{
 "answer": "In the City of Moose Jaw, Saskatchewan, building permit rules are set by The Building Bylaw No. 5524, verified 2026-09-27. Exemptions: Residential accessory buildings 10 m² or less; temporary construction-site buildings. Permit fees: $6.00 per $1000 of construction value; $100 Minimum Fee. Administered by: Building Official.",
 "municipality_id": "gx-000776",
 "municipality": "Moose Jaw",
 "status_type": "City",
 "jurisdiction": "Saskatchewan",
 "country": "CA",
 "topic": "building_permits",
 "label": "Building permits",
 "status": "found",
 "last_verified": "2026-09-27",
 "official_website": "https://moosejaw.ca/",
 "documents": [
  {
   "primary": true,
   "is_official": true,
   "title": "The Building Bylaw No. 5524",
   "category": "building_permits",
   "document_type": "bylaw",
   "status": "adopted",
   "adopted_date": null,
   "document_url": "https://moosejaw.ca/wp-content/uploads/2019/12/Bylaw-No.-5524-The-Building-Bylaw.pdf",
   "summary": "City of Moose Jaw Building Bylaw on the city's official domain (document body behind site proof-of-work captcha; verified by title/URL on official site).",
   "captured_at": "2026-09-25T02:42:57+00:00",
   "capture_http_status": 200,
   "capture_note": null,
   "capture_sha256": "3ec026e39818c560f99ec3924e6caba097d4bf27a51574865afd3750b9a060ad",
   "snapshot_source": "https://web.archive.org/web/2026id_/https://moosejaw.ca/wp-content/uploads/2019/12/Bylaw-No.-5524-The-Building-Bylaw.pdf",
   "document_number": "5524",
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/3ec026e39818c560f99ec3924e6caba097d4bf27a51574865afd3750b9a060ad.pdf",
   "link_dead": false,
   "facts": {
    "permit_required_for": "A Permit is required for any work regulated under the Act, Regulations pertaining to the Act and the latest adopted edition of the National Building Code of Canada.",
    "exemptions": "Residential accessory buildings 10 m² or less; temporary construction-site buildings.",
    "fee_basis": "$6.00 per $1000 of construction value; $100 Minimum Fee",
    "authority": "Building Official",
    "fine_range": "Individual: up to $5,000, plus up to $5,000/day continuing; corporation: up to $10,000, plus up to $10,000/day continuing."
   },
   "fact_citations": {
    "permit_required_for": "s. 4.1",
    "exemptions": "s. 4.8; s. 4.11(f)",
    "fee_basis": "Schedule \"1\", ss. 1.1-1.2",
    "authority": "s. 15.3(a)",
    "fine_range": "s. 5.4(a)-(b)"
   },
   "transcript_url": "/ca/sk/moose-jaw/building-permits/bylaw-5524/",
   "transcript_quality": "exact"
  }
 ],
 "source": "https://govanswers.org/ca/sk/moose-jaw/building-permits/"
}