The Corporation of the City of Peterborough
By-Law Number 25-128
Being a By-law to establish User Fees as approved as part of the 2026 Budget process
Whereas Section 391 (1) of the Municipal Act, S.O. 2001, c.25, as amended,
stipulates that despite any Act, a municipality may pass by-laws imposing fees or
charges on any class of persons for services or activities provided or done by or on
behalf of it; for costs payable by it for services or activities provided or done by or on
behalf of any other municipality or local board; and for the use of its property including
property under its control;
And Whereas Section 398 (1) of the Municipal Act S.O. 2001, c.25, as amended,
states fees and charges imposed by a municipality or local board on a person under this
Part constitute a debt of the person to the municipality or local board, respectively;
And Whereas Section 398 (2) of the Municipal Act S.O. 2001, c.25, as amended,
states the treasurer of a local municipality may add fees and charges imposed by the
municipality to the tax roll for the following property in the local municipality and collect
them in the same manner as municipal taxes;
1.
In the case of fees and charges for the supply of a public utility, the property to
which the public utility was supplied;
2.
In all other cases, any property for which all of the owners are responsible for
paying the fees and charges;
And Whereas at its meeting held December 8, 2025, the Council of the City of
Peterborough adopted a series of 2026 budget recommendations including a number of
fees and charges as set out in Part 5 of the budget book entitled "2026 Budget Book",
as amended and as set out in Schedule A to this by-law.
Now Therefore, The Corporation of the City of Peterborough by the Council thereof
hereby enacts as follows:
1. The 2026 user fees as set out in Schedule A to this by-law are adopted.
2. Simple interest of 1.25% per month may be added on the first day of default and
on the first day of each successive month to any fee not paid by the stipulated
due date.
3. At the Treasurer's discretion and, where possible, any unpaid fees, including
interest, may be added to the tax roll.
4. Subject to section 5, User Fee By-laws 24-084 and 25-007 are repealed.
5. The repeal of User Fee By-laws 24-084 and 25-007 does not affect its previous
operation or a right, privilege, obligation or liability that came into existence under
it. Without limitation, User fee By-laws 24-084 and 25-007 continues to apply to a
service or thing for which User Fee By-laws 24-084 and 25-007 imposed a fee or
charge to the extent that such part of the service or thing has been provided to
the moment of its repeal.
6. This By-law is in effect January 1, 2026.
Amended by 26-028, 26-059
By-law 25-128
Page 2
By-law passed this 8th day of December, 2025
Sgd. Jeff Leal, Mayor
Sgd. John Kennedy, City Clerk
Appendix A
Finance and Corporate Support Services
1
Appendix A
2
Appendix A
3
Appendix A
4
Appendix A
Legislative Services
5
Appendix A
6
Appendix A
7
Appendix A
8
Appendix A
9
Appendix A
10
Appendix A
11
Appendix A
12
Appendix A
Infrastructure, Planning and Growth Management
13
Department
Infrastructure, Planning and Growth Management
Division
Engineering and Capital Works
Activity
Parking
G/L Account
Number
User Fee Name and Description
Rationale for Fee (i.e. Government mandated, recover
all or part of cost to deliver service, recovery of admin
charges, etc.)
Unit Basis
(Time/Participation
Etc.)
HST
Current Rate
2025 Total Budgeted
Rev from Fee
Date of change
in 2026 if
applicable
Proposed Rate
for 2026 Budget
2026 Total
Budgeted Rev.
from Fee
C1
C2
C3
C4
C5
C6
C7
C8
C9
C10
10885-450130
Parking Garage : Simcoe Street Parking Garage (Daily)
Parking garage fees : Simcoe Street Parking Garage
To partially recover operating and maintenance costs for
facility
Hourly
Y
$2.00
$119,746.00
$2.00
$100,000.00
Parking garage fees : Simcoe Street Parking Garage
Daily Max.
Y
$14.00
$14.00
Total 10885-450130
$119,746.00
$100,000.00
10885-450135
Parking Garage : Simcoe Street Parking Garage (Permit)
Parking garage fees : Simcoe Street Parking Garage
To partially recover operating and maintenance costs for
facility
Y
$90.00
$233,280.00
$90.00
$253,350.00
Total 10885-450135
$233,280.00
$253,350.00
10890-450130
Parking Garage : King Street Parkade (Daily)
Parking garage fees : King Street Parkade
To partially recover operating and maintenance costs for
facility
Hourly
Y
$2.00
$319,250.00
$2.00
$295,000.00
Parking garage fees : King Street Parkade
Daily Max.
