{
 "answer": "In the Township of Warwick, Ontario, building permit rules are set by Building By-law (By-law Number 79 of 2024) and 1 other bylaw, verified 2026-09-25. Permit required for: Any construction, demolition, and/or change of use to any structure or building defined in the Act requires a permit and a fee as defined in this By-Law. Administered by: Chief Building Official.",
 "municipality_id": "gx-001810",
 "municipality": "Warwick",
 "status_type": "Township",
 "jurisdiction": "Ontario",
 "country": "CA",
 "topic": "building_permits",
 "label": "Building permits",
 "status": "found",
 "last_verified": "2026-09-25",
 "official_website": "http://www.warwicktownship.ca/",
 "documents": [
  {
   "primary": true,
   "is_official": true,
   "title": "Building By-law (By-law Number 79 of 2024)",
   "category": "building_permits",
   "document_type": "bylaw",
   "status": "adopted",
   "adopted_date": null,
   "document_url": "https://www.warwicktownship.ca/public/download/files/330053",
   "summary": "Township of Warwick Building By-law respecting construction, demolition, change-of-use permits and inspections under s.7 Building Code Act, 1992. Notes County of Lambton enforces the Act for Warwick under agreement. Schedule A fee schedule is a placeholder referencing the Consolidated User Fee By-law.",
   "discovered_by": "on-building",
   "discovered_at": "2026-09-25",
   "capture_sha256": "abafcd93c1fe536b71b6da094b552bd2edece8f5b40f88d4fe9b4044863a0814",
   "captured_at": "2026-09-25T07:16:54+00:00",
   "capture_http_status": 200,
   "document_number": "79",
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/abafcd93c1fe536b71b6da094b552bd2edece8f5b40f88d4fe9b4044863a0814.pdf",
   "link_dead": false,
   "facts": {
    "permit_required_for": "Any construction, demolition, and/or change of use to any structure or building defined in the Act requires a permit and a fee as defined in this By-Law.",
    "fee_basis": "Calculated in accordance with Schedule 'A'; where based on cost of valuation, total cost of all work including material, labour, equipment, overhead and professional services.",
    "authority": "Chief Building Official"
   },
   "fact_citations": {
    "permit_required_for": "s. 2.2",
    "fee_basis": "s. 9.1(a), (b)",
    "authority": "s. 3.1"
   },
   "transcript_url": "/ca/on/warwick/building-permits/bylaw-79/",
   "transcript_quality": "exact"
  },
  {
   "primary": true,
   "is_official": true,
   "title": "Consolidated User Fee and Charges By-Law (By-law 9 of 2025, amended by By-law 55 of 2025) - Schedule G: Building Permits and Related Matters",
   "category": "building_permits",
   "document_type": "bylaw",
   "status": "adopted",
   "adopted_date": null,
   "document_url": "https://www.warwicktownship.ca/public/download/files/330054",
   "summary": "Recorded again under building_permits per the Building By-law's own Schedule A, which points to this consolidated fee schedule for the actual building permit fees/deposits (Schedule G).",
   "discovered_by": "on-building",
   "discovered_at": "2026-09-25",
   "capture_sha256": "1ce8fb8c1ce5ffab8044acbdace8193be29143e7fd404294c038dacd595f51f5",
   "captured_at": "2026-09-25T07:16:54+00:00",
   "capture_http_status": 200,
   "document_number": "9",
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/1ce8fb8c1ce5ffab8044acbdace8193be29143e7fd404294c038dacd595f51f5.pdf",
   "link_dead": false,
   "facts": {
    "permit_required_for": "Single Family Dwelling, Multiple Family Dwellings, additions, alterations, commercial/industrial renovations, accessory buildings, agricultural buildings, grain bins/silos, manure pits, decks/porches, pools, demolition, change of use.",
    "fee_basis": "Fixed fees by permit type as listed in Schedule G; multiple family dwellings fee is per dwelling unit."
   },
   "fact_citations": {
    "permit_required_for": "Schedule G, Type of Permit",
    "fee_basis": "Schedule G, Type of Permit"
   },
   "transcript_url": "/ca/on/warwick/building-permits/bylaw-9/",
   "transcript_quality": "exact"
  },
  {
   "primary": false,
   "is_official": true,
   "title": "By-laws (index page)",
   "category": "building_permits",
   "document_type": "bylaw_index",
   "status": "n/a",
   "adopted_date": null,
   "document_url": "https://www.warwicktownship.ca/our-government/bylaws",
   "summary": "Township's 'Frequently Requested By-Laws' page listing the Building By-Law and Consolidated User Fee and Charges By-Law among others; used to locate both documents.",
   "discovered_by": "on-building",
   "discovered_at": "2026-09-25",
   "capture_sha256": "5251b2ebe88304148b4ae4560033bebf1fdb74746c136b3764c288f7a546ab21",
   "captured_at": "2026-09-25T07:16:54+00:00",
   "capture_http_status": 200,
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/5251b2ebe88304148b4ae4560033bebf1fdb74746c136b3764c288f7a546ab21.html",
   "link_dead": false,
   "transcript_url": "/ca/on/warwick/building-permits/by-laws/",
   "transcript_quality": "exact"
  }
 ],
 "source": "https://govanswers.org/ca/on/warwick/building-permits/"
}