{
 "answer": "In the Rural Municipality of Frontier No. 19, Saskatchewan, building permit rules are set by Building Bylaw GOVSK 1-2024, verified 2026-09-27. Permit required for: Work must not commence before a permit is issued. Permit fees: sum of permit administration fee, plan review/inspection/enforcement fees, SAMA fees, and deposit if required. Fees set in: a fee bylaw.",
 "municipality_id": "gx-000936",
 "municipality": "Rural Municipality of Frontier No. 19",
 "status_type": "Rural Municipality",
 "jurisdiction": "Saskatchewan",
 "country": "CA",
 "topic": "building_permits",
 "label": "Building permits",
 "status": "found",
 "last_verified": "2026-09-27",
 "official_website": "https://www.frontiersask.com/rm",
 "documents": [
  {
   "primary": true,
   "is_official": false,
   "title": "Building Bylaw GOVSK 1-2024",
   "category": "building_permits",
   "document_type": "bylaw",
   "status": "adopted",
   "adopted_date": null,
   "document_url": "https://cdn.prod.website-files.com/65e3b0beca52a50bf9725bce/6680e1effadb8416f53e6c0b_Building%20Bylaw%20%23%201-2024.pdf",
   "summary": "Adopted building bylaw administering The Construction Codes Act and National Building Code within the R.M. of Frontier No. 19.",
   "capture_sha256": "619b2d03dc3e11aa18b345f4b6ea5ac8955f8ecb1f59a45f592a9bbf33b8471b",
   "captured_at": "2026-06-13T16:33:18+00:00",
   "capture_http_status": 200,
   "document_number": "1-2024",
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/619b2d03dc3e11aa18b345f4b6ea5ac8955f8ecb1f59a45f592a9bbf33b8471b.pdf",
   "link_dead": false,
   "facts": {
    "permit_required_for": "Work must not commence before a permit is issued.",
    "fee_basis": "sum of permit administration fee, plan review/inspection/enforcement fees, SAMA fees, and deposit if required",
    "fees_location": "a fee bylaw",
    "authority": "local authority or building official"
   },
   "fact_citations": {
    "permit_required_for": "Work must not commence before a permit is issued",
    "fee_basis": "The permit fee shall be calculated according to the sum",
    "fees_location": "listed in a fee bylaw",
    "authority": "local authority or the building official"
   },
   "transcript_url": "/ca/sk/rural-municipality-of-frontier-no-19/building-permits/bylaw-1-2024/",
   "transcript_quality": "ocr"
  }
 ],
 "source": "https://govanswers.org/ca/sk/rural-municipality-of-frontier-no-19/building-permits/"
}