2025 Asset Management Plan

Russell, Ontario

This is the exact embedded text of the captured official document. Snapshot 99d14b14ceb0 · verified 2026-06-10 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

2025-Asset-Management-Plan-Final.pdf" municipality_ids: - gx-001733 content_type: "application/pdf" captured_at: "2026-06-10T22:36:29+00:00" normalize_method: "pdf-pymupdf" normalize_version: "0.2" needs_ocr: false char_count: 199286 --- Township of Russell Asset Management Plan 2025 1 Asset Management Plan 2025 TOWNSHIP OF RUSSELL 2025 .. psdcitywide Township of Russell Asset Management Plan 2025 2 This Asset Management Plan was prepared by: Empowering your organization through advanced asset management, budgeting & GIS solutions ~ citywide Township of Russell Asset Management Plan 2025 3 Key Statistics $553m 2024 Replacement Cost of Asset Portfolio $67.5k Replacement Cost of Infrastructure Per Household 78% Percentage of Assets in Fair or Better Condition 51% Percentage of Assets with Assessed Condition Data $12.84m Average Annual Requirement $6.48m Actual Funding Level (2024) 2.32% Target Reinvestment Rate 1.17% Actual Reinvestment Rate 10 Years Recommended Timeframe for Eliminating Annual Infrastructure Deficit Township of Russell Asset Management Plan 2025 4 Table of Contents 1. Executive Summary......................................................................5 2. Introduction & Context..................................................................8 3. Portfolio Overview - State of the Infrastructure .............................26 Core Assets ................................................................................ 34 4. Road Network ............................................................................35 5. Bridges & Culverts......................................................................46 6. Water Network...........................................................................53 7. Sanitary Sewer Network..............................................................63 8. Storm Network ..........................................................................73 Non-Core Assets......................................................................... 81 9. Facilities....................................................................................82 10. Vehicles ....................................................................................92 11. Machinery & Equipment ............................................................ 101 12. Land Improvements ................................................................. 109 Strategies................................................................................. 117 13. Growth ................................................................................... 118 14. Financial Strategy .................................................................... 121 Appendices............................................................................... 136 Appendix A - Infrastructure Report Card ........................................... 137 Appendix B - Level of Service Maps & Photos..................................... 139 Appendix C - Public Engagement Questionnaire ................................. 145 Township of Russell Asset Management Plan 2025 5 1. Executive Summary Municipal infrastructure delivers critical services that are foundational to the economic, social, and environmental health and growth of a community. The goal of asset management is to enable infrastructure to deliver an adequate level of service in the most cost-effective manner. This involves the ongoing review and update of infrastructure information and data alongside the development and implementation of asset management strategies and long­ term financial planning. 1.1 Scope This Asset Management Plan (AMP) identifies the strategies that are in place to manage public infrastructure and makes recommendations where they can be further refined. Through the implementation of sound asset management strategies, the Township can ensure that public infrastructure is managed to support the sustainable delivery of municipal services. This AMP include the following asset categories: Figure 1 Core and Non-Core Asset Categories 1.2 O. Reg. 588/17 Compliance With the development of this AMP the Township has achieved compliance with July 1, 2025, requirements under O. Reg. 588/17. This includes requirements - Road Network - Bridges & Culverts - Storm Network - Water Network - Sanitary Sewer Network Core Assets - Facilties - Vehicles - Machinery & Equipment - Land Improvements Non-Core Assets - - I Township of Russell Asset Management Plan 2025 6 for levels of service and inventory reporting for all asset categories. More detail on compliance can be found in section 2.5.1 O. Reg. 588/17 Compliance Review. 1.3 Findings The overall replacement cost of the asset categories included in this AMP totals $553 million. 78% of all assets analyzed in this AMP are in fair or better condition and assessed condition data was available for 51% of assets. For the remaining 49% of assets, assessed condition data was unavailable. In lieu of assessed condition assessments, asset age was used to approximate condition - a data gap that persists in most municipalities. Generally, age misstates the true condition of assets, making assessments essential to accurate asset management planning, and a recurring recommendation in this AMP. The Township has taken proactive steps to address this gap by establishing condition assessment timelines, specific to each asset category. Furthermore, the Township has established a designated reserve specifically for condition assessments. To meet capital replacement and rehabilitation needs for existing infrastructure, prevent infrastructure backlogs, and achieve long-term sustainability, the Township's average annual capital requirement totals $12.84 million. Based on a historical analysis of sustainable capital funding sources, the Township is committing approximately $6.48 million towards capital projects or reserves per year. As a result, there is currently an annual funding gap of $6.36 million. It is important to note that this AMP represents a snapshot in time and is based on the best available processes, data, and information at the Township. 1 Strategic asset management planning is an ongoing and dynamic process that requires continuous improvement and dedicated resources. 1 Year-end 2024. Township of Russell Asset Management Plan 2025 7 1.4 Recommendations A financial strategy was developed to address the annual capital funding gap. The following graphics shows annual tax/rate change required to eliminate the Township's infrastructure deficit. Figure 2 Proposed Tax/Rate Changes Tax-Funded ASSETS Average Annual Tax Change 10 Year Phase-In 2.8% Rate-Funded WATER Average Annual Rate Change 10 Year Phase-In 3.6% Rate-Funded SANITARY Average Annual Rate Change 10 Year Phase-In 1.8% Township of Russell Asset Management Plan 2025 8 2. Introduction & Context 2.1 Community Profile Census Characteristic Township of Russell2 Ontario3 Population 2021 22,534 14,223,942 Total Private Dwellings 8,197 5,929,250 Population Density 98.6/km2 15.9/km2 Land Area 198.78 km2 892,411.76 km2 Table 1 Township of Russell Township Community Profile The Township of Russell is a lower-tier Township, part of United Counties of Prescott and Russell, which is located within eastern Ontario. It is situated east of Ottawa, Ontario. Russell was incorporated as a Township in 1857. This incorporation marked the official recognition of the Russell as a municipal entity, allowing it to establish local governance and provide services to its residents. The Township comprises several communities, including Embrun, Russell, Limoges, and Marionville. Embrun and Russell are the largest, serving as the primary hubs for residential, commercial, and social activities. The Township offers a variety of rich rural settings, including farms, forests, and rivers, along with facilities for outdoor activities. With plenty of parks and trails, it's easy for residents to enjoy walking, biking, and getting closer to nature. It's a welcoming place with a strong sense of community, highlighted by regular events and festivals that celebrate its culture and history, providing entertainment and opportunities for community engagement. Demand in the Township of Russell is driven by its proximity to Ottawa, offering a quiet lifestyle with easy urban access. Beautiful landscapes, and a close-knit community attract diverse individuals. The area's growth brings new residential and commercial opportunities while maintaining its rural charm. Agriculture supports the rural character and green spaces, fostering a lifestyle connected to nature. This blend of urban accessibility, community services, and agricultural landscapes fuels demand in the Township. The infrastructure priorities of the Township include sustainable and efficient development. The Township aims to ensure new growth is compatible with 2 2024 figures provided by Russell Township's planning department 3 2021 Census Township of Russell Asset Management Plan 2025 9 existing infrastructure, minimizing adverse impacts on current services and the character of established areas. 2.2 Climate Change Climate change can cause severe impacts on human and natural systems around the world. The effects of climate change include increasing temperatures, higher levels of precipitation, droughts, and extreme weather events. In 2019, Canada's Changing Climate Report (CCCR 2019) was released by Environment and Climate Change Canada (ECCC). The report revealed that between 1948 and 2016, the average temperature increase across Canada was 1.7°C; moreover, during this period, Northern Canada experienced a 2.3°C increase. The temperature increase in Canada has doubled that of the global average. If emissions are not significantly reduced, the temperature could increase by 6.3°C in Canada by the year 2100 compared to 2005 levels. Observed precipitation changes in Canada include an increase of approximately 20% between 1948 and 2012. By the late 21st century, the projected increase could reach an additional 24%. During the summer months, some regions in Southern Canada are expected to experience periods of drought at a higher rate. Extreme weather events and climate conditions are more common across Canada. Recorded events include droughts, flooding, cold extremes, warm extremes, wildfires, and record minimum arctic sea ice extent. The changing climate poses a significant risk to the Canadian economy, society, environment, and infrastructure. The impacts on infrastructure are often a result of climate-related extremes such as droughts, floods, higher frequency of freeze-thaw cycles, extended periods of high temperatures, high winds, and wildfires. Physical infrastructure is vulnerable to damage and increased wear when exposed to these extreme events and climate variabilities. Canadian Municipalities are faced with the responsibility to protect their local economy, citizens, environment, and physical assets. 2.2.1 Russell Township Climate Profile The Township of Russell is situated in Eastern Ontario within the United Counties of Prescott and Russell. The Township is expected to experience notable effects of climate change which include higher average annual temperatures, an increase in total annual precipitation, and an increase in the frequency and severity of extreme events. According to Climatedata.ca - a collaboration supported by Environment and Climate Change Canada (ECCC) - the Township of Russell may experience the following trends: Higher Average Annual Temperature: Township of Russell Asset Management Plan 2025 10 - Between the years 1971 and 2010 the annual average temperature was 6.0 ºC - Under a high emissions scenario, the annual average temperatures are projected to increase by 4.8 ºC by the year 2050 and over 6.6 ºC by the end of the century. Increase in Total Annual Precipitation: - Under a high emissions scenario, Russell Township is projected to experience an 13% increase in precipitation by the year 2051 and a 16% increase by the end of the century. Increase in Frequency of Extreme Weather Events: - It is expected that the frequency and severity of extreme weather events will change. 2.2.2 Integration of Climate Change and Asset Management Asset management practices aim to deliver sustainable service delivery - the delivery of services to residents today without compromising the services and well-being of future residents. Climate change threatens sustainable service delivery by reducing the useful life of an asset and increasing the risk of asset failure. Desired levels of service can be more difficult to achieve due to climate change impacts such as flooding, high heat, drought, and more frequent and intense storms. To achieve the sustainable delivery of services, climate change considerations should be incorporated into asset management practices. The integration of asset management and climate change adaptation observes industry best practices and enables the development of a holistic approach to risk management. 2.3 Asset Management Overview Municipalities are responsible for managing and maintaining a broad portfolio of infrastructure assets to deliver services to the community. The goal of asset management is to minimize the lifecycle costs of delivering infrastructure services, manage the associated risks, while maximizing value the community receives. The acquisition of capital assets accounts for only 10-20% of their total cost of ownership. The remaining 80-90% comes from operations and maintenance. This AMP focuses its analysis on the capital costs to maintain, rehabilitate and replace existing municipal infrastructure assets. Township of Russell Asset Management Plan 2025 11 Figure 3 Total Cost of Asset Ownership These costs can span decades, requiring planning and foresight to ensure financial responsibility is spread equitably across generations. An asset management plan is critical to this planning, and an essential element of broader asset management program. The industry-standard approach and sequence to developing a practical asset management program begins with a Strategic Plan, followed by an Asset Management Policy and an Asset Management Strategy, concluding with an Asset Management Plan. This industry standard, defined by the Institute of Asset Management (IAM), emphasizes the alignment between the corporate strategic plan and various asset management documents. The strategic plan has a direct, and cascading impact on asset management planning and reporting. 2.3.1 Foundational Asset Management Documentation The industry-standard approach and sequence to developing a practical asset management program begins with a Strategic Plan/Priorities, followed by an Asset Management Policy and an Asset Management Strategy, concluding with an Asset Management Plan. Total Cost of Ownership $ - Cost to build (capitol improvement) Cost to maintain (maintenance and operations) Cost to remove $ Township of Russell Asset Management Plan 2025 12 Figure 4 Foundational Asset Management Documents This industry standard, defined by the Institute of Asset Management (IAM), emphasizes the alignment between the corporate strategic plan/priorities and various asset management documents. The strategic plan has a direct, and cascading impact on asset management planning and reporting. Asset Management Policy An asset management policy represents a statement of the principles guiding the Township's approach to asset management activities. It aligns with the organizational strategic plan and provides clear direction to municipal staff on their roles and responsibilities as part of the asset management program. The Township adopted its Asset Management Policy in December of 2024, in accordance with Ontario Regulation 588/17. 4 The Policy outlines the Town's commitment to managing their assets with improved accountability and transparency using consistent standards that reflect the Town's present and future needs. Asset Management Strategy An asset management strategy outlines the translation of organizational objectives into asset management objectives and provides a strategic overview of the activities required to meet these objectives. It provides greater detail than the policy on how the Township plans to achieve asset 4 Bylaw #2024-103 Strategic Plan/Priorities Asset Management Policy Asset Management Strategy Asset Management Plan Township of Russell Asset Management Plan 2025 13 management objectives through planned activities and decision-making criteria. The Township's 2023-2026 Strategic Plan focuses on six key strategies: leadership in sustainable development, modernized service delivery, fiscal and infrastructure sustainability, balanced environmental initiatives, inclusive community practices, and enhanced safety and well-being through improved services and infrastructure. This strategy aims to build a thriving, innovative, and sustainable community for current and future residents. It reflects the Township's dedication to long­ term progress and quality of life for residents. The strategy demonstrates a commitment to strategic growth and community resilience, including targeted investments in infrastructure to support economic development and enhance public amenities. Asset Management Plan The asset management plan (AMP) presents the outcomes of the Township's asset management program and identifies the resource requirements needed to achieve a defined level of service. The AMP typically includes the following content: - State of Infrastructure - Asset Management Strategies - Levels of Service - Financial Strategies The AMP is a living document that should be updated regularly as additional asset and financial data becomes available. This will allow the Township to re­ evaluate the state of infrastructure and identify how the organization's asset management and financial strategies are progressing. 2.3.2 Key Concepts in Asset Management Effective asset management integrates several key components, including lifecycle management, risk & criticality, and levels of service. These concepts are applied throughout this asset management plan and are described below in greater detail. Lifecycle Management Strategies The condition or performance of most assets will deteriorate over time. This process is affected by a range of factors including an asset's characteristics, location, utilization, maintenance history and environment. Asset deterioration has a negative effect on the ability of an asset to fulfill its intended function, and may be characterized by increased cost, risk and even service disruption. Township of Russell Asset Management Plan 2025 14 To ensure that municipal assets are performing as expected and meeting the needs of customers, it is important to establish a lifecycle management strategy to proactively manage asset deterioration. There are several field intervention activities that are available to extend the life of an asset. These activities can be generally placed into one of three categories: maintenance, rehabilitation, and replacement. The following table provides a description of each type of activity and the general difference in cost. Depending on initial lifecycle management strategies, asset performance can be sustained through a combination of maintenance and rehabilitation, but at some point, replacement is required. Understanding what effect these activities will have on the lifecycle of an asset, and their cost, will enable staff to make better recommendations. Lifecycle Activity Cost Typical Associated Risks Maintenance Activities that prevent defects or deteriorations from occurring $ - Balancing limited resources between planned maintenance and reactive, emergency repairs and interventions - Diminishing returns associated with excessive maintenance activities, despite added costs - Intervention selected may not be optimal and may not extend the useful life as expected, leading to lower payoff and potential premature asset failure; Rehabilitation/ Renewal Activities that rectify defects or deficiencies that are already present and may be affecting asset performance $$$ - Useful life may not be extended as expected - May be costlier in the long run when assessed against full reconstruction or replacement - Loss or disruption of service, particularly for underground assets; Replacement/ Reconstruction $$$$ $ - Incorrect or unsafe disposal of existing asset - Costs associated with asset retirement obligations - Substantial exposure to high inflation and cost overruns Township of Russell Asset Management Plan 2025 15 Lifecycle Activity Cost Typical Associated Risks Asset end-of-life activities that often involve the complete replacement of assets - Replacements may not meet capacity needs for a larger population - Loss or disruption of service, particularly for underground assets Table 2 Lifecycle Management: Typical Lifecycle Interventions The Township's approach to lifecycle management is described within each asset category outlined in this AMP. Staff will continue to evolve and innovate current practices for developing and implementing proactive lifecycle strategies to determine which activities to perform on an asset and when they should be performed to maximize useful life at the lowest total cost of ownership. Risk & Criticality Asset risk and criticality are essential building blocks of asset management, integral in prioritizing projects and distributing funds where they are needed most based on a variety of factors. Assets in disrepair may fail to perform their intended function, pose substantial risk to the community, lead to unplanned expenditures, and create liability for the Township. In addition, some assets are simply more important to the community than others, based on their financial significance, their role in delivering essential services, the impact of their failure on public health and safety, and the extent to which they support a high quality of life for community stakeholders. Risk is a product of two variables: the probability that an asset will fail, and the resulting consequences of that failure event. It can be a qualitative measurement, (i.e. low, medium, high) or quantitative measurement (i.e. 1- 5), that can be used to rank assets and projects, identify appropriate lifecycle Township of Russell Asset Management Plan 2025 16 strategies, optimize short- and long-term budgets, minimize service disruptions, and maintain public health and safety. Figure 5 Risk Equations The approach used in this AMP relies on a quantitative measurement of risk associated with each asset. The probability and consequence of failure are each scored from 1 to 5, producing a minimum risk index of 1 for the lowest risk assets, and a maximum risk index of 25 for the highest risk assets. Probability of Failure Several factors can help decision-makers estimate the probability or likelihood of an asset's failure, including its condition, age, previous performance history, and exposure to extreme weather events, such as flooding and ice jams--both a growing concern for municipalities in Canada. Consequence of Failure Estimating criticality also requires identifying the types of consequences that the organization and community may face from an asset's failure, and the magnitude of those consequences. Consequences of asset failure will vary across the infrastructure portfolio; the failure of some assets may result primarily in high direct financial cost but may pose limited risk to the community. Other assets may have a relatively minor financial value, but any downtime may pose significant health and safety hazards to residents. Table 3 illustrates the various