 2022, 2024 and 2025. State of the Infrastructure As shown in Figure ES-1, 72.1% ($90.9 million) of the Township's assets are in Fair condition or better, while 27.9% ($35.1 million) of assets are in Poor or Very Poor condition. Ninety percent (90% or $113.0 million) of the Township's inventory value consists of transportation assets, so the overall condition profile is driven by the condition profile of transportation assets. Figure ES-1: Condition Overview - All Services Assets in Very Poor condition are due or overdue for repair and represent the Township's Renewal Backlog. As shown in the figure, the Township has a renewal backlog of $9.8 million. Seventy percent (69.5% or $6.8 million) of the backlog consists of transportation assets, including $5.8 million of road assets and $1.0 million of bridges and culverts. Another 28.8% ($2.8 million) consists of the existing Emsdale Community Centre and Library buildings, which are being replaced by a new building that will be constructed in 2022-23 (opening anticipated in 2023). The remaining 1.7% ($0.17 million) of assets listed in Very Poor condition were identified based on their age and consist of Self-Contained Breathing Apparatus (SCBA) and associated fire equipment. Township of Perry | 2022 Asset Management Plan | Rev. 5 | ii Levels of Service LOS indicators, current performance and targets are presented by service area. Indicators include those defined by O.Reg.588/17 for roads, bridges, and structural culverts, as well as indicators defined by the Township to reflect specific priorities and concerns related to its transportation, parks and recreation, fire protection, solid waste, and municipal administration services. In general, targets were established in alignment with those seen in peer municipalities, and also considered the findings of an internet-based public survey that was conducted from October 7 to November 3, 2021. Performance gaps were identified with respect to the following indicators: - Average Pavement Condition Index (PCI) for paved (asphalt), surface treated and gravel roads - % of roads in Fair condition or better for MMS Class 5 and 6 roads - Average Bridge Condition Index (BCI) for bridges and structural culverts - % of bridges & culverts in Fair condition or better - % of outdoor recreation equipment assets in Fair condition or better - % of fire emergency equipment (non-vehicle) in Fair condition or better - % of solid waste diverted from landfill A performance gap was also identified for the average Facility Condition Index (FCI) of indoor recreation buildings, due to the poor condition of the Emsdale Community Centre and existing Library; however, plans are already in place to construct a new facility to house the Community Centre and Library in 2022/2023. Risk Management Strategy The Township's key asset management principle is to meet service levels and manage risk, while minimizing lifecycle costs. The Township's risk strategy develops the framework for quantifying the risk exposure of the Township's assets to enable prioritization of projects across asset classes and service areas. The relative importance of the assets to support service delivery, referred to as asset criticality, is a key driver in selection of the most appropriate asset management strategy for each asset. Criticality is evaluated on an asset's impact upon failure to service delivery, health and safety, the environment, financial position, and reputation. Risk exposure is the multiplication of the criticality or consequence of failure (CoF) by the probability of failure (PoF), which is the likelihood or chance that an asset failure may occur. Life Cycle Management Strategy Lifecycle management strategies are the planned lifecycle-based actions that the Township uses to manage its service levels and the risk of asset failure by reducing the probability of failure to acceptable levels. The Township performs hundreds of inspections, maintenance actions, and repair responses to ensure that infrastructure performs reliably. Lifecycle activities also include rehabilitation and replacement activities funded through the Capital Budget. These interventions extend asset service lives and lower overall lifecycle costs. In addition to meeting reliability service levels, the Township also plans for expansion and upgrade strategies to support capacity and functional service levels. The Township's growth and upgrade plan includes a new and expanded Emsdale Community Centre with new library scheduled to be constructed over 2022 and 2023 at a cost of $4.5 million, as well as upgrade of 1.9 km of gravel road to surface treated in 2024 (1.4 km of Churchill Gardens from Bay Lake Road to Homeland Drive and 0.5 km of Beach Road from Bay Lake Road to Churchill Gardens). The cost of the road upgrade is estimated at $90k (in 2022 $). The Township's total forecasted needs based on its planned strategy for managing its assets at proposed service levels is estimated at $62.33 million for the period 2022-2031 for an average of $6.233 million per year. The planned Township of Perry | 2022 Asset Management Plan | Rev. 5 | iii strategy supports the Township's ability to achieve its service levels while balancing risk and minimizing lifecycle costs. If the Township does not invest in renewing its infrastructure, there is a significant deterioration in asset condition over time. The Planned Strategy therefore ensures that assets are maintained and renewed in a state of good repair, as shown in Figure ES-2. Year-by-year expansion, upgrade and renewal actions associated with the Planned Strategy are listed in Appendix C. Figure ES-2: Asset Condition Forecast Comparison - Do Nothing versus Planned Strategy Do Nothing (No Capital Renewal) Planned Strategy Financial Strategy The financial strategy is informed by the preceding sections of the Asset Management Plan: the state or condition of the assets, the proposed levels of service, the risks to service delivery, and the lifecycle activities needed to reduce the risks to service delivery targets to acceptable levels. The Financing strategy considers how the Township will fund the planned asset management actions to meet the proposed service levels. The Township's main sources of revenue include property tax, debt, federal gas tax, grants, and user fees and charges. Over the next ten years, the average annual revenue is estimated at $5.819 million per year. As shown in Figure ES-3, when compared to the forecasted average annual need of $6.233 million per year, the Township has an average annual funding gap of $414,000 per year over the next ten years. Figure ES-3: Funding Gap Closing the $414,000/year gap may require some use of additional funding. The gap may also be reduced if the number of households in the Township grows at a rate greater than the assumed 0.6% growth rate, resulting in higher than forecasted tax revenues. If funding is not increased, then the Township may consider deferring one or more capital projects on lower risk assets. Township of Perry | 2022 Asset Management Plan | Rev. 5 | iv Monitoring and Improvement Development of AM Plans is an iterative process that includes improving data, processes, systems, staff skills, and organizational culture over time. This AM Plan is compliant with Ontario Regulation 588/17 for current and proposed levels of service, and the Township will continue to work on improvement initiatives to its asset management practices to best realize value from its infrastructure. Specific improvements recommended for the next AM Plan include: - Record and categorize complaints (e.g. for solid waste: fees, operating hours, wait time complaints), and use the data to inform future level of service targets. - Collect asset inventory and life cycle data on the landfill, so that it can be included in the next AM Plan. - Develop forecasts of 100-year and 5-year flood impacts. These are LOS metrics required by O.Reg. 588/17 for stormwater and drainage infrastructure. - For bridges, it is recommended that the next OSIM inspection (scheduled for 2022) specifically review the recommended timing for closing Wooden Bridge and replacement of Emsdale box culvert. - Facility Condition Index in the later years of the forecast can be estimated more accurately if the renewal needs beyond 10 years are included in the building condition assessments (for example, the FCI in year 10 of the forecast depends on the renewal needs anticipated in years 11 to 13). - A more granular building breakdown will assist in identifying longer term needs and also enable more accurate reporting of asset condition and shorter-term facility needs. Per O.Reg. 588/17, the Township will conduct an annual review of its asset management progress in implementing this AM Plan, including the year-by-year actions of the Planned Strategy shown in Appendix C, as well as the recommended improvements to AM practices. The annual review will discuss strategies to address any factors impeding implementation of the Planned Strategy and AM improvements. Township of Perry | 2022 Asset Management Plan | Rev. 5 | v Table of contents 1 Introduction ................................................................................................................................................................. 1 1.1 Purpose of the Plan..................................................................................................................................................................... 1 1.2 Alignment with Regulatory Requirements ......................................................................................................................... 1 1.3 Growth at the Township ........................................................................................................................................................... 2 1.4 Relationship with Other Municipal Documents ............................................................................................................... 2 1.5 Scope ............................................................................................................................................................................................... 3 1.6 Asset Management Service Groups ..................................................................................................................................... 3 1.7 Assets Not Included ................................................................................................................................................................... 3 1.8 Organization of the Document ............................................................................................................................................... 3 2 Inventory & Replacement Value ............................................................................................................................. 5 2.1 Overview .......................................................................................................................................................................................... 5 2.2 Transportation Assets ................................................................................................................................................................ 7 2.3 Parks & Recreation Service ................................................................................................................................................... 13 2.4 Fire Protection Service ............................................................................................................................................................ 15 2.5 Solid Waste Service ................................................................................................................................................................... 16 2.6 Municipal Administration ........................................................................................................................................................ 17 3 State of the Infrastructure .................................................................................................................................... 18 3.1 Overview ......................................................................................................................................................................................... 18 3.2 Transportation ............................................................................................................................................................................ 20 3.3 Parks & Recreation .................................................................................................................................................................. 26 3.4 Fire Protection Service ............................................................................................................................................................27 3.5 Solid Waste Service .................................................................................................................................................................. 28 3.6 Municipal Administration ....................................................................................................................................................... 29 4 Levels of Service ....................................................................................................................................................... 31 4.1 Overview ......................................................................................................................................................................................... 31 4.2 Transportation Service ........................................................................................................................................................... 32 4.3 Parks & Recreation .................................................................................................................................................................. 34 4.4 Fire Protection Service ........................................................................................................................................................... 36 4.5 Solid Waste Service .................................................................................................................................................................. 37 4.6 Municipal Administration ....................................................................................................................................................... 37 5 Risk Management Strategy .................................................................................................................................. 38 5.1 Overview ........................................................................................................................................................................................ 38 5.2 Consequence of Failure Matrix ............................................................................................................................................ 38 5.3 Risk to Levels of Service - Approach ................................................................................................................................ 39 6 Life Cycle Management Strategy ....................................................................................................................... 44 6.1 Overview ........................................................................................................................................................................................ 44 6.2 Life Cycle Management Needs ............................................................................................................................................ 45 6.3 Summary of Planned Strategy (Asset Lifecycle Needs) ............................................................................................ 50 6.4 Planned Strategy and Proposed LOS ................................................................................................................................. 51 7 Financing Strategy .................................................................................................................................................. 54 Township of Perry | 2022 Asset Management Plan | Rev. 5 | vi 7.1 Overview ........................................................................................................................................................................................ 54 7.2 Available Funding Amounts and Sources ........................................................................................................................ 54 7.3 Financial Sustainability ........................................................................................................................................................... 55 8 AM Plan Monitoring & Improvement .................................................................................................................. 57 8.1 Overview .........................................................................................................................................................................................57 8.2 Monitoring and Review Procedures ................................................................................................................................... 59 Appendix A - Regulatory Compliance ............................................................................................................................ 60 Appendix B - Public Survey ............................................................................................................................................... 62 Appendix C - 2022-31 Planned Strategy Actions Year by Year................................................................................. 73 List of Tables Table 2-1: Asset Inventory - All Services ......................................................................................................................................................... 5 Table 2-2: Sources of Replacement Value Estimates ................................................................................................................................. 7 Table 2-3: Inventory of Road Assets by Functional Class .......................................................................................................................... 7 Table 2-4: Inventory of Road Assets by Surface Type ............................................................................................................................... 8 Table 2-5: Bridges and Structural Culverts ................................................................................................................................................... 10 Table 2-6: Inventory of Streetlights by Type ................................................................................................................................................. 11 Table 2-7: Inventory of Traffic Signs by Type ................................................................................................................................................ 11 Table 2-8: Inventory of Vehicles & Equipment Supporting Transportation Service ..................................................................... 12 Table 2-9: Inventory of Buildings Supporting Transportation Service ............................................................................................... 12 Table 2-10: Inventory of Outdoor Recreation Assets................................................................................................................................. 13 Table 2-11: Inventory of Vehicles and Equipment Supporting Parks & Recreation Service ...................................................... 14 Table 2-12: Inventory of Buildings Supporting Parks & Recreation Service .................................................................................... 14 Table 2-13: Inventory of Emergency Equipment used by the Fire Service ....................................................................................... 15 Table 2-14: Inventory of Vehicles and Equipment Supporting Fire Service ...................................................................................... 15 Table 2-15: Inventory of Buildings Supporting Fire Service .................................................................................................................... 15 Table 2-16: Inventory of Site Equipment used by the Solid Waste Service ...................................................................................... 16 Table 2-17: Inventory of Buildings Supporting the Solid Waste Service ............................................................................................ 16 Table 2-18: Inventory of Site Equipment used by the Solid Waste Service ...................................................................................... 17 Table 3-1: Condition Grading Criteria ............................................................................................................................................................... 19 Table 3-2: Conversion Table for Condition Grades ..................................................................................................................................... 19 Table 3-3: Descriptions Road Condition Scores ......................................................................................................................................... 22 Table 3-4: Average Age of Road Surface Assets ........................................................................................................................................ 