{
 "answer": "In the Town of North Rustico, Prince Edward Island, building permit rules are set by Town of North Rustico Zoning and Subdivision Control (Development) Bylaw (P. Wood & Associates, May 2014), verified 2026-10-18. Fees set in: A schedule of fees shall be established by resolution of Council. Administered by: Development Officer; inspections by officer or agent of the Town. Fines: first/subsequent offence: fine not exceeding $2000 plus costs; continuing offence: not exceeding $400 per day plus costs.",
 "municipality_id": "gx-003205",
 "municipality": "North Rustico",
 "status_type": "Town",
 "jurisdiction": "Prince Edward Island",
 "country": "CA",
 "topic": "building_permits",
 "label": "Building permits",
 "status": "found",
 "last_verified": "2026-10-18",
 "official_website": "https://northrustico.com/",
 "documents": [
  {
   "primary": true,
   "is_official": true,
   "title": "Town of North Rustico Zoning and Subdivision Control (Development) Bylaw (P. Wood & Associates, May 2014)",
   "category": "building_permits",
   "document_type": "bylaw",
   "status": "adopted",
   "adopted_date": null,
   "document_url": "http://northrustico.com/wp-content/uploads/2016/03/Bylaw.pdf",
   "summary": "Primary: no separate building bylaw found; this Zoning and Subdivision Control Bylaw is what requires a Council development permit (application form and fee) to erect or alter a structure. Note provincial Building Codes Act permit is separate. Town page says these are the maps/bylaw in effect since 2014.",
   "discovered_by": "atl-building",
   "discovered_at": "2026-10-14",
   "capture_sha256": "d17ee92a2673b1f063d7099da00f40475885a25a720973ec8ba532b19c9eed64",
   "captured_at": "2026-10-15T03:14:23+00:00",
   "capture_http_status": 200,
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/d17ee92a2673b1f063d7099da00f40475885a25a720973ec8ba532b19c9eed64.pdf",
   "link_dead": false,
   "facts": {
    "permit_required_for": "Permit required for: change Use; commence Development; construct/replace Structure or Deck; structural alterations; water/sewer connection; underground installation; move/demolish Structure; excavation pit; construct Street; fill; subdivide/consolidate; fence over 4 ft",
    "exemptions": "paving patios/sidewalks; fences under 4 ft; clotheslines, poles, radio/TV antennae (except satellite dishes over 24\"); gardens; crops; landscaping/ornamental structures under 64 sq ft; routine maintenance",
    "fees_location": "A schedule of fees shall be established by resolution of Council",
    "authority": "Development Officer; inspections by officer or agent of the Town",
    "fine_range": "first/subsequent offence: fine not exceeding $2000 plus costs; continuing offence: not exceeding $400 per day plus costs"
   },
   "fact_citations": {
    "permit_required_for": "s. 4.1",
    "exemptions": "s. 4.1(2)",
    "fees_location": "s. 4.3",
    "authority": "s. 1.4; s. 4.24",
    "fine_range": "s. 22.2(1)-(2)"
   },
   "transcript_url": "/ca/pe/north-rustico/zoning/zoning-and-subdivision-control-bylaw/",
   "transcript_quality": "ocr"
  },
  {
   "primary": false,
   "is_official": true,
   "title": "North Rustico Zoning Bylaw first draft (Stantec, 2024.08.27)",
   "category": "building_permits",
   "document_type": "draft",
   "status": "draft",
   "adopted_date": null,
   "document_url": "http://northrustico.com/wp-content/uploads/2024/08/0827_ZoningBYLAW-reduced.pdf",
   "summary": "Marked DRAFT; proposed replacement for 2014 zoning and subdivision bylaw, development permit rules (sections 4.4-4.6).",
   "discovered_by": "atl-building",
   "discovered_at": "2026-10-14",
   "capture_sha256": "590fe7d91f5aa682eb589cf1d11fe72df354cd3e8d5d5eb0bf906cc726c98415",
   "captured_at": "2026-10-15T03:14:23+00:00",
   "capture_http_status": 200,
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/590fe7d91f5aa682eb589cf1d11fe72df354cd3e8d5d5eb0bf906cc726c98415.pdf",
   "link_dead": false,
   "transcript_url": "/ca/pe/north-rustico/zoning/first-draft-zoning-bylaw/",
   "transcript_quality": "ocr"
  },
  {
   "primary": false,
   "is_official": true,
   "title": "Planning and Development page (permit costs, forms)",
   "category": "building_permits",
   "document_type": "other",
   "status": "n/a",
   "adopted_date": null,
   "document_url": "https://northrustico.com/residents/planning-and-development/",
   "summary": "Town takes development applications at the office (902-963-3211) after its development officer withdrew; development application $0.13/sq ft ($30 min). Links 2014 bylaw and permit forms.",
   "discovered_by": "atl-building",
   "discovered_at": "2026-10-14",
   "capture_sha256": "2760e50a3dbaf0aa82188c7e3dd00aa6c1900065c0e9c2012aba356f33dfcd3a",
   "captured_at": "2026-10-15T03:14:23+00:00",
   "capture_http_status": 200,
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/2760e50a3dbaf0aa82188c7e3dd00aa6c1900065c0e9c2012aba356f33dfcd3a.html",
   "link_dead": false,
   "transcript_url": "/ca/pe/north-rustico/building-permits/planning-and-development-page/",
   "transcript_quality": "exact"
  }
 ],
 "source": "https://govanswers.org/ca/pe/north-rustico/building-permits/"
}