types of consequences that can be integrated in developing risk and criticality models for each asset category and segments within. We note that these consequences are common, but not exhaustive. Risk Formula to Assess Risk of Assets -- X Consequence of Failure Township of Russell Asset Management Plan 2025 17 Type of Consequence Description Direct Financial Direct financial consequences are typically measured as the replacement costs of the asset(s) affected by the failure event, including interdependent infrastructure. Economic Economic impacts of asset failure may include disruption to local economic activity and commerce, business closures, service disruptions, etc. Whereas direct financial impacts can be seen immediately or estimated within hours or days, economic impacts can take weeks, months and years to emerge, and may persist for even longer. Socio-political Sociopolitical impacts are more difficult to quantify and may include inconvenience to the public and key community stakeholders, adverse media coverage, and reputational damage to the community and the Township. Environmental Environmental consequences can include pollution, erosion, sedimentation, habitat damage, etc. Public Health and Safety Adverse health and safety impacts may include injury or death, or impeded access to critical services. Strategic These include the effects of an asset's failure on the community's long-term strategic objectives, including economic development, business attraction, etc. Table 3 Risk Analysis: Types of Consequences of Failure This AMP includes a preliminary evaluation of asset risk and criticality. Each asset has been assigned a probability of failure score and consequence of failure score based on available asset data. These risk scores can be used to prioritize maintenance, rehabilitation, and replacement strategies for critical assets. These models have been built in Citywide for continued review, updates, and refinements. Levels of Service A level of service (LOS) is a measure of the services that the Township is providing to the community and the nature and quality of those services. Within each asset category in this AMP, technical metrics and qualitative Township of Russell Asset Management Plan 2025 18 descriptions that measure both technical and community levels of service have been established and measured as data is available. The Township measures the level of service provided at two levels: Community Levels of Service, and Technical Levels of Service. This AMP includes those LOS that are required under O. Reg. 588/17 as well as any additional metrics the Township wishes to track. Community Levels of Service Community levels of service are a simple, plain language description or measure of the service that the community receives. For core (roads, bridges, storm, water, and sanitary sewer) asset categories as applicable the province, through O. Reg. 588/17, has provided qualitative descriptions that are required to be included in this AMP. Technical Levels of Service Technical levels of service are a measure of key technical attributes of the service being provided to the community. These include mostly quantitative measures and tend to reflect the impact of the Township's asset management strategies on the physical condition of assets or the quality/capacity of the services they provide. For core asset categories as applicable, the province, through O. Reg. 588/17, has also provided technical metrics that are required to be included in this AMP. Current and Proposed Levels of Service Proposed levels of service should be realistic and achievable within the timeframe outlined by the Township. They should also be determined with consideration of a variety of community expectations, fiscal capacity, regulatory requirements, corporate goals and long-term sustainability. Once proposed levels of service have been established, the Township must identify a lifecycle management and financial strategy which allows these targets to be achieved. Township of Russell Asset Management Plan 2025 19 Core Values The core values behind levels of service reflect the Township's commitment to delivering services that meet community needs in a fair, responsible, and sustainable way. These values help guide how infrastructure is managed and how service expectations are set. By aligning asset management decisions with these values, the Township can provide services that people trust. Table 4 Levels of Service: Core Values Public Engagement The Russell Township public engagement questionnaire was undertaken to document and capture public responses and opinions related to municipal infrastructure and service priorities. The questionnaire results were collated in October of 2024, with over 650 responses. The Township of Russell's Public Engagement Survey reveals that most residents (75%) are satisfied with the quality of services provided, with fire emergency services, parks and recreation services, and water/sewer services receiving the highest satisfaction ratings. However, roads and sidewalks were frequently cited as areas needing improvement, with mixed feedback. Residents also expressed concerns about the prioritization of new developments over maintenance of core infrastructure, and many highlighted the need for better traffic control and pedestrian safety measures. Regarding infrastructure investments, residents appear cautiously optimistic. While some agree with current investments, many are neutral or skeptical, especially regarding future plans. Roads, fire services, and snow removal are Value Description Accessible Services are available and accessible for customers who require them Reliable Services are provided with minimal service disruption and are available to customers in line with needs and expectations Safe Services are delivered such that they minimize health, safety, and security risks Affordable Services are delivered at an affordable cost for both the organization and customer Sustainable Services are designed to be used efficiently. Long-term plans are in place to ensure that they are available to all customers into the future Township of Russell Asset Management Plan 2025 20 the most valued services, while amenities like parks and community centers are seen as lower priorities. Most residents are open to pragmatic trade-offs, favoring balanced and cost-effective improvements, with some willing to pay more for better service quality. Key recommendations include improving roads and sidewalks, enhancing safety measures, supporting seniors, and increasing transparency in infrastructure planning. Refer to Appendix C for a summary of the public engagement questionnaire. 2.4 Scope & Methodology 2.4.1 Asset Categories for this AMP This asset management plan for the Township of Russell is produced in compliance with O. Reg. 588/17. The July 2025 deadline under the regulation--the last of three AMPs--requires analysis of core and non-core asset categories, along with the proposed levels of service for the following ten years. The AMP summarizes the state of the infrastructure for the Township's asset portfolio, establishes levels of service and the associated technical and customer-oriented key metrics, outlines lifecycle strategies for optimal asset management and performance, and provides financial strategies to reach sustainability for the asset categories listed below. Figure 6 Tax Funded and Rate Funded Asset Categories -Road Network -Bridges & Culverts -Storm Network -Facilties -Machinery & Equipment -Vehicles -Land Improvements Tax Funded Assets -Water Network -Sanitary Sewer Network Rate Funded Assets - - Township of Russell Asset Management Plan 2025 21 2.4.2 Data Effective Date It is important to note that this plan is based on data as of December 2024 therefore, it represents a snapshot in time using the best available processes, data, and information at the Township. Strategic asset management planning is an ongoing and dynamic process that requires continuous data updates and dedicated data management resources. 2.4.3 Deriving Replacement Costs There are a range of methods to determine the replacement cost of an asset, and some are more accurate and reliable than others. This AMP relies on two methodologies: User-Defined Cost and Cost Per Unit Based on costs provided by municipal staff which could include average costs from recent contracts; data from engineering reports and assessments; staff estimates based on knowledge and experience. Cost Inflation / CPI Tables Historical costs of the assets are inflated based on Consumer Price Index or Non-Residential Building Construction Price Index. User-defined costs based on reliable sources are a reasonably accurate and reliable way to determine asset replacement costs. Cost inflation is typically used in the absence of reliable replacement cost data. It is a reliable method for recently purchased and/or constructed assets where the total cost is reflective of the actual costs that the Township incurred. As assets age, and new products and technologies become available, cost inflation becomes a less reliable method. 2.4.4 Estimated Service Life & Service Life Remaining The estimated useful life (EUL) of an asset is the period over which the Township expects the asset to be available for use and remain in service before requiring replacement or disposal. The EUL for each asset in this AMP was assigned according to the knowledge and expertise of municipal staff and supplemented by existing industry standards when necessary. By using an asset's in-service data and its EUL, the Township can determine the service life remaining (SLR) for each asset. Using condition data and the asset's SLR, the Township can more accurately forecast when it will require replacement. The SLR is calculated as follows: Township of Russell Asset Management Plan 2025 22 Figure 7 Service Life Remaining Calculation 2.4.5 Reinvestment Rate As assets age and deteriorate, they require additional investment to maintain a state of good repair. The reinvestment of capital funds, through asset renewal or replacement, is necessary to sustain an adequate level of service. The reinvestment rate is a measurement of available or required funding relative to the total replacement cost. By comparing the actual vs. target reinvestment rate the Township can determine the extent of any existing funding gap. The reinvestment rate is calculated as follows: Figure 8 Target Reinvestment Rate Calculation Figure 9 Actual Reinvestment Rate Calculation 2.4.6 Deriving Asset Condition An incomplete or limited understanding of asset condition can mislead long­ term planning and decision-making. Accurate and reliable condition data helps to prevent premature and costly rehabilitation or replacement and ensures that lifecycle activities occur at the right time to maximize asset value and useful life. A condition assessment rating system provides a standardized descriptive framework that allows comparative benchmarking across the Township's asset portfolio. The table below outlines the condition rating system used in this AMP to determine asset condition. This rating system is aligned with the Service Life Remaining (SLR) TARGET Reinvestment Rate ACTUAL Reinvestment Rate -- In Service Date + Estimated Useful Life (EUL) - Current Year Annual Capital Requirement Total Replacement Cost Annual Capital Funding Total Replacement Cost Township of Russell Asset Management Plan 2025 23 Canadian Core Public Infrastructure Survey which is used to develop the Canadian Infrastructure Report Card. When assessed condition data is not available, service life remaining is used to approximate asset condition. Condition Description Criteria Service Life Remaining (%) Very Good Fit for the future Well maintained, good condition, new or recently rehabilitated 80-100 Good Adequate for now Acceptable, generally approaching mid-stage of expected service life 60-80 Fair Requires attention Signs of deterioration, some elements exhibit significant deficiencies 40-60 Poor Increasing potential of affecting service Approaching end of service life, condition below standard, large portion of system exhibits significant deterioration 20-40 Very Poor Unfit for sustained service Near or beyond expected service life, widespread signs of advanced deterioration, some assets may be unusable 0-20 Table 5 Standard Condition Rating Scale The analysis in this AMP is based on assessed condition data only as available. In the absence of assessed condition data, asset age is used as a proxy to determine asset condition. The table above summarizes the standard methodology for determining asset condition within this AMP. For those categories in which there is a different rating scale for condition assessment, they will be outlined within that category's "Approach to Condition Assessment" subsection. For instances where the scale is the same, only the approach for condition assessment will be outlined. 2.5 Ontario Regulation 588/17 As part of the Infrastructure for Jobs and Prosperity Act, 2015, the Ontario government introduced Regulation 588/17 - Asset Management Planning for Township of Russell Asset Management Plan 2025 24 Municipal Infrastructure (O. Reg 588/17)5 . Along with creating better performing organizations, more liveable and sustainable communities, the regulation is a key, mandated driver of asset management planning and reporting. It places substantial emphasis on current and proposed levels of service and the lifecycle costs incurred in delivering them. Figure 10 below outlines key reporting requirements under O. Reg 588/17 and the associated timelines. Figure 10 O. Reg. 588/17 Requirements and Reporting Deadlines 5 O. Reg. 588/17: Asset Management Planning for Municipal Infrastructure https://www.ontario.ca/laws/regulation/170588 Phase 1 Phase II Phase Ill 2022 2024 2025 CORE ALL ALL Assets Assets Categories ) 0 Included in Included in With additional your AMP your AMP requirements - Levels of Service - Levels of Service - Proposed Levels - Performance of each - Performance of each of Service asset category asset category - Explanation of - Particulars per - Particulars per proposed Levels asset category asset category of Service - Lifecycle activities - Lifecycle activities - Proposed performance to maintain current to maintain current of asset categories Level of Service per Level of Service per - Lifecycle management asset category asset category and financial strategy Township of Russell Asset Management Plan 2025 25 2.5.1 O. Reg. 588/17 Compliance Review Requirement O. Reg. 588/17 Section AMP Section Reference Status Summary of assets in each category S.5(2), 3(i) 4.1 - 12.1 Complete Replacement cost of assets in each category S.5(2), 3(ii) 4.1 - 12.1 Complete Average age of assets in each category S.5(2), 3(iii) 4.3 - 12.3 Complete Condition of core assets in each category S.5(2), 3(iv) 4.2 - 12.2 Complete Description of Township's approach to assessing the condition of assets in each category S.5(2), 3(v) 4.2 & 4.4 - 12.2 & 12.4 Complete Current/proposed levels of service in each category S.5(2), 1(i-ii) S.6 (1) 4.6 - 12.6 Complete Performance measures in each category S.5(2), 2 S. 6 (1), 2 4.6 - 12.6 Complete Lifecycle activities needed for proposed levels of service for 10 years S.5(2), 4 S. 6 (1), 4 4.4 - 12.4 Complete Costs of providing lifecycle activities for 10 years S.5(2), 4 S. 6 (1), 4 4.6.3 - 12.6.3 Complete Growth assumptions S.5(2), 5(i-ii) S.5(2), 6(i-vi) 13 Complete Table 6 O. Reg. 588/17 Compliance Review Township of Russell Asset Management Plan 2025 26 3. Portfolio Overview - State of the Infrastructure The state of the infrastructure (SOTI) summarizes the inventory, condition, age profiles, and other key performance indicators for the Township's infrastructure portfolio. These details are presented for all core and non-core asset categories. 3.1 Asset Hierarchy & Data Classification Asset hierarchies explains the relationship between individual assets and their components, and a wider, more expansive network and system. How assets are grouped in a hierarchy structure can impact how data is interpreted. Assets were structured to support meaningful, efficient reporting and analysis. Key category details are summarized at asset segment level. Township of Russell Asset Management Plan 2025 27 Figure 11 Asset Hierarchy and Data Classification -Curbs -HCB Roads -LCB Roads -Sidewalks & Pathways -Signs -Streetlights Road Network -Bridges -Pedestrian Bridges -Structural Culverts Bridges & Culverts -Booster Station -Hydrants -Misc. Equipment -Reservoirs -Valves -Water Standpost -Water Towers -Watermains Water Network -Forcemains -Lagoons -Manholes -Misc. Equipment -Pumping Stations -Sewer Mains Sanitary Sewer Network -Catch Basins -Culverts -Manholes -OGS -Ponds -Storm Mains Storm Network -Environmental Services -General Government -Protection Services -Recreational & Cultural Services -Transportation Services Facilties -Public Safety & Enforcement -Environmental Services -General Government -Protection Services -Recreational & Cultural Services -Transportation Services Vehicles -Public Safety & Enforcement -General Government -Protection Services -Recreational & Cultural Services -Transportation Services Machinery & Equipment -Marina -Misc. Land Improvements -Parklands & Trails -Parks & Playground Equipment -Splashpads & Pools -Sport Fields & Courts Land Improvements Township of Russell Asset Management Plan 2025 28 3.2 Portfolio Overview 3.2.1 Total Replacement Cost of Asset Portfolio The nine asset categories analyzed in this Asset Management Plan have a total current replacement cost of $553 million. This estimate was calculated using user-defined costing, cost per unit, as well as inflation of historical or original costs to current date. This estimate reflects replacement of historical assets with similar, not necessarily identical, assets available for procurement today. Figure 12 illustrates the replacement cost of each asset category. Figure 12 Current Replacement Cost by Asset Category 3.2.2 Target vs. Actual Reinvestment Rate The graph below depicts funding gaps by comparing the target to the current reinvestment rate. To meet the existing long-term capital requirements, the Township requires an annual capital investment of $12.84 million, for a target portfolio reinvestment rate of 2.32%. Currently, the annual investment from sustainable revenue sources is $6.48 million, for a current portfolio reinvestment rate of 1.17%. Target and current re-investment rates by asset category are detailed below. $7.7m $9.8m $14.3m $58.8m $59.7m $78.1m $93.1m $98.8m $132.9m $50m $100m $150m Machinery & Equipment Land Improvements Vehicles Sanitary Sewer Network Bridges & Culverts Road Network Water Network Facilities Storm Network Replacement Cost by Category Township of Russell Asset Management Plan 2025 29 Figure 13 Current Vs. Target Reinvestment Rate 3.2.3 Condition of Asset Portfolio Figure 14 and Figure 15 summarize asset condition at the portfolio and category levels, respectively. Based on both assessed condition and age- based analysis, 78% of the Township's infrastructure portfolio is in fair or better condition, with the remaining 22% in poor or worse condition. Typically, assets in poor or worse condition may require replacement or major rehabilitation in the immediate or short-term. Targeted condition assessments may help further refine the list of assets that may be candidates for immediate intervention, including potential replacement or reconstruction. Similarly, assets in fair condition should be monitored for disrepair over the medium term. Keeping assets in fair or better condition is typically more cost- effective than addressing assets needs when they enter the latter stages of their lifecycle or decline to a lower condition rating, e.g., poor or worse. 1.49% 2.73% 4.87% 9.34% 3.48% 1.57% 1.55% 6.29% 1.57% 2.14% 0.47% 2.35% 11.42% 2.80% 0.93% 0.08% 0.78% 0.74% 0% 2% 4% 6% 8% 10% 12% Target Reinvestment Rate Actual Reinvestment Rate · - - - - Township of Russell Asset Management Plan 2025 30 Condition data was available for just over half (51%) of assets. For all remaining assets, age was used as an approximation of condition for most of these assets. Age-based condition estimations can skew data and lead to potential under- or overstatement of asset needs. Figure 14 Asset Condition: Portfolio Overview As further illustrated in Figure 15 at the category level, the majority of major, core infrastructure is in fair or better condition. These findings are based on in-field condition assessment data and age-based condition projections. See Table 7 for details on how condition data was derived for each asset segment. Very Poor, $61,518,000 (11%) Poor, $58,222,000 (11%) Fair, $87,441,000 (16%) Good, $105,626,000 (19%) Very Good, $240,226,000 (43%) Overall Portfolio Condition Township of Russell Asset Management Plan 2025 31 Figure 15 Asset Condition by Asset Category $52.5m $5.7m $64.0m $36.3m $35.1m $2.0m $6.6m $29.3m $8.7m $13.4m $3.0m $12.2m $9.8m $13.8m $2.7m $941k $22.9m $27.0m $14.8m $2.5m $12.5m $9.4m $14.6m $869k $1.1m $21.2m $10.5m $10.2m $663k $8.6m $3.1m $10.9m $1.1m $344k $21.8m $1.5m $2.3m $2.4m $35.6m $161k $3.7m $1.1m $800k $3.6m $12.0m 0% 20% 40% 60% 80% 100% Water Network Vehicles Storm Network Sanitary Sewer Network Road Network Machinery & Equipment Land Improvem ents Facilities Bridges & Culverts Value and Percentage of Asset Segments by Replacement Cost Very Good Good Fair Poor Very Poor Township of Russell Asset Management Plan 2025 32 Source of Condition Data This AMP relies on assessed condition for 51% of assets, based on and weighted by replacement cost. For the remaining assets, age is used as an approximation of condition. Assessed condition data is invaluable in asset management planning as it reflects the true condition of the asset and its ability to perform its functions. The table below identifies the source of condition data used throughout this AMP. Asset Category % of Assets with Assessed Condition Source of Condition Data Road Network 77% Road Needs Study 2022 Sidewalks Canada Assessment Staff Assessments Bridges & Culverts 94% 2023 OSIM Report Storm Network 0%6 N/A Facilities 100% 2023 Building Condition Assessment Vehicles 100% Staff Assessments Machinery & Equipment 82% Staff Assessments Land Improvements 93% Staff Assessments Water Network 24% 2023 Building Condition Assessment Staff Assessments Sanitary Sewer Network 23% 2023 Building Condition Assessment Staff Assessments Table 7 Source of Condition Data 6 The Township is in the process of updating its storm network data. Approximately 29% of all storm sewer mains have received a CCTV inspection in recent years. Township of Russell Asset Management Plan 2025 33 3.2.4 Service Life Remaining Based on asset age, available assessed condition data and estimated useful life, 18% of the Township's assets will require replacement within the next 10 years (not accounting for asset replacement backlog). 3.2.5 Risk Matrix Figure 16 shows how the Township's assets across the different asset categories are stratified within a risk matrix. 