23 Township of Perry | 2022 Asset Management Plan | Rev. 5 | vii Table 3-5: Bridge Condition Index scores and Associated Descriptions .......................................................................................... 24 Table 4-1: Levels of Service - Transportation - Roads ............................................................................................................................ 33 Table 4-2: Levels of Service - Transportation - Bridges & Culverts ................................................................................................. 34 Table 4-3: Levels of Service - Parks & Recreation ................................................................................................................................... 35 Table 4-4: Levels of Service - Fire Protection Service ............................................................................................................................ 36 Table 4-5: Levels of Service - Solid Waste Service ................................................................................................................................... 37 Table 4-6: Levels of Service - Municipal Administration ........................................................................................................................ 37 Table 5-1: Asset Criticality (Consequence of Failure) Ratings .............................................................................................................. 39 Table 5-2: Probability of Failure Ratings for Reliability ........................................................................................................................... 40 Table 5-3: Consequence of Failure Ratings for Reliability ...................................................................................................................... 41 Table 6-1: Asset Lifecycle Management Categories ................................................................................................................................ 44 Table 6-2: Upgrade and Renewal Needs Forecasts (in 2022 $, thousands) .................................................................................... 47 Table 6-3: Operations and Maintenance Needs Activities ..................................................................................................................... 48 Table 6-4: Operations and Maintenance Needs History and Forecasts ($ thousands) ............................................................. 50 Table 6-5: Proposed LOS over Forecast Period ......................................................................................................................................... 52 Table 7-1: Key Sources of Funding and Financing ..................................................................................................................................... 54 Table 7-2: AM Plan Risk Mitigation Summary .............................................................................................................................................. 56 Table 8-1: O.Reg. 588/17 Compliance Status and Other Opportunities ..............................................................................................57 Table A-1: Regulatory Compliance ................................................................................................................................................................... 60 Table B-1: Willingness to Pay ..............................................................................................................................................................................72 List of Figures Figure ES-1: Condition Overview - All Services ............................................................................................................................................... i Figure ES-2: Asset Condition Forecast Comparison - Do Nothing versus Planned Strategy ....................................................iii Figure ES-3: Funding Gap ......................................................................................................................................................................................iii Figure 1-1: Township Population History and Forecast to 2031 .............................................................................................................. 2 Figure 2-1: Map of Road Network by Functional Class .............................................................................................................................. 8 Figure 2-2: Map of Road Network by Surface Type .................................................................................................................................... 9 Figure 2-3: Map of Bridges and Structural Culverts ................................................................................................................................. 10 Figure 3-1: Condition Overview - All Services ............................................................................................................................................... 18 Figure 3-2: Condition Overview - Transportation ...................................................................................................................................... 20 Figure 3-3: Condition Distribution - Roads ................................................................................................................................................... 21 Township of Perry | 2022 Asset Management Plan | Rev. 5 | viii Figure 3-4: Map of Road Condition ................................................................................................................................................................... 21 Figure 3-5: Condition Distribution - Bridges and Culverts..................................................................................................................... 23 Figure 3-6: Average Age - Bridges and Culverts ....................................................................................................................................... 24 Figure 3-7: Condition Distribution - Streetlights and Traffic Signs .................................................................................................... 25 Figure 3-8: Average Age - Streetlights and Traffic Signs ...................................................................................................................... 25 Figure 3-9: Condition Distribution - Vehicles, Equipment and Facilities for Transportation ................................................... 25 Figure 3-10: Average age - Vehicles, Equipment & Facilities for Transportation ........................................................................ 26 Figure 3-11: Condition Distribution - Parks & Recreation Assets ........................................................................................................ 26 Figure 3-12: Average Age - Parks & Recreation Assets ...........................................................................................................................27 Figure 3-13: Condition Distribution - Fire Protection Assets .................................................................................................................27 Figure 3-14: Average Age - Fire Protection Assets ................................................................................................................................... 28 Figure 3-15: Condition Distribution - Solid Waste Assets ....................................................................................................................... 28 Figure 3-16: Average Age - Solid Waste Assets ......................................................................................................................................... 29 Figure 3-17: Condition Distribution - Municipal Administration Assets ............................................................................................ 29 Figure 3-18: Average Age - Municipal Administration Assets .............................................................................................................. 30 Figure 4-1: Levels of Service Framework ...................................................................................................................................................... 32 Figure 5-1: Current Risk - All Assets (by Asset Replacement Value in 2022 $M) .......................................................................... 43 Figure 6-1: Conceptual Lifecycle Cost Model .............................................................................................................................................. 45 Figure 6-2: Capital Renewal Needs Forecast .............................................................................................................................................. 46 Figure 6-3: Total 10-Year Expenditures Forecast, 2022 to 2031............................................................................................................ 50 Figure 6-4: Asset Condition Forecast Comparison - Do Nothing versus Planned Strategy ..................................................... 51 Figure 6-5 Asset Risk Forecast Comparison - Do Nothing versus Planned Strategy ................................................................. 51 Figure 7-1: Total 10-Year Funding Forecast, 2022 to 2031 ....................................................................................................................... 55 Figure 7-2: Funding Gap ....................................................................................................................................................................................... 56 Figure B-1: Roads Satisfaction Level .............................................................................................................................................................. 66 Figure B-2: Roads Satisfaction by Respondents' Road Surface Type ............................................................................................... 66 Figure B-3: Road Aspects to be Improved ................................................................................................................................................... 67 Figure B-4: Parks & Outdoor Recreation Satisfaction Level ................................................................................................................. 68 Figure B-5: Parks & Outdoor Recreation Aspects to be Improved .................................................................................................... 68 Figure B-6: Indoor Recreation Satisfaction Level ..................................................................................................................................... 69 Figure B-7: Indoor Recreation Aspects to be Improved ......................................................................................................................... 69 Figure B-8: Solid Waste Satisfaction Level .................................................................................................................................................. 70 Figure B-9: Solid Waste Service Aspects to be Improved ..................................................................................................................... 70 Township of Perry | 2022 Asset Management Plan | Rev. 5 | 1 1 Introduction The Township of Perry provides a range of services to its residents, businesses, and visitors, including transportation services on local roads; parks and recreation; fire protection; solid waste management and municipal administration services. To deliver these services, the Township relies on $126.02 million of infrastructure assets, including 144 km of roadways, 9 bridges and structural culverts, 17 buildings, 21 vehicles, as well as public parks, beaches, and boat launches. The Township proactively and responsibly manages its infrastructure portfolio. As infrastructure ages and demands increase, so will the challenge of ensuring the needs of the community are effectively met with the limited resources available. This Asset Management Plan (AM Plan) seeks to address that concern by providing a framework for prioritizing and optimizing Asset Management (AM) efforts and providing direction for effective management of the Township's infrastructure to best achieve established goals and objectives. As an integrated Plan, it considers the life cycles and needs of all infrastructure assets and classes within the Plan's scope, providing a sustainable, holistic view of the asset portfolios. The Plan is not only focused on managing individual assets but considers the condition and performance of complete asset systems through a systematic, risk-based decision-making process. The resulting Plan is intended to provide the optimal allocation of resources towards meeting prescribed goals, objectives, and levels of service. 1.1 Purpose of the Plan The 2022 AM Plan is an update to the Township's 2013 AM Plan, and describes the actions required to manage this portfolio of assets in a way that supports established service levels, while managing risks and costs. The 2022 AM Plan focuses on the 10-year period from 2022 to 2031 and provides a framework for continuously improving the Township's AM practices. 1.2 Alignment with Regulatory Requirements This AM Plan fulfils the requirements of the Ontario Regulation (O.Reg.) 588/17 Asset Management Planning for Municipal Infrastructure for AM Plans to 2025. Specifically, this AM Plan proposes Levels of Service (LOS) targets for all assets and recommends actions and financial strategies to achieve those targets within a manageable level of risk. For details on how this AM Plan complies with content requirements defined by O.Reg. 588/17, see Appendix A. By meeting O.Reg. 588/17's AM Plan requirements for 2025, this AM Plan meets and surpasses the regulations requirements for 2022 and 2024, specifically to report current LOS performance of core assets (2022) and non-core assets (2024), and costs associated with sustaining that LOS. The regulation defines core assets as roads and bridges, as well as water, wastewater, and stormwater assets. Of these, the Township's inventory includes only roads and bridges. The Township's stormwater is managed by its network of ditches and driveway culverts that are considered as part of the road network in this AM Plan. Non-core assets include all other assets owned by a Township. In accordance with the requirements of O.Reg. 588/17, this AM Plan is posted on the Township's website. Going forward, O.Reg. 588/17 requires that progress implementing the AM Plan be reported to Council by July 1 each year, and that the AM Plan be updated every 5 years or more frequently. Background information and reports for the State of Infrastructure section may be provided by the Township upon request. Township of Perry | 2022 Asset Management Plan | Rev. 5 | 2 1.3 Growth at the Township One main factor many municipalities must consider in AM planning is the impact of future growth on meeting goals and objectives. The Township monitors trends in its population to ensure that its impacts on service levels are well understood and strategies are developed to address additional demands due to growth and demographics. The Township's historical and forecast future population is summarized in Figure 1-1. Historical data is based on Census information up to 2016, at which time the population in the Township was 2,454. From 2017 to 2021, the Township experienced a 0.6% average annual increase in the number of households according to assessment data from the Municipal Property Assessment Corporation (MPAC). Assuming that this annual growth rate is maintained, the population is projected to increase to 2,684 in 2031. Figure 1-1: Township Population History and Forecast to 2031 1.4 Relationship with Other Municipal Documents AM Planning is a key tactical (medium term) planning activity that relies on input from strategic planning activities and informs shorter-term decision making. The AM Plan provides a framework to validate the Township's budgeting processes and assists in prioritizing work activities, including capital projects, based on risk. It also discusses levels of service that support goals in the Township's Strategic Plan (2012) and life cycle management strategies intended to reduce the overall cost of asset ownership. The AM Plan is intended to be read with other Township planning documents, including the following: - Strategic Asset Management Plan Policy - Road Needs Study with Fleet Assessment (2020) - Bridge Inspection Report (2020) - Facility Study Report (2020) - Energy Conservation and Demand Management Plan 2020-2024 - Asset Management Plan for Roads and Bridges (2013) - Operating and Capital Budgets Township of Perry | 2022 Asset Management Plan | Rev. 5 | 3 1.5 Scope This AM Plan includes all assets owned by the Township and for which asset data was available, and provides recommendations for the period 2022-2031, inclusive. Where data gaps were encountered, recommendations for closing data gaps are provided. This will enable the Township to continually improve its AM Planning capabilities. 1.6 Asset Management Service Groups This AM Plan includes five (5) service areas, as follows: A. Transportation Service The Township's transportation network comprises roads, bridges, structural culverts, traffic signs and LED streetlights. A fleet of vehicles support operations and maintenance, including heavy vehicles and equipment for road maintenance, winter control vehicles and equipment, and light vehicles (primarily pick-up trucks) for crew transport to inspection and job sites. The service operates out of a Public Works Garage at 90 Old Government Rd., which has a salt/sand shed and a coverall building. B. Parks & Recreation Service The Township provides indoor and outdoor leisure and recreation spaces to its residents. Indoor spaces include the Emsdale Community Centre, the Novar Community Centre, a Library, and a Museum. Outdoor Park spaces include amenities, such as playing fields, walking paths, a gazebo, two play structures, two outdoor rinks (one of which is covered), changerooms for the rinks, picnic areas and parking areas. The Township also offers an off-leash dog park, public beaches, and public boat launches. The parks service also maintains the cemetery grounds. C. Fire Protection Service The Township provides fire protection throughout the Township out of a Fire Station at 64 Government Rd. The fire service relies on a fleet of five (5) emergency vehicles, along with fire protection equipment, such as air packs, defibrillators, thermal cameras, and extraction jaws. D. Solid Waste Services The Township operates a Transfer Station to where residents and businesses can drop off waste and recyclables. Refuse is limited to a monthly allotment, beyond which user fees (tipping fees) are charged per additional bag or item. E. Municipal Administration Under Municipal Administration, the AM Plan discusses assets that support the Township's remaining activities and services, such as Council activities, building inspection, by-law enforcement, human resources, finance, legal and IT services. These services rely primarily on the Municipal Head Office building. This section also includes all of the organization's IT assets, as well as one light vehicle to support building inspection and by-law enforcement. 