Fee By-law 2026

St. Marys, Ontario

This is the exact embedded text of the captured official document. Snapshot 471ee68de8c5 · verified 2026-06-09 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

Type of Fee 2025 2026 Multi-Discount Insurance Subtotal HST Total $$ Increase from 2025 % Increase from 2025 SCHEDULE "A" 2026 RECREATION & LEISURE Single Admission Child/Youth (3-18) $3.70 $3.89 $3.89 $0.51 $4.40 $0.19 5% Adult (19-64) $5.19 $5.44 $5.44 $0.71 $6.15 $0.25 5% Older Adult (65+) $5.01 $5.22 $5.22 $0.68 $5.90 $0.21 4% Family Admission (Up to: 2 adults and 3 children) $15.62 $16.41 $16.41 $2.13 $18.54 $0.79 5% 15 Admissions (10% discount) Child/Youth (3-18) $55.54 $58.35 $5.84 $52.51 $6.83 $59.34 $2.81 5% Adult (19-64) $77.88 $81.60 $8.16 $73.44 $9.55 $82.99 $3.72 5% Older Adult (65+) $75.12 $78.30 $7.83 $70.47 $9.16 $79.63 $3.18 4% 30 Admissions (12% discount) Child/Youth (3-18) $111.08 $116.70 $14.00 $102.70 $13.35 $116.05 $5.62 5% Adult (19-64) $155.75 $163.20 $19.58 $143.62 $18.67 $162.29 $7.45 5% Older Adult (65+) $150.25 $156.60 $18.79 $137.81 $17.92 $155.73 $6.35 4% 60 Admissions (14% discount) Child/Youth (3-18) $222.16 $233.40 $32.68 $200.72 $26.09 $226.81 $11.24 5% Adult (19-64) $311.51 $326.40 $45.70 $280.70 $36.49 $317.19 $14.89 5% Older Adult (65+) $300.49 $313.20 $43.85 $269.35 $35.02 $304.37 $12.71 4% Swimming Lessons Swim lessons 1/2 hour- 10 lessons $86.28 $90.54 $90.54 n/a $90.54 $4.26 5% Swim lessons 3/4 hour- 10 lessons $97.41 $102.28 $102.28 n/a $102.28 $4.87 5% Swim lessons drop in - 30 mins $8.63 $9.05 $9.05 n/a $9.05 $0.42 5% Swim lessons drop in - 45 mins $9.74 $10.23 $10.23 n/a $10.23 $0.49 5% Private lessons - 30 min $20.66 $22.00 $22.00 n/a $22.00 $1.35 7% Semi-private lessons (per child) $31.01 $17.00 $17.00 n/a $17.00 -$14.01 -45% Recreational Swim Team per lesson $8.64 $9.05 $9.05 n/a $9.05 $0.41 5% Junior Lifeguard Club per lesson $8.64 $9.05 $9.05 n/a $9.05 $0.41 5% Advanced Aquatics Bronze Star $86.28 $114.60 $114.60 n/a $114.60 $28.32 33% Bronze Medallion $150.86 $153.87 $153.87 n/a $153.87 $3.01 2% Bronze Cross $150.86 $153.87 $153.87 $20.00 $173.87 $3.01 2% Lifesaving Manual $48.96 $50.00 $50.00 $6.50 $56.50 $1.04 2% LSS Swim Instructor $150.86 $153.87 $153.87 $20.00 $173.87 $3.01 2% Waterfront NL (was LSS recert) - NEW n/a $200.00 $200.00 $26.00 $226.00 n/a n/a NL Recert $67.63 $70.00 $70.00 $9.10 $79.10 $2.37 4% Standard First Aid CPR C n/a $123.00 $123.00 $15.99 $138.99 n/a n/a Bronze Cross & LSS Swim Instructor-LIT discount - 40% with volunteer hours $90.51 $92.32 $92.32 $12.00 $104.32 $1.81 2% LSS Swim Instructor - LIT discount - 40% with volunteer hours $90.51 $92.32 $92.32 $12.00 $104.32 $1.81 2% Group Facility Rentals - Aquatic Centre 0-60 Swimmers $109.64 $115.10 $115.10 $14.96 $130.06 $5.46 5% 61-100 Swimmers $135.14 $141.88 $141.88 $18.44 $160.32 $6.74 5% Middlesex Swim Club - Hourly Rate $66.43 $69.75 $69.75 $9.07 $78.82 $3.32 5% School Agreement 0-60 swimmers $68.57 $68.57 $68.57 $8.91 $77.48 $0.00 0% 61-100 swimmers $93.51 $93.51 $93.51 $12.16 $105.67 $0.00 0% Single Admission Child/Youth (3-18) $4.43 Removed Removed #VALUE! #VALUE! 0% Adult (19-64) $6.63 Removed Removed #VALUE! #VALUE! 0% Season Pass - Youth (Resident, Mon-Fri ONLY) $66.20 Removed Removed #VALUE! #VALUE! 0% Season Pass - Adult (Resident, Mon-Fri ONLY) $101.05 Removed Removed #VALUE! #VALUE! 0% General Admission (align with Super Splash structure) - NEW n/a $6.64 $6.64 $0.86 $7.50 n/a n/a Quarry per person summer season pass for residents only - NEW n/a $101.05 $101.05 $13.14 $114.19 n/a n/a Pyramid Recreation Centre - Aquatics St. Marys Quarry Type of Fee Base Rate HST TOTAL Base Rate HST TOTAL $$ Increase from 2025 % Increase from 2025 Prime Time - Adult $200.12 $26.02 $226.13 $204.12 $26.54 $230.66 $4.00 2% Non Prime Time - Adult $133.32 $17.33 $150.66 $135.99 $17.68 $153.67 $2.67 2% Prime Time - Minor $165.72 $21.54 $187.26 $169.03 $21.97 $191.00 $3.31 2% Non Prime Time - Minor $104.24 $13.55 $117.79 $106.32 $13.82 $120.14 $2.08 2% Shoulder Ice Rate - reduced rate to sell unused times $101.35 $13.18 $114.53 $103.38 $13.44 $116.82 $2.03 2% New - Summer Ice Rate in effect May 1-Aug 30; one rate for all users. $205.49 $26.71 $232.20 $209.59 $27.25 $236.84 $4.10 2% Dry Pad Hourly Rate $52.50 $6.83 $59.33 $53.55 $6.96 $60.51 $1.05 2% Max Rate $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0% Single Ice Admissions Youth $1.77 $0.23 $2.00 $1.77 $0.23 $2.00 $0.00 0% Adult $1.77 $0.23 $2.00 $1.77 $0.23 $2.00 $0.00 0% Older Adult $1.77 $0.23 $2.00 $1.77 $0.23 $2.00 $0.00 0% Family $12.39 $1.61 $14.00 $12.39 $1.61 $14.00 $0.00 0% Shinny $4.42 $0.57 $4.99 $4.42 $0.57 $4.99 $0.00 0% SCHEDULE "A" RECREATION & LEISURE 2026 EFFECTIVE SEPTEMBER 1, 2025 EFFECTIVE SEPTEMBER 1, 2026 Pyramid Recreation Centre Ice Fees Ice Rentals 2025 Fee 2026 Fee HST TOTAL $$ Increase from 2025 % Increase from 2025 $154.87 Removed #VALUE! #VALUE! #VALUE! #VALUE! $146.02 Removed #VALUE! #VALUE! #VALUE! #VALUE! Add youth $10.50 Removed - $ #VALUE! -100.00% Add Adult $7.30 Removed #VALUE! #VALUE! #VALUE! #VALUE! $199.12 see PRC - Ice #VALUE! #VALUE! #VALUE! #VALUE! $199.12 see PRC - Aquatics #VALUE! #VALUE! #VALUE! #VALUE! Additional 1.5 hour for movie $39.82 Removed #VALUE! #VALUE! #VALUE! #VALUE! Add pizza option $22.12 Removed #VALUE! #VALUE! #VALUE! #VALUE! $22.12 $22.12 $2.88 $25.00 $0.00 0% $38.00 $40.00 n/a $40.00 $2.00 5% TBD $45.00 n/a $45.00 $0.00 n/a St. John's Babysitting $75.00 $80.00 - $ $80.00 $5.00 7% $70.00 $75.00 - $ $75.00 $5.00 7% Youth Centre- School Year Membership $55.00 $60.00 - $ $60.00 $5.00 9% $5.00 $5.00 - $ $5.00 $0.00 0% Adult Soccer Fields (per hour) $21.00 $22.12 $2.88 $25.00 $1.12 5% Minor Soccer Fields (per hour) $20.40 $21.24 $2.76 $24.00 $0.84 4% Adult Baseball (per diamond per game) $42.65 $44.25 $5.75 $50.00 $1.60 4% Adult Slo-Pitch (per diamond per game) $42.65 $44.25 $5.75 $50.00 $1.60 4% Minor Baseball (per diamond per game) $27.60 $29.20 $3.80 $33.00 $1.60 6% Minor Baseball (per diamond per practice) $13.80 $14.60 $1.90 $16.50 $0.80 6% Baseball Tournaments (per day per field) $175.00 $199.11 $25.88 $224.99 $24.11 14% Adult Badminton (per person) $17.70 $30.97 $4.03 $35.00 $13.27 75% Adult Pickleball (per person) $35.40 $35.40 $4.60 $40.00 $0.00 0% Racket Courts (Tournaments only, cost per court) $23.23 $24.78 $3.22 $28.00 $1.55 7% Court - Club Hourly Rate $4.65 $5.31 $0.69 $6.00 $0.66 14% Specialty Camps Programs SCHEDULE "A" 2026 Full Day Full Day St. John's Home Alone Course Youth Centre - Trial RECREATION & LEISURE Type of Fee Birthday Party - PRC Public Skate or Swim Party Fun Zone Party Private Skate (pending space availability) Private Swim (pending space availability) Movie, Food and Swim Parents Night Out Camp PRC Type of Fee 2025 Member Rate 2026 Member Rate HST TOTAL $$ Increase from 2025 % Increase from 2025 2025 Non-Member Rate 2026 Non-Member Rate HST TOTAL $$ Increase from 2025 % Increase from 2025 HST Applicable Membership $48.67 $48.67 $6.33 $55.00 $0.00 0.00% n/a n/a Y Music Jamboree $3.54 $3.54 $0.46 $4.00 $0.00 0.00% $5.31 $5.31 $0.69 $6.00 $0.00 0% Y Quilting Flat Rate Member $66.37 $66.37 $8.63 $75.00 $0.00 0.00% $0.00 $5.31 Y Pickle ball - Drop In $1.77 $1.77 $0.23 $2.00 $0.00 0.00% $3.54 $3.54 $0.46 $4.00 $0.00 0% Y Drop In Shuffleboard Rate $0.00 $0.00 $0.00 $0.00 $1.77 $1.77 $0.23 $2.00 $0.00 0% Y Drop In Carpet Bowling $0.00 $0.00 $0.00 $0.00 $1.77 $1.77 $0.23 $2.00 $0.00 0% Y Contract Bridge $0.89 $0.89 $0.12 $1.01 $0.00 0.00% $2.66 $2.66 $0.35 $3.01 $0.00 0% Y Creative Minds Open Crafting $0.00 $0.00 $0.00 $0.00 $1.77 $1.77 $0.23 $2.00 $0.00 0% Y Scrapbooking $4.43 $4.43 $0.58 $5.01 $0.00 0.00% $6.20 $6.20 $0.81 $7.01 $0.00 0% Y Open Crop Scrapbooking $4.43 $4.43 $0.58 $5.01 $0.00 0.00% $6.20 $6.20 $0.81 $7.01 $0.00 0% Y Choir $58.00 $58.00 $7.54 $65.54 $0.00 0.00% $84.00 $84.00 $10.92 $94.92 $0.00 0% Y Card Making $10.62 $10.62 $1.38 $12.00 $0.00 0.00% $15.04 $15.04 $1.96 $17.00 $0.00 0% Y Meditation $4.43 $4.43 $0.58 $5.01 $0.00 0.00% $6.20 $6.20 $0.81 $7.01 $0.00 0% Y Zumba $11.00 $11.00 $1.43 $12.43 $0.00 0.00% $12.50 $12.50 $1.63 $14.13 $0.00 0% Y Pepperama $5.31 $5.31 $0.69 $6.00 $0.00 0.00% $7.08 $7.08 $0.92 $8.00 $0.00 0% Y Scrap-a-ton $0.00 $0.00 $70.80 $70.80 $9.20 $80.00 $0.00 0% Y Evening Dinner Event Y Themed Lunch Y Scrapbooking Garage Sale per table $0.00 $0.00 $35.39 $35.39 $4.60 $39.99 $0.00 0% Y Craft Show per table $0.00 $0.00 $39.82 $39.82 $5.18 $45.00 $0.00 0% Y Coffee/Tea $1.11 $1.11 $0.14 $1.25 $0.00 0.00% $1.54 $1.54 $0.20 $1.70 $0.00 0% Y Line Dancing $10.00 $10.00 $1.30 $11.30 $0.00 0.00% $12.39 $12.39 $1.61 $14.00 $0.00 0% Y Ballroom Dancing $5.00 $5.00 $0.65 $5.65 $0.00 0.00% $7.97 $7.97 $1.04 $9.01 $0.00 0% Y Community Garden $0.00 $26.55 $26.55 $3.45 $30.00 $0.00 0% Y Pepper $0.89 $0.89 $0.12 $1.01 $0.00 0.00% $1.77 $1.77 $0.23 $2.00 $0.00 0% Y Fine Dining $2.65 $2.65 $0.34 $2.99 $0.00 0.00% $4.43 $4.43 $0.58 $5.01 $0.00 0% Y Travel Club $8.85 $8.85 $1.15 $10.00 $0.00 0.00% $13.27 $13.27 $1.73 $15.00 $0.00 0% Y Friendship Centre Yearly Fee $53.09 $55.00 $7.15 $62.15 $1.91 3.60% $75.22 $78.00 $10.14 $88.14 $2.78 4% Y Schedule "A" 2026 Recreation & Leisure Friendship Centre Member Non - Member based on actual cost based on actual cost based on actual cost based on actual cost Programs Type of Fee 2025 Base Rate 2026 Base Rate HST Total $$ Increase from 2025 % Increase from 2025 Meals on Wheels - hot meal $10.75 $11.00 N $11.00 $0.25 2% Meals on wheels - frozen entrees $7.25 $7.50 N $7.50 $0.25 3% Meals on wheels - frozen soups and desserts $2.75 $3.00 N $3.00 $0.25 9% Frozen entrée package deal (7 meals) $48.00 $50.00 N $50.00 $2.00 4% Dining meals - supper $17.00 $18.00 N $18.00 $1.00 6% Dining meals - breakfasts based on actual cost + $1.00 N $0.00 $0.00 0% Special event