Y
$14.00
$14.00
Total 10890-450130
$319,250.00
$295,000.00
10890-450135
Parking Garage : King Street Parkade (Permits)
Parking garage fees : King Street Parkade
To partially recover operating and maintenance costs for
facility
Y
$105.00
$296,625.00
$105.00
$320,250.00
Total 10890-450135
$296,625.00
$320,250.00
10895-450125
Parking Lots : Reid, Downie, Del Crary
Parking lot fees : Reid, Downie, Del Crary
To partially recover operating and maintenance costs of
lots
Hourly
Y
$1.75
$54,649.00
$1.75
$69,006.00
Parking lot fees : Reid, Downie, Del Crary
Daily Max.
Y
$12.25
$12.25
Parking lot fees : Reid, Downie, Del Crary
Month
Y
$53.00
$53.00
Total 10895-450125
$54,649.00
$69,006.00
10895-450130
Parking Lots : Various Downtown Lots
Appendix A
14
Department
Infrastructure, Planning and Growth Management
Division
Engineering and Capital Works
Activity
Parking
G/L Account
Number
User Fee Name and Description
Rationale for Fee (i.e. Government mandated, recover
all or part of cost to deliver service, recovery of admin
charges, etc.)
Unit Basis
(Time/Participation
Etc.)
HST
Current Rate
2025 Total Budgeted
Rev from Fee
Date of change
in 2026 if
applicable
Proposed Rate
for 2026 Budget
2026 Total
Budgeted Rev.
from Fee
C1
C2
C3
C4
C5
C6
C7
C8
C9
C10
Parking lot fees : Lot - Library, Chambers, Brock, Gas
To partially recover operating and maintenance costs of
lots
Hourly
Y
$1.75
$138,390.00
$1.75
$124,978.00
Parking lot fees : Lot - Library
Daily Max.
Y
$3.50
$3.50
Parking lot fees : Lot - Chambers, Brock, Gas
Daily Max.
Y
$12.25
$12.25
Parking lot fees : Lot - Chambers, Brock, Gas
Month
Y
$53.00
$53.00
Total 450130
$138,390.00
$124,978.00
10900-490110
Parking Advertising
Parking Advertising
Recovery of revenue from advertising through downtown
Christmas free parking
per unit
Y
Variable
$4,000.00
Variable
$4,000.00
Total 450060
$4,000.00
$4,000.00
10900-450125
On-street Parking : Non-CBD Sites
On-street parking fees: non-CBD sites
To partially recover operating costs and ensure customer
turnover
Hourly
Y
$1.75
$60,480.00
$1.75
$69,846.00
Daily Max.
Y
$14.00
Total 450125
$60,480.00
$69,846.00
10900-450130
On-street Parking : Downtown Sites
On-street parking fees: downtown sites
To partially recover operating costs and ensure customer
turnover
Hourly
Y
$1.75
$572,999.00
$1.75
$345,002.00
Daily Max.
Y
$14.00
Total 450125
$572,999.00
$345,002.00
10900-450135
On-street Parking Permit
24 hours (A maximum of ten permits per address per year
may be issued)
n/a
n/a
24 hours (for 11 or more 24-hour permits are issued)
24 hours
Y
$20.00
$20.00
48-hours (may be available if ten 24-hour permits have
been issued)
48 hours
Y
$35.00
$35.00
7 days (may be available if ten 24-hour permits have been
issued)
7 days
Y
$120.00
$120.00
1-month
Y
$150.00
$150.00
6-months
Y
$200.00
$200.00
12-months
Y
$250.00
$250.00
Total Parking Fees
$1,799,419.00
$1,581,432.00
Appendix A
15
Appendix A
16
Appendix A
17
Appendix A
18
Appendix A
19
Appendix A
20
Appendix A
21
Appendix A
22
Appendix A
23
Appendix A
24
Department
Infrastructure, Planning and Growth Management
Division
Building
Activity
Building Inspection
G/L Account
Number
User Fee Name and Description
Rationale for Fee (i.e. Government mandated, recover
all or part of cost to deliver service, recovery of admin
charges, etc.)
Unit Basis
(Time/Participation
Etc.)
HST
Current Rate
2025 Total Budgeted
Rev from Fee
Date of change
in 2026 if
applicable
Proposed Rate
for 2026 Budget
2026 Total
Budgeted Rev.
from Fee
C1
C2
C3
C4
C5
C6
C7
C8
C9
C10
11135-451001
Building Permit Fees
New Residential Construction
To recover all costs of providing service
Rate based on gross
floor area (m²)
N
$28.27/sq. m gross
floor area, min.
$225
1-Jan-26
$29.45/sq. m
gross floor area,
min. $235
Residential Alterations - without identifiable gross floor area
To recover all costs of providing service
Rate based on
construction value
N
$32.63 /$1,000
construction value,
min. $225
1-Jan-26
$34.00 /$1,000
construction
value, min. $235
Industrial Commercial Institutional - Shell
To recover all costs of providing service
Rate based on gross
floor area (m²)
N
$20.18/sq. m gross
floor area, min.