1.7 Assets Not Included Due to lack of inventory data, this AM Plan does not include landfill assets. The landfill, which is shared with the Town of Kearney, will be incorporated in a future update to the AM Plan. 1.8 Organization of the Document The AM Plan is organized to meet the requirements of Ontario Regulation 588/17 (Current Levels of Service) and the Province's "Guide for Municipal Asset Management Plans". The contents of this AM Plan follow the recommended elements of a detailed AM Plan: Township of Perry | 2022 Asset Management Plan | Rev. 5 | 4 - Executive Summary: Summarizes key findings and recommendations of the AM Plan. - 1 - Introduction: Outlines scope, background information, relationship to other Municipal documents and plans, and applicable legislation - 2 - Inventory and Replacement Value: Summarizes the inventory and valuation of the Township's assets by service and asset type - 3 - State of the Infrastructure: Summarizes the condition and remaining life of the assets in the inventory by service and asset type - 4 - Levels of Service: Defines levels of service through performance indicators and targets, and outlines current performance - 5 - Risk Management Strategy: Defines the framework for identifying critical assets and quantifying risk to enable prioritization of lifecycle activities - 6 - Life Cycle Management Strategy: Summarizes the asset management strategies (i.e., planned actions) that will enable the assets to provide the required levels of service in a sustainable way, while managing risk, at the lowest lifecycle cost - 7 - Expenditure Forecasts and Financing Plan: Summarizes the financial planning and budgeting associated with asset management planning - 8 - AM Plan Monitoring and Improvement: Summarizes the next steps including monitoring of AM Plan implementation progress, and improving future iterations of the AM Plan. - Appendix A - Compliance Summary - Appendix B - Public Survey - Appendix C - 2022-31 Planned Strategy Actions Year by Year Township of Perry | 2022 Asset Management Plan | Rev. 5 | 5 2 Inventory & Replacement Value 2.1 Overview The Township of Perry provides transportation, parks & recreation, fire protection, solid waste, and municipal administration services to the community. These services rely on a portfolio of assets with an estimated replacement value of $ 126.02 million (2022 $). Table 2-1 shows a breakdown of the inventory by service and asset type. The table shows that 90% ($112.95 million) of the inventory value consists of assets supporting the transportation service. Table 2-1: Asset Inventory - All Services Service Asset Class Quantity Replacement Value (2022 $, millions) A - Transportation* $ 112.95 Roads** 144 km (centre-line) $ 97.96 Bridges & Culverts 3 Bridges 6 Structural culverts $ 9.45 Roadside Assets 75 Streetlights 535 Traffic signs $ 0.28 Vehicles & Equipment 3 Light vehicles 3 Snow plow trucks 5 Road maintenance vehicles Other equipment $ 2.64 Buildings & Facilities Public Works Garage 1 salt/sand dome 1 coverall shed $ 2.62 B - Parks & Recreation $ 6.59 Outdoor Recreation Assets (including buildings for Outdoor Recreation)*** 3 Play structures, Swings 3 sets of Bleachers Picnic shelter, Gazebo** 2 Rink changeroom buildings** 1 Covered Rink** 1 Outdoor Rink Bike racks Bear bins Community Garden 2 defibrillators 2 boat launches 2 docks 1 path with landscaping Fencing, Lighting and Security cameras $ 1.47 Vehicles and Equipment 2 Light vehicles 2 Tractors Snow blowing attachments Lawn mowing attachments 1 Trailer, 1 snow blower $ 0.18 Buildings Parks & Rec Garage 2 Community Centres 1 Library, 1 Museum $ 4.94 Township of Perry | 2022 Asset Management Plan | Rev. 5 | 6 Service Asset Class Quantity Replacement Value (2022 $, millions) C - Fire Protection Service $ 3.14 Emergency Equipment 3 Defibrillators 1 Hydraulic extraction tool 11 SCBA 1 SCBA (RIT bag) 59 Cylinders Communication systems Portable Radios Camera with heat seeker Various other equipment $ 0.34 Emergency Vehicles 5 Emergency vehicles 1 UTV trailer $ 0.56 Buildings 1 Fire Hall 1 Fire Hall Garage & Training Building $ 2.24 D - Solid Waste Service $ 0.71 Site Equipment 4 Compactors 6 x 40-yd containers Fencing and security cameras Internet network $ 0.17 Vehicles 1 Skid steer $ 0.02 Buildings 1 Transfer Station and Recycling Centre 1 Reusable Item Shed $ 0.52 E - Municipal Administration $ 2.63 IT & Admin assets IP phone system Cameras and security system MuniSoft software Corporate server & network 1 Radio Tower 1 Defibrillator $ 0.17 Vehicles 1 Light vehicle (SUV) $ 0.05 Buildings 1 Municipal Office $ 2.41 TOTAL $ 126.02 * The Township does not own any sidewalks or traffic signals. ** Includes Sharon Lane and Langs Lane, which are private lanes built on the Township's easement. The Township is not responsible for maintenance or renewal of these gravel road assets (total 0.7km). *** These outdoor recreation assets are among the Township's 17 buildings. For the AM Plan, the Replacement Value (RV) represents the expected cost to replace an asset to the same functional standard, but with a new version (not aged), and based on current market conditions and construction standards. Moreover, RV estimates assume that replacements are conducted as part of planned and bundled capital projects where applicable, rather than as individual unplanned replacements, which would typically be more costly. Table 2-2 lists the sources used for estimation of replacement values presented in this AM Plan. Township of Perry | 2022 Asset Management Plan | Rev. 5 | 7 Table 2-2: Sources of Replacement Value Estimates Asset Class Source of Replacement Value Roads 2020 Road Needs Study Bridges & Culverts 2020 Bridge Condition Inspection Roadside Assets Unit costs aligned with peer municipalities Buildings 2020 Building Condition Assessment Vehicles 2020 Road Needs Study Appendix K - Fleet Assessment Outdoor Recreation Assets (not including buildings) Purchase costs recorded in Tangible Capital Asset register, inflated to 2022 Emergency Equipment for the Fire Service Purchase costs recorded in Tangible Capital Asset register, inflated to 2022 Sections 2.2 to 2.6 provide more detail on the asset inventory by service. 2.2 Transportation Assets The Township manages the local road network, which provides access to residential, commercial, agricultural, and lakefront properties throughout the Township. The road network includes three (3) bridges and six (6) structural culverts, as well as streetlights and traffic signs. The Township does not own any sidewalks or traffic signals. To maintain the transportation network, the Township relies on a fleet of light vehicles (pickup trucks), road maintenance equipment and winter control vehicles. The Transportation Service operates out of the Public Works Garage facility, which includes a salt/sand shed and a coverall shed. This section provides more detail on the asset inventory used to deliver transportation services. 2.2.1 Road Network The Township's road network includes segments classified as Local and Collector roads, as shown in Figure 2-1. The Township does not own any arterial roads and does not maintain the provincial highways. Table 2-3 lists the length and replacement value of the Township's roads by functional class (Local or Collector). Table 2-3: Inventory of Road Assets by Functional Class Functional Class Length (centreline km) Replacement Value (2022 $, millions) Local Roads 86.7 55.8 Collector Roads 57.6 42.2 TOTAL 144.3 98.0 Township of Perry | 2022 Asset Management Plan | Rev. 5 | 8 Figure 2-1: Map of Road Network by Functional Class The Township's roads are primarily gravel and surface treated, as shown in Figure 2-2. The figure shows asphalt segments along Emsdale Road, Scotia Road, Mason's Road and Fern Glen Road, as well as in the Novar community. Table 2-4 lists the length and replacement value of the Township's roads by surface type. Table 2-4: Inventory of Road Assets by Surface Type Functional Class Length (centreline km) Replacement Value (2022 $, millions) Gravel 91.9 57.1 Surface Treated 45.2 33.8 Asphalt 7.2 7.0 TOTAL 144.3 98.0 Township of Perry | 2022 Asset Management Plan | Rev. 5 | 9 Figure 2-2: Map of Road Network by Surface Type 2.2.2 Bridges and Structural Culverts Figure 2-3 shows the locations of the Township's 3 bridges and 6 structural culverts. These structures carry vehicular traffic, and do not have pedestrian or cycling facilities. Table 2-5 lists the span, roadway width and replacement value of each of the structures. The table shows that Wooden Bridge and Fish Lake Bridge have load limits, which are due to their condition. The load limit for Wooden Bridge is 9 tonnes, which prevents emergency fire response vehicles from crossing it; however alternate access routes exist to all properties in the area around Wooden Bridge. The load limit for Fish Lake Rd. Bridge is 14 tonnes, which does not inhibit the movement of emergency fire response vehicles. On the other hand, with a roadway width of only 4.2 m, Fish Lake Rd. Bridge is considered to be a single-lane bridge. The bridge is shared with the Town of Huntsville, as it provides access to several properties on Huntsville's side of Fish Lake. Township of Perry | 2022 Asset Management Plan | Rev. 5 | 10 Figure 2-3: Map of Bridges and Structural Culverts Table 2-5: Bridges and Structural Culverts Structure Name Span (m) Roadway Width (m) Load Limits (tonnes)* Replacement Value (2022 $, millions) Fish Lake Rd. Bridge 6.3 4.2 14 2.82 Deer Lake Rd. Bridge 26.5 8.5 1.03 Wooden Bridge 4.2 6.0 9 1.16 Scotia Rd. Culvert 3.0 7.0 0.63 Deer Lake Rd. Culvert 3.6 6.9 0.79 Whitney Rd. Culvert #1 3.2 6.4 0.63 Whitney Rd. Culvert #2 3.1 6.1 0.69 Whitney Rd. Culvert #3 3.2 5.7 0.69 Emsdale Rd. Box Culvert 2.2 9.3 1.00 TOTAL -- -- -- 9.45 Township of Perry | 2022 Asset Management Plan | Rev. 5 | 11 2.2.3 Streetlights and Traffic Signs The Township owns 75 streetlights which were converted to energy-efficient LED in 2016. Table 2-6 lists the quantity of streetlights, differentiating between Cobra and decorative. The 19 decorative streetlights are located at the Municipal Office and include steel poles with concrete bases. The unit cost includes the fixture, pole, base, cabling and installation costs. Table 2-6: Inventory of Streetlights by Type Streetlight Type Quantity Unit Cost (2022 $/unit) Replacement Value (2022 $, thousands) Cobra 46 (no pole) 10 (with pole) $1,000 (no pole) $6,000 (with pole) 106.0 Decorative 19 $6,000 (with pole) 114.0 TOTAL 75 -- 220.0 Table 2-7 lists the quantity of traffic signs by sign type. All signs are assumed to have a unit cost of $110/unit, including the panel, post, and installation costs. Table 2-7: Inventory of Traffic Signs by Type Sign Type Quantity Unit Cost (2022 $/unit) Replacement Value (2022 $, thousands) Regulatory 292 $110 32.1 Warning 128 $110 14.1 Informational 23 $110 2.5 Street Name 92 $110 10.1 TOTAL 535 -- $58.8 Township of Perry | 2022 Asset Management Plan | Rev. 5 | 12 2.2.4 Vehicles and Buildings To maintain the transportation network, the Township relies on light vehicles (pickup trucks), heavy vehicles for road maintenance and vehicles for winter control. Table 2-8 lists the vehicles and equipment supporting the transportation service, along with their replacement values. Table 2-9 lists the buildings supporting the transportation service, and their replacement values. Table 2-8: Inventory of Vehicles & Equipment Supporting Transportation Service Vehicle / Equipment Type Quantity (units) Replacement Value (2022 $, thousands) Light Vehicles (pick-up trucks) 3 156.4 Snow Plow Trucks (and attachments) 3 1,123.5 Road Maintenance Vehicles Loader Excavator Grader Backhoe 1 2 1 1 125.0 504.1 438.7 247.7 Other Equipment Steamer Tag Trailer UTV Trailer 1 1 1 17.4 24.5 5.6 TOTAL 14 2,642.9 Table 2-9: Inventory of Buildings Supporting Transportation Service Building Replacement Value (2022 $, thousands) Public Works Garage 1,569.8 Sand/Salt Shed 784.9 Coverall Building 261.6 TOTAL 2,616.3 Township of Perry | 2022 Asset Management Plan | Rev. 5 | 13 2.3 Parks & Recreation Service The Township provides its residents and visitors with a variety of opportunities for outdoor and indoor recreation. For outdoor recreation the Township manages four parks, which offer walking paths, a butterfly garden, playgrounds, ball fields, picnic areas, a gazebo and washroom facilities. The Township also offers public beaches, public boat launches and a dog park. In the winter, the Township provides outdoor skating rinks in its two Community Parks. For indoor recreation, the Township offers two Community Centres, a Library, and a Museum. A new building for the Community Centre and Library is being constructed in 2022/2023 to replace the existing Emsdale Community Centre and the existing Library. Table 2-10 lists the inventory of outdoor recreation assets, Table 2-11 lists the inventory of vehicles supporting the Parks & Recreation service, and Table 2-12 lists the inventory of buildings supporting the Parks & Recreation service. Table 2-10: Inventory of Outdoor Recreation Assets Asset Type Quantity (units) Replacement Value (2022 $, thousands) Covered Rink (Emsdale) 1 470.9 Outdoor Rink (Novar) 1 186.6 Rink changerooms 2 locations 340.1 Gazebo 1 193.6 Play Structures 2 92.6 Fencing 5 locations 32.9 Dock, path, landscaping at Clear Lake Park 1 set 21.5 Boat Launch Ramp 2 20.0 Boat Launch Dock 1 2.6 18'x18' picnic shelter 1 12.3 Bleachers 3 sets 12.8 Swing 1 set 11.7 Bike racks 2 locations 2.2 Bridge at Novar rink 1 3.8 Community garden and shed 1 8.8 Bear bins (2 x 3-bin along with several singles and doubles) 1 31.0 Lighting 1 site 2.8 Security cameras 2 sites 7.9 Emsdale Rink Shed 2 2.0 Defibrillators 2 13.0 TOTAL 1,469.3 Township of Perry | 2022 Asset Management Plan | Rev. 5 | 14 Table 2-11: Inventory of Vehicles and Equipment Supporting Parks & Recreation Service Vehicle / Equipment Type Quantity (units) Replacement Value (2022 $, thousands) Light Vehicles 2 81.4 Tractors (including attachments for snow clearing and lawn mowing) 2 78.0 Other Equipment Snow blower Trailer 1 1 5.2 10.4 TOTAL 14 175.0 Table 2-12: Inventory of Buildings Supporting Parks & Recreation Service Building Replacement Value (2022 $, thousands) Emsdale Community Centre* 1,308.2 Library* 1,517.5 Museum 497.1 Novar Community Centre 915.7 Parks & Recreation Operations Centre 706.4 TOTAL 4,944.8 * To be replaced with a new Community Centre and Library, being constructed in 2022/2023. Value in table reflects value of existing buildings. Township of Perry | 2022 Asset Management Plan | Rev. 5 | 15 2.4 Fire Protection Service The Fire Protection Service is a volunteer service, led by an on-staff Fire Chief. The Township provides emergency equipment and vehicles for use by the volunteer fire fighters. Equipment and vehicles are kept at the Township's Fire Hall. Table 2-13 lists the inventory of emergency equipment used by the Fire Service. Table 2-14 lists the inventory of vehicles supporting the Fire Service, and Table 2-15 lists the service's buildings. Table 2-13: Inventory of Emergency Equipment used by the Fire Service Equipment Type Quantity (units) Replacement Value (2022 $, thousands) Hydraulic Extrication Tool 1 21.3 Defibrillators 3 19.5 SCBA 11 95.4 SCBA in RIT bag 1 4.2 Cylinders 59 59.6 Radios 31 47.9 Camera with heat seeker 1 2.0 Security Camera System 1 6.8 Computer Network 1 8.9 Dispatch Communication System 1 15.8 Other equipment - 55.3 TOTAL - 336.6 Table 2-14: Inventory of Vehicles and Equipment Supporting Fire Service Vehicle / Equipment Type Quantity (units) Replacement Value (2022 $, thousands) Pumper 2 366.8 Tanker 1 90.9 Rescue 1 69.6 UTV Ranger and attachment 1 24.3 UTV Trailer 1 4.5 TOTAL 6 556.2 Table 2-15: Inventory of Buildings Supporting Fire Service Vehicle / Equipment Type Quantity (units) Replacement Value (2022 $, thousands) Fire Hall 1 2,145.4 Fire Hall Garage & Training Building 1 98.3 TOTAL 2 2,243.7 Township of Perry | 2022 Asset Management Plan | Rev. 5 | 16 2.5 Solid Waste Service The Solid Waste Service manages refuse and recyclables received at the Transfer Station from residents and businesses. Table 2-16 lists the inventory of site equipment used by the Solid Waste Service. Table 2-16: Inventory of Site Equipment used by the Solid Waste Service Equipment Type Quantity (units) Replacement Value (2022 $, thousands) Monitoring Well 1 10.7 Fencing 1 site 7.4 Concrete pads for compactors 2 17.0 Compactors 2 95.7 Recycling compactors 2 21.9 Camera system 1 3.3 Internet network 1 3.6 40-yd containers 6 12.5 TOTAL 14 172.1 As was listed in Table 2-1, the Solid Waste Service has one vehicle (a skid steer). Table 2-17 list the properties and buildings that support the solid waste service. In total, these assets are valued at $523.3 thousand. Table 2-17: Inventory of Buildings Supporting the Solid Waste Service Equipment Type Quantity (units) Replacement Value (2022 $, thousands) Transfer Station, including the Recycling Centre 1 444.8 Reusable Item Shed 1 78.5 TOTAL 2 523.3 This AM Plan does not include the landfill, which is a shared facility with the Town of Kearney. Landfill assets will be added in a future update of the AM Plan. Township of Perry | 2022 Asset Management Plan | Rev. 5 | 17 2.6 Municipal Administration Municipal Administration includes Council activities, building inspection, by-law enforcement, human resources, finance, legal and IT services. These services rely primarily on the Municipal Head Office building. This service also includes all of the organization's IT assets, as well as one light vehicle to support building inspection and by-law enforcement. Table 2-18 lists the inventory of assets used to support municipal administration. Table 2-18: Inventory of Site Equipment used by the Solid Waste Service Equipment Type Quantity (units) Replacement Value (2022 $, thousands) MuniSoft software 1 64.4 Corporate server and network 1 system 58.1 IP phone system 1 system 5.1 Office cameras and security system 1 system 28.0 Radio Tower 1 8.0 Defibrillator (Municipal Office) 1 6.5 TOTAL 4 170.0 As was listed in Table 2-1, the Township has one light vehicle, valued at $53,686 to support municipal administration, specific for building inspections and by-law enforcement. The Township also has one building for municipal administration, the Township Office, which is valued at $2.41 million. Township of Perry | 2022 Asset Management Plan | Rev. 5 | 18 3 State of the Infrastructure 3.1 Overview The condition distribution of the Township's assets is shown in Figure 3-1. The figure shows that 72.1% ($90.9 million) of the Township's assets are in Fair condition or better, while 27.9% ($35.1 million) of assets are in Poor or Very Poor condition. Assets in Very Poor condition are overdue for repair and represent the Township's Renewal Backlog. As shown in the figure, the Township has a renewal backlog of $9.8 million. Figure 3-1: Condition Overview - All Services Seventy percent (69.5% or $6.8 million) of assets in Very Poor condition consist of roads and bridges. Another 28.8% ($2.8 million) consists of the Emsdale Community Centre and Library buildings, which are being replaced by a new Community Centre and Library that will be constructed in 2022-23. The remaining 1.7% ($0.17 million) of assets listed in Very Poor condition were identified based on their age and consist of SCBA and associated equipment for the Fire Service. The condition ratings used in Figure 3-1 are defined in Table 3-1 and are aligned with the International Infrastructure Management Manual's (IIMM) five-point condition scale. For this AM plan, condition assessment data was incorporated where available, specifically for: - Roads (2020 Road Needs Study) - Bridges and structural culverts (2020 Bridge Condition Inspection) - Vehicles (2020 Road Needs Study Appendix K - Fleet Assessment) - Buildings (2020 Building Condition Assessment). For the remaining assets, condition was estimated based on age and staff input. Table 3-2 shows how the five-point scores from VG to VP were determined from the asset data available, including remaining useful life and other condition scoring systems, such as Pavement Condition Index (PCI) and Bridge Township of Perry | 2022 Asset Management Plan | Rev. 5 | 19 Condition Index (BCI). For buildings, the Building Condition Assessment (BCA) scored condition using the five-point VG-VP scale, so the BCA data did not require conversion. Condition scores were adjusted based on staff input, as required. Adjustments were made primarily to reflect renewals and repairs completed more recently than the condition assessments. Table 3-1: Condition Grading Criteria Grade Description Condition Criteria VG Very Good Asset is physically sound and is performing its function as originally intended. Required maintenance costs are well within standards & norms. Typically, asset is new or recently rehabilitated. G Good Asset is physically sound and is performing its function as originally intended. Required maintenance costs are within acceptable standards and norms but are increasing. Typically, asset has been used for some time but is within mid-stage of its expected life. F Fair Asset is showing signs of deterioration and is performing at a lower level than originally intended. Some components of the asset are becoming physically deficient. Required maintenance costs exceed acceptable standards and norms and are increasing. Typically, asset has been used for a long time and is within the later stage of its expected life. P Poor Asset is showing significant signs of deterioration and is performing to a much lower level than originally intended. A major portion of the asset is physically deficient. Required maintenance costs significantly exceed acceptable standards and norms. Typically, asset is approaching the end of its expected life. VP Very Poor Asset is physically unsound and/or not performing as originally intended. Asset has higher probability of failure or failure is imminent. Maintenance costs are unacceptable, and rehabilitation is not cost effective. Replacement / major refurbishment is required. Table 3-2: Conversion Table for Condition Grades Condition Grade % Remaining Useful Life (all asset types) Pavement Condition Index (roads only, if available) Bridge Condition Index (bridges & culverts only) Very Good >75 - 100% 90.0 - 100.0 85 - 100 Good >50 - 75% 80.0 - 89.9 70 - 84 Fair >25 - 50% 70.0 - 79.9 50 - 69 Poor >0 - 25% 50.0 - 69.9 40 - 59 Very Poor <= 0% < 50 < 40 Sections 3.2 to 3.6 provide more detail on the asset condition by service. Township of Perry | 2022 Asset Management Plan | Rev. 5 | 20 3.2 Transportation The condition distribution of the Township's Transportation assets is shown in Figure 3-2. The figure shows that 72.2% ($81.6 million) of the Township's assets are in Fair condition or better, while 27.8% ($31.4 million) of assets are in Poor or Very Poor condition. The figure shows that the renewal backlog is $6.8 million. Eighty-five (85% or $5.8 million) of the backlog consists of road assets, and the remaining 15% ($1.0 million) consists of bridges and culverts. Figure 3-2: Condition Overview - Transportation Figure 3-3 shows the condition distribution of roads by surface type. The figure shows that 8% ($4.6 million) of gravel roads and 3% ($1.2 million) of surface treated roads are in Very Poor condition, and thus in need of renewal. None of the asphalt roads are in Very Poor condition. Figure 3-4 shows a map of the road condition by surface type. The map shows that portions of the following roads are in Very Poor condition: - Appleyards Rd. (gravel, 2,019 m) - Long Lake Rd. (gravel, 3,411 m) - Shannon Rd. (gravel, 836 m) - Stewarts Rd. (gravel, 220 m) - Cherry Hill Rd. (gravel, 2505 m) - Savage Settlement Rd. (surface treated, 1,634 m) Prioritization of renewal work will be discussed in the section on Life Cycle Management. Descriptions of asphalt, surface treated and gravel roads for each condition score are provided in Table 3-3. Township of Perry | 2022 Asset Management Plan | Rev. 5 | 21 Figure 3-3: Condition Distribution - Roads Figure 3-4: Map of Road Condition Township of Perry | 2022 Asset Management Plan | Rev. 5 | 22 Table 3-3: Descriptions Road