Town of Smyrna 2026 Fee Schedule

Smyrna, Delaware

This is the exact embedded text of the captured official document. Snapshot 21429282f362 · verified 2026-06-05 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

Town of Smyrna 2026 Fee Schedule Building Inspection and Permitting Fees Building Permit Fees: Plumbing: $20.00 - first 5 fixtures, $2.00 per fixture thereafter Signs: $2.00 per sq. ft. with a minimum $25.00 fee per sign. Sign re-facing is $25.00 Primary Structure Moving: Accessory Structure Moving: Primary Structure Demolition: $500.00 plus any and all expenses incurred by the Town. Bond required - 150% of contract price. Accessory Structure Demolition: Bond required - 150% of contract price. Certificate of Occupancy: Temporary Certificate of Occupancy: $100.00 plus 200% of cost for unfinished work. Code Enforcement and Licensing Fees Rental License 100.00 $ (Effective January 1, 2026) Rental Inspection 75.00 $ (Effective January 1, 2026) Rental Re-Inspection 100.00 $ (Effective January 1, 2026) Licensing: Contractors $125.00 Peddler, Solicitor $125.00 $60.00 for the first $1,000 of construction value, $11.00 for each $1,000 or portion thereafter up to $1 million, $7.00 for each additional $1,000 over $1 million. $500.00 plus any and all expenses incurred by any department or the Town of Smyrna during the move. $40.00 plus $0.50 per sq. ft. over 160 sq. ft. plus any and all expenses incurred by the Town. $40.00 plus $0.50 per sq. ft. over 160 sq. ft. plus any and all expenses incurred by the Town. $40.00 payable at issuance of building permit. Applies to all living units and commercial structures. 1 of 22 Town of Smyrna 2026 Fee Schedule Business (per location): Architect (per Architect) $250.00 Attorney at Law (per Attorney) $250.00 Bank, Trust, Loan, Credit Union $250.00 Barber, Beautician: First 2 Barbers, Beautician $125.00 3 or more Barbers, Beauticians $250.00 Certified Public Accountant (per CPA) $250.00 Chiropractor (per Chiropractor) $250.00 Daycare: Up to 6 Children $125.00 Over 6 Children $250.00 Dentist (per Dentist) $250.00 Finance or Small Loan Agency $250.00 Gas, Light, Power, Cable TV, or Telephone Co. $825.00 Income Tax Consultant $250.00 Optometrist (per Optometrist) $250.00 Outdoor Music Festival Promoter $250.00 Pharmacist (per Pharmacist) $250.00 Physical Therapist (per Therapist) $250.00 Physician and/or Surgeon (per Doctor) $250.00 Podiatrist (per Podiatrist) $250.00 Professional Engineer (per Engineer) $250.00 Professional Land Surveyor (per License) $250.00 Psychologist (per Psychologist) $250.00 Veterinarian (per Veterinarian) $250.00 All other businesses $125.00 Vacant Building Fee*: Less than one year 500.00 $ Next two calendar years (years one & two): Residential habitually vacant buildings 500.00 $ Non-residential habitually vacant buildings under 10,000 sq. ft. 1,000.00 $ Non-residential habitually vacant buildings 10,000 sq. ft. or greater 2,500.00 $ Next three calendar years (years 3, 4, & 5): Residential habitually vacant buildings 1,000.00 $ Non-residential habitually vacant buildings under 10,000 sq. ft. 2,000.00 $ Non-residential habitually vacant buildings 10,000 sq. ft. or greater 5,000.00 $ Next five calendar years (years 6, 7, 8, 9, & 10): Residential habitually vacant buildings 2,000.00 $ 2 of 22 Town of Smyrna 2026 Fee Schedule Non-residential habitually vacant buildings under 10,000 sq. ft. 4,000.00 $ Non-residential habitually vacant buildings 10,000 sq. ft. or greater 10,000.00 $ For each year thereafter (years 11 & beyond): Residential habitually vacant buildings 500.00 $ Non-residential habitually vacant buildings under 10,000 sq. ft. 1,000.00 $ Non-residential habitually vacant buildings 10,000 sq. ft. or greater 2,000.00 $ *A registration fee will not be required for a habitually vacant building in any year in which the property owner has provided the town with satisfactory proof of occupancy prior to November 1. Enforcement Abatement Fees: Administrative Fee: 100.00 $ (Effective January 1, 2026) Grass and Weed Cutting: Minimum Charge 100.00 $ Per hour per person spent on site: 100.00 $ Refuse and Debris Removal Minimum Charge 50.00 $ Per hour per person spent on site: 50.00 $ Per hour per person spent removing and disposing the collected refuse and debris: 50.00 $ Landfill disposal fees: as applicable *If appeal is successful, this fee shall be refunded to the applicant **Includes 10% administrative overhead charge. Additional escrow may be required because 3 of 22 Town of Smyrna 2026 Fee Schedule Electric Construction Meter (Temporary): 50.00 $ Electric Meter Testing Fee: 50.00 $ (one free meter test every 3 years) Electric Meter Tampering and Theft: Utility Tampering Fee 500.00 $ Theft of Services Penalty 25.00 $ Cost of stolen Electric Varies Electric Department Billable Rates: Labor Rate 65.00 $ per hour Pick-up Truck 35.00 $ per hour Small Bucket 150.00 $ per hour Large Line Truck 150.00 $ per hour Large Bucket 150.00 $ per hour Medium Bucket 150.00 $ per hour Trencher 100.00 $ per hour Line Truck 150.00 $ per hour Electric System Impact Fees: Residential: 1,671.80 $ per EDU Commercial: Electric Utility Rates: Application Fee: 50.00 $ Residential Meter Deposit: 200.00 $ Commercial Deposit: Calculated Varies based on KVA rating Electric Fees 4 of 22 Town of Smyrna 2026 Fee Schedule Power Adjust Cost (PPCAC): 0.0244 $ per kWH Environment Fund Rate: 0.000178 $ per kWH Administrative Fee (Disconnect Related): During Business Hours 50.00 $ After Business Hours 100.00 $ Late Fees 7% of unpaid balance Returned Check Fee $55.00 Year 2 Year 3 Year 4 2024 2025 2026 Customer Charge: Energy Charge: 19.00 $ 20.00 $ 25.00 $ 0-500 kWH 0.1198 $ 0.1198 $ 0.1198 $ Over 500 kWH 0.1198 $ 0.1198 $ 0.1198 $ Year 2 Year 3 Year 4 Customer Charge: 2024 2025 2026 Energy Charge: 28.00 $ 30.00 $ 31.50 $ per kWH 0.1321 $ 0.1278 $ 0.1278 $ Year 2 Year 3 Year 4 2024 2025 2026 Small General Service (3,500 kwh to 75kW) Customer Charge: 75.00 $ 50.00 $ 52.50 $ Energy Charge: 0.0780 $ 0.080 $ 0.080 $ Demand Charge: 13.50 $ 13.00 $ 13.65 $ Industrial: Residential: Commercial: 5 of 22 Town of Smyrna 2026 Fee Schedule Medium General Service (75kW Demand to 200kW) Customer Charge: 100.00 $ 100.00 $ 105.00 $ Energy Charge: 0.0717 $ 0.0702 $ 0.0702 $ Demand Charge: 14.50 $ 14.50 $ 15.23 $ Large General Service (above 200kW) Customer Charge: 175.00 $ 200.00 $ 210.00 $ Energy Charge: 0.0682 $ 0.06525 $ 0.06525 $ Demand Charge: 15.50 $ 16.00 $ 16.80 $ 6 of 22 Town of Smyrna 2026 Fee Schedule Parks and Recreation Impact Fee: Residential Single Family: $4,539.68 per unit Residential Multi-Family: $2,543.60 per Unit Fields, Pavilion, & Park Rental Fees: General Park Use (parties, picnics, reunions, etc.) town residents / non- residents Pavilion 1 $25 for 4 hours/ $40 for 4 hours closer to play