{
 "answer": "In the Rural Municipality of The Gap No. 39, Saskatchewan, building permit rules are set by RM of The Gap No. 39 Building Bylaw No. 1/2023 (A Bylaw Respecting Buildings), verified 2026-09-27. Permit required for: Work requires a valid permit; retaining walls >600 mm differential grade on non-agricultural lands require permits. Fees set in: Service provider agreement. Administered by: Local authority or its building official.",
 "municipality_id": "gx-001108",
 "municipality": "Rural Municipality of The Gap No. 39",
 "status_type": "Rural Municipality",
 "jurisdiction": "Saskatchewan",
 "country": "CA",
 "topic": "building_permits",
 "label": "Building permits",
 "status": "found",
 "last_verified": "2026-09-27",
 "official_website": "https://oursask.info/rm39/",
 "documents": [
  {
   "primary": true,
   "is_official": true,
   "title": "RM of The Gap No. 39 Building Bylaw No. 1/2023 (A Bylaw Respecting Buildings)",
   "category": "building_permits",
   "document_type": "bylaw",
   "status": "adopted",
   "adopted_date": "2023-08-09",
   "document_url": "https://oursask.info/rm39/wp-content/uploads/sites/16/bylaw/RM039_Bylaw_01-2023_Building-Bylaw.pdf",
   "summary": "RM of The Gap No. 39 (SK) Building Bylaw 1/2023, 'adopted by resolution of the Council ... on the 9th day of August, 2023'. Covers permit administration under the Construction Codes Act/NBC/NECB. Permit fee and payment set out within the bylaw itself (Administration Fee section: processing/handling/issuance fee, building-official service fee per service-provider agreement, SAMA fee, additional fees).",
   "capture_sha256": "9267e881b0edc0c2a993c2264e17159ccd3a6bf8098bc4952369b32c1b8b7f92",
   "captured_at": "2026-09-27T23:01:27+00:00",
   "capture_http_status": 200,
   "discovered_by": "building-gaps",
   "discovered_at": "2026-09-27",
   "document_number": "39",
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/9267e881b0edc0c2a993c2264e17159ccd3a6bf8098bc4952369b32c1b8b7f92.pdf",
   "link_dead": false,
   "facts": {
    "permit_required_for": "Work requires a valid permit; retaining walls >600 mm differential grade on non-agricultural lands require permits.",
    "exemptions": "Bylaw applies to buildings greater than 10 m2 (107.6 ft2) except as otherwise exempted by the Act or regulations; accessory buildings not greater than 10 m2 (107.6 ft2) with no hazard and no sleeping accommodations; decks under 600 mm (2 ft) in differential grade height on residential land (deemed patios); construction standards do not apply to farm buildings (subsection 6(2) of the Act).",
    "fee_basis": "Permit fee may include administration fee, deposit, service fee, SAMA fee, applicable taxes. Administration Fee: $100.00, one family dwellings detached, semi-detached or accessory buildings; $200.00, commercial properties. Deposit: $750.00, one family dwellings detached, semi-detached or accessory buildings properties; $1,500.00, commercial properties. Building official may establish value of construction.",
    "fees_location": "Service provider agreement",
    "authority": "Local authority or its building official"
   },
   "fact_citations": {
    "permit_required_for": "s. 6(1)(b); s. 7(2)",
    "exemptions": "\"apply to buildings greater than 10 m2 (107.6 ft2)\"; \"An accessory building not greater than 10 m2 (107.6 ft2) is exempt from this building bylaw\"; \"Decks under 600 mm (2 ft) in differential grade height on lands for residential use are deemed as patios exempt\"",
    "fee_basis": "s. 5 \"The permit fee as determined by the local authority may include the following\"; \"$100. 00, one family dwellings detached\"; \"$200. 00, commercial properties\"; \"$750.00, one family dwellings detached\"; \"$1,500.00, commercial properties\"",
    "fees_location": "s. 5(1)(c); s. 5(2)",
    "authority": "s. 8(5); s. 8(6); s. 12(3)"
   },
   "transcript_url": "/ca/sk/rural-municipality-of-the-gap-no-39/building-permits/bylaw-39/",
   "transcript_quality": "exact"
  },
  {
   "primary": false,
   "is_official": true,
   "title": "Building Bylaw No. 01-2023",
   "category": "building_permits",
   "document_type": "bylaw",
   "status": "adopted",
   "adopted_date": "2023-08-09",
   "document_url": "https://oursask.info/rm39/document/bylaw/building-bylaw-no-01-2023/",
   "summary": "Adopted Building Bylaw No. 1/2023 of the RM of The Gap No. 39; adopted 9 August 2023. (Landing page; the bylaw file itself is recorded separately.)",
   "capture_sha256": "0ae7188aced3054b31234a3f05059d192169d8bf967007a95a4ff9288874dbe2",
   "captured_at": "2026-06-13T16:33:18+00:00",
   "capture_http_status": 200,
   "document_number": "01-2023",
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/0ae7188aced3054b31234a3f05059d192169d8bf967007a95a4ff9288874dbe2.html",
   "link_dead": false,
   "transcript_url": "/ca/sk/rural-municipality-of-the-gap-no-39/building-permits/bylaw-01-2023/",
   "transcript_quality": "exact"
  }
 ],
 "source": "https://govanswers.org/ca/sk/rural-municipality-of-the-gap-no-39/building-permits/"
}