{
 "answer": "In the Municipality of Thames Centre, Ontario, building permit rules are set by By-law No. 91-2021 - Building By-law (Administration and Enforcement of the Building Code Act, 1992, and Swimming Pool Permits), verified 2026-09-25. Permit fees: Set out in Corporations current Fee By-Law; calculated by Chief Building Official for work proposed; floor area basis for finished/unfinished buildings. Fees set in: Corporations current Fee By-Law. Administered by: Chief Building Official and inspectors.",
 "municipality_id": "gx-001786",
 "municipality": "Thames Centre",
 "status_type": "Municipality",
 "jurisdiction": "Ontario",
 "country": "CA",
 "topic": "building_permits",
 "label": "Building permits",
 "status": "found",
 "last_verified": "2026-09-25",
 "official_website": "https://www.thamescentre.on.ca/",
 "documents": [
  {
   "primary": true,
   "is_official": true,
   "title": "By-law No. 91-2021 - Building By-law (Administration and Enforcement of the Building Code Act, 1992, and Swimming Pool Permits)",
   "category": "building_permits",
   "document_type": "bylaw",
   "status": "adopted",
   "adopted_date": "2021-12-13",
   "document_url": "https://media-001-ca.cdn.govstack.com/thamescentre-006-ca/media/mvihjj5e/bylaw091-2021-buildingbylaw.pdf",
   "summary": "Municipality of Thames Centre's Building Code Act by-law: permits for construction, demolition, occupancy, change of use, sewage systems and swimming pools; fee/inspection requirements and Chief Building Official code of conduct.",
   "discovered_by": "on-building",
   "discovered_at": "2026-09-25",
   "capture_sha256": "71c08e41608de767091a21e1862997e7f85fa000fa476e15f40bdf0ad4223e8a",
   "captured_at": "2026-09-25T07:16:54+00:00",
   "capture_http_status": 200,
   "document_number": "91-2021",
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/71c08e41608de767091a21e1862997e7f85fa000fa476e15f40bdf0ad4223e8a.pdf",
   "link_dead": false,
   "facts": {
    "permit_required_for": "Construction, demolition, change of use, occupancy, sewage systems, farm buildings, designated structures, signs, private swimming pools/hot tubs/fences as specified.",
    "fee_basis": "Set out in Corporations current Fee By-Law; calculated by Chief Building Official for work proposed; floor area basis for finished/unfinished buildings.",
    "fees_location": "Corporations current Fee By-Law",
    "authority": "Chief Building Official and inspectors"
   },
   "fact_citations": {
    "permit_required_for": "s. 3.1-3.6",
    "fee_basis": "s. 8.1; s. 8.2.1-8.2.2",
    "fees_location": "s. 8.1",
    "authority": "s. 5; s. 9.4"
   },
   "transcript_url": "/ca/on/thames-centre/building-permits/code-91-2021/",
   "transcript_quality": "exact"
  }
 ],
 "source": "https://govanswers.org/ca/on/thames-centre/building-permits/"
}