area, 20-25 people $25 for 2 additional areas/ $40 for 2 additional hours Pavilion 2 $25 for 4 hours/ $40 for 4 hours closer to fields, 20-25 people $25 for 2 additional areas/ $40 for 2 additional hours Gazebo $50 for 4 hours / $75 for 4 hours $50 for 2 additional hours / $75 for 2 additional hours Electric Use $100 for 4 hours / $125 for 4 hours Softball field 1 - west facing $50 for 4 hours / $75 for 4 hours $50 for 2 additional hours $50/hr for lights Softball field 2 - east facing $50 for 4 hours / $75 for 4 hours $50 for 2 additional hours Above fees are for less than 100 attendees. League Practice and/or Play: Softball field 1 - west facing $300, 1-3 times weekly, up to 12 weeks, add'l fees if 12+ weeks Softball field 2 - east facing $300, 1-3 times weekly, up to 12 weeks, add'l fees if 12+ weeks Football field - north end of park; Separate parking lot $300, 1-3 times weekly, up to 12 weeks, add'l fees if 12+ weeks $50/hr for lights Lake Como: General Park Use (parties, picnics, reunions, etc.) Pavilion 1 - in front of dock $25 for 4 hours/ $40 for 4 hours $25 for 2 additional areas There will be additional fees for more than 100 attendees. Individuals must also obtain pre-approval from the Town and complete a Police Dept event form, all subject to review. The park is open 8:00 a.m. to 8:00 p.m. during the summer and 8:00 a.m. to 5:00 p.m. during the winter. Pavilion rentals are available during these times. League reservations do not grant exclusive use of the field/s. The town reserves the right to assign and use the facilities on non-scheduled days. Permits will be discussed with the Police Department to verify if parking or road issues need to be addressed. Parks & Recreation Fees 7 of 22 Town of Smyrna 2026 Fee Schedule Pavilion 2 - center pavilion $25 for 4 hours/ $40 for 4 hours $25 for 2 additional areas Pavilion 3 - close to entrance $25 for 4 hours/ $40 for 4 hours $25 for 2 additional areas Water events $100 / hours Pavilions and beach area are open Memorial Day weekend to Labor Day weekend. Special Events for GCW or Lake Como Deposits are refundable. Areas must be clean and neatly kept before, during, and after the event. Any large scale event that requires the full use the park's facilities and may require the closure of the park to the public, will first be reviewed by the Town Manager's office, Smyrna Police Department, and/or the Parks & Recreation Committee. Requestee is required to provide a detailed outline of event, Certificate of Insurance, discuss parking, road closure, and/or needed police presence. Fee will be based on size of event but will be no less than a $100 deposit and a $500 fee. 8 of 22 Town of Smyrna 2026 Fee Schedule Major Subdivision Plan Application (four or more lots): Concept Plan Application Fee: 500.00 $ Preliminary Plan Application Fee: 500.00 $ Per additional lot: 25.00 $ Final Plan Application Fee: 500.00 $ Per additional lot: 25.00 $ Engineering and Legal Review Fees: As applicable Public Improvements Inspection Escrow: 1,000.00 $ Per additional lot: 100.00 $ Electrical System Escrow** As determined for each project Minor Subdivision Plan Application (three lots or less): Application Fee: 500.00 $ Engineering and Legal Review Fees: As applicable Public Improvements Inspection Escrow: 1,000.00 $ Per additional lot: 100.00 $ Electrical System Escrow** As determined for each project Major Resubdivision Plan