1 - 4 5 - 7 8 - 9 10 - 14 15 - 25 Very Low Low Moderate High Very High $199,648,056 $117,144,763 $53,102,595 $87,086,523 $96,051,584 (36%) (21%) (10%) (16%) (17%) Figure 16 Risk Matrix: All Assets The analysis shows that based on current risk models, approximately 17% of the Township's assets, with a current replacement cost of approximately $96.5 million, carry a risk rating of 15 or higher (red) out of 25. Assets in this group may have a high probability of failure based on available condition data and age-based estimates. As new asset attribute information and condition assessment data are integrated with the asset register, asset risk ratings will evolve, resulting in a redistribution of assets within the risk matrix. Staff should also continue to calibrate risk models. We caution that since risk ratings rely on many factors beyond an asset's physical condition or age; assets in a state of disrepair can sometimes be classified as low risk, despite their poor condition rating. In such cases, although the probability of failure for these assets may be high, their consequence of failure ratings was determined to be low based on the attributes used and the data available. Similarly, assets with very high condition ratings can receive a moderate to high-risk rating despite a low probability of failure. These assets may be deemed as highly critical to the Township based on their costs, economic importance, social significance, and other factors. Continued calibration of an asset's criticality and regular data updates are needed to ensure these models more accurately reflect an asset's actual risk profile. Township of Russell Asset Management Plan 2025 34 Core Assets Township of Russell Asset Management Plan 2025 35 4. Road Network 4.1 Inventory & Valuation Table 8 summarizes the quantity, unit of measure, total replacement cost, and primary replacement cost method of each asset segment in the Township's road network inventory. Segment7 Quantity Unit of Measure Replacement Cost Primary RC Method Curbs 22,154 Metres $1,968,957 CPI HCB Roads 193.7 Kilometres $63,994,849 Cost per Unit LCB Roads 30.1 Kilometres $2,645,728 Cost per Unit Sidewalks & Pathways 23,760 Metres $7,306,717 CPI Signs 1,456 Assets $210,360 CPI Streetlights 1,578 Assets $1,946,250 User-Defined Total $78,072,861 Table 8 Detailed Asset Inventory: Road Network Figure 17 Portfolio Valuation: Road Network 7 The Township also owns and manages 61.3 kms of unpaved (dirt, earth, and gravel) roads. Since both road types don't carry significant operating or capital costs, they have been excluded from this AMP. $210k $1.9m $2.0m $2.6m $7.3m $64.0m $20m $40m $60m $80m Signs Streetlights Curbs LCB Roads Sidewalks & Pathways HCB Roads Replacement Cost by Segment Township of Russell Asset Management Plan 2025 36 4.2 Asset Condition Figure 18 summarizes the replacement cost-weighted condition of the Township's Road network. Based on a combination of field inspection data and age, 81% of assets are in fair or better condition; the remaining 19% of assets are in poor to very poor condition. Condition assessments were available for 80% of HCB roads, 75% of LCB Roads and 85% of sidewalks, based on replacement cost. This condition data was projected from inspection date to current year to estimate their condition today. Assets in poor or worse condition may be candidates for replacement in the short term; similarly, assets in fair condition may require rehabilitation or replacement in the medium term and should be monitored for further degradation in condition. As illustrated in Figure 18, most Township road network assets are in fair or better condition. Figure 18 Asset Condition: Road Network Overall As illustrated in Figure 19, based on condition assessments, the majority of the Township's Road network is in fair or better condition. Very Poor, $3,671,000 (5%) Poor, $10,932,000 (14%) Fair, $14,581,000 (19%) Good, $13,762,000 (18%) Very Good, $35,126,000 (45%) Township of Russell Asset Management Plan 2025 37 Figure 19 Asset Condition: Road Network by Segment 4.2.1 Current Approach to Condition Assessment Accurate and reliable condition data allows staff to more confidently determine the remaining service life of assets and identify the most cost-effective approach to managing assets. The following describes the Township's current approach: - Road assessments are performed every 5 years by a third-party consultant. The last assessment was in 2024. The Township aims to eventually conduct condition assessments every 3 years - Streetlights are inspected once per year, at night, to ensure they function properly - Sidewalks are inspected annually for accessibility concerns and evaluated for tripping hazards - Street signs are evaluated annually for reflectivity - Supporting infrastructure assessments are performed internally, as per MMS $169k $8k $2.8m $214k $30.5m $1.4m $330k $1k $326k $1.5m $11.1m $539k $1.3m $18k $494k $939k $11.8m $137k $3.3m $7.5m $183k $380k $3.1m 0% 20% 40% 60% 80% 100% Streetlights Signs Sidewalks & Pathways LCB Roads HCB Roads Curbs Value and Percentage of Asset Segments by Replacement Cost Very Good Good Fair Poor Very Poor Township of Russell Asset Management Plan 2025 38 4.3 Age Profile An asset's age profile comprises two key values: estimated useful life (EUL), or design life; and the percentage of EUL consumed. The EUL is the serviceable lifespan of an asset during which it can continue to fulfil its intended purpose and provide value to users, safely and efficiently. As assets age, their performance diminishes, often more rapidly as they approach the end of their design life. In conjunction with condition data, an asset's age profile provides a more complete summary of the state of infrastructure. It can help identify assets that may be candidates for further review through condition assessment programs; inform the selection of optimal lifecycle strategies; and improve planning for potential long-term replacement spikes. Figure 20 illustrates the average current age of each asset type and its estimated useful life. Both values are weighted by the replacement cost of individual assets. Figure 20 Estimated Useful Life vs. Asset Age: Road Network Although asset age is an important measurement for long-term planning, condition assessments provide a more accurate indication of actual asset needs. 2.1 11.4 5.1 27.7 16.7 8.2 38.2 25 19 49.6 5.1 17 0 10 20 30 40 50 60 Curbs HCB Roads LCB Roads Sidewalks & Pathways Signs Streetlights Number of Years Weighted Average Age Weighted Average EUL - - - - - - I I I I I I Township of Russell Asset Management Plan 2025 39 4.4 Current Approach to Lifecycle Management The condition or performance of most assets will deteriorate over time. This process is affected by a range of factors including an asset's characteristics, location, utilization, maintenance history and environment. The following lifecycle strategies have been developed as a proactive approach to managing the lifecycle of LCB and HCB roads. Instead of allowing the roads to deteriorate until replacement is required, strategic rehabilitation is expected to extend the service life of roads at a lower total cost. The following schedules outline the events taken by the Township in its care of Road Network: Paved Roads (Rural HCB)8 Event Name Event Class Event Trigger Crack Sealing Preventative Maintenance 6 Years 10 Months Basic Resurfacing - 50mm (Rural) Rehabilitation 15 Years 10 Months Basic Resurfacing - 100mm (Rural) Rehabilitation 33 Years 2 Months Full Reconstruction End of Life Replacement 58 Years 2 Months Table 9 Lifecycle Management Strategy: Road Network (Rural HCB) Paved Roads (Urban HCB)9 Event Name Event Class Event Trigger Crack Sealing Preventative Maintenance 6 Years 7 Months 8 The lifecycle strategies for the rural HCB roads with grade restriction 100mm and 150mm. 9 The lifecycle strategies for the urban HCB roads with grade restriction 90mm, 100mm, 150mm. 100 90 80 70 60 50 40 30 20 10 Original Pr:ojeaed 0+----~--~~--~---~-----+---~---~---~---~--~---~--., 0 10 15 20 25 30 35 40 45 50 55 Time-(in Y~ars) Township of Russell Asset Management Plan 2025 40 Full Reconstruction End of Life Replacement 26 Years 11 Months Table 10 Lifecycle Management Strategy: Road Network (Urban HCB) Paved Roads (Urban HCB)10 Event Name Event Class Event Trigger Crack Sealing Preventative Maintenance 6 Years 7 Months Surface Course Paving (By Others) Rehabilitation 8 Years Full Reconstruction End of Life Replacement 33 Years Table 11 Lifecycle Management Strategy: Road Network (Urban HCB) Paved Roads (Urban HCB)11 Event Name Event Class Event Trigger 10 The lifecycle strategies for the urban HCB roads with grade restriction on base course 100mm. 11 The lifecycle strategies for the urban HCB roads without grade restriction. 100 90 80 70 e 60 0 :~ 50 -g 0 u 40 30 20 10 0 0 10 100 90 80 70 e 60 .g 'c 50 e 0 u 40 30 20 10 0 0 10 15 15 20 Time (in Years) 20 25 Time (in Years) ..................................... 25 30 Original Pr.oj_en Original Pr.ai=J:1 Township of Russell Asset Management Plan 2025 41 Crack Sealing Preventative Maintenance 6 Years 7 Months Basic Resurfacing - 50mm (Urban) Rehabilitation 15 Years 10 Months Basic Resurfacing - 100mm (Urban) Rehabilitation 34Years 6 Months Full Reconstruction End of Life Replacement 59 Years 6 Months Table 12 Lifecycle Management Strategy: Road Network (Urban HCB) Paved Roads (Rural LCB) Event Name Event Class Event Trigger Crack Sealing Preventative Maintenance 2 Years 4 Months Full Reconstruction End of Life Replacement 20 Years 11 Months Table 13 Lifecycle Management Strategy: Road Network (Paved Roads - LCB) 100 90 80 70 e 60 .g '5 50 e 0 40 u 30 20 10 0 0 10 15 20 100 90 80 70 e 60 .g '5 50 e 0 40 u 30 20 10 0 0 25 30 35 40 Time (in Years) 10 15 Time (in Years) 45 50 55 Original Pc.oj_e Origir,al P,;o· 20 60 Township of Russell Asset Management Plan 2025 42 The following table expands on maintenance and inspection activities for road network assets. Activity Type Description of Current Strategy Maintenance Routine road patrols are performed in accordance with Ontario Minimum Maintenance Standards (MMS). Maintenance is triggered by visual inspection during routine patrols or upon notification from residents Potholes are repaired when notified by residents or discovered through road patrols Street sweeping is performed every spring season Vegetation control within road ditches and around guiderails is performed as necessary Crack sealing and overlay are undertaken on roads wherever feasible. Crack sealing is initiated when the total length of cracks equals the total length of the road and is inspected annually. Rehabilitation To streamline projects, the Township will concurrently rehabilitate aging sewers pipes (via CIPP), provided that the piping ovality remains intact Replacement Replacement is considered when an asset's condition has deteriorated significantly, making rehabilitation no longer cost- effective. Assets are replaced upon failure or prior to road paving if the asset is not expected to last longer than the surface Table 14 Lifecycle Management Strategy: Road Network 4.5 Risk Analysis The risk matrix below is generated using available asset data, including condition, service life remaining, replacement costs, and road class. The risk ratings for assets without useful attribute data were calculated using only condition, service life remaining, and their replacement costs. The matrix stratifies assets based on their individual probability and consequence of failure; each scored from 1 to 5. Their product generates a risk index ranging from 1-25. Assets with the highest criticality and likelihood of failure receive a risk rating of 25; those with lowest probability of failure and lowest criticality carry a risk rating of 1. As new data and information is gathered, the Township may consider integrating relevant information that improves confidence in the criteria used to assess asset risk and criticality. Township of Russell Asset Management Plan 2025 43 These risk models have been built into the Township's Asset Management Database (Citywide Assets). See Risk & Criticality section for further details on approach used to determine asset risk ratings and classifications. 1 - 4 5 - 7 8 - 9 10 - 14 15 - 25 Very Low Low Moderate High Very High $18,561,339 $23,436,847 $7,963,097 $13,696,987 $14,414,591 (24%) (30%) (10%) (18%) (18%) Figure 21 Risk Matrix: Road Network 4.6 Levels of Service The table that follows summarize the Township's current and proposed levels of service with respect to prescribed KPIs under Ontario Regulation 588/17, as well as any additional performance measures that the Township selected for this AMP. 4.6.1 Levels of Service - Current Metric Type KPI Metric Service Attribute Current LOS Community Description, which may include maps, of the road network in the Township and its level of connectivity Scope Appendix B: Level of Service Maps Description or images that illustrate the different levels of road class pavement condition Quality The Township completed a Roads Needs Study in 2024 in coordination with Streetscan. Assets are groups as per the five-tier condition rating scale: Very Good: 90+ Good: 70-89 Fair: 35-69 Poor: 20-34 Very Poor: 0-19 Technical Lane-km of arterial roads (MMS classes 1 and 2) per land area (km/km2) Scope 0 Township of Russell Asset Management Plan 2025 44 Metric Type KPI Metric Service Attribute Current LOS Lane-km of collector roads (MMS classes 3 and 4) per land area (km/km2) 1.12 Lane-km of local roads (MMS classes 5 and 6) per land area (km/km2) 0.97 Technical Average pavement condition index for paved roads in the Township Quality 74 Table 15: Road Network - Current Levels of Service 4.6.2 Levels of Service - Proposed The scenarios that were used to analyse Russell Township's inventory were run for 60-years to ensure all the lifecycles were included at least once. They are also all based on the data available in the asset management system which outlines estimated useful life and condition as well as replacement costs which all the results are based on. Scenario 1: Current Lifecycle Activities - this scenario utilizes the current lifecycle activities outlined as current practice within each asset category. The condition and annual investment were then determined. Scenario 2: Current Capital Reinvestment Rate - this scenario utilizes the current capital reinvestment within each asset category. The current annual investment was held, and the condition was determined. Scenario 3: Target Condition Good - this scenario utilizes a target average condition of 70% of the infrastructure within each asset category. The condition value was held, and the annual investment was then determined. The table below outlines the results for each scenario for the road network. Township of Russell Asset Management Plan 2025 45 Scenarios Replacement Cost Average Condition Average Risk Rating (0-25)12 Annual Capital Reinvestment Scenario 1 - Lifecycle (selected) $78,072,000 62% 10.39 $2,718,000 Scenario 2 - Current Capital Investment Rate 54% 12.08 $2,139,000 Scenario 3 - Maintain Condition 70% 70% 9.19 $3,284,000 4.6.3 10-Year Capital Forecast Below is the projected ten-year capital forecast (scenario 1) needed to obtain full funding, within the recommended timeframe (see 1.4). 12 See 2.3.2 Segment 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Curbs - - - - - - - - - - HCB Roads $1.8m $2.2m $2.7m $2.0m $2.3m $1.7m $2.0m $1.7m $1.1m $932k LCB Roads $8k - - - - - $77k $300k $91k $19k Sidewalks & Pathways - - - - - - - $25k - $258k Signs $2k - $18k $1k - $183k $8k $18k $1k - Streetlights - - - - - $63k $74k $12k $1.3m - Total $1.8m $2.2m $2.7m $2.0m $2.3m $1.9m $2.2m $2.1m $2.5m $1.2m Township of Russell Asset Management Plan 2025 46 5. Bridges & Culverts 5.1 Inventory & Valuation Table 16 summarizes the quantity, unit of measure, total replacement cost, and primary replacement cost method of each asset segment in the Township's bridges & culverts. Segment Quantity Unit of Measure Replacement Cost Primary RC Method Bridges 14 Assets $39,678,830 User-Defined Pedestrian Bridges 2 Assets $715,800 User-Defined Structural Culverts 9 Assets $19,279,900 User-Defined TOTAL $59,674,530 Table 16 Detailed Asset Inventory: Bridges & Culverts Figure 22 Portfolio Valuation: Bridges & Culverts 5.2 Asset Condition Figure 23 summarizes the replacement cost-weighted condition of the Township's bridges and culverts. Based on the Township's latest Ontario Structures Inspection Manual (OSIM) assessments, 78% bridges and $716k $19.3m $39.7m $10m $20m $30m $40m $50m Pedestrian Bridges Structural Culverts Bridges Replacement Cost by Segment Township of Russell Asset Management Plan 2025 47 structural culverts are in fair or better condition. Some elements or components of these structures may be candidates for replacement or rehabilitation in the medium term and should be monitored for further degradation in condition. Figure 23 Asset Condition: Bridges & Culverts Overall As illustrated in Figure 24, based on condition assessments, the majority of the Township's bridges & culverts are in fair or better condition. Very Poor, $12,041,000 (20%) Poor, $1,475,000 (2%) Fair, $10,519,000 (18%) Good, $26,980,000 (45%) Very Good, $8,660,000 (15%) $3.2m $5.4m $5.2m $716k $21.0m $4.5m $6.0m $1.5m $6.3m $5.8m 0% 20% 40% 60% 80% 100% Structural Culverts Pedestrian Bridges Bridges Value and Percentage of Asset Segments by Replacement Cost Very Good Good Fair Poor Very Poor Township of Russell Asset Management Plan 2025 48 Figure 24 Asset Condition: Bridges & Culverts by Segment 5.2.1 Current Approach to Condition Assessment Accurate and reliable condition data allows staff to more confidently determine the remaining service life of assets and identify the most cost-effective approach to managing assets. The following describes the Township's current approach: - Condition assessments for all bridges and culverts within the Township are conducted biennially, following the guidelines of the Ontario Structure Inspection Manual (OSIM). The last inspection was performed in 2023 by TSI Inc. 5.3 Age Profile An asset's age profile comprises two key values: estimated useful life (EUL), or design life; and the percentage of EUL consumed. The EUL is the serviceable lifespan of an asset during which it can continue to fulfil its intended purpose and provide value to users, safely and efficiently. As assets age, their performance diminishes, often more rapidly as they approach the end of their design life. In conjunction with condition data, an asset's age profile provides a more complete summary of the state of infrastructure. It can help identify assets that may be candidates for further review through condition assessment programs; inform the selection of optimal lifecycle strategies; and improve planning for potential replacement spikes. Figure 25 illustrates the average current age of each asset type and its estimated useful life. Both values are weighted by the replacement cost of individual assets. Township of Russell Asset Management Plan 2025 49 Figure 25 Estimated Useful Life vs. Asset Age: Bridges & Culverts 5.4 Current Approach to Lifecycle Management The condition or performance of most assets will deteriorate over time. To ensure that municipal assets are performing as expected and meeting the needs of customers, it is important to establish a lifecycle management strategy to proactively manage asset deterioration. The following table outlines the Township's current lifecycle management strategy. Activity Type Description of Current Strategy Maintenance Routine maintenance activities for bridges and culverts include inspections, cleaning, minor repairs, and vegetation management Cleaning and minor repairs are completed annually or on an as- needed basic Rehabilitation / Replacement Rehabilitation and replacement activities are driven by the results of mandated structural inspections competed according to the Ontario Structure Inspection Manual (OSIM) Inspection The most recent inspection report was completed in 2023 by TSI Inc. Table 17 Lifecycle Management Strategy: Bridges & Culverts 50 10.1 24.7 75 75 73.1 0 10 20 30 40 50 60 70 80 Bridges Pedestrian Bridges Structural Culverts Number of Years Weighted Average Age Weighted Average EUL - - - - - -,~ - - Township of Russell Asset Management Plan 2025 50 5.5 Risk Analysis The risk matrix below is generated using available asset data, including condition and replacement costs. The matrix stratifies assets based on their individual probability and consequence of failure; each scored from 1 to 5. Their product generates a risk index ranging from 1-25. Assets with the highest criticality and likelihood of failure receive a risk rating of 25; those with lowest probability of failure and lowest criticality carry a risk rating of 1. As new data and information is gathered, the Township may consider integrating relevant information that improves confidence in the criteria used to assess asset risk and criticality. These risk models have been built into the Township's Asset Management Database (Citywide Assets). See Risk & Criticality section for further details on approach used to determine asset risk ratings and classifications. 1 - 4 5 - 7 8 - 9 10 - 14 15 - 25 Very Low Low Moderate High Very High $253,665 $8,637,810 $5,986,100 $29,437,360 $15,359,595 (<1%) (14%) (10%) (49%) (26%) Figure 26 Risk Matrix: Bridges & Culverts 5.6 Levels of Service The table that follows summarize the Township's current and proposed levels of service with respect to prescribed KPIs under Ontario Regulation 588/17 as well as any additional performance measures that the Township has selected for this AMP. 5.6.1 Levels of Service - Current Metric Type KPI Metric Service Attribute Current LOS Community Description of the traffic that is supported by municipal bridges (e.g. heavy transport vehicles, motor vehicles, emergency vehicles, pedestrians, cyclists) Scope Bridges and structural culverts are a key component of the municipal transportation network. Structures allow for most types of vehicles, including heavy transport, emergency vehicles, and cyclists Within the Township, only bridge structure R-027 has a loading limit (14 tons). Township of Russell Asset Management Plan 2025 51 Metric Type KPI Metric Service Attribute Current LOS Description or images of the condition of bridges and culverts and how this would affect use of the bridges and culverts Quality Appendix B: Level of Service Maps Technical % of bridges in the Township with loading or dimensional restrictions Scope 1.4%13 Average bridge condition index value for bridges in the Township Quality 69 Average bridge condition index value for structural culverts in the Township 68 Table 18: Bridges & Structural Culverts - Current Levels of Service 5.6.2 Levels of Service - Proposed The scenarios that were used to analyse Russell Township's inventory were run for 85-years to ensure all the lifecycles were included at least once. They are also all based on the data available in the asset management system which outlines estimated useful life and condition as well as replacement costs which all the results are based on. Scenario 1: Current Lifecycle Activities - this scenario utilizes the current lifecycle activities outlined as current practice within each asset category. The condition and annual investment were then determined. Scenario 2: Current Capital Reinvestment Rate - this scenario utilizes the current capital reinvestment within each asset category. The current annual investment was held, and the condition was determined. Scenario 3: Target Condition Good - this scenario utilizes a target average condition of 70% of the infrastructure within each asset category. The condition value was held, and the annual investment was then determined. 