Planning and Permitting Application Fee Schedule (effective January 1, 2026)

Brooks, Alberta · summary & facts

This is the exact embedded text of the captured official document. Snapshot a994b0dc4e85 · verified 2026-09-27 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

New Single Family Dwelling $150 New Multi Unit Dwelling (duplex/townhouse/ $150 for the first unit plus apartment) $100 for each additional unit to a maximum of four (4) Accessory Building/Structure over 10m2 $150 Additions/Secondary Suites $100 Home Occupation 2 $100 Home Occupation 3 $200 Demolition Permit $150 Discretionary Uses (includes variances) in addition to any other fee $200 Minor Variance for permitted uses (includes all) in addition to any other fee $75 Major Variance for permitted uses (includes all) in addition to any other fee $200 New Construction/Additions < 5,000 sqft (gfa) $250 5,001 - 20,000 sqft $350 20,001 - 50,000 sqft $550 > 50,000 sqft $1,000 Intensification of Use $250 Shipping Container $100 Demolition Permit $150 Discretionary Uses (including variances) in addition to any other fee $200 Minor Variance for permitted uses (includes all) in addition to any other fee $75 Major Variance for permitted uses (includes all) in addition to any other fee $200 Change in Use $100 New Use $100 Sign Permits $80 LUB Amendment $800 Outline Plan Adoption $1,000 ASP Amendment $800 ASP Adoption $1,500 MDP/IMDP Amendment $800 SDAB Appeal $150 (if appellant is successful, fee is refunded) Subdivision Application $750 plus $350 per new lot Subdivision Time Extension (1st Request) $350 Subdivision Time Extension (2nd Request) $450 Subdivision Time Extension (3rd Request) $550 Subdivision Endorsement $220 per lot Condominium Application $40 per unit Land Title Search $25 Certificate of Compliance $75 Records Search $125 Request for Extension 6 months $0 Additional 6 months 10% of permit fee, minimum $125 Alternative Solutions / Variances $150/hour, minimum 2 hour charge Additional Work Found During Inspection $75 Changes to Drawings or Design After Permit Issuance $150 Planning and Permitting Application Fee Schedule (effective January 1 2026) Residential Development Permits Non-Residential Development Permits Planning Applications Records Searches Miscellaneous Building, Gas, Electrical Fees Minimum Fee $225 New Construction $7.00 per $1000 of Project Value Additions $7.00 per $1000 of Project Value Accessory Structures $7.00 per $1000 of Project Value Structural Alterations/Basement Development/Decks/Secondary Suites $7.00 per $1000 of Project Value Wood Burning Stove/Fire Place $225 Hot Tub/Swimming Pool $225 Alternate Energy Permits $225 Demolition Permit $225 Additional Inspection Requested or Re-Inspection Required $125 Safety Code Council Levy 4% of building permit fee up to a maximum of $560 Minimum Fee $300 New Construction/Additions/Structural Alterations $7.00 per $1000 of Project Value Shipping Container $300 Change in Classification/Occupancy in addition to any other fee $260 Demolition Permit $300 Alternate Energy Permits $7.00 per $1000 of Project Value Fire Supression/Sprinkler System/HVAC Installation $7.00 per $1000 of Project Value Additional Inspection Requested or Re-Inspection Required $125 Safety Code Council Levy 4% of building permit fee to a maximum of $560 Single Family Dwellings, Additions Up to 1000 sqft $225 1001-1200 sqft $250 1201-1500 sqft $275 1501-2000 sqft $300 2001-2500 sqft $325 Over 2500 sqft $325 plus $0.10 per sqft Temporary Power/ Underground Service $225 Permanent Service Connection $225 Alternate Energy (Solar, Wind) $225 Additional Inspection Requested or Re-Inspection Required $125 Safety Code Council Levy 4% of electrical permit fee up to a maximum of $560 Other than Single Family Dwellings, Additions and Residential $0.00 - $2,500 Installation Cost $225 $2,501 - $5,000 Installation Cost $250 $5,001 - $7,500 Installation Cost $300 $7,501 - $10,000 Installation Cost $350 $10,001 - $20,000 Installation Cost $475 $20,001 - $30,000 Installation Cost $600 $30,001 - $40,000 Installation Cost $725 $40,001 - $50,000 Installation Cost $875 $50,001 - $100,000 Installation Cost $1,100 $100,001 - $250,000 Installation Cost $1,300 $250,001 - $350,000 Installation Cost $1,650 $350,001 - $500,000 Installation Cost $1,900 $500,001 - $750,000 Installation Cost $2,500 $750,001 - $1,000,000 Installation Cost $3,000 Greater than $1,000,000 Divide total installation cost by $1,000 and then multiply by 3.000 Annual Electrical Maintenance $375 Additional Inspection Requested or Re-Inspection Required $125 Safety Code Council Levy 4% of electrical permit fee up to a maximum of $560 Residenital and Non-Residential Installations Up to 20 fixtures $225 Over 20 fixtures $225 plus $5.00 per fixture Additional Inspection Requested or Re-Inspection Required $125 Safety Code Council Levy 4% of plumbing permit fee up to a maximum of $560 Residential Installations 1-5 Outlets $225 Non-Residential Building Permits Residential Electrical Permits Plumbing Permits Residential Gas Permits Non-Residential Electrical Permits Residential Building Permits 6-10 Outlets $250 11-15 Outlets $275 16-20 Outlets $325 Over 20 Outlets $325 plus $10 per outlet over 20 Propane Tank Set In addition to permit fee for number of outlets $225 Temporary Heat $225 Additional Inspection Requested or Re-Inspection Required $125 Safety Code Council Levy 4% of gas permit fee up to a maximum of $560 New and Replacement Installations 0 - 400,000 BTU $225 400,001 - 750,000 BTU $275 750,001 - 1,000,000 BTU $350 1,000,001 - 2,000,000 BTU $375 Over 2,000,000 BTU $375 plus $7 per 100,000 (or portion of) over 2,000,000 BTU Propane Tank Set In addition to permit fee for BTU input $225 Temporary Heat (Propane Installation) $250 Propane Cylinder Refill Centre $250 Additional Inspection Requested or Re-Inspection Required $125 Safety Code Council Levy 4% of gas permit fee up to a maximum of $560 Where development commences before a permit is issued, the permit fee is doubled. Non-Residential Gas Permits (Mutli-Family, Commercial, Industrial, Institutional)