meals based on actual cost + $5.00 N $0.00 $0.00 0% Shopping Service - Personal $10.00 $12.00 N $12.00 $2.00 20% Food Hamper Delivery $0.00 $0.00 N $0.00 $0.00 0% Shopping Services - Delivery $3.00 $3.00 N $3.00 $0.00 0% Foot Care Clinic $35.00 $40.00 N $40.00 $5.00 14% Chair Yoga $10.00 $10.00 N $10.00 $0.00 0% Drop In Chair Yoga - NEW n/a $15.00 N $15.00 n/a n/a Step Fitness - NEW n/a $10.00 N $10.00 n/a n/a Fitness Workshop $10.00 $10.00 N $10.00 $0.00 0% Healthy Living Workshops $25.00 $25.00 N $25.00 $0.00 0% More Services Home Support SCHEDULE "A" 2026 RECREATION & LEISURE HST TOTAL $$ Increase from 2025 % Increase from 2025 Non-Profit Rate HST TOTAL $$ Increase from 2025 % Increase from 2025 per hour Removed #VALUE! #VALUE! #VALUE! Removed #VALUE! #VALUE! #VALUE! per hour $55.00 $7.15 $62.15 $0.92 2% $49.64 $6.45 $56.09 $0.97 2% per hour Removed #VALUE! #VALUE! #VALUE! Removed #VALUE! #VALUE! #VALUE! per hour $83.00 $10.79 $93.79 $1.89 2% $77.22 $10.04 $87.26 $1.52 2% per hour Removed #VALUE! #VALUE! #VALUE! Removed #VALUE! #VALUE! #VALUE! per hour $100.00 $13.00 $113.00 $2.66 3% $93.77 $12.19 $105.96 $1.84 2% (Non-Prime) per hour Removed #VALUE! #VALUE! #VALUE! Removed #VALUE! #VALUE! #VALUE! (Prime) per hour $22.00 $2.86 $24.86 $0.37 2% $22.06 $2.87 $24.93 $0.43 2% Set Up Fees (based on availability - 30% of hourly fee) Prime per hour $17.00 $2.21 $19.21 $0.78 5% n/a Non-Prime per hour Removed #VALUE! #VALUE! #VALUE! n/a Prime per hour $22.00 $2.86 $24.86 $0.91 4% n/a Non-Prime per hour Removed #VALUE! #VALUE! #VALUE! n/a Prime per hour $30.00 $3.90 $33.90 $0.80 3% n/a Non-Prime per hour Removed #VALUE! #VALUE! #VALUE! n/a Prime per hour $12.00 $1.56 $13.56 $0.64 6% n/a Non-Prime per hour Removed #VALUE! #VALUE! #VALUE! n/a Prime per hour $7.00 $0.91 $7.91 $0.51 8% n/a Non-Prime per hour Removed #VALUE! #VALUE! #VALUE! n/a per hour $42.00 $5.46 $47.46 $0.59 1% n/a Town Hall Town Hall: Auditorium (Base rate) per hour $52.53 $6.83 $59.36 $1.03 2% n/a Town Hall: Auditorium (Staffing Price/Hr) per hour This is included in the above rate n/a Lind Sportsplex Lind Sportsplex: Dry Surface (Base rate Sun-Sat) per hour $57.78 $7.51 $65.29 $1.13 2% n/a Lind Sportsplex: Lounge (Base Rate Sun-Sat) per hour $57.78 $7.51 $65.29 $1.13 2% n/a Lind Sportsplex: Summer Rate per hour 28.68 $3.73 $32.41 $0.56 2% n/a Municipal Building not open to the public per hour $52.53 $6.83 $59.36 $1.03 2% n/a Events with entertainment that plays non-original music Re-Sound and SOCAN tariffs may apply if music is played. These rates are not set by the Municipality. Alcohol for Facility Managed Bar 12 oz beer $5.75 $0.75 $6.50 $0.00 0% Tall Can 473 ml $5.75 $0.75 $6.50 $0.00 0% 12 oz cooler $5.75 $0.75 $6.50 $0.00 0% 1oz liquor $5.75 $0.75 $6.50 $0.00 0% 5oz house wine $5.75 $0.75 $6.50 $0.00 0% 26 oz house wine Profit Share for Bars $50 Admin Fee for the bar, in addition to rental fee for bar services Not-for-Profit renters receive 50% of profit after expenses - proof is required All other groups - profit remains with the PRC - no profit share A La Carte Pricing Stage cost per section (4 feet by 8 feet is one section) $21.00 $2.73 $23.73 $0.40 2% n/a Portable Projector/Screen $15.00 $1.95 $16.95 $15.00 100% N/C Podium $0.00 $0.00 $0.00 $0.00 0% N/C Portable Sound System $0.00 $0.00 $0.00 $0.00 0% N/C Hourly rate after 1 a.m. (per staff) per hour $63.00 $8.19 $71.19 $1.20 2% n/a Power drops from height per drop plus the cost of lift access $10.50 $1.37 $11.87 $0.20 2% n/a Lift access with staff (per hour) per hour $63.00 $8.19 $71.19 $1.20 2% n/a FC Industrial Kitchen Determined by customer wine selection For private functions, the minimum bar requirement is $250 in sales - if this cannot be met the difference is added to the room rental 1/3 hall & Multi purpose room Main Hall & End Zone: Fri -Sat (Prime) 2/3 hall: Sunday-Thursday (Non-Prime) 2/3 hall: Friday - Saturday (Prime) Whole hall: Sunday - Thursday (Non-Prime) Whole hall: Friday - Saturday (Prime) 1/3 Hall, Multi-Purpose Room & End Zone 2/3 Hall Whole Hall Main Hall Meeting Room A,B,C,D Meeting Room A,B,C,D SCHEDULE "B" 2026 FACILITY RENTALS Type of Fee Base Rate PRC Halls and Rooms 1/3 hall, MP Room Main Hall & End Zone: Sun-Thurs (Non-Prime) Profit Non-Profit Facility Rentals Type of Fee 2026 Fee HST Total $$ Increase from 2025 % Increase from 2025 Official Plan Amendment $4,303.00 n/a $4,303.00 $125.00 3% Zoning Amendment $4,303.00 round $4,303.00 $125.00 3% Zoning By-law Amendment - Minor (i.e. addition of single use) $3,288.00 n/a $3,288.00 $96.00 3% Concurrent Official Plan and Zoning By-law Amendments $6,799.00 n/a $6,799.00 $198.00 3% Consent to Sever $1,885.00 n/a $1,885.00 $55.00 3% Minor Variance $1,738.00 n/a $1,738.00 $51.00 3% Site Plan Approval Exemption $229.00 n/a $229.00 $7.00 3% Site Plan Agreement $2,498.00 n/a $2,498.00 $73.00 3% + $56 per lot/unit over 5 lots/units $56.00 per lot/unit