$225
1-Jan-26
$21.04/sq. m
gross floor area,
min. $235
Industrial Commercial Institutional - Tenant Fit-up and Alteration
To recover all costs of providing service
Rate based on
construction value
N
$28.41 /$1,000
construction value,
min. $225
1-Jan-26
$29.63 /$1,000
construction
value, min. $235
Industrial Commercial Institutional - Finished
To recover all costs of providing service
Rate based on gross
floor area (m²)
N
$26.90 /sq. m
gross floor area,
min. $225
1-Jan-26
$28.05/sq. m
gross floor area,
min. $235
Industrial Commercial Institutional Alteration - without identifiable gross floor area
To recover all costs of providing service
Rate based on
construction value
N
$28.40 /$1,000
construction value,
min. $225
1-Jan-26
$29.62 /$1,000
construction
value, min. $235
Demolition of Building up to 600 m² or up to 3 stories
To recover all costs of providing service
Flat Fee
N
$282/permit
1-Jan-26
$294/permit
Demolition of Building over 600 m² or 3 stories
To recover all costs of providing service
Flat Fee
N
$530/permit
1-Jan-26
$552/permit
Design Structures and Stand Alone Works
To recover all costs of providing service
Flat Fee
N
$265/permit
1-Jan-26
$276/permit
Plumbing Permit <= 10 fixtures
To recover all costs of providing service
Flat Fee
N
$140/permit
1-Jan-26
$146/permit
Plumbing Permit > 10 fixtures
To recover all costs of providing service
Flat Fee
N
$260/permit
1-Jan-26
$271/permit
Change of Use
To recover all costs of providing service
Flat Fee
N
$245/permit
1-Jan-26
$255/permit
Conditional Permit
To recover all costs of providing service
Full Fee
N
1-Jan-26
Occupancy Permit
To recover all costs of providing service
Flat Fee
N
$465/permit
1-Jan-26
$485/permit
Reinspection's
To recover all costs of providing service
Flat Fee
N
$465/permit
1-Jan-26
$485/permit
Construction Commenced Without Permit
To recover all costs of providing service
Flat Fee
N
$242/permit
1-Jan-26
$252/permit
Transfer Ownership
To recover all costs of providing service
Flat Fee
N
$242/permit
1-Jan-26
$252/permit
Cancelled building permit - fee refund
Refund in accordance with Building By-law 10-048
Varies - see by-law
N
1-Jan-26
Permit Amendment/re-review
To recover all costs of providing service
$75 / Hr staff time
N
1-Jan-26 $78.15/Hr staff
time
Total 420020
$2,988,192
11135-440920
Other Fees
Building Code Order - Order To Comply
To recover all costs of providing service
each
N
$170.00
1-Jan-26
$177.14
Building Code Order - Stop Work Order
To recover all costs of providing service
each
N
$335.00
1-Jan-26
$349.07
Building Code Order - Unsafe Building
To recover all costs of providing service
each
N
$500.00
1-Jan-26
$521.00
Building Code Order - Order Prohibiting Occupancy
To recover all costs of providing service
each
N
$500.00
1-Jan-26
$521.00
Building Code Order - Order Not To Cover
To recover all costs of providing service
each
N
$335.00
1-Jan-26
$349.07
Building Code Order - Order To Uncover
To recover all costs of providing service
each
N
$555.00
1-Jan-26
$578.31
Building Code Order - Emergency Order
To recover all costs of providing service
each
N
$665.00
1-Jan-26
$692.93
Liquor licence inspection/approval letter
To recover all costs of providing service
each
N
$80.00
1-Jan-26
$83.36
Restaurant inspection/approval letter
To recover all costs of providing service
each
N
$80.00
1-Jan-26
$83.36
Retail car sales approval letter
To recover all costs of providing service
each
N
$80.00
1-Jan-26
$83.36
Day care provider approval letter
To recover all costs of providing service
each
N
$80.00
1-Jan-26
$83.36
Accessory apartment registration fee
To recover all costs of providing service
each
N
$80.00
1-Jan-26
$83.36
Retail gas/propane letter of approval
To recover all costs of providing service
each
N
$80.00
1-Jan-26
$83.36
Service charge on contract work
To recover all costs of providing service
10% of cost - min. $25
N
10% of cost - min.
$50
1-Jan-26
10% of cost -
min. $52
Total 450040
$22,000
11135-450355
Compliance Letter Fees
Zoning compliance letter
To recover all costs of providing service
$30.00 each
N
$40 each
1-Jan-26
$41.68
Work order compliance letter
To recover all costs of providing service
$30.00 each
N
$40 each
1-Jan-26
$41.68
Survey compliance letter
To recover all costs of providing service
$75.00 each
N
$90 each
1-Jan-26
$93.78
Total 450355
$50,000
Appendix A
25
Department
Infrastructure, Planning and Growth Management
Division
Building
Activity
Building Inspection
G/L Account
Number
User Fee Name and Description
Rationale for Fee (i.e. Government mandated, recover
all or part of cost to deliver service, recovery of admin
charges, etc.)