Application: Preliminary Plan Fee: 500.00 $ Final Plan Fee: 500.00 $ Engineering and Legal Review Fees: As applicable Minor Resubdivision Plan Application: Application Fee: 250.00 $ Engineering and Legal Review Fees: As applicable Category A Site Plan Application (Over 50,000 sq. ft. or 50 multi-family dwelling units): Concept Category A Site Plan Application Fee: 750.00 $ Preliminary Category A Site Plan Application Fee: 750.00 $ Per additional 1,000 sq. ft/ 50.00 $ Planning & Development Fees (Additional escrow may be required based on actual inspection costs) (Additional escrow may be required based on actual inspection costs) (Additional escrow may be required based on actual inspection costs) (Additional escrow may be required based on actual inspection costs) 9 of 22 Town of Smyrna 2026 Fee Schedule Final Category A Site Plan Application Fee: 750.00 $ Per additional 1,000 sq. ft/ 50.00 $ Engineering and Legal Review Fees: As applicable Public Improvements Inspection Escrow: 1,000.00 $ Per additional lot: 100.00 $ Electrical System Escrow** As determined for each project Category B Site Plan Application (Less than 50,000 sq. ft. or 50 multi-family dwelling units): Concept Category B Site Plan Application Fee: 500.00 $ Preliminary Category B Site Plan Application Fee: 500.00 $ Per additional 1,000 sq. ft/ 50.00 $ Final Category B Site Plan Application Fee: 500.00 $ Per additional 1,000 sq. ft/ 50.00 $ Engineering and Legal Review Fees: As applicable Public Improvements Inspection Escrow: 1,000.00 $ Per additional lot: 100.00 $ Electrical System Escrow** As determined for each project Category C Site Plan Application (Minor - Commercial/Industrial/Office Additions): Concept Category C Site Plan Application Fee: 500.00 $ Rezoning Application: Base Fee: 450.00 $ Each additional acre: 25.00 $ Variance Application: Residential: 450.00 $ Non-Residential: 650.00 $ Conditional Use Application: 500.00 $ Special Exception Application: 300.00 $ Annexation: 500.00 $ Each additional acre: 50.00 $ (Additional escrow may be required based on actual inspection costs) (Additional escrow may be required based on actual inspection costs) 10 of 22 Town of Smyrna 2026 Fee Schedule Certificate of Zoning Compliance: 75.00 $ Zoning Appeal*: 450.00 $ Maintenance Bond: 10% of the cost of improvement installed or $5,000.00, whichever is greater Professional Service Fees: Fees charged the Town of Smyrna, plus 10%; Billed as encumbered. 11 of 22 Public Works Department Billable Rates: Labor Rate 65.00 $ Pick-up Truck 35.00 $ per hour Vac Truck 275.00 $ per hour Small Dump Truck 31.25 $ per hour Backhoe 56.25 $ per hour Professional Service Fees: Construction Inspector Fee $75.00 per hour Professional Service Fees: Public Work Fees Fees charged the Town of Smyrna, plus 10%; Billed as encumbered. 2026 12 of 22 Town of Smyrna 2026 Fee Schedule Trash Customer Charge: 38.00 $ 1 Trash Bin & 1 Recycle Bin Each Additional Bin 9.91 $ Scheduled Bulk Pick Up 75.00 $ Trash Fees: 13 of 22 Town of Smyrna 2026 Fee Schedule Fees for water and sewer connections servicing individual residential units shall be as follows: (1) Water or sewer connections installed by private contractor: a. Within town limits - $300 per each water or sewer connection b. Outside town limits - $450 per each water or sewer connection a. Within town limits - $400 per each water connection b. Outside town limits - $600 per each water