n/a $56.00 per lot/unit $1.50 3% + $1.32/sq. meter of non-residential floor area after the first 1,000 square meters $1.32/sq meter n/a $1.32/sq meter $0.04 3% Amending Site Plan Agreement $1,093.00 n/a $1,093.00 $32.00 3% Remove Holding Symbol $1,060.00 n/a $1,060.00 $31.00 3% Part Lot Control - up to one lot $1,187.00 n/a $1,187.00 $35.00 3% Deeming By-law $1,026.00 n/a $1,026.00 $30.00 3% Registration on Title $613.00 n/a $613.00 $18.00 3% Up to 20 lots/units $6,556.00 n/a $6,556.00 $191.00 3% Over 20 lots/units add $222 per lot/unit n/a add $222 per lot/unit $6.00 3% Over 30 lots/units add $111 per lot/unit n/a add $111 per lot/unit $3.00 3% Over 40 lots/units add $56.00 per lot/unit n/a add $56.00 per lot/unit $1.50 3% Applications for fill and/or topsoil less than 500 cubic meters $279.00 n/a $279.00 $8.00 3% Applications for fill and/or topsoil more than 500 cubic meters $557.00 n/a $557.00 $16.00 3% Applications for additional inspection $168.00 n/a $168.00 $5.00 3% Re-issue of expired permit $168.00 n/a $168.00 $5.00 3% By-Law Variance $279.00 n/a $279.00 $8.00 3% Portable sign (per occasion) $111.00 n/a $111.00 $3.00 3% Temporary sign (per occasion) $44.00 n/a $44.00 $1.00 2% Sidewalk sign (no charge) $0.00 n/a $0.00 $0.00 0% Sign installed prior to issuance of permit $168.00 n/a $168.00 $5.00 3% Encroachment Agreement $274.00 n/a $274.00 $8.00 3% Single and Semi-detached dwelling TBD TBD TBD TBD Apartment - Two or More Bedrooms TBD TBD TBD TBD Apartment - Bachelor and One-bedroom TBD TBD TBD TBD Townhouse and Other Multiple Dwelling TBD TBD TBD TBD Special Care - Special Dwelling Units TBD TBD TBD TBD Non-Residential (per square foot) TBD TBD TBD TBD Site Alteration Additional Applications Sign Applications Development Charges SCHEDULE "C" 2026 BUILDING & PLANNING Development & Planning Site Plan Approval Plan of Subdivision *Refer to By-Law 106-2022 for applicable exemptions and reductions Type of Fee 2026 Per sq. ft. fee $$ Increase from 2025 % Increase from 2025 2026 Minimum fee $$ Increase from 2025 % Increase from 2025 Group A - New Construction $1.84 $0.06 3% $4,590.00 $134.00 3% Group A - Major Additions or Alterations (≥$75,000 construction value) $1.09 $0.03 3% $2,885.00 $84.00 3% Group A - alterations, retrofit, interior finishes, mechanical stand alone ($50,000 - $75,000) $1.09 $0.03 3% $2,885.00 $84.00 3% Group A - minor interior renovations, alterations, minor mechanical (up to $50,000) $0.76 $0.02 3% $218.00 $6.00 3% Group B - New Construction $1.84 $0.06 3% $4,590.00 $134.00 3% Group B - Major Additions or Alterations (≥$75,000 construction value) $1.09 $0.03 3% $2,885.00 $84.00 3% Group B - alterations, retrofit, interior finishes, mechanical stand alone ($50,000 - $75,000) $1.09 $0.03 3% $2,885.00 $84.00 3% Group B - minor interior renovations, alterations, minor mechanical (up to $50,000) $0.76 $0.02 3% $218.00 $6.00 3% Group C - Low Density Residential $1.38 $0.04 3% $2,752.00 $80.00 3% Group C - Low Density Residential CSA approved $1.38 $0.04 3% $2,063.00 $60.00 3% Group C - Multiple Residential $1.38 $0.04 3% $2,063.00 $60.00 3% Group C - Major Additions or Alterations (≥$75,000 construction value) $1.38 $0.04 3% $218.00 $6.00 3% Group C - Alterations, Interior Finishes, Minor Mechanical (up to $75,000) $1.09 $0.03 3% $218.00 $6.00 3% Group D - New Construction $1.84 $0.06 3% $4,590.00 $134.00 3% Group D - Major Additions or Alterations (≥$75,000 construction value) $1.09 $0.03 3% $2,885.00 $84.00 3% Group D - alterations, retrofit, interior finishes, mechanical stand alone ($50,000 - $75,000) $1.09 $0.03 3% $2,885.00 $84.00 3% Group D - minor interior renovations, alterations, minor mechanical (up to $50,000) $0.76 $0.02 3% $218.00 $6.00 3% Group E - New Construction $1.84 $0.06 3% $4,590.00 $134.00 3% Group E - Major Additions or Alterations (≥$75,000 construction value) $1.09 $0.03 3% $2,885.00 $84.00 3% Group E - alterations, retrofit, interior finishes, mechanical stand alone ($50,000 - $75,000) $1.09 $0.03 3% $2,885.00 $84.00 3% Group E - minor interior renovations, alterations, minor mechanical (up to $50,000) $0.76 $0.02 3% $218.00 $6.00 3% Group F - New Construction $1.34 $0.04 3% $3,327.00 $97.00 3% Group F - Major Additions or Alterations (≥$75,000 construction value) $1.09 $0.03 3% $2,885.00 $84.00 3% Group F - alterations, retrofit, interior finishes, mechanical stand alone ($50,000 - $75,000) $1.09 $0.03 3% $2,885.00 $84.00 3% Group F - minor interior renovations, alterations, minor mechanical (up to $50,000) $0.76 $0.02 3% $218.00 $6.00 3% Change of Use $218.00 $6.00 3% Conditional (Partial Permit) Permit $218.00 $6.00 3% Minor residential (i.e. decks, sheds, etc.) $0.76 $0.02 3% $218.00 $6.00 3% Demolitions - Residential $218.00 $6.00 3% Demolitions - Non-Residential $1,202.00 $35.00 3% Communication Tower or facility, silo, wind turbine $874.00 $25.00 3% Revocation Fee $71.00 $2.00 