Condition Scores Scale Pavement Condition Index Asphalt or Surface Treated Roads Gravel Roads Very Good 1 90 - 100 The road segment is relatively new, or recently reconstructed. There are no visible cracks and no structural issues. The ride is smooth. Excellent surface condition and ride. Excellent drainage. Dust controlled. No Distress. Good 2 80 - 89 The road segment is starting to exhibit few, if any, signs of surface deterioration, random cracks, and rutting. The ride is relatively smooth. Good crown and drainage throughout. Dust under dry conditions. Moderate loose aggregate. Slight washboarding. Fair 3 70 - 79 The road segment is exhibiting signs of surface deterioration, random cracks, rutting, and some patching of surface defects. The ride is becoming rough. Good crown (3" - 6"). Ditches present on more than 50% of roadway. Some culvert cleaning needed. Some loose aggregate (2" deep). Moderate washboarding (1" - 2"), over 10% - 25% of the area. Moderate dust, partial obstruction of vision. No or slight rutting (<1" deep). An occasional pothole (<2" deep). Poor 4 50 - 69 The road segment shows signs of deterioration, cracks, rutting, and patching of surface defects that occurs over 50 percent of the surface. Some structural issues are starting to show. The ride is uncomfortable. Little or no roadway crown (<3"). Adequate ditches on less than 50% of roadway, with portions of the ditches filled, overgrown and/or show erosion. Culverts partially full of debris. Severe loose aggregate (> 4"). Some areas (25%) with little or no aggregate. Moderate to severe washboarding (>3" deep) over 25% of area. Moderate rutting (l" - 3") and/or moderate potholes (2" - 4"), over 10% - 25% of area. Very Poor 5 0 - 49 The road segment is reaching the end of its useful life. There are significant structural issues with large visible cracks, rutting and patching surface defects that occurs over 75 percent of the surface. The road is difficult to drive at the posted speed limit. No roadway crown or road is bowl shaped with extensive ponding. Little if any ditching. Filled or damaged culverts. Many areas (over 25%) with little or no aggregate. Severe rutting (>3" deep) and/or severe potholes (>4" deep), over 25% of areas Township of Perry | 2022 Asset Management Plan | Rev. 5 | 23 The average age of road assets was estimated based on data from the Tangible Capital Asset (TCA) register. The TCA register includes road surface and base, recognizing that the surface may be renewed separately from the base, and that the two components have different expected service life values; however, the installation year for many of the road base records is 1900, which suggests that the actual installation year of the base was unknown when the TCA registry was compiled. All road surface installation years were available in the TCA registry, and the average age of these assets is summarized in Table 3-4 by surface type. Table 3-4: Average Age of Road Surface Assets Road Surface Type Length (centreline-km) Average Age of Road Surface (years) Gravel 91.9 16.9 Surface Treated 45.2 10.8 Asphalt 7.2 10.0 Figure 3-5 shows the condition distribution of bridges and structural culverts. The figure shows that three bridges are in Good (Deer Lake Rd. bridge) and Fair condition (Fish Lake Rd. bridge and Wooden bridge), although the two bridges in Fair condition have load limits. The figure also shows that most of the six culverts are in Fair condition, except for Whitney Rd. culvert #3, which is in Poor condition, and Emsdale Rd. box culvert, which is in Very Poor condition. Descriptions of bridge condition scores are provided in Table 3-5. Figure 3-5: Condition Distribution - Bridges and Culverts Township of Perry | 2022 Asset Management Plan | Rev. 5 | 24 Table 3-5: Bridge Condition Index scores and Associated Descriptions Scale Bridge Condition Index Description Very Good 85 - 100 Structure condition is as constructed, with no visible deterioration Good 70 - 84 Minor defects are visible, but these do not affect overall performance and would not normally trigger remedial action. E.g. Light corrosion, light scaling, narrow cracks in concrete. Fair 50 - 69 Medium defects are visible and may trigger preventive maintenance and remedial action. E.g. Medium corrosion with up to 5% section loss, medium cracks in concrete. Poor 40 - 49 Medium defects are visible, requiring. E.g. Medium corrosion with up to 10% section loss, medium cracks in concrete. Very Poor 0 - 39 Severe defects are visible, affecting the overall performance of the structure. E.g. severe corrosion with over 10% section loss, spalling, delamination. Figure 3-6 shows that the average age of bridges exceeds the expected service life of 75 years, as defined in the 2020 Bridge Condition Inspection report. Specifically, Fish Lake Rd. bridge was constructed in 1930, and Wooden Bridge in 1931, making them 92 and 91 years old, respectively, in year 2022. Deer Lake Rd. bridge was installed in 1975, making it 47 years old in 2022. The average age of the structural culverts is 37 years, or about half of the expected service life; however, this excludes Emsdale Rd. box culvert, for which the installation year is unknown, because the culvert was installed by the Ministry of Transportation (MTO) before Emsdale Rd. was transferred to the Township. Emsdale Rd. box culvert is in Very Poor condition and may be beyond its service life. Figure 3-6: Average Age - Bridges and Culverts Figure 3-7 shows the condition distribution of streetlights and traffic signs. The figure shows that almost all of these assets are in Good or Very Good condition. The Township adheres to the inspection and repair timelines set out in the Minimum Maintenance Standards (O.Reg. 239/02) to ensure these assets remain in a state of good repair. Township of Perry | 2022 Asset Management Plan | Rev. 5 | 25 Figure 3-7: Condition Distribution - Streetlights and Traffic Signs Figure 3-8 shows that the average age of streetlights is 6 years. In fact, all of the Township's streetlights are 6 years old as they were converted to LED in 2016. Installation year and age data were not available for traffic signs. Figure 3-8: Average Age - Streetlights and Traffic Signs Figure 3-9 shows the condition distribution of vehicle, equipment and facilities that support the Transportation Service. The figure shows that most vehicles and equipment are in Very Good condition. The Figure also shows that all three facilities supporting the Transportation Service are in Very Good condition based on their facility condition index. Rehabilitation work on the Public Works Garage was recently completed. Figure 3-9: Condition Distribution - Vehicles, Equipment and Facilities for Transportation Figure 3-10 shows that the average age of vehicles and equipment is 5 years, which is 40% of the average expected service life for this asset class. Installation year data was not available for facilities assets. Township of Perry | 2022 Asset Management Plan | Rev. 5 | 26 Figure 3-10: Average age - Vehicles, Equipment & Facilities for Transportation 3.3 Parks & Recreation Figure 3-11 shows the condition distribution of assets supporting the Parks and Recreations Service. The figure shows that outdoor recreation assets, along with most vehicles and equipment, are in Fair condition or better. The outdoor recreation assets identified in Poor condition are the outdoor rink in Novar, the Community Garden wood-framed beds and the Bay Lake Boat Launch ramp, which are nearing the end of their service lives. The Figure shows that $2.8 million of facilities supporting the Parks and Recreation Service are in Very Poor condition. This amount consists of the Emsdale Community Centre and Library buildings, which are being replaced with a combined new building that is being constructed in 2022/2023. The Museum, valued at $0.5 million, is in Poor condition. Figure 3-11: Condition Distribution - Parks & Recreation Assets Figure 3-12 shows the average age of Parks and Recreation assets. As shown in the figure, installation year data was not available for building assets. Outdoor recreation assets (excluding buildings, such as rink changerooms, the covered rink and the gazebo) have an average age of 14 years, which is approximately 56% of the average expected service life for this asset class. The average age of vehicles and equipment is 6 years out of an average expected service life of 8.2 years. The condition assessment for these vehicles shows that some vehicles are generally in better condition than expected based on age and will likely be able to remain in service beyond their estimated service life. Township of Perry | 2022 Asset Management Plan | Rev. 5 | 27 Figure 3-12: Average Age - Parks & Recreation Assets 3.4 Fire Protection Service Figure 3-13 shows the condition distribution of assets supporting the Fire Protection Service. The figure shows that the Fire Hall ($2.1 million) and Fire Hall Garage & Training Centre ($0.1 million) are in Very Good condition. The Figure also shows that all vehicles and equipment are in Fair condition or better; however, $0.2 million of fire protection equipment have been identified as being in Poor or Very Poor condition, based on age. Assets in Very Poor condition consist of the SCBA and associated equipment and a defibrillator. Assets in Poor condition consist of a hydraulic extrication tool, a second defibrillator, and six portable radios. Figure 3-13: Condition Distribution - Fire Protection Assets Figure 3-14 shows the average age of Fire Protection assets. As shown in the figure, the average age of fire protection equipment is 8 years out of the average 12.8 year expected service life for this asset class. The average age of vehicles and equipment is 4 years, or approximately 30% of the average expected service life. The Fire Hall was constructed in 2019, and the Fire Hall Garage & Training Centre were constructed in 2021. The average age of these facilities is 2.0 years (4%) of its expected 50-year service life. Township of Perry | 2022 Asset Management Plan | Rev. 5 | 28 Figure 3-14: Average Age - Fire Protection Assets 3.5 Solid Waste Service Figure 3-15 shows the condition distribution of assets supporting the Solid Waste Service. As shown in the figure, these assets are all in Fair condition or better. In fact, the Site Equipment and the Transfer Station facility (including Recycling Centre) are mostly in Very Good condition. The skid steer and Reusable Items Shed are in Fair condition. Figure 3-15: Condition Distribution - Solid Waste Assets Figure 3-16 shows the average age of Solid Waste Service assets. As shown in the figure, the average age of site equipment is 2 years, or 11% of the average expected service life for this asset class. The Solid Waste Service has one vehicle, which is a skid steer that was purchased in year 2000. This asset has exceeded its expected service life but remains in Fair condition. Installation year data was not available for building assets (the Transfer Station). Township of Perry | 2022 Asset Management Plan | Rev. 5 | 29 Figure 3-16: Average Age - Solid Waste Assets 3.6 Municipal Administration Figure 3-17 shows the condition distribution of assets supporting the municipal administration services. As shown in the figure, the light vehicle ($54 thousand) is in Very Good condition, and the Township Office building ($2.4 million) is in Fair condition. All technology assets are in fair or better condition. Figure 3-17: Condition Distribution - Municipal Administration Assets Figure 3-18 shows the average age of municipal administration assets. As shown in the figure, the average age of technology assets is 10 years, approximately 50% of the average expected service life. This service area has one vehicle, which is a light vehicle that was purchased in year 2020. The Township Office was constructed in 2010 and is estimated at 22% of its expected 50-year service life. Township of Perry | 2022 Asset Management Plan | Rev. 5 | 30 Figure 3-18: Average Age - Municipal Administration Assets Township of Perry | 2022 Asset Management Plan | Rev. 5 | 31 4 Levels of Service 4.1 Overview Levels of Service (LOS) are statements that describe the outputs and objectives the Township intends to deliver to its citizens, businesses, and other stakeholders. Developing, monitoring, and reporting on LOS are all integral parts of an overall performance management program which is aimed at improving service delivery and demonstrating accountability to the Township's stakeholders. In general, LOS are guided by a combination of customer expectations, legislative requirements, and internal guidelines, policies, and procedures. In many cases, LOS are also implied based on past service delivery, community expectations, and infrastructure system design. Effective asset management requires that LOS be formalized and supported through a framework of performance measures, targets, and timeframes to achieve targets, and that the costs to deliver the documented LOS be understood. Figure 4-1 shows that Corporate LOS commitments, along with the legislated LOS referenced by them, drive the definition of more specific Community LOS. Community LOS can be categorized as relating to one of the following service attributes: - Capacity & Use: Assessing whether services have enough capacity and are accessible to the customers - Function: Assessing whether services meet customer needs while limiting health, safety, security, natural and heritage impacts - Quality: Assessing whether services are reliable and responsive to customers - Affordability: Assessing whether services are affordable and provided at the lowest cost for both current and future customers Community LOS are in turn are translated into Technical LOS, where Capacity & Use LOS drive assessment of the Growth needs; Function LOS drive assessment of Upgrade needs; Quality LOS drive assessment of renewal, operations and maintenance needs; and Affordability LOS drive assessment of Financial Sustainability needs. The risks of failing to achieve the defined Community and Technical LOS are assessed, and life cycle activities are prioritized to address those risks. Life cycle activities may include expansion, upgrade, renewal, maintenance or operational activities, depending on the category of LOS to be addressed. The nature of the life cycle activity determines whether it should be funded as capital or operating, as well as eligible funding sources. As shown in the figure, even after the life cycle intervention, some residual risk may remain. Sections 4.2 to 4.6 report the LOS indicators, current performance and target performance by service. In general, targets were aligned with those seen in peer municipalities, and also considered the findings of an internet-based public survey that was conducted from October 7 to November 3, 2021. The findings of the survey are included in Appendix B. Performance gaps identified in this section will drive the Risk and Life Cycle Management Strategies of this AM Plan. Proposed performance over the next 10 years based on the planned strategies is discussed in Section 6.4. Township of Perry | 2022 Asset Management Plan | Rev. 5 | 32 Figure 4-1: Levels of Service Framework 4.2 Transportation Service Table 4-1 lists LOS indicators related to roads, and Table 4-2 lists LOS indicators related to bridges and structural culverts. LOS indicators required by O.Reg. 588/17 are marked with an asterisk (*). The tables report the Township's current performance and targets and indicate whether the target has been met. As shown in the table, the Township has a performance gap with respect to the following indicators: - Average Pavement Condition Index (PCI) for paved (asphalt), surface treated and gravel roads - % of roads in Fair condition or better for MMS Class 5 and 6 roads - Average Bridge Condition Index (BCI) for bridges and structural culverts - % of bridges & culverts in Fair condition or better Road condition targets were set to aim for average PCI of Good across all surface types. A separate indicator has been defined to monitor the percentage of roads in Fair condition or better (State of Good Repair). Higher targets are set for roads with higher traffic volumes and speeds, which are captured by the Minimum Maintenance Standard (MMS) road class assigned to each road segment. The Township's target is for 90% of Class 4 roads, 80% of Class 5 roads and 70% of Class 6 roads to be in Fair condition or better. These targets are aligned with targets seen in peer municipalities. The public survey of residents and businesses found that 70% of respondents were Very Satisfied or Satisfied with the condition of their road, 6% were Neutral and 24% were Very Dissatisfied or Dissatisfied. These findings indicate the public's desire for improved road condition. The survey did not include questions about bridges and culverts, because renewal and repair of these structures is driven by safety requirements, rather than public opinion. Township of Perry | 2022 Asset Management Plan | Rev. 5 | 33 Table 4-1: Levels of Service - Transportation - Roads Service Attribute Levels of Service Indicator Current Performance Target Target Met Capacity and Connectivity Description, which may include maps, of the road network in the municipality and its level of connectivity.* See Section 2.2.1 for description and maps of the Township's road network. Not applicable. n/a Number of lane-km of each of arterial roads, collector roads and local roads as a proportion of km2 of land area of the Township.* Roads Type Lane-km As proportion of land area* (lane- km/km2) Local 173.3 0.93 Collector 115.2 0.62 Arterial -- -- * Township land area = 187.22 km2 No target. n/a Function No LOS indicators defined Quality Description or images that illustrate the different levels of road class pavement condition.* See Table 3-3. Not applicable. n/a For paved roads in the Township, the average pavement condition index value.* Paved: 79.0 (Fair) Surface Treated: 74.1 (Fair) 80 (Good) or higher 80 (Good) or higher No No For unpaved roads in the Township, the average surface condition (e.g. excellent, good, fair, or poor).* Gravel: 74.1(Fair) 80 (Good) or higher No % of roads in Fair condition or better MMS Class 4: 92% MMS Class 5: 69% MMS Class 6: 61% 90% or more 80% or more 70% or more Yes No No % of Transportation service vehicles in Fair condition or better 100% 90% or more Yes Average Facility Condition Index of Transportation service buildings 0.0% 5% or less Yes * O.Reg. 588/17 LOS reporting requirement. Township of Perry | 2022 Asset Management Plan | Rev. 5 | 34 Table 4-2: Levels of Service - Transportation - Bridges & Culverts Service Attribute Levels of Service Indicator Current Performance Target Target Met Capacity and Connectivity Description of the traffic that is supported by municipal bridges (e.g., heavy transport vehicles, motor vehicles, emergency vehicles, pedestrians, cyclists).* See Section 2.2.2 for descriptions and maps of the Township's 3 bridges and 6 structural culverts. Not applicable. n/a Percentage of bridges in the Township with loading or dimensional restrictions.* Loading restrictions: 67% (2 of the 3 bridges) - restrictions are due to condition Dimensional restrictions: 33% (1 of the 3 bridges) - single lane No target No target n/a n/a Function No LOS indicators defined Quality Description or images of the condition of bridges and how this would affect use of the bridges.* See Table 3-6. Not applicable. n/a For bridges in the Township, the average bridge condition index value.* 66.8 (Fair) 70 (Good) or higher No For structural culverts in the Township, the average bridge condition index value.* 54.3 (Fair) 70 (Good) or higher No % of bridges and culverts in Fair condition or better 82.1% 90% or more No * O.Reg. 588/17 LOS reporting requirement. 