Recycled Materials Policy
Page 1 of 2
THE CORPORATION OF THE CITY OF WINDSOR
POLICY
Service Area: Public Works
Policy No.:
944/88
Department:
Corporate Wide
Approval Date: April 18, 2016
Division:
Approved By:
CR259/2016
Effective Date:
1988; amended October 2015
Subject:
City of Windsor Recycled
Construction Materials Policy
Procedure Ref.:
Review Date: October 1, 2020
Pages:
Replaces: Recycled Materials Policy
Updated By:
Andrew Lewis
Date:1988
1.
POLICY
1.1 This policy pertains to promotion and use of recycled and reusable construction
materials in construction projects funded by the City of Windsor.
2.
PURPOSE
2.1 The purpose of the Recycled Construction Materials Policy is to promote that all
removed materials generated from City of Windsor funded construction or
reconstruction projects be disposed of in a fashion which provides for the opportunity
of future recycling or reuse of the materials.
2.2 That consideration is given to the use of materials that are recycled or reused for
construction in City of Windsor funded projects, where deemed acceptable, by the
designer.
3.
SCOPE
3.1 This policy applies to all contractors who enter into contracts with the Corporation of
the City of Windsor to construct, reconstruct or rehabilitate any type of municipally
owned buildings or infrastructure utilize this policy, when applicable.
4.
RESPONSIBILITY
4.1 The Chief Administrative Officer is responsible for:
4.1.1
The application of this policy within the Corporation.
4.2 The City Engineer is responsible for:
4.2.1
The communication of this policy to all Department Heads that are
responsible for construction and rehabilitation projects funded by the City
of Windsor.
4.2.2
Being the chief spokesperson on this policy and may speak on behalf of
the municipality regarding this policy.
4.2.3
The review and revision of this policy so that it remains current with
industry practices and standards, as applicable.
4.3 The Department Heads are responsible for:
4.3.1
The communication of this policy to all their Employees whom they
supervise so that those employees are aware of and implement this policy,
when applicable.
Recycled Materials Policy
Page 2 of 2
4.4 The Engineers, Project Managers and Coordinators are responsible for:
4.4.1
That this policy is included in any applicable tender for work funded by
the City of Windsor.
5.
GOVERNING RULES AND REGULATIONS
5.1 The following should be considered prior to the use of recycled materials on any
project:
5.1.1
An application to use the recycled material must be completed and
submitted to the City of Windsor for review where it is deemed, by the
designer, to be cost effective and consistent with sound engineering design
systems.
5.1.2
Future disassembly or reuse of the materials should always be considered
during the design phase so a greater percentage of materials can be reused
or recycled in the future.
5.1.3
The Ministry of Environment and Climate Change should be consulted for
any testing requirements that pertain to the use or disposal of recycled
materials.
5.2 The City of Windsor has an established Recycled Aggregate Program. This successful
program would be a good model for any future material recycling programs when it
pertains to construction projects.
6.
RECORDS, FORMS AND ATTACHMENTS
6.1 Records are the responsibility of Public Works and will be kept in accordance with
the Records Retention Bylaw #21-2013 as amended from time to time.