3% Additional Inspections $71.00 $2.00 3% Transfer of Permit $218.00 $6.00 3% Revisions - Residential $218.00 $6.00 3% Revisions - Non-Residential $218.00 $6.00 3% Building Permit Fees (HST not applicable to these fees) SCHEDULE "D" 2026 BUILDING PERMIT Type of Fee 2025 Fee 2026 Fee 2026 HST 2026 Total $$ Increase from 2025 % Increase from 2025 Cemetery (resident) $1,496.50 $1,541.39 $200.38 $1,741.77 $44.89 3% Cemetery (non-resident) $1,923.46 $1,981.16 $257.55 $2,238.71 $57.70 3% Cremation Plot (3 x 3") (resident) $855.34 $881.00 $114.53 $995.53 $25.66 3% Cremation Plot (3 x 3") (non-resident) $1,069.53 $1,101.62 $143.21 $1,244.83 $32.09 3% Columbarium Niche (resident) $2,334.83 $2,404.87 $312.63 $2,717.50 $70.04 3% Columbarium Niche (non-resident) $2,581.65 $2,659.09 $345.68 $3,004.77 $77.44 3% Bronze Scroll Wreath for Columbarium Niche - Initial Etch $855.34 $881.00 $114.53 $995.53 $25.66 3% Bronze Scroll Wreath for Columbarium Niche - Modification Etch $433.47 $446.47 $58.04 $504.51 $13.00 3% Foundation $425.54 $438.31 $56.98 $495.29 $12.77 3% Youth 6+ Adult (resident) $1,282.31 $1,320.78 $171.70 $1,492.48 $38.47 3% Youth 6+ Adult (non-resident) $1,442.60 $1,485.88 $193.16 $1,679.04 $43.28 3% Child 5 and under $111.39 $114.74 $14.92 $129.66 $3.35 3% Cremated remains $641.15 $660.39 $85.85 $746.24 $19.24 3% Saturday or Statutory Holiday - Full Traditional Interment $1,170.17 $1,205.28 $156.69 $1,361.97 $35.11 3% Saturday or Statutory Holiday - Full Cremation Interment $485.17 $499.73 $64.96 $564.69 $14.56 3% Saturday or Statutory Holiday - Columbarium Interment $266.68 $274.68 $35.71 $310.39 $8.00 3% Winter Internment (Dec. 1 - April 15) $266.68 $274.68 $35.71 $310.39 $8.00 3% Weekdays after 4:00pm (per hour) $195.35 $201.21 $26.16 $227.37 $5.86 3% Chapel rental (resident) $96.71 $99.61 $12.95 $112.56 $2.90 3% Chapel rental (other cemeteries) (non-resident) $235.47 $242.53 $31.53 $274.06 $7.06 3% Flat Marker $103.00 $103.00 $0.00 $103.00 $0.00 0% Upright marker (up to and including 1.22m length and height) $206.00 $206.00 $0.00 $206.00 $0.00 0% Upright marker (more than 1.22m in length and height) $412.00 $412.00 $0.00 $412.00 $0.00 0% Monument Inspection Fee (Added to all marker fees) $70.92 $73.05 $9.50 $82.55 $2.13 3% Deed holder transfer back to Town $558.88 $575.64 $74.83 $650.47 $16.76 3% Deed holder name transfer $106.38 $109.57 $14.24 $123.81 $3.19 3% Registration fee $12.36 $12.73 N $12.73 $0.37 3% Disinterment $1,418.49 $1,461.04 $189.94 $1,650.98 $42.55 3% Disinterment - Urn $250.00 $257.50 $33.48 $290.98 $7.50 3% Reburial $2,269.57 $2,337.66 $303.90 $2,641.56 $68.09 3% Markers (If not aligned with BAO, BAO rates are applicable) Other Burial Fees *All fees are inclusive of the Cemeteries Care and Maintenance Fund fee Operations - Cemetery Schedule "E" 2026 Cemetery Extras Interment Fees Chapel Type of Fee 2025 Fee 2026 Fee HST TOTAL $$ Increase from 2025 % Increase from 2025 Labour (non-supervisor) $35.17 $36.22 $4.71 $40.93 $1.05 3% Labour - Supervisor & Admin Support $51.94 $53.50 $6.96 $60.46 $1.56 3% L-05 Linhai Utility Vehicle $22.72 $23.41 $3.04 $26.45 $0.69 3% L-10 GMC Pickup $29.22 $30.09 $3.91 $34.00 $0.87 3% L-20 Dodge Pickup $29.22 $30.09 $3.91 $34.00 $0.87 3% L-30 Chev Pickup $29.22 $30.09 $3.91 $34.00 $0.87 3% L-40 Dodge Pickup $29.22 $30.09 $3.91 $34.00 $0.87 3% L-50 Dodge Pickup $29.22 $30.09 $3.91 $34.00 $0.87 3% L-60 Tandem Trailer $29.22 $30.09 $3.91 $34.00 $0.87 3% L-70 Dodge Pickup $29.22 $30.09 $3.91 $34.00 $0.87 3% J-05 Kubota $16.23 $16.72 $2.17 $18.89 $0.49 3% J-10 JCB Cemetery Backhoe $38.96 $40.12 $5.22 $45.34 $1.16 3% J-20 Kubota $28.41 $29.26 $3.80 $33.06 $0.85 3% J-30 Cat Loader $81.16 $83.59 $10.87 $94.46 $2.43 3% J-40 Sweeper $117.23 $120.75 $15.70 $136.45 $3.52 3% J-50 Trackless $56.81 $58.52 $7.61 $66.13 $1.71 3% J-60 Caterpillar $113.62 $117.03 $15.21 $132.24 $3.41 3% J-?? Dozer Caterpillar (Landfill) $73.04 $75.23 $9.78 $85.01 $2.19 3% J-90 Trackless $56.81 $58.52 $7.61 $66.13 $1.71 3% T-10 Dodge Truck (Cemetery) $39.68 $40.87 $5.31 $46.18 $1.19 3% T-20 International $99.19 $102.17 $13.28 $115.45 $2.98 3% T-30 Freightliner $106.41 $109.60 $14.25 $123.85 $3.19 3% T-40 Freightliner $106.41 $109.60 $14.25 $123.85 $3.19 3% T-60 Dump Truck $39.68 $40.87 $5.31 $46.18 $1.19 3% R-10 Vactor $234.46 $241.49 $31.39 $272.88 $7.03 3% R-20 Chipper $42.20 $43.47 $5.65 $49.12 $1.27 3% R-30 Roller Wacker $16.23 $16.72 $2.17 $18.89 $0.49 3% R-40 Generator $32.46 $33.44 $4.35 $37.79 $0.98 3% Small Tools $21.64 $22.29 $2.90 $25.19 $0.65 3% Engineering Staff Rate $64.93 $66.88 $8.69 $75.57 $1.95 3% Engineering SCHEDULE "F" 2026 PUBLIC WORKS General Operations - Hourly Type of Fee 2025 Fee 2026 Fee HST TOTAL $$ Increase from 2025 % Increase from 2025 Small Waste Cart - 35 Gallon $132.89 $136.88 $136.88 $3.99 3% Medium Waste Cart - 65 Gallon $190.65 $196.37 $196.37 $5.72 3% Large Waste Cart - 95 Gallon $264.61 $272.55 $272.55 $7.94 3% Solid Waste - Disposal Minimum Fee (0-100 KG) $10.00 $10.00 $10.00 $0.00 0% Solid Waste - Disposal per tn (>100KG) $93.97/tonne $96.79/tonne $96.79/tonne $3.61/tonne 4% Wood Waste $93.97/tonne $96.79/tonne $96.79/tonne $3.61/tonne 4% Clean fill $20.00/tonne $20.00/tonne $20.00/tonne $0.00 0% Shingles/Roofing Material $93.97/tonne $96.79/tonne $96.79/tonne $3.61/tonne 4% Asbestos Containing Material Waste cost + tipping fee cost + tipping fee cost + tipping fee no change no change Contaminated Soil $185.00/tonne $185.00/tonne $185.00/tonne $0.00 0% Loads Containing Banned Materials $205.00/tonne $205.00/tonne $205.00/tonne $0.00 0% Unsorted Waste $205.00/tonne $205.00/tonne $205.00/tonne $0.00 0% Recyclables n/a n/a n/a n/a n/a Leaf and Yard Waste n/a n/a n/a n/a n/a Brush Material n/a n/a n/a n/a n/a Electronic Waste n/a n/a n/a n/a n/a Scrap Metal n/a n/a n/a n/a n/a Municipal Special and Hazardous Waste n/a n/a n/a n/a n/a Mattress minimum fee minimum fee minimum fee no change no change Box Spring minimum fee minimum fee minimum fee no change no change Axle Weight - Single Axle Dump Truck/Trailer (Estimated Net Weight of 725 KG to be used) $68.13 $70.17 $70.17 $2.04 3% Axle Weight - Double Axle Roll Off (Estimated Net Weight of 1,450 KG to be used) $136.25 $140.34 $140.34 $4.09 3% Axle Weight - Tri-Axle Roll Off or Dump Truck (Estimated Net Weight of 3,750 KG to be used) $352.38 $362.95 $362.95 $10.57 3% Axle Weight - Double Axle Compactor (Estimated Net Weight of 8,500 KG to be used) $798.75 $822.71 $822.71 $23.96 3% Wheelie Bin Container Size Increase or Decrease $100.00 $100.00 $13.00 $113.00 $0.00 0% Replacement or Removal of Waste or Recycling Carts As determined by Service Provider As determined by Service Provider no change no change Reproduction of Solid Waste Tickets and/or Invoices $20.00 $20.00 $2.60 $22.60 $0.00 0% SCHEDULE "G" 2026 WASTE MANAGEMENT Administrative Fees St. Marys Landfill Site Waste Collection & Diversion Fee Type of Fee 2025 Fee 2026 Fee HST TOTAL $$ Increase from 2025 % Increase from 2025 Base Rate [Monthly]: $15.95 $16.22 $16.22 $0.27 2% Usage Rate [per cubic meter]: Note: Usage Charge [Water] equals Water Quantity Used in cubic meters multiplied by the Usage Charge [Water] per cubic meter $1.69 $1.72 $1.72 $0.03 2% Base Rate [Monthly]: $61.39 $62.43 $62.43 $1.04 2% Usage Rate [per cubic meter]: Note: Usage Charge [Water] equals Water Quantity Used in cubic meters multiplied by the Usage Charge [Water] per cubic meter $1.54 $1.57 $1.57 $0.03 2% Base Rate [Monthly]: $245.50 $249.67 $249.67 $4.17 2% Usage Rate [per cubic meter]: Note: Usage Charge [Water] equals Water Quantity Used in cubic meters multiplied by the Usage Charge [Water] per cubic meter $1.22 $1.24 $1.24 $0.02 2% Non-Resident Surcharge (applicable to any non-resident use, unless otherwise agreed to by the Town) 50% 50% no change no change Change of Occupancy Charge $25.00 $25.00 $3.25 $28.25 $0.00 0% New Construction $375.00 $385.00 $50.05 $435.05 $10.00 3% New Construction IC&I Property Full Cost Full Cost Full Cost no change no change Touch Pad Not Installed by Builder (New Construction) $90.00 $90.00 $11.70 $101.70 $0.00 0% Water Meter Testing Deposit $75.00 $75.00 $9.75 $84.75 $0.00 0% Water Meter Testing Charge $145.00 $145.00 $18.85 $163.85 $0.00 0% Water Meter Calibration Full cost Full Cost Full Cost no change no change Water Meter Replacement Cost [Owner's Misuse] $350.00 $350.00 $45.50 $395.50 $0.00 0% Repair or Replace Touch Pad System as a Result of Damage $75.00 $75.00 $9.75 $84.75 $0.00 0% Bulk Water Surcharge Fee 250% 250% no change no change Bulk Water Administration Fee $50.00 $50.00 $6.50 $56.50 $0.00 0% Backflow Testing/Late Filing Fee $150.00 $150.00 $19.50 $169.50 $0.00 0% Water Turn On/Off [Non-Emergency - between Monday to Friday 8:00am to 4:30pm] $30.00 $30.00 $30.00 $0.00 0% Water Turn Off [Non-Emergency, after hours] $350.00 $350.00 $350.00 $0.00 0% Water Turn Off [Statutory Holiday] $700.00 $700.00 $700.00 $0.00 0% Temporary Hydrant Connection/Disconnection Fee $175.00 $175.00 $22.75 $197.75 $0.00 0% Temporary Hydrant Connection, Usage Charge Minimum Charge includes 350 cubic meters if water. Current usage rate applies to usage above 350 cubic meters. $500.00 $500.00 $65.00 $565.00 $0.00 0% Private Water Well Application Fee [Deposit] $250.00 $250.00 $32.50 $282.50 $0.00 0% Private Water Well Application Fee Any Incurred Fees Any Incurred Fees no change no change External Water Use Permit $10.00 $10.00 $1.30 $11.30 $0.00 0% Property Connection Charge Any Incurred Fees Any Incurred Fees no change no change Let Water Run TW4 - 0-4m3 $6.76 $6.88 $6.88 $0.12 2% TW5 - 5-9m3 $8.45 $8.60 #REF! $8.60 $0.15 2% T10 - 10-14m3 $18.59 $17.20 $17.20 -$1.39 -7% T15 - 15-19m3 $25.35 $25.80 $25.80 $0.45 2% T20 - 20-24m3 $33.80 $34.40 $34.40 $0.60 2% T25 - 25-29m3 $42.25 $43.00 $43.00 $0.75 2% T30 - 30-34m3 $50.70 $51.60 $51.60 $0.90 2% T35 - 35-39m3 $59.15 $60.20 $60.20 $1.05 2% T40 - 40-49m3 $67.60 $68.80 $68.80 $1.20 2% T50 - 50-59m3 $84.50 $86.00 $86.00 $1.50 2% T60 - 60-69m3 $101.40 $103.20 $103.20 $1.80 2% T70 - 70-79m3 $118.30 $120.40 $120.40 $2.10 2% Water Meter Charges Bulk Water Water Turn On/Off Temporary Hydrant Connection Other Fees Backflow SCHEDULE "H" 2026 WATER SUPPLY & DISTRIBUTION Tier 1 Water User [0-250 cubic meters per month] Monthly Water Charge is equal to Monthly Base Rate [Water] + Usage Charge [Water] Tier 2 Water User [250-750 cubic meters per month] Monthly Water Charge is equal to Monthly Base Rate [Water] + Usage Charge [Water] Tier 3 Water User [751 + cubic meters per month] Monthly Water Charge is equal to Monthly Base Rate [Water] + Usage Charge [Water] Type of Fee 2025 Fee 2026 Fee HST Total $$ Increase from 2025 % Increase from 2025 Base Rate [Monthly]: $23.58 $24.64 $24.64 $1.06 5% Usage Rate [per cubic meter]: Note: Usage Charge [Wastewater] equals Water Quantity Used in cubic meters multiplied by the Usage Charge [Wastewater] per cubic meter $1.57 $1.64 $1.64 $0.07 5% Base Rate [Monthly]: $78.54 $82.07 $82.07 $3.53 4% Usage Rate [per cubic meter]: Note: Usage Charge [Wastewater] equals Water Quantity Used in cubic meters multiplied by the Usage Charge [Wastewater] per cubic meter $1.57 $1.64 $1.64 $0.07 5% Base Rate [Monthly]: $274.93 $287.30 $287.30 $12.37 4% Usage Rate [per cubic meter]: Note: Usage Charge [Wastewater] equals Water Quantity Used in cubic meters multiplied by the Usage Charge [Wastewater] per cubic meter $1.57 $1.64 $1.64 $0.07 5% Sanitary Sewer Blockage - After Hours (Private) $350.00 $350.00 $350.00 $0.00 0% CCTV Sanitary Sewer Inspection (Private) Full Cost Full Cost Full Cost no change no change Sewer Monitoring Testing and Sampling Full Cost Full Cost Full Cost no change no change WW4 - 0-4m3 $6.28 $6.56 $6.56 $0.28 4% WW5 - 5-9m3 $7.85 $8.20 $8.20 $0.35 4% W10 - 10-14m3 $15.70 $16.40 $16.40 $0.70 4% W15 - 15-19m3 $23.55 $24.60 $24.60 $1.05 4% W20 - 20-24m3 $31.40 $32.80 $32.80 $1.40 4% W25 - 25-29m3 $39.25 $41.00 $41.00 $1.75 4% W30 - 30-34m3 $47.10 $49.20 $49.20 $2.10 4% W35 - 35-39m3 $54.95 $57.40 $57.40 $2.45 4% W40 - 40-49m3 $62.80 $65.60 $65.60 $2.80 4% W50 - 50-59m3 $78.50 $82.00 $82.00 $3.50 4% W60 - 60-69m3 $94.20 $98.40 $98.40 $4.20 4% W70 - 70-79m3 $109.90 $114.80 $114.80 $4.90 4% SCHEDULE "I" 2026 WASTEWATER COLLECTION AND TREATMENT Let Water Run Sanitary System & Monitoring Tier 3 Wastewater User [751 + cubic meters pre month] Monthly Wastewater Charge is equal to Monthly Base Rate [Wastewater] + Usage Charge [Wastewater] Tier 2 Wastewater User [250-750 cubic meters per month] Monthly Wastewater Charge is equal to Monthly Base Rate [Wastewater] + Usage Charge [Wastewater] Tier 1 Wastewater User [0-250 cubic meters per month] Monthly Wastewater Charge is equal to Monthly Base Rate [Water] + Usage Charge [Water] 2025 Fee 2026 Fee HST Total HST Applicable $$ Increase from 2025 % Increase from 2025 $125.00 $125.00 $125.00 N $0.00 0% during business hours $275.00 $275.00 $35.75 $310.75 Y $0.00 0% outside of business hours at Town Hall $600.00 Removed outside of business hours, not at Town $400.00 Removed rehearsal, plus mileage @ CRA rate/km $75.00 Removed $22.12 $22.12 $2.88 $25.00 Y $0.00 0% Event of Municipal Significance $44.25 $44.25 $5.75 $50.00 Y $0.00 0% $40.00 $50.00 $0.00 $50.00 N $10.00 25% $30.00 $30.00 $0.00 $30.00 N $0.00 0% $5.00 $5.00 $0.65 $5.65 Y $0.00 0% $60.00 $60.00 $0.00 $60.00 N $0.00 0% $400.00 Actual Cost $0.00 Actual Cost N n/a n/a $250.00 $250.00 $0.00 $250.00 N $0.00 0% Photocopies - per page - minimum $5.00 Black and white - per page $0.10 $0.10 $0.01 $0.11 Y $0.00 0% Colour - per page $0.50 $0.50 $0.07 $0.57 Y $0.00 0% $25.00 $25.00 $25.00 N $0.00 0% $50.00 $80.00 $80.00 N $30.00 60% $50.00 $80.00 $80.00 N $30.00 60% $50.00 $80.00 $80.00 N $30.00 60% $5.00 $5.00 $5.00 N $0.00 0% $7.50 $7.50 $7.50 N $0.00 0% $7.50 $7.50 $7.50 N $0.00 0% $60.00 $60.00 $60.00 N $0.00 0% $10.00 $10.00 $10.00 N $0.00 0% Specified on Invoice Specified on Invoice N Resident $75.00 $75.00 $75.00 N $0.00 0% Non-resident $150.00 $150.00 $150.00 N $0.00 0% 3% of prize value 3% of prize value 3% of prize value N no change no change Taxi Company License (first vehicle) $100.00 $100.00 $100.00 N $0.00 0% Taxi - Company License (subsequent vehicles) $50.00 $50.00 $50.00 N $0.00 0% Taxi Driver License $25.00 $25.00 $25.00 N $0.00 0% $10.00 $10.00 $10.00 N $0.00 0% Resident $250.00 $250.00 $250.00 N $0.00 0% Non-resident $500.00 $500.00 $500.00 N $0.00 0% Motorized and/or cook/prep $360/year $360/year $360/year N $0.00 0% Non-motorized and prepack/ice $180/year $180/year $180/year N $0.00 0% Daily Fee - all vehicles $80.00 $80.00 $80.00 N $0.00 0% Existing establishment owner Fee waived Fee waived Fee waived N no change no change Non-profit and charitable participant Fee waived