connection a. Within town limits - $550 per each sewer connection b. Outside town limits - $825 per each sewer connection Fees for water and sewer connections servicing multi-family residential buildings and all non­ residential buildings shall be as follows: (1) Water or sewer connections within town limits installed by private contractor: a. Lines less than 4" - $450 per each water or sewer connection b. 4" to 6" line - $1,000 per each water or sewer connection c. 8" or larger line - $1,550 per each water or sewer connection a. Lines less than 4" - $675 per each water or sewer connection b. 4" to 6" line - $1,225 per each water or sewer connection c. 8" or larger line - $1,775 per each water or sewer connection Water and Sewer Fees: (3) Sewer connections installed by the Town shall be assessed the following fee, plus town labor and material costs: (2) Water connections installed by the Town shall be assessed the following fee, plus town labor and material costs: (3) Water or sewer connections within town limits installed by the Town shall be assessed the following fees plus town labor and material costs: (2) Water or sewer connections outside of town limits installed by private contractor: 14 of 22 Town of Smyrna 2026 Fee Schedule a. Lines less than 4" - $575 per each water or sewer connection b. 4" to 6" line - $1,125 per each water or sewer connection c. 8" or larger line - $1,675 per each water or sewer connection a. Lines less than 4" - $1,150 per each water or sewer connection b. 4" to 6" line - $1,700 per each water or sewer connection c. 8" or larger line - $2,250 per each water or sewer connection Bulk Water Rate: Per Load 50.00 $ Per 1,000 Gallons 22.00 $ Administrative Fee (After hours or Unlogged Loads) 25.00 $ Water Impact Fee (South Utility Service Area): Residential Single Family: 1,348.07 $ per Unit Residential Multi-Family: 754.44 $ per Unit Nonresidential 5/8" meter: 1,348.07 $ per meter Nonresidential 3/4" meter: 2,022.11 $ per meter Nonresidential 1" meter: 3,370.17 $ per meter Nonresidential 1.5" meter: 6,740.34 $ per meter Nonresidential 2" meter: 10,783.35 $ per meter Nonresidential 3" meter: 21,567.89 $ per meter Nonresidential 4" meter: 33,699.32 $ per meter Nonresidential 6" meter: 67,398.65 $ per meter (4) Water or sewer connections outside of town limits installed by Town shall be assessed the following fees plus town labor and material costs: 15 of 22 Town of Smyrna 2026 Fee Schedule Nonresidential 8" meter: 107,838.30 $ per meter Water Impact Fee (North Utility Service Area): Residential Single Family: 3,031.97 $ per Unit Residential Multi-Family: 1,698.10 $ per Unit Nonresidential 5/8" meter: 3,031.97 $ per meter Nonresidential 3/4" meter: 4,549.15 $ per meter Nonresidential 1" meter: 7,581.11 $ per meter Nonresidential 1.5" meter: 15,162.21 $ per meter Nonresidential 2" meter: 24,259.30 $ per meter Nonresidential 3" meter: 48,519.79 $ per meter Nonresidential 4" meter: 75,811.06 $ per meter Nonresidential 6" meter: 151,623.31 $ per meter Nonresidential 8" meter: 242,596.57 $ per meter Sewer Impact Fee (South Utility Service Area): Residential Single Family: 642.65 $ per Unit Residential Multi-Family: 354.75 $ per Unit Nonresidential 5/8" meter: 642.65 $ per meter Nonresidential 3/4" meter: 948.39 $ per meter Nonresidential 1" meter: 1,581.04 $ per meter Nonresidential 1.5" meter: 3,162.04 $ per meter Nonresidential 2" meter: 