4.3 Parks & Recreation Table 4-3 lists LOS indicators, current performance and targets related to the Parks and Recreation Service. The table also shows whether the targets have been met. As shown in the table, the Township has a performance gap with respect to the following indicators: - % of outdoor recreation equipment assets in Fair condition or better - Average Facility Condition Index (FCI) for indoor recreation buildings The Township is constructing a new Community Centre and Library in 2022/2023 to replace the existing Emsdale Community Centre and existing Library. Excluding the existing Community Centre and Library from the calculation, this target would be met. Condition targets were aligned with targets seen in peer municipalities. The public survey of residents and businesses found that 65% and 48% of respondents were Very Satisfied or Satisfied with the outdoor and indoor recreation services, respectively, while 17% and 17% were Very Dissatisfied or Dissatisfied. The remainder were neutral. These findings indicate that the public's desire for improved condition of recreation assets. Township of Perry | 2022 Asset Management Plan | Rev. 5 | 35 Table 4-3: Levels of Service - Parks & Recreation Service Attribute Levels of Service Indicator Current Performance Target Target Met Capacity Description of Parks and Recreation Service and the assets used to support it See Section 2.3 Not applicable. n/a Number of play structures 2 play structures: - Emsdale Community Park - Novar Community Park No target. n/a Number of public beaches 2 public beaches: - Clear Lake Beach - Long Lake Beach (limited parking) No target. n/a Number of public boat launches 5 public boat launches: - Clear Lake - Bay Lake (limited parking) - Long Lake (no parking) - Foote Lake (no parking) - Fish Lake (no parking) No target. n/a Function No LOS indicators defined Quality Description of operations and maintenance practices to ensure safety, cleanliness and comfort at parks and outdoor recreation spaces Grass Cutting Bi-weekly Litter Pickup Bi-weekly Waste Collection 2x per week Cleaning of Washrooms Daily Cleaning of Rental Washrooms 1-3x/week Cleaning of Rink Changerooms: - Novar volunteer - Emsdale weekdays - Inspection of play structures Monthly Maintenance, inspection, cleaning and garbage pick-up at boat launches: Bay Lake 2x/week Clear Lake 2x/week Others none Bi-weekly Bi-weekly Bi-weekly Daily 1-3x/week Daily Daily Monthly 2x/week None None Yes Yes Yes Yes Yes No No Yes Yes Yes Yes % of outdoor recreation equipment assets in Fair condition or better 53.4% 90% or more No Average Facility Condition Index for Recreation buildings 56.9% 5% or less No % of Parks and Recreation service vehicles in Fair condition or better 97.5% 90% or more Yes Township of Perry | 2022 Asset Management Plan | Rev. 5 | 36 4.4 Fire Protection Service Table 4-4 lists LOS indicators, current performance and targets related to the Fire Protection Service. The table also shows whether the targets have been met. As shown in the table, the Township has a performance gap with respect to the following indicators: - % of emergency equipment (non-vehicle) in Fair condition or better A target of 90% was set for this indicator, in alignment with other classes. Table 4-4: Levels of Service - Fire Protection Service Service Attribute Levels of Service Indicator Current Performance Target Target Met Capacity Description of the Fire Protection Service and the assets used to support it. See Section 2.4. Not applicable. n/a Average Dispatch Time to Time on Scene 2018: 18.1 minutes 2019: 15.6 minutes 2020: data not available No target. n/a Function Percentage of Equipment meeting NFPA standards 100% 100% Yes Quality % of Fire Protection emergency equipment (non-vehicle) in Fair condition or better 39.9% 90% No % of Fire Protection service vehicles in Fair condition or better 100% 90% or more Yes Average Facility Condition Index of Fire Protection facilities 0% 5% or less Yes Township of Perry | 2022 Asset Management Plan | Rev. 5 | 37 4.5 Solid Waste Service Table 4-5 lists LOS indicators, current performance and targets related to the Solid Waste Service and shows whether the targets have been met. As shown in the table, the Township has a performance gap with respect to the following indicators: - % of solid waste diverted from landfill A target of 40% was set for this indicator, in alignment with peer municipalities. Table 4-5: Levels of Service - Solid Waste Service Service Attribute Levels of Service Indicator Current Performance Target Target Met Capacity Description of Solid Waste Service and the assets used to support it. See Section 2.5. Not applicable. n/a Number of vehicle visits served 2019: 26,445 2020: 28,113 2021: data not available No target n/a Function % of solid waste diverted from landfill 2019: 30.5% 2020: 32.0% 2021: data not available 40% No Quality % of Solid Waste Service vehicles in Fair condition or better 100% 90% or more Yes Average Facility Condition Index (FCI) of Solid Waste Service facilities 0.3% 5% or less Yes 4.6 Municipal Administration Table 4-6 lists LOS indicators, current performance and targets related to Municipal Administration and shows whether the targets have been met. As shown in the table, the Township is meeting the performance targets set for this service. Targets were set in alignment with peer municipalities, and with condition targets for other asset classes. Table 4-6: Levels of Service - Municipal Administration Service Attribute Levels of Service Indicator Current Performance Target Target Met Capacity Description of Municipal Administration Service and the assets used to support it. See Section 2.6. Not applicable. n/a Function No LOS indicators defined Quality % of Municipal Administration Service vehicles in Fair condition or better 100% 90% or more Yes Average Facility Condition Index (FCI) of Municipal Administration Service facilities 1.7% 5% or less Yes Township of Perry | 2022 Asset Management Plan | Rev. 5 | 38 5 Risk Management Strategy 5.1 Overview The Township's key asset management principle is to meet service levels and manage risk, while minimizing lifecycle costs. The relative importance of the assets to support service delivery, referred to as asset criticality, is a key driver in selection of the most appropriate asset management strategy for each asset. Critical assets include assets that are key contributors to performance, expensive in terms of lifecycle costs, and most prone to deterioration or need ongoing maintenance investment. Risk events, such as an asset's failure to have sufficient capacity, function, or reliability, are events that may compromise the delivery of the Township's strategic objectives. Lifecycle activities are used to manage the risk of failure by reducing the chance of asset failure to acceptable levels. The impact of asset failure on the Township's ability to meet its strategic objectives dictates the type and timing of lifecycle activities. The Township's risk strategy develops the framework for quantifying the risk exposure of its assets to enable prioritization of projects across asset classes and service areas. Risk exposure is the multiplication of the criticality or consequence of failure (CoF), which is the direct and indirect impact on the Township if an asset failure were to occur, by the probability of failure (PoF), which is the likelihood or chance that an asset failure may occur: Risk Exposure = Consequence of Failure x Probability of Failure 5.2 Consequence of Failure Matrix The focus in this section is on asset criticality or consequence of failure which reflects the importance of an asset to the Township's delivery of services. The following impacts of a potential asset failure are considered: Service Delivery considerations ranging from a disruption of non-essential service to widespread and long-term disruption of essential service Health and Safety considerations including the ability to meet health and safety related regulatory requirements, and degree and extent of injury, ranging from negligible injuries to loss of life Environmental considerations such as length and extent of damages to the natural environment Financial impact considerations such as asset replacement cost, damages to Township or private property and infrastructure, loss of revenue, and fines. Reputational considerations such as residents' reduced trust and confidence in the Township. Table 5-1 summarizes the above listed impacts against an asset criticality rating scale from 1 to 5, with a higher score indicating a higher consequence of failure. Township of Perry | 2022 Asset Management Plan | Rev. 5 | 39 Table 5-1: Asset Criticality (Consequence of Failure) Ratings The above criticality profiles enable risk to be incorporated into the development of asset management strategies. More critical assets are prioritized for expansion, inspection, cleaning, maintenance, and renewal, depending on their current and forecasted performance. 5.3 Risk to Levels of Service - Approach Asset criticality is determined based on the degree to which the failure of the asset would impact the following three community levels of service attributes: Capacity and Use: Assets of sufficient capacity are available, convenient, and accessible Function: Assets comply with regulations, perform their intended function and are safe, secure, and sustainable Quality/Reliability: Assets are in adequate condition and are maintained as required. 5.3.1 Risk to Capacity LOS As indicated in Section 1.3, the Township has experienced some growth in the past few years and will continue to grow at a modest rate through to 2031. To accommodate this growth, the Township plans for a new and expanded Emsdale Community Centre, coincident with renewal plans as the existing community centre is in very poor condition. The existing library is also in very poor condition and will be removed and included on a single floor in the same facility as the new community centre. Township of Perry | 2022 Asset Management Plan | Rev. 5 | 40 As indicated in Chapter 4, other capacity LOS for the Township relate to continuing to provide convenient access to beaches, boat ramps, and play structures, as well as access to properties through the road network. For Solid Waste, the number of vehicle visits to the transfer station is reported. As the probability of capacity failure remains low for these assets, the Township does not anticipate that additional infrastructure will be required over the next 10 years to maintain capacity service levels. 5.3.2 Risk to Function LOS The new Library, as part of the new Emsdale Community Centre, will retain the same area as the existing library, but will feature improvements that will increase its service levels to meet the current and future functional needs of residents. As indicated in Chapter 4, other functional LOS for the Township relate to maintaining Fire equipment to NFPA standards and maintaining two bridges under load restrictions. These service levels are proposed to be maintained at current levels and additional expenditures to improve function are not anticipated. The Township also plans to increase solid waste diversion from the landfill from 32% in 2020 to 40% in 2031. This increase in service level may require additional operating and maintenance activities but will not require additional capital expenditures related to the physical infrastructure. The Township's 2020 Road Needs Study recommended that the Township consider upgrading gravel roads to a hard surface only for those with a good or moderate condition base, as well as prioritization on higher volume roads. Gravel roads with a poor base are recommended to first consider improvements to the base, as a poor base condition results in higher lifecycle costs for hard surface roads. Public consultation is also recommended to ensure residents understand both the benefits (smoother ride, reduced dust) as well as the possibly perceived disadvantages (perception of increased travel speeds and higher traffic volumes). 5.3.3 Risk to Service Reliability The Reliability Level of Service refers to the Township's aim to ensure that its assets are kept in a state of good repair to reduce the incidence of unplanned service interruptions due to poor asset condition. Depending on the asset, unplanned failures can have wide-ranging consequences including service disruption, damage to surrounding infrastructure and property, risks to public safety, and environmental impacts. Probability of Failure is estimated based on the condition of the asset, as shown in Table 5-2. Table 5-2: Probability of Failure Ratings for Reliability PoF Rating Corresponding Asset Condition 1 Very Good 2 Good 3 Fair 4 Poor 5 Very Poor Consequence of Failure is estimated based on the expected impact of an asset failure. Each asset's criticality is assessed based on the rating scale provided in Table 5-1. Table 5-3 provides a summary of the assessment by Asset Type. Township of Perry | 2022 Asset Management Plan | Rev. 5 | 41 Table 5-3: Consequence of Failure Ratings for Reliability Asset Type Assumptions Consequence Category of Highest Concern Attributes Consequence of Failure Score Description of Assets Roads Road surface defects may cause vehicle damage, loss of vehicle control, injury, or loss of life. Health & Safety MS Classes 1-3 n/a None MS Class 4 4 10.7 km MS Class 5 3 102.7 km MS Class 6 2 30.9 km Bridges & Culverts Serious injury or loss of life likely if a structure fails Health & Safety Span >8m and/or Class 4 and/or no detour 5 1 (Deer Lake Rd. bridge - 26m span) 1 (Fish Lake Rd. bridge - no detour) 1 (Emsdale Rd. culvert - Class 4 road) Span >6m, ≤8m 4 None Span >3m, ≤6m 3 6 (Wooden Bridge, Scotia Rd. culvert, Deer Lake Rd. culvert, all 3 Whitney Rd. culverts Span ≤3 m 2 None Traffic Signs Increased likelihood of traffic collision and/or and thus serious injury or loss of life. Defective signs are replaced in accordance with Minimum Maintenance Standard timelines. Health & Safety ALL 5 535 units Streetlights Vehicle headlights and streetlights nearby will still be in use. Defective streetlights are replaced in accordance with Minimum Maintenance Standard timelines. Health & Safety ALL 2 75 units Buildings - Administration and Operations Failure or closure of these buildings will disrupt operation and delivery of critical municipal services Availability/ Reliability ALL 5 Municipal Office (Emergency Operations) Fire Hall - Secondary (Emergency Operations) PW Garage & Storage sheds Transfer Station 1 Transfer Station Shed Township of Perry | 2022 Asset Management Plan | Rev. 5 | 42 Asset Type Assumptions Consequence Category of Highest Concern Attributes Consequence of Failure Score Description of Assets 3 Parks & Rec Ops Building 5 Community Centres (these are contingency for municipal office) Buildings - Recreation & Culture Failure or closure of these buildings will disrupt operation and delivery of recreation and culture services Availability/ Reliability ALL 3 Library 2 Covered Rink Rink Changeroom 1 Museum Vehicles - Pickup trucks and SUVs Pickup trucks and SUVs can be quickly replaced with rental vehicle options. Failure will affect operational costs. Financial ALL 2 Pickups and SUVs used by Public Works, Recreation, Bylaw/Buildings, Fire Vehicles - Emergency Vehicles Failure of an emergency vehicle will reduce the Fire Service's capacity and capabilities, and result in slower response times. Availability/ Reliability Health & Safety ALL 5 Emergency vehicles used by Fire Service Vehicles - UTV & Trailer (Fire) UTV not used on a daily basis and can be replaced with rental options if necessary. Availability/ Reliability Health & Safety ALL 2 UTV & trailer used by Fire Service Vehicles - Road Maintenance & Winter Control Failure of these units may result in inability to meet timelines of Road Maintenance Standards. Rental equipment may not be available during peak seasons. Multiple vehicles - available redundancy Availability/ Reliability Health & Safety ALL 4 Loader, excavator, grader, snow plow trucks Vehicles - Park Maintenance Equipment Failure of these units may result in delays with park maintenance. Availability/ Reliability ALL 2 Township of Perry | 2022 Asset Management Plan | Rev. 5 | 43 5.3.4 Reliability Risk Results After assessing the criticality and probability of each asset's risk, the results are plotted on a risk map, a graphic representation of probability and consequence of failure. Colours on the map denote different levels of risk and help to prioritize the Township's resources, time, and effort. - Risks that appear in the light red (extreme) zone are significant to the Township and therefore need to be actively managed and monitored in a more comprehensive manner than other risks (i.e., prioritized) - Risks that appear in the orange (high) or green (moderate) zones will also be actively managed depending on their nature - Risks that appear in the light blue (low) or grey (very low) zones are generally acceptable without significant mitigation strategies being implemented, although monitoring may still occur in some form. The risk of not meeting the stated reliability levels of service is influenced by both the asset criticality and asset performance, as represented by asset condition. Current Risk: As shown in Figure 5-1, $2.48 million (2.0%) of Township assets are currently in the Very High risk category, consisting of the Emsdale Community Centre ($1.31M), Emsdale Road Box Culvert ($0.95M), SCBA Fire equipment and one defibrillator ($0.166M), and various traffic signs ($1650). Figure 5-1: Current Risk - All Assets (by Asset Replacement Value in 2022 $M) The Township mitigates its exposure to this risk through the planned lifecycle strategies discussed in the next Chapter. Township of Perry | 2022 Asset Management Plan | Rev. 5 | 44 6 Life Cycle Management Strategy 6.1 Overview The Township's ability to deliver the levels of service outlined in the Asset Management Plan is impacted in large part by: - aging infrastructure and the associated need for operations, maintenance, and renewal investments to sustain it - forecast future population growth and the associated need for additional infrastructure to serve it - changing functional, legislative and sustainability requirements and the associated need for existing assets to be upgraded to continue to be fit for purpose - available funds and the associated need for assets to be provided at lowest cost for both current and future customers. To achieve its objectives, the Township builds new infrastructure assets to meet capacity needs, upgrades assets to meet new functional needs and manages existing assets to meet reliability needs - all with limited funds. Asset lifecycle management strategies are planned activities that enable assets to provide the defined levels of service in a sustainable way, while managing risk, at the lowest lifecycle cost. Asset lifecycle management strategies are typically organized into the categories listed in Table 6-1, and are driven by the levels of services defined in Section 4. Table 6-1: Asset Lifecycle Management Categories Lifecycle Management Category Description Examples of Associated Activities Operate Regular activities to provide services inspect, clean, energy usage Maintain Activities to retain asset condition to enable it to provide service for its planned life repair, replace component Renew Activities that return the original service capability of an asset rehabilitate (minor), rehabilitate (major), replace Upgrade Activities to provide a higher level of service capability from an existing asset to achieve better fit for purpose or meet regulatory requirements update system to be more energy efficient, improve environmental sustainability Grow Activities to provide a new asset that did not exist previously or an expansion to an existing asset acquire new asset, expand existing asset In addition to the above asset strategies, non-asset solutions are also considered which are actions or policies that can lower costs, lower demands, or also extend asset life (e.g. better integrated infrastructure planning and land use planning, demand management, insurance, process optimization, and education of the public). The Township assesses the costs of potential lifecycle activities to determine the lowest lifecycle cost strategy to manage each asset type while still meeting levels of service. The total cost of ownership is the sum of lifecycle activity costs to sustain each asset type over the asset lifecycle. (See Figure 6-1 for a conceptual lifecycle cost model.) Sufficient investment of the right type and at the right time minimizes the total cost of ownership for each asset and also mitigates other potential risks such as interruption to service delivery or damage to other nearby infrastructure. Operations, maintenance, and renewal activities are timed to reduce the risk of service failure from deterioration in asset condition and are part of the total cost of ownership. Township of Perry | 2022 Asset Management Plan | Rev. 5 | 45 Figure 6-1: Conceptual Lifecycle Cost Model 6.2 Life Cycle Management Needs The Township uses its understanding of risks of not meeting service levels to inform the timing and level of investments needed in infrastructure assets. The Township aims to provide sufficient service capacity to meet demand and manages the upgrade, operations, maintenance, and renewal of assets to meet defined service levels, including legislated and other corporate requirements. This section of the AM Plan outlines the Township's expansion and upgrade strategies to support capacity and functional service levels, and the Township's operations, maintenance, and renewal activities to support reliability service levels. Year-by-year expansion, upgrade and renewal actions associated with the Planned Strategy are listed in Appendix C. 6.2.1 Growth and Upgrade Needs As indicated in Section 5.3.1, the Township's growth plan over the next ten years includes a new and expanded Emsdale Community Centre with the new library. This new facility will be constructed over 2022 and 2023 at a cost of $4.5 million. With the replacement of the existing facilities estimated at $2.83 million, it is estimated that the growth and upgrade portion of the project is the remaining $1.67 million, split between 2022 and 2023. For road maintenance, the Township requires a packer for the rear of the grader. This purchase is planned for 2022 at a cost of $30k. In addition, the need for a fence around the Novar outdoor rink has been identified for 2027 at an expected cost of $30k (in year 2022 $). This will be done in conjunction with the renewal of the rink, but is considered an upgrade, because there is currently no fence around the rink. Moreover, 1.9 km of roads have been identified for upgrade from gravel to surface treated in 2024. These segments consist of: - Segment 520: Churchill Gardens from Bay Lake Road to Homeland Drive (1.4 km) - Segment 530: Beach Road from Bay Lake Road to Churchill Gardens (0.5 km) In 2023, granite will be added to these segments at a cost of $56k, then in 2024 surface treatment will be applied at a cost of $90k (all values in 2022 $). The $56k is treated as a renewal cost, while the $90k is considered an upgrade cost. Township of Perry | 2022 Asset Management Plan | Rev. 5 | 46 6.2.2 Renewal Needs Renewal efforts focus on rehabilitation and replacement activities to enable the Township to meet its reliability objectives. The renewal activities included in this AM Plan are forecast to be needed to achieve the proposed levels of service at acceptable levels of risk. Over time, as the Township refines the asset management strategies through tracking of actual condition and actual costs and benefits of the strategies, the Township will improve its understanding of the deterioration rates and the