{
 "answer": "In the Township of Uxbridge, Ontario, development charges & levies rules are set by By-law Number 2024-038, Being a By-law Respecting Development Charges (Services Related to a Highway; Storm Water Drainage and Control) and 4 other bylaws, verified 2026-10-19. Charge per single-detached home: $15,134 per single/semi unit (highway and stormwater services only: $2,026 + $9,880 + $3,228; 2024 rates). Charge per apartment unit: $8,018 per apartment unit (highway and stormwater services only: $1,073 + $5,235 + $1,710; 2024 rates). Non-residential charge: $139.86 per sq.m (public works/fleet $18.72 + roads $91.31 + stormwater $29.83; 2024 rates).",
 "municipality_id": "gx-001806",
 "municipality": "Uxbridge",
 "status_type": "Township",
 "jurisdiction": "Ontario",
 "country": "CA",
 "topic": "development_charges",
 "label": "Development charges & levies",
 "status": "found",
 "last_verified": "2026-10-19",
 "official_website": "http://www.town.uxbridge.on.ca/",
 "documents": [
  {
   "primary": true,
   "is_official": true,
   "title": "By-law Number 2024-038, Being a By-law Respecting Development Charges (Services Related to a Highway; Storm Water Drainage and Control)",
   "category": "development_charges",
   "document_type": "bylaw",
   "status": "adopted",
   "adopted_date": "2024-05-06",
   "document_url": "https://www.uxbridge.ca/public/download/files/311776",
   "summary": "Township DC by-law for services related to a highway (public works/fleet, roads) and storm water drainage, passed May 6, 2024; repeals 2019-076. 2024 schedule: $15,134 per single/semi; $139.86/m2 non-residential. Indexed July 1 (2026: $16,407 single).",
   "discovered_by": "dc-on",
   "discovered_at": "2026-10-19",
   "capture_sha256": "b2c06ac4137aa1d2a6e1e72d5aa01388f6552be012bffa77d8e4b35e6a923418",
   "captured_at": "2026-10-19T15:54:40+00:00",
   "capture_http_status": 200,
   "document_number": "2024-038",
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/b2c06ac4137aa1d2a6e1e72d5aa01388f6552be012bffa77d8e4b35e6a923418.pdf",
   "link_dead": false,
   "facts": {
    "single_detached_charge": "$15,134 per single/semi unit (highway and stormwater services only: $2,026 + $9,880 + $3,228; 2024 rates)",
    "apartment_charge": "$8,018 per apartment unit (highway and stormwater services only: $1,073 + $5,235 + $1,710; 2024 rates)",
    "non_residential_charge": "$139.86 per sq.m (public works/fleet $18.72 + roads $91.31 + stormwater $29.83; 2024 rates)",
    "services_covered": "Services Related to a Highway: Public Works and Fleet; Roads and Related; Storm Water Drainage and Control Services.",
    "exemptions": "Additional residential units; industrial enlargement 50% or less; hospitals, Township/Region/education/university, places of worship, farm buildings, parking, affordable/non-profit housing; agricultural; temporary; redevelopment credits.",
    "payment_timing": "Payable on building permit issuance; rental/institutional in 6 equal annual payments from occupancy; agreements may defer.",
    "indexing_expiry": "Annual indexing on July 1 commencing 2025 (first adjustment July 1, 2024) per Statistics Canada Construction Price Statistics; no expiry stated."