13 1 of the Township's 29 bridges and culvert assets (3.4%) has a loading limit/restriction. Replacement cost weighted: 1.4% Township of Russell Asset Management Plan 2025 52 The table below outlines the results for each scenario for the Township's bridges & structural culverts. Scenarios Replacement Cost Average Condition Average Risk Rating (0- 25)14 Annual Capital Reinvestment Scenario 1 - Lifecycle (selected) $59,675,000 54% 16.99 $ 887,903 Scenario 2 - Current Capital Investment Rate 53% 16.99 $ 1,252,000 Scenario 3 - Maintain Condition 70% 72% 12.37 $1,394,000 Table 19: Bridges & Structural Culverts - Proposed Levels of Service Scenarios 5.6.3 10-Year Capital Forecast Below is the projected ten-year capital forecast (scenario 1) needed to obtain full funding, within the recommended timeframe (see 1.4). Segment 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Bridges $1.1m $737k $509k $566k $484k $468k $747k - - - Pedestrian Bridges - - - - - - - - - - Structural Culverts $1.9m $145k $1.9m $220k - $2.7m $13k $230k - - Total $3.0m $882k $2.4m $786k $484k $3.2m $760k $230k - - Table 20: Bridges & Structural Culverts - 10-Year Capital Forecast 14 See 2.3.2 Township of Russell Asset Management Plan 2025 53 6. Water Network 6.1 Inventory & Valuation Table 21 summarizes the quantity and current replacement cost of the Township's various water network assets as managed in its primary asset management register, Citywide. Segment Quantity (Components) Unit of Measure Replacement Cost Primary RC Method Booster Station 1 Facilities $2,205,620 User- Defined Hydrants 723 Assets $3,940,625 User- Defined Misc. Equipment 2 Assets $6,310 CPI Reservoirs 1 Facilities $6,262,350 User- Defined Valves 1,648 Assets $8,465,809 User- Defined Water Standpost 38,312 Assets $19,380,009 Cost per Unit Water Towers 3 Facilities $12,659,166 User- Defined Watermains 131,550 Metres $40,209,474 Cost per Unit TOTAL $93,129,364 Table 21 Detailed Asset Inventory: Water Network Township of Russell Asset Management Plan 2025 54 Figure 27 Portfolio Valuation: Water Network 6.2 Asset Condition Figure 28 summarizes the replacement cost-weighted condition of the Township's water network. Based on a combination of field inspection data and age, 87% of assets are in fair or better condition; the remaining 13% of assets are in poor to very poor condition. Condition assessments were available for 24% of assets in the category. Assets in poor or worse condition may be candidates for replacement in the short term; similarly, assets in fair condition may require rehabilitation or replacement in the medium term and should be monitored for further degradation in condition. $6k $2.2m $3.9m $6.3m $8.5m $12.7m $19.4m $40.2m $10m $20m $30m $40m $50m Misc. Equipment Booster Station Hydrants Reservoirs Valves Water Towers Water Standpost Watermains Replacement Cost by Segment Township of Russell Asset Management Plan 2025 55 Figure 28 Asset Condition: Water Network Overall Very Poor, $2,291,000 (2%) Poor, $10,186,000 (11%) Fair, $14,844,000 (16%) Good, $13,358,000 (14%) Very Good, $52,450,000 (56%) Township of Russell Asset Management Plan 2025 56 As illustrated in Figure 29, most of the Township's water network assets are in fair or better condition. Figure 29 Asset Condition: Water Network by Segment 6.2.1 Current Approach to Condition Assessment Accurate and reliable condition data allows staff to more confidently determine the remaining service life of assets and identify the most cost- effective approach to managing assets. The following describes the Township's current approach: - There is currently no program in place for the condition assessment of water main pipes and standposts - Valves, valve chambers, pumps, and air release valves are inspected annually, and fire hydrants are inspected semi-annually to ensure safety and functionality - The reservoir and booster station, along with their components, are inspected weekly through visual and audible checks $40.2m $429k $3.0m $6.1m $283k $2.3m $62k $165k $5.0m $1.7m $4.4m $1k $1.2m $946k $7.9m $3.4m $594k $1.5m $410k $972k $4.0m $6.0m $64k $90k $75k $2.0m $30k $5k $136k 0% 20% 40% 60% 80% 100% Watermains Water Towers Water Standpost Valves Reservoirs Misc. Equipment Hydrants Booster Station Value and Percentage of Asset Segments by Replacement Cost Very Good Good Fair Poor Very Poor Township of Russell Asset Management Plan 2025 57 - A standardized checklist is used for inspecting hydrants, components of the booster stations, and the reservoir - Condition assessments for supporting infrastructure are performed by internal staff 6.3 Age Profile An asset's age profile comprises two key values: estimated useful life (EUL), or design life; and the percentage of EUL consumed. The EUL is the serviceable lifespan of an asset during which it can continue to fulfil its intended purpose and provide value to users, safely and efficiently. As assets age, their performance diminishes, often more rapidly as they approach the end of their design life. In conjunction with condition data, an asset's age profile provides a more complete summary of the state of infrastructure. It can help identify assets that may be candidates for further review through condition assessment programs; inform the selection of optimal lifecycle strategies; and improve planning for potential long-term replacement spikes. Figure 30 illustrates the average current age of each asset type and its estimated useful life. Both values are weighted by the replacement cost of individual assets. Figure 30 Estimated Useful Life vs. Asset Age: Water Network 31.6 22.4 14.6 22.7 20.9 28.7 33.9 21.8 56.2 50 10 51.9 50 64.1 48 75 0 10 20 30 40 50 60 70 80 Number of Years Weighted Average Age Weighted Average EUL - - - - - - - - I I I I I I I I -5::- '!,.,"; ~ . ~"; ~"; S" ~"; ~ ~o ~ ~(l) o" .::::.~~ ~o ~(l) ~~ c,-<..,'l> '(§'l> ;$-~ ~~ -5::-'S ,<,_0 ~~ rt- '<'~ ~"' c,~'l> ~ '!,.,(l) ~ <v(S. ~ '!,.,(l) ~'l> 00 v· rt- ~'l> ~ ~"' ~~ Township of Russell Asset Management Plan 2025 58 6.4 Current Approach to Lifecycle Management The condition or performance of most assets will deteriorate over time. To ensure that municipal assets are performing as expected and meeting the needs of customers, it is important to establish a lifecycle management strategy to proactively manage asset deterioration. The following table outlines the Township's current lifecycle management strategy. Activity Type Description of Current Strategy Maintenance/R ehabilitation Routine maintenance activities include flushing, flow testing, minor repairs, and valve turning. Flushing is conducted annually, flow testing every five years, valve turning annually, and minor repairs as required. Inspections are typically performed weekly, with maintenance triggered by visual inspections Rehabilitation programs are initiated as required, often triggered by component failure or visual inspections indicating deterioration Replacement Pump components, water valve components, hydrant components, or entire hydrants, and standposts are replaced on an as-needed basis Assets nearing the end of their expected service life, or those incurring frequent and costly repairs, are prioritized for replacement. Additionally, assets with a higher risk or consequence of failure are given priority for replacement Table 22 Lifecycle Management Strategy: Water Network 6.5 Risk Analysis The risk matrix below is generated using available asset data, including condition, service life remaining, replacement costs, traffic data, and road class. The risk ratings for assets without useful attribute data were calculated using only condition, service life remaining, and their replacement costs. The matrix stratifies assets based on their individual probability and consequence of failure; each scored from 1 to 5. Their product generates a risk index ranging from 1-25. Assets with the highest criticality and likelihood of failure receive a risk rating of 25; those with lowest probability of failure and lowest criticality carry a risk rating of 1. As new data and information is gathered, the Township may consider integrating relevant Township of Russell Asset Management Plan 2025 59 information that improves confidence in the criteria used to assess asset risk and criticality. These risk models have been built into the Township's Asset Management Database (Citywide Assets). See Risk & Criticality section for further details on approach used to determine asset risk ratings and classifications. 1 - 4 5 - 7 8 - 9 10 - 14 15 - 25 Very Low Low Moderate High Very High $54,969,189 $21,516,389 $5,068,150 $8,009,435 $3,566,200 (59%) (23%) (5%) (9%) (4%) Figure 31 Risk Matrix: Water Network 6.6 Levels of Service The table that follows summarizes the Township's current and proposed levels of service with respect to prescribed KPIs under Ontario Regulation 588/17 as well as any additional performance measures that the Township has selected for this AMP. 6.6.1 Levels of Service - Current Metric Type KPI Metric Service Attribute Current LOS Community Description, which may include maps, of the user groups or areas of the Township that are connected to the municipal water system Scope Appendix B: Level of Service Maps Description, which may include maps, of the user groups or areas of the Township that have fire flow Appendix B: Level of Service Maps Community Description of boil water advisories and service interruptions Reliability The Township did not experience any service interruptions in 2024. The Township follows Ontario's Drinking Water Quality Management Standard (DWQMS). The Township delivers boil water advisories to affected households. Township of Russell Asset Management Plan 2025 60 Metric Type KPI Metric Service Attribute Current LOS Technical % of properties connected to the municipal water system Scope 65% % of properties where fire flow is available 100% # of connection-days per year where a boil water advisory notice is in place compared to the total number of properties connected to the municipal water system Reliability 0 # of connection-days per year where water is not available due to water main breaks compared to the total number of properties connected to the municipal water system <1 Table 23: Water Network - Current Levels of Service 6.6.2 Levels of Service - Proposed The scenarios that were used to analyse Russell Township's inventory were run for 100-years to ensure all the lifecycles were included at least once. They are also all based on the data available in the asset management system which outlines estimated useful life and condition as well as replacement costs which all the results are based on. Scenario 1: Current Lifecycle Activities - this scenario utilizes the current lifecycle activities outlined as current practice within each asset category. The condition and annual investment were then determined. Scenario 2: Current Capital Reinvestment Rate - this scenario utilizes the current capital reinvestment within each asset category. The current annual investment was held, and the condition was determined. Township of Russell Asset Management Plan 2025 61 Scenario 3: Target Condition Good - this scenario utilizes a target average condition of 70% of the infrastructure within each asset category. The condition value was held, and the annual investment was then determined. The table below outlines the results for each scenario for the water network. Scenarios Replacement Cost Average Condition Average Risk Rating (0-25)15 Annual Capital Reinvestment Scenario 1 - Lifecycle (selected) $93,129,000 67% 6.97 $ 1,459,000 Scenario 2 - Current Capital Investment Rate 41% 11.05 $ 690,000 Scenario 3 - Maintain Condition 70% 70% 5.87 $2,048,000 Table 24: Water Network - Proposed Levels of Service Scenarios 15 See 2.3.2 Township of Russell Asset Management Plan 2025 62 6.6.3 10-Year Capital Forecast Below is the projected ten-year capital forecast (scenario 1) needed to obtain full funding, within the recommended timeframe (see 1.4). Segment 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Booster Station $11k $2k - $40k - $13k - - $20k $16k Hydrants - - - - - - - - $5k $3k Misc. Equipment - - - - - - - $1k - - Reservoirs $42k $3k $30k $22k - $42k - - $6k - Valves - - - - - - - - - - Water Standpost - - - - - - - - - $2.0m Water Towers $48k $1k $1k $151k $30k $3k $159k - $27k $3.9m Watermains - - - - - - - - - - Total $100k $6k $31k $213k $30k $57k $159k $1k $57k $5.9m Table 25: Water Network - 10-Year Capital Forecast Township of Russell Asset Management Plan 2025 63 7. Sanitary Sewer Network 7.1 Inventory & Valuation Table 26 summarizes the quantity and current replacement cost of the Township's various sanitary sewer network assets as managed in its primary asset management register, Citywide. Segment Quantity Unit of Measure Replacement Cost Primary RC Method Force mains 20,953 Metres $7,445,477 User-Defined Lagoons 26,940 Square Feet $6,111,282 User-Defined Manholes 1,036 Assets $10,039,938 User-Defined Misc. Equipment 24 Assets $4,949,172 CPI Pumping Stations 76,470 Square Feet $9,851,164 User-Defined Sewer Mains 72,572 Metres $20,400,190 Cost per Unit TOTAL $58,797,223 Table 26 Detailed Asset Inventory: Sanitary Sewer Network Figure 32 Portfolio Valuation: Sanitary Sewer Network $4.9m $6.1m $7.4m $9.9m $10.0m $20.4m $5m $10m $15m $20m $25m Misc. Equipment Lagoons Forcemains Pumping Stations Manholes Sewer Mains Replacement Cost by Segment Township of Russell Asset Management Plan 2025 64 7.2 Asset Condition Figure 33 summarizes the replacement cost-weighted condition of the Township's sanitary sewer network. Based on a combination of field inspection data and age, 94% of assets are in fair or better condition; the remaining 6% of assets are in poor to very poor condition. Condition assessments were available for 23% of sanitary sewer network assets, based on replacement cost. Assets in poor or worse condition may be candidates for replacement in the short term; similarly, assets in fair condition may require rehabilitation or replacement in the medium term and should be monitored for further degradation in condition. As illustrated Figure 33 in most the Township's Sanitary Sewer System assets are in fair or better condition. Figure 33 Asset Condition: Sanitary Sewer Network Overall Very Poor, $161,000 (<1%) Poor, $3,132,000 (5%) Fair, $9,360,000 (16%) Good, $9,821,000 (17%) Very Good, $36,322,000 (62%) Township of Russell Asset Management Plan 2025 65 Figure 34 Asset Condition: Sanitary Sewer Network by Segment 7.2.1 Current Approach to Condition Assessment Accurate and reliable condition data allows staff to more confidently determine the remaining service life of assets and identify the most cost-effective approach to managing assets. The following describes the Township's current approach: - There is currently no dedicated program in place for the condition assessment of sanitary mains - Maintenance holes are inspected on an annual basis - Pump stations and lagoons are inspected weekly to ensure safety and functionality - A standardized checklist is used for assessments, covering factors such as structural adequacy $18.1m $3.7m $477k $6.3m $258k $7.4m $3.1m $503k $1.8m $4.5m $582k $2.4m $3.9m $1.2m $1.3m $1.7m $590k $804k $59k $87k $53k $21k 0% 20% 40% 60% 80% 100% Sewer Mains Pumping Stations Misc. Equipment Manholes Lagoons Forcemains Value and Percentage of Asset Segments by Replacement Cost Very Good Good Fair Poor Very Poor Township of Russell Asset Management Plan 2025 66 - Assessments are primarily conducted by the internal maintenance team, with external contractors engaged for specialized assessments 7.3 Age Profile An asset's age profile comprises two key values: estimated useful life (EUL), or design life; and the percentage of EUL consumed. The EUL is the serviceable lifespan of an asset during which it can continue to fulfil its intended purpose and provide value to users, safely and efficiently. As assets age, their performance diminishes, often more rapidly as they approach the end of their design life. In conjunction with condition data, an asset's age profile provides a more complete summary of the state of infrastructure. It can help identify assets that may be candidates for further review through condition assessment programs; inform the selection of optimal lifecycle strategies; and improve planning for potential long-term replacement spikes. Figure 35 illustrates the average current age of each asset type and its estimated useful life. Both values are weighted by the replacement cost of individual assets. Overall, all sanitary assets are well within their expected useful life, with sewer mains and manholes being the oldest but still far from end of life. Figure 35 Estimated Useful Life vs. Asset Age: Sanitary Sewer System 19.2 19.6 22.1 21.8 19.1 22.7 75 49 50 47.6 46.1 72 0 10 20 30 40 50 60 70 80 Forcemains Lagoons Manholes Misc. Equipment Pumping Stations Sewer Mains Number of Years Weighted Average Age Weighted Average EUL - - - - - Township of Russell Asset Management Plan 2025 67 7.4 Current Approach to Lifecycle Management The condition or performance of most assets will deteriorate over time. This process is affected by a range of factors including an asset's characteristics, location, utilization, maintenance history and environment. The following lifecycle strategy has been developed as a proactive approach to managing the lifecycle of sanitary mains. A trenchless re-lining strategy is expected to extend the service life of sanitary mains at a lower total cost of ownership. Activity Type Description of Current Strategy Maintenance Gravity mains flushed and reamed as issues are identified through CCTV inspections. Rehabilitation When applicable, rehabilitation activities include trenchless relining, structural repairs, and upgrading outdated systems Currently, there is no formal rehabilitation program, and rehabilitation is only initiated when an issue occurs Replacement Asset replacement occurs upon failure or when an asset is nearing the end of its life, and the consequence of failure is significant Trigger points for replacement are periodically reviewed to ensure they align with asset conditions and evolving best practices Table 27 Lifecycle Management Strategy: Sanitary Sewer Network 7.5 Risk Analysis The risk matrix below is generated using available asset data, including condition, service life remaining, replacement costs, traffic data, and road class. The risk ratings for assets without useful attribute data were calculated using only condition, service life remaining, and their replacement costs. The matrix stratifies assets based on their individual probability and consequence of failure; each scored from 1 to 5. Their product generates a risk index ranging from 1-25. Assets with the highest criticality and likelihood of failure receive a risk rating of 25; those with lowest probability of failure and lowest criticality carry a risk rating of 1. As new data and information is gathered, the Township may consider integrating relevant information that improves confidence in the criteria used to assess asset risk and criticality. Township of Russell Asset Management Plan 2025 68 These risk models have been built into the Township's Asset Management Database (Citywide Assets). See Risk & Criticality section for further details on approach used to determine asset risk ratings and classifications. 1 - 4 5 - 7 8 - 9 10 - 14 15 - 25 Very Low Low Moderate High Very High $33,238,150 $13,371,974 $6,718,916 $5,318,183 $150,000 (57%) (23%) (11%) (9%) (<1%) Figure 36 Risk Matrix: Sanitary Sewer System 7.6 Levels of Service The table that follows summarizes the Township's current and proposed levels of service with respect to prescribed KPIs under Ontario Regulation 588/17 as well as any additional performance measures that the Township has selected for this AMP. 7.6.1 Levels of Service - Current Metric Type KPI Metric Service Attribute Current LOS Community Description, which may include maps, of the user groups or areas of the Township that are connected to the municipal wastewater system Scope Appendix B: Level of Service Maps Description of how combined sewers in the municipal wastewater system are designed with overflow structures in place which allow overflow during storm events to prevent backups into homes Reliability The Township does not own any combined sewers Description of the frequency and volume of overflows in combined sewers in the municipal wastewater system that occur in habitable areas or beaches The Township does not own any combined sewers Township of Russell Asset Management Plan 2025 69 Metric Type KPI Metric Service Attribute Current LOS Description of how storm water can get into sanitary sewers in the municipal wastewater system, causing sewage to overflow into streets or backup into homes Reliability Grounwater can enter sanitary sewers due to cracks in sanitary mains or through indirect connections (e.g. weeping tiles). In the case of heavy rainfall events, sanitary sewers may experience a volume of water and sewage that exceeds its designed capacity. In some cases, this can cause water and/or sewage to overflow backup into homes. the disconnection of weeping tiles from sanitary mains and the use of sump pumps and pits directing storm water to the storm drain system can help to reduce the chance of this occurring. To mitigate the negative impacts of this, the Township ensures that all new homes are installed with backwater valves Community Description of how sanitary sewers in the municipal wastewater system are designed to be resilient to Storm Sewer infiltration Reliability The Township follows a series of design standards that integrate servicing requirements and land use considerations when constructing or replacing sanitary sewers. These standards have been determined with consideration of the minimization of sewage overflows and backups. Description of the effluent that is discharged from sewage treatment plants in Reliability Effluent refers to water pollution that is discharged from a wastewater treatment plant, and may Township of Russell Asset Management Plan 2025 70 Metric Type KPI Metric Service Attribute Current LOS the municipal wastewater system include suspended solids, total phosphorous and biological oxygen demand. The Environmental Compliance Approval (ECA) identifies the effluent criteria for municipal wastewater treatment plants. Technical % of properties connected to the municipal wastewater system Scope 62% Technical # of events per year where combined sewer flow in the municipal wastewater system exceeds system capacity compared to the total number of properties connected to the municipal wastewater system Reliability 0 Technical # of connection-days per year having wastewater backups compared to the total number of properties connected to the municipal wastewater system <1 # of effluent violations per year due to wastewater discharge compared to the total number of properties connected to the municipal wastewater system 3 Table 28: Sanitary Sewer Network - Current Levels of Service 7.6.2 Levels of Service - Proposed The scenarios that were used to analyse Russell Township's inventory were run for 100-years to ensure all the lifecycles were included at least once. They are also all based on the data available in the asset management system which Township of Russell Asset Management Plan 2025 71 outlines estimated useful life and condition as well as replacement costs which all the results are based on. Scenario 1: Current Lifecycle Activities - this scenario utilizes the current lifecycle activities outlined as current practice within each asset category. The condition and annual investment were then determined. Scenario 2: Current Capital Reinvestment Rate - this scenario utilizes the current capital reinvestment within each asset category. The current annual investment was held, and the condition was determined. Scenario 3: Target Condition Good - this scenario utilizes a target average condition of 70% of the infrastructure within each asset category. The condition value was held, and the annual investment was then determined. The table below outlines the results for each scenario for the sanitary sewer network. Scenarios Replacement Cost Average Condition Average Risk Rating (0-25)16 Annual Capital Reinvestment Scenario 1 - Lifecycle (selected) $58,797,000 66% 7.74 $ 922,000 Scenario 2 - Current Capital Investment Rate 40% 11.65 $ 548,000 Scenario 3 - Maintain Condition 70% 70% 7.22 $1,730,000 Table 29: Sanitary Sewer Network - Proposed Levels of Service Scenarios 16 See 2.3.2 Township of Russell Asset Management Plan 2025 72 7.6.3 10-Year Capital Forecast Below is the projected ten-year capital forecast (scenario 1) needed to obtain full funding, within the recommended timeframe (see 1.4). Table 30: Sanitary Sewer Network - 10-Year Capital Forecast Segment 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Forcemains - - - - - - - - - - Lagoons $28k $5k $6k $47k $43k $4k - $4k $547k $14k Manholes - - - - - - - - - - Misc. Equipment - $28k $5k - - $24k $46k $5k $5k - Pumping Stations $9k $49k - $28k $217k $45k $185k $2k $113k $337k Sewer Mains - - - - - - - - - - Total $36k $82k $11k $75k $261k $72k $231k $11k $665k $351k Township of Russell Asset Management Plan 2025 73 8. Storm Network 8.1 Inventory & Valuation Table 31 summarizes the quantity and current replacement cost of all storm network assets available in the Township's asset register. Segment Quantity Unit of Measure Replacement Cost Primary RC Method Catch Basins 2,901 Assets $13,982,549 User-Defined Culverts 4,219 Metres $1,518,738 User-Defined Manholes 929 Assets $12,676,086 User-Defined OGS 21 Assets $1,184,523 Cost per Unit Ponds 19 Assets $400,001 User-Defined Storm Mains 130,332 Metres $103,091,282 Cost per Unit TOTAL $132,853,179 Table 31 Detailed Asset Inventory: Storm Network Figure 37 Portfolio Valuation: Storm Network $400k $1.2m $1.5m $12.7m $14.0m $103.1m $40m $80m $120m Ponds OGS Culverts Manholes Catch Basins Storm Mains Replacement Cost by Segment Township of Russell Asset Management Plan 2025 74 8.2 Asset Condition Figure 38 summarizes the replacement cost-weighted condition of the Township's storm network assets. Based on age data, approximately 67% of assets are in fair or better condition. These assets may be candidates for replacement in the short term; similarly, assets in fair condition may require rehabilitation or replacement in the medium term and should be monitored for further degradation in condition. Figure 38 Asset Condition: Storm Network Overall Figure 39 summarizes the age-based condition of storm network assets. The analysis illustrates that most storm mains are in fair or better condition. However, 39% of mains, with a current replacement cost of about $39,794,600, are in poor or worse condition. Very Poor, $35,555,000 (27%) Poor, $8,600,000 (6%) Fair, $12,465,000 (9%) Good, $12,195,000 (9%) Very Good, $64,038,000 (48%) Township of Russell Asset Management Plan 2025 75 Figure 39 Asset Condition: Storm Network by Segment 8.2.1 Current Approach to Condition Assessment Accurate and reliable condition data allows staff to more confidently determine the remaining service life of assets and identify the most cost-effective approach to managing assets. The following describes the Township's current approach: - Storm sewer assets were partially assessed in 2012. Visual inspections have identified that sewers constructed prior to 1982 were not built using modern practices, making them difficult to maintain or inspect effectively - Coordination and management of cleaning and CCTV inspections are performed internally. CCTV inspection reports are then submitted to an external consultant for a comprehensive masterplan study, ensuring $46.5m $400k $1.2m $9.6m $6.3m $6.8m $2.0m $768k $2.6m $10.0m $711k $332k $1.4m $5.9m $280k $226k $2.2m $33.9m $78k $193k $1.4m 0% 20% 40% 60% 80% 100% Storm Mains Ponds OGS Manholes Culverts Catch Basins Value and Percentage of Asset Segments by Replacement Cost Very Good Good Fair Poor Very Poor -----~-J I Township of Russell Asset Management Plan 2025 76 thorough evaluation and planning. The last storm masterplan was conducted in 2018, with the next tentatively scheduled for 2026, in conjunction with the Township's user-fee analysis - Initial assessments of supporting infrastructure are performed internally. If concerns are identified, third-party consultants are retained for further review and to provide solutions on a reactive basis 8.3 Age Profile An asset's age profile comprises two key values: estimated useful life (EUL), or design life; and the percentage of EUL consumed. The EUL is the serviceable lifespan of an asset during which it can continue to fulfil its intended purpose and provide value to users, safely and efficiently. As assets age, their performance diminishes, often more rapidly as they approach the end of their design life. In conjunction with condition data, an asset's age profile provides a more complete summary of the state of infrastructure. It can help identify assets that may be candidates for further review through condition assessment programs; inform the selection of optimal lifecycle strategies; and improve planning for potential replacement spikes. Figure 40 illustrates the average current age of each asset type and its estimated useful life. Both values are weighted by the replacement cost of individual assets. Storm network assets generally remain well within their expected useful life. Storm mains have the highest average age but still offer significant remaining service life, while ponds and OGS units are the youngest. Township of Russell Asset Management Plan 2025 77 Figure 40 Estimated Useful Life vs. Asset Age: Storm Network 8.4 Current Approach to Lifecycle Management The condition or performance of most assets will deteriorate over time. To ensure that municipal assets are performing as expected and meeting the needs of customers, it is important to establish a lifecycle management strategy to proactively manage asset deterioration. The following table outlines the Township's current lifecycle management strategy. Activity Type Description of Current Strategy Maintenance Maintenance activities are often triggered by complaints or issues observed during routine patrols Catch basins are cleaned every two years to maintain proper drainage function Storm water management ponds undergo vegetation management twice a year to prevent overgrowth Stormwater management ponds are measured for sediment accumulation every five years, and cleanouts are scheduled based on these measurements Rehabilitation Rehabilitation needs are identified through CCTV inspections, which assess the ovality of the pipe to determine suitability for relining 20.6 22.6 17.8 10.3 2 33.9 50.7 49.2 50.1 50 75 54.7 0 10 20 30 40 50 60 70 80 Catch Basins Culverts Manholes OGS Ponds Storm Mains Number of Years Weighted Average Age Weighted Average EUL - - - - - - - - I I I I I I Township of Russell Asset Management Plan 2025 78 Activity Type Description of Current Strategy Replacement Replacement is considered when an asset's condition has significantly deteriorated, the asset has failed, or it no longer has sufficient capacity. Replacements are prioritized when rehabilitation is not cost-effective and if they can be coordinated with other linear assets, such as failing road surfaces Table 32 Lifecycle Management Strategy: Storm Network 8.5 Risk Analysis The risk matrix below is generated using available asset data, including condition, service life remaining, and replacement costs. As no attribute data was available for storm assets, the risk ratings for assets were calculated using only these required, minimum asset fields. The matrix stratifies assets based on their individual probability and consequence of failure; each scored from 1 to 5. Their product generates a risk index ranging from 1-25. Assets with the highest criticality and likelihood of failure receive a risk rating of 25; those with lowest probability of failure and lowest criticality carry a risk rating of 1. As new data and information is gathered, the Township may consider integrating relevant information that improves confidence in the criteria used to assess asset risk and criticality. These risk models have been built into the Township's Asset Management Database (Citywide Assets). See Risk & Criticality section for further details on approach used to determine asset risk ratings and classifications. 1 - 4 5 - 7 8 - 9 10 - 14 15 - 25 Very Low Low Moderate High Very High $67,121,439 $11,817,926 $6,811,752 $7,937,808 $39,164,255 (51%) (9%) (5%) (6%) (29%) Figure 41 Risk Matrix: Storm Network 8.6 Levels of Service The table that follows summarizes the Township's current and proposed levels of service with respect to prescribed KPIs under Ontario Regulation 588/17 as well as any additional performance measures that the Township has selected for this AMP. Township of Russell Asset Management Plan 2025 79 8.6.1 Levels of Service - Current Metric Type KPI Metric Service Attribute Current LOS Community Description, which may include map, of the user groups or areas of the Township that are protected from flooding, including the extent of protection provided by the municipal Storm Sewer system Scope Appendix B: Level of Service Maps Technical % of properties in Township resilient to a 100-year storm Scope Embrun: 78% Russell: 75% Marionville: 100% % of the municipal storm sewer management system resilient to a 5-year storm Embrun: 13% Russell: 59% Marionville: 100% Table 33: Storm Network - Current Levels of Service 8.6.2 Levels of Service - Proposed The scenarios that were used to analyse Russell Township's inventory were run for 100-years to ensure all the lifecycles were included at least once. They are also all based on the data available in the asset management system which outlines estimated useful life and condition as well as replacement costs which all the results are based on. Scenario 1: Current Lifecycle Activities - this scenario utilizes the current lifecycle activities outlined as current practice within each asset category. The condition and annual investment were then determined. Scenario 2: Current Capital Reinvestment Rate - this scenario utilizes the current capital reinvestment within each asset category. The current annual investment was held, and the condition was determined. Scenario 3: Target Condition Good - this scenario utilizes a target average condition of 70% of the infrastructure within each asset category. The condition value was held, and the annual investment was then determined. The table below outlines the results for each scenario for the storm network. Township of Russell Asset Management Plan 2025 80 Scenarios Replacement Cost Average Condition Average Risk Rating (0-25)17 Annual Capital Reinvestment Scenario 1 - Lifecycle (selected) $132,853,000 76% 5.17 $ 2,066,000 Scenario 2 - Current Capital Investment Rate 25% 11.71 $ 97,000 Scenario 3 - Maintain Condition 70% 70% 5.83 $1,501,000 Table 34: Storm Network - Proposed Levels of Service Scenarios 8.6.3 10-Year Capital Forecast Below is the projected ten-year capital forecast (scenario 1) needed to obtain full funding, within the recommended timeframe (see 1.4). Segment 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Catch Basins - - - - - - - - - - Culverts $69k - $126k - $100k - - - - $304k Manholes - - - - - - - - - - OGS - - - - - - - - - - Ponds - - - - - - - - - - Storm Mains $664k $4.8m - $17k $4.7m $2.5m - $86k $38k - Total $733k $4.8m $126k $17k $4.8m $2.5m - $86k $38k $304k Table 35: Storm Network - 10-Year Capital Forecast 17 See 2.3.2 Township of Russell Asset Management Plan 2025 81 Non-Core Assets Township of Russell Asset Management Plan 2025 82 9. Facilities 9.1 Inventory & Valuation Table 36 summarizes the quantity and current replacement cost of all Facilities assets available in the Township's asset register. Facilities assets are componentized. The quantity listed represents the number of asset records currently available for each department. Segment Quantity Unit of Measure Replacement Cost Primary RC Method Environmental Services 2 Facilities $3,712,530 User- Defined General Government 5 Facilities $17,453,834 User- Defined Protection Services 3 Facilities $9,755,593 User- Defined Recreational & Cultural Services 12 Facilities $60,815,800 User- Defined Transportation Services 3 Facilities $7,056,693 User- Defined TOTAL $98,794,450 Table 36 Detailed Asset Inventory: Facilities Township of Russell Asset Management Plan 2025 83 Figure 42 Portfolio Valuation: Facilities 9.2 Asset Condition Figure 43 summarizes the replacement cost-weighted condition of the Township's Facilities portfolio. Based on assessment data, 74% of Facilities assets are in fair or better condition. Aspects of some of these assets may be candidates for replacement in the short term; similarly, assets in fair condition may require rehabilitation or replacement in the medium term and should be monitored for further degradation in condition. 100% of Facilities had assessed condition ratings available. $3.7m $7.1m $9.8m $17.5m $60.8m $20m $40m $60m $80m Environmental Services Transportation Services Protection Services General Government Recreational & Cultural Services Replacement Cost by Segment Township of Russell Asset Management Plan 2025 84 Figure 43 Asset Condition: Facilities Overall Figure 44 summarizes the age-based condition of Facilities by each department. Overall, based on the information available, this asset category is in a very healthy state. Very Poor, $3,568,000 (4%) Poor, $21,832,000 (22%) Fair, $21,182,000 (21%) Good, $22,888,000 (23%) Very Good, $29,324,000 (30%) Township of Russell Asset Management Plan 2025 85 Figure 44 Asset Condition: Facilities by Segment Facilities assets are unique in that they rarely require the need for replacement based solely on condition. It is typical that, in addition to condition, other factors, such as capacity, will impact the asset's ability to serve the purpose originally intended.18 18 Refer to section 14. $1.2m $11.9m $4.2m $10.6m $1.4m $4.8m $8.6m $3.8m $4.0m $1.6m $331k $17.1m $1.4m $1.9m $482k $546k $20.3m $204k $627k $124k $217k $2.9m $111k $284k $75k 0% 20% 40% 60% 80% 100% Transportation Services Recreational & Cultural Services Protection Services General Government Environmental Services Value and Percentage of Asset Segments by Replacement Cost Very Good Good Fair Poor Very Poor --,------ -- ' ---~ ~ ' Township of Russell Asset Management Plan 2025 86 9.2.1 Current Approach to Condition Assessment Accurate and reliable condition data allows staff to more confidently determine the remaining service life of assets and identify the most cost- effective approach to managing assets. The following describes the Township's current approach: - Buildings are assessed every 5 years for structural, mechanical, and other conditions. Building Condition Assessments (BCAs) are conducted by external consultants - The last assessment was conducted in 2023 by Accent Building Sciences Inc (ABSI) 9.3 Age Profile An asset's age profile comprises two key values: estimated useful life (EUL), or design life; and the percentage of EUL consumed. The EUL is the serviceable lifespan of an asset during which it can continue to fulfil its intended purpose and provide value to users, safely and efficiently. As assets age, their performance diminishes, often more rapidly as they approach the end of their design life. In conjunction with condition data, an asset's age profile provides a more complete summary of the state of infrastructure. It can help identify assets that may be candidates for further review through condition assessment programs; inform the selection of optimal lifecycle strategies; and improve planning for potential replacement spikes. Figure 45 illustrates the average current age of each asset type and its estimated useful life. Both values are weighted by the replacement cost of individual assets. Township of Russell Asset Management Plan 2025 87 Figure 45 Estimated Useful Life vs. Asset Age: Facilities 9.4 Current Approach to Lifecycle Management The condition or performance of most assets will deteriorate over time. To ensure that municipal assets are performing as expected and meeting the needs of customers, it is important to establish a lifecycle management strategy to proactively manage asset deterioration. Table 37 outlines the Township's current lifecycle management strategy. 21.1 20 15.5 33.5 15.8 54 47.8 50.6 48.7 48.7 0 10 20 30 40 50 60 Environmental Services General Government Protection Services Recreational & Cultural Services Transportation Services Number of Years Weighted Average Age Weighted Average EUL - - - - - - I I I I I Township of Russell Asset Management Plan 2025 88 Activity Type Description of Current Strategy Maintenance / Rehabilitation Routine maintenance includes furnaces, AC units, fire protection equipment, doors, HVAC repairs, electrical systems, and general housekeeping Maintenance is triggered by manufacturer recommendations, regulatory requirements, and inspections identifying safety, accessibility, and structural issues. It is performed as recommended through staff observations and routine checks of operating systems Rehabilitation activities involve roof replacements, pump repairs, structural component repairs, and HVAC system updates Rehabilitation is based on inspections and consultant recommendations Replacement Replacement is considered when an asset's condition has significantly deteriorated, making maintenance and rehabilitation no longer cost-effective Assets nearing the end of their expected service life or those with frequent and costly repairs are prioritized for replacement Table 37 Lifecycle Management Strategy: Facilities 9.5 Risk Analysis The risk matrix below is generated using available asset data, including service life remaining, replacement costs, and building department. The risk ratings for assets without useful attribute data were calculated using only age, service life remaining, and their replacement costs. The matrix classifies assets based on their individual probability and consequence of failure; each scored from 1 to 5. Their product generates a risk index ranging from 1-25. Assets with the highest criticality and likelihood of failure receive a risk rating of 25; those with lowest probability of failure and lowest criticality carry a risk rating of 1. As new data and information is gathered, the Township may consider integrating relevant information that improves confidence in the criteria used to assess asset risk and criticality. These risk models have been built into the Township's Asset Management Database (Citywide Assets). See Risk & Criticality section for further details on approach used to determine asset risk ratings and classifications. Township of Russell Asset Management Plan 2025 89 1 - 4 5 - 7 8 - 9 10 - 14 15 - 25 Very Low Low Moderate High Very High $17,599,432 $29,572,816 $16,410,660 $16,533,662 $18,677,880 (18%) (30%) (17%) (17%) (19%) Figure 46 Risk Matrix: Facilities 9.6 Levels of Service The table that follows summarizes the Township's current levels of service with respect to prescribed KPIs under Ontario Regulation 588/17 as well as any additional performance measures that the Township has selected for this AMP. 9.6.1 Levels of Service - Current Metric Type KPI Metric Service Attribute Current LOS Community Description, which may include maps, of the types of facilities that the Township operates and maintains Scope Refer to section 9.1 Describe criteria for rehabilitation and replacement decisions and any related long­ term forecasts Quality Refer to sections 9.2 & 9.4 Technical Average condition rating Quality Good - 67 Table 38: Facilities - Current Levels of Service 9.6.2 Levels of Service - Proposed The scenarios that were used to analyse Russell Township's inventory were run for 75-years to ensure all the lifecycles were included at least once. They are also all based on the data available in the asset management system which outlines estimated useful life and condition as well as replacement costs which all the results are based on. Township of Russell Asset Management Plan 2025 90 Scenario 1: Current Lifecycle Activities - this scenario utilizes the current lifecycle activities outlined as current practice within each asset category. The condition and annual investment were then determined. Scenario 2: Current Capital Reinvestment Rate - this scenario utilizes the current capital reinvestment within each asset category. The current annual investment was held, and the condition was determined. Scenario 3: Target Condition Good - this scenario utilizes a target average condition of 70% of the infrastructure within each asset category. The condition value was held, and the annual investment was then determined. The table below outlines the results for each scenario for facilities. Scenarios Replacement Cost Average Condition Average Risk Rating (0- 25)19 Annual Capital Reinvestment Scenario 1 - Lifecycle (selected) $98,794,450 51% 12.55 $ 2,698,000 Scenario 2 - Current Capital Investment Rate 22% 17.4 $ 439,000 Scenario 3 - Maintain Condition 70% 68% 9.18 $3,973,000 Table 39: Facilities - Proposed Levels of Service Scenarios 19 See 2.3.2 Township of Russell Asset Management Plan 2025 91 9.6.3 10-Year Capital Forecast Below is the projected ten-year capital forecast (scenario 1) needed to obtain full funding, within the recommended timeframe (see 1.4). Segment 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Environmental Services $5k $2k $12k $51k $85k $27k $12k - $41k $331k General Government $37k $221k $2k $484k $116k $320k $263k $20k $393k $174k Protection Services $94k $30k $71k $21k $668k $9k $78k $2k $112k $913k Recreational & Cultural Services $1.5m $398k $329k $10.0m $567k $763k $158k $638k $2.5m $3.3m Transportation Services $55k $4k $487k $3k $2k $101k $14k $151k $80k $38k Total $1.7m $654k $900k $10.5m $1.4m $1.2m $524k $810k $3.1m $4.8m Table 40: Facilities - 10-Year Capital Forecast Township of Russell Asset Management Plan 2025 92 10. Vehicles 10.1 Inventory & Valuation Table 41 summarizes the quantity and current replacement cost of all vehicle assets available in the Township's asset register. Segment Quantity Unit of Measure Replacement Cost Primary RC Method Public Safety & Enforcement 5 Assets $267,700 CPI Environmental Services 9 Assets $491,313 CPI General Government 6 Assets $281,742 User-Defined Protection Services 12 Assets $10,935,000 User-Defined Recreational & Cultural Services 5 Assets $196,124 CPI Transportation Services 10 Assets $2,102,542 CPI TOTAL $14,274,422 Table 41 Detailed Asset Inventory: Vehicles Township of Russell Asset Management Plan 2025 93 Figure 47 Portfolio Valuation: Vehicles 10.2 Asset Condition Figure 48 summarizes the replacement cost-weighted condition of the Township's vehicles portfolio. Based primarily on assessment data, 79% of vehicles are in fair or better condition, with the remaining 21% are in poor or worse condition. These assets may be candidates for replacement in the short term; similarly, assets in fair condition may require rehabilitation or replacement in the medium term and should be monitored for further degradation in condition. Condition data was available for 100% of vehicles, based on replacement costs. $196k $268k $282k $491k $2.1m $10.9m $5m $10m $15m Recreational & Cultural Services Public Safety & Enforcement General Government Environmental Services Transportation Services Protection Services Replacement Cost by Segment Township of Russell Asset Management Plan 2025 94 Figure 48 Asset Condition: Vehicles Overall Figure 49 summarizes the condition of vehicles by use case. Except for environmental and recreational services assets, most vehicles across all other asset segments are in fair or better condition. Figure 49 Asset Condition: Vehicles by Segment Very Poor, $2,382,000 (17%) Poor, $663,000 (5%) Fair, $2,542,000 (18%) Good, $2,992,000 (21%) Very Good, $5,696,000 (40%) $839k $4.5m $200k $50k $124k $97k $51k $2.7m $152k $694k $39k $1.8m $49k $525k $82k $56k $473k $105k $1.5m $234k $95k 0% 20% 40% 60% 80% 100% Transportation Services Recreational & Cultural... Protection Services General Government Environmental Services Public Safety & Enforcement Value and Percentage of Asset Segments by Replacement Cost Very Good Good Fair Poor Very Poor Township of Russell Asset Management Plan 2025 95 10.2.1 Current Approach to Condition Assessment Accurate and reliable condition data allows staff to more confidently determine the remaining service life of assets and identify the most cost- effective approach to managing assets. The following describes the Township's current approach: - As per the Township's fleet policy, vehicles are evaluated annually for condition and suitability based on its Fleet Replacement Strategy Furthermore, the Township has developed a condition rating scale, along with a 5-year replacement and acquisition plan - Vehicles also undergo an annual safety inspection as per MTO and are performed externally - Vehicles listed under CVOR are inspected yearly - All protection vehicles with a pump are tested annually in accordance with MTO and NFPA standards - Internal staff conduct monthly cab lifts and biweekly truck checks 10.3 Age Profile An asset's age profile comprises two key values: estimated useful life (EUL), or design life; and the percentage of EUL consumed. The EUL is the serviceable lifespan of an asset during which it can continue to fulfil its intended purpose and provide value to users, safely and efficiently. As assets age, their performance diminishes, often more rapidly as they approach the end of their design life. In conjunction with condition data, an asset's age profile provides a more complete summary of the state of infrastructure. It can help identify assets that may be candidates for further review through condition assessment programs; inform the selection of optimal lifecycle strategies; and improve planning for potential replacement spikes. Figure 50 illustrates the average current age of each asset type and its estimated useful life. Both values are weighted by the replacement cost of individual assets. Township of Russell Asset Management Plan 2025 96 Figure 50 Estimated Useful Life vs. Asset Age: Vehicles 10.4 Current Approach to Lifecycle Management The condition or performance of most assets will deteriorate over time. To ensure that municipal assets are performing as expected and meeting the needs of customers, it is important to establish a lifecycle management strategy to proactively manage asset deterioration. The following table outlines the Township's current lifecycle management strategy. Activity Type Description of Current Strategy Maintenance/ Rehabilitation Daily circle checks are performed and every two weeks, all vehicles receive a maintenance check, including fluid levels, air brakes, pump checks, and functional checks of all items on the vehicles Routine maintenance includes oil changes, tire replacements, and necessary repairs Cab-over vehicles have their cabs lifted, with fluids and belts checked monthly 3.9 4.6 2.9 10.6 6.8 4.7 7.6 7.4 7.7 22.1 6.9 10.5 0 5 10 15 20 25 Number of Years Weighted Average Age Weighted Average EUL -, - - - - - r 1 I - ' _J I --, ~ (l? e; ~ Township of Russell Asset Management Plan 2025 97 Activity Type Description of Current Strategy Annually, pump tests, aerial inspections, a five-year NDT, and safety checks are performed by a licensed mechanic Maintenance is triggered by legislated requirements or if issues such as leaks or breaks occur between maintenance intervals. Replacement Pumper trucks, tankers, and aerial ladders are replaced at 20- year intervals as required by Fire Underwriters Survey requirements Although not mandated, rescue vehicles are replaced every 25- 30 years Vehicle replacement is considered based on age requirements listed in the fleet policy, significant deterioration, minimal estimated useful life, and when maintenance is no longer cost- effective Table 42 Lifecycle Management Strategy: Vehicles 10.5 Risk Analysis The risk matrix below is generated using available asset data, including condition, service life remaining, replacement costs, and department or service area. The risk ratings for assets without useful attribute data were calculated using only condition, service life remaining, and their replacement costs. The matrix stratifies assets based on their individual probability and consequence of failure; each scored from 1 to 5. Their product generates a risk index ranging from 1-25. Assets with the highest criticality and likelihood of failure receive a risk rating of 25; those with lowest probability of failure and lowest criticality carry a risk rating of 1. As new data and information is gathered, the Township may consider integrating relevant information that improves confidence in the criteria used to assess asset risk and criticality. These risk models have been built into the Township's Asset Management Database (Citywide Assets). See Risk & Criticality section for further details on approach used to determine asset risk ratings and classifications. 1 - 4 5 - 7 8 - 9 10 - 14 15 - 25 Very Low Low Moderate High Very High $722,261 $3,910,007 $2,635,441 $4,317,499 $2,689,214 (5%) (27%) (18%) (30%) (19%) Figure 51 Risk Matrix: Vehicles Township of Russell Asset Management Plan 2025 98 10.6 Levels of Service The table that follows summarizes the Township's current and proposed levels of service with respect to prescribed KPIs under Ontario Regulation 588/17 as well as any additional performance measures that the Township has selected for this AMP. 10.6.1 Levels of Service - Current Metric Type KPI Metric Service Attribute Current LOS Community Description or images of the types of vehicles (e.g. light, medium and heavy-duty) that the Township operates and the services that they help to provide to the community Scope Refer to section 10.1 Describe criteria for rehabilitation and replacement decisions and any related long-term forecasts Quality Refer to sections 10.2 & 10.4 Technical Average condition rating Quality Good - 64 Table 43: Vehicles - Current Levels of Service 10.6.2 Levels of Service - Proposed The scenarios that were used to analyse Russell Township's inventory were run for 25-years to ensure all the lifecycles were included at least once. They are also all based on the data available in the asset management system which outlines estimated useful life and condition as well as replacement costs which all the results are based on. Scenario 1: Current Lifecycle Activities - this scenario utilizes the current lifecycle activities outlined as current practice within each asset category. The condition and annual investment were then determined. Scenario 2: Current Capital Reinvestment Rate - this scenario utilizes the current capital reinvestment within each asset category. The current annual investment was held, and the condition was determined. Township of Russell Asset Management Plan 2025 99 Scenario 3: Target Condition Good - this scenario utilizes a target average condition of 70% of the infrastructure within each asset category. The condition value was held, and the annual investment was then determined. The table below outlines the results for each scenario for vehicles assets. Scenarios Replacement Cost Average Condition Average Risk Rating (0-25)20 Annual Capital Reinvestment Scenario 1 - Lifecycle (selected) $14,274,422 50% 14.29 $ 898,000 Scenario 2 - Current Capital Investment Rate 20% 20.36 $ 106,500 Scenario 3 - Maintain Condition 70% 72% 9.16 $1,641,000 Table 44: Vehicles - Proposed Levels of Service Scenarios 20 See 2.3.2 Township of Russell Asset Management Plan 2025 100 10.6.3 10-Year Capital Forecast Below is the projected ten-year capital forecast (scenario 1) needed to obtain full funding, within the recommended timeframe (see 1.4). Segment 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Public Safety & Enforcement $46k $49k $49k $68k $101k Environmental Services $56k $77k $152k $75k $132k $56k General Government $82k $123k $77k $82k Protection Services $1.2m $132k $213k Recreational & Cultural Services $39k $51k $105k Transportation Services $80k $333k $338k $356k $296k Total $126k $1.7m $126k $426k $691k $266k $924k $138k Table 45: Vehicles - 10-Year Capital Forecast Township of Russell Asset Management Plan 2025 101 11. Machinery & Equipment 11.1 Inventory & Valuation Table 46 summarizes the quantity and current replacement cost of all machinery & equipment assets available in the Township's asset register. Segment Quantity Unit of Measure Replacement Cost Primary RC Method Public Safety & Enforcement 7 Assets $225,228 CPI General Government 347 Assets $2,205,006 CPI Protection Services 521 Assets $1,623,988 CPI Recreational & Cultural Services 276 Assets $1,846,807 CPI Transportation Services 64 Assets $1,754,078 CPI TOTAL $7,655,107 Table 46 Detailed Asset Inventory: Machinery & Equipment $225k $1.6m $1.8m $1.8m $2.2m $500k $1m $2m $2m $3m Public Safety & Enforcement Protection Services Transportation Services Recreational & Cultural Services General Government Replacement Cost by Segment Township of Russell Asset Management Plan 2025 102 Figure 52 Portfolio Valuation: Machinery & Equipment 11.2 Asset Condition Figure 53 summarizes the replacement cost-weighted condition of the Township's equipment portfolio. Based on a combination of assessed conditions and age data, 72% of assets are in fair or better condition; the remaining 28% are in poor or worse condition. These assets may be candidates for replacement in the short term; similarly, assets in fair condition may require rehabilitation or replacement in the medium term and should be monitored for further degradation in condition. Figure 53 Asset Condition: Machinery & Equipment Overall Figure 54 summarizes the age-based condition of machinery and equipment by each department. Most assets in poor or worse condition are concentrated in the recreational & cultural services segment. Very Poor, $1,051,000 (14%) Poor, $1,058,000 (14%) Fair, $869,000 (11%) Good, $2,689,000 (35%) Very Good, $1,988,000 (26%) Township of Russell Asset Management Plan 2025 103 Figure 54 Asset Condition: Equipment by Segment 11.2.1 Current Approach to Condition Assessment Accurate and reliable condition data allows staff to more confidently determine the remaining service life of assets and identify the most cost- effective approach to managing assets. The following describes the Township's current approach: - Machinery and equipment are inspected before each use, though there are no formal policies or scheduled assessments - Other equipment is spot-checked and tested according to manufacturers' recommendations or regulatory requirements - Backup generators are assessed annually by an external contractor 11.3 Age Profile An asset's age profile comprises two key values: estimated useful life (EUL), or design life; and the percentage of EUL consumed. The EUL is the serviceable lifespan of an asset during which it can continue to fulfil its intended purpose and provide value to users, safely and efficiently. As assets $816k $145k $789k $188k $50k $511k $540k $274k $1.2m $120k $18k $337k $149k $324k $41k $303k $522k $70k $163k $106k $302k $341k $288k $14k 0% 20% 40% 60% 80% 100% Transportation Services Recreational & Cultural Services Protection Services General Government Public Safety & Enforcement Value and Percentage of Asset Segments by Replacement Cost Very Good Good Fair Poor Very Poor Township of Russell Asset Management Plan 2025 104 age, their performance diminishes, often more rapidly as they approach the end of their design life. In conjunction with condition data, an asset's age profile provides a more complete summary of the state of infrastructure. It can help identify assets that may be candidates for further review through condition assessment programs; inform the selection of optimal lifecycle strategies; and improve planning for potential replacement spikes. Figure 55 illustrates the average current age of each asset type and its estimated useful life. Both values are weighted by the replacement cost of individual assets. Figure 55 Estimated Useful Life vs. Asset Age: Machinery & Equipment 11.4 Current Approach to Lifecycle Management The condition or performance of most assets will deteriorate over time. To ensure that municipal assets are performing as expected and meeting the needs of customers, it is important to establish a lifecycle management strategy to proactively manage asset deterioration. The following table outlines the Township's current lifecycle management strategy. 13.8 9.1 7.2 10 5.5 12.7 9.3 10.2 15.1 14 0 2 4 6 8 10 12 14 16 Public Safety & Enforcement General Government Protection Services Recreational & Cultural Services Transportation Services Number of Years Weighted Average Age Weighted Average EUL - - - - I - - - - I I I I I Township of Russell Asset Management Plan 2025 105 Activity Type Description of Current Strategy Maintenance/ Rehabilitation Manufacturers' recommended practices and any other regulatory requirements are followed for maintenance Operational tests are conducted biweekly on small equipment and as per manufacturers' recommendations and regulatory requirements for other equipment Routine maintenance activities include inspections, minor repairs, and oil changes Inspections are conducted monthly, while minor repairs are performed as required Replacement Replacement is considered when an asset's condition has deteriorated significantly, making maintenance no longer cost- effective Assets nearing the end of their life as per regulation or manufacturers' recommendations are prioritized for replacement Table 47 Lifecycle Management Strategy: Machinery & Equipment 11.5 Risk Analysis The risk matrix below is generated using available asset data, including condition, service life remaining, and replacement costs. The risk ratings for assets without useful attribute data were calculated using only condition, service life remaining, and their replacement costs. The matrix stratifies assets based on their individual probability and consequence of failure; each scored from 1 to 5. Their product generates a risk index ranging from 1-25. Assets with the highest criticality and likelihood of failure receive a risk rating of 25; those with lowest probability of failure and lowest criticality carry a risk rating of 1. As new data and information is gathered, the Township may consider integrating relevant information that improves confidence in the criteria used to assess asset risk and criticality. These risk models have been built into the Township's Asset Management Database (Citywide Assets). See Risk & Criticality section for further details on approach used to determine asset risk ratings and classifications. 1 - 4 5 - 7 8 - 9 10 - 14 15 - 25 Very Low Low Moderate High Very High $2,274,690 $1,987,456 $1,330,266 $1,292,037 $770,658 (30%) (26%) (17%) (17%) (10%) Figure 56 Risk Matrix: Machinery & Equipment Township of Russell Asset Management Plan 2025 106 11.6 Levels of Service The table that follows summarizes the Township's current and proposed levels of service with respect to prescribed KPIs under Ontario Regulation 588/17 as well as any additional performance measures that the Township has selected for this AMP. 11.6.1 Levels of Service - Current Metric Type KPI Metric Service Attribute Current LOS Community Description or images of the types of equipment that the Township operates and the services that they help to provide to the community Scope Refer to section 11.1 Describe criteria for rehabilitation and replacement decisions and any related long-term forecasts Quality Refer to sections 11.2 & 11.4 Technical Average condition rating Quality Good - 60 Table 48: Machinery & Equipment - Current Levels of Service 11.6.2 Levels of Service - Proposed The scenarios that were used to analyse Russell Township's inventory were run for 15-years to ensure all the lifecycles were included at least once. They are also all based on the data available in the asset management system which outlines estimated useful life and condition as well as replacement costs which all the results are based on. Scenario 1: Current Lifecycle Activities - this scenario utilizes the current lifecycle activities outlined as current practice within each asset category. The condition and annual investment were then determined. Scenario 2: Current Capital Reinvestment Rate - this scenario utilizes the current capital reinvestment within each asset category. The current annual investment was held, and the condition was determined. Township of Russell Asset Management Plan 2025 107 Scenario 3: Target Condition Good - this scenario utilizes a target average condition of 70% of the infrastructure within each asset category. The condition value was held, and the annual investment was then determined. The table below outlines the results for each scenario for machinery & equipment assets. Scenarios Replacement Cost Average Condition Average Risk Rating (0-25)21 Annual Capital Reinvestment Scenario 1 - Lifecycle (selected) $7,655,107 51% 9.28 $ 715,000 Scenario 2 - Current Capital Investment Rate 51% 9.28 $ 888,000 Scenario 3 - Maintain Condition 70% 70% 6.14 $1,249,000 Table 49: Machinery & Equipment - Proposed Levels of Service Scenarios 21 See 2.3.2 Township of Russell Asset Management Plan 2025 108 11.6.3 10-Year Capital Forecast Below is the projected ten-year capital forecast (scenario 1) needed to obtain full funding, within the recommended timeframe (see 1.4). Segment 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Public Safety & Enforcement - - - - - - - $120k $15k $35k General Government $53k $145k $214k $144k $169k $116k $91k $1.2m $99k $134k Protection Services $102k $14k $70k - $95k $49k $43k $368k $574k $75k Recreational & Cultural Services $33k $30k $57k $325k $18k $22k $115k $108k $216k $8k Transportation Services - $37k $222k $20k $55k - $83k $15k $20k $46k Total $187k $226k $563k $488k $337k $187k $331k $1.8m $924k $297k Table 50: Machinery & Equipment - 10-Year Capital Forecast Township of Russell Asset Management Plan 2025 109 12. Land Improvements 12.1 Inventory & Valuation Table 51 summarizes the quantity and current replacement cost of all land improvements assets available in the Township's asset register. Segment Quantity (Components) Unit of Measure Replacement Cost Primary RC Method Boat Launch 1 (6) Assets $100,590 CPI Misc. Land Improvements 20,915 Assets $3,162,462 CPI Parklands & Trails 2,601 Square Meters $254,166 CPI Parks & Playground Equipment 28,896 Square Meters $3,318,616 User- Defined Splashpads & Pools 15 Assets $264,990 User- Defined Sport Fields & Courts 9,536 Square Meters $2,681,562 User- Defined TOTAL $9,782,386 Table 51 Detailed Asset Inventory: Land Improvements Figure 57 Portfolio Valuation: Land Improvements $101k $254k $265k $2.7m $3.2m $3.3m $1m $2m $3m Boat Launch Parklands & Trails Splashpads & Pools Sport Fields & Courts Misc. Land Improvements Parks & Playground Equipment Replacement Cost by Segment Township of Russell Asset Management Plan 2025 110 12.2 Asset Condition Figure 58 summarizes the replacement cost-weighted condition of the Township's land improvements portfolio. Based on a combination of assessed condition and age data, 88% of assets are in fair or better condition; the remaining 12% are in poor or worse condition. These assets may be candidates for replacement in the short term; similarly, assets in fair condition may require rehabilitation or replacement in the medium term and should be monitored for further degradation in condition. Figure 58 Asset Condition: Land Improvements Overall Figure 59 summarizes the age-based condition of land improvements by each department. Most assets in poor or worse condition are concentrated primarily administration and the sports fields & courts, and parks & playgrounds segments. Very Poor, $800,000 (8%) Poor, $344,000 (4%) Fair, $1,077,000 (11%) Good, $941,000 (10%) Very Good, $6,621,000 (68%) Township of Russell Asset Management Plan 2025 111 Figure 59 Asset Condition: Land Improvements by Segment 12.2.1 Current Approach to Condition Assessment Accurate and reliable condition data allows staff to more confidently determine the remaining service life of assets and identify the most cost- effective approach to managing assets. The following describes the Township's current approach: - Land improvements and park assets are assessed annually by internal staff to ensure they meet safety and maintenance standard $1.4m $265k $2.3m $2.7m $345k $149k $94k $344k $9k $508k $222k $160k $96k $91k $113k $173k $58k $310k $488k $1k 0% 20% 40% 60% 80% 100% Sport Fields & Courts Splashpads & Pools Parks & Playground Equipment Parklands & Trails Misc. Land Improvements Boat Launch Value and Percentage of Asset Segments by Replacement Cost Very Good Good Fair Poor Very Poor Township of Russell Asset Management Plan 2025 112 12.3 Age Profile An asset's age profile comprises two key values: estimated useful life (EUL), or design life; and the percentage of EUL consumed. The EUL is the serviceable lifespan of an asset during which it can continue to fulfil its intended purpose and provide value to users, safely and efficiently. As assets age, their performance diminishes, often more rapidly as they approach the end of their design life. In conjunction with condition data, an asset's age profile provides a more complete summary of the state of infrastructure. It can help identify assets that may be candidates for further review through condition assessment programs; inform the selection of optimal lifecycle strategies; and improve planning for potential replacement spikes. Figure 60 illustrates the average current age of each asset type and its estimated useful life. Both values are weighted by the replacement cost of individual assets. Figure 60 Estimated Useful Life vs. Asset Age: Land Improvements 14.1 2.8 7.1 8.9 2.7 16.7 24.5 54.8 15.9 29.1 15.2 23.8 0 10 20 30 40 50 60 Number of Years Weighted Average Age Weighted Average EUL - - - - - - Township of Russell Asset Management Plan 2025 113 12.4 Current Approach to Lifecycle Management The condition or performance of most assets will deteriorate over time. To ensure that municipal assets are performing as expected and meeting the needs of customers, it is important to establish a lifecycle management strategy to proactively manage asset deterioration. The following table outlines the Township's current lifecycle management strategy. Activity Type Description of Current Strategy Maintenance & Rehabilitation Yearly assessments and inspections are completed in the spring on all parks to ensure safety for all users Routine maintenance is conducted throughout the summer months, with weekly checks to ensure consistency Inspections are completed in early spring, with periodic inspections carried out monthly as a minimum standard Maintenance is triggered by visual inspections performed weekly Replacement Replacement is considered when an asset's condition has significantly deteriorated, making maintenance no longer cost- effective If structures are deemed aging and recommended for replacement, a capital submission is made along with the condition assessment of the structure Table 52 Lifecycle Management Strategy: Land Improvements 12.5 Risk Analysis The risk matrix below is generated using available asset data, including condition, service life remaining, and replacement costs. The risk ratings for assets without useful attribute data were calculated using only condition, service life remaining, and their replacement costs. The matrix stratifies assets based on their individual probability and consequence of failure; each scored from 1 to 5. Their product generates a risk index ranging from 1-25. Assets with the highest criticality and likelihood of failure receive a risk rating of 25; those with lowest probability of failure and lowest criticality carry a risk rating of 1. As new data and information is gathered, the Township may consider integrating relevant information that improves confidence in the criteria used to assess asset risk and criticality. Township of Russell Asset Management Plan 2025 114 These risk models have been built into the Township's Asset Management Database (Citywide Assets). See Risk & Criticality section for further details on approach used to determine asset risk ratings and classifications. 