Unit Basis
(Time/Participation
Etc.)
HST
Current Rate
2025 Total Budgeted
Rev from Fee
Date of change
in 2026 if
applicable
Proposed Rate
for 2026 Budget
2026 Total
Budgeted Rev.
from Fee
C1
C2
C3
C4
C5
C6
C7
C8
C9
C10
Total
$3,060,192
$0.00
Appendix A
26
Appendix A
27
Appendix A
Municipal Operations
28
Appendix A
29
Appendix A
30
Appendix A
31
Appendix A
32
Appendix A
33
Appendix A
34
Appendix A
35
Appendix A
36
Department
Municipal Operations
Division
Environmental Services
Activity
Waste Management
G/L Account
Number
User Fee Name and
Description
Rationale for Fee (i.e. Government mandated, recover
all or part of cost to deliver service, recovery of admin
charges, etc.)
Unit Basis
(Time/Participation
Etc.)
HST
Current Rate
2025 Total
Budgeted Rev
from Fee
Date of change
in 2026 if
applicable
Proposed Rate for
2026 Budget
2026 Total
Budgeted Rev.
from Fee
C1
C2
C3
C4
C5
C6
C7
C8
C9
C10
10980-450390
Tipping Fees
Landfill fine - Fail to weigh out
To partially recover operating cost to administer / recover
skipped tipping fees and to deter users from skipping
weigh out
per unit
N
$125.00
$1,250.00
$125.00
$1,250.00
Landfill fine - Fail to tarp load
To partially recover operating cost to administer / recover
litter clean-up costs and to deter users from not tarping
loads
per unit
N
$75.00
$300.00
$75.00
$300.00
Landfill Tipping Fee - Sorted -
clear bagged garbage, shingles,
construction material, drywall &
Contaminated soil (with pre-
approval)
- 100 kg or less
To partially recover operating costs of landfill site for
garbage loads 100 kg or less.
Flat Fee
N
$12.00
$343,500.00
$12.00
$360,000.00
Landfill Tipping Fee - Sorted -
clear bagged garbage, shingles,
construction material, drywall &
Contaminated soil (with pre-
approval)
- over 100 kg (Unsorted)
To partially recover operating costs of landfill site for
garbage loads 101 kg or more.
per tonne
N
$150.00
$1,731,739.00
$150.00
$1,800,000.00
Landfill Tipping Fee - Sorted -
Recyclables include green waste
(L&Y or Source Separated
Organics), scrap metal, clean
wood waste, and blue box
materials
- 100 kg or less
To partially recover operating costs of landfill site for mixed
recyclable loads of 100 kg or less.
Flat Fee
N
$10.00
$74,428.90
$10.00
$70,000.00
Landfill Tipping Fee - Sorted -
Recyclables include green waste
(L&Y or Source Separated
Organics), scrap metal, clean
wood waste, and blue box
materials
- 100 kg or more
Mixed recyclable loads of 101 kg or more.
per tonne
N
$120.00
$104,860.34
$120.00
$102,000.00
Landfill Tipping Fee - Unsorted -
mixed garbage, garbage in
opaque bags, including mixed
loads of recyclables and different
types of garbage, etc.
- 100 kg or less
To partially recover operating costs of landfill site for
unsorted garbage loads 100 kg or less.
Flat Fee
N
$25.00
$381,285.00
$25.00
$362,500.00
Landfill Tipping Fee - Unsorted -
mixed garbage, garbage in
opaque bags, including mixed
loads of recyclables and different
types of garbage, etc.
- 100 kg or more
To partially recover operating costs of landfill site for
unsorted garbage loads 101 kg or more.
per tonne
N
$260.00
$644,368.00
$260.00
$637,000.00
Department
Municipal Operations
Division
Environmental Services
Activity
Waste Management
G/L Account
Number
User Fee Name and
Description
Rationale for Fee (i.e. Government mandated, recover
all or part of cost to deliver service, recovery of admin
charges, etc.)
Unit Basis
(Time/Participation
Etc.)