Fee waived Fee waived N no change no change Private event/private property Fee waived Fee waived Fee waived N no change no change Designated Parking Permits Effective November 1, 2026 Long-Term (Annual Fee) $78.84 $81.21 $10.56 $91.77 Y $2.37 3% Short-Term (Daily, up to 7 days) $10.00 $10.00 $1.30 $11.30 Y $0.00 0% Note: parking permits are not valid for heavy trucks. Animal Control 2025 Before March 31 2025 After March 31 2026 Before March 31 2026 After March 31 Cat license - per year (not to exceed three licenses) $25.00 $35.00 $25.00 $35.00 N $0.00 0% Dog license - per year (not to exceed three licenses) $25.00 $35.00 $25.00 $35.00 N $0.00 0% Kennel License - per year $300.00 $300.00 $300.00 $300.00 N $0.00 0% Service Animal $0.00 $0.00 $0.00 $0.00 N $0.00 0% Replace of Tag $10.00 $10.00 $10.00 $10.00 N $0.00 0% SCHEDULE "J" 2026 ADMINISTRATION & OTHER Type of Fee Marriage License Commissioner of Oath Tax Certificates Non-sufficient funds/stop payment fee Copy of Tax Bill/Account Statement/Invoice Building & Zoning Compliance Report Property Tax Sale Registration Property Tax Sale Extension Agreement Approved Fire Pit - per year Fire Department Reports File Search and Letter Real Estate Sale Inspection Fire Department General Administration Licensing Freedom of Information Administration Marriage Ceremony *Fee is consistent across all Town buildings Refreshment Vehicles Hawker & Pedlar Auctioneer License The rate is at the full cost of wages and administrative costs for each false alarm where, in the opinion of the Fire Chief, the alarms could have been controlled by the owner or the person(s) in charge of the property. Lottery License Fee Lost or Damaged Plate False Alarm Charge Application Fee Research Time - per 15 minutes Records Preparation Time - per 15 minutes Computer Programming - per 30 minutes Floppy Disks Other Costs 2025 Fee 2026 Fee HST $$ Increase from 2025 % Increase from 2025 $22.00 $22.00 N $0.00 0% $1.00 $1.00 N $0.00 0% N n/a n/a $19.33 $19.33 N $0.00 0% N n/a n/a $1.00 $1.00 N $0.00 0% N n/a n/a $21.15 $21.15 N $0.00 0% N n/a n/a $1.00 $1.00 N $0.00 0% $16.06 $16.06 N $0.00 0% $34.00 $36.00 N $2.00 6% $1.00 $1.00 N $0.00 0% Kindergarten Before School only $12.00 $12.00 N $0.00 0% Kindergarten After School only $12.00 $12.00 N $0.00 0% Kindergarten both Before & After $12.96 $12.96 N $0.00 0% Grade 1 and up Before School only $11.58 $12.15 N $0.57 5% Grade 1 and up After School only $10.30 $10.80 N $0.50 5% Grade 1 and up Both Before & After $21.88 $22.95 N $1.07 5% Kindergarten Before School only $11.32 $11.32 N $0.00 0% Kindergarten After School only $12.00 $12.00 N $0.00 0% Kindergarten both Before & After $12.96 $12.96 N $0.00 0% Grade 1 and up Before School only $8.98 $9.43 N $0.45 5% Grade 1 and up After School only $12.90 $13.52 N $0.62 5% Grade 1 and up Both Before & After $21.88 $22.95 N $1.07 5% Holy Name - Daily Little Falls School - Daily Before and After School Program Kindergarten age School age Late charge - per minute Daily rate - 5 full days per week Emergency or Flex Care Late charge - per minute Part-time contract enrollment - per day Daily rate - 5 full days per week Emergency or Flex Care Late charge - per minute Toddler Groups PA Day Care SCHEDULE "K" 2026 EARLY LEARNING CENTRE Type of Fee Daily rate - 5 full days per week Late charge - per minute Part-time contract enrollment - per day EFFECTIVE JANUARY 1, 2026 Infant Program Preschool Groups Fees HST Total $$ Increase from 2025 % Increase from 2025 Adult By Donation By Donation no change no change Senior By Donation By Donation no change no change Children 5-12 By Donation By Donation no change No change Children under 5 By Donation By Donation no change no change Family (2 adults and 1-3 children) By Donation By Donation no change no change Guided group tour - regular hours per person Adult $4.42 $0.57 $4.99 $0.22 5% Senior $3.98 $0.52 $4.50 $0.44 12% Guided group tour - after hours Adult $4.86 $0.63 $5.49 $0.21 5% Senior $4.42 $0.57 $4.99 $0.44 11% Outreach program per program By Donation By Donation no change no change $3.50 $3.50 $0.00 0% Curriculum based school field trip per student (virtual) $3.00 $3.00 $1.00 50% $5.09 $0.66 $5.75 $0.00 0% $29.20 $3.80 $33.00 $0.00 0% $11.06 $1.44 $12.50 $0.00 0% $20.35 $2.65 $23.00 $0.00 0% $0.10 $0.01 $0.11 $0.00 0% $0.50 $0.07 $0.57 $0.00 0% $0.10 $0.01 $0.11 -$0.34 -77% SCHEDULE "L" 2026 MUSEUM Type of Fee Curriculum based school field trip per student (on-site) Research request - full staff assistance required (per article) Cultural Services - Museum Admission Printing microfilmed material - per copy by researcher Research request - full staff assistance required (per hour) *minimum ½ hour charge Reproduction of photographs - digital image on CD or via email (personal use) Reproduction of photographs - digital image on CD or via email (commercial use) Photocopy (Black & White) Photocopy (Colour)