1 - 4 5 - 7 8 - 9 10 - 14 15 - 25 Very Low Low Moderate High Very High $4,907,891 $2,893,538 $178,213 $543,553 $1,259,191 (50%) (30%) (2%) (6%) (13%) Figure 61 Risk Matrix: Land Improvements 12.6 Levels of Service The table that follows summarizes the Township's current and proposed levels of service with respect to prescribed KPIs under Ontario Regulation 588/17 as well as any additional performance measures that the Township has selected for this AMP. 12.6.1 Levels of Service - Current Metric Type KPI Metric Service Attribute Current LOS Community Description, which may include maps, of the land improvements that the Township operates and maintains Scope Refer to section 12.1 Describe criteria for rehabilitation and replacement decisions and any related long-term forecasts Quality Refer to sections 12.2 & 12.4 Technical Average condition rating Quality Good -76 Table 53: Land Improvements - Current Levels of Service 12.6.2 Levels of Service - Proposed The scenarios that were used to analyse Russell Township's inventory were run for 100-years to ensure all the lifecycles were included at least once. Township of Russell Asset Management Plan 2025 115 They are also all based on the data available in the asset management system which outlines estimated useful life and condition as well as replacement costs which all the results are based on. Scenario 1: Current Lifecycle Activities - this scenario utilizes the current lifecycle activities outlined as current practice within each asset category. The condition and annual investment were then determined. Scenario 2: Current Capital Reinvestment Rate - this scenario utilizes the current capital reinvestment within each asset category. The current annual investment was held, and the condition was determined. Scenario 3: Target Condition Good - this scenario utilizes a target average condition of 70% of the infrastructure within each asset category. The condition value was held, and the annual investment was then determined. The table below outlines the results for each scenario for land improvements. Scenarios Replacement Cost Average Condition Average Risk Rating (0-25)22 Annual Capital Reinvestment Scenario 1 - Lifecycle (selected) $9,782,000 51% 10.32 $ 476,000 Scenario 2 - Current Capital Investment Rate 30% 12.8 $ 211,000 Scenario 3 - Maintain Condition 70% 70% 7.81 $792,000 Table 54: Land Improvements - Proposed Levels of Service Scenarios 22 See 2.3.2 Township of Russell Asset Management Plan 2025 116 12.6.3 10-Year Capital Forecast Below is the projected ten-year capital forecast (scenario 1) needed to obtain full funding, within the recommended timeframe (see 1.4). Segment 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Marina $1k - - - - - - - - - Misc. Land Improvements - - - $11k $20k $47k - $65k - $124k Parklands & Trails - - - - - - $6k $98k $47k - Parks & Playground Equipment $30k - $47k - $9k $333k $30k $202k $26k $408k Splashpads & Pools - - - - - - - - - - Sport Fields & Courts $13k - $44k - $61k $44k - $151k $31k $15k Total $44k - $91k $11k $90k $424k $36k $515k $104k $547k Table 55: Land Improvements - 10-Year Capital Forecast Township of Russell Asset Management Plan 2025 117 Strategies Growth Financial Strategy Township of Russell Asset Management Plan 2025 118 13. Growth The demand for infrastructure and services will change over time based on a combination of internal and external factors. Understanding the key drivers of growth and demand will allow the Township to plan for new infrastructure more effectively, and the upgrade or disposal of existing infrastructure. Increases or decreases in demand can affect what assets are needed and what level of service meets the needs of the community. 13.1 Township of Russell Draft Official Plan (2025)23 The Township of Russell's Draft Official Plan establishes a comprehensive framework to guide land use, infrastructure development, and community planning through to the year 2046. The Plan is focused on managing anticipated growth while promoting environmental sustainability, livable communities, and economic development. It applies to the Township's four villages--Embrun, Russell, Limoges, and Marionville--as well as designated employment areas including the Commercial Parks and the 417 Industrial Park. Developed in alignment with the United Counties of Prescott and Russell Official Plan and the 2024 Provincial Policy Statement, the Plan emphasizes intensification, compact development, and efficient use of infrastructure to accommodate an expected population increase from approximately 20,160 in 2021 to 30,740 by 2046. The Official Plan prioritizes the development of complete communities with a full range of housing options, employment opportunities, and accessible community services. Residential areas will support diverse housing forms, including affordable and multi-unit dwellings, while economic growth will be directed toward designated employment lands, particularly the 417 Industrial Park. Infrastructure planning supports this growth by ensuring that transportation, water, wastewater, stormwater, and energy systems are in place to service both new and existing development areas. The Plan also encourages active transportation networks, future transit readiness, and climate-resilient design. Environmental protection is a core component of the Plan, with policies aimed at conserving natural heritage features, wetlands, tree canopy coverage, and the Castor River corridor. Cultural heritage resources are similarly protected, with guidelines to ensure new development respects and integrates the Township's historical character. Community design principles are embedded 23 Note: The Official Plan is currently under review and has not yet received formal approval. Any information contained within the Official Plan is subject to change. This asset management plan has incorporated the most current available information. The Official Plan is projected to be adopted in 2025. Township of Russell Asset Management Plan 2025 119 throughout, promoting walkable, human-scale development and urban design that prioritizes safety, accessibility, and visual quality. To ensure long-term implementation, the Official Plan includes tools such as zoning by-laws, site plan control, and community planning permit systems, supported by regular public consultation. The Plan will be formally reviewed every ten years, with interim updates every five years, allowing the Township to adapt its strategies to emerging needs and opportunities while maintaining alignment with provincial and county policy directions. 13.2 United Counties of Prescott & Russell Official Plan (2022) The Approved Official Plan sets out the long-term vision for land use, growth management, and community development across the United Counties of Prescott and Russell. It is designed to guide decision-making on infrastructure, housing, economic development, transportation, and environmental protection in a way that balances growth with sustainability. The Plan is informed by the 2020 Provincial Policy Statement and supports the creation of healthy, complete communities that are compact, resilient, and efficiently serviced. It emphasizes the importance of directing development toward designated settlement areas with full municipal servicing and encourages a mix of land uses to reduce the need for car dependency and promote walkability. Anticipated growth will be accommodated primarily within urban areas to make optimal use of infrastructure and minimize sprawl. From an infrastructure perspective, the Plan outlines policies that ensure new development is supported by appropriate servicing strategies, including water, wastewater, stormwater, transportation networks, and active transportation facilities. Priority is given to maintaining existing assets and coordinating infrastructure investments with population and employment forecasts. The Plan also incorporates environmental protection measures, safeguarding natural heritage systems, water resources, and agricultural lands, while integrating climate change adaptation into land use decisions. Cultural heritage and Indigenous engagement are also addressed, ensuring that planning decisions respect the region's identity and history. Implementation tools include zoning by-laws, subdivision approvals, and monitoring mechanisms to evaluate progress and respond to emerging needs. The Official Plan provides a framework that aligns infrastructure and land use planning with long-term community goals, supporting the development of resilient and well-serviced municipalities within the United Counties. Township of Russell Asset Management Plan 2025 120 13.3 Impact of Growth on Lifecycle Activities As the municipality's population is expected to increase in the coming years, demand will evolve, and it is likely that funding will need to be reprioritized. As growth-related assets are acquired, constructed, or retired, updated records should be integrated into the Township's asset register, and consequently, its asset management plan. Additionally, the municipality should continue to review the lifecycle costs of growth-related infrastructure. These costs should be considered in long-term funding strategies that are designed to achieve the municipality's proposed levels of service. Township of Russell Asset Management Plan 2025 121 14. Financial Strategy For an asset management plan to be effective and meaningful, it must be integrated with financial planning and long-term budgeting. The development of a comprehensive financial plan will allow the Township of Russell to identify the financial resources required for sustainable asset management based on existing asset inventories, desired levels of service, and projected growth requirements. This report develops such a financial plan by presenting several scenarios for consideration and culminating with final recommendations. As outlined below, the scenarios presented model different combinations of the following components: - The financial requirements for: o Existing assets o Existing/proposed service levels o Requirements of contemplated changes in service o Requirements of anticipated growth - Use of traditional sources of municipal funds: o Tax levies o User fees o Debt o Development charges - Use of non-traditional sources of municipal funds: o Reallocated budgets o Partnerships o Procurement methods - Use of Senior Government Funds: o Canada Community-Building Fund (CCBF) o Annual grants (ex. OCIF) Note: Periodic grants are normally not included due to Provincial requirements for firm commitments. However, if moving a specific project forward is wholly dependent on receiving a one-time grant, the replacement cost included in the financial strategy is the net of such grant being received. If the financial plan component results in a funding shortfall, the province requires the inclusion of a specific plan as to how the impact of the shortfall will be managed. In determining the legitimacy of a funding shortfall, the province may evaluate a Township's approach to the following: Township of Russell Asset Management Plan 2025 122 - To reduce financial requirements, consideration has been given to revising service levels downward - All asset management and financial strategies have been considered. For example: o If a zero-debt policy is in place, is it warranted? If not the use of debt should be considered o Do user fees reflect the cost of the applicable service? If not, increased user fees should be considered 14.1 Annual Requirements & Capital Funding 14.1.1 Annual Requirements The annual requirements represent the amount the Township should allocate annually to each asset category to meet replacement needs as they arise, prevent infrastructure backlogs and achieve long-term sustainability. In total, the Township must allocate approximately $12.84 million annually to address capital requirements for the assets included in this AMP. Figure 62 Annual Capital Funding Requirements by Asset Category $476k $715k $888k $898k $922k $1.5m $2.1m $2.7m $2.7m $1m $2m $3m Land Improvements Machinery & Equipment Bridges & Culverts Vehicles Sanitary Sewer Network Water Network Storm Network Facilities Road Network Average Annual Capital Requirements by Category - I - I I I - I I j - I I - I - l - I - I - I Township of Russell Asset Management Plan 2025 123 Where applicable, lifecycle management strategies have been developed to identify capital costs that are realized through strategic rehabilitation and renewal of some of the main assets in these categories. The development of these strategies allows for a comparison of potential cost avoidance if the strategies were to be implemented. The following compares the two different strategies: - Replacement Only Scenario: based on the assumption that assets deteriorate and - without regularly scheduled maintenance and rehabilitation - are replaced at the end of their service life. - Lifecycle Strategy Scenario: based on the assumption that lifecycle activities are performed at strategic intervals to extend the service life of assets until replacement is required. The implementation of a proactive lifecycle strategy leads to potential annual cost avoidance and better overall performance. As the lifecycle strategy scenario represents the lowest cost option available to the Township, we have used these annual requirements in the development of the financial strategy. 14.1.2 Annual Funding Available Based on a historical analysis of sustainable capital funding sources, the Township is committing approximately $6.48 million towards capital projects per year. Given the annual capital requirement of $12.84 million, there is Township of Russell Asset Management Plan 2025 124 currently a funding gap of $6.36 million annually. Figure 63 Annual Requirements vs. Capital Funding Available 14.2 Funding Objective We have developed a scenario that would enable Russell Township to achieve full funding within 1 to 20 years for the following assets: - Tax Funded Assets: road network, bridges & culverts, storm network, facilities, vehicles, machinery & equipment, and land improvements - Rate-Funded Assets: water network, and sanitary sewer network $230k $874k $1.3m $112k $548k $690k $102k $461k $2.2m $476k $715k $888k $898k $922k $1.5m $2.1m $2.7m $2.7m $1m $2m $3m Land Improvements Machinery & Equipment Bridges & Culverts Vehicles Sanitary Sewer Network Water Network Storm Network Facilities Road Network Average Annual Capital Requirements vs. Actual Capital Reinvestment by Category Average Annual Requirements Actual Reinvestment Rate I I J I I I I _J I I I I I _J I I L, ___r I I I Township of Russell Asset Management Plan 2025 125 14.3 Financial Profile: Tax Funded Assets 14.3.1 Current Funding Position The following tables show, by asset category, Russell Township's average annual asset investment requirements, current funding positions, and funding increases required to achieve full funding on assets funded by taxes. Asset Category Avg. Annual Require­ ment Annual Funding Available Annual Deficit Property Taxation & Reserves CCBF OCIF Total Available Bridges & Culverts 888,000 487,000 312,000 476,000 1,275,000 -387,000 Facilities 2,699,000 461,000 461,000 2,238,000 Land Improvements 476,000 230,000 230,000 246,000 Machinery & Equipment 715,000 874,000 874,000 -159,000 Road Network 2,718,000 1,398,000 312,000 476,000 2,186,000 532,000 Storm Network 2,066,000 102,000 102,000 1,964,000 Vehicles 898,000 112,000 112,000 786,000 Total 10,460,000 3,664,000 624,000 952,000 5,240,00024 5,220,000 Table 56 Annual Available Funding for Tax Funded Assets The average annual investment requirement for the above categories is approximately $10.46 million. Annual revenue currently allocated to these assets for capital purposes is approximately $5.24 million leaving an annual deficit of about $5.22 million. Put differently, these infrastructure categories are currently funded at 50.1% of their long-term requirements. 14.3.2 Full Funding Requirements In 2024, Russell Township had annual tax revenues of $17.8 million. As illustrated in the following table, without consideration of any other sources of revenue or cost containment strategies, full funding would require the following tax change over time: 24 In 2024, the Township had $5.2 million in funding from sustainable sources. To further address the infrastructure deficit, the Township implemented an additional 1% increase in 2025. On November 10, 2025, Council approved a further 2.3% increase for the 2026 budget. These commitments demonstrate the Township's proactive approach to asset management, its dedication to reducing the infrastructure deficit, and its ongoing effort to ensure that desired levels of service are maintained for the community. Township of Russell Asset Management Plan 2025 126 Asset Category Tax Change Required for Full Funding Bridges & Culverts -2.2% Facilities 12.5% Land Improvements 1.4% Machinery & Equipment -0.9% Road Network 3.0% Storm Network 11.0% Vehicles 4.4% Total 29.2%25 Table 57 Tax Increase Requirements for Full Funding Our recommendations include capturing the above changes and allocating them to the infrastructure deficit outlined above. The table below outlines this concept and presents several options26: 5 Years 10 Years 12 Years 15 Years 20 Years Infrastructure Deficit 5,220,000 5,220,000 5,220,000 5,220,000 5,220,000 Change in Debt Costs -161,000 -161,000 -161,000 -219,000 -219,000 Resulting Infrastructure Deficit: 5,059,000 5,059,000 5,059,000 5,001,000 5,001,000 Tax Increase Required 28.4% 28.4% 28.4% 28.0% 28.0% Annually: 5.7% 2.8% 2.4% 1.9% 1.4% Table 58 Tax Increase Options 5-20 Years 25 A negative funding figure for an asset category does not inherently mean it is overfunded; rather, it reflects a reallocation of resources within a shared property tax pool to better align with overall asset management priorities in any given year. 26 While this AMP recommends the 10-year option, with an annual increase of 2.8%, it is highly likely that this figure will need to be reviewed each year. The Township is currently considering the retirement and decommissioning of several facility assets, including the Camille Piché Community Centre, the Embrun Arena, the Russell Arena, and the Russell Centennial Pool. If all mentioned facilities were to be decommissioned, the Township's recommended annual tax increase would be reduced to 2.2%. The Township has committed to a 2.3% increase for 2026, reflecting its commitment to addressing the evolving nature of infrastructure requirements and community needs. Additional information: 14.3.3 Township of Russell Asset Management Plan 2025 127 14.3.3 Other Considerations The Township of Russell is projected to grow for the foreseeable future, as indicated within both the Township's Official Plan (2025) and the United Counties of Prescott & Russell Official Plan (2022). Consequently, numerous large-scale projects are either in progress or are on the horizon for the Township - most notably, the new, $104 million recreation complex, which is scheduled to open in the Fall of 2026. With the new recreation complex, the Township has begun the process of evaluating the community's needs for its older facilities. This includes: the Camille Piché community centre, Embrun arena, Russell arena, and the Russell Centennial pool. The table below compares various scenarios by summarizing replacement costs and average annual requirements. Scenarios Replacement Cost Average Annual Requirement Scenario 1 - Current Facilities $98.8 million $2.7 million Scenario 2 - Excluding Facilities27 $55.1 million $1.5 million Scenario 3 - Integration of New Facility28 $159.3 million $3.6 million The table below provides additional information pertaining to the four facilities: Facility Replacement Cost Average Annual Requirement Camille Piché Community Centre $9.5 million $314,000 Embrun Arena $17.4 million $478,000 Russell Arena $15.6 million $394,000 Russell Centennial Pool $1.5 million $45,000 Total $43.7 million $1.2 million 27 This scenario excludes Camille Piché community centre, Embrun arena, Russell arena, and the Russell Centennial Pool. The assumption(s) is that these facilities would be sold, decommissioned, retired, etc., and would no longer be owned and managed by the Township. 28 This scenario excludes the aforementioned facilities, while integrating the new recreation complex. Assumptions: replacement cost ($104 million) and estimated useful life (50 years). Township of Russell Asset Management Plan 2025 128 In addition to the new recreation complex, there are numerous proposed capital projects which the Township is evaluating for the next 10 years. These include: Project Details Scheduled Year Cost Land purchase for Fire Station 11 (Embrun) 2026 $3.0 million Intersection Improvements (roads) 2026-2027 & 2035 $8.25 million Addition to Fire Station 11 2029 $4.0 million Administrative Office 2037 $3.6 million Dog Parks 2029 & 2031 $300 thousand Addition to Fire Station 12 (Russell) 2031 $1.1 million These proposed projects have not been integrated into the Township's asset register. It is prudent that if/when these projects are completed, that the Township's asset register is updated to reflect new assets, replacement costs, average annual requirements, and adjust its proposed levels of service accordingly. Furthermore, as legislatively required by O.Reg. 588/17, the Township will update its asset management plan, in 2030. 14.3.4 Financial Strategy Recommendations Considering all the above information, we recommend the 10-year option. This involves full funding being achieved over 10 years by: - when realized, reallocating the debt cost reductions of $161,000 to the infrastructure deficit as outlined above - increasing tax revenues by 2.8% each year for the next 10 years solely for the purpose of phasing in the proposed levels of service for asset categories covered in this section of the AMP - adjusting tax revenue increases in future year(s) when allocations to capital expenditure exceed or fail to meet budgeted amounts - allocating the current CCBF and OCIF revenue as outlined previously - reallocating appropriate revenue from categories in a surplus position to those in a deficit position, when applicable - increasing existing and future infrastructure budgets by the applicable inflation index on an annual basis in addition to the deficit phase-in Township of Russell Asset Management Plan 2025 129 Notes: - As in the past, periodic senior government infrastructure funding will most likely be available during the phase-in period. By Provincial AMP rules, this periodic funding cannot be incorporated into an AMP unless there are firm commitments in place. We have included OCIF formula- based funding, if applicable, since this funding is a multi-year commitment. 