HST
Current Rate
2025 Total
Budgeted Rev
from Fee
Date of change
in 2026 if
applicable
Proposed Rate for
2026 Budget
2026 Total
Budgeted Rev.
from Fee
C1
C2
C3
C4
C5
C6
C7
C8
C9
C10
Mattress and Box spring
Recycling Fee - <10 units
To partially recover cost of Mattress and Box spring
recycling program
per unit
N
$23.00
$271,400.00
$23.00
$264,500.00
Commercial Mattresses and Box
springs - over 10 units
To recover the cost of 10+ mattresses and box springs
brought to the landfill by commercial sources.
per unit
N
$26.00
$20,800.00
$26.00
$20,800.00
Landfill Tipping Fee - Cover Mater To partially recover operating costs of landfill site, and
bring charges in line with other similar materials
per tonne
N
$65.00
$105,597.80
$65.00
$845,000.00
Landfill Tipping Fee -
Contaminated Soils Approved for
Fill
To partially recover operating costs of landfill site
per tonne
N
$150.00
$1,425,000.00
$150.00
$153,726.00
Landfill Tipping Fee - Asbestos
To partially recover operating costs of landfill site
per tonne
N
$300.00
$154,607.25
$300.00
$154,500.00
Landfill Tipping Fee - Freon-
based appliances
To partially recover operating costs of landfill site
per unit
N
$25.00
$25,800.00
$25.00
$26,250.00
Total 450390
$5,284,936.29
$4,797,826.00
10980-450390
Tipping Fees if scales out of service
Garbage
Sorted - clear bagged garbage,
shingles, construction material,
drywall & Contaminated soil (with
pre-approval)
To partially recover operating costs of landfill site for a car
per unit
N
$12.00
$12.00
Garbage
Sorted - clear bagged garbage,
shingles, construction material,
drywall & Contaminated soil (with
pre-approval)
To partially recover operating costs of landfill site for a
Passenger van/SUV/pickup truck
per unit
N
$18.00
$18.00
Garbage
Sorted - clear bagged garbage,
shingles, construction material,
drywall & Contaminated soil (with
pre-approval)
To partially recover operating costs of landfill site for a
Pickup/Cargo van with a trailer
per unit
N
$25.00
$25.00
Garbage
Sorted - clear bagged garbage,
shingles, construction material,
drywall & Contaminated soil (with
pre-approval)
To partially recover operating costs of landfill site for a 10
yard container
per unit
N
$170.00
$170.00
Garbage
Sorted - clear bagged garbage,
shingles, construction material,
drywall & Contaminated soil (with
pre-approval)
To partially recover operating costs of landfill site for a 15
yard container
per unit
N
$260.00
$260.00
Department
Municipal Operations
Division
Environmental Services
Activity
Waste Management
G/L Account
Number
User Fee Name and
Description
Rationale for Fee (i.e. Government mandated, recover
all or part of cost to deliver service, recovery of admin
charges, etc.)
Unit Basis
(Time/Participation
Etc.)
HST
Current Rate
2025 Total
Budgeted Rev
from Fee
Date of change
in 2026 if
applicable
Proposed Rate for
2026 Budget
2026 Total
Budgeted Rev.
from Fee
C1
C2
C3
C4
C5
C6
C7
C8
C9
C10
Garbage
Sorted - clear bagged garbage,
shingles, construction material,
drywall & Contaminated soil (with
pre-approval)
To partially recover operating costs of landfill site for a 20
yard container
per unit
N
$340.00
$340.00
Garbage
Sorted - clear bagged garbage,
shingles, construction material,
drywall & Contaminated soil (with
pre-approval)
To partially recover operating costs of landfill site for a 30
yard container
per unit
N
$520.00
$520.00
Garbage
Sorted - clear bagged garbage,
shingles, construction material,
drywall & Contaminated soil (with
pre-approval)
To partially recover operating costs of landfill site for a 40
yard container
per unit
N
$680.00
$680.00
Garbage
Sorted - clear bagged garbage,
shingles, construction material,
drywall & Contaminated soil (with
pre-approval)
To partially recover operating costs of landfill site for a
Packer Truck
per unit
N
$1,220.00
$1,220.00
Garbage
Sorted - clear bagged garbage,
shingles, construction material,
drywall & Contaminated soil (with
pre-approval)
To partially recover operating costs of landfill site for a
Compactor Bin
per unit
N
$1,220.00
$1,220.00
Garbage
Sorted - clear bagged garbage,
shingles, construction material,
drywall & Contaminated soil (with
pre-approval)
To partially recover operating costs of landfill site for a
Front Loader Truck
per unit
N
$1,220.00
$1,220.00
Garbage
Unsorted - mixed garbage,
garbage in opaque bags,
including mixed loads of
recyclables and different types of
garbage, etc.
To partially recover operating costs of landfill site for a car
per unit
N
$25.00
$25.00
Garbage
Unsorted - mixed garbage,
garbage in opaque bags,
including mixed loads of
recyclables and different types of
garbage, etc.