lowest lifecycle cost for each asset type. For renewal projects, the Township considers coordinating multiple activities through project bundling where possible to reduce total costs. Rehabilitation activities extend the life of an asset and reduce its risk of failure. These activities and associated benefits are deemed more cost effective than allowing the asset to reach its end of life. An example of a rehabilitation activity is concrete repair work on a bridge or culvert, which will improve the condition of the structure and extend its life such that the overall lifecycle cost is minimized. At a certain point in an asset's lifecycle, it is no longer cost-effective to rehabilitate the asset, and replacement is required. The Township has identified estimated service lives for each of its assets. These replacement intervals are developed to minimize lifecycle costs while considering service levels and the associated risk. Note that due to recent provincial regulation in the recycling industry, the Township is not planning to renew its two recycling compactors. The renewal forecasts consider the asset's current condition or age, the Township's planned rehabilitation and replacement activities, as well as the recommended strategies from the following specific studies: Road & Bridge Needs Study (2020) - This study identified the need and recommended timing for road and bridge improvements, appropriate rehabilitation, reconstruction and/or improvement strategies and costs. For bridges, it is recommended that the next OSIM inspection (scheduled for 2022) specifically review the recommended timing for closing Wooden Bridge and replacement of Emsdale box culvert. Public Facilities Structural Review and Assessment (2020) - This study provided a structural condition assessment of the buildings to determine their condition and provide recommendations for repair and regular maintenance. Figure 6-2 shows the renewal needs over the next 10 years by Service Area. The average renewal need is estimated at $1.70 million per year for the period 2022-2031. (This plot does not include costs allocated to expansion and upgrade, such as $1.67 million of the cost of the new Community Centre and Library in Emsdale.) Figure 6-2: Capital Renewal Needs Forecast . Township of Perry | 2022 Asset Management Plan | Rev. 5 | 47 The average annual cost of expansion, upgrade and renewal needs combined is $1.886 million per year for the period 2022-2031. Table 6-2 summarizes the renewal activities by asset category for each of the next 10 years. Year-by-year upgrade and renewal actions associated with the Planned Strategy are listed in Appendix C. Table 6-2: Upgrade and Renewal Needs Forecasts (in 2022 $, thousands) Service Category 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Annual Average (2022 to 2031) Transportation Roads $ 536.9 $ 622.7 $ 723.9 $ 1,320.4 $ 872.4 $ 1,669.8 $ 769.9 $ 703.7 $ 1,289.7 $ 515.9 $ 902.5 Bridges & Culverts $ 355.0 $ 900.0 $ 125.5 Streetlights $ 0.0 Traffic Signs $ 0.0 Vehicles $ 68.3 $ 141.7 $ 55.0 $ 142.9 $ 410.5 $ 36.5 $ 53.4 $ 17.9 $ 1,324.0 $ 225.0 Facilities $ 41.9 $ 4.2 Parks & Recreation Equipment $ 6.8 $ 216.6 $ 7.9 $ 13.0 $ 10.0 $ 11.7 $ 26.6 Vehicles $ 4.4 $ 30.6 $ 5.2 $ 42.9 $ 4.4 $ 60.3 $ 5.2 $ 94.7 $ 24.8 Facilities $ 2,258.6 $ 2,253.7 $ 2.0 $ 3.1 $ 2.0 $ 451.9 Fire Protection Equipment $ 172.2 $ 8.9 $ 21.3 $ 14.4 $ 169.7 $ 4.1 $ 39.1 Vehicles $ 700.0 $ 5.7 $ 18.6 $ 72.4 Facilities $ 0.0 Solid Waste Equipment $ 3.6 $ 6.9 $ 1.0 Vehicles $ 23.4 $ 2.3 Facilities $ 1.6 $ 0.2 Administration Equipment $ 2.1 $ 2.1 $ 28.0 $ 2.1 $ 5.1 $ 3.9 Vehicles $ 53.7 $ 5.4 Facilities $ 10.0 $ 4.2 $ 1.4 Total $ 3,397.0 $ 3,067.7 $ 1,493.4 $ 1,495.5 $ 1,328.0 $ 2,840.0 $ 958.3 $ 793.6 $ 1,492.5 $ 1,997.5 $ 1,886.3 Township of Perry | 2022 Asset Management Plan | Rev. 5 | 48 6.2.3 Operations and Maintenance Needs Along with timely renewal of assets, operations, and maintenance (O&M) work directly enables the Township to meet state of good repair service levels (percentage of assets in fair or better condition) to support the reliable service delivery objective. The distinction between renewals (capital programs) and operations and maintenance (operating expenses) is defined by the Township's accounting policies and standard operating procedures. Operations and maintenance activities ensure the asset continues to deliver defined levels of services, while renewal activities discussed in Section 6.2.2 extend the useful life of the asset. Renewals, operations, and maintenance are strongly linked; operations and maintenance strategies can accelerate or delay the need for renewals, and if renewals are deferred, operations and maintenance needs will often increase to ensure that assets are kept in a state of good repair. Table 6-3 summarizes the Township's operations and maintenance activities, by service area. Table 6-3: Operations and Maintenance Needs Activities Asset Type Operations Maintenance Transportation Roads - Paved + Surface Treated - Winter control- per MMS - Pot-hole filling as-needed/complaint - Road Patrol - per MMS - Ditching (not associated with a re-surface) - Sweeping - Roadside mowing - frequency - Brushing - remove trees & branches Roads - Gravel - Winter control - Grading - Add maintenance gravel - Dust control - calcium - Ditching (not associated with a re-gravel) - Roadside mowing - frequency - Brushing - remove trees & branches Bridges - Brushing - Inspection every 2 years - Sweep - Maintenance/repair as needed Culverts - Brushing - Inspection every 2 years - Sweep - Maintenance/repair as needed - Clear inlet & outlet Traffic Signs - Retro reflectivity inspection annual (Road Patrol catches other issues) - Repair and replacement as needed Streetlights - (Road Patrol catches other issues) - Repair as needed Vehicles &Maintenance Vehicles - Fuel - PM activities PW Building - Propane, Electricity, Water, Internet - Annual inspection, Repair as needed Coverall, Sand Shed - Inspection, Repair as needed Parks & Recreation Play Structures - Inspect monthly - Repair as needed Open spaces - Grass cutting - Litter pickup - Garbage bin emptying Sports fields - Same as open spaces Township of Perry | 2022 Asset Management Plan | Rev. 5 | 49 Asset Type Operations Maintenance - Groomed in spring Gazebo - Condition assessment Picnic Tables Put wooden ones into storage in the fall - Inspection, repair Picnic Shelter - Condition assessment Vehicles - Fuel - PM activities Community Centres - Natural Gas/Propane, Electricity, Water, Internet - Building condition assessment every 5 years - Repair as needed Fire Services Fire Equipment - Test hoses, extricator annually - Inspect - Repair as needed - Replacements of radios, camera with heat seeker Fire Vehicles - Fuel - PM activities - Test SCBA and pumps, ladders (annual) Fire Station & Garage - Propane, Electricity, Water, Internet - Repair as needed - Building condition assessment every 5 years Solid Waste Compactors - Maintenance as required Skid Steer - Fuel - PM activities Transfer Station - Propane, Electricity, Water, Internet - Repair as needed - Building condition assessment Monitoring Well - Tested quarterly - Maintenance as required Administration Software - Annual support - Annual upgrade Defibrillators - Monthly testing - Maintenance as required Vehicle - Fuel - PM activities Municipal Building - Propane, Electricity, Water, Internet - Repair as needed - Building condition assessment Table 6-4 summarizes the Township's historical operations and maintenance expenditures as well as the forecasted average expenditures for the period 2022-2031. Future operations and maintenance costs are estimated at $3.568 million per year and $0.779 million per year, respectively. These expenditures include all wages, including the proportion of wages that would be allocated for staff time on capital construction projects. The forecasts are based on the historical costs of operations and maintenance activities, with the addition of an FTE and additional maintenance costs anticipated at the new and expanded Emsdale Community Centre. Township of Perry | 2022 Asset Management Plan | Rev. 5 | 50 Table 6-4: Operations and Maintenance Needs History and Forecasts ($ thousands) Service Operations Maintenance 2018 2019 2020 2021 2022 to 2031 2018 2019 2020 2021 2022 to 2031 Actuals Budget Forecast (per yr) Actuals Budget Forecast (per yr) Transportation $ 381.9 $ 357.2 $ 315.3 $ 378.4 $ 381.9 $ 518.2 $ 501.2 $ 552.3 $ 624.1 $ 624.1 Parks & Recreation $ 226.2 $ 268.5 $ 252.1 $ 307.7 $ 360.0 $ 37.1 $ 37.9 $ 27.7 $ 26.7 $ 45.0 Fire $ 157.1 $ 164.6 $ 186.1 $ 244.0 $ 244.0 $ 16.7 $ 23.4 $ 23.3 $ 24.0 $ 24.0 Solid Waste $ 349.2 $ 364.8 $ 335.0 $ 365.3 $ 365.3 $ 3.4 $ 4.7 $ 1.1 $ 8.5 $ 8.5 Administration $ 1,863.7 $ 1,958.3 $ 2,068.2 $ 2,217.2 $ 2,217.2 $ 34.1 $ 43.9 $ 58.2 $ 77.0 $ 77.0 Total $ 2,978.1 $ 3,113.3 $ 3,156.6 $ 3,512.6 $ 3,568.4 $ 609.5 $ 611.1 $ 662.6 $ 760.3 $ 778.6 6.3 Summary of Planned Strategy (Asset Lifecycle Needs) The Township's total forecasted needs based on its planned strategy for managing its assets is estimated at $62.33 million for the period 2022-2031 for an average of $6.23 million per year. Figure 6-3 provides the total renewal, operations and maintenance, and growth and upgrade forecasted expenditures for the Township over the next 10 years. Year-by-year expansion, upgrade and renewal actions associated with the Planned Strategy are listed in Appendix C. Figure 6-3: Total 10-Year Expenditures Forecast, 2022 to 2031 The large capital expenditures in the first two years are mainly due to the new Emsdale Community Centre and Library and the 'now' needs identified in the Roads Needs Study. Township of Perry | 2022 Asset Management Plan | Rev. 5 | 51 6.4 Planned Strategy and Proposed LOS 6.4.1 Overall Impact of Planned Strategy The planned strategy associated with the average $6.233 million per year in expenditures supports the Township's ability to achieve its service levels while balancing risk and minimizing lifecycle costs. If the Township does not invest in renewing its infrastructure, there is a significant deterioration in asset condition over time. The Planned Strategy ensures that assets are maintained and renewed in a state of good repair, as shown in Figure 6-4. Figure 6-4: Asset Condition Forecast Comparison - Do Nothing versus Planned Strategy Do Nothing (No Capital Renewal) Planned Strategy The planned strategy also has a significant impact on managing risk. If the Township does not invest in renewal of its assets, there is a significant risk exposure to asset failure on factors such as health and safety and service delivery. The Planned Strategy mitigates very high risks and results in lower risk exposure compared to an increasing risk profile if the Township did not perform any capital renewal activities, as shown in Figure 6-5. Figure 6-5 Asset Risk Forecast Comparison - Do Nothing versus Planned Strategy Do Nothing (No Capital Renewal) Planned Strategy 6.4.2 Impact of Planned Strategy on LOS The Township's expansion and upgrade strategies support capacity and functional service levels, and its operations, maintenance, and renewal activities support reliability service levels over the next ten years. Table 6-5 details the impact of the Planned Strategy ($6.233 million on average per year) on the reliability service levels from Section 4 and demonstrates how the proposed LOS compare to the target LOS based on the expenditures from 2022 to 2031 under the Township's Planned Strategy. Green cells indicate that the target LOS is met in that given year of the 10- year forecast. A natural increase and decrease in performance year over year is expected as assets deteriorate in condition until the planned rehabilitation or replacement occurs. For some measures, a limited number of assets results in significant changes in reported performance each year. For example, there is only one Administration vehicle so the percentage of assets in fair or better condition is either 100% or 0% each year. If the performance is Township of Perry | 2022 Asset Management Plan | Rev. 5 | 52 0%, this simply represents that the asset is in poor condition and will soon be replaced once it reaches very poor condition at the end of its service life. In Table 6-5, only the pavement condition index for asphalt roads does not reach the target LOS of 80 in any of the ten years. However, the proposed pavement condition index remains above 70 throughout the forecast. The affordability of the proposed service levels in Table 6-5 is discussed in Section 7. Table 6-5: Proposed LOS over Forecast Period Reliability Technical Levels of Service (TLOS) Measure Asset Type Performance Target Current Proposed 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Transportation Average bridge condition index (O.Reg. 588) Bridges 70 66.8 70.2 68.9 67.7 66.4 65.1 63.8 62.5 61.1 59.8 58.5 Structural Culverts 70 54.3 60.7 59.5 58.4 57.3 56.2 70.8 69.8 68.8 67.8 66.9 The average pavement condition index (O.Reg. 588) Asphalt roads 80 79.0 77.0 75.8 74.7 73.6 74.4 75.3 74.2 73.1 72.7 71.7 Surface treated roads 80 73.8 70.8 68.7 75.4 78.0 77.7 75.2 74.7 71.6 80.4 82.1 Unpaved roads 80 75.3 68.7 65.8 63.3 66.1 65.9 85.4 87.5 85.0 81.8 78.2 % in fair or better condition Bridges & Culverts 90% 82.1% 89.4% 89.4% 81.0% 81.0% 81.0% 91.6% 91.6% 91.6% 91.6% 84.9% MMS Class 4 roads 90% 91.8% 91.8% 91.8% 50.9% 59.2% 59.2% 57.7% 73.1% 73.1% 73.1% 73.1% MMS Class 5 roads 80% 70.7% 59.7% 51.0% 51.5% 60.2% 63.0% 70.0% 77.0% 76.8% 88.3% 92.6% MMS Class 6 roads 70% 63.3% 38.3% 28.2% 31.6% 33.5% 45.5% 69.1% 73.5% 80.9% 92.7% 98.2% Vehicles 90% 100.0% 98.6% 99.3% 99.3% 99.6% 93.3% 88.5% 86.1% 43.0% 43.3% 82.4% Average facility condition index Facilities <5% 0.0% 0.0% 0.0% 1.6% 1.6% 1.6% 1.6% 0.0% 0.0% 0.0% 0.0% Parks & Recreation % in fair or better condition Equipment 90% 53.4% 53.4% 55.0% 55.0% 52.0% 47.5% 90.3% 77.3% 66.8% 60.7% 60.9% Vehicles 90% 97.5% 82.5% 100.0% 72.5% 75.5% 80.5% 65.5% 100.0% 67.5% 45.9% 91.5% Township of Perry | 2022 Asset Management Plan | Rev. 5 | 53 Reliability Technical Levels of Service (TLOS) Measure Asset Type Performance Target Current Proposed 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Average facility condition index Facilities <5% 57.4% 57.4% 28.6% 0.1% 0.1% 0.1% 0.1% 0.0% 0.0% 0.0% 0.0% Fire Protection % in fair or better condition Equipment 90% 39.9% 91.5% 90.2% 91.2% 94.9% 94.0% 89.8% 82.1% 83.7% 86.1% 88.6% Vehicles 90% 100.0% 100.0% 99.0% 99.0% 100.0% 100.0% 100.0% 83.7% 80.3% 80.3% 83.7% Average facility condition index Facilities <5% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Solid Waste % in fair or better condition Vehicles 90% 100.0% 100.0% 100.0% 100.0% 100.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% Average facility condition index Facilities <5% 0.3% 0.3% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Administration % in fair or better condition Vehicles 90% 100.0% 100.0% 100.0% 100.0% 100.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% Average facility condition index Facilities <5% 0.4% 0.4% 0.4% 0.2% 0.2% 0.2% 0.2% 0.0% 0.0% 0.0% 0.0% Township of Perry | 2022 Asset Management Plan | Rev. 5 | 54 7 Financing Strategy 7.1 Overview The financial strategy is informed by the preceding sections of the Asset Management Plan: the state or condition of the assets, the proposed levels of service, the risks to service delivery, and the lifecycle activities needed to reduce the risks to service delivery to acceptable levels. The Financing strategy considers how the Township will fund the planned asset management actions to meet the proposed service levels. A global leader in asset management, the Local Government Association of Australia defines financial sustainability within the municipal government context as "... a government's ability to manage its finances so it can meet its spending commitments, both now and in the future. It ensures future generations of taxpayers do not face an unmanageable bill for government services provided to the current generation". A municipality is in a financially sustainable position if it: - Provides a level of service commensurate with willingness and ability to pay - Can adjust service levels in response to changes in economic conditions or grants - Can adjust its implementation plans in response to changes in the rate of growth - Has sufficient reserves and/or debt capacity to replace infrastructure when it needs to be replaced to keep its infrastructure in a state of good repair. The key challenges to financial sustainability are: - A discrepancy between level of service decisions and fiscal capacity - The future cost of infrastructure investments - Unforeseen impacts to revenue Per O.Reg. 588/17, this section of the AM Plan identifies the annual funding projected to be available to undertake the planned lifecycle activities and discusses strategies to address potential funding shortfalls. 7.2 Available Funding Amounts and Sources Through the Township's annual budget process, capital project and operating activity expenditure information is gathered from service areas, including investment needs, trends, and priorities to enable preparation of the capital and annual operating plans. Once the expenditure plans are finalized, a financing plan is developed which includes several key sources of funding as outlined in the table below. Table 7-1: Key Sources of Funding and Financing Funding Source Description Property Tax - Residential and commercial property owners pay an annual tax to the Township Debt - Long term borrowing, to be paid for by future taxpayers Canada Community Building Fund (formerly Federal Gas Tax) - A long-term grant agreement with the Association of Municipalities of Ontario (AMO), that provides a portion of the Federal gas tax revenues to municipalities for revitalization of infrastructure that achieves positive environmental results Grants - Project specific grants / subsidies Township of Perry | 2022 Asset Management Plan | Rev. 5 | 55 Funding Source Description User Fees and Charges - Funds collected for the use of Township services or infrastructure. For example, tipping fees charged to residents at the transfer station. In addition to the above sources, capital reserves are established as a source of pay-as-you-go funding for the Township's capital program. Funding for these reserves is obtained through annual contributions. These annual reserve contributions sustain reserve balances at appropriate levels to address infrastructure replacement costs in the future and inherent uncertainties in capital funding needs. Reserve contributions are evaluated annually to ensure adequate funds are raised to meet future capital requirements and to smooth out the impact on the annual operating budget. The Township minimizes impacts on residents through maximizing other revenue sources such as grants. The $4.5 million new Emsdale Community Centre and Library includes $2.5 million in federal and provincial grants. The remaining amount is funded through reserves and debt. In addition, the Township will receive $112,257 in provincial funding for road renewal for each of the next 5 years (2022-2026). The projected 10-year revenue for the Township is shown in Figure 7-1, including the additional revenue in 2022 for the Emsdale Community Centre and Library and for road renewal. A 0.6% annual growth rate, based on the increase in the number of households in the Township from 2017 to 2021, is assumed in the tax portion of the revenue forecast. The average annual revenue from 2022 to 2031 is estimated to be $5.819 million. Figure 7-1: Total 10-Year Funding Forecast, 2022 to 2031 7.3 Financial Sustainability This section compares the planned funding (Section 7.2) against the forecast needs for the planned lifecycle activities (Section 6.3 summary of growth and upgrade, renewal, and operations and maintenance) to determine if there is a funding shortfall to meet the proposed service levels. Figure 7-2 shows the forecasted average annual need over the next ten years of $6.233 million per year (dashed black line) and the average annual funding of $5.819 million per year (dashed purple line). This results in an estimated average annual funding gap of $414,000 per year over the next ten years. Township of Perry | 2022 Asset Management Plan | Rev. 5 | 56 Figure 7-2: Funding Gap The $414,000 annual funding gap is 7.1% of the annual average revenue and indicates that the Township may require some use of reserves or other grants. The gap may also be reduced if the number of households in the Township grows at a rate greater than the assumed 0.6% growth rate, which would result in higher than forecasted tax revenues. If funding is not increased, then the Township may consider deferring one or more capital projects on lower risk assets. Table 7-2 summarizes the risks associated with implementation of this AM Plan and the strategies in response to those risks. Table 7-2: AM Plan Risk Mitigation Summary Service Attributes Lifecycle Activity Identified AM Lifecycle Risks Strategies to Manage Risk Capacity, Use and Function Expansion and upgrade The costs for upgrading gravel roads to hard surface roads is not funded based on the forecasted revenue available. Further upgrade of gravel roads first requires consideration of traffic levels and their impact on maintenance costs of gravel roads. Re-assess the need for gravel road conversion after additional studies and public consultation. Reliability Renewal With a $414,000 per year funding gap ($4.14 million total gap over 10 years), a project, or several smaller renewal projects may need to be deferred. Continue to use risk-based prioritization to address the most critical needs in years with limited funds. Reserves and other grants may also be considered to resolve the funding gap. Operations and maintenance An additional