29 - We realize that raising tax revenues by the amounts recommended above for infrastructure purposes will be very difficult to do. However, considering a longer phase-in window may have even greater consequences in terms of infrastructure failure. Alternatively, Municipality's should consider a downward revision of certain service levels. Although this option achieves full funding within 10 years and provides financial sustainability over the period modeled, the recommendations do require prioritizing capital projects to fit the resulting annual funding available. Current data shows a pent-up investment demand of $35 million, for tax funded assets.30 Prioritizing future projects will require the current data to be replaced by condition-based data. Although our recommendations include no further use of debt, the results of the condition-based analysis may require otherwise. 14.4 Financial Profile: Rate Funded Assets 14.4.1 Current Funding Position The following tables show, by asset category, Russell Township's average annual asset investment requirements, current funding positions, and funding increases required to achieve full funding on assets funded by rates. 29 The Township should take advantage of all available grant funding programs and transfers from other levels of government. While OCIF has historically been considered a sustainable source of funding, the program is currently undergoing review by the provincial government. Depending on the outcome of this review, there may be changes that impact its availability. 30 While there is $35 million in assets identified as backlog, with $33 million pertaining to the storm network, it is recommended that the Township allocate resources to further refine its asset register (Citywide) in the coming years. Township of Russell Asset Management Plan 2025 130 Asset Category Avg. Annual Requirement Annual Funding Available Annual Deficit Rates Grants To Operations Total Available Water Network 1,459,000 2,133,000 0 -1,443,000 690,00031 769,000 Sanitary Sewer Network 922,000 2,031,000 0 -1,483,000 548,00032 374,000 Total 2,381,000 4,164,000 0 -2,926,000 1,238,000 1,143,000 Table 59 Annual Available Funding for Rate Funded Assets The average annual investment requirement for the above categories is $2.4 million. Annual revenue currently allocated to these assets for capital purposes is $1.2 million leaving an annual deficit of $1.2 million. Put differently, these infrastructure categories are currently funded at 52% of their long-term requirements. 14.4.2 Full Funding Requirements In 2024, the Russell Township had annual water and sanitary revenues of $2,133,000 and $2,031,000 respectively. As illustrated in the table below, without consideration of any other sources of revenue, full funding would require the following changes over time: Asset Category Rate Change Required for Full Funding Water Network 36.1% Sanitary Sewer Network 18.4% Table 60 Rate Increase Requirements for Full Funding Our recommendations include capturing the above changes and allocating them to the infrastructure deficit outlined above. The table below outlines this concept and presents several options: 31 In 2024, the Township allocated $690,000 from sustainable funding sources. To address ongoing infrastructure challenges, this amount was increased to $942,000 for 2025, supporting improved long-term asset planning and financial resilience. 32 In 2024, the Township allocated $548,000 from sustainable funding sources. To address ongoing infrastructure challenges, this amount was increased to $640,000 for 2025. Township of Russell Asset Management Plan 2025 131 Water Network 5 Years 10 Years 12 Years 15 Years 20 Years Infrastructure Deficit 769,000 769,000 769,000 769,000 769,000 Rate Increase Required 36.1% 36.1% 36.1% 36.1% 28.1% Annually: 7.2% 3.6% 3.0% 2.4% 1.4% Table 61 Water Rate Increase Options 5-20 Years Sanitary Sewer Network 5 Years 10 Years 12 Years 15 Years 20 Years Infrastructure Deficit 374,000 374,000 374,000 374,000 374,000 Rate Increase Required 18.4% 18.4% 18.4% 18.4% 18.4% Annually: 3.7% 1.8% 1.5% 1.2% 0.9% Table 62 Sanitary Rate Increase Options 5-20 Years 14.4.3 Other Considerations The Township of Russell is projected to grow for the foreseeable future, as indicated within both the Township's Official Plan (2025) and the United Counties of Prescott & Russell Official Plan (2022). There are numerous large- scale projects for both the water and sanitary sewer network, which the Township is currently evaluating. These include: Project Details Scheduled Year Cost Water Reservoir Expansion 2026 $5.0 million Watermain Upgrades (Valoris) 2027, 2033 $13.7 million Pumping Station Upgrades 2029-2030, 2032- 2033 $14.3 million Water Supply (Ottawa) 2030 $20.0 million Wastewater Treatment Plant 2031 $95 million Watermain Upgrade (Route 300) 2031-2035 $10 million Township of Russell Asset Management Plan 2025 132 Project Details Scheduled Year Cost Watermain Upgrades (Craig St.) 2032 $2.0 million These proposed projects have not been integrated into the Township's asset register. It is prudent that if/when these projects are completed, that the Township's asset register is updated to reflect new assets, replacement costs, average annual requirements, and adjust its proposed levels of service accordingly. Furthermore, as legislatively required by O.Reg. 588/17, the Township will update its asset management plan, in 2030. 14.4.4 Financial Strategy Recommendations Considering all the above information, we recommend the 10-year option for both the water network and sanitary sewer network. This involves full funding being achieved over 10 years by: - increasing rate revenues by 1.8% for sanitary services and 3.6% for water services each year for the next 10 years solely for the purpose of phasing in full funding to the asset categories covered in this section of the AMP. - increasing existing and future infrastructure budgets by the applicable inflation index on an annual basis in addition to the deficit phase-in. Notes: - As in the past, periodic senior government infrastructure funding will most likely be available during the phase-in period. This periodic funding should not be incorporated into an AMP unless there are firm commitments in place. - We realize that raising rate revenues for infrastructure purposes will be very difficult to do. However, considering a longer phase-in window may have even greater consequences in terms of infrastructure failure. Alternatively, Municipality's should consider a downward revision of certain service levels. - Any increase in rates required for operations would be in addition to the above recommendations. Although this option achieves full funding on an annual basis of 10 years and provides financial sustainability over the period modeled, the recommendations do require prioritizing capital projects to fit the resulting annual funding available. Current data shows the pent-up investment demand of $100 thousand in backlog, for rate-funded assets. Township of Russell Asset Management Plan 2025 133 14.5 Use of Debt The following tables outline how Russell Township has historically used debt for investing in the asset categories as listed. There is currently $3.4 million of debt outstanding for the assets covered by this AMP with corresponding principal and interest payments of $423,000 (2024), well within its provincially prescribed maximum of $7,416,368.33 Asset Category Current Debt Outstanding (2024) Use of Debt in the Last Five Years 2019 2020 2021 2022 2023 Bridges & Culverts 1,128,000 0 900,000 0 0 0 Facilities 35,000 0 0 0 0 0 Land Improvements 0 0 0 0 0 0 Machinery & Equipment 0 0 0 0 0 0 Road Network 0 0 0 0 0 0 Storm Network 0 0 0 0 0 0 Vehicles 263,000 0 0 0 0 0 Total Tax Funded 1,426,000 0 900,000 0 0 0 Water Network 1,982,000 0 0 0 0 0 Sanitary Sewer Network 0 0 0 0 0 0 Total Rate Funded 1,982,000 0 900,000 0 0 0 Table 63: Use of Debt 2019-2023 33 Schedule 81, as per 2024 FIR Township of Russell Asset Management Plan 2025 134 Asset Category Principal & Interest Payments in the Next Ten Years 2025 2026 2027 2028 2029 2030 2035 Bridges & Culverts 140,000 140,000 140,000 140,000 58,000 58,000 58,000 Facilities - - - - - - - Land Improvements - - - - - - - Machinery & Equipment - - - - - - - Road Network - - - - - - - Storm Network - - - - - - - Vehicles 79,000 79,000 39,000 - - - - Total Tax Funded 219,000 219,000 179,000 140,000 58,000 58,000 58,000 Water Network34 169,000 169,000 169,000 169,000 169,000 169,000 169,000 Sanitary Sewer Network - - - - - - - Total Rate Funded 169,000 169,000 169,000 169,000 169,000 169,000 169,000 Table 64: Principal and Interest Payments The revenue options outlined in this plan allow Russell Township to fully fund its long-term infrastructure requirements without further use of debt. 14.6 Use of Reserves Available Reserves Reserves play a critical role in long-term financial planning. The benefits of having reserves available for infrastructure planning include: - the ability to stabilize tax rates when dealing with variable and sometimes uncontrollable factors - financing one-time or short-term investments 34 $169,000 represents 19% of the Township's total water-related debt. The remaining 81%--amounting to $722,000--is funded through development charges. Township of Russell Asset Management Plan 2025 135 - accumulating the funding for significant future infrastructure investments - managing the use of debt - normalizing infrastructure funding requirement By asset category, the table below outlines the details of the reserves currently available to Russell Township Asset Category Reserve Balances Bridges & Culverts -37,000 Facilities 750,000 Land Improvements 357,000 Machinery & Equipment 670,000 Road Network 1,864,000 Storm Network -1,626,000 Vehicles 628,000 Total Tax Funded: 2,606,000 Water Network 6,605,000 Sanitary Sewer Network 484,000 Total Rate Funded: 7,089,000 Table 65: Reserve Balances There is considerable debate in the municipal sector as to the appropriate level of reserves that a Township should have on hand. There is no clear guideline that has gained wide acceptance. Factors that municipalities should consider when determining their capital reserve requirements include: - breadth of services provided - age and condition of infrastructure - use and level of debt - economic conditions and outlook - internal reserve and debt policies These reserves are available for use by applicable asset categories during the phase-in period to full funding. This coupled with Russell Township's judicious use of debt in the past, allows the scenarios to assume that, if required, available reserves and debt capacity can be used for high priority and emergency infrastructure investments in the short- to medium-term. Township of Russell Asset Management Plan 2025 136 Appendices Appendix A - Infrastructure Report Card Appendix B - Level of Service Maps Township of Russell Asset Management Plan 2025 137 Appendix A - Infrastructure Report Card Asset Category Replacement Cost Average Condition Current Financial Capacity Road Network $ 78.1m Good Annual Requirement: $2,718,000 Funding Available: $2,186,000 Annual Deficit: $532,000 Bridges & Culverts $ 59.6m Good Annual Requirement: $888,000 Funding Available: $1,275,000 Annual Surplus: $387,000 Water Network $ 93.1m Good Annual Requirement: $1,459,000 Funding Available: $690,000 Annual Deficit: $769,000 Sanitary Sewer Network $ 58.8m Very Good Annual Requirement: $922,000 Funding Available: $548,000 Annual Deficit: $374,000 Storm Network $ 132.8m Fair Annual Requirement: $2,066,000 Funding Available: $102,000 Annual Deficit: $1,964,000 Facilities $ 98.7m Good Annual Requirement: $2,699,00035 Funding Available: $461,000 Annual Deficit: $2,238,000 Vehicles $ 14.2m Good Annual Requirement: $898,000 Funding Available: $112,000 Annual Deficit: $786,000 Machinery & Equipment $ 7.6m Good Annual Requirement: $715,000 Funding Available: $874,000 Annual Surplus: $159,000 Land Improvements $ 9.7m Good Annual Requirement: $476,000 Funding Available: $230,000 Annual Deficit: $246,000 Total $ 553m Good Annual Requirement: $12,840,000 Funding Available: $6,478,000 35 See 14.3.3 I I I I I I I I I I I I I I I I I I I I I I I I I I Township of Russell Asset Management Plan 2025 138 Asset Category Replacement Cost Average Condition Current Financial Capacity Annual Deficit: $6,362,000 Township of Russell Asset Management Plan 2025 139 Appendix B - Level of Service Maps & Photos Road Network Map Cityof 0ttawA, PrOWK- al 0manQ. bn ~ Elf\, Tom Tom. GMmr!, 5.ifite.raph. GeoT«hrdog-. Inc. METI/NASA, USGS, EPA, NPS, USDA NRun.. PMU ~n.d;a Legend OWNER - Developper - Township of Russell - UCPR PROKT Road Network l.OCATI<»l(S) Township of Russell DRAWN BY P.A om May 21, 2024 "'~~~~~ f-The_li_own_sh-ip_o_f Ru-ssel-1 d-isd-ai-ms--1-1 respon __ si_b<_lity-for_e_rr_oo;-, o_m_iss_io_ns_or_i_naccu--raa-.-.. - in-th-is_pu_b_lica_lion __ Do-no-, ,-ely-on_lt_a_s_bei __ ng_a_p_rec_ise_ind_ica_tor_o_f_rou_tes_or_loca_ti __ on_of_f----tu-,es-.---------l.,1 6 10-~s' 1'.s 1 1 3 Kilometers Township of Russell Asset Management Plan 2025 140 East Elevation Street Looking North East Elevation Street Looking South North Expansion Joint Concrete End Post Southwest SBGR Interior Soffit - Medium Delamination West Exterior Girder and Soffit Interior Span Wide Vertical Crack on South Abutment Footing Bracing - Severe Section Loss Images of a Bridge in Good Condition St-Jacques Road Inspected: May 22, 2023 Images of a Bridge in Good Condition St-Jacques Road Inspected: May 22, 2023 Images of a Bridge in Fair Condition Bridge - R-14 on St-Pierre Road Inspected: May 22, 2023 Images of a Bridge in Fair Condition Bridge - R-14 on St-Pierre Road Inspected: May 22, 2023 Township of Russell Asset Management Plan 2025 141 East Elevation Outlet Street Looking South Southeast Elevation (Inlet) Street Looking North SBGR Steel Post Condition Northwest Embankment Southwest SBGR - Collision Damage SBGR Wood Post Condition - Medium Rot South Cell Looking East (Downstream) Energy Attenuator North Embankment Outlet Component Images of a Culvert in Very Good Condition Culvert - RC-006 on Route 300 Inspected: May 22, 2023 Images of a Culvert in Fair Condition Culvert - RC-001 on Route 200 at St. Thomas Road Inspected: May 22, 2023 Township of Russell Asset Management Plan 2025 142 Storm Network Map C")'ol~ ... Pn,,.,no:io o/Ont¥io,E.snc.n..i.,tsn.bnTom,C......,s..Gr.opl\Geole<molog...,lnc.ME1\'NASA.USGS,EPA. NPS, USO,,,,NRC..,_Parnc....S.. Legen d Storm Manhole - Confirmed - Unconfirmed Storm Catchbasin - Confirmed Unconfirmed A Storm Outfall SWM Facilrty 9 Developper 9 Township Storm Sewers -+- Confirmed -- Unconfirmed Stormwater Network l.OCATION(S) Township of Russell ""' May 2 1, 2024 MunicipalitC de RUSSELL Township f-The-S-own-sh-;p_o_ f ----,-d;_sda_;_ms_a_ll ____ _ "- l;ty_f_o,_em,s--, o,o-;ss,oos-.-o-,-;naccu--,aa-·es-;o_th_o_pu_S_;cat1oo-. - .-Do-oo-t,e!y_oo_-_a_s bei-.,,.-,-.,-ease- ·-;oa-,-,-,0<-ol_rout_es_o,_loca_oo_ · ,-ol-fea_tu_n,s _ _ ------; ~ 6 ~-~ 51 1 ~5 1 1 1 j Kiomelefs Township of Russell Asset Management Plan 2025 143 Sanitary Sewer Network Map Co.yolen-.._Pn>w,c-olOntano. E.,,~EnT<>n'ITom.Garmon.s..toG.,op'I.GooT~lnc.MCTIIN"SA.USG'i.EPA.NP'i. !JSOA.NRC.,,,~C"""'1o legend 0 Sanitary Manhole ® Lagoons lil Pumping Stations ♦ Sanitary Sewer Waste Water Network L«Anott(S) Township of Russell """""' P.A '"' May 21, 2021 "'·~~~~ >-The-,----,.-.,-.-usse-ll_d_iSd_a_ims_a_ll_respons,--.~-,11y-fo<-emn--, _oml_ssoos_·_o,_ina_ccu_raoes_·_;n_u;_·s-pu-~-iea-tiOo-. -.-Do-oot-,-ely-on_it_as--,-.-,ease-.-,nd-leat_o,_o_r ,ou-tes_o,_loca_tion_o_rr_ea_tu_res_. ____ _, A/~ 1 0.~s- /s 1 1 1 ; Kilometers Township of Russell Asset Management Plan 2025 144 Water Network Map Legend Feedermain_ Valve (LOCAL) Feedermain_Manhol (LOCAL) - Watermain t><l vatveMain l><l Valve Hydrant ... Standpost Fire Hydrant Potable Water Network LOCATION(S) Township of Russell '"' May 21, 2021 "'~~-~~ f-The - li_own,;h __ ;p_of_ R_,_sse_ll_d_od_a_;ms - ,11-"""°"" --.~-.lity- fo,- em,e; --, -om-;sslons --o, - m_a;u _ rac_;e,; _ ;n_u;_·,- po- bl_<a_ ooo _· - .-Oo_ no_t ,-ely- oo-;,-,-, t,e;-.ng- ,- p-,edse --lod_ k;at _o,_o_f_,oo_t_es_o,_kxa _ OOO _ o_r,_ea_tu_,es _ _ --------j~ O 1·5 3 6 Kilometers Township of Russell Asset Management Plan 2025 145 Appendix C - Public Engagement Questionnaire Q1 Are you a full-time resident of Russell! Townshiip or do you own property and reside elsewhere? Resident I Property Owner I (Reside Elsewhere) , 0% 10% 20% 30% 40% 50% 60% 7(1Jf, 80% 90% 100% ANSWER CHOICES Resident Property Owner (Reside Elsev1here) TOTAL RESPOINSES 97.75% 225% Q2 Please select the area you live: Embrun Marionville Ruis.sell Limoges Other (please specify) 0% 10% 20% 30% 40% 50% 60% 7m, 80% 90% 100% 652 15 667 Township of Russell Asset Management Plan 2025 146 Q3 Please select your age range: Under 18 18·24 25·34 35.44 45.54 55·64 65- 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Q4 Which of the following statements best describes your daily experiences with different infrastructure services such as roads, sidewalks, parts, recreational centres, water services, etc.? I l ·T- gener-a!.lJ »U:.fi:"J with b'r-c, .. ;:ility ... I :l<T- e;cocral.ly U 'lUtlSl'l:<:I Ylilll he ... ANS\\lt.WL'.HUU.:t.S Nn'l'e1ed: 607 Skipp~d: EO I am geocrdlf ntis.fied with the qu.ality oi s:rtice~ provid:cl. I a.1 1,1em:1ci{bt -J11:,c,ti::sicd wiU1 lhc vualily ur~c1viccs i,iuvU:1.1. TOTAi Rt. Sl-l'UNSt. 'S '"" M7 Township of Russell Asset Management Plan 2025 147 Q5 How would you describe your experience with different infrastructure and their service provided:(From highly satisfied to highly dissatisfied with quality) 'V - - N/A TOTAL WEIGKTEO AVERAGE Roads 6 75% 3377% 34.43% 1466% 10.38% 0.00% 41 205 209 89 63 0 607 3.12 Sidewalk 10.54% 3624% 27.68% 1367% 8.07% 3.79% 64 220 168 83 49 23 607 3.29 Bridges 20.43% 53.87% 16.80% 1.81% 0.66% 6.43% 124 327 102 11 4 39 607 3.98 Park-sfTrails/Oog Patk 32.13% 42.34% 12.36% 4.45% 2.97% 5.77% 195 257 75 27 18 35 607 4.02 Community C-entres 11.86% 40.69% 25.70% 6.75% 3.13% 11.86% 72 247 156 41 19 72 607 3.58 Fire Emergency Services 48.93% 31.63% 4.28% 0.66% 0.33% 14.17% 297 192 26 4 2 86 607 4.49 Winter Control {snow 23.72% 42.34% 18.78% 8.90% 3.62% 2.64% pJowong) 144 257 114 54 22 16 607 3.76 Water & Sewer Services 29.00% 39.87% 13.51% 3.29% 2.80% 11.53% 176 242 82 20 17 70 607 4.01 Public Safety & 23.23% 40.20% 19.11% 7.25% 5.44% 4.78% Enforcement 141 244 116 44 33 29 607 3.72 Q6 In my opinion, Russell Township is making the right investments in infrastructure for its current residents: Strongly agree ~ee Unsure Strongly disagree Answered. 607 Skipped. 60 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Township of Russell Asset Management Plan 2025 148 Q7 Which infrastructure services do you value the most? Please move each line in order of importance. Answered: 607 Skipped: 60 Roads Sidewalks Bridges Parks/Trails/Do gPark Community Centre Fire Emergency Services Winter Control (snow plowing) Water a Sewer Services Public Safety a Enforcement 0 2 3 4 5 6 7 8 9 10 Township of Russell Asset Management Plan 2025 149 Q8 Since funds are limited, it is often necessary to make trade-offs between different infrastructure services and programs. This could mean reducing spending on some services while increasing expenditure on others. For example, more sidewalks but fewer bike trails. Which of the following statements best represents your opinion on changing services: I am willing to make trade-offs ... lam willing to pay more for additional o ... I am not willing to pay more for .. , .--- If it meant lower taxes or fees, lamo ... Answered: 565 Skipped: 102 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% ANSWER CHOICES I am willing to make trade-offs between different infrastructure services (spending more on some. and less on others) if it means keeping costs at similar levels. I am willing to pay more for additional or better infrastructure services if it means improvement in my quality of life. I am not willing to pay more for additional or better infrastructure services. If it meant lower taxes or fees, II am open to a reduction in the qualrty and quantity of infrastructure services. TOTAL RESPONSES 55.58% 314 26.37% 149 12.57% 71 5.49% 31 565 Township of Russell Asset Management Plan 2025 150 Q9 Russell Township is growing and evolving. This means spending on infrastructure services may need to change over time to meet the needs of the community. Which factors are most important to you in deciding if Russell Township's spending on infrastructure is best for the community? Please rank the following in order of importance. Answered: 565 Skipped: 102 Preserving the TO\mship's current. .. Attracting and acoommodating new residents Attracting and acoommodating new businesses Impact on cost to residents Supporting local economic activity environment Supporting and acoommodating older ... Supporting and aooommodating yoongtMu!i--- Suµµurl i1tt vulnerable population,,. Maintaining public safety, security and ... Maintain emergency management ... 0 2 3 4 5 6 7 8 9 10 Township of Russell Asset Management Plan 2025 151 2 3 4 5 6 7 8 9 10 11 Preserving the 37.70% 13.10% 5.84% 9.38% 8.14% 5.31% 4.60% 3.54% 2.48% 3.19% 6.73% Township's 213 74 33 53 46 30 26 20 14 18 38 current character and charm Attracting and 1.95% 7.96% 7.61% 5.49% 6.90% 6.90% 7.61% 6.19% 8.67% 13.63% 27.08% accommodating 11 45 43 31 39 39 43 35 49 77 153 new residents Attracting and 11.50% 13.27% 15.75% 11.86% 7.96% 7.26% 7.43% 5.49% 6.37% 6.90% 6.19% accommodating 65 75 89 67 45 41 42 31 36 39 35 new businesses Impact on cost 16.46% 22.48% 18.41% 14.34% 10.80% 6.37% 3.01% 2.48% 1.42% 2.12% 2.12% to residents 93 127 104 81 61 36 17 14 8 12 12 Supporting 1.95% 7.96% 17.88% 15.75% 20.88% 12.74% 9.20% 6.90% 4.07% 2.12% 0.53% local economic 11 45 101 89 118 72 52 39 23 12 3 activity Protecting the 5.31% 6.73% 9.38% 11.33% 9.56% 16.64% 11.15% 10.80% 6.37% 6.37% 6.37% environment 30 38 53 64 54 94 63 61 36 36 36 Supporting and 1.77% 3.01% 3.89% 8.14% 10.97% 12.21% 21.42% 13.98% 15.22% 6.02% 3.36% accommodating 10 17 22 46 62 69 121 79 86 34 19 older population groups Supporting and 2.48% 3.01% 3.89% 6.02% 5.66% 9.56% 10.80% 19.65% 16.99% 15.93% 6.02% accommodating 14 17 22 34 32 54 61 111 96 90 34 young families and singles Supporting 0.35% 1.42% 2.30% 3.01% 4.78% 5.31% 5.84% 12.04% 21.59% 21.24% 22.12% vulnerable 2 8 13 17 27 30 33 68 122 120 125 population groups M.:1int.:1inin9 14 fi;Q0/4 10 44% ~?0% R 14°J. R'.l?'¼ 9 O'.l0J. R 67°J. liiSS'¼ ~?0% 1? 74% 301'¼ public safety, 83 59 52 46 47 51 49 37 52 72 17 security and well-being of residents Maintain 5.84% 10.62% 5.84% 6.55% 6.02% 8.67% 10.27% 12.39% 7.61% 9.73% 16.46% emergency 33 60 33 37 34 49 58 70 43 55 93 management program - Prepare for emergencies Township of Russell Asset Management Plan 2025 152 Q10 In my opinion, Russell Township is making the right investments in infrastructure for its future: Strongly agree Agree Neutral Disagree Strongly disagree Answered: 565 Skipped: 102 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Q11 In your opinion, is the service level provided by each of the following assets exceeding expectations, meeting expectations, or below expectations: EXCEED MEET BELOW NIA TOTAL WEIGHTED EXPECTATIONS EXPECTATIONS EXPECTATIONS AVERAGE Road-> :;.89% 51.86% 43.89¾ 0.35% 22 293 248 2 565 1.60 Sidev,al<s 5.31% 56.64% S1.50% 6.55% 30 3?0 HR ~7 56S 17? Rri1g~~ ~ 5?1¾ 7ft ?9~ 4fi3% 1 1 !i7% 31 4,0 26 65 562 2.01 Parh/Trail/Oog Park 18.94% 61.S9¼ 1138¾ 7.79% 107 3<8 66 -- 565 2.08 Communify Centr&e -1.97% 51.33¼ 30.37% 13.32% 2S 2$0 171 75 563 1."71 fire emergency 25.04% GJ.72~<(, 3.01% 7. ◄3'}6 Servt;e$ 14(; 3GO 17 42 565 2.2:5 W i111t1 Cu11ll-JI l::SIIOvt 1 1.50% 63. l9% 23.54% 1.77% pli.1Wi11y ;, 65 357 133 10 565 1.&a vvater & sewer n:1io/o 63.30% ·13_;5¼, "1 1.88% s.erw:es 6J 357 r7 67 ,04 Uf/ PUOIIC Salef! & 10.0!fo/o ~-4~':lb W .J!>% t.U/~ Enfon:emenl 57 3i0 115 23 565 1.89