Building Deposit Bylaw 15-2017

Grand Coulee, Saskatchewan

This is the exact embedded text of the captured official document. Snapshot ada417431156 · verified 2026-06-13 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

BUILDING DEPOSIT TOWN OF GRAND COULEE BYLAW NO 15-2017 A BYLAW OF THE TOWN OF GRAND COULEE IN THE PROVINCE OF SASKATCHEWAN FOR BUILDING DEPOSIT The Council of the Town of Grand Coulee in the Province of Saskatchewan enacts as follows: 1. Property owners will be required to place a building deposit in the amount of two thousand dollars ($2,000.00) with the Town at the time of applying for a building permit for a primary building. 2. The Town will refund the deposit upon the completion of the building and lot in accordance with the prescribed terms contained in Appendix A of this bylaw and the lot purchase agreement, if any, and upon completion of the application for the refund. The deposit may be retained and forfeited in whole or in part in the event completion of such terms does not meet the Town's requirements. 3. Bylaw 04-2015 is hereby repealed. 4. This bylaw shall come into force and effect on the day of its final reading. SEAL _______________________________ Mayor _______________________________ Administrator Read a third time and adopted this 11th day of April, 2017. _________________________ Administrator TOWN OF GRAND COULEE BYLAW NO 15-2017 APPENDIX A Date: ___________________ Dear: _______________________________________________________________________________ Re: _________________________________________________________________________________ This is to advise you of your deposits and requirements of your permit for the above property. 1. ITEMS REQUIRED TO RECEIVE A REFUND OF THE BUILDING DEPOSIT The Town has adopted a Bylaw whereby a $2,000.00 building deposit will be collected at the time of the building permit, to ensure the requirements for the building permit and the lot purchase agreements, where applicable, are adhered to by the builder/owner. A. BUILDING PERMIT REQUIREMENTS ________ Surveyor Certificate and/or Real Property Report ________ Finished grade levels certified (Finished grade level for the lot is the responsibility of the builder). ________ The final building inspection and occupancy must be approved by the Town building inspector before occupancy. Move in prior to obtaining an occupancy permit may result in forfeiture of the deposit. ________ Deficiencies must be corrected as listed on the final building inspection report. Once the deficiencies are corrected, a building inspection maybe be required, if stated on the final report. Any extra inspection costs will be taken from the deposit. ________ Completion of outside construction items on the house. ________ Water meter and reader installed and verified working. B. LOT PURCHASE AGREEMENT REQUIREMENTS ________ Landscaping, ________ Fences, ________ Driveways, ________ And any other requirement stated in the lot purchase agreement, signed with the developer. "OWNER" INFORMATION The homeowner is responsible to have a licensed plumber come pick up a water meter at the Town Office and install it. The water meter is supplied free of charge. PLEASE NOTIFY THE TOWN OFFICE minimum 2 WEEKS PRIOR TO MOVE IN DATE. If you have any questions, please contact the Town Office at 306-352-8694.