5,059.99 $ per meter Nonresidential 3" meter: 10,118.79 $ per meter Nonresidential 4" meter: 15,811.42 $ per meter Nonresidential 6" meter: 31,622.84 $ per meter 16 of 22 Town of Smyrna 2026 Fee Schedule Nonresidential 8" meter: 50,596.29 $ per meter Sewer Impact Fee (North Utility Service Area): Residential Single Family: 2,178.19 $ per Unit Residential Multi-Family: 1,219.18 $ per Unit Nonresidential 5/8" meter: 2,178.19 $ per meter Nonresidential 3/4" meter: 3,267.29 $ per meter Nonresidential 1" meter: 5,445.49 $ per meter Nonresidential 1.5" meter: 10,890.96 $ per meter Nonresidential 2" meter: 17,425.55 $ per meter Nonresidential 3" meter: 34,849.91 $ per meter Nonresidential 4" meter: 54,452.47 $ per meter Nonresidential 6" meter: 108,906.12 $ per meter Nonresidential 8" meter: 174,249.55 $ per meter Sewer and Water Capital Recovery Connection Fee: 3,323.42 $ (North of Duck Creek - In and Out of Town Limits) Water & Sewer Rates: Application Fee: 50.00 $ Residential Meter Deposit: 200.00 $ Commercial Deposit: Calculated Late Fees 7% of unpaid balance Returned Check Fee $55.00 Year 2 Year 3 Year 4 Water Inside Town Limits: 2024 2025 2026 Fixed Charge Per Month 24.90 $ 25.65 $ 28.22 $ 0-3,000 Gallons an additional 1.20 $ 1.70 $ 1.87 $ Residential, Commercial & Industrial Single Unit: 17 of 22 Town of Smyrna 2026 Fee Schedule 3,001-4,000 Gallons an additional 5.20 $ 3.90 $ 4.29 $ 4,001-6,000 Gallons an additional 6.60 $ 4.50 $ 4.95 $ 6,001-7,000 Gallons an additional 6.60 $ 4.50 $ 4.95 $ 7,001-10,000 Gallons an additional 11.40 $ 10.40 $ 11.44 $ Over 10,001 Gallons an additional 8.40 $ 7.55 $ 8.31 $ Water Outside Town Limits: Fixed Charge Per Month 49.80 $ 51.30 $ 56.43 $ 0-3,000 Gallons an additional 2.40 $ 3.40 $ 3.74 $ 3,001-4,000 Gallons an additional 10.40 $ 7.80 $ 8.58 $ 4,001-6,000 Gallons an additional 13.20 $ 9.00 $ 9.90 $ 6,001-7,000 Gallons an additional 13.20 $ 9.00 $ 9.90 $ 7,001-10,000 Gallons an additional 22.80 $ 20.80 $ 22.88 $ Over 10,001 Gallons an additional 16.80 $ 15.10 $ 16.61 $ Sewer Inside Town Limits: Fixed Charge Per Month 38.40 $ 39.35 $ 44.07 $ 0-3,000 Gallons an additional 1.20 $ 2.30 $ 2.58 $ Over 3,000 (per thousand Gallons) 7.55 $ 5.85 $ 6.55 $ Sewer Town Limits: Fixed Charge Per Month 76.80 $ 78.70 $ 88.14 $ 0-3,000 Gallons an additional 2.40 $ 4.60 $ 5.15 $ Over 3,000 (per thousand Gallons) 15.10 $ 11.70 $ 13.10 $ Yard Inside Town Limits: Fixed Charge April - October Only 8.75 $ 10.00 $ 11.00 $ 0-3,000 Gallons an additional 1.00 $ 1.50 $ 1.65 $ 3,001-4,000 Gallons an additional 4.31 $ 3.00 $ 3.30 $ 4,001-6,000 Gallons an additional 5.50 $ 3.40 $ 3.74 $ 6,001-7,000 Gallons an additional 5.50 $ 3.40 $ 3.74 $ 7,001-10,000 Gallons an additional 9.50 $ 8.50 $ 9.35 $ Over 10,001 Gallons an additional 7.00 $ 6.15 $ 6.77 $ Yard Outside Town Limits: Fixed Charge April - October Only 17.50 $ 20.00 $ 22.00 $ 0-3,000 Gallons an additional 2.00 $ 3.00 $ 3.30 $ 3,001-4,000 Gallons an additional 8.62 $ 6.00 $ 6.60 $ 4,001-6,000 Gallons an additional 11.00 $ 6.80 $ 7.48 $ 6,001-7,000 Gallons an additional 11.00 $ 6.80 $ 7.48 $ 7,001-10,000 Gallons an additional 19.00 $ 17.00 $ 18.70 $ Over 10,001 Gallons an additional 14.00 $ 12.30 $ 13.53 $ Commercial Multi - Unit: 18 of 22 Town of Smyrna 2026 Fee Schedule Multi-Unit Apartment Buildings Year 2 Year 3 Year 4 Water: Inside Town Limits: 2024 2025 2026 6 Unit Fixed Charge Per Month 184.50 $ 