   },
   "fact_citations": {
    "non_residential_charge": "Schedule \"C\"",
    "services_covered": "Schedule \"A\"",
    "exemptions": "ss. 19-24",
    "payment_timing": "s. 17(1), (3), (5)",
    "indexing_expiry": "s. 16",
    "single_detached_charge": "Schedule \"C\"",
    "apartment_charge": "Schedule \"C\""
   },
   "transcript_url": "/ca/on/uxbridge/development-charges/bylaw-2024-038/",
   "transcript_quality": "exact"
  },
  {
   "primary": true,
   "is_official": true,
   "title": "By-law Number 2024-039, Being a By-law Respecting Development Charges (General Services)",
   "category": "development_charges",
   "document_type": "bylaw",
   "status": "adopted",
   "adopted_date": "2024-05-06",
   "document_url": "https://www.uxbridge.ca/public/download/files/311777",
   "summary": "Township DC by-law for general services (studies, library, fire, by-law enforcement, parks and recreation), passed May 6, 2024; repeals 2019-076. 2024 schedule: $16,712 per single/semi; $14.47/m2 non-residential. Indexed each July 1.",
   "discovered_by": "dc-on",
   "discovered_at": "2026-10-19",
   "capture_sha256": "af2a067a9d6d2562670341d46db12bcf02c9ca8f76295435351bf8b9af225eb7",
   "captured_at": "2026-10-19T15:54:40+00:00",
   "capture_http_status": 200,
   "document_number": "2024-039",
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/af2a067a9d6d2562670341d46db12bcf02c9ca8f76295435351bf8b9af225eb7.pdf",
   "link_dead": false,
   "facts": {
    "single_detached_charge": "$16,712 per single/semi unit (general services only: studies, library, fire, by-law, parks & rec; 2024 rates)",
    "apartment_charge": "$8,854 per apartment unit (general services only; 2024 rates, sum of Schedule B service lines)",
    "non_residential_charge": "$14.47 per sq.m (general services: studies $0.42 + fire $14.05; 2024 rates)",
    "services_covered": "Development-Related Studies, Library Services, Fire Services, Parks & Recreation, By-Law Enforcement",
    "exemptions": "Additional residential units; industrial enlargement (50% or less); hospitals, municipal/regional, school, university, worship, farm, parking, affordable/non-profit housing; agricultural; temporary buildings; rental housing reduction",
    "payment_timing": "At building permit issuance; rental/institutional developments in 6 equal annual payments from occupancy; agreement may alter timing",
    "indexing_expiry": "Annual adjustment on July 1 commencing 2025 (first adjustment July 1, 2024) per Statistics Canada Construction Price Statistics (12-month period ending March 31)"
   },
   "fact_citations": {
    "single_detached_charge": "Schedule \"B\"; s. 31",
    "apartment_charge": "Schedule \"B\"; s. 31",
    "non_residential_charge": "Schedule \"C\"; s. 31",
    "services_covered": "Schedule \"A\"",
    "exemptions": "ss. 19–23",
    "payment_timing": "s. 17(1), (3), (5)",
    "indexing_expiry": "s. 16(1)-(2)"
   },
   "transcript_url": "/ca/on/uxbridge/development-charges/bylaw-2024-039/",
   "transcript_quality": "exact"
  },
  {
   "primary": true,
   "is_official": true,
   "title": "Development Charges Fees Chart (Township, Region, Education) - July 2026",
   "category": "development_charges",
   "document_type": "announcement",
   "status": "n/a",
   "adopted_date": null,
   "document_url": "https://www.uxbridge.ca/public/download/files/353513",
   "summary": "rates page: effective July 2026. Township: $34,525 single/semi; $28,008 townhouse; $18,291 apartment 2+ bed or 1 bed; non-residential $167.31/sq.m. Region (Durham) serviced single $76,227.",
   "discovered_by": "dc-on",
   "discovered_at": "2026-10-19",
   "capture_sha256": "885811ab63cab4d54990b4cdf1dcdcc56008ea2bd6cd1c86f2bb5a5a33a111b0",
   "captured_at": "2026-10-19T15:54:40+00:00",
   "capture_http_status": 200,
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/885811ab63cab4d54990b4cdf1dcdcc56008ea2bd6cd1c86f2bb5a5a33a111b0.pdf",
   "link_dead": false,
   "facts": {
    "single_detached_charge": "$34,525 per unit (Township of Uxbridge, July 2026); Durham Region adds up to $76,227 (serviced lot) and education $7,535",