To partially recover operating costs of landfill site for a
Passenger van/SUV/pickup truck
per unit
N
$35.00
$35.00
Department
Municipal Operations
Division
Environmental Services
Activity
Waste Management
G/L Account
Number
User Fee Name and
Description
Rationale for Fee (i.e. Government mandated, recover
all or part of cost to deliver service, recovery of admin
charges, etc.)
Unit Basis
(Time/Participation
Etc.)
HST
Current Rate
2025 Total
Budgeted Rev
from Fee
Date of change
in 2026 if
applicable
Proposed Rate for
2026 Budget
2026 Total
Budgeted Rev.
from Fee
C1
C2
C3
C4
C5
C6
C7
C8
C9
C10
Garbage
Unsorted - mixed garbage,
garbage in opaque bags,
including mixed loads of
recyclables and different types of
garbage, etc.
To partially recover operating costs of landfill site for a
Pickup/Cargo van with a trailer
per unit
N
$50.00
$50.00
Garbage
Unsorted - mixed garbage,
garbage in opaque bags,
including mixed loads of
recyclables and different types of
garbage, etc.
To partially recover operating costs of landfill site for a 10
yard container
per unit
N
$350.00
$350.00
Garbage
Unsorted - mixed garbage,
garbage in opaque bags,
including mixed loads of
recyclables and different types of
garbage, etc.
To partially recover operating costs of landfill site for a 15
yard container
per unit
N
$520.00
$520.00
Garbage
Unsorted - mixed garbage,
garbage in opaque bags,
including mixed loads of
recyclables and different types of
garbage, etc.
To partially recover operating costs of landfill site for a 20
yard container
per unit
N
$700.00
$700.00
Garbage
Unsorted - mixed garbage,
garbage in opaque bags,
including mixed loads of
recyclables and different types of
garbage, etc.
To partially recover operating costs of landfill site for a 30
yard container
per unit
N
$1,040.00
$1,040.00
Garbage
Unsorted - mixed garbage,
garbage in opaque bags,
including mixed loads of
recyclables and different types of
garbage, etc.
To partially recover operating costs of landfill site for a 40
yard container
per unit
N
$1,400.00
$1,400.00
Garbage
Unsorted - mixed garbage,
garbage in opaque bags,
including mixed loads of
recyclables and different types of
garbage, etc.
To partially recover operating costs of landfill site for a
Packer Truck
per unit
N
$2,400.00
$2,400.00
Department
Municipal Operations
Division
Environmental Services
Activity
Waste Management
G/L Account
Number
User Fee Name and
Description
Rationale for Fee (i.e. Government mandated, recover
all or part of cost to deliver service, recovery of admin
charges, etc.)
Unit Basis
(Time/Participation
Etc.)
HST
Current Rate
2025 Total
Budgeted Rev
from Fee
Date of change
in 2026 if
applicable
Proposed Rate for
2026 Budget
2026 Total
Budgeted Rev.
from Fee
C1
C2
C3
C4
C5
C6
C7
C8
C9
C10
Garbage
Unsorted - mixed garbage,
garbage in opaque bags,
including mixed loads of
recyclables and different types of
garbage, etc.
To partially recover operating costs of landfill site for a
Compactor Bin
per unit
N
$2,400.00
$2,400.00
Garbage
Unsorted - mixed garbage,
garbage in opaque bags,
including mixed loads of
recyclables and different types of
garbage, etc.
To partially recover operating costs of landfill site for a
Front Loader Truck
per unit
N
$2,400.00
$2,400.00
Contaminated Soil - Cover
To partially recover operating costs of landfill site for a
Passenger van/SUV/pickup truck
per unit
N
$12.00
$12.00
Contaminated Soil - Cover
To partially recover operating costs of landfill site for a
Pickup/Cargo van with a trailer
per unit
N
$12.00
$12.00
Contaminated Soil - Cover
To partially recover operating costs of landfill site for a 10
yard container
per unit
N
$70.00
$70.00
Contaminated Soil - Cover
To partially recover operating costs of landfill site for a 15
yard container
per unit
N
$100.00
$100.00
Contaminated Soil - Cover
To partially recover operating costs of landfill site for a 20
yard container
per unit
N
$140.00
$140.00
Contaminated Soil - Cover
To partially recover operating costs of landfill site for a 30
yard container
per unit
N
$200.00
$200.00
Contaminated Soil - Cover
To partially recover operating costs of landfill site for a 40
yard container
per unit
N
$265.00
$265.00
Contaminated Soil - Cover
To partially recover operating costs of landfill site for a
Packer Truck
per unit
N
$460.00
$460.00
Contaminated Soil - Cover
To partially recover operating costs of landfill site for a
Compactor Bin
per unit
N
$460.00
$460.00
Contaminated Soil - Cover
To partially recover operating costs of landfill site for a
Front Loader Truck
per unit
N
$460.00
$460.00
Contaminated Soil - Waste
To partially recover operating costs of landfill site for a
Passenger van/SUV/pickup truck
per unit
N
$18.00
$18.00
Contaminated Soil - Waste
To partially recover operating costs of landfill site for a
Pickup/Cargo van with a trailer
per unit
N
$25.00
$25.00
Department
Municipal Operations
Division
Environmental Services
Activity
Waste Management
G/L Account
Number
User Fee Name and
Description
Rationale for Fee (i.e. Government mandated, recover
all or part of cost to deliver service, recovery of admin
charges, etc.)