202.95 $ Per 1,000 gallons over 18,000 7.55 $ 8.31 $ 8 Unit Fixed Charge Per Month 246.00 $ 270.60 $ Per 1,000 gallons over 24,000 7.55 $ 8.31 $ 10 Unit Fixed Charge Per Month 307.50 $ 338.25 $ Per 1,000 gallons over 30,000 7.55 $ 8.31 $ 12 Unit Fixed Charge Per Month 369.00 $ 405.90 $ Per 1,000 gallons over 36,000 7.55 $ 8.31 $ 14 Unit Fixed Charge Per Month 430.50 $ 473.55 $ Per 1,000 gallons over 42,000 7.55 $ 8.31 $ Outside Town Limits: 6 Unit Fixed Charge Per Month 369.00 $ 405.90 $ Per 1,000 gallons over 18,000 15.10 $ 16.61 $ 8 Unit Fixed Charge Per Month 492.00 $ 541.20 $ Per 1,000 gallons over 24,000 15.10 $ 16.61 $ 10 Unit Fixed Charge Per Month 615.00 $ 676.50 $ Per 1,000 gallons over 30,000 15.10 $ 16.61 $ 12 Unit Fixed Charge Per Month 738.00 $ 811.80 $ Per 1,000 gallons over 36,000 15.10 $ 16.61 $ 14 Unit Fixed Charge Per Month 861.00 $ 947.10 $ Per 1,000 gallons over 42,000 15.10 $ 16.61 $ Sewer: Inside Town Limits: 6 Unit Fixed Charge Per Month 277.50 $ 310.80 $ Per 1,000 gallons over 18,000 5.85 $ 6.55 $ 8 Unit Fixed Charge Per Month 370.00 $ 414.40 $ Per 1,000 gallons over 24,000 5.85 $ 6.55 $ 10 Unit Fixed Charge Per Month 462.50 $ 518.00 $ Per 1,000 gallons over 30,000 5.85 $ 6.55 $ 12 Unit Fixed Charge Per Month 555.00 $ 621.60 $ Per 1,000 gallons over 36,000 5.85 $ 6.55 $ 14 Unit Fixed Charge Per Month 647.50 $ 725.20 $ Per 1,000 gallons over 42,000 5.85 $ 6.55 $ Outside Town Limits: 6 Unit Fixed Charge Per Month 555.00 $ 621.60 $ Per 1,000 gallons over 18,000 11.70 $ 13.10 $ 8 Unit Fixed Charge Per Month 740.00 $ 828.80 $ Per 1,000 gallons over 24,000 11.70 $ 13.10 $ 10 Unit Fixed Charge Per Month 925.00 $ 1,036.00 $ Per 1,000 gallons over 30,000 11.70 $ 13.10 $ 12 Unit Fixed Charge Per Month 1,110.00 $ 1,243.20 $ 19 of 22 Town of Smyrna 2026 Fee Schedule Per 1,000 gallons over 36,000 11.70 $ 13.10 $ 14 Unit Fixed Charge Per Month 1,295.00 $ 1,450.40 $ Per 1,000 gallons over 42,000 11.70 $ 13.10 $ 20 of 22 Town of Smyrna 2026 Fee Schedule Municipal Facilities Impact Fee: Residential Single Family: 2,276.34 $ per Unit Residential Multi-Family: 1,274.74 $ per Unit Commercial: 1,798.61 $ per 1,000 sq. ft Industrial: 1,252.29 $ per 1,000 sq. ft Office/Industrial: 2,282.26 $ per 1,000 sq. ft Police Impact Fee: Residential Single Family: 249.51 $ per Unit Residential Multi-Family: 139.53 $ per Unit Commercial: 394.96 $ per 1,000 sq. ft Industrial: 79.23 $ per 1,000 sq. ft Office/Industrial: 154.91 $ per 1,000 sq. ft Fire Department Impact Fees: Residential Single Family: 2,035.42 $ per Unit Residential Multi-Family: 1,324.72 $ per Unit Commercial: 1,379.26 $ per 1,000 sq. ft Industrial: 1,228.86 $ per 1,000 sq. ft Office/Industrial: 2,113.10 $ per 1,000 sq. ft Institutional: 1,854.44 $ per 1,000 sq. ft Ambulance Impact Fees: Residential Single Family: 634.68 $ per Unit Residential Multi-Family: 446.26 $ per Unit Commercial: 1,242.91 $ per 1,000 sq. ft Industrial: 1,228.86 $ per 1,000 sq. ft Office/Industrial: 241.31 $ per 1,000 sq. ft Other Impact Fees: 21 of 22 Town of Smyrna 2026 Fee Schedule Institutional: 391.96 $ per 1,000 sq. ft Kent County Impact Fees: Main System Capital Improvement Fee: Residential 3,277.00 $ per Dwelling Unit (Effective July 1, 2026 3,392.00 $ per Dwelling Unit) Commercial Varies based on EDU calculation District Expansion Fee: Residential 2,813.13 $ per Dwelling Unit Commercial Varies based on EDU calculation 22 of 22