    "apartment_charge": "$18,291 per unit, 2+ bedroom or 1-bedroom (Township of Uxbridge, July 2026); Durham Region adds $44,320 / $27,224 (serviced lot) and education $7,535",
    "non_residential_charge": "$167.31 per sq.m. (Township of Uxbridge, industrial and non-industrial, July 2026); Durham Region adds $41.65/sq.ft. ($19.80 industrial) and education $0.60/sq.ft.",
    "services_covered": "Discounted services and non-discounted services (Township); Regional and Education board charges also included",
    "exemptions": "Industrial buildings on partially serviced or unserviced lots receive reduced Regional charge; Garden Suites show no Township or Education charge ('-')",
    "indexing_expiry": "Township and Region fees effective July 2026; Education fees effective May 2026; no indexing rule or by-law expiry date stated"
   },
   "fact_citations": {
    "single_detached_charge": "\"Single Family Dwelling & Semi Detached\" fee table; \"Township and Region Development Charge Fees Effective July 2026\"",
    "apartment_charge": "\"2 Bedroom Apartments or more\" and \"1 Bedroom Apartment\" rows; \"Garden Suites\" column",
    "non_residential_charge": "\"Non-Residential (Excluding Industrial)\" and \"Non-Residential (Industrial)\" sections",
    "services_covered": "\"Charges include charges for discounted services and non-discounted services\"",
    "exemptions": "\"The development charge will be less on an industrial building located on a property that is partially serviced or unserviced\"; Garden Suites column shows '-'",
    "indexing_expiry": "\"Township and Region Development Charge Fees Effective July 2026\" / \"Education Development Charge Fee Effective May 2026\""
   },
   "transcript_url": "/ca/on/uxbridge/development-charges/development-charges-fees-chart-july-2026/",
   "transcript_quality": "exact"
  },
  {
   "primary": true,
   "is_official": true,
   "title": "Development Charges page",
   "category": "development_charges",
   "document_type": "announcement",
   "status": "n/a",
   "adopted_date": null,
   "document_url": "https://www.uxbridge.ca/doing-business/development-and-planning/development-charges",
   "summary": "Rates as of July 1, 2026: $34,525 single/semi; $28,008 rows/multiples; $18,291 apartment; $12,576 special care; non-residential $167.31/m2. Indexed every July 1. Region of Durham and school boards set their own DCs.",
   "discovered_by": "dc-on",
   "discovered_at": "2026-10-19",
   "capture_sha256": "55a656c28b1a367f610e0ea25e9c52a64b7b05ed77e194b1c5003493c3bdf9ef",
   "captured_at": "2026-10-19T15:54:40+00:00",
   "capture_http_status": 200,
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/55a656c28b1a367f610e0ea25e9c52a64b7b05ed77e194b1c5003493c3bdf9ef.html",
   "link_dead": false,
   "facts": {
    "single_detached_charge": "$34,525 per unit (July 1, 2026)",
    "apartment_charge": "Apartments: $18,291/unit; Rows and other multiples: $28,008/unit; Special care: $12,576/unit (July 1, 2026)",
    "non_residential_charge": "$167.31 per square metre of floor area (July 1, 2026)",
    "services_covered": "Roads, storm water, parks & recreation, fire services, library, public works & fleet, by-law enforcement, development studies",
    "exemptions": "Credits, exemptions and special provisions for residential and non-residential development may be provided in the by-laws",
    "payment_timing": "Prior to issuance of a building permit, unless otherwise specified in the development agreement",
    "indexing_expiry": "Automatic annual indexing on July 1st per Statistics Canada Quarterly Construction Price Statistics; first adjustment July 1, 2024"
   },
   "fact_citations": {
    "single_detached_charge": "\"Residential Development Charge Rates (as of July 1st, 2026)\" — Singles and semis Total municipal charges",
    "apartment_charge": "\"Residential Development Charge Rates (as of July 1st, 2026)\" — Apartments, Rows and other multiples, Special care Total municipal charges",