Unit Basis
(Time/Participation
Etc.)
HST
Current Rate
2025 Total
Budgeted Rev
from Fee
Date of change
in 2026 if
applicable
Proposed Rate for
2026 Budget
2026 Total
Budgeted Rev.
from Fee
C1
C2
C3
C4
C5
C6
C7
C8
C9
C10
Contaminated Soil - Waste
To partially recover operating costs of landfill site for a 10
yard container
per unit
N
$175.00
$175.00
Contaminated Soil - Waste
To partially recover operating costs of landfill site for a 15
yard container
per unit
N
$260.00
$260.00
Contaminated Soil - Waste
To partially recover operating costs of landfill site for a 20
yard container
per unit
N
$350.00
$350.00
Contaminated Soil - Waste
To partially recover operating costs of landfill site for a 30
yard container
per unit
N
$520.00
$520.00
Contaminated Soil - Waste
To partially recover operating costs of landfill site for a 40
yard container
per unit
N
$680.00
$680.00
Contaminated Soil - Waste
To partially recover operating costs of landfill site for a
Packer Truck
per unit
N
$1,220.00
$1,220.00
Contaminated Soil - Waste
To partially recover operating costs of landfill site for a
Compactor Bin
per unit
N
$1,220.00
$1,220.00
Contaminated Soil - Waste
To partially recover operating costs of landfill site for a
Front Loader Truck
per unit
N
$1,220.00
$1,220.00
Landfill Tipping Fee -
Recyclables include green waste,
scrap metal, and blue box
materials
To partially recover operating costs of landfill site for a car
per unit
N
$10.00
$10.00
Landfill Tipping Fee -
Recyclables include green waste,
scrap metal, and blue box
materials
To partially recover operating costs of landfill site for a
Passenger van/SUV/pickup truck
per unit
N
$10.00
$10.00
Landfill Tipping Fee -
Recyclables include green waste,
scrap metal, and blue box
materials
To partially recover operating costs of landfill site for a
Pickup/Cargo van with a trailer
per unit
N
$10.00
$10.00
Department
Municipal Operations
Division
Environmental Services
Activity
Waste Management
G/L Account
Number
User Fee Name and
Description
Rationale for Fee (i.e. Government mandated, recover
all or part of cost to deliver service, recovery of admin
charges, etc.)
Unit Basis
(Time/Participation
Etc.)
HST
Current Rate
2025 Total
Budgeted Rev
from Fee
Date of change
in 2026 if
applicable
Proposed Rate for
2026 Budget
2026 Total
Budgeted Rev.
from Fee
C1
C2
C3
C4
C5
C6
C7
C8
C9
C10
Landfill Tipping Fee -
Recyclables include green waste,
scrap metal, and blue box
materials
To partially recover operating costs of landfill site for a 10
yard container
per unit
N
$140.00
$140.00
Landfill Tipping Fee -
Recyclables include green waste,
scrap metal, and blue box
materials
To partially recover operating costs of landfill site for a 15
yard container
per unit
N
$210.00
$210.00
Landfill Tipping Fee -
Recyclables include green waste,
scrap metal, and blue box
materials
To partially recover operating costs of landfill site for a 20
yard container
per unit
N
$280.00
$280.00
Landfill Tipping Fee -
Recyclables include green waste,
scrap metal, and blue box
materials
To partially recover operating costs of landfill site for a 30
yard container
per unit
N
$420.00
$420.00
Landfill Tipping Fee -
Recyclables include green waste,
scrap metal, and blue box
materials
To partially recover operating costs of landfill site for a 40
yard container
per unit
N
$560.00
$560.00
Landfill Tipping Fee -
Recyclables include green waste,
scrap metal, and blue box
materials
To partially recover operating costs of landfill site for a
Packer Truck
per unit
N
$980.00
$980.00
Landfill Tipping Fee -
Recyclables include green waste,
scrap metal, and blue box
materials
To partially recover operating costs of landfill site for a
Compactor Bin
per unit
N
$980.00
$980.00
Department
Municipal Operations
Division
Environmental Services
Activity
Waste Management
G/L Account
Number
User Fee Name and
Description
Rationale for Fee (i.e. Government mandated, recover
all or part of cost to deliver service, recovery of admin
charges, etc.)