FTE for the new Community Centre is included in the needs forecast. It is assumed that this additional FTE will be required to provide the proposed service levels expected at the new facility. Without additional staffing, the Township may not be able to fully utilize the potential services made possible by the new and upgraded facility. Refer to strategies above to mitigate funding gap. As indicated in Section 1.5, the landfill is in not included in this AM Plan and future needs will further increase when considering the lifecycle costs of the landfill. For some road and bridge assets, maintenance and renewal costs are shared with neighbouring municipalities and may also impact the expected forecast. Township of Perry | 2022 Asset Management Plan | Rev. 5 | 57 8 AM Plan Monitoring & Improvement 8.1 Overview Development of AM Plans is an iterative process that includes improving data, processes, systems, staff skills, and organizational culture over time. This section provides an overview of the compliance of this AM Plan with Ontario Regulation 588/17 for proposed levels of service (year 2025 requirements) and recommends improvements to the Township's asset management practices. Table 8-1: O.Reg. 588/17 Compliance Status and Other Opportunities Plan Section O.Reg. 588/17 Compliance (Proposed LOS) Other Opportunities State of Local Infrastructure (Yes) For each asset category, the AM Plan provides a summary of the assets, the replacement cost of the assets, the average age of the assets, the condition of the assets, and the approach to assessing condition of assets. Continue to improve knowledge of asset replacement costs and current condition of the assets. Target efforts on highest risk assets and assets with unknown condition. Specific improvements: - Include landfill in next AM Plan. - Record installation year for signs as they are replaced Levels of Service (Yes) For each asset category, the AM Plan reports the current LOS performance. For core assets, the 2022 AM provides the qualitative community descriptions and technical metrics as required by O.Reg. 588/17, and the current performance. For non-core assets, qualitative descriptions and technical metrics established by the Township are discussed. For each asset category, the AM Plan provides the LOS that the Township proposes to provide for the next 10 years. The proposed LOS are appropriate based on an assessment of: the options for the proposed LOS and the risks associated with those options to the long-term sustainability of the Township, how the proposed LOS differ from the current LOS, whether the proposed LOS are achievable, and the Township's ability to afford the proposed LOS. Continue to review levels of service metrics that support lifecycle asset planning activities for specific asset types. Adjust or develop new measures as required. Specific improvements: - Improve description of gravel road rating scale with images at different condition grades. - Record and categorize complaints (e.g. for solid waste: fees, operating hours, wait time complaints) - Develop forecasts of 100-year and 5- year flood impacts. These are LOS metrics required by O.Reg. 588/17 for stormwater and drainage infrastructure. Township of Perry | 2022 Asset Management Plan | Rev. 5 | 58 Plan Section O.Reg. 588/17 Compliance (Proposed LOS) Other Opportunities Asset Management Strategy (Yes) For each asset category, the AM Plan provides the lowest cost lifecycle activities, separated into capital and significant operating expenditures, which would need to be undertaken to provide the proposed LOS for each of the next 10 years. The strategy is based on an assessment of: - currently available data, - the full lifecycle of the assets, - and the associated risks mitigated by the planned lifecycle strategies. (Yes) The AM Plan provides the population forecasts based on historical growth and describes how this growth has been considered in growth projects (the new Emsdale Community Centre). Continue to optimize the lifecycle activities by searching out and testing various operations, maintenance and renewal activity and timing options, and then evaluating the benefits against the costs of each option over time to determine the lowest cost option for the required benefits. - For bridges, it is recommended that the next OSIM inspection (scheduled for 2022) specifically review the recommended timing for closing Wooden Bridge and replacement of Emsdale box culvert. - Facility Condition Index in the later years of the forecast can be estimated more accurately if the renewal needs beyond 10 years are included in the building condition assessments (for example, the FCI in year 10 of the forecast depends on the renewal needs anticipated in years 11 to 13). - A more granular building breakdown will assist in identifying longer term needs and also enable more accurate reporting of asset condition and shorter-term facility needs. Financing Plan (Yes) For each asset category, the AM Plan provides the financial strategy that sets out the following for the 10-year period: - The annual funding projected to be available to undertake lifecycle activities and the options examined to maximize the funding projected to be available. - For any funding shortfalls, which lifecycle activities will be funded and, for those not funded, the associated risks. Improve forecasting of expected revenues to increase accuracy of funding gap analysis. Continue to maximize funding sources such as grants to mitigate funding shortfalls. Township of Perry | 2022 Asset Management Plan | Rev. 5 | 59 8.2 Monitoring and Review Procedures The AM Plan will be updated every five years to ensure it reports an updated snapshot of the Township's asset portfolio and its associated value, age, and condition. It will ensure that the Township has an updated 10-year outlook including the proposed service levels, costs of the associated lifecycle strategies and as assessment of any funding shortfalls. Per O.Reg. 588/17, the Township will conduct an annual review of its asset management progress in implementing this AM Plan, including the year-by-year actions of the Planned Strategy, shown in Appendix C. The annual review will discuss strategies to address any factors impeding implementation of the Planned Strategy. Township of Perry | 2022 Asset Management Plan | Rev. 5 | 60 Appendix A - Regulatory Compliance The following chart represents the Township's position with respect to the asset management requirements identified in O.Reg. 588/17 for Core and Non-Core Assets for July 1, 2025 (proposed Levels of Service). Table A-1: Regulatory Compliance Plan Section O.Reg. 588/17 Compliance Practices (Proposed LOS) Transportation Service assets, including Roads & Bridges Parks & Recreation Service assets Fire Protection Service assets Solid Waste Service assets Municipal Administration Service assets State of Local Infrastructure For each asset category, the AM Plan provides - a summary of the assets, Section 2.2 Section 2.3 Section 2.4 Section 2.5 Section 2.6 - the replacement cost of the assets, Section 2.2 Section 2.3 Section 2.4 Section 2.5 Section 2.6 - the average age of the assets, Section 3.2 Section 3.3 Section 3.4 Section 3.5 Section 3.6 - the condition of the assets, Section 3.2 Section 3.3 Section 3.4 Section 3.5 Section 3.6 - the approach to assessing condition of assets. Section 3.2 Section 3.3 Section 3.4 Section 3.5 Section 3.6 Levels of Service For each asset category, the AM Plan reports the current LOS performance and outlines the proposed service levels. Section 4.2 & Section 6.4 Section 4.3 & Section 6.4 Section 4.4 & Section 6.4 Section 4.5 & Section 6.4 Section 4.6 & Section 6.4 Asset Management Strategy For each asset category, the AM Plan provides the lifecycle activities that would need to be undertaken to provide the proposed LOS for each of the next 10 years. A discussion of how the assumptions regarding future changes in population and economic activity informed the preparation of the lifecycle management and financial strategy. Section 6.2 & Section 6.4 Section 6.2 & Section 6.4 Section 6.2 & Section 6.4 Section 6.2 & Section 6.4 Section 6.2 & Section 6.4 Financial Strategy The annual funding projected to be available to undertake lifecycle activities and the options examined to maximize the funding projected to be available. For any funding shortfalls, which lifecycle activities Section 7.2 & Section 7.3 Section 7.2 & Section 7.3 Section 7.2 & Section 7.3 Section 7.2 & Section 7.3 Section 7.2 & Section 7.3 Township of Perry | 2022 Asset Management Plan | Rev. 5 | 61 Plan Section O.Reg. 588/17 Compliance Practices (Proposed LOS) Transportation Service assets, including Roads & Bridges Parks & Recreation Service assets Fire Protection Service assets Solid Waste Service assets Municipal Administration Service assets will be funded and, for those not funded, the risks of not undertaking them. Background Information The AM Plan indicates how the background information and reports upon which the state of infrastructure section is based will be made available to the public. Section 1.2 Section 1.2 Section 1.2 Section 1.2 Section 1.2 Township of Perry | 2022 Asset Management Plan | Rev. 5 | 62 Appendix B - Public Survey B.1 Introduction A survey was conducted to determine the public's satisfaction with current service levels, and to help establish service level targets. The survey focused on services and asset types where the Township has discretion over service levels, specifically: - Roads - Parks & Outdoor Facilities - Indoor Recreation Facilities - Solid Waste Service In contrast, the survey avoided topics where service levels are primarily defined by safety requirements or regulation, such as bridges, streetlights, traffic signs, fire services. The survey also avoided questions related to internal service assets with which the public does not interact, such as technology assets and maintenance vehicles. B.2 Methodology The survey was developed and conducted as follows: 1. Survey Topics Defined Survey topics were defined with input from staff on the Township's current concerns, based on public complaints and comments, discussions at Council meetings and general discourse in the local media and on social media. 2. Questions Developed Questions were developed to: - obtain basic information on the respondent's relationship with the Township - determine which types of assets they use within each of the service area topics - determine the respondent's satisfaction level with each service - determine what the respondent would like improved about each service - determine whether the respondent is supportive of increased taxes or user fees to support the recommended improvements All questions were multiple choice, but a free form text box allowed respondents to add their own ideas for improvement needs. 3. Survey Posted and Advertised The survey was posted on Google forms for three weeks from October 7 to November 3, 2021, and was advertised on the Township's social media (Facebook) account. 4. Survey Closed and Analysed The survey was closed and results were analysed and reported for the AM Plan. Township of Perry | 2022 Asset Management Plan | Rev. 5 | 63 B.3 Survey Questions The survey content is shown below. Square bullets indicate that multiple selections are allowed for the question, while round bullets (radio buttons) indicate that only one selection is allowed for the question. The Township of Perry is updating its Asset Management (AM) Plan, and would like your input to ensure that services meet your expectations for performance and value. The AM Plan will define the Township's plan for managing its roads, buildings, and vehicles to meet established service levels, at the lowest life cycle cost, within an acceptable threshold of risk. Your input will help the Township direct its effort and resources to what matters most. About the respondent 1. First, please tell us a little about yourself. Please select all options that apply to you: I am a year-round resident of Perry. I am a seasonal resident of Perry. I rent my property in Perry. I own my property in Perry. I own a business in Perry. Roads 2. Is your property located on a gravel road or a hard-surface road (paved or surface treated)? [Select one option] o Gravel road o Hard-surface road (paved or surface treated) 3. How satisfied are you with the quality of your road? [Select one option] o Very Satisfied o Satisfied o No opinion o Dissatisfied o Very Dissatisfied 4. What aspects of your road would you improve? [Select up to 3] Cracks Rutting Uncomfortable ride surface Too much dust Flooding / washouts Other ___________________ Outdoor Recreation 5. Which of the Township's outdoor recreation facilities have you and your family used in the past 12 months? [Select all that apply] Parks / greenspace Ball fields Township of Perry | 2022 Asset Management Plan | Rev. 5 | 64 Outdoor skating rinks Play structure Emsdale Gazebo Beaches Boat Launches Other ___________________ 6. How satisfied are you with the Township's outdoor recreation facilities? [Select one option] o Very Satisfied o Satisfied o No opinion o Dissatisfied o Very Dissatisfied 7. What aspects of outdoor recreation would you improve? [Select up to 3] Capacity - too crowded Cleanliness - garbage and litter Condition - facilities are in poor condition, require maintenance Variety of facilities (e.g. need more different types of sports fields and courts) Wait time for boat launch too long Not enough parking Other ___________________ Indoor Recreation and Culture 8. Which of the Township's indoor recreation and culture facilities have you and your family used in the past 12 months? [Select all that apply] Emsdale Community Centre Novar Community Centre Township of Perry Public Library Other ___________________ 9. How satisfied are you with the Township's indoor recreation and culture facilities? [Select one option] o Very Satisfied o Satisfied o No opinion o Dissatisfied o Very Dissatisfied 10. What aspects of indoor recreation and culture would you improve? [Select up to 3] Capacity - too crowded, not available for booking Cleanliness - garbage and litter Condition - facility is in poor condition, requires maintenance Variety of types of spaces Not enough parking Other ___________________ Township of Perry | 2022 Asset Management Plan | Rev. 5 | 65 Solid Waste Management 12. How satisfied are you with the Township's Solid Waste Transfer Station and Recycling Centre? [Select one option] o Very Satisfied o Satisfied o No opinion o Dissatisfied o Very Dissatisfied 13. What aspects of outdoor recreation would you improve? [Select up to 3] Wait time for tipping is too long Hours of operation are inconvenient Household bag limit is too low Tipping fees are too high Other ___________________ General 14. Would you be open to increasing property taxes or user fees to support these improvements? [Select all that apply] I would support higher property taxes to support service improvements. I would support higher user fees to support service improvements (e.g. tipping fees, boat launch fees, beach entry fees) I don't support higher taxes or fees. I am not willing to pay for these improvements. Thank you for your input! It will be incorporated into the Asset Management Plan, which is scheduled to be released in February 2022. For more information on the AM Plan project, please contact Kim Seguin, Treasurer, Township of Perry, at 705-636- 5941. Township of Perry | 2022 Asset Management Plan | Rev. 5 | 66 B.4 Results B.4.1 ABOUT THE RESPONDENTS Fifty-four (54) responses were received. Of those, - 48 identified themselves as year-round residents and 4 as seasonal. - 28 identified themselves as owners, 2 as renters, 1 as both and 23 as neither - 1 identified themselves as a business owner B.4.2 ROADS RESULTS Figure B-1: Roads Satisfaction Level Satisfaction Level Number of Responses Very Satisfied 7 Satisfied 31 No Opinion 3 Dissatisfied 8 Very Dissatisfied 5 TOTAL 54 Figure B-2: Roads Satisfaction by Respondents' Road Surface Type Township of Perry | 2022 Asset Management Plan | Rev. 5 | 67 Figure B-3: Road Aspects to be Improved Other improvements suggested by respondents: Winter-related - Plowing - Plowing the railway tracks Grading - Grading leaves a lip or drop down to the road - Grading too infrequent (2) Mud - Deep mud in spring is difficult to steer through Other - Culvert issues - Lost shoulder - Frost heaves - Pave it - Open Cherry Hill Rd year round Township of Perry | 2022 Asset Management Plan | Rev. 5 | 68 B.4.3 PARKS & OUTDOOR RECREATION RESULTS Figure B-4: Parks & Outdoor Recreation Satisfaction Level Satisfaction Level Number of Responses Very Satisfied 8 Satisfied 27 No Opinion 10 Dissatisfied 9 Very Dissatisfied 0 TOTAL 54 Figure B-5: Parks & Outdoor Recreation Aspects to be Improved Other improvements suggested by respondents: - Info on how to rent - Bay Lake boat launch needs a dock - Wait time for boat launch too long - More hiking trails. Develop the north side of Brook's Falls with a foot bridge over the river and hiking trails - No access to washrooms - Play structure geared toward under 4 Township of Perry | 2022 Asset Management Plan | Rev. 5 | 69 B.4.4 INDOOR RECREATION RESULTS Figure B-6: Indoor Recreation Satisfaction Level Satisfaction Level Number of Responses Very Satisfied 9 Satisfied 17 No Opinion 19 Dissatisfied 6 Very Dissatisfied 3 TOTAL 54 Figure B-7: Indoor Recreation Aspects to be Improved Other improvements suggested by respondents: - Need new community centre & library - Needs full update (library) - Can't wait for the new Emsdale community centre. Township of Perry | 2022 Asset Management Plan | Rev. 5 | 70 B.4.5 SOLID WASTE SERVICE RESULTS Figure B-8: Solid Waste Satisfaction Level Satisfaction Level Number of Responses Very Satisfied 9 Satisfied 27 No Opinion 2 Dissatisfied 13 Very Dissatisfied 3 TOTAL 54 Figure B-9: Solid Waste Service Aspects to be Improved Other improvements suggested by respondents: Operations - Commercial drop off time separately - The Diabetic Containers should come back. - Garbage pick up should be considered Township of Perry | 2022 Asset Management Plan | Rev. 5 | 71 - The line up makes it a safer experience when at the Transfer Station. Before, you had to be careful when getting out because cars would come up both sides of your vehicle Wait times - Covid has increased wait times but we can only hope to put that virus behind us. Reuse / Exchange Shed - The reuse building should be opened asap!!!! Smiling staff would also be a perk. - Reinstate the free exchange shed (now that we know that fomite [sic] transmission of coronavirus is not a significant risk). It keeps useable items out of landfill. Recycling - Promote successful recycling. Good luck - More really recycled - better options/system for recycling or diverting waste Driveway Condition - Road in is potholes & bumpy - Driveway has potholes all the time where it joins the road #592 & the yard itself is really bumpy, we have hundreds of thousands od dollars worth of heavy equipment & the landfill yard is always a bumpy pothole mess !! Op Hours and Bag Limits - It's well run and the employees are very nice, but I can only come out to my property on weekends so I can't take advantage of regular garbage bag limits. I think it sucks that I can't use or bank my weekly allotment to dispose of a trailer load of garbage when I need to, since I can't take advantage of the dump weekly. User Fee - If the transfer station and land fill require additional funds to operate raise taxes and answer for it at the ballot box. Charging user fees for every day household waste at a facility that virtually everyone in the township uses is nothing more than a TAX. Township of Perry | 2022 Asset Management Plan | Rev. 5 | 72 B.4.6 WILLINGNESS TO PAY Table B-1: Willingness to Pay Willingness to Pay Number of Responses Supports higher user fees to pay for improvements 8 Supports higher property taxes to pay for improvements 16 Supports both higher property taxes and user fees to pay for improvements 3 Does not support higher property taxes or user fees to pay for improvements 26 Selected all 3 options: - Supports higher user fees - Supports higher property taxes - Does not support higher property taxes or user fees 1 TOTAL 54 Township of Perry | 2022 Asset Management Plan | Rev. 5 | 73 Appendix C - 2022-31 Planned Strategy Actions Year by Year This appendix presents the capital expansion, upgrade and renewal actions associated with the AM Plan's 2022-31 Planned Strategy. Township of Perry 2022 AM Plan - Appendix C Planned Strategy Actions Year-by-Year Renewals, Expansions and Upgrades of all Asset Classes See page C-3 for detailed listing of road improvements. Implementation Schedule - Treatment Costs in 2022 $ # Service Asset Class Asset Type Asset ID Description Action 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 TOTAL 1 Transportation Roads All - see Roads tab 536,925 622,737 723,913 1,320,395 872,420 1,669,778 769,900 703,710 1,289,711 515,897 9,025,386 2 Transportation Bridges and Culverts Bridge Structure #7 Fish Lake Road Bridge Replace damaged guiderail, repair concrete on railing, repair concrete girders, repair concrete exterior soffit 150,000 150,000 3 Transportation Bridges and Culverts Bridge Structure #44-143 Deer Lake Road Bridge Replace guiderail 35,000 35,000 4 Transportation Bridges and Culverts Bridge Structure #TP 2 Wooden Bridge During next OSIM inspection (2022), obtain advice on potentially removing this structure. - 5 Transportation Bridges and Culverts Culvert Structure #TP 10 Whitney Road 3rd Culvert Replace structure 120,000 120,000 6 Transportation Bridges and Culverts Culvert Structure #TP 11 Emsdale Road Box Culvert Design (2026) and replace structure (2027) 50,000 900,000 950,000 7 Transportation Buildings & Facilities Salt/Sand