    "non_residential_charge": "\"Non-residential Development Charge Rates (as of July 1st, 2026)\" — Total per square metre",
    "services_covered": "\"Revenue from DCs is used to fund essential growth-related projects, including the construction of roads, water and wastewater systems, emergency services, and community amenities\"",
    "exemptions": "\"The Development Charges by-laws may provide for credits, exemptions and special provisions for residential and non-residential development.\"",
    "payment_timing": "\"Development charges are to be paid prior to the issuance of a building permit, unless otherwise specified in the development agreement.\"",
    "indexing_expiry": "\"automatic indexing of of the Development Charges, without amendment, annually on July 1st of each year in accordance with the most recent twelve-month change in the Statistics Canada Quarterly Construction Price Statistics\""
   },
   "transcript_url": "/ca/on/uxbridge/development-charges/development-charges-page/",
   "transcript_quality": "exact"
  },
  {
   "primary": true,
   "is_official": true,
   "title": "Township of Uxbridge By-law Number 2000-071, To require a park dedication as a condition of development or redevelopment of land",
   "category": "development_charges",
   "document_type": "bylaw",
   "status": "adopted",
   "adopted_date": "2000-06-12",
   "document_url": "https://www.uxbridge.ca/public/download/files/334943",
   "summary": "Parkland dedication by-law passed June 12, 2000: 5% of land for residential and 2% for other development, or cash-in-lieu at appraised land value, payable before the building permit. Bundled policy resolution caps cash-in-lieu at $10,000 for farm severances.",
   "discovered_by": "dc-on",
   "discovered_at": "2026-10-19",
   "capture_sha256": "3a7333e058bbab9a3b499c87aff1c076623fd8a0ac39284c5b529221de1d2371",
   "captured_at": "2026-10-19T15:54:40+00:00",
   "capture_http_status": 200,
   "document_number": "2000-071",
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/3a7333e058bbab9a3b499c87aff1c076623fd8a0ac39284c5b529221de1d2371.pdf",
   "link_dead": false,
   "facts": {
    "parkland_rate": "5% of land for residential; 2% of land for other than residential; cash-in-lieu to value of land otherwise required",
    "services_covered": "Park or other public recreation purposes",
    "exemptions": "No requirement if no increase in residential dwelling units beyond those existing 6 months prior; prior building permit/planning approvals; prior parkland conveyance unless density increases or commercial/industrial becomes residential",
    "payment_timing": "Prior to issuance of building permit (or first permit); for non-residential consents/subdivisions, prior to stamping deed, final plan approval, or part lot control by-law"
   },
   "fact_citations": {
    "parkland_rate": "s. 3; s. 4; s. 6",
    "services_covered": "s. 3; s. 4",
    "exemptions": "s. 3; s. 12; B.",
    "payment_timing": "s. 7; Resolution No. 20b0-055 s. 1"
   },
   "transcript_url": "/ca/on/uxbridge/development-charges/bylaw-2000-071/",
   "transcript_quality": "exact"
  },
  {
   "primary": false,
   "is_official": true,
   "title": "2024 Development Charges Background Study",
   "category": "development_charges",
   "document_type": "other",
   "status": "n/a",
   "adopted_date": null,
   "document_url": "https://www.uxbridge.ca/public/download/files/311775",
   "summary": "Hemson background study supporting 2024 DC by-laws.",
   "discovered_by": "dc-on",
   "discovered_at": "2026-10-19",
   "capture_sha256": "460cb62f97829de0eb7af66d1c90ad9770726d4f616e90a250e42322e2f260ea",
   "captured_at": "2026-10-19T15:54:40+00:00",
   "capture_http_status": 200,
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/460cb62f97829de0eb7af66d1c90ad9770726d4f616e90a250e42322e2f260ea.pdf",
   "link_dead": false,
   "transcript_url": "/ca/on/uxbridge/development-charges/2024-development-charges-background-study/",
   "transcript_quality": "exact"
  }
 ],
 "source": "https://govanswers.org/ca/on/uxbridge/development-charges/"
}