Unit Basis
(Time/Participation
Etc.)
HST
Current Rate
2025 Total
Budgeted Rev
from Fee
Date of change
in 2026 if
applicable
Proposed Rate for
2026 Budget
2026 Total
Budgeted Rev.
from Fee
C1
C2
C3
C4
C5
C6
C7
C8
C9
C10
Landfill Tipping Fee -
Recyclables include green waste,
scrap metal, and blue box
materials
To partially recover operating costs of landfill site for a
Front Loader Truck
per unit
N
$980.00
$980.00
Total 450390 - Scales out of
Order
$0.00
$0.00
10985-410400
Woodchips services
Bulk Ground woodchips
To cover the City's cost to process ground woodchips
(clean, uncontaminated) dropped at the City's composting
facility by Municipal and bulk Contract agreements.
per tonne
Y
$50.00
$15,000.00
$50.00
$35,000.00
Total 410400
$15,000.00
$35,000.00
10985-450034
Composting services
L&Y (Leaf and Yard) Composting
services to for greenwaste
materials delivered to the BRLS
public drop off and private waste
haulers.
To cover the City's cost to process green waste material
dropped at the City's composting facility by various
sources.
per tonne
Y
$112.00
$124,000.00
$112.00
$124,000.00
SSO Composting Services for
Commercial Waste
To cover the City's cost to process compostable waste
delivered to the Organics Facility. Material is delivered by
private waste hauling contractors from ICI facilities.
per tonne
Y
$120.00
$17,500.00
$120.00
$17,500.00
Total 450034
$141,500.00
$141,500.00
10985-450390
Composting services
L&Y Composting services to
townships, County, City PW, and
bulk agreement
To cover the City's cost to process green waste material,
and bulk wood dropped at the City's composting facility by
Peterborough County, Townships, City PW, Municipal
Contract agreements.
per tonne
Y
$85.00
$51,750.00
$85.00
$81,250.00
SSO Composting services to
townships, County, and bulk
agreement
To cover the City's cost to process source Separated
Organics material dropped at the City's composting facility
by Peterborough County, Townships, Municipal Contract
agreements.
per tonne
Y
$112.00
$17,500.00
$112.00
$17,500.00
Total 450390
$69,250.00
$98,750.00
11000-450392
Large Article Collection
Large Article Collection
To partially recover operating costs of large article
collection and disposal
per unit
N
$60 for 1st item, $30
each add 'l item
$21,900.00
1-Jun-26
$0.00
$5,200.00
Total 450392
$21,900.00
$5,200.00
11010-450020
Container sales
Department
Municipal Operations
Division
Environmental Services
Activity
Waste Management
G/L Account
Number
User Fee Name and
Description
Rationale for Fee (i.e. Government mandated, recover
all or part of cost to deliver service, recovery of admin
charges, etc.)
Unit Basis
(Time/Participation
Etc.)
HST
Current Rate
2025 Total
Budgeted Rev
from Fee
Date of change
in 2026 if
applicable
Proposed Rate for
2026 Budget
2026 Total
Budgeted Rev.
from Fee
C1
C2
C3
C4
C5
C6
C7
C8
C9
C10
Blue boxes sold back to
community
To partly recover the new supply contract for recycling
bins, blue boxes will now be: $5.00 for the small 23L carry
bin, and $8.00 for the 61L fibre or 89L container recycling
boxes. No free blue box replacements.
per unit
Y
$4.42 for 23L
$7.08 for 68L or 83L
$0.00
100 L SSO Carts sold
To recover the cost of SSO carts sold (Not warranty
replacements)
per unit
Y
$88.49
$3,100.00
1-Jun-26
$35.40
$2,500.00
Organics Kitchen catcher
To recover the cost of kitchen catchers sold
per unit
Y
$8.85
$0.00
270 L Caddies sold back to the
community
To recover the cost of recycling caddies supplied to
apartments and businesses. This better encourages
recycling, and drastically reduces administrative work.
per unit
Y
$88.50
$0.00
Total 450020
$3,100.00
$2,500.00
Total
$5,535,686.29
$5,080,776.00
Appendix A
44
Appendix A
45
Appendix A
46
Appendix A
47
Appendix A
Community Services
48
Appendix A
49
Appendix A
50
Appendix A
51
Appendix A
52
Appendix A
53
Appendix A
54
Appendix A
55
Appendix A
56
Appendix A
57
Appendix A
58
Appendix A
59
Appendix A
60
Appendix A
61
Appendix A
62
Appendix A
63
Appendix A
64
Appendix A
65
Appendix A
66
Appendix A
67
Appendix A
68
Appendix A
69
Appendix A
70
Appendix A
71
Appendix A
72
Appendix A
73
Appendix A
74
Appendix A
75
Appendix A
76