{
 "answer": "In the Village of Sedley, Saskatchewan, building permit rules are set by Building Bylaw No. 2023-2, verified 2026-09-27. Exemptions: Work exempted by the Act or the regulations. Permit fees: PBI Fee Calculator fee for plan review and field inspection, plus 25% administrative fee, plus SAMA fees, plus deposit if required. Fees set in: PBI Fee Calculator; Saskatchewan Assessment Management Agency.",
 "municipality_id": "gx-001150",
 "municipality": "Sedley",
 "status_type": "Village",
 "jurisdiction": "Saskatchewan",
 "country": "CA",
 "topic": "building_permits",
 "label": "Building permits",
 "status": "found",
 "last_verified": "2026-09-27",
 "official_website": "http://villageofsedley.com/",
 "documents": [
  {
   "primary": true,
   "is_official": true,
   "title": "Building Bylaw No. 2023-2",
   "category": "building_permits",
   "document_type": "bylaw",
   "status": "adopted",
   "adopted_date": null,
   "document_url": "http://villageofsedley.com/wp-content/uploads/2023/10/2023-2-Building-Bylaw.pdf",
   "summary": "Village of Sedley Building Bylaw (administration/enforcement of construction codes). OCR-confirmed jurisdiction.",
   "capture_sha256": "3f0c65a41233517cff12dd71e9c262ab379f79f7acfa77fec0b77c2380bc96fe",
   "captured_at": "2026-06-13T16:33:18+00:00",
   "capture_http_status": 200,
   "document_number": "2023-2",
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/3f0c65a41233517cff12dd71e9c262ab379f79f7acfa77fec0b77c2380bc96fe.pdf",
   "link_dead": false,
   "facts": {
    "permit_required_for": "Work, meaning any construction, addition, erection, placement, alteration, repair, renovation, demolition, relocation, removal, use, occupancy or change of occupancy of a building.",
    "exemptions": "Work exempted by the Act or the regulations.",
    "fee_basis": "PBI Fee Calculator fee for plan review and field inspection, plus 25% administrative fee, plus SAMA fees, plus deposit if required.",
    "fees_location": "PBI Fee Calculator; Saskatchewan Assessment Management Agency",
    "authority": "Local authority or the building official."
   },
   "fact_citations": {
    "permit_required_for": "s. 3 definition of 'work'; s. 6(6)",
    "exemptions": "s. 5(4)",
    "fee_basis": "s. 6(7)",
    "fees_location": "s. 6(7)(a),(c)",
    "authority": "s. 6(3)"
   },
   "transcript_url": "/ca/sk/sedley/building-permits/bylaw-2023-2/",
   "transcript_quality": "ocr"
  }
 ],
 "source": "https://govanswers.org/ca/sk/sedley/building-permits/"
}