{
 "answer": "The Town of Hudson, Wyoming has 2 adopted ordinances on file: Ordinance 859 (Utility Rate Schedule - Water/Sewer); Ordinance No. 829 (Chapter 15 - Water Meter Pits, Installation, Connections), verified 2026-09-22.",
 "municipality_id": "gx-031360",
 "municipality": "Hudson",
 "status_type": "Town",
 "jurisdiction": "Wyoming",
 "country": "US",
 "topic": "water_sewer",
 "label": "Water & sewer",
 "status": "found",
 "last_verified": "2026-09-22",
 "official_website": null,
 "documents": [
  {
   "primary": true,
   "is_official": true,
   "title": "Ordinance 859 (Utility Rate Schedule - Water/Sewer)",
   "category": "water_sewer",
   "document_type": "code_chapter",
   "status": "adopted",
   "adopted_date": null,
   "document_url": "https://www.hudsonwy.org/wp-content/uploads/2026/06/Ordinance-859-Utility-Rate-Increase.pdf",
   "summary": "Adopts a new water and sewer utility rate schedule effective July 1, 2026, following a Level 1 Water Study and Wastewater PER, repealing prior rate ordinances.",
   "document_number": "859",
   "link_dead": false
  },
  {
   "primary": true,
   "is_official": true,
   "title": "Ordinance No. 829 (Chapter 15 - Water Meter Pits, Installation, Connections)",
   "category": "water_sewer",
   "document_type": "code_chapter",
   "status": "adopted",
   "adopted_date": null,
   "document_url": "https://www.hudsonwy.org/wp-content/uploads/2022/09/ORDINANCE-NO-829-Water-Meter-Pits.pdf",
   "summary": "Requires water meter pits for new construction/mobile homes, sets responsibility for meter/line installation and repair costs, and requires a utility excavation permit to tap Town water mains.",
   "document_number": "829",
   "link_dead": false
  }
 ],
 "source": "https://govanswers.org/us/wy/hudson/water-sewer/"
}