Shed Salt/Sand Shed Replace 41,861 41,861 8 Transportation Vehicles and Equipment Attachment Packer for grader Addition (Upgrade) 30,000 30,000 9 Transportation Vehicles and Equipment Light Dodge Ram 1500 Replace 38,336 38,336 10 Transportation Vehicles and Equipment Light Dodge Ram 5500 Replace 80,710 80,710 11 Transportation Vehicles and Equipment Attachment Brush Head Replace 36,504 36,504 73,007 12 Transportation Vehicles and Equipment Trailer 20 ton tag trailer Replace 24,526 24,526 13 Transportation Vehicles and Equipment Attachment Boss V Plow Replace 17,616 17,616 35,232 14 Transportation Vehicles and Equipment Light Dodge Ram 1500 Replace 37,390 37,390 15 Transportation Vehicles and Equipment Heavy Daewoo Loader Mego 200 Replace 125,005 125,005 16 Transportation Vehicles and Equipment Attachment AMI Sweeper Replace 17,865 17,865 35,730 17 Transportation Vehicles and Equipment Attachment Sander Replace 10,513 10,513 21,027 Vehicles and Equipment Heavy Freightliner Tandem Plow Replace 400,000 400,000 18 Transportation Vehicles and Equipment Attachment Slip in Water Tank Replace 35,834 35,834 19 Transportation Vehicles and Equipment Heavy Western Star u1569 Tandem Plow Replace 349,204 349,204 20 Transportation Vehicles and Equipment Heavy Western Star u1568 Tandem Plow Replace 349,204 349,204 21 Transportation Vehicles and Equipment Heavy Daewoo Track excavator Replace 176,431 176,431 22 Transportation Vehicles and Equipment Heavy John Deere 870GP grader Replace 438,676 438,676 23 Transportation ALL 960,261 764,477 778,919 1,463,265 1,282,933 2,611,638 806,404 757,160 1,307,576 1,839,925 12,572,558 24 Parks & Recreation Outdoor Recreation Assets Other Community Garden - 12 wood-framed beds & fencing Replace 6,825 6,825 25 Parks & Recreation Outdoor Recreation Assets Play Equipment Swings-Novar Park Replace 11,735 11,735 26 Parks & Recreation Outdoor Recreation Assets Security Security cameras - ECC park Replace 3,930 3,930 27 Parks & Recreation Outdoor Recreation Assets Security Security cameras - Fire Hall public park Replace 3,930 3,930 28 Parks & Recreation Outdoor Recreation Assets Boat Launch Ramp Bay Lake Boat Launch - Ramp Replace 10,000 10,000 29 Parks & Recreation Outdoor Recreation Assets Defibrillator - Emsdale CC Defibrillator - Emsdale CC Replace 6,500 6,500 30 Parks & Recreation Outdoor Recreation Assets Defibrillator - Novar CC Defibrillator - Novar CC Replace 6,500 6,500 31 Parks & Recreation Outdoor Recreation Assets Rink - Novar outdoor Cement slab 75' X 150' - $123,200 Replace 125,000 125,000 32 Parks & Recreation Outdoor Recreation Assets Rink - Novar outdoor Ice rink boards - 50' X 100" rink - $59,500 Replace 60,000 60,000 33 Parks & Recreation Outdoor Recreation Assets Rink - Novar outdoor Ice rink liner - $1,620 Replace 1,620 1,620 34 Parks & Recreation Outdoor Recreation Assets Rink - Novar outdoor Fence - $30,000 Add (Upgrade to rink facility) 30,000 30,000 35 Parks & Recreation Buildings Gazebo Clean and recoat baseplates 2,000 2,000 36 Parks & Recreation Buildings Covered Rink Clean and recoat baseplates 2,000 2,000 37 Parks & Recreation Buildings Museum Repair concrete slab at entrance, remove and repair deteriroated logs/re-grade 6,500 6,500 38 Parks & Recreation Buildings Community Centre & Library Scheduled for Replacement & Expansion 2,250,000 2,250,000 4,500,000 39 Parks & Recreation Buildings Parks & Rec Seal hole at base of exterior wall (2022) and re-grade to promote drainage (2024) 2,000 - 2,000 40 Parks & Recreation Buildings Community Centre Re-grade to promote drainage (2023) and clean and recoat beam saddles at porch (2027) 3,663 3,140 6,802 41 Parks & Recreation Vehicles and Equipment Light Chev 3500 Replace 51,750 51,750 42 Parks & Recreation Vehicles and Equipment Light Jeep Patriot Replace 29,688 29,688 43 Parks & Recreation Vehicles and Equipment Tractor John Deere Tractor Replace 42,929 42,929 85,859 44 Parks & Recreation Vehicles and Equipment Attachment (Addition to above item) mower Replace 8,235 8,235 16,470 45 Parks & Recreation Vehicles and Equipment Attachment (Addition to above item) snowblower Replace 6,484 6,484 12,968 46 Parks & Recreation Vehicles and Equipment Tractor John Deere Lawn tractor Replace 15,929 15,929 31,858 47 Parks & Recreation Vehicles and Equipment Attachment (Addition to above item) Snow blower Replace 4,432 4,432 8,864 Township of Perry 2022 AM Plan Appendix C Page C-1 of 5 Township of Perry 2022 AM Plan - Appendix C Planned Strategy Actions Year-by-Year Renewals, Expansions and Upgrades of all Asset Classes See page C-3 for detailed listing of road improvements. Implementation Schedule - Treatment Costs in 2022 $ # Service Asset Class Asset Type Asset ID Description Action 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 TOTAL 48 Parks & Recreation Vehicles and Equipment Small Honda Snow blower Replace 5,218 5,218 10,436 49 Parks & Recreation ALL 2,262,932 2,291,136 2,000 5,218 42,929 224,192 70,196 13,000 15,218 106,414 5,033,235 50 Fire Protection Service Emergency Equipment Equipment Amkus Heavy Hydraulic Extrication tool Replace 21,286 21,286 51 Fire Protection Service Emergency Equipment Equipment FR2 heart Start Defibrillator Replace 6,500 6,500 52 Fire Protection Service Emergency Equipment Equipment FR2 heart Start Defibrillator Replace 6,500 6,500 53 Fire Protection Service Emergency Equipment Equipment 11 SCBA (4 out of service) Replace 95,369 95,369 190,737 54 Fire Protection Service Emergency Equipment Equipment 1- SCBA pack in RIT bag (Rapid Intervention Team) Replace 4,233 4,233 8,465 55 Fire Protection Service Emergency Equipment Equipment 58 Cylinders (45min) + 1 Cylinder (1 hr) Replace 59,605 59,605 119,210 56 Fire Protection Service Emergency Equipment Equipment West Bay Lake repeater station radio equipment Replace 4,080 4,080 57 Fire Protection Service Emergency Equipment Equipment Emsdale hall ION washer Replace 5,520 5,520 58 Fire Protection Service Emergency Equipment Equipment 16" electric fan Replace 3,665 3,665 59 Fire Protection Service Emergency Equipment Equipment Security camera system Replace 6,820 6,820 60 Fire Protection Service Emergency Equipment Equipment Emsdale hall computer network Replace 8,900 8,900 17,800 61 Fire Protection Service Emergency Vehicles Emergency Polaris 800EFI UTV Ranger 4x4 Replace 18,597 18,597 62 Fire Protection Service Emergency Vehicles Emergency GMC C7500 Pumper Replace 700,000 700,000 63 Fire Protection Service Emergency Vehicles Attachment (Addition to above item) tracks Replace 5,750 5,750 64 Fire Protection Service ALL 172,206 - 708,900 27,036 - - - 14,420 169,691 22,677 1,114,929 65 Solid Waste Service Site Equipment Site Security camera system Replace 3,310 3,310 66 Solid Waste Service Site Equipment Site Internet network - security router Replace 3,580 3,580 7,160 67 Solid Waste Service Buildings Reusable Item Shed Reinforce broken truss chord 1,570 1,570 68 Solid Waste Service Vehicles Small Bobcat 753 skidsteer Replace 23,442 23,442 69 Solid Waste Service ALL 1,570 - 3,580 - - - - 6,890 - 23,442 35,482 70 Municipal Administration IT & Admin Assets Technology IP Phone system Replace 5,050 5,050 71 Municipal Administration IT & Admin Assets Technology Office cameras/security system (total 7 cameras at $4k each) Replace 28,000 28,000 72 Municipal Administration IT & Admin Assets Technology Server upgrade Replace 2,090 2,090 2,090 6,270 73 Municipal Administration Buildings Municipal Office Seal gaps in exterior stucco (2023) and replace damaged stucco panel near entry (2027) 10,000 4,186 14,186 74 Municipal Administration Vehicles Light Jeep Cherokee Replace 53,686 53,686 75 Municipal Administration ALL - 12,090 - - 2,090 4,186 81,686 2,090 - 5,050 107,193 76 TOTAL 3,396,969 3,067,703 1,493,399 1,495,518 1,327,953 2,840,016 958,286 793,560 1,492,485 1,997,508 18,863,397 Township of Perry 2022 AM Plan Appendix C Page C-2 of 5 Township of Perry 2022 AM Plan - Appendix C Planned Strategy Actions Year-by-Year Cost in 2022 $ Re-graveling - 4" with ditching Road Improvements Cost in 2022 $ Double layer surface treatment Cost in 2022 $ Rehab (remove surface treatment and apply granite) Cost in 2022 $ Asphalt re-surface Cost in 2022 $ Micro-sealing Implementation Schedule - Treatment Costs in 2022 $ Section Road Name From To Length (km) 2021 PCI Surface Type 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 TOTAL 10 Star Lake Road Old Government Road 0.4km W of Old Government Road 0.4 73.4 Surface Treated 14,400 20,160 34,560 20 Star Lake Road 0.4km W of Old Government Road Masons Road 0.8 76.7 Surface Treated 29,880 41,832 71,712 30 Star Lake Road Masons Road Expressway Road 2.1 100.0 Gravel 56,160 56,160 40 Star Lake Road Expressway Road West Municipal Boundary 2.0 100.0 Gravel 54,810 54,810 50 Expressway Road Star Lake Road Fern Glen Road 2.1 68.5 Gravel 56,700 56700 113,400 60 Stewarts Road Fern Glen Road West End 0.2 49.0 Gravel - 70 Fern Glen Road Fern Glen Road 0.5km S of Fern Glen Road 0.5 80.8 Surface Treated 18,250 18,250 36,500 80 Fern Glen Road 0.5km S of Fern Glen Road Whitney Road 1.5 81.2 Gravel 51,430 41,040 92,470 90 Fern Glen Road Whitney Road Appleyards Road 2.0 78.9 Gravel 68,570 55,080 123,650 100 Appleyards Road Fern Glen Road South Limit 2.0 47.8 Gravel (summer road) 54,540 54,540 110 Old Track Road Fern Glen Road East End 0.5 76.1 Gravel 12,150 12,150 24,300 120 Whitney Road Fern Glen Road Long Lake Road 2.1 69.3 Gravel 80,000 80,000 160,000 130 Long Lake Road Whitney Road Shannon Road 3.4 22.2 Gravel 92,070 92,070 140 Whitney Road Long Lake Road Brushs Road 2.0 71.7 Gravel 80,000 55,080 135,080 150 Brushs Road Whitney Road West End 1.0 61.0 Gravel 35,000 26,460 61,460 160 Whitney Road Brushs Road Old Novar Road 2.3 76.0 Gravel 90,000 62,910 152,910 170 Old Novar Road Whitney Road West Municipal Boundary 2.6 55.1 Gravel 69,120 69,120 180 Boundary Road Whitney Road 1.2km E of Whitney Road 1.2 65.9 Gravel 32,400 32,400 190 Boundary Road 1.2km E of Whitney Road Bittern Lake Lane 1.6 73.7 Gravel 42,120 42,120 200 Boundary Road Bittern Lake Lane 0.1km E of Jenkins Lane (Edge of Surface Treatment) 1.7 88.1 Gravel 44,550 44,550 210 Boundary Road 0.1km E of Jenkins Lane Long Lake Road 0.3 77.0 Surface Treated 9,600 13,440 23,040 220 Long Lake Road Boundary Road Shannon Road 4.0 74.9 Gravel 107,190 107,190 230 Shannon Road Long Lake Road South End 0.7 44.2 Gravel 17,820 17,820 240 Boundary Road Long Lake Road Gabriel Lane 1.0 85.4 Surface Treated 31,310 31,310 62,620 260 Rattray'S Road Highway 11 0.2km W of Highway 11 0.2 71.5 Gravel 5,400 5,400 270 Rattray'S Road 0.2km W of Highway 11 0.4km W of Highway 11 0.2 52.4 Gravel 5,850 5,850 280 Rattray'S Road 0.4km W of Highway 11 South End 1.7 57.9 Gravel 46,710 46,710 290 Station Road Highway 11 Wooden Bridge Road 0.3 73.0 Gravel 8,100 8,100 16,200 300 Wooden Bridge Road Station Road East End 0.7 67.8 Gravel 25,000 25,000 50,000 310 Station Road Wooden Bridge Road Highway 592 2.0 70.4 Gravel 80,000 54,000 80,000 214,000 320 Fish Lake Road Highway 592 Langs Lane 2.5 74.4 Surface Treated 81,900 114,660 196,560 340 Savage Settlement Road Highway 592 1.3km E of Highway 592 1.3 75.3 Surface Treated 42,250 59,150 101,400 350 Savage Settlement Road 1.3km E of Highway 592 Locke Road 1.0 62.1 Surface Treated 36,000 56,000 32,640 124,640 360 Savage Settlement Road Locke Road Lakeview Drive 1.5 62.7 Surface Treated 54,000 84,000 52,020 190,020 370 Savage Settlement Road Lakeview Drive Foote Lake Road 1.6 48.9 Surface Treated 57,600 89,600 55,420 202,620 380 Savage Settlement Road Foote Lake Road 0.9km E of Foote Lake Road 0.9 69.8 Surface Treated 32,400 50,400 27,000 109,800 390 Savage Settlement Road 0.9km E of Foote Lake Road Kearney Boundary 0.7 71.5 Gravel 18,630 18,630 400 Foote Lake Road Savage Settlement Road 0.1km S of Savage Settlement Road 0.1 100.0 Surface Treated 3,400 4,760 8,160 410 Foote Lake Road 0.07km S of Savage Settlement Road Sherwood Drive 1.5 100.0 Gravel 41,310 41,310 420 Sherwood Drive Foote Lake Road 0.37km N of Foote Lake Road 0.4 100.0 Gravel 10,800 10,800 430 Sherwood Drive Foote Lake Road Sherwood Crescent 1.0 100.0 Gravel 26,190 26,190 440 Sherwood Crescent Sherwood Drive North End Cul De Sac 0.1 74.8 Gravel 3,240 3,240 450 Pinedale Road Savage Settlement Road North End 0.7 100.0 Gravel 19,440 19,440 460 Lakeview Drive Savage Settlement Road 1.1km N of Savage Settlement Road 1.1 65.7 Surface Treated 35,600 51,590 87,190 470 Lakeview Drive 1.1km N of Savage Settlement Road Locke Road 0.8 65.7 Surface Treated 29,100 34,020 63,120 480 Locke Road Lakeview Drive North End 1.4 57.9 Gravel (limited access) 38,610 38,610 490 Locke Road Lakeview Drive Savage Settlement Road 1.0 71.2 Surface Treated 32,300 49,490 81,790 500 Bay Lake Road Highway 592 0.9km W of Rochester Lake Road 1.9 80.4 Surface Treated 61,975 61,975 123,950 510 Bay Lake Road 0.9km W of Rochester Lake Road Rochester Lake Road 0.9 80.4 Surface Treated 30,150 30,150 60,300 520 Churchill Gardens Bay Lake Road Homeland Drive 1.4 62.2 Gravel 50,000 70,000 46150 166,150 530 Beach Road Bay Lake Road Churchill Gardens 0.5 79.4 Gravel 16,000 20,000 15000 51,000 540 Homeland Drive Bay Lake Road Churchill Gardens 0.7 79.6 Surface Treated 21,780 30,492 52,272 Township of Perry 2022 AM Plan Appendix C Page C-3 of 5 550 Homeland Drive Churchill Gardens North End Cul De Sac 2.1 79.3 Surface Treated 67,980 95,172 163,152 560 Bay Lake Road Rochester Lake Road North Bay Lake Road 0.5 73.0 Surface Treated 17,550 24,570 42,120 570 North Bay Lake Road Bay Lake Road South End 3.1 74.1 Gravel 82,350 82,350 580 Bay Lake Road North Bay Lake Road End Cul De Sac 2.9 72.5 Surface Treated 92,610 129,654 222,264 590 King Sideroad Bay Lake Road End 0.5 71.5 Gravel 12,420 12,420 600 Maple Drive Bay Lake Road Bay Lake Road 0.6 62.5 Gravel 16,470 16,470 32,940 610 Rochester Lake Road Bay Lake Road Halls Road 3.3 80.1 Gravel 88,020 88,020 620 Jay Ridge Road Highway 592 West End 0.1 78.1 Gravel 2,970 2,970 630 Mcsewell Harbour Lane Highway 592 East End 0.2 100.0 Gravel 4,050 4,050 640 Gibson Road Highway 592 West End 0.2 78.9 Gravel 5,940 5,940 650 Clear Lake Road Highway 592 East End 0.3 83.8 Gravel 7,020 7,020 660 Trainers Road Highway 592 Highway 592 0.3 58.5 Gravel 8,483 8,483 670 Scotia Road Highway 592 0.5km W of Highway 592 0.5 76.4 Asphalt 15,000 15,000 680 Scotia Road 0.5km W of Highway 592 Emsdale Road 0.4 103.9 Asphalt 11,160 11,160 690 Old Muskoka Road Highway 592 1.2km S of South of Highway 592 1.2 74.1 Gravel 32,400 32,400 695 Old Muskoka Road Highway 592 200M West 0.2 82.7 Surface Treated 6,000 6,000 12,000 700 Old Muskoka Road 1.2km S of Highway 592 Emsdale Road 0.2 95.7 Asphalt 4,650 4,650 710 Fern Glen Road Highway 11 Sb Off Ramp 0.3km W of Highway 11 Sb Off Ramp 0.3 95.1 Asphalt 10,500 10,500 720 Fern Glen Road 0.3km W of Highway 11 Sb Off Ramp Masons Road 1.6 71.8 Asphalt 314,820 314,820 730 Fern Glen Road Masons Road Stewarts Road 2.4 76.1 Surface Treated 76,375 106,925 183,300 740 Masons Road Fern Glen Road Star Lake Road 2.1 83.8 Gravel 56,430 56,430 750 Masons Road Star Lake Road 0.25km S of Highway 518 West 1.8 81.2 Gravel 47,790 47,790 760 Masons Road 0.25km S of Highway 518 West Highway 518 West 0.3 74.5 Asphalt 8,000 8,000 770 Mcmullen'S Drive Highway 518 West East End Cul De Sac 0.4 64.8 Gravel 9,450 9,450 18,900 780 Old Government Road Star Lake Road Highway 518 West 2.2 88.7 Surface Treated 66,000 66,000 132,000 790 Amylee Drive Old Government Road East End Cul De Sac 0.3 65.8 Surface Treated 8,700 12,180 20,880 800 So Ho Mish Road Highway 518 West 0.1km W of Sunset Pass Road 1.8 100.0 Gravel (changing to surface treated in 2022) 98,000 63,350 161,350 820 So Ho Mish Road 0.1km W of Sunset Pass Road 3.3km W of Sunset Pass Road 3.3 100.0 Gravel 89,100 89,100 830 So Ho Mish Road 3.3km W of Sunset Pass Road West End Cul De Sac 1.0 100.0 Gravel 29,250 29,250 835 Brogan'S Road So Ho Mish Road 300 M East To End 0.3 51.5 Gravel 8,100 8,100 840 Star Lake Road Old Government Road Emsdale Road 0.5 78.3 Asphalt 108,900 108,900 850 Super Sign Road Highway 592 1km E of Highway 592 1.0 73.0 Surface Treated 35,720 48,810 42,000 30,000 156,530 860 Super Sign Road 1km E of Highway 592 2.7km E of Highway 592 1.7 70.9 Surface Treated 60,700 73,215 71,400 51,000 256,315 865 Super Sign Road 2.7km East of Highway 592 Hall'S Road 1.5 80.5 Gravel 60,000 40,500 60,000 160,500 870 Birchdale Road Halls Road Highway 518 East 1.5 67.4 Gravel 80,000 41,040 80,000 201,040 880 Halls Road Super Sign Road Rochester Lake Road 2.2 65.9 Gravel 58,860 58,860 890 Kearney Road Rochester Lake Road Pinegrove Road 0.3 79.3 Surface Treated 20,000 20,000 10,500 50,500 900 Pinegrove Road Kearney Road North End Cul De Sac 1.8 67.0 Gravel 80,000 48,330 80,000 208,330 920 Kearney Road Pinegrove Road Emsdale Lake Road 1.1 68.0 Surface Treated 50,000 50,000 33,300 133,300 930 Kearney Road Emsdale Lake Road Kearney Boundary 1.1 75.3 Surface Treated 37,620 52,668 90,288 940 Bill Groome Road Kearney Road East End Turnaround 0.3 63.7 Gravel 6,750 6,750 13,500 950 Emsdale Lake Road Kearney Road Fisher Lake Lane 0.6 81.2 Gravel 16,470 16,470 960 Fisher Lake Lane Emsdale Lake Road 220 M East of Emsdale Lake Road 0.2 84.2 Gravel 5,940 5,940 970 Emsdale Lake Road Fisher Lake Lane Kearney Boundary 1.1 74.5 Gravel 28,350 28,350 990 Cherry Hill Road Sand Lake Road 12Th Concession Road 0.8 55.1 Gravel 28,000 28,000 1000 12Th Concession Road Cherry Hill Road Kearney Boundary 0.3 70.5 Gravel 7,560 7,560 15,120 1010 Cherry Hill Road 12Th Concession Road Purdie Road 1.2 83.8 Gravel 42,000 32,670 74,670 1020 Purdie Road Cherry Hill Road South End 0.5 56.8 Gravel (summer road) 14,310 14,310 1030 Cherry Hill Road Purdie Road Deer Lake Road 2.5 49.0 Gravel (summer road) 67,770 67,770 1040 Bevan Road Sand Lake Road / Highway 518 Kearney Limit 1.1 72.9 Gravel 29,160 29,160 1050 Bevan Road Kearney Limit Deer Lake Road 3.9 76.0 Gravel 140,000 104,490 244,490 1060 Deer Lake Road Bevans Road 0.4km E of Nulty Lane 2.4 71.3 Surface Treated 90,000 63,000 78,325 231,325 1065 Deer Lake Road 0.4km E of Nulty Lane 0.7km E of Nulty Lane 0.3 76.5 Gravel 11,250 7,875 9,000 28,125 1066 Deer Lake Road 1.3km E of Nulty Lane 2.0km E of Nulty Lane (Tee In Road) 0.7 59.6 Gravel 26,250 18,375 21,000 65,625 1067 Deer Lake Road 0.7km E of Nulty Lane 1.3km E of Nulty Lane 0.6 55.8 Gravel 22,500 15,750 18,000 56,250 1069 Deer Lake Road Highway 518 Highway 592 0.5 75.0 Surface Treated 16,000 24,500 40,500 1070 Deer Lake Road Bevans Road Highway 592 3.7 62.4 Surface Treated 164,493 117,495 281,988 1080 Old Mulligans Road Highway 518 East Highway 518 East 0.4 60.3 Gravel 15,000 15,000 30,000 1090 Old Monteith Road (S Side of Hwy 518) Highway 518 East Highway 518 East 0.3 57.3 Gravel 10,500 10,500 21,000 1095 Old Monteith Road (N Side of Hwy 518) Highway 518 East Highway 518 East 0.7 74.5 Gravel 24,500 24,500 49,000 2010 Gabriel Lane Boundary Road Centurion Cres 0.5 100.0 Gravel 12,425 12,425 2020 Centurion Cres Gabriel Lane Gabriel Lane 0.7 100.0 Surface Treated 17,934 17,934 Township of Perry 2022 AM Plan Appendix C Page C-4 of 5 2030 Florence Street Boundary Road North End Cul De Sac 0.7 100.0 Surface Treated 17,934 17,934 2040 Adelaide Crescent Florence Street Florence Street 0.4 100.0 Surface Treated 9,940 9,940 2050 Mcphail Crescent Florence Street East End 0.2 100.0 Surface Treated 4,970 4,970 2070 Oak Street Boundary Road North End 0.1 100.0 Surface Treated 1,000 1,000 2080 Boundary Road Gabriel Lane Pond Crescent West Leg 0.3 84.2 Surface Treated 14,105 10,075 24,180 2090 Boundary Road West Leg Pond Crescent Main Street 0.1 67.7 Surface Treated 5,915 4,225 10,140 2100 Boundary Road Main Street Peter Street 0.3 77.8 Asphalt 65,000 65,000 2110 Boundary Road Peter Street Highway 11 0.1 81.1 Asphalt 3,800 3,800 2120 Mccrandle Street Boundary Road North End Cul De Sac 0.7 100.0 Surface Treated 17,934 17,934 2130 Main Street Boundary Road North End Cul De Sac 0.5 71.1 Asphalt 115,000 115,000 2140 Barbara Street Main Street Main Street 0.2 67.8 Asphalt 45,000 45,000 2150 Jessie Street Main Street Laurie Street 0.2 64.7 Surface Treated 30,000 6,300 36,300 2160 Laurie Street Main Street East End 0.2 64.4 Asphalt 45,000 45,000 2170 Peter Street Laurie Street Boundary Road 0.2 76.2 Asphalt 45,000 45,000 2180 George Street Peter Street Main Street 0.1 84.4 Asphalt 20,000 20,000 3010 James Street Highway 518 East Ellen Street 0.2 70.7 Surface Treated 6,500 9,100 15,600 3020 Parish Street James Street Highway 518 East 0.2 72.9 Gravel 4,590 4,590 9,180 3030 Richmond Street Ellen Street Highway 592 0.3 66.1 Surface Treated 10,200 14,280 24,480 3040 Ellen Street Highway 592 James Street 0.2 77.6 Surface Treated 7,475 10,465 17,940 3050 Mary Street Highway 592 Mitchell Street 0.1 70.7 Surface Treated 2,700 3,780 6,480 3060 Mitchell Street Mary Street Highway 518 East 0.1 77.6 Surface Treated 2,700 3,780 6,480 3070 Joseph Street Highway 592 Highway 592 0.2 62.6 Surface Treated 8,820 6,300 15,120 4000 Emsdale Road Highway 518 Old Muskoka Road 1.6 81.0 Asphalt 56,000 56,000 4010 Emsdale Road Old Muskoka Road Scotia Road 0.3 81.1 Asphalt 11,200 11,200 Total Cost of Re-graveling $264,820 $271,250 $190,000 $403,630 $221,470 $1,281,533 $500,310 $354,940 $180,330 $190,000 $3,858,283 Total Cost of Surface Treatment (double layer) $112,105 $429,493 $285,915 $130,845 $198,590 $570,311 $217,147 $1,944,406 Total Cost of Rehabs to Surface Treated roads $160,000 $180,000 $96,420 $436,420 Total Cost of Asphalt Re-surfacing $365,000 $314,820 $108,900 $788,720 Total cost of Micro-sealing $171,487 $8,000 $630,850 $155,105 $73,425 $71,000 $348,770 $430,170 $108,750 $1,997,557 TOTAL - ALL TREATMENTS $536,925 $622,737 $723,913 $1,320,395 $872,420 $1,669,778 $769,900 $703,710 $1,289,711 $515,897 $9,025,386 ANNUAL AVERAGE - ALL TREATMENTS $902,539 Township of Perry 2022 AM Plan Appendix C Page C-5 of 5